SUI 29 - (SML)
Company: Pakistan Petroleum LimitedField: Sui Gas FieldWell / Lease Name: SUI - 29(SML)Formation: Sui Main Lime StoneTest Type: DeliverabilityJob Number: Sui-Swt-Feb-13
WELL TEST REPORT
17-Feb-13 To 18-Feb-13
7/29/2019 SUI - 29-SML 18 FEB 13
2/7
Date Time Comment1 2013/02/17 10:30:00 SWT crew and equipment arrive at wellsite.
2 2013/02/17 10:35:00 Conduct safety meeting.
3 2013/02/17 11:30:00 Offload and spot SWT equipment.
4 2013/02/17 12:30:00 Complete SWT equipment rig up.
5 2013/02/17 12:39:00 Open swab valve.
6 2013/02/17 12:39:00 Wellhead flowing pressure (WHFP) by DWT = 305 psig.
7 2013/02/17 12:45:00 Close flow wing valve.
8 2013/02/17 12:45:00 Divert flow through SWT equipment @ 16/64" towards flare pit.
9 2013/02/17 13:35:00 Gradually increase adjustable choke size to 28/64".
10 2013/02/17 13:35:00 Achieve wellhead flowing pressure (WHFP).
11 2013/02/17 13:45:00 Gradually increase adjustable choke size to 36/64".
12 2013/02/17 13:50:00 Gradually increase adjustable choke size to 42/64" for maximum offloading of well.
13 2013/02/17 13:52:00 Observe sudden decrease in WHP.
14 2013/02/17 13:52:00 Observe water at choke manifold sampling point and flare pit.
15 2013/02/17 14:00:00 Gradually decrease adjsutable choke size to 40/64".
16 2013/02/17 14:00:00 Observe no water at choke manifold sampling point and flare pit.
17 2013/02/17 14:30:00 Gradually decrease adjustable choke size to 36/64".18 2013/02/17 14:45:00 Gradually decrease adjustable choke size to 28/64".
19 2013/02/17 16:01:00 Divert flow towards plant.
20 2013/02/17 16:03:00 Depressurize SWT equipment.
21 2013/02/18 09:40:00 Crew arrive at wellsite.
22 2013/02/18 09:40:00 Conduct safety meeting.
23 2013/02/18 09:45:00 Wellhead flowing pressure (WHFP) by DWT = 305 psig.
24 2013/02/18 10:15:00 Open swab valve and close flow wing valve.
25 2013/02/18 10:15:00 Divert flow through SWT equipment @ 28/64" adjustable choke towards flare pit.
26 2013/02/18 10:25:00 Flow pass through separator.
27 2013/02/18 10:55:00 Sp.gravity of gas = 0.65, H2S = 500 ppm, CO2 = 2%.
28 2013/02/18 10:56:00 Lower down orifice plate; size = 1.25"
29 2013/02/18 15:00:00 Lift up orifice plate.
30 2013/02/18 15:00:00 Open flow wing valve and close swab valve.
31 2013/02/18 15:00:00 Divert flow towards plant.
32 2013/02/18 15:00:00 Observe no liquid at bottom valve of separator.
33 2013/02/18 15:05:00 Depressurize SWT equipment and start rigdown.
SEQUENCE OF EVENTS
Company: Pakistan Petroleum LimitedWell / Lease Name: SUI - 29(SML)Test Type: Deliverability
Job Number: Sui-Swt-Feb-13Formation: Sui Main Lime StoneField: Sui Gas Field
FieldNotes32X Ver 5.1.1.34 117109TM
SUI - 29-SML 17 FEB 13 18-Feb-13 2
7/29/2019 SUI - 29-SML 18 FEB 13
3/7
Wellhead Gas Measurement Water Measurement
Date Time Tubing Press Tubing Temp Down StreamPress
Static Press Meter Temp DifferentialPress
Plate Size Gas Rate (average)
Volume Water Rate
YYY/MM/DD HH:mm:ss psi(a) F psi(a) psi(a) F in of H2O in MMscfd bbl bbl/d
1 2013/02/17 10:30:00 SWT crew and equipment arrive at wellsite.
2 10:35:00 Conduct safety meeting.
3 11:30:00 Offload and spot SWT equipment.
4 12:30:00 Complete SWT equipment rig up.
5 12:39:00 Open swab valve.
6 12:39:00 Wellhead flowing pressure (WHFP) by DWT = 305 psig.
7 12:40:00 321.50 83.48 316.85 12.35 71.84 0.07 0.00 0.00
8 12:45:00 322.22 83.58 318.94 12.39 71.72 0.13 0.00
9 12:45:00 Close flow wing valve.
10 12:45:00 Divert flow through SWT equipment @ 16/64" towards flare pit.
11 12:46:00 320.74 83.40 14.72 12.20 71.75 0.07 0.0012 13:00:00 319.78 85.67 28.80 12.85 73.15 0.22 0.00
13 13:15:00 319.08 88.03 21.20 10.86 73.89 0.21 0.00
14 13:30:00 319.67 84.73 34.11 12.40 76.44 0.15 0.00
15 13:35:00 317.63 94.22 22.70 11.08 77.86 0.17 0.00
16 13:35:00 Gradually increase adjustable choke size to 28/64".
17 13:35:00 Achieve wellhead flowing pressure (WHFP).
18 13:45:00 281.04 96.36 57.53 11.75 80.42 0.28 0.00
19 13:45:00 Gradually increase adjustable choke size to 36/64".
20 13:46:00 292.97 96.79 66.79 10.92 80.68 0.24 0.00
21 13:50:00 206.84 97.88 67.56 11.99 81.61 0.22 0.00
22 13:50:00 Gradually increase adjustable choke size to 42/64" for maximum offloading of well.
23 13:52:00 171.04 98.31 71.31 11.31 81.89 0.13 0.00
24 13:52:00 Observe sudden decrease in WHP.
25 13:52:00 Observe water at choke manifold sampling point and flare pit.
26 14:00:00 206.84 99.09 67.36 10.52 83.30 0.16 0.00
27 14:00:00 Gradually decrease adjsutable choke size to 40/64".
28 14:00:00 Observe no water at choke manifold sampling point and flare pit.
29 14:01:00 211.11 99.10 67.34 10.88 83.40 0.18 0.00
30 14:15:00 242.36 99.43 66.12 11.68 85.27 0.30 0.00
31 14:30:00 293.74 101.00 59.54 10.85 86.21 0.27 0.0032 14:30:00
WELL TEST DATA
Company: Pakistan Petroleum LimitedWell / Lease Name: SUI - 29(SML)Test Type: Deliverability
Job Number: Sui-Swt-Feb-13Formation: Sui Main Lime StoneField: Sui Gas Field
FieldNotes32X Ver 5.1.1.34 117109TM
SUI - 29-SML 17 FEB 13 18-Feb-13 3-1
7/29/2019 SUI - 29-SML 18 FEB 13
4/7
Wellhead Gas Measurement Water Measurement
Date Time Tubing Press Tubing Temp Down StreamPress
Static Press Meter Temp DifferentialPress
Plate Size Gas Rate (average) Volume Water Rate
YYY/MM/DD HH:mm:ss psi(a) F psi(a) psi(a) F in of H2O in MMscfd bbl bbl/d
33 2013/02/17 14:32:00 295.99 101.13 54.26 10.23 86.23 0.36 0.00 0.00
34 14:45:00 319.80 101.14 28.59 11.17 86.72 0.20 0.00
35 14:45:00 Gradually decrease adjustable choke size to 28/64".
36 14:46:00 319.98 101.22 28.76 11.46 86.73 0.25 0.00
37 15:00:00 320.45 101.24 28.45 11.15 86.66 0.24 0.00
38 15:15:00 317.76 101.81 22.95 9.85 86.67 0.18 0.00
39 15:30:00 319.80 101.14 28.59 11.17 86.72 0.20 0.00
40 15:45:00 317.69 102.04 27.80 10.96 85.32 0.25 0.00
41 16:00:00 319.46 103.37 25.92 11.17 84.53 0.41 0.00
42 16:01:00 318.88 103.46 25.60 11.08 84.51 0.27 0.00
43 16:01:00 Divert flow towards plant.
44 16:03:00 15.36 103.53 13.04 11.11 84.77 0.28 0.00
45 16:03:00 Depressurize SWT equipment.
46 2013/02/18 09:40:00 10.03 69.74 10.64 13.09 65.63 0.13 0.00
47 09:40:00 Crew arrive at wellsite.
48 09:40:00 Conduct safety meeting.
49 09:40:43 10.16 69.82 10.61 13.29 65.33 0.17 0.00
50 09:45:00 321.55 70.47 12.58 12.08 65.37 0.14 0.00
51 09:45:00 Wellhead flowing pressure (WHFP) by DWT = 305 psig.
52 09:46:00 320.96 71.02 12.19 13.75 65.45 0.17 0.00
53 10:00:00 321.59 73.29 13.64 13.65 66.60 0.22 0.00
54 10:15:00 313.28 74.62 19.87 12.94 67.74 0.22 0.00
55 10:15:00 Open swab valve and close flow wing valve.
56 10:15:00 Divert flow through SWT equipment @ 28/64" adjustable choke towards flare pit.
57 10:16:00 321.99 74.78 20.48 12.54 67.92 0.25 0.00
58 10:25:00 317.21 76.22 21.54 12.67 68.47 0.11 0.00
59 10:25:00 Flow pass through separator.
60 10:30:00 319.18 77.25 22.18 19.44 68.97 0.20 0.0061 10:45:00 317.57 79.59 57.92 56.95 69.98 0.28 0.00
62 10:55:00 322.16 81.93 107.68 103.73 70.78 0.56 0.00
63 10:55:00 Sp.gravity of gas = 0.65, H2S = 500 ppm, CO2 = 2%.
64 10:56:00 321.55 85.25 110.55 109.50 72.42 113.93 1.25 1.06
WELL TEST DATA
Company: Pakistan Petroleum LimitedWell / Lease Name: SUI - 29(SML)Test Type: Deliverability
Job Number: Sui-Swt-Feb-13Formation: Sui Main Lime StoneField: Sui Gas Field
FieldNotes32X Ver 5.1.1.34 117109TM
SUI - 29-SML 17 FEB 13 18-Feb-13 4-1
7/29/2019 SUI - 29-SML 18 FEB 13
5/7
Wellhead Gas Measurement Water Measurement
Date Time Tubing Press Tubing Temp Down StreamPress
Static Press Meter Temp DifferentialPress
Plate Size Gas Rate (average) Volume Water Rate
YYY/MM/DD HH:mm:ss psi(a) F psi(a) psi(a) F in of H2O in MMscfd bbl bbl/d
65 2013/02/18 10:56:00 Lower down orifice plate; size = 1.25"
66 11:00:00 321.38 89.08 108.59 108.61 74.44 114.55 1.05
67 11:15:00 320.96 85.53 111.55 110.66 72.62 114.89 1.07
68 11:30:00 320.88 88.76 108.92 106.28 74.18 113.58 1.04
69 11:45:00 320.49 90.70 110.80 108.63 75.60 116.13 1.07
70 12:00:00 320.76 92.05 109.88 108.13 76.67 114.73 1.05
71 12:15:00 320.86 93.44 115.01 111.63 77.40 119.26 1.09
72 12:30:00 320.43 94.57 112.32 109.02 78.30 126.02 1.11
73 12:45:00 320.16 95.29 111.79 109.08 78.98 126.53 1.11
74 13:00:00 320.63 96.03 113.28 110.62 79.48 127.45 1.12
75 13:15:00 319.91 97.66 113.55 111.84 80.00 128.17 1.13
76 13:30:00 319.81 98.42 113.71 111.71 81.18 128.29 1.1277 13:45:00 319.29 98.67 113.08 111.06 82.62 127.34 1.12
78 14:00:00 318.66 99.89 111.23 108.41 84.39 124.88 1.11
79 14:15:00 317.26 100.18 111.49 108.12 85.46 125.05 1.09
80 14:30:00 318.80 101.56 113.36 108.14 86.21 125.32 1.09
81 14:45:00 318.48 101.81 108.42 103.92 86.17 131.76 1.10
82 15:00:00 317.66 100.76 108.17 102.47 84.79 37.03 0.00 0.00
83 15:00:00 Lift up orifice plate.
84 15:00:00Open flow wing valve and close swab valve.
85 15:00:00 Divert flow towards plant.
86 15:00:00 Observe no liquid at bottom valve of separator.
87 15:01:00 318.76 100.50 98.90 100.30 84.64 0.14 0.00
88 15:05:00 16.64 99.42 14.76 83.96 83.94 0.20 0.00
89 15:05:00 Depressurize SWT equipment and start rigdown.
WELL TEST DATA
Company: Pakistan Petroleum LimitedWell / Lease Name: SUI - 29(SML)Test Type: Deliverability
Job Number: Sui-Swt-Feb-13Formation: Sui Main Lime StoneField: Sui Gas Field
FieldNotes32X Ver 5.1.1.34 117109TM
SUI - 29-SML 17 FEB 13 18-Feb-13 5-1
7/29/2019 SUI - 29-SML 18 FEB 13
6/7
WELLHEAD PLOT
Company: Pakistan Petroleum LimitedWell / Lease Name: SUI - 29(SML)Test Type: Deliverability
Job Number: Sui-Swt-Feb-13Formation: Sui Main Lime StoneField: Sui Gas Field
WELL HEAD PLOT
0
40
80
120
160
200
240
280
320
360
400
TubingPress(psi(a))
0
40
80
120
160
200
240
280
320
360
400
DownStreamPress(psi(a))
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
Tubing
Temp(F)
10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00
February 18 2013 (Monday)
Legend
Tubing Press
Tubing Temp
Down Stream Press
FieldNotes32X Ver 5.1.1.34 117109TM
SUI - 29-SML 17 FEB 13 18-Feb-13 6
7/29/2019 SUI - 29-SML 18 FEB 13
7/7
FLOW RATE PLOT
Company: Pakistan Petroleum LimitedWell / Lease Name: SUI - 29(SML)Test Type: Deliverability
Job Number: Sui-Swt-Feb-13Formation: Sui Main Lime StoneField: Sui Gas Field
GAS RATE
0
40
80
120
160
200
240
280
320
360
400
StaticPres
s(psi(a))
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
GasRate(av
erage)(MMscfd)
10:45 11:00 11:15 11:30 11:45 12:00 12:15 12:30 12:45 13:00 13:15 13:30 13:45 14:00 14:15 14:30 14:45 15:00
February 18 2013 (Monday)
Legend
Gas Rate (average)
Static Press
FieldNotes32X Ver 5.1.1.34 117109TM
SUI - 29-SML 17 FEB 13 18-Feb-13 7