Summary of MAP D-PHASE Strategy and Requirements
MAP D-PHASE / Olympics Project Meeting6 February 2006
Prepared by: Ron McTaggart-Cowan
Outline
● Summary of 1st MAP D-PHASE Science Meeting (November 2006, Vienna, Austria)
● Deliverables for MAP D-PHASE– Test Period (Feb 2007)– DOP (1 June - 30 November 2007)
● Status of EC contribution to MAP D-PHASE● Relationship to Olympics Project● Status of Olympics Project
Summary of MAP D-PHASE
● MAP Demonstration of Probabilistic Hydrological and Atmospheric Simulation of flood Events in the alpine region
● A Forecast Demonstration Project of the WWRP
● Organized by MeteoSwiss with collaboration from many European centers and universities
● Coordinates with COPS IOP● Overlap with E-TReC 2007
MAP D-PHASE
Summary of MAP D-PHASE
MAP D-PHASE and COPS output domains for 2007 DOP
MAP D-PHASE
Summary of MAP D-PHASE
● Both deterministic and low/high resolution ensembles will be run by various centers:– Ensembles: MOGREPS (UKMet), INM Multi-
model (Spain), COSMO-LEPS (ECMWF), MICRO-PEPS (DWD)
– Deteministic: GEM (Canada), MOLOCH (Italy), AROME (France), MM5 (Universities)
● Numerous hydrological models will be run either coupled or in offline mode
MAP D-PHASE
Summary of MAP D-PHASE
● Preliminary verification strategies:– (real time) subjective evaluation by MAP D-
PHASE forecasters from MeteoSwiss– (offline) from data archive by researchers in
Austria using the Vienna enhanced resolution analysis (VERA) technique
● The key predictors will be related to flood forecasting, so the focus in on QPF
MAP D-PHASE
Deliverables MAP D-PHASE(Test Period, 26 Feb – 2 March 2007)
● High resolution models (mesh size 1-3 km)run between 1 and 4 times daily
● Outputs are requested hourly for 41 surface fields, and a total of 134 upper air fields (mix of model level and pressure outputs)
● Gridded GRIB data will be interpolated to the D-PHASE domain and uploaded to the University of Hamburg
● Generated images will be sent to the Operations Centre
MAP D-PHASE
Deliverables MAP D-PHASE(DOP, 1 June – 30 November 2007)
● In addition to the D-PHASE domain fields, all 41 surface fields, and a total of 134 upper air fields are requested at 15 minute intervals for the COPS domain from June to August
● Gridded GRIB data will be interpolated to the D-PHASE and COPS domains and uploaded to the University of Hamburg
● Generated images will be sent to the Operations Centre
MAP D-PHASE
Status of EC Contribution
● Intention for twice-daily nested (10, 2.5 km) runs over the Test Period and DOP have been presented to the MAP collaborators
● Preliminary domains have been constructed● Work has begun on postprocessing:
– interpolation to final grids and GRIB generation– GrADS image generation
● No automation or operational consideration has been made
MAP D-PHASE
Status of EC ContributionT
imeline for tasks involved w
ith completing
EC
contribution to MA
P D
-PH
AS
E project.
Green – started; Y
ellow – in planning stage;
Red – not planned
MAP D-PHASE
Status of EC Contribution
● Specific items that need to be discussed:– Model domain and configuration– Software requirements (GRIB, GrADS)– Storage requirements (temporary / long term)– User account / special account / operational– Host machine for real-time runs– Verification / model improvement strategy
(identify collaborators)
MAP D-PHASE
Relationship to Olympics Project
● Beijing 2008 is a WWRP Forecast Demonstration Project (B08FDP)
● Both the status of the Beijing planning and the Australian support (based on Sydney 2000 experience) were presented in Vienna
● Both are end-to-end systems focused on high impact events using deterministic and ensemble approaches
● Offers of support were received from several European centres
Olympics Project
Status of the Olympics Project
?
Olympics Project
Next Steps for Olympics Project
● Define the current status of the project● Establish a rough timeline● Meet with involved / interested parties to
finalize timeline● Begin development● [Based on the Australian experience, we
should have a basic system ready for operational testing sometime in 2008]
Olympics Project
Additional Information
● MAP D-PHASE Links:– MeteoSwiss MAP homepage
http://www.map.meteoswiss.ch/map-doc/dphase/dphase_info.htm
– EC Contribution Presentation
http://www.atmos.albany.edu/facstaff/rmctc/rpn_map-dphase_v2.ppt