Structured project development creates
competitive advantagesP E R L U N D Q U I S T, D I R E C TO R O F O P E R AT I O N S D E V E LO P M E N T
C A P I TA L M A R K E T S DAY M AY 2 1 , 2 0 1 9
Structured project developmentA chain of improvement projects
21/05/20192
2003Structured Pre-Construction
2004Strategic Purchasing
2010Structured Production2008
Structured Sales
1999Streamlining of business to Project DevelopmentResidential Units and change of name to JM AB
2011Structured Project Design
2013Structured AcquisitionStructured Purchasing
2014Structured Logistics
BIM, PLM
Logistics procedures
Method descriptions
Product descriptions
Pre-Construction Procedures
Framework agreements
2015Structured Interior SelectionsStructured Management
2018Model-based working method
2016Structured ProjectManagement
Installation Instructions
Capital Market Day May 21, 2019 // PL
Our focus on development is a success
21/05/20193
2009 2010 2011
1 1 1 1
2012
2017 2018 2017 2018
1 1 1
2015 201620143 1 3
2013 2014 2015 2016
1 1 2 2
1
Capital Market Day May 21, 2019 // PL
Development with the customer in focus
We want to make it easy for our customers to choose a JM home
• 2018- around 240 quality and standard improvements in
the home- expanded selection of no-cost options- online reservations and payment
• 2019 - new user-friendly website- digital interior selections - digital agreement management- services for worry-free accommodation
• 2020 - customer portal for services and information about
the home
21/05/20194 Capital Market Day May 21, 2019 // PL
Services for worry-free accommodation – 2019
21/05/20195
More comfortable and sustainable housing that
saves time
Lower warranty costs and quicker service
Smart Home Smart ServiceSharingSecure Home
Focus on security for both residents and the Board
Leakage warning
(possibility to shut off water)
Connected fire alarm — collective
collaboration in the event of
smoke and fire
Package containers for delivery/return of e-commerce packages at the
entrance
One tag for all required access
rights on the property
Sensors in the residential unit and building for efficient service
Alarm in the event of unlocked/open doors for quick
action and to limit unauthorized
access
Exam ples
On/Off appliances
Visualization and
Sustainability tips
Sharing of the shared property resources
Motion-sensor lighting
Capital Market Day May 21, 2019 // PL
Development with internal efficiency in focus
21/05/20196
Our ambition is to lower the costs and shorten the lead times for the entire value chain
Long-termgoal 2025 5-10% increase in RFA/GFA 30% shorter lead times,
50% lower pre-construction costs
30% shorter lead times,3-5% efficiency/year
50% lower quality costs25% lower energy consumption than applicable norm
50% circular material flows
Acquisition Planning Constrution site Completed construction
Demolition
Capital Market Day May 21, 2019 // PL
Development with internal efficiency in focus
21/05/20197
Activities2018-2021
Industrial product development, modular construction, BIM
Sensors, IoT, predictable management
Swan Ecolabel, circular material flows
Optimization of building rights, digital management of early stages
Prefabrication, industrial logistics and production
Acquisition Planning Constrution site Completed construction
Demolition
Capital Market Day May 21, 2019 // PL
Development with sustainability in focusIndustry challenges
21/05/20198
of total carbon dioxide emissions in Europe
of the energy need in Europe
of total waste volume in Europe
Buildings:
Buildings:
Construction & demolition:
Capital Market Day May 21, 2019 // PL
Development with sustainability in focus
Starting in 2018, Swan Ecolabel for all JM residential units• Environmental evaluation of all products
and material• Approval of material selection• Energy requirements at building level• Strict requirements that must be verified• Ongoing reporting to Swan Ecolabel• Logbook
In 2018 and 2019, we started 42 Swan Ecolabel-certified projects in Sweden, 16 in Norway and 3 in Finland
21/05/20199 Capital Market Day May 21, 2019 // PL
Examples of measures
21/05/201910
Waste sorting station
Lighting
AppliancesSolar panels
Waste sorting in the home
Daylight
Logbook
Bicycle parking
Electrical charging
Phased-out use
Capital Market Day May 21, 2019 // PL
Example of measuresWaste minimization
29 30
34
23
19
1513
11
8
5
0
5
10
15
20
25
30
35
40
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Kg / GFA
21/05/201911
Example of measures for the goal 15 kg/GFA in 2021• Incentive program• IT support for follow-up of waste work in project • Handling of excess material• Dimensioned product selection• Material management and new sorting procedures at the workplace• General implementation, skill-enhancing measures, communication• JM Supply• More correct volumes with help of BIM• Rental solutions for temporary structures
Goals set annuallyOutcome
Capital Market Day May 21, 2019 // PL
History is made in our homes