01.07.18
EVENT ENGINEERING 17-19 O’Connor Street Chippendale, NSW 2008 02 9690 1734
JOB NO.: EE18 220 REV.: A
Unit 2, 15 Percy Street Auburn NSW 2144 ATTENTION: Ian Wood
STRUCTURAL DESIGN CERTIFICATE
PROJECT: F34P Truss Structure
STRUCTURE: 8.5m (L) x 6.5m (W) x 4 m (H) F34P Truss
LOCATION: Multiple locations, Australia Wide Subject to Local Government Requirements
DURATION: April 2018—April 2020 We Event Engineering, being professional Structural Engineers within the meaning of the Building Code of Australia, confirm that we have been appointed as the engineers responsible for the Structural Certification of the above structure. We certify that we have reviewed the design as described herein and that this work was designed in accordance with the relevant provisions of the standard building codes, accepted engineering practice and principles and the design methods for Temporary demountable structures as specified in the Guidance on procurement, design and use of temporary demountable structures (Institution of Structural Engineers, 2017) subject to the design limitations listed overleaf. We advise that the maximum design 3 second wind gust speed for the above structure is 25m/s, in accordance with the minimum requirements set forth by AS1170.2:2011. Should the wind speed measured on site approach this speed, the safety steps identified within this certificate must be implemented. We note that this certification is effective only for the dates specified and that further review and certification will be required if the design is modified in any way. This certificate shall not be construed as relieving any other party of their responsibilities, liabilities or contractual obligations. This certificate is applicable only for this installation and relies upon all other risk assessments, WHS safety requirements and job safety statements associated with this project. Alice Los MIEAust BEng (Civil & Architectural) STRUCTURAL ENGINEER
Morgan Sheehy MEng (Hons I) Tech Cert Eng (Civil) MIEAust CPEng NER APEC Engineer IntPE(Aus) RPEQ RBP Victoria EC 41049 (Civil Engineer) SENIOR ENGINEER
01.07.18
EVENT ENGINEERING 17-19 O’Connor Street Chippendale, NSW 2008 02 9690 1734
JOB NO.: EE18 220 REV.: A
1. REFERENCED STANDARDS
1.1. ABCB:2015 Temporary Structures Standard; 1.2. AS1170.0:2002 General Principles; 1.3. AS1170.1:2002 Permanent, Imposed and Other Actions; 1.4. AS1170.2:2011 Wind Actions; 1.5. AS1664.1:1997 Aluminium Structures; 1.6. AS4100:1998 Steel Structures; 1.7. IStructE:2017 Temporary demountable structures.
2. REFERENCED DOCUMENTS
Issued By Title Reference
Event Engineering Engineering Report and Truss Stage Frame, Allowable Loading, Dwg No.: S01
Global Truss F34P, Dwg. No.: F34P-8.5L6.5W4HA
F34P Square Truss, Technical Data, F34P Data Sheet
3. DESIGN LIMITATIONS & REQUIREMENTS 3.1. Maximum Loading:
3.1.1. Dead: 2No. Load cases as per attached drawing “Truss Stage Frame, Allowable
Loading, Dwg No.: S01”. For reference: 3.1.1.1. Load Case 1 - Point Load: 3kN over 3No. points per arch; 3.1.1.2. Load Case 2 - Uniformly Distributed Load: 1.5kN/m per arch;
3.1.2. Live: No live loading permitted;
3.2. Rigging: Certified rigging technicians must install and sign-off all rigging; 3.3. Catenary Loading: No catenaries to be fixed to structure; 3.4. Bearing Capacity: Minimum bearing capacity shall be 100kpa; 3.5. Spreader Plates: To be provided beneath all truss supports; 3.6. Workshop Drawings: Shall be submitted for engineer’s written approval prior to any additional
fabrication or further modifications. 3.7. Wind Management Plan:
3.7.1. The wind speed must be measured on site by an anemometer or the nearest weather station;
3.7.2. If the wind speed approaches 20m/s, production crew must go on standby to implement
an evacuation and create an exclusion zone;
3.7.3. If the wind speed approaches 22m/s, all non-essential personnel must be evacuated and the exclusion zone must be enforced;
3.7.4. If the wind speed approaches 25m/s, the structure must be abandoned and all personnel moved within a permanent structure of importance level 2-4 as specified within the BCA.
8792
4396
LOAD CASE 1:
ALLOWABLE POINT
LOADS PER ARCH
SCALE 1:50
LOAD CASE 2:
ALLOWABLE UNIFORMLY
DISTRIBUTED LOAD PER
ARCH
SCALE 1:50
ARCH 1
ARCH 2
ARCH 3
3kN
3kN
3kN
1.5kN/m
F34P STAGE TRUSS
Engineering Results on Matrix Model
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 1
View - Cases: 1 (SELFWEIGHT)
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 1
View - Cases: 13 (1.2G +1.5Q Point)
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 1
View - FX, Cases: 13 (1.2G + 1.5Q Point Loads)
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 1
View - Cases: 3 (DISTRIBUTED LOADS)
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 1
View - FX, Cases: 14 (1.2G + 1.5Q UDL)
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 1
View - MX,MY,MZ, Cases: 13 (1.2G + 1.5Q Point Loads)
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 1
View - Exact deformation(s), Cases: 15 (G + Q Deflection)
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 2
Reactions ULS: global extremes
Displacements SLS: global extremes
Member Forces ULS: envelope
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 3
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 4
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 5
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 6
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 7
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 8
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 9
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 10
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 11
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 12
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 13
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 14
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 15
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 16
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 17
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 18
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 19
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 20
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 21
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 22
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 23
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 24
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 25
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 26
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 27
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 28
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 29
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 30
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 31
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 32
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 33
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 34
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 35
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 36
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 37
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 38
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 39
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 40
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 41
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 42
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 43
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 44
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 45
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 46
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 47
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 48
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 49
Autodesk Robot Structural Analysis Professional 2014 Author: Event Engineering File: EE18 220 DQ F34P Stage Truss.strAddress: 17-19 O'Connor St Chippendale NSW 2008 Project: Allowable Loading
Date : 02/07/18 Page : 50
290mm
240mm
290mm
240mm
TECHNICAL DATA
Chord diameter: 50mmØWall thickness: 3mm4 x Conical Spigots included.
F34P SQUARE TRUSS
F3
4P
F34PDATA SHEET
INCLUSIVE LOAD TABLE
4 X 8 X
Technical changes and errors are reservedThe weight of the truss is considered in the load table.
LINEARCODE LENGTH WEIGHT
GT F34PL025GT F34PL029GT F34PL040GT F34PL050GT F34PL075GT F34PL100GT F34PL125GT F34PL150GT F34PL200GT F34PL250GT F34PL300GT F34PL350GT F34PL400GT F34PL450GT F34PL500Custom lengths and radials can be manufactured to order.
0.25m0.29m0.4m0.5m
0.75m1.0m
1.25m1.5m
2.0m2.5m3.0m3.5m4.0m4.5m5.0m
4.65kg4.8kg5.4kg6.0kg7.5kg9.0kg
10.5kg12.0kg16.0kg19.5kg
20.0kg23.0kg25.0kg28.0kg31.0kg
Contact us for more info.Sydney (02) 9649 2266Melbourne (03) 9645 2266Brisbane 0419 777 877Perth 0419 898 999Email [email protected]
Check out our website
dq.com.au
FOLLOW US:
m kg / m kg kg kg kg4.05.06.07.08.09.010.011.012.013.014.015.016.017.018.0
Sp
an
Un
ifo
rm
dis
trib
uti
on
loa
d
Ce
ntr
e p
oin
t lo
ad
po
int
loa
d in
th
ird
-po
int
po
int
loa
d in
q
ua
rter-
po
int
po
int
loa
d in
fi
fth
-po
int
50940633726620316012810687746354494035
13761142972845744663597541493452416384355329306
929789681597530476430391359330305282262243227
680617519446391347311281256233215107182169157
510485411357314252279228208190175162150138129