STATE OF CONNECTICUT
DEPARTMENT OF TRANSPORTATION
M E M O R A N D U M
Subject:
0004-0118(4-132) Reconstruction of Old Farms Road Avon
Date: September 9, 2016
to:
Mary E. Baker Trans. Principal Engineer Bureau of Engineering and Construction
from:
Leo L. Fontaine Trans. Principal Engineer Bureau of Engineering and Construction
1. Transmitted are the following: Roadway Geotechnical Report Structure Geotechnical Report (Headwalls/Endwalls) Plans: Correspondence:
2. This transmittal is being made: In response to your request dated February 4, 2015. Initiated by this office
3. Comments:
4. Please take the following action: Please review and forward to Please review for incorporation into the design of the project For your use and information
Attachment
Amy Hare cc: Leo Fontaine – Michael McDonnell Jon Hagert – David Gruttadauria – Luis Alfonzo William Britnell - Matthew Vail – Marissa Washburn – Charlie Grillo
To: Mary E. Baker 2 Project No.: 0004-0118 From: Leo L. Fontaine Date: September 9, 2016
Geotechnical Roadway Report-Transmittal Format
Project Description : This project includes the realignment of Old Farms Road and safety improvements at the intersection of old Farms Road and Route 10. The purpose is to improve flooding conditions and safety concerns at the intersection. A short section of Route 10 will be widened with full-depth reconstruction. Two headwalls for the existing culverts at Sta. 2+118 and Sta. 2+268 will be constructed within the widening section of Route 10. This report details the roadway recommendations in addition to the structure recommendations.
Geotechnical Information and Site Conditions: Surficial Geology: Published USGS mapping indicated the presence of alluvium overlying fines in the area of the stream, and sand and gravel underlying the site. Bedrock Geology: Published USGS mapping indicates the presence of the bedrock formation New Haven Arkose underlying the site. Observations:
o Groundwater was observed in three of the borings, R-2, R-3, and R-4. Zero-hour readings obtained directly after drilling indicated a shallow groundwater at elevations varying from elevation 54 to 56.
o Slope instability is present at the outlets of both culverts at Site 1 and Site 2 due to erosion at the culvert outlets.
Subsurface Exploration and Testing Data: Boring logs and location plan attached. Pavement Core results and location plan attached. Rock Core data sheet attached. Laboratory test data attached.
Recommendations (Headwalls):
Site 1 (Sta. 2+268): o Found the spread footing foundation on 12 inches of granular fill on
prepared in-situ soil, with a minimum embedment depth of 4 feet. o The granular fill should extend 12-inches beyond the limits of the footing. o The preliminary plans indicate the footing shall be founded at elevation
54.5 ft. o Backfill the headwall with Pervious Structure Backfill. Provide back wall
drainage using bagged stone and weepholes. o The attached Geotechnical Wall Design Parameter sheet details the
foundation design recommendations. o Immediate settlement is predicted to be 0.5” or less. Post-construction
settlement is expected to be negligible.
To: Mary E. Baker 3 Project No.: 0004-0118 From: Leo L. Fontaine Date: September 9, 2016
Site 2 (Sta. 2+118):
o Found the spread footing foundation on 12 inches of granular fill on prepared in-situ soil, with a minimum embedment depth of 4 feet.
o The granular fill should extend 12-inches beyond the limits of the footing. o The preliminary plans indicate the footing shall be founded at elevation
56.75 ft. o Backfill the headwall with Pervious Structure Backfill. Provide backwall
drainage using bagged stone and weepholes. o The attached Geotechnical Wall Design Parameter Sheet details the
foundation design recommendations. o Immediate settlement is predicted to be ¾” or less. Post-construction
settlement is expected to be negligible.
o The Factored Strength Limit and Factored Service Limit bearing capacities for both retaining walls should be reflected on the plans.
Recommendations (Roadway):
Fill Slopes: o Maximum fill slope rates: 1 (V) to 1.5 (H). o Slope treatments for slope surface: Use standard turf establishment for
slopes 1(V) to 2(H) or flatter as per FORM 817. Earth Cut Slopes: o Maximum cut slope rates: 1 (V) to 2 (H). o Treatment for slope surface: Use standard turf establishment as per FORM
817. o Earth excavation shrink value: 10% o Rock excavation estimate for payment size boulders: Neither rock excavation
nor payment sized boulders are anticipated during roadway excavation.
Additional Recommendations: o Include the following logs on the wall plan sheets: R-1, R-2, R-3, and R-4. o Reuse of excavated materials should be limited to embankment fill only.
To: Mary E. Baker 4 Project No.: 0004-0118 From: Leo L. Fontaine Date: September 9, 2016
Construction Considerations: o Maximum cut slope rates for establishing temporary sheeting limits shall be:
1.5(H): 1(V). We anticipate the use of TERS is required at this site and should be called for on the plans. Steel sheetpiling should be feasible.
o The proposed method for water handling is a diversion pipe around the existing culverts. Should this method change, we will provide recommendations for cofferdam and dewatering requirements with the associated pay items.
o Bedrock and payment-sized boulders should not be encountered during construction so no rock excavation items will be required.
o No yielding or overexcavation of subgrade soil is anticipated. Subgrade soil, prepared in accordance with Form 816-Section 2.09, shall provide a firm stable base for the placement of the pavement structure.
o Plans should call for the use of Structure Excavation – Earth (Complete.) o Slope treatment for slope surfaces: As previously discussed with Highway
Design, for the steepened slope at 2+268, utilize crushed stone placed upon 6-inches of granular fill.
Attachments:
1. Figures a. Project Location Plan b. USGS Mapping (Surficial and Bedrock) c. Boring Location Plans (3)
2. Subsurface Data: a. Boring Logs
3. Design a. Wall Design Sheet for Site 1 b. Wall Design Sheer for Site 2
Wa
terv
ille
Sta
te H
wy 1
0
Cid
er
Bro
ok
Old Farms
Tillo
tso
n
Fawn
Bishop
Cem
ete
ry
Driveway
Bishop
Thick Till
Till
Sand and GravelAlluvium overlying Fines
Water
Water
Alluvium overlying Fines
Gravel
Avon
Project No. 0004-0118Relocation of Old Farms Road
4
Surficial Geology
0 1,200 2,400600Feet
Wa
terv
ille
Sta
te H
wy 1
0
Cid
er
Bro
ok
Old Farms
Tillo
tso
n
Fawn
Bishop
Cem
ete
ry
Driveway
Bishop
New Haven ArkoseAvon
Project No. 0004-0118Relocation of Old Farms Road
4
Bedrock Geology
0 1,200 2,400600Feet
27C
OO
RDIN
AT
E
GRID
AD
CO
NN
EC
TIC
UT
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
9/9/2016
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\Geotech\4-118_SF_LOC.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
-
-
-
-ROUTE 10
AVON
1 OF 3BORING LOCATION PLAN
AEH
REALIGNMENT OF OLD FARMS RD4-118
R-1
R-4, Sta. 2+412
R-3, Sta. 2+250
R-2, Sta. 2+117
R-1, Sta. 1+550
MA
PL
E
1.0
MA
PL
E
1.0
AS
H
1.0
TWIN
OA
K
1.5
OA
K
1.5
AP
PR
OX.
WE
TL
AN
DS
49
49
4949
49
49
49
49
49
49
48
48
48
49
49
49
49
Z=4
8.7
7
X=17
67
13.1
6
Y=104
315.8
1
1+540
1+520
1+500
1+560
1+580
Proposed Alignment
27
CO
OR
DIN
AT
E
GRID
AD
CO
NN
EC
TIC
UT
R-2
R-3
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
9/9/2016
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\Geotech\4-118_SF_LOC.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
-
-
-
-REALIGNMENT OF OLD FARMS RD
ROUTE 10
AVON
2 OF 3BORING LOCATION PLAN
AEH 4-118
R-4, Sta. 2+412
R-3, Sta. 2+250
R-2, Sta. 2+117
R-1, Sta. 1+55062
59
60
60
60
60
61
61
61
61
61
62
62
62
62
62
62
62
62
62
62
62
62
62
62
62
62
62
62
62
63
63
63
63
63
64
64
64
64
64
Sta. 2+118
Proposed Headwall
Sta. 2+268
Proposed Headwall
27
CO
OR
DIN
AT
E
GRID
AD
CO
NN
EC
TIC
UT
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
9/9/2016
BLOCK:
SIGNATURE/
APPROVED BY:
OFFICE OF ENGINEERING
...\Geotech\4-118_SF_LOC.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
-
-
-
-REALIGNMENT OF OLD FARMS RD
ROUTE 10
AVON
3 OF 3BORING LOCATION PLAN
4-118AEH
BO
UL
DE
R
PIL
LA
R
IRO
N
FE
NC
E
375
CP
P
63
64
64
64
64
64
64
64
65
65
66
67
R-4
R-4, Sta. 2+412
R-3, Sta. 2+250
R-2, Sta. 2+117
R-1, Sta. 1+550
S-1
S-2
S-3
S-4
TOPSOIL
SAND Brown f-c SAND, tr. silt
Brown f SAND, little silt, tr. gravel
Brown f-c SAND, little gravel, tr. silt, with cobbles
Brown f-c SAND, some silt, little gravel
END OF BORING 17ft
24
24
24
24
2
5
15
17
3 4 4 5
1 1 1 3
8 16 25 21
12 12 14 9
Core Barrel Type: NA
Driller: P. Michaud
Engineer: Amy Hare
Start Date: 7-11-15 Route No.: Old Farms Rd.
Inspector: A. Hare
Hammer Wt.: NA
Earth: 17ft
Stat./Offset: 1+550/3.5 m RTown: Avon
Project No.: 0004-0118 Northing: 104332.74
Easting: 176722.557
Finish Date: 7-11-15 Bridge No.:
Hole No.: R-1
NOTES: The Depths are in feet.The Stations are in meters.
Sheet1 of 1
No. ofSoil Samples: 4
Rock: ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sam
ple
Typ
e/N
o.
Total Penetration in
Surface Elevation: 48.69
Fall: 30in.Fall: NAin.
Sampler Type/Size: 2" SS
Gen
eral
ized
Str
ata
Des
crip
tion
Dep
th (
ft)
0
5
10
15
20
Hammer Wt.: 140
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: NA
SM-001-M REV. 1/02
Pen
. (in
.)
Rec
. (in
.)
Ele
vatio
n (f
t)
45
40
35
30
Blows onSampler
per 6 inches
Project Description: Realignment of Old Farms Rd
Groundwater Observations: @NE
S-1
S-2
S-3
S-4
S-5
PAVEMENTSTRUCTURESILTY SAND
GLACIALTILL
Reddish brown f SAND, some silt
Brown f SAND, some silt, tr. organics
Reddish brown f SAND, little silt, tr. gravel
Reddish brown f SAND, some silt, tr. gravel
Reddish brown f SAND, some silt, tr. gravel
END OF BORING 26.9ft
24
24
24
24
22
10
12
12
15
17
1 2 1 1
13 3 6 11
12 12 10 10
12 28 31 34
58 32 60 65/4
Core Barrel Type: NA
Driller: P. Michaud
Engineer: Amy Hare
Start Date: 7-13-15 Route No.: 10
Inspector: G. Arzt
Hammer Wt.: 140lb
Earth: 26.9ft
Stat./Offset: 2+117/3 m LTown: Avon
Project No.: 0004-0118 Northing: 104049.817
Easting: 177011.618
Finish Date: 7-13-15 Bridge No.:
Hole No.: R-2
NOTES: The Depths are in feet.The Stations are in meters.
Sheet1 of 1
No. ofSoil Samples: 5
Rock: ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sam
ple
Typ
e/N
o.
Total Penetration in
Surface Elevation: 60.57
Fall: 30in.Fall: 24in.
Sampler Type/Size: 2"SS
Gen
eral
ized
Str
ata
Des
crip
tion
Dep
th (
ft)
0
5
10
15
20
25
30
Hammer Wt.: 140lb
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pen
. (in
.)
Rec
. (in
.)
Ele
vatio
n (f
t)
60
55
50
45
40
35
Blows onSampler
per 6 inches
Project Description: Realignment of Old Farms Rd
Groundwater Observations: @7.5 after 0 hours
85
S-1
S-2
S-3
S-4
C-1
PAVEMENTSTRUCTURESAND
GLACIALTILL
BEDROCK
Brown f-c SAND, tr. silt, with cobbles
Reddish brown f SAND, little silt, tr. gravel
Reddish brown f SAND, little silt, tr. gravel, withcobbles
Reddish brown f-c SAND and GRAVEL, withcobbles
Red SILTSTONE, fine-grained, laminated,moderately fractured, slightly weathered, mediumstrong. Core times: 3, 2, 2.5, 2.5, 3 min.
END OF BORING 30ft
24
24
24
1.5
60
2
15
9
1.5
55.6
1 1 1 2
13 7 8 14
11 15 34 37
50/1.5 0 0 0
Core Barrel Type: NQ2
Driller: P. Michaud
Engineer: Amy Hare
Start Date: 7-13-15 Route No.: 10
Inspector: G. Arzt
Hammer Wt.: 140lb
Earth: 25.1ft
Stat./Offset: 2+250/0.5 m RTown: Avon
Project No.: 0004-0118 Northing: 104179.588
Easting: 177041.368
Finish Date: 7-13-15 Bridge No.:
Hole No.: R-3
NOTES: The Depths are in feet.The Stations are in meters.
Sheet1 of 1
No. ofSoil Samples: 5
Rock: 5ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 1
RQ
D %
Sam
ple
Typ
e/N
o.
Total Penetration in
Surface Elevation: 62
Fall: 30in.Fall: 24in.
Sampler Type/Size: 2"SS
Gen
eral
ized
Str
ata
Des
crip
tion
Dep
th (
ft)
0
5
10
15
20
25
30
Hammer Wt.: 140lb
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4" HFJ
SM-001-M REV. 1/02
Pen
. (in
.)
Rec
. (in
.)
Ele
vatio
n (f
t)
60
55
50
45
40
35
30
Blows onSampler
per 6 inches
Project Description: Realignment of Old Farms Rd
Groundwater Observations: @4.5 after 0 hours
S-1
S-2
S-3
S-4
S-5
PAVEMENTSTRUCTURESAND
GLACIALTILL
Reddish brown f-c SAND, little silt, tr. gravel
Reddish brown f SAND, little silt, tr. gravel
Reddish brown f SAND, little silt, tr. gravel
Reddish brown f SAND, some silt, tr. f gravelwith cobbles
Reddish brown f SAND and SILT
END OF BORING 26.5ft
24
24
16
24
6
10
14
15
18
6
9 10 12 15
16 24 25 39
40 62 70/5 0
24 28 45 55
60/6"
Core Barrel Type: NA
Driller: P. Michaud
Engineer: Amy Hare
Start Date: 7-13-15 Route No.: 10
Inspector: G. Arzt
Hammer Wt.: 140lb
Earth: 28ft
Stat./Offset: 2+412/2 m LTown: Avon
Project No.: 0004-0118 Northing: 104338.609
Easting: 177071.668
Finish Date: 7-13-15 Bridge No.:
Hole No.: R-4
NOTES: The Depths are in feet.The Stations are in meters.
Sheet1 of 1
No. ofSoil Samples: 5
Rock: ft
Sample Type: S = Split Spoon C = Core UP = Undisturbed Piston V = Vane Shear Test
Proportions Used: Trace = 1 - 10%, Little = 10 - 20%, Some = 20 - 35%, And = 35 - 50%
No. ofCore Runs: 0
RQ
D %
Sam
ple
Typ
e/N
o.
Total Penetration in
Surface Elevation: 64.8
Fall: 30in.Fall: 24in.
Sampler Type/Size: 2"SS
Gen
eral
ized
Str
ata
Des
crip
tion
Dep
th (
ft)
0
5
10
15
20
25
30
Hammer Wt.: 140lb
Material Descriptionand Notes
SAMPLES
Connecticut DOT Boring Report
Casing Size/Type: 4"HFJ
SM-001-M REV. 1/02
Pen
. (in
.)
Rec
. (in
.)
Ele
vatio
n (f
t)
60
55
50
45
40
35
Blows onSampler
per 6 inches
Project Description: Realignment of Old Farms Rd
Groundwater Observations: @3 after 0 hours
Geotechnical Wall Design Parameters
Project No. 0004-0118
Retaining Wall Site 1
Sta. 2+268
Factored Resistances
Strength Limit Service Limit
Bearing 3.3 tsf 4.0 tsf
Sliding 0.46V 0.57V
V=total vertical force
Lateral Earth Loads
Soil Unit Weight, γ : 125 pcf
Lateral Earth Pressure(static): 34 psf
Live Load Surcharge-Uniform Earth Pressure*: 0.33 γ heq
*heq based on AASHTO-LRFD Table 3.11.6.4-2
Foundation Design Details
Minimum Embedment Depth: 4 ft.
Backwall Drainage: Bagged Stone and Weepholes
Subgrade Preparation: 1ft of Granular Fill
Maximum Temporary Cut Slope: 1(V):1.5(H)
Additional Comments
• Design recommendations based on 2007 AASHTO LRFD and ConnDOT Bridge Design
Manual.
• Preliminary plans/cross sections provided show the bottom of footing to be at elevation
54.5 ft +
• Include the following logs on the wall plan sheets: R-3
Geotechnical Wall Design Parameters
Project No. 0004-0118
Retaining Wall Site 2
Sta. 2+118
Factored Resistances
Strength Limit Service Limit
Bearing 2.6 tsf 2.2 tsf
Sliding 0.46V 0.57V
V=total vertical force
Lateral Earth Loads
Soil Unit Weight, γ : 120 pcf
Lateral Earth Pressure(static): 34 psf
Live Load Surcharge-Uniform Earth Pressure*: 0.33 γ heq
*heq based on AASHTO-LRFD Table 3.11.6.4-2
Foundation Design Details
Minimum Embedment Depth: 4 ft.
Backwall Drainage: Bagged Stone and Weepholes
Subgrade Preparation: 1ft of Granular Fill
Maximum Temporary Cut Slope: 1(V):1.5(H)
Additional Comments
• Design recommendations based on 2007 AASHTO LRFD and ConnDOT Bridge Design
Manual.
• Preliminary plans/cross sections provided show the bottom of footing to be at elevation
56.75 ft +
• Include the following logs on the wall plan sheets: R-2.