ENLOCUS // CITY OF PARRAMATTA 1 SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT 26.08.2019

SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

ENLOCUS // CITY OF PARRAMATTA

1

SUE SAVAGE RESERVE SKATEPARKPRELIMINARY CONCEPT26.08.2019

Page 2: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

SUE SAVAGE RESERVE SKATE PARK >> PRELIMINARYCONCEPT

2

“HAVING LOTS OF SPACE FOR NATURE, AND LOTS OF BUBBLERS”

WHAT WOULD YOU LIKE IN THE SPACE?

WHAT TYPE OF ELEMENT NEEDS TO BE INCLUDED?

CONSULTATION SUMMARY - JULY 2019

“I REALLY THINK THAT A DRINKING FOUNTAIN, TOI-LETS AND SHELTERS IS IM-PORTANT. ALSO A NICE BAL-ANCE BETWEEN NATURE AND CONCRETE."

37 RESPONDENTS

30+CONSULTED

“TO MAKE IT KIDS FRIENDLY”

“KEEN TO USE THIS AS A RESIDENT AND AN EDUCATOR. WOULD LOVE TO SEE ONGOING CLASS/WORKSHOPS IN SCHOOL HOLIDAYS TO SUPPORT POSITIVE USE OF THIS RESOURCE.”

5-9 - 35%15-19 - 0%30-39 - 3%

20-29 - 3%40-49 - 5%

10-14 - 51%

SKATESOCIAL

INLINE

54% 54%SCOOTER

76%

8%BMX

62%

WHAT ELSE NEEDS TO BE IN THE SPACE ?

OTHER COMMENTS?

59% MALES

41% FEMALES

RESPONDENT AGES:

COMMENTS:

USERS:

SPACE ART &INSPIRATION SUPPORT

B

C

D

BANK HUBBA RAIL ROLL-OVER QUARTER PIPE

E

A

49%

1ST

1ST

3RD2ND

4TH

4TH

5TH

5TH

3%

32%

22%

14%

46%

24%

65%

54%

22%

19%

22%

38%

22%

38%

30%

65%

STREET

PLAZA ELEMENT

SEATING

SCULPTURAL

TRANSITION-WALL

SHELTERS

FLOWS

BEGINNERS ELEMENT

PAVING

TRANSITION-BIGGER

BOWLS

LIGHTING

PUBLIC MEDIA

PUBLIC MEDIA

SEATING

2NDLIGHTING

SHELTER

3RDDRINKING FOUNTAIN

LIGHTINGDRINKING FOUN-TAIN

SEATING

SHELTER

“WE CAN ADD A RECYCLED SEAT-ING AREA"

“COLOUR, NATURE, LIGHTING"

USERSSTATISTICS

WE

LCO

ME THE W

HOLE COMMUNITY

Page 3: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

ENLOCUS // CITY OF PARRAMATTA

3

“COLOUR, NATURE, LIGHTING"

STATISTICS

SO

CIAL SPACES

CLIMBING TOGETHER

SKATE SPACES

LISTENING TO THE GREAT IDEAS OF YOUNG PEOPLE AT TOONGABBIE PUBLIC SCHOOL WORKSHOP /JUNE 2019...

PUBLIC ART

SOCIALSPACE SKATE

SPACE

WE

LCO

ME THE W

HOLE COMMUNITY

A

RT & EXPRESSION

Page 4: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

SUE SAVAGE RESERVE SKATE PARK >> PRELIMINARYCONCEPT

4

RIVERSIDE VEGETATION

EXTENT OF PROPOSEDSKATEPARK

EXTENT OF PROPOSEDSKATEPARK

EXTENT OF PROPOSEDSKATEPARK

EXTENT OF PROPOSEDSKATEPARK EXTENT OF PROPOSED

SKATEPARK

TOONGABBIE CREEK

TOONGABBIE CREEK

TOONGABBIE CREEK

TOONGABBIE CREEK

TOONGABBIE CREEK

EXISTING CONTOURS

EXTENT OF EASEMENT

EXISTING POWER LINE

DRAINAGE LINE

100 YEARS FLOOD ZONE

20 YEARS FLOOD ZONE

EXISTING BUSH TRAIL RETAINED (INFORMAL PATH)

5. INCORPORATING FLOW LINES READ FROM TOONGABBIE CREEK AND THE MASTERPLAN.

1. EXPLORING THE POSSIBILITIES CREATED BY THE EXISTING LANDFORM.

• NATURAL SHADE & COOLING• NATIVE & ENDEMIC SPECIES• OPPORTUNITIES FOR WSUD• ALLOW VEGETATION TO SHAPE CONCRETE FORM• BREAK UP MONOTONY OF CONCRETE SLAB

• CONSTRAINTS ON USABLE AREA• NARROW CONCRETE FOOTPRINT• PEDESTRIAN AND ACTIVE USER MOVEMENT• DIRECTION OF USER FLOW

• LINES OF MOVEMENT • CONSIDERED INTEGRATION OF OLD AND NEW• ACTIVE / PASSIVE SPACE DELINEATION• ENTRANCE SEATING• SOCIAL NODES• DDA ACCESSIBILITY• NEW CONNECTIONS

• VIEWS TOWARDS TOONGABBIE CREEK• TERRACED SEATING• VIEWS OVER PROGRAM (SKATE & BASKETBALL)• EVENTS HILL• SKATE ELEMENT FORM

• WATER SENSITIVE URBAN DESIGN• COMMUNITY SAFETY • UTILIZING LANDFORM HIGH POINTS• LAYERS OF ELEMENTS AND FORM• FLOW MOTIF & EXPRESSION

4. WORKING WITHIN THE CONSTRAINTS OF THE 20 & 100 YEAR FLOOD ZONE.

2. CREATE A LINEAR ACTIVITY SPACE THAT SITS WITHIN THE EXISTING SERVICES AND EASEMENT LINES.

3. EXTEND THE RIVERSIDE VEGETATION AND PROVIDE NATURAL AMENITY FOR NEW SKATEPARK.

EXISTING 3M WIDE SHARED PATH (LINKS TOONGABBIE STATION WITH PARRAMATTA CBD)

LANDFORM

FLOW LINES

RIVERSIDE PLANTING

FLOOD ZONE

T O O N G A B B I E C R E E K

DESIGN PRINCIPLES

SERVICES & EASEMENT

S K A T E

C H A N E L S T R E E T C H A N E L S T R E E T

C H A N E L S T R E E T C H A N E L S T R E E T C H A N E L S T R E E T

R E S I D E N T I A L

R E S I D E N T I A L R E S I D E N T I A L R E S I D E N T I A L

R E S I D E N T I A L

T O O N G A B B I E C R E E K

T O O N G A B B I E C R E E KT O O N G A B B I E C R E E K

T O O N G A B B I E C R E E K

S K A T E

S K A T E S K A T E

S K A T E

Page 5: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

ENLOCUS // CITY OF PARRAMATTA

5

CONCEPT DESIGN SKETCH

FORMING DESIGN LANGUAGE

PERSPECTIVE SKETCHES

PRELIMINARY CONCEPT 1

PRELIMINARY CONCEPT 2

INCORPORATING SKATE FUNCTIONS PLAYTING WITH LEVELS

Page 6: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

SUE SAVAGE RESERVE SKATE PARK >> PRELIMINARYCONCEPT

6

SCHEMATIC CONCEPT PLAN

1

2

3 45

7

6

6

1

2

3

4

5

6

71:250 AT A3

900H QUARTER ROLL IN SECTION

1500H POCKET RETURN

1200H ROLL OVER TO 1500MM DEEP

1200H CENTRAL ISLAND TIC-TAC QUARTER

OPEN SHALLOW WITH CENTRAL VOLCANO

SHARED ENTRY WITH SPILLOUT TO BASKETBALL COURT

EVELVATED SEATING SOCIAL NODE. FEATURE LIGHTING AND FLOOD INDICATOR

SUE SAVAGE RESERVE SKATEPARKSCHEMATIC CONCEPT PLAN

TOONGABIE CREEK

Page 7: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

ENLOCUS // CITY OF PARRAMATTA

7

Page 8: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

SUE SAVAGE RESERVE SKATE PARK >> PRELIMINARYCONCEPT

8

CONCEPT PLAN

1

3

15

5

4

9

6

8

11

10

11 16

11 1112 17

13 18

14 19

201510

13

12

17

16

18

18

19

20 14

7

2

1 6

2 7

3 8

4 9

51:200 AT A3

900H QUARTERPIPE 1500H MELLOW QUARTERPIPE POCKETWITH 500H BOX

1200H FLATBANK HIP GABION RETAINING WALL

450H VARIABLE PROFILE MOGUL 1500H QUARTERPIPE HIP 600H QUARTERPIPE PROPOSED GARDEN BED

1500 TO 2100H CANTILEVERED BANK EXTENSION 1000H MOGUL / SPINE BLEND 600H MOGUL EXISTING PEDESTRIAN FOOTPATH

600H WATERFALL 1500H ROLL-IN 450H FLATBANK HIP EXISTING BASKETBALL COURT

VARIABLE PROFILE PUMP MOGUL900 TO 1500H QUARTERPIPE 1200H TIGHT STREET SPINECOMMUNAL SEATING WITH FEATURE LIGHTING

SUE SAVAGE RESERVE SKATEPARKCONCEPT PLAN REV B

Page 9: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

ENLOCUS // CITY OF PARRAMATTA

9

Page 10: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

SUE SAVAGE RESERVE SKATE PARK >> PRELIMINARYCONCEPT

10

Page 11: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

ENLOCUS // CITY OF PARRAMATTA

11

Page 12: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

SUE SAVAGE RESERVE SKATE PARK >> PRELIMINARYCONCEPT

12

CITY OF PARRAMATTASUE SAVAGE SKATEPARKESTIMATE OF PROBABLE COSTSPrepared by Enlocus PTY LTD

All prices and rates are exclusive of GST

1 PRELIMINARIES //Item Description Unit Qty** Rate Total

(ex GST) (ex GST)1.1 Site - Preliminaries Including but not limited to: onsite management and

supervision, site amenities, site inspection, insurances, surveying and setting out of works, temporary fencing, and temporary power. Includes set out and service location. Approx 5% of capital works

No. 1 $ 32,000.00 $ 32,000

1.2 Intergrated Management System Allow for the preparation of an Intergrated Management System including Quality Assurance, Environmental Management, OHS and Traffic Management (as required). Develop and maintain a documented Quality Assurance System specific to the project and in accordance with the contract specifications. Maintain and obtain approval of project specific Environmental Management Plan (EMP) to manage the environmental effects of the works.

No. 1 INCL.

1 PRELIMINARIES // 32,000.00$

2 DEMOLITION //Item Description Unit Qty** Rate Total

(ex GST) (ex GST)2.1 Demolition - General Remove all items as specified on plans and

stockpile/recycle to Superintendent approved location.note

2.2 Clearing and Grubbing Removal of surface vegetation material (stock pile topsoil) m2 1437 $ 4.50 $ 6,466.50

2 DEMOLITION // 6,466.50$

3 EARTHWORKS //Item Description Unit Qty** Rate Total

(ex GST) (ex GST)3.1 Earthworks - General Including grading & trimming, sub-grade preparation to

specified depths & compaction to achieve design levels. note

3.2 Excavation Excavate to proposed levels. Strip soil free of debris and stockpile for future earthworks.

m3 350 $ 40.00 $ 14,000.00

3.3 Shaped Earthworks - Imported Fill Volume of clean fill imported to site. Price includes transportation.

m3 66 $ 90.00 $ 5,940.00

3 EARTHWORKS // 19,940.00$

5 SKATEPARK CONCRETE WORKS //Item Description Unit Qty** Rate Total

(ex GST) (ex GST)5.1 RC concrete works - General Perform all works as necessary to construct concrete skate

elements including all preparation, formwork, supply, plant, labour, placement, reinforcement, vibration, finishing off and joint work of all concrete works (including footings) as shown and detailed in drawings, class 1 'burnished' finish as specified.

note

5.2 RC skatepark concrete slab - Reinforcing Steel SL82 placed at top w/50mm CLR m2 643 $ 90.00 $ 57,870.00

5.3 RC Skatepark concrete slab - Concrete 100mm THK 32MPa Portland grey reinforced concrete surface. Steel float Class1 finish. Apply Avista concrete sealer primer & avista concrete sealer general purpose"Matt" finish x2 coats as per manufacturer's specification or approved equivalent. Contractor to apply surface harder to 2mx2m test pnel for approval by superintendent prior to proceeding with works.

m2 591 $ 210.00 $ 124,110.00

5.4 RC Skatepark Ramped Slab - Concrete 100mm THK 32MPa Portland grey reinforced concrete surface. Steel float Class1 finish. Apply Avista concrete sealer primer & avista concrete sealer general purpose"Matt" finish x2 coats as per manufacturer's specification or approved equivalent. Contractor to apply surface harder to 2mx2m test pnel for approval by superintendent prior to proceeding with works.

m2 52 $ 220.00 $ 11,440.00

5.5 RC Skatepark concrete slab - Finishes Steel trowelled burnished surface finish apply Parchem Lustreseal Extended Wear matt concrete sealant to all surfaces as per manufacturers specifications.

m2 643 $ 90.00 $ 57,870.00

Note : This estimate is based on currently industry prices. Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently tendered projects. This is an estimate of probable costs only, all components of which are subject to escalation in construction, labour and material costs.

5.6 RC Skatepark elements - Formwork Formwork Class 1 to sides of flat banks, transitions and blocks

m2 311 $ 130.00 $ 40,430.00

5.7 RC Skatepark elements - Reinforcing steel N12 steel reinforcement 200mm EW in banks and transitions and SL82 w/30mm CLR

m2 311 $ 110.00 $ 34,210.00

5.8 RC Skatepark elements - Concrete 150mm THK 32MPa transitions/flat banks Portland grey concrete on 50mm compacted FCR Class 2 bedding and damp proof membrane.

m2 311 $ 365.00 $ 113,515.00

5.10 RC Skatepark elements - Finishes Steel trowelled burnished surface finish apply Parchem Lustreseal Extended Wear matt concrete sealant to all surfaces as per manufacturers specifications.

m2 311 $ 100.00 $ 31,100.00

5.11 RC Skatepark Blocks - Ledges and Skate Walls concrete RC Concrete Block 32MPa Portland Grey concrete on 50mm compacted FCR Class 2 bedding.

lm 13.9 $ 440.00 $ 6,116.00

5.12 Paint - Concrete Paint Outdoor compatible concrete paint as specified m2 275 $ 170.00 $ 46,750.00

5 SKATEPARK CONCRETE WORKS // 523,411.00$

6 STEEL WORKS //Item Description Unit Qty** Rate Total

(ex GST) (ex GST)6.1 Steel - 50NB CHS coping 50NB CHS coping galvanised to all transitions as nominated.

Costs to include supply, fabrication and installation. All onsite welds to be sprayed with 'Galmet' or approved equivalent to match steel.

lm 88 $ 98.00 $ 8,624.00

6.2 Steel - 125x75 RHS coping 125x75 RHS coping galvanised, where shown and fixed as per detail. Costs to include supply, fabrication and installations.

lm 11.5 $ 115.00 $ 1,322.50

6 STEEL WORKS // 9,946.50$

7 BESPOKE SEATING //Item Description Unit Qty Rate Total

(ex GST) (ex GST)7.1 Seat - Steel sheeting Steel seat sheeting - 5mm thk lasercut M/S plate, galv. and

powdercoated as specified. m2 83 $ 500.00 $ 41,500.00

7.3 Seat - Internal frame PSUM 1 $ 5,000.00 $ 5,000.00

7 BESPOKE SEATING // 46,500.00$

8 LIGHTING AND ELECTRICAL //Item Description Unit Qty Rate Total

(ex GST) (ex GST)8.1 Seat - Linear Luminaire Linear LED tape supplied by Enttec Lighting. Price to include

cast in / screw in mounting frame, strip lighting and diffuser. Refer to Manufacturer's specification.

lm 140 $ 320.00 $ 44,800.00

8 LIGHTING AND ELECTRICAL // 44,800.00$

9 LANDSCAPE WORKS //Item Description Unit Qty Rate Total

(ex GST) (ex GST)9.1 Garden bed mulch 150mm depth of tree multch bed or multch to match

existing.m2 429 $ 8.63 $ 3,700.13

9.2 Trees 45 litre native shade trees including preperation, instalation and staking.

No. 13 $ 180.00 $ 2,340.00

9.3 Planting area Planting Beds - per m2 including 150mm topsoil, 75mm mulch and supply and install of nominated drought tolerant plant species.

m2 330 $ 42.50 $ 14,025.00

9.4 Gabion Retaining wall 82 $ 260.00 $ 21,320.00

9 LANDSCAPE WORKS // 41,385.13$

1 PRELIMINARIES // 32,000.00$ 2 DEMOLITION // 6,466.50$ 3 EARTHWORKS // 19,940.00$ 5 SKATEPARK CONCRETE WORKS // 523,411.00$ 6 STEEL WORKS // 9,946.50$ 7 BESPOKE SEATING // 46,500.00$ 8 LIGHTING AND ELECTRICAL // 44,800.00$ 9 LANDSCAPE WORKS // 41,385.13$

TOTAL SUE SAVAGE SKATEPARK (EX. GST) 724,449.13$

SUMMARY OF SUE SAVAGE SKATEPARK

Page 13: SUE SAVAGE RESERVE SKATEPARK PRELIMINARY CONCEPT · Skatepark construction is a specialised trade and costs are prone to fluctuation. Enlocus have based the skatepark costs on recently

ENLOCUS // CITY OF PARRAMATTA

13