Summary. Updates from previous Muon Week status of mdt library mapping file and DB items Next future Open issues Conclusions. documentation at http://pfzema.cs.infn.it/phys/GNAM http://www.pv.infn.it/ ~gaudio/Monitoring/mdtlib.html. MDT library for commissioning. - PowerPoint PPT Presentation
Citation preview
Progress report about Progress report about monitoring for MDT monitoring for MDT commissioningcommissioning
G. Crosetti, D. Salvatore, G. Crosetti, D. Salvatore, P.F. ZemaP.F. Zema (Cosenza)(Cosenza)
M. Della Pietra M. Della Pietra (Napoli)(Napoli)
R. Ferrari, G. Gaudio, W. Vandelli R. Ferrari, G. Gaudio, W. Vandelli (Pavia)(Pavia)
Muon Week – September 2005Muon Week – September 2005
Muon Week, 6th Sept 2005 Federico Zema 2
SummarySummary
* Updates from previous Muon Week* status of mdt library
* mapping file and DB items
* Next future
* Open issues
* Conclusions
documentation athttp://pfzema.cs.infn.it/phys/GNAMhttp://pfzema.cs.infn.it/phys/GNAM
http://www.pv.infn.it/http://www.pv.infn.it/~gaudio/Monitoring/mdtlib.html~gaudio/Monitoring/mdtlib.html
Muon Week, 6th Sept 2005 Federico Zema 3
MDT library for MDT library for commissioningcommissioning
MDT code for satisfying requests of commissioning at Pit:
1. manage a variable nr. and type of chambers instead of a pre-fixed one
2. choose how to retrieve MDTs parameters and mapping ---> new “MapInterface” routine can access DB (to be implemented) DB (to be implemented) and/orand/or a text a text file (DONE!)file (DONE!)
3. once read, information is used in the same way independentlyindependently of source ---> map format modifications only require changes in “MapInterface”
Muon Week, 6th Sept 2005 Federico Zema 4
MDT library for MDT library for commissioningcommissioning4. Easy configuration via .txt file
(interface for file modification under development)
# atlas chamber list fileATLAS /mnt/Monitoring/mdtlib-00-04-01/data/atlasChList.txt
# filename containing list of chambers under testTEST /mnt/Monitoring/mdtlib-00-04-01/data/filelist.txt
# output directory for data fileOUT /mnt/Monitoring/mdtlib-00-04-01/tmp/
# Switch for map source (0 = DB; 1 = File)SOURCE 1
# Path of file mapFILEMAP /mnt/Monitoring/mdtlib-00-04-01/data/mapfile.txt
# DB informationDBMAP DBSERVER
# Run Type (0= noise; 1= pulser; 2= cosmics)RUNTYPE 0
To be updated on chamber
changing
Choose mapsource
Select the run type. When Online taken from IS. To be understood how discriminate between Online/Offline
Not to be modified
Muon Week, 6th Sept 2005 Federico Zema 5
First tests for First tests for commissioningcommissioning
reading data file from commissioning with filesampler
decoding and histogram production
noise frequency saved to text file
working on pulser data
Muon Week, 6th Sept 2005 Federico Zema 6
Mapping file and Mapping file and DataBaseDataBase Mapping file (chamber geometrical parameters
and electronic channel connections):* A text file with mapping for all the chambers has
been produced (thanks to P. Fleischmann P. Fleischmann ))* still to be verified special chambers (e.g. BEE)* easy updating of the map file
Data Base* on going discussion for DB format and content
Muon Week, 6th Sept 2005 Federico Zema 7
Next futureNext future
Since next week (12th of September)Since next week (12th of September)* Understanding of computational power computational power:
number of events, trigger rate, total time, sampling efficiency
* Configuration of daq for GNAM * Installation of presenter (OHP): local
installation for tdaq-01-02-00* On-line tests at commissioning * Analysis of pulser data
Muon Week, 6th Sept 2005 Federico Zema 8
Open issuesOpen issues
* DB Interface* infrastructure is ready, coding to be implemented
once the DB structure is defined* cross check with certification informationcross check with certification information
* Error handling* On going dicussion on automatic check and alarm
generation. Feedback welcome...
Muon Week, 6th Sept 2005 Federico Zema 9
ConclusionsConclusions
* Upgrades of mdt library since last muon week* Starting test at commissioning site* still some issues to be implemented* forseen a working monitoring for end of september
* estimation of performances and load* tuning of data analysis and output informations