JURISDICTIONAL STREAM U ISOLATED WETLAND R SUBJECT TO CHANGE WITHOUT NOTICE CONCEPTUAL DRAWING LAUREL HALL UNC CHARLOTTE PARKING LOT 26 UNC CHARLOTTE PARKING LOT 25 Light Rail Terminus At UNC Charlotte SCALE 1" = 60’ 0 60 240 180 120 UNC CHARLOTTE STATION (3 - CAR CENTER PLATFORM) 3 - CAR TAIL TRACK TRACK CROSSOVER TRACTION POWER SUBSTATION RETAINING WALL SIDEWALK BUS PULL-OFF LYNX BLUE LINE EXTENSION | NORTHEAST CORRIDOR LIGHT RAIL PROJECT DATE: 02-08-11 70’ LRT CORRIDOR SIGNAL HOUSE CREW COMFORT FACILITY

SUBJECT TO CHANGE WITHOUT NOTICE - City of Charlottecharlottenc.gov/cats/transit-planning/blue-line-extension/Documents... · SUBJECT TO CHANGE WITHOUT NOTICE ... UNC CHARLOTTE PARKING

Embed Size (px)

Citation preview

JURISDICTIONAL

STREAM U

ISOLATED

WETLAND R

SUBJECT TO CHANGE WITHOUT NOTICE

CONCEPTUAL DRAWING

LAUREL HALL

UNC CHARLOTTE

PARKING LOT 26

UNC CHARLOTTE

PARKING LOT 25

Light Rail Terminus At UNC Charlotte

SCALE 1" = 60’

0 60 240180120

UNC CHARLOTTE STATION

(3 - CAR CENTER PLATFORM)

3 - CAR TAIL TRACKTRACK CROSSOVER

TRACTION POWER SUBSTATION

RETAINING WALL

SIDEWALK

BUS PULL-OFF

LYNX BLUE LINE EXTENSION | NORTHEAST CORRIDOR LIGHT RAIL PROJECT

DATE: 02-08-11

70’ LRT CORRIDOR

SIGNAL HOUSE

CREW COMFORT

FACILITY