Upload
avani
View
30
Download
0
Tags:
Embed Size (px)
DESCRIPTION
STUDY TITLE. Presenter Name Presenter Title Duty Location Date of Presentation. Briefing Purpose. Confirm the Tentatively Selected Plan. Discuss significant public, technical, and policy comments and their resolution. Discuss significant risks being carried forward in the study - PowerPoint PPT Presentation
Citation preview
US Army Corps of EngineersBUILDING STRONG®
STUDY TITLE
Presenter NamePresenter Title
Duty Location
Date of Presentation
BUILDING STRONG®
Briefing Purpose Confirm the Tentatively Selected Plan.
Discuss significant public, technical, and policy comments and their resolution.
Discuss significant risks being carried forward in the study
Confirms a willing non-Federal sponsor
Request Panel endorsement of the TSP.
Request feedback and guidance on path forward
Request approval to proceed to feasibility level design.
2
BUILDING STRONG®
Study Authorities List date and blurb of study authority that defines mission
area and scope.
3
BUILDING STRONG®
Authorized Study Area
4
Insert Map
BUILDING STRONG®
Problems/Objectives/Constraints Focus on problems that are unique to the study and
show that the study has Federal Interest Clear, measurable objectives Constraints unique to this study/study area
5
BUILDING STRONG®
Final Array of Alternatives Distinctly different alternatives Risks inherent in each alternative Potential impacts Major qualitative and quantitative metrics used for trade off
analysis
6
BUILDING STRONG®
Tentatively Selected Plan
Key features of the TSP Trade-offs between benefits, environmental
impacts, costs, policy, legal issues, and sponsor capability that led to selection
7
BUILDING STRONG®
Significant CommentsATR/IEPR/Policy/ Public
Only discuss SIGNIFICANT comments that have changed the TSP since the TSP milestone or have high risk when moving forward in the study
8
BUILDING STRONG®
MSC Quality Assurance MSC confirms that they have done their QA role
throughout the study process ATR and IEPR leads can add input here if they deem it
necessary
9
BUILDING STRONG®
Sponsor Views
Sponsor may send District a statement to enter here, and this is the time for them to speak of few words of their support of the TSP (whether that is NED or LPP)
10
BUILDING STRONG®
HQ Policy Review Recap of significant Policy and Legal Review comments
and recommendations
11
BUILDING STRONG®
Risk Register Highlights Confirming the TSP
This reflects the Risk Register summary submitted as a read ahead with issues that have not been covered by other slides
Significant Risk Register items added because of review comments that have changed the TSP or are high risks
12
BUILDING STRONG®
Risk Register Highlights Path Forward for TSP Refinement
Risks being carried forward into feasibility level design
How will the PDT move from TSP to final report / recommendation?
13
BUILDING STRONG®
Feasibility Level DesignRemaining Funds Available
14
BUILDING STRONG®
Project Schedule
15
Milestone Date (or Projected Date)
Feasibility Cost Share Agreement Signed
Alternatives Milestone
Tentatively Selected Plan Milestone
Agency Decision Milestone
Civil Works Review Board
Chief’s Report
BUILDING STRONG®
Applied Lessons Learned Lessons learned from previous studies
Lessons learned during this study
16
BUILDING STRONG®
Discussion and
Decision
17