Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
w ww .In t eg r a lE n gin ee r i ng Co .c o m 30 3 -80 4 -70 03
Structural Engineers • 303-804-7003
Win
d S
cree
n,
DA
RT
Integral Engineering is a full service structural engineering firm dedicated to understanding your needs on
each project and tailoring our services to exceed your expectations. Integral Engineering brings more than
25 years of engineering experience to a wide range of commercial, industrial, and governmental projects and
specializes in unique structural engineering challenges. We are a small firm that combines personal service
with professional quality for an outstanding value.
Airports Colorado Springs Airport Expansion, CO
Tinker Airforce Base, Oklahoma City, OK
Denver International Airport Repairs, CO
Train StationsDenver Union Station, Denver, CO
Eagle P3, Denver, CO
RTD Light Rail West Corridor, Denver, CO
Dallas Area Rapid Transit Orange Line, Dallas, TX
Pedestrian Bridges T-REX Project, Denver, CO
Elkhead Reservoir, Craig, CO
Rail Runner, Rio Metro RTD, Santa Fe and Albuquerque, NM
NAICS Codes 541330 Engineering Services
541340 Drafting Services
541310 Architectural Services
CAGE Code – 72K52
DUNS Number – 021347301
Licenses Professional Engineer in:
AR, CA, CO, DC, IA, MA, MI, MN, MT,
NC, ND, NE, NM, OK, PA, SD, TX, WY
Certifications DBE, EBE, EDWOSB, ESB,
SBE, WBE
Memberships NSPE, ASCE, SEI, SEAC,
COMTO, WTS, AISC, ICC
Art Curved
Structures
Wind Screens
Sculptures
Signage
Wind Screens
EOR for the DART Orange
Line Train Station Canopies,
Integral provided 3D modeling
and over four hundred pages of
calculations.
EOR for a 20,000 Sq.
Foot, $17M expansion to
the main terminal at the
Colorado Springs Airport.
`
EOR for the Rail Runner
pedestrian bridge stairs, access,
and enclosures at the
Bernalillo and Santa Fe stops.
w ww .In t eg r a lE n gin ee r i ng Co .c o m 30 3 -80 4 -70 03
Structural Engineers • 303-804-7003
Fir
st P
resb
yte
rian
Chu
rch
St.
An
ne`
s C
hu
rch
Mad
ison
Squ
are
Ret
ail
Bus Stations North County Transit Shelters, North County, CA
MAX TransFort, Ft. Collins, CO
North County Transit District, Oceanside, CA
Euclid Corridor, Cleveland, OH
The Rapid BRT, Grand Rapids, MI
Hospitals Sulphur Veterans Center, Sulphur, OK
Denver Health Medical Center, Denver, CO
Colorado General Photomedicine, Centennial, CO
Colorado General Hospital, Broomfield, CO
Churches Central Presbyterian, Denver, CO
Edmond Church, Edmund, OK
St. Anne’s Church, Denver, CO
Schools & Libraries Southridge Elementary, WY
Parker Library, Parker, CO
Chicksaw Nation Carl Albert Service Center, OK
Parks Stapleton Redevelopment, Denver, CO
Westlands Park, Centennial, CO
Louisville Skate Park, Louisville, CO
Coors Field Rooftop Remodel, Denver, CO
Commercial & Industrial Shopping Centers
Retail Centers
Manufacturing Buildings
Building Remodels
Structural Rehab
Construction and Misc. Shop drawings - stair and railing
design and detailing - crane
lifting points - temperature
effects - spreader bars - site
obvservations - retaining walls -
floor ratings - rooftop unit
analysis - catwalk design -
equip. platforms - fall protection
Partial Client List RTD - City & County of Denver -
DEN - City of Colorado Springs -
Dallas Area Rapid Transit - New
Mexico DOT - Gensler - AECOM
- Kiewit - CoorsTek - Mortensen
Construction - URS - Redd Iron -
Tryba Architects - True Steel
EOR for the Grand Rapids Silver
Line bus station canopies,
worked closely with the
manufacturer to incorporate
lighting and integral benches.
Integral’s quick turn around on
rail shop drawings and anchorage
design helped meet the Opening
Day deadline at Coors Field.
w ww .In t eg r a lE n gin ee r i ng Co .c o m 30 3 -80 4 -70 03
Structural Engineers • 303-804-7003