Upload
engels-ticona
View
228
Download
0
Embed Size (px)
Citation preview
8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
1/20
http://www.edumine.com/courses/online-courses/design-and-application-of-sublevel-stoping-
methods/
Design and Application of Sublevel Stoping Methods
Review #1
The randomly selected multiple-choice questions below are designed to review
your understanding of the material covered in the preceding sessions. Your
selections are lost when you leave the review page. On return the review will
start afresh with a new selection of questions.
You are currently registered for certification and the review is set to certification
mode. Each question has one or more correct responses. Your selection of aresponse is immediately marked correct or not. If you select an incorrect
response you may still make another selection for that question. You receive
one point for each correct response, and lose a point for each incorrect
response. Click the Scorebutton at the end to view your score.
To qualify for certification you must achieve an average score of 75% or more in
the course reviews with a minimum score of not less than 60%. Click
the Submitbutton at the end when you are satisfied with your score. Use Exit
Coursewhen you have completed all reviews.
Q1. Sublevel stoping requires pillars to ... (select one or more)
separate adjacent stopes?
reduce the potential for wall slough?
define stope boundaries?
Q2. With respect to geometric requirements, the dip of the orebody should be _________
the angle of draw of blasted ore? (select one only)
less than... Learn more
http://www.edumine.com/courses/online-courses/design-and-application-of-sublevel-stoping-methods/http://www.edumine.com/courses/online-courses/design-and-application-of-sublevel-stoping-methods/http://www.edumine.com/courses/online-courses/design-and-application-of-sublevel-stoping-methods/http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/courses/online-courses/design-and-application-of-sublevel-stoping-methods/http://www.edumine.com/courses/online-courses/design-and-application-of-sublevel-stoping-methods/8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
2/20
equal to... Learn more
greater than
Q3. Which of the following terms is synonymous with planned dilution (select one only)?
external dilution... Learn more
internal dilution
unplanned dilution... Learn more
Q4. A sill pillar is aligned transverse to the stope and perpendicular to the strike of the
orebody.
True?... Learn more
False?
Q5. Which of the following drilling methods are the best for drilling straight holes with
minimum deviation? (select one or more)
in-the-hole drilling
down-the-hole drilling
top hammer drilling... Learn more
Q7. Which of the following drilling methods has the greatest penetration rate? (select one
only)
in-the-hole drilling... Learn more
down-the-hole drilling... Learn more
top hammer drilling
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
3/20
Q6. VCR mining requires blasting to a ... (select one only)
horizontal free face?
vertical free face?... Learn more
vertical slot?... Learn more
Q7. In terms of geotechnical requirements, sublevel stoping requires a competent hanging
wall and footwall and a weak ore strength.
True?... Learn more
False?
Q8. The height of a sublevel stope is ... (select one only)
the exposed distance along the hanging wall?
the inclined distance along the footwall?... Learnmore
the vertical distance between levels?... Learn more
Q9. Which of the following stoping methods require blasting into a vertical slot? (select
one or more)
sublevel stoping
longhole stoping
VCR... Learn more
Alimak
blasthole stoping
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
4/20
8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
5/20
mode. Each question has one or more correct responses. Your selection of a
response is immediately marked correct or not. If you select an incorrect
response you may still make another selection for that question. You receive
one point for each correct response, and lose a point for each incorrect
response. Click the Scorebutton at the end to view your score.
To qualify for certification you must achieve an average score of 75% or more in
the course reviews with a minimum score of not less than 60%. Click
the Submitbutton at the end when you are satisfied with your score. Use Exit
Coursewhen you have completed all reviews.
Q1. Which of the following stoping methods require blasting into a vertical slot? (select
one or more)
sublevel stoping
longhole stoping
VCR... Learn more
Alimak
blasthole stoping
Q2. Which of the following drilling methods has the greatest penetration rate? (select one
only)
in-the-hole drilling... Learn more
down-the-hole drilling... Learn more
top hammer drilling
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
6/20
Q3. The span of a sublevel stope is ... (select one only)
the perpendicular distance between the footwall
and the hanging wall?... Learn more
the length of the stope along the strike of the
orebody?
the distance along the exposed hanging wall?...Learn more
Q4. With respect to geometric requirements, the dip of the orebody should be _________
the angle of draw of blasted ore? (select one only)
less than... Learn more
equal to... Learn more
greater than
Q5. In terms of geotechnical requirements, sublevel stoping requires a competent hanging
wall and footwall and a weak ore strength.
True?... Learn more
False?
Q6. Which of the following terms is synonymous with planned dilution (select one only)?
external dilution... Learn more
internal dilution
unplanned dilution... Learn more
Q7. Sublevel stoping requires pillars to ... (select one or more)
separate adjacent stopes?
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
7/20
reduce the potential for wall slough?
define stope boundaries?
Q8. A sill pillar is aligned transverse to the stope and perpendicular to the strike of theorebody.
True?... Learn more
False?
Q9. The minimum stope width that can be mined by sublevel stoping is ... (select one only)
0.8m?
1.5m?... Learn more
3m?... Learn more
Q10. The height of a sublevel stope is ... (select one only)
the exposed distance along the hanging wall?
the inclined distance along the footwall?... Learnmore
the vertical distance between levels?... Learn more
Q11. Swell is defined as the volume increase of a material when it is broken and removed
from the natural state.
True?
False?... Learn more
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
8/20
Q12. Sublevel stoping is a highly selective mining method because changes in ore-body
geometry can be easily accommodated.
True?... Learn more
False?
Review #2
The randomly selected multiple-choice questions below are designed to review
your understanding of the material covered in the preceding sessions. Your
selections are lost when you leave the review page. On return the review will
start afresh with a new selection of questions.
You are currently registered for certification and the review is set to certification
mode. Each question has one or more correct responses. Your selection of a
response is immediately marked correct or not. If you select an incorrect
response you may still make another selection for that question. You receive
one point for each correct response, and lose a point for each incorrect
response. Click the Scorebutton at the end to view your score.
To qualify for certification you must achieve an average score of 75% or more in
the course reviews with a minimum score of not less than 60%. Click
the Submitbutton at the end when you are satisfied with your score. Use Exit
Coursewhen you have completed all reviews.
Q1. Sublevel stoping is more suitable for narrower orebodies than longhole stoping.
True?
False?... Learn more
Q2. The principal difference between sublevel stoping and long-hole stoping is that
intermediate level drill drifts are eliminated.
True?
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
9/20
False?... Learn more
Q3. In long-hole stoping, the principal reason for using large diameter drills is ... (select
one only)
to accommodate more explosive... Learn more
to increase the drilling accuracy
to increase the drilling rate... Learn more
Q4. Ensuring that drawpoints remain full above the brow of a stope helps to eliminate the
risk of air blast.
True?
False?... Learn more
Q5. The principal objective of transverse open stoping is to mine the secondary pillars
between the primary stoping blocks after the latter have been backfilled with
consolidated fill.
True?
False?... Learn more
Q6. To accommodate the swell of blasted muck in a stope, a slot should be developed at
... (select one only)
one end of the stope... Learn more
the narrowest part of the stope... Learn more
the widest part of the stope
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
10/20
Q7. Which of the following technolgy developments have contributed significantly to the
viability of sublevel stoping methods by reducing the required development and
increasing production capacity? (select one or more)
drill extension steels
hollow tube rock drills
ITH drilling techniques
Q8. With vein mining, the direction of drilling for blasting is ... (select one only)
parallel to orebody dip?... Learn more
parallel to orebody strike?
perpendicular to the plane of the orebody?... Learnmore
Q9. In the context of VCR mining, a ratio of explosive column length (L) to hole diameter
(D) of _______ or less will behave similarly to a spherical charge. (select one only)
9?... Learn more
6?
3?... Learn more
Q10. In sublevel stoping, drill drives should be developed in both the hanging wall and the
footwall if the stope width is greater than ... (select one only)
5m... Learn more
10m... Learn more
15m
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
11/20
Q11. The principal difference between vertical crater retreat stoping and long-hole
stoping is that the free face for blasting is vertical rather than horizontal.
True?... Learn more
False?
Q12. Advantages of vertical crater retreat stoping include ... (select one or more)
accommodation of irregular orebodies?... Learn more
high productivity?
short development time?... Learn more
support for hanging wall and footwall?
high degree of mechanization?
Q13. Which of the following drill types are more suitable for wider orebodies? (select one
or more)
DTH drill
ITH drill
top hammer drill... Learn more
Q14. Longitudinal mining, which involves mining along the strike of an orebody, is also
called ... (select one or more)
Alimak mining?... Learn more
Avoca mining?
strike mining?
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
12/20
transverse open stoping?... Learn more
Q15. Vertical crater retreat stoping is more suited to orebodies with less competent
hanging wall and footwall because the stope remains full of blasted muck until the end.
True?
False?... Learn more
Q16. The perimeter of a ring section should always follow the contours of the orebody.
True?... Learn more
False?
Review #2
The randomly selected multiple-choice questions below are designed to review
your understanding of the material covered in the preceding sessions. Your
selections are lost when you leave the review page. On return the review will
start afresh with a new selection of questions.
You are currently registered for certification and the review is set to certificationmode. Each question has one or more correct responses. Your selection of a
response is immediately marked correct or not. If you select an incorrect
response you may still make another selection for that question. You receive
one point for each correct response, and lose a point for each incorrect
response. Click the Scorebutton at the end to view your score.
To qualify for certification you must achieve an average score of 75% or more in
the course reviews with a minimum score of not less than 60%. Click
the Submitbutton at the end when you are satisfied with your score. Use Exit
Coursewhen you have completed all reviews.
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
13/20
Q1. Which of the following technolgy developments have contributed significantly to the
viability of sublevel stoping methods by reducing the required development and
increasing production capacity? (select one or more)
drill extension steels
hollow tube rock drills
ITH drilling techniques
Q2. Vein mining, which is employed with narrow vein ore bodies, is also called ... (select
one only)
Alimak mining?
Avoca mining?... Learn more
longitudinal mining?... Learn more
Q3. In sublevel stoping, drill drives should be developed in both the hanging wall and the
footwall if the stope width is greater than ... (select one only)
5m... Learn more
10m... Learn more
15m
Q4. The principal difference between sublevel stoping and long-hole stoping is that
intermediate level drill drifts are eliminated.
True?
False?... Learn more
Q5. Advantages of vertical crater retreat stoping include ... (select one or more)
accommodation of irregular orebodies?... Learn more
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
14/20
high productivity?
short development time?... Learn more
support for hanging wall and footwall?
high degree of mechanization?
Q6. In long-hole stoping, the principal reason for using large diameter drills is ... (select
one only)
to accommodate more explosive... Learn more
to increase the drilling accuracy
to increase the drilling rate... Learn more
Q7. The perimeter of a ring section should always follow the contours of the orebody.
True?... Learn more
False?
Q8. Which of the following drill types are more suitable for wider orebodies? (select one
or more)
DTH drill
ITH drill
top hammer drill... Learn more
Q9. Sublevel stoping is more suitable for narrower orebodies than longhole stoping.
True?
False?... Learn more
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
15/20
Q10. With vein mining, the direction of drilling for blasting is ... (select one only)
parallel to orebody dip?... Learn more
parallel to orebody strike?
perpendicular to the plane of the orebody?... Learnmore
Q11. The principal objective of transverse open stoping is to mine the secondary pillars
between the primary stoping blocks after the latter have been backfilled with
consolidated fill.
True?
False?... Learn more
Q12. In the context of sublevel stoping, the term toe spacing is defined as ... (select one
only)
the distance between the starts of adjacent drill
holes?... Learn more
the distance between the ends of adjacent drill
holes?
the distance between ring sections at the draw
level?... Learn more
Q13. The principal difference between vertical crater retreat stoping and long-hole
stoping is that the free face for blasting is vertical rather than horizontal.
True?... Learn more
False?
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
16/20
Q14. Ensuring that drawpoints remain full above the brow of a stope helps to eliminate
the risk of air blast.
True?
False?... Learn more
Q15. To accommodate the swell of blasted muck in a stope, a slot should be developed at
... (select one only)
one end of the stope... Learn more
the narrowest part of the stope... Learn more
the widest part of the stope
Q16. In the context of VCR mining, a ratio of explosive column length (L) to hole diameter
(D) of _______ or less will behave similarly to a spherical charge. (select one only)
9?... Learn more
6?
3?... Learn more
Q1. Sublevel stoping is more suitable for narrower orebodies than longhole stoping.
True?
False?
Q2. Longitudinal mining, which involves mining along the strike of an orebody, is also
called ... (select one or more)
Alimak mining?
Avoca mining?
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
17/20
strike mining?
transverse open stoping?
Q3. Which of the following drill types are more suitable for narrow orebodies? (select oneor more)
ITH drill... Learn more
top hammer drill
DTH drill... Learn more
Q4. In the context of VCR mining, a ratio of explosive column length (L) to hole diameter(D) of _______ or less will behave similarly to a spherical charge. (select one only)
9?
6?
3?
Q5. Advantages of vertical crater retreat stoping include ... (select one or more)
accommodation of irregular orebodies?
high productivity?
short development time?
support for hanging wall and footwall?
high degree of mechanization?
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
18/20
Q6. The principal objective of transverse open stoping is to mine the secondary pillars
between the primary stoping blocks after the latter have been backfilled with
consolidated fill.
True?
False?
Q7. To accommodate the swell of blasted muck in a stope, a slot should be developed at
... (select one only)
one end of the stope
the narrowest part of the stope
the widest part of the stope
Q8. Vertical crater retreat stoping is more suited to orebodies with less competent
hanging wall and footwall because the stope remains full of blasted muck until the end.
True?
False?
Q9. In long-hole stoping, the principal reason for using large diameter drills is ... (select
one only)
to accommodate more explosive
to increase the drilling accuracy
to increase the drilling rate
Q10. The perimeter of a ring section should always follow the contours of the orebody.
True?
False?
8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
19/20
Q11. In sublevel stoping, drill drives should be developed in both the hanging wall and the
footwall if the stope width is greater than ... (select one only)
5m
10m
15m
Q12. With vein mining, the direction of drilling for blasting is ... (select one only)
parallel to orebody dip?
parallel to orebody strike?
perpendicular to the plane of the orebody?
Q13. Which of the following technolgy developments have contributed significantly to the
viability of sublevel stoping methods by reducing the required development and
increasing production capacity? (select one or more)
drill extension steels
hollow tube rock drills
ITH drilling techniques
Q14. In the context of sublevel stoping, the term burden is defined as ... (select one only)
the mass of rock in a ring section?... Learn more
the weight of explosive required to blast a ringsection?... Learn more
the perpendicular distance between drill rings?
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm8/11/2019 Sub l Eves Lllll Nnnnnnn Nnnnnnnnn
20/20
Q15. Which of the following drill types are more suitable for wider orebodies? (select one
or more)
DTH drill
ITH drill
top hammer drill... Learn more
Q16. Vein mining, which is employed with narrow vein ore bodies, is also called ... (select
one only)
Alimak mining?
Avoca mining?... Learn more
longitudinal mining?
http://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htmhttp://www.edumine.com/xutility/html/documentDisplayEN.htm