SUI - 29-SML 18 FEB 13

Embed Size (px)

Citation preview

  • 7/29/2019 SUI - 29-SML 18 FEB 13

    1/7

    SUI 29 - (SML)

    Company: Pakistan Petroleum LimitedField: Sui Gas FieldWell / Lease Name: SUI - 29(SML)Formation: Sui Main Lime StoneTest Type: DeliverabilityJob Number: Sui-Swt-Feb-13

    WELL TEST REPORT

    17-Feb-13 To 18-Feb-13

  • 7/29/2019 SUI - 29-SML 18 FEB 13

    2/7

    Date Time Comment1 2013/02/17 10:30:00 SWT crew and equipment arrive at wellsite.

    2 2013/02/17 10:35:00 Conduct safety meeting.

    3 2013/02/17 11:30:00 Offload and spot SWT equipment.

    4 2013/02/17 12:30:00 Complete SWT equipment rig up.

    5 2013/02/17 12:39:00 Open swab valve.

    6 2013/02/17 12:39:00 Wellhead flowing pressure (WHFP) by DWT = 305 psig.

    7 2013/02/17 12:45:00 Close flow wing valve.

    8 2013/02/17 12:45:00 Divert flow through SWT equipment @ 16/64" towards flare pit.

    9 2013/02/17 13:35:00 Gradually increase adjustable choke size to 28/64".

    10 2013/02/17 13:35:00 Achieve wellhead flowing pressure (WHFP).

    11 2013/02/17 13:45:00 Gradually increase adjustable choke size to 36/64".

    12 2013/02/17 13:50:00 Gradually increase adjustable choke size to 42/64" for maximum offloading of well.

    13 2013/02/17 13:52:00 Observe sudden decrease in WHP.

    14 2013/02/17 13:52:00 Observe water at choke manifold sampling point and flare pit.

    15 2013/02/17 14:00:00 Gradually decrease adjsutable choke size to 40/64".

    16 2013/02/17 14:00:00 Observe no water at choke manifold sampling point and flare pit.

    17 2013/02/17 14:30:00 Gradually decrease adjustable choke size to 36/64".18 2013/02/17 14:45:00 Gradually decrease adjustable choke size to 28/64".

    19 2013/02/17 16:01:00 Divert flow towards plant.

    20 2013/02/17 16:03:00 Depressurize SWT equipment.

    21 2013/02/18 09:40:00 Crew arrive at wellsite.

    22 2013/02/18 09:40:00 Conduct safety meeting.

    23 2013/02/18 09:45:00 Wellhead flowing pressure (WHFP) by DWT = 305 psig.

    24 2013/02/18 10:15:00 Open swab valve and close flow wing valve.

    25 2013/02/18 10:15:00 Divert flow through SWT equipment @ 28/64" adjustable choke towards flare pit.

    26 2013/02/18 10:25:00 Flow pass through separator.

    27 2013/02/18 10:55:00 Sp.gravity of gas = 0.65, H2S = 500 ppm, CO2 = 2%.

    28 2013/02/18 10:56:00 Lower down orifice plate; size = 1.25"

    29 2013/02/18 15:00:00 Lift up orifice plate.

    30 2013/02/18 15:00:00 Open flow wing valve and close swab valve.

    31 2013/02/18 15:00:00 Divert flow towards plant.

    32 2013/02/18 15:00:00 Observe no liquid at bottom valve of separator.

    33 2013/02/18 15:05:00 Depressurize SWT equipment and start rigdown.

    SEQUENCE OF EVENTS

    Company: Pakistan Petroleum LimitedWell / Lease Name: SUI - 29(SML)Test Type: Deliverability

    Job Number: Sui-Swt-Feb-13Formation: Sui Main Lime StoneField: Sui Gas Field

    FieldNotes32X Ver 5.1.1.34 117109TM

    SUI - 29-SML 17 FEB 13 18-Feb-13 2

  • 7/29/2019 SUI - 29-SML 18 FEB 13

    3/7

    Wellhead Gas Measurement Water Measurement

    Date Time Tubing Press Tubing Temp Down StreamPress

    Static Press Meter Temp DifferentialPress

    Plate Size Gas Rate (average)

    Volume Water Rate

    YYY/MM/DD HH:mm:ss psi(a) F psi(a) psi(a) F in of H2O in MMscfd bbl bbl/d

    1 2013/02/17 10:30:00 SWT crew and equipment arrive at wellsite.

    2 10:35:00 Conduct safety meeting.

    3 11:30:00 Offload and spot SWT equipment.

    4 12:30:00 Complete SWT equipment rig up.

    5 12:39:00 Open swab valve.

    6 12:39:00 Wellhead flowing pressure (WHFP) by DWT = 305 psig.

    7 12:40:00 321.50 83.48 316.85 12.35 71.84 0.07 0.00 0.00

    8 12:45:00 322.22 83.58 318.94 12.39 71.72 0.13 0.00

    9 12:45:00 Close flow wing valve.

    10 12:45:00 Divert flow through SWT equipment @ 16/64" towards flare pit.

    11 12:46:00 320.74 83.40 14.72 12.20 71.75 0.07 0.0012 13:00:00 319.78 85.67 28.80 12.85 73.15 0.22 0.00

    13 13:15:00 319.08 88.03 21.20 10.86 73.89 0.21 0.00

    14 13:30:00 319.67 84.73 34.11 12.40 76.44 0.15 0.00

    15 13:35:00 317.63 94.22 22.70 11.08 77.86 0.17 0.00

    16 13:35:00 Gradually increase adjustable choke size to 28/64".

    17 13:35:00 Achieve wellhead flowing pressure (WHFP).

    18 13:45:00 281.04 96.36 57.53 11.75 80.42 0.28 0.00

    19 13:45:00 Gradually increase adjustable choke size to 36/64".

    20 13:46:00 292.97 96.79 66.79 10.92 80.68 0.24 0.00

    21 13:50:00 206.84 97.88 67.56 11.99 81.61 0.22 0.00

    22 13:50:00 Gradually increase adjustable choke size to 42/64" for maximum offloading of well.

    23 13:52:00 171.04 98.31 71.31 11.31 81.89 0.13 0.00

    24 13:52:00 Observe sudden decrease in WHP.

    25 13:52:00 Observe water at choke manifold sampling point and flare pit.

    26 14:00:00 206.84 99.09 67.36 10.52 83.30 0.16 0.00

    27 14:00:00 Gradually decrease adjsutable choke size to 40/64".

    28 14:00:00 Observe no water at choke manifold sampling point and flare pit.

    29 14:01:00 211.11 99.10 67.34 10.88 83.40 0.18 0.00

    30 14:15:00 242.36 99.43 66.12 11.68 85.27 0.30 0.00

    31 14:30:00 293.74 101.00 59.54 10.85 86.21 0.27 0.0032 14:30:00

    WELL TEST DATA

    Company: Pakistan Petroleum LimitedWell / Lease Name: SUI - 29(SML)Test Type: Deliverability

    Job Number: Sui-Swt-Feb-13Formation: Sui Main Lime StoneField: Sui Gas Field

    FieldNotes32X Ver 5.1.1.34 117109TM

    SUI - 29-SML 17 FEB 13 18-Feb-13 3-1

  • 7/29/2019 SUI - 29-SML 18 FEB 13

    4/7

    Wellhead Gas Measurement Water Measurement

    Date Time Tubing Press Tubing Temp Down StreamPress

    Static Press Meter Temp DifferentialPress

    Plate Size Gas Rate (average) Volume Water Rate

    YYY/MM/DD HH:mm:ss psi(a) F psi(a) psi(a) F in of H2O in MMscfd bbl bbl/d

    33 2013/02/17 14:32:00 295.99 101.13 54.26 10.23 86.23 0.36 0.00 0.00

    34 14:45:00 319.80 101.14 28.59 11.17 86.72 0.20 0.00

    35 14:45:00 Gradually decrease adjustable choke size to 28/64".

    36 14:46:00 319.98 101.22 28.76 11.46 86.73 0.25 0.00

    37 15:00:00 320.45 101.24 28.45 11.15 86.66 0.24 0.00

    38 15:15:00 317.76 101.81 22.95 9.85 86.67 0.18 0.00

    39 15:30:00 319.80 101.14 28.59 11.17 86.72 0.20 0.00

    40 15:45:00 317.69 102.04 27.80 10.96 85.32 0.25 0.00

    41 16:00:00 319.46 103.37 25.92 11.17 84.53 0.41 0.00

    42 16:01:00 318.88 103.46 25.60 11.08 84.51 0.27 0.00

    43 16:01:00 Divert flow towards plant.

    44 16:03:00 15.36 103.53 13.04 11.11 84.77 0.28 0.00

    45 16:03:00 Depressurize SWT equipment.

    46 2013/02/18 09:40:00 10.03 69.74 10.64 13.09 65.63 0.13 0.00

    47 09:40:00 Crew arrive at wellsite.

    48 09:40:00 Conduct safety meeting.

    49 09:40:43 10.16 69.82 10.61 13.29 65.33 0.17 0.00

    50 09:45:00 321.55 70.47 12.58 12.08 65.37 0.14 0.00

    51 09:45:00 Wellhead flowing pressure (WHFP) by DWT = 305 psig.

    52 09:46:00 320.96 71.02 12.19 13.75 65.45 0.17 0.00

    53 10:00:00 321.59 73.29 13.64 13.65 66.60 0.22 0.00

    54 10:15:00 313.28 74.62 19.87 12.94 67.74 0.22 0.00

    55 10:15:00 Open swab valve and close flow wing valve.

    56 10:15:00 Divert flow through SWT equipment @ 28/64" adjustable choke towards flare pit.

    57 10:16:00 321.99 74.78 20.48 12.54 67.92 0.25 0.00

    58 10:25:00 317.21 76.22 21.54 12.67 68.47 0.11 0.00

    59 10:25:00 Flow pass through separator.

    60 10:30:00 319.18 77.25 22.18 19.44 68.97 0.20 0.0061 10:45:00 317.57 79.59 57.92 56.95 69.98 0.28 0.00

    62 10:55:00 322.16 81.93 107.68 103.73 70.78 0.56 0.00

    63 10:55:00 Sp.gravity of gas = 0.65, H2S = 500 ppm, CO2 = 2%.

    64 10:56:00 321.55 85.25 110.55 109.50 72.42 113.93 1.25 1.06

    WELL TEST DATA

    Company: Pakistan Petroleum LimitedWell / Lease Name: SUI - 29(SML)Test Type: Deliverability

    Job Number: Sui-Swt-Feb-13Formation: Sui Main Lime StoneField: Sui Gas Field

    FieldNotes32X Ver 5.1.1.34 117109TM

    SUI - 29-SML 17 FEB 13 18-Feb-13 4-1

  • 7/29/2019 SUI - 29-SML 18 FEB 13

    5/7

    Wellhead Gas Measurement Water Measurement

    Date Time Tubing Press Tubing Temp Down StreamPress

    Static Press Meter Temp DifferentialPress

    Plate Size Gas Rate (average) Volume Water Rate

    YYY/MM/DD HH:mm:ss psi(a) F psi(a) psi(a) F in of H2O in MMscfd bbl bbl/d

    65 2013/02/18 10:56:00 Lower down orifice plate; size = 1.25"

    66 11:00:00 321.38 89.08 108.59 108.61 74.44 114.55 1.05

    67 11:15:00 320.96 85.53 111.55 110.66 72.62 114.89 1.07

    68 11:30:00 320.88 88.76 108.92 106.28 74.18 113.58 1.04

    69 11:45:00 320.49 90.70 110.80 108.63 75.60 116.13 1.07

    70 12:00:00 320.76 92.05 109.88 108.13 76.67 114.73 1.05

    71 12:15:00 320.86 93.44 115.01 111.63 77.40 119.26 1.09

    72 12:30:00 320.43 94.57 112.32 109.02 78.30 126.02 1.11

    73 12:45:00 320.16 95.29 111.79 109.08 78.98 126.53 1.11

    74 13:00:00 320.63 96.03 113.28 110.62 79.48 127.45 1.12

    75 13:15:00 319.91 97.66 113.55 111.84 80.00 128.17 1.13

    76 13:30:00 319.81 98.42 113.71 111.71 81.18 128.29 1.1277 13:45:00 319.29 98.67 113.08 111.06 82.62 127.34 1.12

    78 14:00:00 318.66 99.89 111.23 108.41 84.39 124.88 1.11

    79 14:15:00 317.26 100.18 111.49 108.12 85.46 125.05 1.09

    80 14:30:00 318.80 101.56 113.36 108.14 86.21 125.32 1.09

    81 14:45:00 318.48 101.81 108.42 103.92 86.17 131.76 1.10

    82 15:00:00 317.66 100.76 108.17 102.47 84.79 37.03 0.00 0.00

    83 15:00:00 Lift up orifice plate.

    84 15:00:00Open flow wing valve and close swab valve.

    85 15:00:00 Divert flow towards plant.

    86 15:00:00 Observe no liquid at bottom valve of separator.

    87 15:01:00 318.76 100.50 98.90 100.30 84.64 0.14 0.00

    88 15:05:00 16.64 99.42 14.76 83.96 83.94 0.20 0.00

    89 15:05:00 Depressurize SWT equipment and start rigdown.

    WELL TEST DATA

    Company: Pakistan Petroleum LimitedWell / Lease Name: SUI - 29(SML)Test Type: Deliverability

    Job Number: Sui-Swt-Feb-13Formation: Sui Main Lime StoneField: Sui Gas Field

    FieldNotes32X Ver 5.1.1.34 117109TM

    SUI - 29-SML 17 FEB 13 18-Feb-13 5-1

  • 7/29/2019 SUI - 29-SML 18 FEB 13

    6/7

    WELLHEAD PLOT

    Company: Pakistan Petroleum LimitedWell / Lease Name: SUI - 29(SML)Test Type: Deliverability

    Job Number: Sui-Swt-Feb-13Formation: Sui Main Lime StoneField: Sui Gas Field

    WELL HEAD PLOT

    0

    40

    80

    120

    160

    200

    240

    280

    320

    360

    400

    TubingPress(psi(a))

    0

    40

    80

    120

    160

    200

    240

    280

    320

    360

    400

    DownStreamPress(psi(a))

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    110

    120

    130

    140

    150

    Tubing

    Temp(F)

    10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00

    February 18 2013 (Monday)

    Legend

    Tubing Press

    Tubing Temp

    Down Stream Press

    FieldNotes32X Ver 5.1.1.34 117109TM

    SUI - 29-SML 17 FEB 13 18-Feb-13 6

  • 7/29/2019 SUI - 29-SML 18 FEB 13

    7/7

    FLOW RATE PLOT

    Company: Pakistan Petroleum LimitedWell / Lease Name: SUI - 29(SML)Test Type: Deliverability

    Job Number: Sui-Swt-Feb-13Formation: Sui Main Lime StoneField: Sui Gas Field

    GAS RATE

    0

    40

    80

    120

    160

    200

    240

    280

    320

    360

    400

    StaticPres

    s(psi(a))

    0.00

    0.20

    0.40

    0.60

    0.80

    1.00

    1.20

    1.40

    1.60

    1.80

    2.00

    GasRate(av

    erage)(MMscfd)

    10:45 11:00 11:15 11:30 11:45 12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00

    February 18 2013 (Monday)

    Legend

    Gas Rate (average)

    Static Press

    FieldNotes32X Ver 5.1.1.34 117109TM

    SUI - 29-SML 17 FEB 13 18-Feb-13 7