The following is a detailed description of the changes made to each affected PINC on the PINC List in May 2012 and updated August 2013:
FIELD PINCS
PERMANENT ABANDONMENT Added PINC A-111
Change: PINC was added. Rationale: The PINC was added to address a requirement in the new
Drilling Safety Rule (RIN 1014-AA02) published in the the Federal Register, Vol 77, No. 163, Wednesday August 22, 2012.
Revised PINC A-102 Change: Step 2 of the “Inspection Procedure” section was revised by
adding a new isolation method, C, and reordering t he remaining steps alphabetically.
Rationale: Revision to the PINC was required to reflect a new requirement in the regulations at 30 CFR 250.1715(a)(3).
TEMPORARY ABANDONMENT
Revised PINC A-114 Change: Authority section was revised; Inspection Procedure item 2
was added. Rationale: Revision to the PINC was required to reflect a new requirement in
the new Drilling Safety Rule (RIN 1014-AA02).
Added PINCs A-121 through A-168 Change: PINCs were added. Rationale: The PINCs were added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02).
Summary of PINC Revision and Addition Records
PINC Team Meeting
1
SUBSEA BOP TEST/ACUATION/INSPECTION AND MAINTENACE
Added PINCs A-190 through A-201 Change: PINCs were added. Rationale: The PINC was added to reflect a requirement in the new Drilling
Safety Rule (RIN 1014-AA02).
SUBSEA BOP STUMP TEST
Added PINCs A-221 through A-224 Change: PINCs were added. Rationale: The PINCs was added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02).
BOP TESTS, ACTUATORS,
INSPECTIONS AND MAINTENANCE
Added PINC A-240 through A-246 Change: PINCs were added. Rationale: The PINCs were added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02).
WELL-COMPLETION OPERATIONS
Added PINC C-106 Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02).
Revised PINC C-107 Change: Form designations were changed. Rationale: Revisions to the PINCs were added to reflect new name of the
bureau of responsibility.
2
BOP TESTS, ACTUATORS, INSPECTIONS, AND MAINTENANCE Revised PINC C-135
Change: PINC title question was revised. Rationale: Revision to the PINC title question was made to reflect new
requirements of the Drilling Safety Rule (RIN 1014-AA02).
Added PINCS C-153 through C-155 Change: PINCs were added. Rationale: The PINCs were added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02). Revised PINC C-180
Change: Changed the term “glory-hole” to “well-cellar”. Rationale: Revision to the PINC title question was made to reflect new
requirements of the Drilling Safety Rule (RIN 1014-AA02).
BLOWOUT PREVENTER SYSTEM TESTS, INSPECTIONS, AND MAINTENANCE
Revised PINC C-183
Change: PINC was revised. Rationale: Revision to the PINC title question was made to reflect new
requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing steps.
Revised PINC C-184
Change: PINC was revised. Rationale: Revision to the PINC title question was made to reflect new
requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing steps.
Revised PINC C-185
Change: PINC title question and Inspection Procedure section were revised.
Rationale: Revision to the PINC title question; the addition of “during stump test” to step 1; and, inserting a new step 2 in the Inspection Procedure section were completed to better reflect the new requirements of the Drilling Safety Rule (RIN 1014-AA02).
3
Revised PINC C-188 Change: PINC title question and Note section were revised. Rationale: Revision to the PINC title question and inserting a new first note
were completed to better reflect the new requirements of the Drilling Safety Rule (RIN 1014-AA02).
MOVING DRILLING RIGS Revised PINC D-120
Change: PINC title question was revised. Rationale: Revision to the PINC title question was completed to better reflect
the new requirements of the Drilling Safety Rule (RIN 1014AA02).
CASING PROGRAM
Revised PINC D-158 Change: “IF NONCOMPLIANCE EXISTS” section was revised Rationale: Revision to the PINC was required to reflect the changes in
the Drilling Safety Rule (RIN 1014-AA02).. Revised PINC D-174
Change: BOEMRE was replaced with BSEE; added the words “or liner” to the PINC title question after “string”.
Rationale: Revisions to the PINCs were added to reflect new name of the bureau of responsibility.
Revised PINC D-178
Change: PINC title question and inspection procedure were revised. Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02).
Added PINC D-179
Change: PINC was added Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02),
specifically the new requirement for two barriers to flow in place before performing a negative pressure test.
4
BOP SYSTEMS AND COMPONENTS Revised PINC D-213
Change: Deleted the phrase, “MASP Installed” and substituted in “Maximum Anticipated Well-Head Pressure” where needed.
Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02) and
To focus the PINC language around the item being inspected.
Revised PINC D-226
Change: Removed “BOEMRE” and replaced it with “BSEE”; altered the “Inspection Procedure” section
Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02).
SUBSEA BOP SYSTEMS Revised PINC D-240
Change: Note section was modified to expressly indicate workstring a nd tubing should be recognized as potential “drill pipe” that may need to be sheared.
Rationale: The note was added to make sure that the blind shear ram is capable of shearing a ny drill pipe in the hole under MASP.
Revised PINC D-243
Change: The words “well cellar” was substituted in place of the words “glory hole” in the PINC title question and elsewhere in the PINC.
Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02). .
Revised PINC D-248
Change: Placed definitions for an autoshear and a deadman system above the Inspection Procedure section of this PINC.
Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02).
5
Revised PINC D-283 Change: Added authority 30 CFR 250.449(b) to the PINC; added
“within 30 days of the stump test” to step one of the Inspection Procedure.
Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02).
Revised PINC D-290 Change: Replaced “BOEMRE” with “BSEE” Rationale: Revision to the PINC was required to reflect the bureau’s
reorganization. Revised PINC D-416
Change: Added “AND/OR RISER” to the PINC title question; added “volumes and rates of” to step 2.d. of the Inspection Procedure between the words “monitor” and “fluids”.
Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02).
Revised PINC D-463
Change: Replaced “BOEMRE” with “BSEE” in the form designations in the Note section inserted on the PINC.
Rationale: Revision to the PINC was required to reflect the bureau’s reorganization.
BOP TESTS, ACTUATORS, INSPECTIONS, AND MAINTENANCE Revised PINC D-500
Change: Changed the API RP 53 reference in the title question from 17.10.1 and 18.10.1 to 17.10 and 18.10, respectively. Added “for subsea stacks, or before well operations on surface stacks” to the end of the Inspection Procedure section text.
Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02).
Revised PINC D-501 Change: Changed the API RP 53 reference in the title question from
17.10.3 and 18.10.3 to 17.10 and 18.10, respectively. Deleted “of your last major inspection, whichever is longer” from the end of the Note included in the PINC and replaced it with “the records are created or longer if directed by BSEE.”
Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02) and
to ensure the reference included the all of the appropriate information.
6
Revised PINC D-502
Change: Changed the API RP 53 reference in the title question from 17.11.1 and 18.11.1 to 17.11 and 18.11, respectively.
Rationale: Revision to the PINC was made to ensure the reference included the all of the appropriate information.
Revised PINC D-503
Change: Changed the API RP 53 reference in the title question from 17.12.2 and 18.12.2 to 17.12 and 18.12, respectively
Rationale: Revision to the PINC was made to ensure the reference included the all of the appropriate information.
.
Revised PINC D-504 Change: Changed the API RP 53 reference in the title question from
17.12.2 and 18.12.2 to 17.12 and 18.12, respectively; replaced “BOEMRE” with “BSEE”
Rationale: Revision to the PINC was made to ensure the reference included the all of the appropriate information and to reflect the bureau’s reorganization.
SUBSEA BOP SYSTEMS
Revised PINC D-600 Change: Deleted the phrase, “Depress test lights by pressing
pushbutton on control panel” from the Note section. Rationale: Improve clarity of the PINC be removing an unnecessary
statement.
Added PINC D-603 Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02).
Added PINC D-604 Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02).
7
STUMP TEST Revised PINC D-610
Change: Replaced “BOEMRE” with “BSEE” Rationale: Revision to the PINC was required to reflect the bureau’s
reorganization.
Revised PINC D-611
Change: Replaced “BOEMRE” with “BSEE” Rationale: Revision to the PINC was required to reflect the bureau’s
reorganization.
INITIAL INSTALLATION TEST Revised PINC D-612
Change: Added the phrase, “with the rov” to the title question; replaced “BOEMRE” with “BSEE” in the title question; and, added “and verify the closure of” to inspection procedure step 1a.
Rationale: The PINC was revised to reflect requirements in the new Drilling Safety Rule (RIN 1014-AA02).
Revised PINC D-613
Change: Replaced “BOEMRE” with “BSEE” in the title question; and, added “the closure of at least one set of blind-shear rams and” to inspection procedure step 1.
Rationale: PINC was revised to reflect requirements in the new Drilling Safety Rule (RIN 1014-AA02).
GENERAL Revised PINC G-113
Change: Replaced “BOEMRE” with “BSEE” in the title question and in Inspection Procedure step 1.
Rationale: Revision to the PINC was required to reflect the bureau’s reorganization.
Revised PINC G-115
Change: Replaced “BOEMRE” with “BSEE” in the Note included at the end of the PINC; modified several authorities.
Rationale: Revision to the PINC was required to reflect the bureau’s reorganization and to include the necessary authority citations.
8
Revised PINC G-116 Change: Replaced “BOEMRE” with “BSEE” in the Note included at
the end of the PINC; modified several authorities including 30 CFR 550.283. Also removed, regulatory authority 30 CFR 250.200 because that authority pertains to definitions of key terminology for 30 CFR Part 250 (now Part 550), Subpart B – Plans and Information. The authority sets no regulatory requirements, guidance, etc.
Rationale: Revision to the PINC was required to reflect the bureau’s reorganization and to include the necessary authority citations. The EED post-activity compliance reviews and inspections verify the submittal of required revised plans (e.g. EP, DPP, or DOCD) to account for changes to impacts of environmental resources (e.g. increase in air emissions, increase in handling and discharge of liquid and solid wastes, etc).
Revised PINC G-117 Change: Replaced “BOEMRE” with “BSEE” in the Note included at
the end of the PINC. Rationale: Revision to the PINC was required to reflect the bureau’s
reorganization. Revised PINC G-131
Change: Replaced “BOEMRE” with “BSEE” in the title question of the PINC.
Rationale: Revision to the PINC was required to reflect the bureau’s reorganization.
Revised PINC G-132
Change: Replaced “BOEMRE” with “BSEE” in the title question of the PINC.
Rationale: Revision to the PINC was required to reflect the bureau’s reorganization.
MARKING OF EQUIPMENT Revised PINC G-251
Change: Added authority 30 CFR 250.300(c)(4) Rationale: Revision to the PINC was required to include relevant authority
citations.
9
CRANE LIFTING: OPERATING PROCEDURES
Revised PINC I-102
Change: Corrected a portion of the leading question for the PINC Rationale: Revision to the PINC was required to change the citation from “API
RP 2C” to the correct “API SPEC 2C”.
BOP WELL-WORKOVER OPERATIONS
Added PINC W-106
Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02). Revised PINCs W-114 through W-213
Change: Adjusted the authority citations. Rationale: The PINC was revised to reflect the insertion of a new section 615
in 30 CFR 250 and the subsequent renumbering of the previously existing sections in the new Drilling Safety Rule (RIN 1014-AA02).
Revised PINC W-119
Change: Added “When the tree is removed” to the beginning of the title question of this PINC.
Rationale: The PINC was revised to better reflect the requirements in the new Drilling Safety Rule (RIN 1014-AA02).
Added PINC W-125
Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02).
Revised PINC W-141 Change: Added “THE LARGEST AND THE SMALLEST” to the title
question of this PINC. Rationale: The PINC was revised to better reflect the requirements in the new
Drilling Safety Rule (RIN 1014-AA02). Added PINC W-144
Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02).
10
Revised PINC W-152 Change: Added facility shut-in (S) enforcement code and drafted new
instructions under the IF NONCOMPLIANCE EXISTS header.
Rationale: The PINC was revised to acknowledge the situation where an inspector finds there has been a successful casing pressure test but it occurred beyond the 30-day limit.
Added PINC W-153
Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02).
Revised PINC W-156 Change: Added facility shut-in (S) enforcement code and drafted new
instructions under the IF NONCOMPLIANCE EXISTS header.
Rationale: The PINC was revised to acknowledge the situation where documentation indicates that each BOP component did not hold pressure for at least the required time period approved by the District Manager during a previous pressure test, but a subsequent successful test was completed.
Revised PINC W-195 Change: Modified the content and organization of the steps in the
INPSECTION PROCEDURE section. Rationale: The PINC was revised clarify the INSPECTION PROCEDURE
steps and to reflect requirements in the new Drilling Safety Rule (RIN 1014-AA02).
Revised PINC W-196 Change: Modified the information in the Definitions section of this
PINC. Rationale: The PINC was revised to improve the clarity of the PINC.
Revised PINC W-205 Change: Modified the content and organization of the steps in the
INPSECTION PROCEDURE section. Rationale: The PINC was revised clarify the INSPECTION PROCEDURE
steps and to reflect requirements in the new Drilling Safety Rule (RIN 1014-AA02).
Revised PINC W-208 Change: PINC title question was modified. Rationale: The PINC was added to reflect requirements in the new Drilling
11
Safety Rule (RIN 1014-AA02).
Revised PINC W-209 Change: PINC title question was modified by changing the API RP 53
citation from 17.11.1 and 18.11.1 to 17.11 and 18.11, respectively.
Rationale: Revision to the PINC was made to ensure the reference included the all of the appropriate information.
Revised PINC W-210
Change: PINC title question was modified by changing the API RP 53 citation from 17.12.1 and 18.12.1 to 17.12 and 18.12, respectively.
Rationale: Revision to the PINC was made to ensure the reference included the all of the appropriate information.
Revised PINC W-211
Change: PINC title question was modified by changing the API RP 53 citation from 17.12.1 and 18.12.1 to 17.12 and 18.12, respectively. Also, replaced “BOEMRE” with “BSEE”
Rationale: Revision to the PINC was made to ensure the reference included the all of the appropriate information and to recognize the reorganization of the bureau.
Added PINC W-212
Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02).
12
Added PINC W-213 Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling
Safety Rule (RIN 1014-AA02).
Office PINCs
GENERAL OPERATIONS
Revised PINC G-801
Change: Authorities were changed Rationale: Authorities were added to better reflect the requirements of Oil
and Gas and Sulphur Operations on the Outer Continental Shelf – Increased Safety Measures for Energy Development on the Outer Continental Shelf Rule (aka the Drilling Safety Rule) published Wednesday, August 22, 2012 in the Federal Register.
Revised PINC G-802
Change: Authorities were added Rationale: Authority was added to better reflect the requirements in the
Drilling Safety Rule. Revised PINC G-803
Change: Authority 30 CFR 550.280 was added and authority 30 CFR 250.200 was removed.
Rationale: Authority was added to better reflect the requirements in the Drilling Safety Rule. For 30 CFR 550.280, EED post-activity compliance reviews and inspections verify compliance with approved plans, e.g. EP, DPP, or DOCD. Authority 30 CFR 250.200 was removed because it pertains to definitions of key terminology for 30 CFR Part 250 (Now Part 550), Subpart B Plans and Information. The authority sets no regulatory requirements, guidance, etc.
13
RECORDS
Revised PINC G-811 Change: Five authorities were added including 30 CFR 550.283 Rationale: Authorities were added to better reflect the requirements in the
Drilling Safety Rule. Also, EED post-activity compliance reviews and inspections verify the submittal of required revised plans (e.g. EP, DPP, or DOCD) to account for changes to impacts of environmental resources (e.g. increase in air emissions, increase in handling and discharge of liquid and solid wastes, etc)
PLATFORMS AND STRUCTURES
Revised PINC G-821 Change: Inserted the word, “and”, between “inspected” and
“maintained”. Rationale: Word was added to clarify that Operators are expected to
carry out all the tasks identified to ensure structural integrity for safe conduct of drilling, workover, and production operations.
Revised PINC G-822 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
BONDING
Revised PINC G-831 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC G-832 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
14
TRAINING Revised PINC G-842
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC G-848
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC G-857
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC G-858
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC G-859
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC G-862
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
15
ACCIDENT REPORTING
Revised PINC G-892 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
ENVIRONMENTAL PROTECTION
OIL SPILL RESPONSE PLANS
Revised PINC E-802 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC E-821
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC E-822
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC E-831
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC E-832
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC E-833
Change: Rationale:
Exchanged “BSEE” for “BOEMRE”. Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made.
16
OIL SPILL R EPORTS
Revised PINC E-841 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC E-842
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
DRILLING PLAN APPROVAL
Revised PINC D-803
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
SUSTAINED PRESSURE CASING MANAGEMENT Revised PINC P-807
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC P-808
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
COMPANY INFORMATION Revised PINC L-851
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
17
CONSERVATION OF RESOURCES INTERESTS
Revised PINC P-803
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC P-804
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
PRODUCTION RATE
Revised PINC P-822 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
WELL TESTS Revised PINC P-832
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
CONSERVATION OF RESOURCES
(CIDs and Gas Cap Production) Revised PINC P-840
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC P-841
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
18
BOTTOMHOLE PRESSURE SURVEYS Revised PINC P-850
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC R-851
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
GEOLOGICAL AND GEOPHYSICAL EXPLORATION PERMITS
Revised PINC O-801
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC O-803
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
DATA Revised PINC O-811
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
Revised PINC O-812
Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made.
19
RENEWABLE ENERGY GENERAL PROVISIONS
Revised PINC T-800
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-801
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-802
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
COMPANY INFORMATION
Revised PINC T-803
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
BONDING
Revised PINC T-804 Change: Changed the authority citation and exchanged “BOEMRE” for
“BOEM” Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
20
Revised PINC T-805 Change: Changed the authority citation and exchanged “BOEMRE” for
“BOEM” Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-806
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
PLANS AND INFORMATION REQUIREMENTS
Revised PINC T-807 Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-808
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
SITE ASSESSMENT PLAN (SAP)
Revised PINC T-809 Change: Changed the authority citation and exchanged “BOEMRE” for
“BOEM” Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
21
CONSTURCTION AND OPERATION PLAN (COP)
Revised PINC T-810 Change: Changed the authority citation and exchanged “BOEMRE” for
“BOEM” Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
GENERAL ACTIVITY PLAN (GAP)
Revised PINC T-811 Change: Changed the authority citation and exchanged “BOEMRE” for
“BOEM” Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-812
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
CERTIFIED VERIFICATION AGENT Revised PINC T-813
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-814
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
22
ENVIRONMENTAL AND SAFETY MANAGEMENT INSPECTIONS, AND FACILITY ASSESSMENTS
Revised PINC T-815
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-816
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-817
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-818
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-819
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-820
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
23
Revised PINC T-821
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-822
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-823
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-824
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
EQUIPMENT FAILURE AND ADVERSE ENVIRONMENTAL EFFECTS
Revised PINC T-825 Change: Exchanged “BOEMRE” for “BOEM” Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-826
Change: Exchanged “BOEMRE” for “BOEM” Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
24
Revised PINC T-827
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-828
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-829
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-830
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-831
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-832
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
25
Revised PINC T-833 Change: Changed the authority citation and exchanged “BOEMRE” for
“BOEM” Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-834
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-835
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-836
Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity
with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-837
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
Revised PINC T-838
Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”
Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).
26
27
28