10
Summarize Strategy Summarize Strategy The strategy is comprehensive. Covers: 4 listed ESU/DPS 65+ populations 1 unlisted group 5+ populations

Summarize Strategy

  • Upload
    elke

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

Summarize Strategy. The strategy is comprehensive. Covers: 4 listed ESU/DPS65+ populations 1 unlisted group 5+ populations. Summarize Strategy. The strategy is comprehensive. The strategy is founded on assessing management action effectiveness. Status and Trend - PowerPoint PPT Presentation

Citation preview

Page 1: Summarize Strategy

Summarize StrategySummarize StrategyThe strategy is comprehensive.

Covers:4 listed ESU/DPS 65+ populations1 unlisted group 5+ populations

Page 2: Summarize Strategy

Summarize StrategySummarize Strategy

Status and Trend Assess population status and trends using Viable Salmonid Population (VSP) metrics and TRT viability criteria.

includes populations with high precision and low precision monitoring

The strategy is comprehensive.The strategy is founded on assessing management action effectiveness.

HatcheryAssess and adaptively manage hatchery programs to respond to mitigation goals, recovery criteria, and supplementation effectiveness.

Habitat Characterize existing physical habitat related to watershed hydrology and aquatic biotic productivity. Document changes in physical habitat structure/function due to natural processes (climate change) and changes resulting from human manipulation of physical habitat (includes both degradation and restoration). Validate fish response to habitat changes..

Page 3: Summarize Strategy

◦ How it conforms with your strategy◦ How it informs the BIOP RPA’s◦ Were there adjustments identified ◦ Were these adjustments cost plus, cost minus or cost neutral, include total

amounts

* incomplete assessment

Summarize the confirmed existing monitoring and its Summarize the confirmed existing monitoring and its relation to your strategy and the BIOP RPA’srelation to your strategy and the BIOP RPA’s

Number of Projects Cost

Ongoing FWP BPA 71 $19,951,763

Ongoing Other 12* $4,745,700

Page 4: Summarize Strategy

◦ How it conforms with your strategy

◦ How it informs the BIOP RPA’s◦ Were there adjustments identified ◦ Were these adjustments cost plus, cost minus or cost neutral, include total

amounts

Number of RPA’s addressed: 46

Summarize the confirmed existing monitoring and its Summarize the confirmed existing monitoring and its relation to your strategy and the BIOP RPA’srelation to your strategy and the BIOP RPA’s

Number of Projects Cost

Ongoing FWP BPA 71 $19,951,763

Ongoing FWP RPA 37 $17,529,047

Page 5: Summarize Strategy

◦ How it conforms with your strategy◦ How it informs the BIOP RPA’s

◦ Were there adjustments identified ◦ Were these adjustments cost plus, cost minus or cost neutral, include total

amounts

YES

Summarize the confirmed existing monitoring and its Summarize the confirmed existing monitoring and its relation to your strategy and the BIOP RPA’srelation to your strategy and the BIOP RPA’s

Page 6: Summarize Strategy

◦ How it conforms with your strategy◦ How it informs the BIOP RPA’s◦ Were there adjustments identified

◦ Were these adjustments cost plus, cost minus or cost neutral, include total amounts

Summarize the confirmed existing monitoring and its Summarize the confirmed existing monitoring and its relation to your strategy and the BIOP RPA’srelation to your strategy and the BIOP RPA’s

Number of Projects Cost

Decreased 10 $1,318,146

Expanded Ongoing RPA

17 $3,032,129

Expanded Ongoing Strategy (Non –RPA)

8 $450,000

Cost Neutral 54 $0

Total Change Ongoing $2,163,983

Page 7: Summarize Strategy

◦ Needed for the RPA requirements

6 projects $3,207,200

◦ Needed for non-RPA strategy

4 projects $839,780

Summarize any Accord monitoring within Summarize any Accord monitoring within your strategyyour strategy

Page 8: Summarize Strategy

Summarize, by priority, the new monitoring Summarize, by priority, the new monitoring efforts needed to meet the RPA requirements efforts needed to meet the RPA requirements

Number of Projects Cost

New RPA proposals 5 $965,000

Page 9: Summarize Strategy

Summarize, by priority, the new additional Summarize, by priority, the new additional monitoring efforts needed to meet the strategy.monitoring efforts needed to meet the strategy.

Number of Projects Cost

New non -RPA proposals

14 $2,440,000

Page 10: Summarize Strategy

One Time Cost NeedsOne Time Cost Needs

Number of Projects Cost

One time-RPA 4 $3,817,000

One time – Non RPA 4 $2,240,000

Total $6,057,000