CASE STUDIES
The services and sectors in which we work are diverse and require different disciplines, our case studies detail, examples of the type of projects we have undertaken in the past few years.
Title LayoutSubtitle
PROJECT DETAILS
This project consisted of the
supply, installation, testing and
commissioning of VRF Cooling &
Heating Systems:
Office Refurbishment
London
NATURE OF PROJECT: Office Refurbishment
AVERAGE LABOUR STRENGTH: 6 Operatives
CONTRACT PERIOD: 50-weeks
WORKS COMPLETED: October 2008
• VRF Cooling/Heating System.
• LTHW Serving Heater Batteries
• LTHW Serving Calorifiers
• Domestic Hot & Cold Water Services
• Installation of Sanitary ware
• Supply & Extract Ventilation Systems.
• Strip out of Existing Services
• Installation of BMS
• Modification to Rainwater Pipe Work.
CONTRACT: Health Authority
MAIN CONTRACTOR:
Airconaire Limited
NATURE OF PROJECT: Replacement
of Cold Water Infrastructure
AVERAGE LABOUR STRENGTH:
10 Operatives
CONTRACT PERIOD: 4-months
Health Authorities
PROJECT DETAILS
This project consisted of the
supply, installation, testing &
commissioning of:
• 6 no GRP Tanks up to 244,000 litres
• Booster Set & Cold Water Distribution Pipe Work
• Steam Plate Heat Exchangers
• Ensuring Water Supply not Interrupted
• Installation of Tanks, Pipe Work & Booster Pumps
• Controls
• BMS & Electrical
• Builders work
• Testing & Commissioning
City Offices Chillers
London
CONTRACT: City Offices - London MAIN CONTRACTOR: Airconaire Limited NATURE OF PROJECT: Replacement Chillers & Pumps AVERAGE LABOUR STRENGTH: 20 Operatives CONTRACT PERIOD: 14-months
PROJECT DETAILS
This project consisted of the supply,
installation, testing and commissioning
of 6 Basement Chillers, 6 Chiller Pumps
and Cooling Tower Enabling Works,
whilst maintaining the integrity of the
building.
• Enabling works for temporary chiller installation
• Installation of new chillers
• Pipe work and controls
• BMS
• Electrical Installation
• Builders work
• Testing & Commissioning
CONTRACT: Operations Centre - Southend-on-Sea
MAIN CONTRACTOR: Airconaire Limited
NATURE OF PROJECT: Replacement Chillers
AVERAGE LABOUR STRENGTH: 15 Operatives
CONTRACT PERIOD: 6-months
Replacement
Chillers
PROJECT DETAILS
This project consisted of the supply, installation, testing and commissioning of 3
Roof Chillers, associated Pipe work and Controls.
• Positioning and installation of new chillers, pipe work and controls
• BMS
• Electrical Installation
• Builder’s work
• Testing and commissioning
CONTRACT: Whittington Avenue,
Leadenhall Street
NATURE OF PROJECT:
Office Refurbishment
AVERAGE LABOUR STRENGTH: 22
Operatives
CONTRACT PERIOD: 10-months
Office Refurbishment
• 144 Fan Coil Units
• AHU Heat Recovery Unit
• Installation of new Chillers, Pipe Work & Pumps
• Controls & BMS
• Air Handling Unit
• Ductwork & Associated Grilles
• Domestic Hot & Cold Water Services
• Testing & Commissioning
PROJECT DETAILS
This project consisted of stripping
out all existing services and the
supply, installation, testing and
commissioning of:
Cooling Towers
London
PROJECT DETAILS
This project consisted of the
supply, installation, testing and
commissioning of 4 Cooling
Towers:
• Strip-out and removal of
redundant cooling tower and
pipe work.
• Installation of new cooling
towers
• Installation of condense water
services pipe work
• Installation of control valves
• Removal, modification and
installation of new and existing
controls to re-configure the
existing BMS system and
incorporate inverter for control
• Test and commissioning
CONTRACT: City Offices - London
MAIN CONTRACTOR: Airconaire Limited
NATURE OF PROJECT: New Cooling Towers
AVERAGE LABOUR STRENGTH: 12 Operatives
CONTRACT PERIOD: 16-weeks
PROJECT DETAILS
This project consisted of the design,
supply, installation, testing and
commissioning of 9 no Down Flow chilled
water air handling units, full function
including temperature and humidity
control, complete with open floor stands,
supply air to heavy duty floor mounted
supply grilles located in the cold aisles. 3
no free Cooling Chillers, tandem buffer
vessels, stainless steel pipe work.
Commerical Building
Data Centre
NATURE OF PROJECT: Full Mechanical
Services & BMS to a Data Centre
AVERAGE LABOUR STRENGTH: 20 Operatives
CONTRACT PERIOD: 6 Months
•Comms Room Cooling and Humidification
• UPS Room Cooling
• LV Switchboard Room Heating and Ventilation
•BMS System
•Office Air Conditioning and Ventilation
•HV Incoming Room Heating and Ventilation
•Toilet Core Heating, Ventilation, Hot & Cold
Water Services and Sanitary Ware
•Testing & Commissioning
CONTRACT: Process Cooling
MAIN CONTRACTOR:
Airconaire Limited
NATURE OF PROJECT: Replacement
of Water Cooled Chillers
AVERAGE LABOUR STRENGTH:
6 Operatives
CONTRACT PERIOD: 5-months
Industrial Building
PROJECT DETAILS
The Project consisted of the
removal of 5 existing water-
cooled chillers and replaced
with 3 new air-cooled chillers,
whilst maintaining the integrity
of the building.
• Removal of existing chillers and cooling towers
• Installation of new chillers
• Pipe work and controls
• BMS
• Electrical Installation
• Builders work
• Testing & Commissioning
CONTRACT: Manchester Evening
News, Offices Oldham
NATURE OF PROJECT:
Office Refurbishment
AVERAGE LABOUR STRENGTH: 22
Operatives
CONTRACT PERIOD: 10-months
Office Refurbishment
• Mitsubishi VRF Fan Coil Units
• Controls & BMS
• Air Handling Unit
• Ductwork & Associated Grilles
• Domestic Hot & Cold Water Services
• Testing & Commissioning
PROJECT DETAILS
This project consisted of installation
of Mitsubishi VRF AC Systems,
Ventilation services and associated
controls, and the installation of new
domestic H&C services, testing and
commissioning of:
PROJECT DETAILS
This Project consisted of the
removal and replacement of a
VRV System with a total of 5
fan coil units of various types.
The equipment used was the
latest replacement range from
Daikin enabling the re-use of
the existing R22 pipe work
whilst also allowing the upgrade
to some of the most efficient
systems in the market.
R22 Replacement
Office Refurbishment
London
CONTRACT:
BASEMENT OPEN PLAN OFFICE OF A SIX STOREY
COMMERCIAL BUILDING IN LONDON.
NATURE OF PROJECT:
REPLACEMENT OF 1 NO DAIKIN VRV HEAT PUMP SYSTEM.
AVERAGE LABOUR STRENGTH: 2 Operatives
CONTRACT PERIOD: 2-weeks
The scheme consisted of the
following elements:
•Installation of 1 new outdoor unit
•Installation of 5 new indoor units
•Pressure testing of pipe work
• Evacuating and charging of
system
• Reconfiguring of existing control
system
•Testing & Commissioning
REPLACE
CONTRACT: Local Glazing Company
MAIN CONTRACTOR:
Airconaire Limited
NATURE OF PROJECT: Replacement
of 1 Daikin VRV Systems
AVERAGE LABOUR STRENGTH:
2 Operatives
CONTRACT PERIOD: 4-weeks
AC Replacement
PROJECT DETAILS
This Project consisted of the removal and replacement of 2 no
VRV Systems with a total of 14 fan coil units of various types.
The equipment used was the latest replacement range from
Daikin enabling the re-use of the existing R22 pipe work whilst
also allowing the upgrade to some of the most efficient systems
in the market.
REPLACE
The scheme consisted of the
following elements:
•Installation of 2 new outdoor units
•Installation of 14 new indoor units
•Pressure testing of pipe work
•Evacuating and charging of system
•Reconfiguring of existing control system
•Testing & Commissioning
Office
Refurbishment
CONTRACT: Offices - Southeast MAIN CONTRACTOR: Airconaire Limited NATURE OF PROJECT: Refrigeration/AC replacement of R407c Units AVERAGE LABOUR STRENGTH: 6 Operatives CONTRACT PERIOD: 12-weeks
PROJECT DETAILS This Project consisted of the removal and replacement of 10 no VRF Systems with a total of 93 ducted fan coil units. The equipment used was the latest replacement multi range from Mitsubishi Electric Living Environmental Systems enabling the re-use of the existing R407C pipe work whilst also allowing the upgrade to some of the most efficient systems in the market.
• Installation of 10 new outdoor units
• Installation of 93 new indoor units
• Pressure Testing of pipe work
• Evacuating and charging of system
• Reconfiguring of existing control systems
• Testing & Commissioning