28
The following is a detailed description of the changes made to each affected PINC on the PINC List in May 2012 and updated August 2013: FIELD PINCS PERMANENT ABANDONMENT Added PINC A-111 Change: PINC was added. Rationale: The PINC was added to address a requirement in the new Drilling Safety Rule (RIN 1014-AA02) published in the the Federal Register, Vol 77, No. 163, Wednesday August 22, 2012. Revised PINC A-102 Change: Step 2 of the “Inspection Procedure” section was revised by adding a new isolation method, C, and reordering the remaining steps alphabetically. Rationale: Revision to the PINC was required to reflect a new requirement in the regulations at 30 CFR 250.1715(a)(3). TEMPORARY ABANDONMENT Revised PINC A-114 Change: Authority section was revised; Inspection Procedure item 2 was added. Rationale: Revision to the PINC was required to reflect a new requirement in the new Drilling Safety Rule (RIN 1014-AA02). Added PINCs A-121 through A-168 Change: PINCs were added. Rationale: The PINCs were added to reflect requirements in the new Drilling Safety Rule (RIN 1014-AA02). Summary of PINC Revision and Addition Records PINC Team Meeting 1

SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

The following is a detailed description of the changes made to each affected PINC on the PINC List in May 2012 and updated August 2013:

FIELD PINCS

PERMANENT ABANDONMENT Added PINC A-111

Change: PINC was added. Rationale: The PINC was added to address a requirement in the new

Drilling Safety Rule (RIN 1014-AA02) published in the the Federal Register, Vol 77, No. 163, Wednesday August 22, 2012.

Revised PINC A-102 Change: Step 2 of the “Inspection Procedure” section was revised by

adding a new isolation method, C, and reordering t he remaining steps alphabetically.

Rationale: Revision to the PINC was required to reflect a new requirement in the regulations at 30 CFR 250.1715(a)(3).

TEMPORARY ABANDONMENT

Revised PINC A-114 Change: Authority section was revised; Inspection Procedure item 2

was added. Rationale: Revision to the PINC was required to reflect a new requirement in

the new Drilling Safety Rule (RIN 1014-AA02).

Added PINCs A-121 through A-168 Change: PINCs were added. Rationale: The PINCs were added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02).

Summary of PINC Revision and Addition Records

PINC Team Meeting

1

Page 2: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

SUBSEA BOP TEST/ACUATION/INSPECTION AND MAINTENACE

Added PINCs A-190 through A-201 Change: PINCs were added. Rationale: The PINC was added to reflect a requirement in the new Drilling

Safety Rule (RIN 1014-AA02).

SUBSEA BOP STUMP TEST

Added PINCs A-221 through A-224 Change: PINCs were added. Rationale: The PINCs was added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02).

BOP TESTS, ACTUATORS,

INSPECTIONS AND MAINTENANCE

Added PINC A-240 through A-246 Change: PINCs were added. Rationale: The PINCs were added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02).

WELL-COMPLETION OPERATIONS

Added PINC C-106 Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02).

Revised PINC C-107 Change: Form designations were changed. Rationale: Revisions to the PINCs were added to reflect new name of the

bureau of responsibility.

2

Page 3: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

BOP TESTS, ACTUATORS, INSPECTIONS, AND MAINTENANCE Revised PINC C-135

Change: PINC title question was revised. Rationale: Revision to the PINC title question was made to reflect new

requirements of the Drilling Safety Rule (RIN 1014-AA02).

Added PINCS C-153 through C-155 Change: PINCs were added. Rationale: The PINCs were added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02). Revised PINC C-180

Change: Changed the term “glory-hole” to “well-cellar”. Rationale: Revision to the PINC title question was made to reflect new

requirements of the Drilling Safety Rule (RIN 1014-AA02).

BLOWOUT PREVENTER SYSTEM TESTS, INSPECTIONS, AND MAINTENANCE

Revised PINC C-183

Change: PINC was revised. Rationale: Revision to the PINC title question was made to reflect new

requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing steps.

Revised PINC C-184

Change: PINC was revised. Rationale: Revision to the PINC title question was made to reflect new

requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing steps.

Revised PINC C-185

Change: PINC title question and Inspection Procedure section were revised.

Rationale: Revision to the PINC title question; the addition of “during stump test” to step 1; and, inserting a new step 2 in the Inspection Procedure section were completed to better reflect the new requirements of the Drilling Safety Rule (RIN 1014-AA02).

3

Page 4: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

Revised PINC C-188 Change: PINC title question and Note section were revised. Rationale: Revision to the PINC title question and inserting a new first note

were completed to better reflect the new requirements of the Drilling Safety Rule (RIN 1014-AA02).

MOVING DRILLING RIGS Revised PINC D-120

Change: PINC title question was revised. Rationale: Revision to the PINC title question was completed to better reflect

the new requirements of the Drilling Safety Rule (RIN 1014­AA02).

CASING PROGRAM

Revised PINC D-158 Change: “IF NONCOMPLIANCE EXISTS” section was revised Rationale: Revision to the PINC was required to reflect the changes in

the Drilling Safety Rule (RIN 1014-AA02).. Revised PINC D-174

Change: BOEMRE was replaced with BSEE; added the words “or liner” to the PINC title question after “string”.

Rationale: Revisions to the PINCs were added to reflect new name of the bureau of responsibility.

Revised PINC D-178

Change: PINC title question and inspection procedure were revised. Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02).

Added PINC D-179

Change: PINC was added Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02),

specifically the new requirement for two barriers to flow in place before performing a negative pressure test.

4

Page 5: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

BOP SYSTEMS AND COMPONENTS Revised PINC D-213

Change: Deleted the phrase, “MASP Installed” and substituted in “Maximum Anticipated Well-Head Pressure” where needed.

Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02) and

To focus the PINC language around the item being inspected.

Revised PINC D-226

Change: Removed “BOEMRE” and replaced it with “BSEE”; altered the “Inspection Procedure” section

Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02).

SUBSEA BOP SYSTEMS Revised PINC D-240

Change: Note section was modified to expressly indicate workstring a nd tubing should be recognized as potential “drill pipe” that may need to be sheared.

Rationale: The note was added to make sure that the blind shear ram is capable of shearing a ny drill pipe in the hole under MASP.

Revised PINC D-243

Change: The words “well cellar” was substituted in place of the words “glory hole” in the PINC title question and elsewhere in the PINC.

Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02). .

Revised PINC D-248

Change: Placed definitions for an autoshear and a deadman system above the Inspection Procedure section of this PINC.

Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02).

5

Page 6: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

Revised PINC D-283 Change: Added authority 30 CFR 250.449(b) to the PINC; added

“within 30 days of the stump test” to step one of the Inspection Procedure.

Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02).

Revised PINC D-290 Change: Replaced “BOEMRE” with “BSEE” Rationale: Revision to the PINC was required to reflect the bureau’s

reorganization. Revised PINC D-416

Change: Added “AND/OR RISER” to the PINC title question; added “volumes and rates of” to step 2.d. of the Inspection Procedure between the words “monitor” and “fluids”.

Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02).

Revised PINC D-463

Change: Replaced “BOEMRE” with “BSEE” in the form designations in the Note section inserted on the PINC.

Rationale: Revision to the PINC was required to reflect the bureau’s reorganization.

BOP TESTS, ACTUATORS, INSPECTIONS, AND MAINTENANCE Revised PINC D-500

Change: Changed the API RP 53 reference in the title question from 17.10.1 and 18.10.1 to 17.10 and 18.10, respectively. Added “for subsea stacks, or before well operations on surface stacks” to the end of the Inspection Procedure section text.

Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02).

Revised PINC D-501 Change: Changed the API RP 53 reference in the title question from

17.10.3 and 18.10.3 to 17.10 and 18.10, respectively. Deleted “of your last major inspection, whichever is longer” from the end of the Note included in the PINC and replaced it with “the records are created or longer if directed by BSEE.”

Rationale: Revision to the PINC was required to reflect the changes in the Drilling Safety Rule (RIN 1014-AA02) and

to ensure the reference included the all of the appropriate information.

6

Page 7: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

Revised PINC D-502

Change: Changed the API RP 53 reference in the title question from 17.11.1 and 18.11.1 to 17.11 and 18.11, respectively.

Rationale: Revision to the PINC was made to ensure the reference included the all of the appropriate information.

Revised PINC D-503

Change: Changed the API RP 53 reference in the title question from 17.12.2 and 18.12.2 to 17.12 and 18.12, respectively

Rationale: Revision to the PINC was made to ensure the reference included the all of the appropriate information.

.

Revised PINC D-504 Change: Changed the API RP 53 reference in the title question from

17.12.2 and 18.12.2 to 17.12 and 18.12, respectively; replaced “BOEMRE” with “BSEE”

Rationale: Revision to the PINC was made to ensure the reference included the all of the appropriate information and to reflect the bureau’s reorganization.

SUBSEA BOP SYSTEMS

Revised PINC D-600 Change: Deleted the phrase, “Depress test lights by pressing

pushbutton on control panel” from the Note section. Rationale: Improve clarity of the PINC be removing an unnecessary

statement.

Added PINC D-603 Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02).

Added PINC D-604 Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02).

7

Page 8: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

STUMP TEST Revised PINC D-610

Change: Replaced “BOEMRE” with “BSEE” Rationale: Revision to the PINC was required to reflect the bureau’s

reorganization.

Revised PINC D-611

Change: Replaced “BOEMRE” with “BSEE” Rationale: Revision to the PINC was required to reflect the bureau’s

reorganization.

INITIAL INSTALLATION TEST Revised PINC D-612

Change: Added the phrase, “with the rov” to the title question; replaced “BOEMRE” with “BSEE” in the title question; and, added “and verify the closure of” to inspection procedure step 1a.

Rationale: The PINC was revised to reflect requirements in the new Drilling Safety Rule (RIN 1014-AA02).

Revised PINC D-613

Change: Replaced “BOEMRE” with “BSEE” in the title question; and, added “the closure of at least one set of blind-shear rams and” to inspection procedure step 1.

Rationale: PINC was revised to reflect requirements in the new Drilling Safety Rule (RIN 1014-AA02).

GENERAL Revised PINC G-113

Change: Replaced “BOEMRE” with “BSEE” in the title question and in Inspection Procedure step 1.

Rationale: Revision to the PINC was required to reflect the bureau’s reorganization.

Revised PINC G-115

Change: Replaced “BOEMRE” with “BSEE” in the Note included at the end of the PINC; modified several authorities.

Rationale: Revision to the PINC was required to reflect the bureau’s reorganization and to include the necessary authority citations.

8

Page 9: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

Revised PINC G-116 Change: Replaced “BOEMRE” with “BSEE” in the Note included at

the end of the PINC; modified several authorities including 30 CFR 550.283. Also removed, regulatory authority 30 CFR 250.200 because that authority pertains to definitions of key terminology for 30 CFR Part 250 (now Part 550), Subpart B – Plans and Information. The authority sets no regulatory requirements, guidance, etc.

Rationale: Revision to the PINC was required to reflect the bureau’s reorganization and to include the necessary authority citations. The EED post-activity compliance reviews and inspections verify the submittal of required revised plans (e.g. EP, DPP, or DOCD) to account for changes to impacts of environmental resources (e.g. increase in air emissions, increase in handling and discharge of liquid and solid wastes, etc).

Revised PINC G-117 Change: Replaced “BOEMRE” with “BSEE” in the Note included at

the end of the PINC. Rationale: Revision to the PINC was required to reflect the bureau’s

reorganization. Revised PINC G-131

Change: Replaced “BOEMRE” with “BSEE” in the title question of the PINC.

Rationale: Revision to the PINC was required to reflect the bureau’s reorganization.

Revised PINC G-132

Change: Replaced “BOEMRE” with “BSEE” in the title question of the PINC.

Rationale: Revision to the PINC was required to reflect the bureau’s reorganization.

MARKING OF EQUIPMENT Revised PINC G-251

Change: Added authority 30 CFR 250.300(c)(4) Rationale: Revision to the PINC was required to include relevant authority

citations.

9

Page 10: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

CRANE LIFTING: OPERATING PROCEDURES

Revised PINC I-102

Change: Corrected a portion of the leading question for the PINC Rationale: Revision to the PINC was required to change the citation from “API

RP 2C” to the correct “API SPEC 2C”.

BOP WELL-WORKOVER OPERATIONS

Added PINC W-106

Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02). Revised PINCs W-114 through W-213

Change: Adjusted the authority citations. Rationale: The PINC was revised to reflect the insertion of a new section 615

in 30 CFR 250 and the subsequent renumbering of the previously existing sections in the new Drilling Safety Rule (RIN 1014-AA02).

Revised PINC W-119

Change: Added “When the tree is removed” to the beginning of the title question of this PINC.

Rationale: The PINC was revised to better reflect the requirements in the new Drilling Safety Rule (RIN 1014-AA02).

Added PINC W-125

Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02).

Revised PINC W-141 Change: Added “THE LARGEST AND THE SMALLEST” to the title

question of this PINC. Rationale: The PINC was revised to better reflect the requirements in the new

Drilling Safety Rule (RIN 1014-AA02). Added PINC W-144

Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02).

10

Page 11: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

Revised PINC W-152 Change: Added facility shut-in (S) enforcement code and drafted new

instructions under the IF NONCOMPLIANCE EXISTS header.

Rationale: The PINC was revised to acknowledge the situation where an inspector finds there has been a successful casing pressure test but it occurred beyond the 30-day limit.

Added PINC W-153

Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02).

Revised PINC W-156 Change: Added facility shut-in (S) enforcement code and drafted new

instructions under the IF NONCOMPLIANCE EXISTS header.

Rationale: The PINC was revised to acknowledge the situation where documentation indicates that each BOP component did not hold pressure for at least the required time period approved by the District Manager during a previous pressure test, but a subsequent successful test was completed.

Revised PINC W-195 Change: Modified the content and organization of the steps in the

INPSECTION PROCEDURE section. Rationale: The PINC was revised clarify the INSPECTION PROCEDURE

steps and to reflect requirements in the new Drilling Safety Rule (RIN 1014-AA02).

Revised PINC W-196 Change: Modified the information in the Definitions section of this

PINC. Rationale: The PINC was revised to improve the clarity of the PINC.

Revised PINC W-205 Change: Modified the content and organization of the steps in the

INPSECTION PROCEDURE section. Rationale: The PINC was revised clarify the INSPECTION PROCEDURE

steps and to reflect requirements in the new Drilling Safety Rule (RIN 1014-AA02).

Revised PINC W-208 Change: PINC title question was modified. Rationale: The PINC was added to reflect requirements in the new Drilling

11

Page 12: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

Safety Rule (RIN 1014-AA02).

Revised PINC W-209 Change: PINC title question was modified by changing the API RP 53

citation from 17.11.1 and 18.11.1 to 17.11 and 18.11, respectively.

Rationale: Revision to the PINC was made to ensure the reference included the all of the appropriate information.

Revised PINC W-210

Change: PINC title question was modified by changing the API RP 53 citation from 17.12.1 and 18.12.1 to 17.12 and 18.12, respectively.

Rationale: Revision to the PINC was made to ensure the reference included the all of the appropriate information.

Revised PINC W-211

Change: PINC title question was modified by changing the API RP 53 citation from 17.12.1 and 18.12.1 to 17.12 and 18.12, respectively. Also, replaced “BOEMRE” with “BSEE”

Rationale: Revision to the PINC was made to ensure the reference included the all of the appropriate information and to recognize the reorganization of the bureau.

Added PINC W-212

Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02).

12

Page 13: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

Added PINC W-213 Change: PINC was added. Rationale: The PINC was added to reflect requirements in the new Drilling

Safety Rule (RIN 1014-AA02).

Office PINCs

GENERAL OPERATIONS

Revised PINC G-801

Change: Authorities were changed Rationale: Authorities were added to better reflect the requirements of Oil

and Gas and Sulphur Operations on the Outer Continental Shelf – Increased Safety Measures for Energy Development on the Outer Continental Shelf Rule (aka the Drilling Safety Rule) published Wednesday, August 22, 2012 in the Federal Register.

Revised PINC G-802

Change: Authorities were added Rationale: Authority was added to better reflect the requirements in the

Drilling Safety Rule. Revised PINC G-803

Change: Authority 30 CFR 550.280 was added and authority 30 CFR 250.200 was removed.

Rationale: Authority was added to better reflect the requirements in the Drilling Safety Rule. For 30 CFR 550.280, EED post-activity compliance reviews and inspections verify compliance with approved plans, e.g. EP, DPP, or DOCD. Authority 30 CFR 250.200 was removed because it pertains to definitions of key terminology for 30 CFR Part 250 (Now Part 550), Subpart B ­ Plans and Information. The authority sets no regulatory requirements, guidance, etc.

13

Page 14: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

RECORDS

Revised PINC G-811 Change: Five authorities were added including 30 CFR 550.283 Rationale: Authorities were added to better reflect the requirements in the

Drilling Safety Rule. Also, EED post-activity compliance reviews and inspections verify the submittal of required revised plans (e.g. EP, DPP, or DOCD) to account for changes to impacts of environmental resources (e.g. increase in air emissions, increase in handling and discharge of liquid and solid wastes, etc)

PLATFORMS AND STRUCTURES

Revised PINC G-821 Change: Inserted the word, “and”, between “inspected” and

“maintained”. Rationale: Word was added to clarify that Operators are expected to

carry out all the tasks identified to ensure structural integrity for safe conduct of drilling, workover, and production operations.

Revised PINC G-822 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

BONDING

Revised PINC G-831 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC G-832 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

14

Page 15: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

TRAINING Revised PINC G-842

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC G-848

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC G-857

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC G-858

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC G-859

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC G-862

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

15

Page 16: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

ACCIDENT REPORTING

Revised PINC G-892 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

ENVIRONMENTAL PROTECTION

OIL SPILL RESPONSE PLANS

Revised PINC E-802 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC E-821

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC E-822

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC E-831

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC E-832

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC E-833

Change: Rationale:

Exchanged “BSEE” for “BOEMRE”. Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made.

16

Page 17: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

OIL SPILL R EPORTS

Revised PINC E-841 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC E-842

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

DRILLING PLAN APPROVAL

Revised PINC D-803

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

SUSTAINED PRESSURE CASING MANAGEMENT Revised PINC P-807

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC P-808

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

COMPANY INFORMATION Revised PINC L-851

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

17

Page 18: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

CONSERVATION OF RESOURCES INTERESTS

Revised PINC P-803

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC P-804

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

PRODUCTION RATE

Revised PINC P-822 Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

WELL TESTS Revised PINC P-832

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

CONSERVATION OF RESOURCES

(CIDs and Gas Cap Production) Revised PINC P-840

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC P-841

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

18

Page 19: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

BOTTOMHOLE PRESSURE SURVEYS Revised PINC P-850

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC R-851

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

GEOLOGICAL AND GEOPHYSICAL EXPLORATION PERMITS

Revised PINC O-801

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC O-803

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

DATA Revised PINC O-811

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

Revised PINC O-812

Change: Exchanged “BSEE” for “BOEMRE”. Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made.

19

Page 20: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

RENEWABLE ENERGY GENERAL PROVISIONS

Revised PINC T-800

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-801

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-802

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

COMPANY INFORMATION

Revised PINC T-803

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

BONDING

Revised PINC T-804 Change: Changed the authority citation and exchanged “BOEMRE” for

“BOEM” Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

20

Page 21: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

Revised PINC T-805 Change: Changed the authority citation and exchanged “BOEMRE” for

“BOEM” Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-806

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

PLANS AND INFORMATION REQUIREMENTS

Revised PINC T-807 Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-808

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

SITE ASSESSMENT PLAN (SAP)

Revised PINC T-809 Change: Changed the authority citation and exchanged “BOEMRE” for

“BOEM” Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

21

Page 22: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

CONSTURCTION AND OPERATION PLAN (COP)

Revised PINC T-810 Change: Changed the authority citation and exchanged “BOEMRE” for

“BOEM” Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

GENERAL ACTIVITY PLAN (GAP)

Revised PINC T-811 Change: Changed the authority citation and exchanged “BOEMRE” for

“BOEM” Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-812

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

CERTIFIED VERIFICATION AGENT Revised PINC T-813

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-814

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

22

Page 23: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

ENVIRONMENTAL AND SAFETY MANAGEMENT INSPECTIONS, AND FACILITY ASSESSMENTS

Revised PINC T-815

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-816

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-817

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-818

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-819

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-820

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

23

Page 24: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

Revised PINC T-821

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-822

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-823

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-824

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

EQUIPMENT FAILURE AND ADVERSE ENVIRONMENTAL EFFECTS

Revised PINC T-825 Change: Exchanged “BOEMRE” for “BOEM” Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-826

Change: Exchanged “BOEMRE” for “BOEM” Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

24

Page 25: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

Revised PINC T-827

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-828

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-829

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-830

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-831

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-832

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

25

Page 26: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

Revised PINC T-833 Change: Changed the authority citation and exchanged “BOEMRE” for

“BOEM” Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-834

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-835

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-836

Change: Changed the authority citation Rationale: Change was made to bring the PINC language into conformity

with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-837

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

Revised PINC T-838

Change: Changed the authority citation and exchanged “BOEMRE” for “BOEM”

Rationale: Change was made to bring the PINC language into conformity with the organizational changes made since previous PINC list updates were made including changes to the organization of certain entries in the Code of Federal Regulations (CFR).

26

Page 27: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

27

Page 28: SUMMARY OF PINC REVISION AND ADDITION RECORDS · requirements of the Drilling Safety Rule (RIN 1014-AA02); included a new first Inspection Procedure step and renumbered the existing

28