    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Department

    Responsibility/Role

    File Name 27762748.doc

    Revision

    Document Generation Date 18/01/2010 09:41:00

    Date Modified 1/18/2010 09:41:00 AM

    Last Changed by

    Status

    Submitting the Pre-Explode Configurable Bills of MaterialProcess

    Trigger:

    Concept

    You can use the Pre-Explode Configurable Bills of Material process to show all available options

    in a bill of material during order entry.

    Following is an example of a situation when such a process would be useful in a business

    scenario:

    A sales person enters sales orders for computers. Each computer has a large number of options

    available. The order entry page lists all of the option classes, such as monitor, CPU, and

    keyboard, but does not list all of the options within an option class until the sales person selects

    the option class. The sales person must wait while the options (such as standard, ergonomic, and

    wireless for the keyboard option class) are retrieved before selecting one of them. In order to

    eliminate this lag time (the time taken for options to load), run the Pre-Explode Configurable

    Bills of Material process on a nightly basis. This process explodes all the options so they are

    viewable in the order entry page without selecting an option class first.

    In this process, you will submit the pre-explode configurable bills of material process.

    Required Field(s) Comments

    Output - Result(s) Comments

    Last changed on: 1/18/2010 09:41:00 AM Page 1

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    2/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Additional Information

    Page 2 Last changed on: 1/18/2010 09:41:00 AM

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    3/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Procedure

    Step Action

    1. Begin by navigating to the Submit Request page.

    Click the vertical scrollbar.

    Last changed on: 1/18/2010 09:41:00 AM Page 3

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    4/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Step Action

    2. Click the Manufacturing and Distribution Manager link.

    Page 4 Last changed on: 1/18/2010 09:41:00 AM

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    5/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Step Action

    3. Click the vertical scrollbar.

    Step Action

    4. Click the Requests link.

    Last changed on: 1/18/2010 09:41:00 AM Page 5

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    6/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Step Action

    5. Use the Organizations page to select your organization.

    Page 6 Last changed on: 1/18/2010 09:41:00 AM

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    7/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Step Action

    6. Click the M1 Seattle Manufacturing list item.

    Step Action

    7. Click the OKbutton.

    orPress [Alt+O].

    Last changed on: 1/18/2010 09:41:00 AM Page 7

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    8/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Step Action

    8. Use the Submit a New Request page to enter either a single request or a set.

    Page 8 Last changed on: 1/18/2010 09:41:00 AM

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    9/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Step Action

    9. Click the OKbutton.

    orPress [Alt+O].

    Step Action

    10. Use the Submit Request page to enter the name of the report you want to run.

    Last changed on: 1/18/2010 09:41:00 AM Page 9

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    10/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Step Action

    11. Click in the Name field.

    Page 10 Last changed on: 1/18/2010 09:41:00 AM

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    11/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Step Action

    12. Enter the desired information into the Name field. Enter "Pre-Explode

    Configurable Bills of Material Process".

    Step Action

    13. Click in the Parameters field.

    Last changed on: 1/18/2010 09:41:00 AM Page 11

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    12/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Step Action

    14. Use the Parameters page to enter organization and the assembly details.

    Page 12 Last changed on: 1/18/2010 09:41:00 AM

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    13/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Step Action

    15. Click in the Org REQUIRED field.

    Step Action

    16. Enter the desired information into the Org REQUIRED field. Enter "M1".

    Last changed on: 1/18/2010 09:41:00 AM Page 13

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    14/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Step Action

    17. Click in the Specific Assembly field.

    Page 14 Last changed on: 1/18/2010 09:41:00 AM

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    15/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Step Action

    18. Use the System Items page to enter the item.

    Step Action

    19. Click in the Item field.

    Last changed on: 1/18/2010 09:41:00 AM Page 15

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    16/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Step Action

    20. Enter the desired information into the Item field. Enter "SB10299".

    Page 16 Last changed on: 1/18/2010 09:41:00 AM

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    17/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Step Action

    21. Click the OKbutton.

    orPress [Alt+O].

    Step Action

    22. Click the Explosion Type button.

    Last changed on: 1/18/2010 09:41:00 AM Page 17

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    18/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Step Action

    23. Use the Explosion Type page to select the explosion type.

    Page 18 Last changed on: 1/18/2010 09:41:00 AM

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    19/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Step Action

    24. Click the OKbutton.

    orPress [Alt+O].

    Step Action

    25. Click the OKbutton.

    orPress [Alt+O].

    Last changed on: 1/18/2010 09:41:00 AM Page 19

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    20/28

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    21/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Step Action

    27. Use the Decision page to note the request ID or optionally you can also submitanother request.

    Last changed on: 1/18/2010 09:41:00 AM Page 21

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    22/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Step Action

    28. Click the No button.

    orPress [Alt+N].

    Step Action

    29. Use the Find Requests page to enter the request ID.

    Page 22 Last changed on: 1/18/2010 09:41:00 AM

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    23/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Step Action

    30. Click the Specific Requests option.

    Last changed on: 1/18/2010 09:41:00 AM Page 23

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    24/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Step Action

    31. Click in the Request ID field.

    Step Action

    32. Enter the desired information into the Request ID field. Enter "5598461".

    Page 24 Last changed on: 1/18/2010 09:41:00 AM

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    25/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Step Action

    33. Click the Find button.

    orPress [Alt+i].

    Last changed on: 1/18/2010 09:41:00 AM Page 25

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    26/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Step Action

    34. Use the Requests page to find the status of the submitted request.

    Page 26 Last changed on: 1/18/2010 09:41:00 AM

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    27/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills of

    Material Process

    Step Action

    35. Click the View Details button.

    Step Action

    36. You can view the details of the request that you had submitted in the Request

    Detail page.

    Last changed on: 1/18/2010 09:41:00 AM Page 27

  • 8/14/2019 Submitting the Pre-Explode Configurable Bills of Material Process_SPD

    28/28

    System Process DocumentSubmitting the Pre-Explode Configurable Bills ofMaterial Process

    Step Action

    37. You have completed the Submitting the Pre-Explode Configurable Bills of MaterialProcess procedure.

    End of Procedure.