STRUCTURAL CONDITION ASSESSMENT PREPARED FOR: STATE OF WISCONSIN DEPARTMENT OF NATURAL RESOURCES 12G1S-12 PENINSULA STATE PARK OBSERVATION TOWER FISH CREEK, WISCONSIN EDGE PROJECT NUMBER: 8016-12 MAY 20, 2015 624 Water Street Prairie du Sac, Wisconsin 53578 608.644.1449 Phone 608.644.1549 Fax www.edgeconsult.com

STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

  • Upload
    vubao

  • View
    217

  • Download
    2

Embed Size (px)

Citation preview

Page 1: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

STRUCTURAL CONDITION ASSESSMENT

PREPARED FOR:

STATE OF WISCONSIN DEPARTMENT OF NATURAL RESOURCES

12G1S-12 PENINSULA STATE PARK OBSERVATION TOWER

FISH CREEK, WISCONSIN

EDGE PROJECT NUMBER:

8016-12

MAY 20, 2015

624 Water Street Prairie du Sac, Wisconsin 53578

608.644.1449 Phone 608.644.1549 Fax

www.edgeconsult.com

Page 2: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural
Page 3: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

TABLE OF CONTENTS

SECTION 1 INTRODUCTION 1 1.1 PROJECT OVERVIEW 1

1.2 PURPOSE OF REPORT 1

1.3 SCOPE OF SERVICES 1

SECTION 2 INVESTIGATION 2

2.1 BACKGROUND 2

2.2 DESCRIPTION OF EXISTING STRUCTURES 2

2.3 FIELD OBSERVATIONS 3

SECTION 3 REMARKS 5

3.1 MODELING & DESIGN LOADS 5

3.2 RECOMMENDATIONS 7

SECTION 4 LIMITATIONS AND RESTRICTIONS 8

APPENDICES Appendix A: Photographs Appendix B: Drawings Appendix C: Structural Calculations

Page 4: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

8016-12_Condition Assessment Report_2015-05-20.docx Edge #8016-12 -1-

SECTION 1 INTRODUCTION

1.1 PROJECT OVERVIEW Edge Consulting Engineers, Inc. (Edge) has been engaged by the State of Wisconsin Department of Natural Resources (Client) to perform a structural condition assessment of the existing observation tower structure at the Peninsula State Park located in Fish Creek, Wisconsin. 1.2 PURPOSE OF REPORT The purpose of this assessment was to examine and comment on the condition of the structural components of the existing structure. The assessment is also intended to provide recommendations for repair of the structure. 1.3 SCOPE OF SERVICES The scope of services for this project included a field inspection of the existing observation tower to assess its current condition, core samples to visually inspect for signs of rot and decay, a structural model of the existing structure and a report to document our findings, opinions and recommendations. The project was completed in conformance with a client agreed upon scope of work, and utilizing the judgment of the structural engineer. The field review was limited to areas and elements that were determined to be accessible at the time of the inspection. Elements concealed by non-structural elements were not reviewed. A non-destructive approach was used throughout accessible areas; although some core samples were collected and observed as part of this project for the tower legs and timber support members. Recommendations and comments are based on the review conducted through the field inspection conducted on April 22, 2015. The following recommendations have been made as based on current standards and our accumulated knowledge and experience. This Structural Condition Assessment report has been prepared for the intended and exclusive use of Edge Consulting Engineers, Inc. and Client. Edge Consulting Engineers, Inc. does not assume any liability for the use of this report, or for the information included herein, or resulting in any damages from the use of this report by other parties.

Page 5: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

8016-12_Condition Assessment Report_2015-05-20.docx Edge #8016-12 -2-

SECTION 2 INVESTIGATION

2.1 BACKGROUND The existing observation tower structure is located at Peninsula State Park on the bluffs over Lake Michigan. The current tower was built in 1932 to replace the structure originally constructed in 1914. Modifications believed to have been completed in the1980’s to the existing tower include replacement framing that has been installed for the first and third levels. Plans for the original construction of the tower could not be located and were not available for use in our assessment. All subsequent work on the tower has been limited to minor maintenance and repairs. 2.2 DESCRIPTION OF EXISTING STRUCTURES The existing observation tower structure is a 5 legged timber structure which is approximately 76 feet tall and includes 3 levels of lookout platforms (30’, 51’ & 72’). There is an interior stair system which wraps the interior support column. The interior support column is a series of timber members that decrease in size with elevation; 12x12” at the tower base to 10x10” at the third level. The stair stringers are supported with a series of 6x6” posts at the tower base and 4x4” hangers from platform levels above. No information was available regarding the concrete footings for the interior support column or stair support posts. The four exterior legs are continuous timber columns that taper with elevation; 18.5” dia. at the tower base and 11.5” dia. at the third level. All columns bear directly on concrete footings and are attached by steel hardware. The four exterior columns include steel tie rod X-bracing between each platform level to provide lateral support. The steel tie rod X-bracing for the first level, second level and third level were measured to be approximately 1 1/8”, 1” and 7/8” in diameter respectively. No information was available regarding the concrete footings for the exterior columns. The first level platform level is supported by (2) 8x8” treated timber beams spanning east-west (EW) connected to the exterior of the columns with steel hardware. Two (2) 8x8” treated timber edge joists spanning north-south bear on the EW timber beams and are connected are to the exterior of the columns in the opposite direction. Doubled-up 2x12” treated lumber joists spanning north-south bear on the EW timber beams on the interior of each platform and are spaced approximately 16-inches O.C. The joists are topped with 2x8” treated lumber deck boards. The second level appears to be part of the1932 tower construction. The second level platform level is supported by (2) 8x8” timber beams spanning east -west connected to the exterior of the columns with steel hardware. Two (2) 8x8” timber edge joists spanning north-south bear on the EW timber beams and are connected are to the exterior of the columns in the opposite direction. Additional 3”x8” joists bear on the EW timber beams on the interior of each platform and are spaced approximately 16-inches O.C. The joists located on the east side of the second level also have been modified with additional 2x6” joist members. The joists are topped with 3x8” timber deck boards. The third level platform level is supported by (2) 8x8” timber beams spanning east-west (EW) connected to the exterior of the columns with steel hardware. Two (2) 8x8” timber edge joists

Page 6: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

8016-12_Condition Assessment Report_2015-05-20.docx Edge #8016-12 -3-

spanning north-south bear on the EW timber beams and are connected are to the exterior of the columns in the opposite direction. Single 2x12” treated lumber joists spanning north-south bear on the EW timber beams on the interior of each platform and are spaced approximately 16-inches O.C. The joists are topped with 2x8” treated lumber deck boards. The first level platform has a railing system consisting of 4x4” treated posts spaced approx. 5’ O.C. 2x8” treated rails and a 2x8” top rail. The second level platform has a railing system consisting of 4x4” timber posts spaced approx. 5’ O.C. and 3x6” timber rail members. The third level platform has a railing system consisting of 4x4” treated timber posts spaced approx. 6’ O.C. and 2x6” rail members. All three railing systems are approximately 44” in height. The stair system includes a series of landings which wrap the main interior column. The timber stair system consists of 3x12” stair treads approximately 29” wide supported by 3x8” stair stringers and 3x8” joists at stair landings. The stairs and landings are supported in three ways: main interior timber column, (2) additional 6x6” timber columns on either side of the stair system and hanging 4x4” supports from the platform levels above. 2.3 FIELD OBSERVATIONS Our field inspection was completed on April 22, 2015. Photos from this inspection have been included in Appendix A. At the time of the inspection the tower main structural components (columns, beams & deck), where visible, generally appeared to be in good condition. Some deck boards were deteriorated or otherwise damaged and needed replacement. A total of twelve (12) cores were taken on the tower structure; eight (8) from the tower legs and two (2) from 8x8” EW timber support members. A 2-1/2” void and a 4-1/2” void were detected at the base of the NE and SW tower columns respectively. An additional core was completed approximately 20’ above ground level on the NE tower leg just above an area with notable damage and a 2” void was detected. No voids were detected at the base of the NW and SE tower columns at the tower base. No voids were detected in the 8x8” treated timber member of the first level platform or 8x8” timber member of second level platform. In addition, several column members had checking cracks up to ½” in width but otherwise appeared to be in sound condition. It should be noted that our investigation of the column condition was based on visual inspection and a limited number of cores. Additional testing procedures including (radiograph and/ stress wave propagation testing) would be necessary to provide better insight as to the degree and severity of the deterioration of these support members. The tie rod X-bracing between columns was found to be extremely loose which is allowing the overall structure to move excessively in the wind and is causing hardware and fasteners throughout the structure to loosen. Overall structure movement was noticeable at the top level when utilizing weight shift of two individuals. The stair system and protective railings were generally found to be in fair to poor condition throughout the structure. These items included severely deteriorated and missing members, loose hardware and inadequate and inconsistent installation throughout. Several stair treads were severely deteriorated and in need of replacement. The 6x6” timber column stair supports have split down the middle and in need of replacement. The hanging 4x4 supports were all severely

Page 7: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

8016-12_Condition Assessment Report_2015-05-20.docx Edge #8016-12 -4-

deteriorated/dry rotted and in need of replacement. The structural adequacy of the several modifications to the hanging 4x4 supports that have been installed is indeterminate. In addition, several railings had bowed/damaged members and many top rails did not have adequate support.

Page 8: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

8016-12_Condition Assessment Report_2015-05-20.docx Edge #8016-12 -5-

SECTION 3 REMARKS

3.1 MODELING & DESIGN LOADS Using measurements obtained at the time of our inspection, the existing observation tower structure was modeled and evaluated to determine its adequacy. The original design loading criterion was not available for the tower structure and is unknown. As a result, loading conditions in accordance with current building code requirements (IBC 2009/ASCE7-05) were utilized. The following are the superimposed loads utilized in our analysis:

Decking (Dead Load): 5 psf Platforms Assembly (Live Load): 100 psf Stairs and Exit Ways (Live Load): 100 psf Snow Loads:

o Design Uniform Snow Load: 33.6 psf o Flat Roof Snow Load, Pf: 33.6 psf o Balanced Snow Load, Ps: 33.6 psf o Ground Snow Load, Pg: 50.0 psf o Importance Factor, I: 1.00 o Snow Exposure Factor, Ce: 0.80 o Thermal Factor, Ct: 1.20 o Sloped-roof Factor, Cs: 1.00

Wind Design Data: o Basic Wind Speed, V: 90 mph o Importance Factor, I: 1.00 o Occupancy Category: II o Mean Roof Height: 72 ft. o Exposure Category: D o Enclosure Classification: Open o Internal Pressure coefficient: +/- 0.00 o Directionality, Kd: 0.95

Seismic Design Data: o Occupancy Category: II o Importance Factor, I: 1.00 o Mapped Spectral Response, Ss: 5.80 %g o Mapped Spectral Response, S1: 2.80 %g o Site Class: D o Spectral Response Coef., Sds: 0.062 o Spectral Response Coef., Sd1: 0.045 o Seismic Design Category: A o Design Base Shear: 0.792 kips o Seismic Response Coefficient, Cs; 0.01 o Response Modification Factor, R: 3 o Analysis Procedure: Index Force Analysis

Page 9: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

8016-12_Condition Assessment Report_2015-05-20.docx Edge #8016-12 -6-

The original structural member design material properties were not available for the tower structure and are unknown. The following are the assumptions for material properties were utilized in our analysis:

Steel members and connections: A36 steel Timber Members (1932 construction): Douglas-Fir-Larch No.1 Treated Lumber Members: Spruce-Pine-Fir No.1/No.2

The results of our analysis indicate that the existing observation tower structure is not structurally adequate to support the superimposed loading conditions.

Capacity Ratio(%)

Comment

Columns6x6" Stair Support 278.0% Not Adequate10x10" Center Support 175.0% Not Adequate12x12" Center Support 172.0% Not Adequate

D16 Tower Legs 83.0% AdequateJoists

3rd Level @ 72' 186.0% Not Adequate2nd Level @ 51' 236.0% Not Adequate

H2 1st Lvl @ 30' 163.0% Not AdequateTimber Beams (Joist support)

3rd Level @ 72' 106.0% Not Adequate2nd Level @ 51' 149.0% Not Adequate

TG1 1st Lvl @ 30' 321.0% Not AdequateTie Rod X-Bracing

3rd Level @ 72' 78.0% Adequate2nd Level @ 51' 117.0% Not Adequate

GC381st Lvl @ 30' 185.0% Not AdequateMisc.

Stair Landing Support (2nd landing) 153.0% Not Adequate\ Stair Stringer (7th Landing to 3rd Lvl) 119.0% Not Adequate

Tower Structure Elements

Capacity - Results

It should be noted that the modeled members were assumed to be in a new, non-deteriorated condition. The weathered and deteriorated condition of the tower timber members will indeed reduce their overall capacity; however we are not able to definitively determine how much of an effect this plays based on current information. Additional testing procedures including (radiograph and/ stress wave propagation testing) could be done to provide better insight as to the degree and severity of the deterioration. The original tower foundation designs were not provided at the time of this investigation. Therefore, no analysis was performed and no recommendations were formulated in regards to the adequacy of the towers foundations. See Appendix C for structural calculations.

Page 10: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

8016-12_Condition Assessment Report_2015-05-20.docx Edge #8016-12 -7-

3.2 RECOMMENDATIONS Based on our field inspection and analysis, it is our opinion that the existing observation tower structure is not structurally adequate to support the superimposed loading conditions and should not be utilized in its current condition. The original design loading criterion was not available for the tower structure and is unknown. As a result, loading conditions in accordance with current building code requirements (IBC 2009/ASCE7-05) were utilized. From analysis, the tower structure could handle a live load of approximately 30-40 psf. However, the lateral bracing provided by the steel tie rod X-bracing would still be inadequate for the design code related wind loading. After speaking with members of the park staff regarding the volume and magnitude of traffic from the public for the tower structure, a live load of 100psf is more appropriate to depict the expected loading the tower structure would experience. Given the age of the tower structure, condition of the structural members and inadequate connections, modification of the existing tower structure is not recommended as a viable option to address the structural deficiencies identified. We recommend that the tower structure be closed to the public, razed and a new tower be constructed that will adequately support the expected loading conditions.

Page 11: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

8016-12_Condition Assessment Report_2015-05-20.docx Edge #8016-12 -8-

SECTION 4 LIMITATIONS AND RESTRICTIONS

1. This report was prepared in accordance with generally accepted structural engineering practices and makes no other warranties, either expressed or implied, as to the professional advice provided under the terms of the agreement between Engineer and Client. This report has not been prepared for uses or parties other than those specifically named, or for uses or applications other than those enumerated herein. The report may contain insufficient or inaccurate information for other purposes, applications, and/or other uses.

2. This report is intended for the use of the client, and cannot be utilized or relied upon by other parties without the written consent of Edge Consulting Engineers.

3. Edge consulting Engineers is not responsible for any, and all, modifications completed prior to, or hereafter, which Edge Consulting Engineers was not, or will not, be directly involved.

4. The conclusions, and recommendations contained within this report are based upon the supplied and attained information as described within the report. If it is known, or becomes known, that any item(s) are in conflict with what is described within this document, this report should be considered void and Edge Consulting Engineers should be contacted immediately.

5. Edge Consulting Engineers disclaims all liability for any information, conclusion, or recommendation that is not expressly stated or represented within this report.

6. Edge Consulting Engineers shall not be liable for any incidental, consequential, indirect, special or punitive damages arising out of any claim associated with the use of this report.

Page 12: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

APPENDIX A

PHOTOGRAPHS

Page 13: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

1.JPG

2.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 1 of 23

Page 14: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural
Page 15: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

5.JPG

6.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 3 of 23

Page 16: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

7.JPG

8.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 4 of 23

Page 17: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

9.JPG

10.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 5 of 23

Page 18: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

11.JPG

12.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 6 of 23

Page 19: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

13.JPG

14.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 7 of 23

Page 20: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

15.JPG

16.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 8 of 23

Page 21: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural
Page 22: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

19.JPG

20.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 10 of 23

Page 23: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

21.JPG

22.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 11 of 23

Page 24: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural
Page 25: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

25.JPG

26.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 13 of 23

Page 26: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

27.JPG

28.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 14 of 23

Page 27: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

29.JPG

30.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 15 of 23

Page 28: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

31.JPG

32.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 16 of 23

Page 29: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

33.JPG

34.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 17 of 23

Page 30: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

35.JPG

36.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 18 of 23

Page 31: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

37.JPG

38.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 19 of 23

Page 32: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

39.JPG

40.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 20 of 23

Page 33: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

41.JPG

42.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 21 of 23

Page 34: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

43.JPG

44.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 22 of 23

Page 35: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

45.JPG

46.JPG

Peninsula State Park Observation Tower_2015-05-20

Page 23 of 23

Page 36: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

APPENDIX B

DRAWINGS

Page 37: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

5/15/2015

8016-12 Tower.dgn

8016.12 AGJ

5/7/15OBSERVATION TOWER

PENINSULA STATE PARK

FISH CREEK, WISCONSIN

0

SCALE:Edge

Consulting Engineers, Inc.

www.edgeconsult.com

608.644.1549 fax

608.644.1449 voice

Prairie du Sac, WI 53578

624 Water Street PLOT DATE:

FILE NAME:

PROJECT #:

ISSUE DATE:

DRAWN BY:

SHEET NUMBER:

C EDGE CONSULTING ENGINEERS, INC.I:\8000\8016\12-Peninsula State Park Observation Tower\CAD\8016-12 Tower.dgn

SHEET TITLE:

S-1

NORTH ELEVATION

BASE

= PHOTO REFERENCE4

21'-0"

21'-0"

30'-0"

72' LEVEL

51' LEVEL

30' LEVEL

10'

8.5" x 11" - 1" = 10'

5' 5'

6

5

1

3

4

7

17 18 19

2122

26

10

8

9

25

23

24

27 28

49

34

40 41

42

39

Page 38: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

5/15/2015

8016-12 Tower.dgn

8016.12 AGJ

5/7/15OBSERVATION TOWER

PENINSULA STATE PARK

FISH CREEK, WISCONSIN

0

SCALE:Edge

Consulting Engineers, Inc.

www.edgeconsult.com

608.644.1549 fax

608.644.1449 voice

Prairie du Sac, WI 53578

624 Water Street PLOT DATE:

FILE NAME:

PROJECT #:

ISSUE DATE:

DRAWN BY:

SHEET NUMBER:

C EDGE CONSULTING ENGINEERS, INC.I:\8000\8016\12-Peninsula State Park Observation Tower\CAD\8016-12 Tower.dgn

SHEET TITLE:

S-2

BASE

EAST ELEVATION

= PHOTO REFERENCE4

2

21'-0"

21'-0"

30'-0"

72' LEVEL

51' LEVEL

30' LEVEL

10'

8.5" x 11" - 1" = 10'

5' 5'

4

3

17

18

19

5 6

22

8

20

10

1211

7

16

15 21

9

251314

23 24

27 28

37 38

4140

4243

39

44

Page 39: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

5/15/2015

8016-12 Tower.dgn

8016.12 AGJ

5/7/15OBSERVATION TOWER

PENINSULA STATE PARK

FISH CREEK, WISCONSIN

0

SCALE:Edge

Consulting Engineers, Inc.

www.edgeconsult.com

608.644.1549 fax

608.644.1449 voice

Prairie du Sac, WI 53578

624 Water Street PLOT DATE:

FILE NAME:

PROJECT #:

ISSUE DATE:

DRAWN BY:

SHEET NUMBER:

C EDGE CONSULTING ENGINEERS, INC.I:\8000\8016\12-Peninsula State Park Observation Tower\CAD\8016-12 Tower.dgn

SHEET TITLE:

NORTH

S-3

BASE & 30' LEVELS

22'-0"

22'-0"

4' 8'4'

S-3

BASE LEVEL

S-2

30' LEVEL

A

B

PARKING LOT

= PHOTO REFERENCE4

5'-4"

5'-4"

20'-3"

20'-3"

8.5" x 11" - 1/8" = 1'-0"

2

1

6

5

7

43

Page 40: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

5/15/2015

8016-12 Tower.dgn

8016.12 AGJ

5/7/15OBSERVATION TOWER

PENINSULA STATE PARK

FISH CREEK, WISCONSIN

EdgeConsulting Engineers, Inc.

www.edgeconsult.com

608.644.1549 fax

608.644.1449 voice

Prairie du Sac, WI 53578

624 Water Street PLOT DATE:

FILE NAME:

PROJECT #:

ISSUE DATE:

DRAWN BY:

SHEET NUMBER:

C EDGE CONSULTING ENGINEERS, INC.I:\8000\8016\12-Peninsula State Park Observation Tower\CAD\8016-12 Tower.dgn

SHEET TITLE:

NORTH

0

SCALE: 8.5" x 11" - 1/8" = 1'-0"

4' 8'4'

S-4

51' LEVELA

S-4

72' LEVELB

51' & 72' LEVELS

18'-7"

18'-7"

18'-0"

18'-0"

S-4

= PHOTO REFERENCE4

32

46

45

41

43

39

44

31

33

42

40

29

34

35

36

Page 41: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

APPENDIX C

STRUCTURAL CALCULATIONS

Page 42: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Maps | Country - State | Places | Cities | Lat - Long

Home » Latitude and Longitude of a Point

To find the latitude and longitude of a point Click on the map, Drag the marker, or enter the...

Address:

Map Center: Wikipedia/Wikivoyage Places of Interest - Get Address - Land Plat Size

Latitude and Longitude of a Point

Get the Latitude and Longitude of a Point

When you click on the map, move the marker or enter anaddress the latitude and longitude coordinates of the pointare inserted in the boxes below.

Latitude:

Longitude:

Degrees Minutes Seconds

Latitude:

Longitude:

Show Point from Latitude and Longitude

Use this if you know the latitude and longitude coordinates ofa point and want to see where on the map the point is.

Use: + for N Lat or E Long - for S Lat or W Long.Example: +40.689060 -74.044636Note: Your entry should not have any embedded spaces.

Decimal Deg. Latitude:

Decimal Deg. Longitude:

Example: +34 40 50.12 for 34N 40' 50.12"

Degrees Minutes Seconds

Latitude:

Longitude:

© iTouchMap.com 2007-2014

Latitude and Longitude of a Point http://itouchmap.com/latlong.html

1 of 1 5/5/2015 4:55 PM

Page 43: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural
Page 44: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineers, Inc. JOB TITLE Eagle Tower624 Water Street Peninsula State Park

Prairie du Sac, WI 53578 JOB NO. 8016-12 SHEET NO.

608.644.1449 CALCULATED BY BPB DATE 5/5/14CHECKED BY DATE

Seismic Loads: IBC 2009 Strength Level Forces

Occupancy Category : IIImportance Factor (I) : 1.00

Site Class : D

Ss (0.2 sec) = 5.80 %gS1 (1.0 sec) = 2.80 %g

Fa = 1.600 Sms = 0.093 SDS = 0.062 Design Category = A

Fv = 2.400 Sm1 = 0.067 SD1 = 0.045 Design Category = A

Seismic Design Category = A ASCE7 Section 11.4.1 Exception Applies

Number of Stories: 3

Structure Type: All other building systems

Horizontal Struct Irregularities:No plan Irregularity

Vertical Structural Irregularities:No vertical Irregularity

Flexible Diaphragms: Yes

Building System: Structural steel systems not specifically detailed for seismic resistance

Seismic resisting system: Structural steel systems not specifically detailed for seismic resistance

System Structural Height Limit: Height not limitedActual Structural Height (hn) =72.0 ft

DESIGN COEFFICIENTS AND FACTORS

Response Modification Coefficient (R) = 3 Over-Strength Factor (Ωo) = 2.5

Deflection Amplification Factor (Cd) = 3SDS = 0.062SD1 = 0.045

ρ = redundancy coefficienSeismic Load Effect (E) = ρ QE +/- 0.2SDS D = ρ QE +/- 0.012D QE = horizontal seismic force

Special Seismic Load Effect (Em) = Ωo QE +/- 0.2SDS D = 2.5 QE +/- 0.012D D = dead load

PERMITTED ANALYTICAL PROCEDURES

Index Force Analysis (Seismic Category A only) - Minimum lateral force Fx = 0.01Wx at each floor leve

Simplified Analysis - Use Equivalent Lateral Force Analysis

Equivalent Lateral-Force Analysis - PermittedBuilding period coef. (CT) = 0.020 Cu = 1.70

Approx fundamental period (Ta) = CThnx = 0.494 sec x= 0.75 Tmax = CuTa = 0.840

User calculated fundamental period (T) = 0 sec Use T = 0.494Long Period Transition Period (TL) = ASCE7 map = 12

Seismic response coef. (Cs) = SDSI/R = 0.021

need not exceed Cs = Sd1 I /RT = 0.030but not less than Cs = 0.010

USE Cs = 0.021Design Base Shear V = 0.021W

Model & Seismic Response Analysis - Permitted (see code for procedure)

ALLOWABLE STORY DRIFT

Structure Type: All other structures

Allowable story drift = 0.020hsx where hsx is the story height below level x

bballweg
Text Box
Seismic Design Category A Use Index Force Analysis Cs = 0.01 V = Cs*W = 0.01*32.0k V = 0.320 kips *Wind Governs*
Page 45: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineers, Inc. JOB TITLE Eagle Tower624 Water Street Peninsula State Park

Prairie du Sac, WI 53578 JOB NO. 8016-12 SHEET NO.

608.644.1449 CALCULATED BY BPB DATE 5/5/14CHECKED BY DATE

Snow Loads : ASCE 7-05 Nominal Snow Forces

Roof slope = 0.0 degHoriz. eave to ridge dist (W) = 20.0 ft

Roof length parallel to ridge (L) = 20.0 ft

Type of Roof MonoslopeGround Snow Load Pg = 50.0 psfOccupancy Category = IIImportance Factor I = 1.0Thermal Factor Ct = 1.20Exposure Factor Ce = 0.8

Pf = 0.7*Ce*Ct*I*Pg = 33.6 psfUnobstructed Slippery Surface no

Sloped-roof Factor Cs = 1.00Balanced Snow Load Ps = 33.6 psf

Rain on Snow Surcharge Angle 0.40 degCode Maximum Rain Surcharge 5.0 psfRain on Snow Surcharge = 0.0 psfPs plus rain surcharge = 33.6 psfMinimum Snow Load Pfmin = 20.0 psf

NOTE: Alternate spans of continuous beams Uniform Roof Design Snow Load = 33.6 psf and other areas shall be loaded with half the

design roof snow load so as to produce the greatest possible effect - see code.

Windward Snow Drifts 1 - Against walls, parapets, etc more than 15' long

Upwind fetch lu = 0.0 ftProjection height h = 0.0 ftSnow density g = 20.5 pcfBalanced snow height hb = 1.64 ft

hd = 1.50 ft hc = -1.64 ft

hc/hb <0.2 = -1.0 Therefore, no driftDrift height (hc) = 0.00 ftDrift width w = -13.11 ftSurcharge load: pd = γ*hd = 0.0 psfBalanced Snow load: = 33.6 psf

33.6 psf

Windward Snow Drifts 2 - Against walls, parapets, etc > 15' Upwind fetch lu = 0.0 ftProjection height h = 0.0 ftSnow density g = 20.5 pcfBalanced snow height hb = 1.64 ft

hd = 1.50 ft hc = -1.64 ft

hc/hb <0.2 = -1.0 Therefore, no driftDrift height (hc) = 0.00 ftDrift width w = -13.11 ftSurcharge load: pd = γ*hd = 0.0 psf

Page 46: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineers, Inc. JOB TITLE Eagle Tower624 Water Street Peninsula State Park

Prairie du Sac, WI 53578 JOB NO. 8016-12 SHEET NO.

608.644.1449 CALCULATED BY BPB DATE 5/5/14CHECKED BY DATE

Wind Loads - Other Structures: ASCE 7 - 05 Nominal Wind Pressures

Importance Factor = 1.00Gust Effect Factor (G) = 0.85 90 mph

Kzt = 1.47 Exposure = D

A. Solid Freestanding Walls & Solid Signs (& open signs with less than 30% open)

s/h = #DIV/0! Case A & B

Dist to sign top (h) 0.0 ft B/s = #DIV/0! Cf = #DIV/0!

Height (s) 0.0 ft Lr/s = #DIV/0! F = qz G Cf As = #DIV/0! AsWidth (B) 200.0 ft Kz = 1.030 As = 10.0 sfWall Return (Lr) = qz = 26.6 psf F = #DIV/0! lbsDirectionality (Kd) 0.85

Percent of open area Open reduction CaseCto gross area 0.0% factor = 1.00 Horiz dist from

windward edge Cf F=qzGCfAs (psf)Case C reduction factors #DIV/0! #DIV/0! #DIV/0! As

Factor if s/h>0.8 = #DIV/0! #DIV/0! #DIV/0! #DIV/0! AsWall return factor #DIV/0! #DIV/0! #DIV/0! #DIV/0!

for Cf at 0 to s = #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!#DIV/0! #DIV/0! #DIV/0! #DIV/0!#DIV/0! #DIV/0! #DIV/0! #DIV/0!#DIV/0! #DIV/0! #DIV/0! #DIV/0!

B. Open Signs & Lattice Frameworks (openings 30% or more of gross area)

Height to centroid of Af (z) 38.0 ft Kz = 1.211Base pressure (qz) = 31.3 psf

Width (zero if round) 1.5 ft

Diameter (zero if rect) 0.0 ft F = qz G Cf Af = 42.6 AfPercent of open area Î = 0.35 Solid Area: Af = 0.0 sf

to gross area 65.0% Cf = 1.6 F = 0 lbsDirectionality (Kd) 0.85

C. Chimneys, Tanks, Rooftop Equipment (h>60') & Similar Structures

Height to centroid of Af (z) 0.0 ft Kz = 1.030

Cross-Section Square Base pressure (qz) = 28.2 psfDirectionality (Kd) 0.90 h/D = #DIV/0!Height (h) 0.0 ftWidth (D) 0.0 ftType of Surface N/A

Square (wind along diagonal) Square (wind normal to face)Cf = #DIV/0! Cf = #DIV/0!

F = qz G Cf Af = #DIV/0! Af F = qz G Cf Af = #DIV/0! Af

Af = 10.0 sf Af = 0.0 sf

F = #DIV/0! lbs F = #DIV/0! lbs

D. Trussed Towers

Height to centroid of Af (z) 38.0 ft Kz = 1.211

0.35 Base pressure (qz) = 35.0 psf

Tower Cross Section square

Member Shape flat Diagonal wind factor = 1.2Directionality (Kd) 0.95 Round member factor = 1.000

Square (wind along tower diagonal) Square (wind normal to face)Cf = 2.90 Cf = 2.42

F = qz G Cf Af = 86.3 Af F = qz G Cf Af = 71.9 Af

Solid Area: Af = 1.0 sf Solid Area: Af = 1.0 sf

F = 86 lbs F = 72 lbs

Wind Speed =

Page 47: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineers, Inc. JOB TITLE Eagle Tower624 Water Street Peninsula State Park

Prairie du Sac, WI 53578 JOB NO. 8016-12 SHEET NO.

608.644.1449 CALCULATED BY BPB DATE 5/5/14CHECKED BY DATE

Wind Loads - Other Structures: ASCE 7 - 05 Nominal Wind Pressures

Importance Factor = 1.00Gust Effect Factor (G) = 0.85 90 mph

Kzt = 1.47 Exposure = D

A. Solid Freestanding Walls & Solid Signs (& open signs with less than 30% open)

s/h = #DIV/0! Case A & B

Dist to sign top (h) 0.0 ft B/s = #DIV/0! Cf = #DIV/0!

Height (s) 0.0 ft Lr/s = #DIV/0! F = qz G Cf As = #DIV/0! AsWidth (B) 200.0 ft Kz = 1.030 As = 10.0 sfWall Return (Lr) = qz = 26.6 psf F = #DIV/0! lbsDirectionality (Kd) 0.85

Percent of open area Open reduction CaseCto gross area 0.0% factor = 1.00 Horiz dist from

windward edge Cf F=qzGCfAs (psf)Case C reduction factors #DIV/0! #DIV/0! #DIV/0! As

Factor if s/h>0.8 = #DIV/0! #DIV/0! #DIV/0! #DIV/0! AsWall return factor #DIV/0! #DIV/0! #DIV/0! #DIV/0!

for Cf at 0 to s = #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!#DIV/0! #DIV/0! #DIV/0! #DIV/0!#DIV/0! #DIV/0! #DIV/0! #DIV/0!#DIV/0! #DIV/0! #DIV/0! #DIV/0!

B. Open Signs & Lattice Frameworks (openings 30% or more of gross area)

Height to centroid of Af (z) 38.0 ft Kz = 1.211Base pressure (qz) = 31.3 psf

Width (zero if round) 1.5 ft

Diameter (zero if rect) 0.0 ft F = qz G Cf Af = 42.6 AfPercent of open area Î = 0.35 Solid Area: Af = 0.0 sf

to gross area 65.0% Cf = 1.6 F = 0 lbsDirectionality (Kd) 0.85

C. Chimneys, Tanks, Rooftop Equipment (h>60') & Similar Structures

Height to centroid of Af (z) 0.0 ft Kz = 1.030

Cross-Section Square Base pressure (qz) = 28.2 psfDirectionality (Kd) 0.90 h/D = #DIV/0!Height (h) 0.0 ftWidth (D) 0.0 ftType of Surface N/A

Square (wind along diagonal) Square (wind normal to face)Cf = #DIV/0! Cf = #DIV/0!

F = qz G Cf Af = #DIV/0! Af F = qz G Cf Af = #DIV/0! Af

Af = 10.0 sf Af = 0.0 sf

F = #DIV/0! lbs F = #DIV/0! lbs

D. Trussed Towers

Height to centroid of Af (z) 38.0 ft Kz = 1.211

0.35 Base pressure (qz) = 35.0 psf

Tower Cross Section square

Member Shape round Diagonal wind factor = 1.2Directionality (Kd) 0.95 Round member factor = 0.634

Square (wind along tower diagonal) Square (wind normal to face)Cf = 1.84 Cf = 1.53

F = qz G Cf Af = 54.7 Af F = qz G Cf Af = 45.5 Af

Solid Area: Af = 1.0 sf Solid Area: Af = 1.0 sf

F = 55 lbs F = 46 lbs

Wind Speed =

Page 48: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineer...

BPB

8016-12

Eagle Tower

SK - 1

May 19, 2015 at 2:40 PM

8016-12_Peninsula State Park Ob...

Y

XZ

Page 49: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineer...

BPB

8016-12

Eagle Tower

SK - 2

May 19, 2015 at 2:40 PM

8016-12_Peninsula State Park Ob...

N1

N2

N3

N4

N5 N6

N7

N8

N9 N10

N11

N12

N13 N14

N15

N16

N17

N18

N19

N20

N21

N22

N23

N24

N25

N26

N27

N28

N29

N30

N31

N32

N33

N34 N35

N36 N37

N38

N39

N40

N41

N42

N43

N44 N45

N46

N47

N48

N49

N50

N51

N52

N53

N54

N55

N56

N57

N58

N59

N60

N61

N62

N63

N64

N65

N66

N67

N68

N69

N70

N71

N72

N73

N74

N75

N76

N77

N78

N79

N80

N81

N82

N83

N84

N85

N86

N87

N88

N89

N90

N91

N92

N93

N94

N95

N96

N97

N98 N99

N100 N101

N102

N103

N104

N105

N106

N107

N108 N109

N110

N111

N112

N113

N114

N115

N116

N117

N118

N119 N120

N121

N122

N123

N124

N125

N126

N127

N128

N129

N130

N131

N132

N133

N134

N135

N136

N137

N138

N139 N140

N141 N142

N143

N144

N145

N146

N147

N148

N149

N150

N151 N152

N153

N154

N155

N156

N157

N158

N159

N160

N161

N162

N163

N164

N165

N166

N167

N168

N169

N170

N171

N172

N173

N174

N175

N176

N177

N178

N179

N180

N181

N182

N183

N184

N185

N186

N187

N188

N189

N190

N191

N192

N193

N194

N195

N196

N197 N198

N199

N200

N201

N202

N203

N204

N205

N206

N207

N208

N209

N210

N211

N212

N213

N214

N215

N216

N217

N218

N219

N220

N221

N222

N223

N224

N225

N226

N227

N228

N229

N230

N231

N232 N233

N234

N235

N236

N237

N238

N239

N240

N241

N242

N243

N244

N245

N246

N247

N248

N249

N250

N251

N252

N253

N254

N255

N256

N257

N258

N259

N260

N261

N262

N263

N264

N265

N266

N267

N268

N269

N270

N271

N272

N273

N274

N275

N276

N277

N278

N279

N280

N281

N282

N283

N284

N285

N286

N287

Y

XZ

Page 50: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineer...

BPB

8016-12

Eagle Tower

SK - 3

May 19, 2015 at 2:40 PM

8016-12_Peninsula State Park Ob...

M9

M155M158

M18

0

M155

M190

M18

5

M158

M15

9

M157

M8 M

7

M153

M15

6M

181

M190

M10M

5

M15

9M

185M18

0

M15

2

M166

M153

M15

2M

181M18

5

M60 M61

M204

M18

0

M61M65

M15

4

M61

M9

M28M195

M157

M61

M18

5

M169M170

M61

M162

M18

1

M12M

6

M61

M166

M18

0

M15

6

M61

M169

M192

M18

5

M191

M170

M162

M61

M67

M16

7

M60

M16

7

M83

M61

M168

M18

1

M65

M164

M203

M192

M61

M18

5

M160

M191

M67

M70

M18

0

M66

M16

5

M61M74

M15

4

M16

5

M171

M61M82M73

M27

M168

M4

M11

M18

1

M160 M164

M61

M66

M18

5

M82M72

M68

M202

M67

M2M

1

M18

0

M61

M71

M61

M16

3

M83

M66

M61

M18

5

M60

M133M177

M61

M18

1

M63

M68

M6

M12

M67

M61M65

M22M26

M171

M18

2

M63

M25

M64

M23

M48M49

M61

M79

M133

M188

M63

M53

M45

M18

6

M62

M177

M80M66

M63

M113

M84

M16

1

M14

9

M67

M113M114

M3

M63

M148M

134

M14

9

M113

M84

M131

M75

M27

M39M40

M66

M69M188

M63

M201

M68

M113

M18

6

M67

M76

M18

2

M81

M14

7

M63

M150

M113

M14

7

M77

M66

M63

M131

M113

M69

M78

M68

M18

6

M200

M63

M18

2

M113

M13

2

M120

M64

M21M

24

M63

M112 M113

M62

M148

M63

M68

M114

M120

M18

6

M63

M113

M145

M124

M69

M63

M121

M113

M150M18

2

M63

M123M126

M18

6M

38

M113

M119

M120

M194

M63

M121M122

M15

1

M116

M145

M113

M3

M63

M52 M44

M174

M15

1

M119

M116

M31M30

M56

M57

M63

M69

M113

M199

M121

M18

6

M179

M63 M64

M125

M11

7

M113

M139

M18

4

M194

M63

M113M114

M33M36

M111

M21M

24

M62

M175

M11

7

M115M111

M34M37

M113

M119

M120

M14

6

M69

M111

M51 M

50M139 M179

M18

7

M198M

54M

46

M18

4

M111

M121

M111

M95

M174

M128

M96 M95

M120

M141M143

M18

7M111

M119

M95

M118M

29M

38M129

M20M19

M176

M95

M18

3

M14

0

M111

M121

M14

4

M118

M175

M130

M18

4

M95

M141

M193

M111 M127M

187

M143

M115

M95

M189

M119

M176

M111

M35

M32

M110M

173

M99

M88

M95

M17

3

M119

M178

M111

M18

3

M99

M193

M197

M94 M95

M135

M18

7M18

4

M137

M189

M96

M111

M85

M17

2

M14

2M100

M95

M91

M86M87

M17

2

M109M95

M111

M178

M100

M87

M18

3

M86

M95

M108

M99

M18

7M

29

M196

M135M137

M111

M18

4

M98

M95

M42M43

M107

M47M

55

M111

M58

M59

M115M111

M95

M13

8

M100

M88

M111

M95

M18

7

M95

M98

M99

M18

3

M16 M13

M95M96

M35

M32

M93

M95

M93 M97

M15 M14

M91

M101

M93M93

M102M100

M90M89

M99

M93

M13

6

M90M89

M104

M41

M93

M99

M103M105

M93

M100

M98

M106M93 M97M93M92

M93M93

M98

M93M93

M41

M93

M18M17

M93 M97M93M93

Y

XZ

Page 51: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineer...

BPB

8016-12

Eagle Tower

SK - 4

May 19, 2015 at 2:41 PM

8016-12_Peninsula State Park Ob...

16

RN

D

3X83X8

6X

6

3X8

2-3X8

12X

12

3X8

3X8

3X8

1 1/8" Rod 1 1/

8" R

od

3X8

4X

46

X6

2-3X8

1 1/8" Rod1

1/8"

Rod

3X8

12X

126X

6

3X8

3X8

3X8

3X8

6X

612X

12

2-2X128X8

Solid Bar 3/4"

6X

6

8X88X8

4X

4

8X8

16

RN

D

3X8

8X8

12X

12

3X83X8

8X8

3X8

6X

6

16RN

D16

RN

D

8X8

3X8

6X

6

4X

4

8X8

3X8

2-3X8

12X

12

2-3X8

3X8

3X8

8X8

2-2X12

3X8

2-2X12

3X8

3X8

8X8

3X8

6X

6

8X8

3X8

Solid Bar 3/4"

2-3X8

8X8

12X

12

3X82-3X8

2-2X12

2X12

6X

6

2-2X12

3X8

8X8

2-2X12

4X

4

3X8

3X8

8X82-2X122-2X12

12

RN

D

3X8

1 1/

8" R

od1 1/8" Rod

6X

6

3X8 3X8

8X8

2-2X12

12X

12

2-2X122-2X12

2-2X12Solid Bar 3/4"

2-2X12

1 1/

8" R

od1 1/8" R

od

6X

6

8X8

2-2X12

8X8

4X

4

3X8

2-2X12

8X8

12X

12

2-2X12

3X83X8

8X8

6X

6

8X8

2-2X12

16R

ND

16RN

D

2-2X12

8X88X8

3X8

6X

6

8X8 8X8

RB 1RB 1

8X8

2-2X12

3X8

2-3X8

8X8

RB

1R

B 1

10X

10

2-2X12

3X8

2-2X122-2X12

8X8

8X8

2-2X12

4X

4

3X8

2-2X12

8X88X8

16

RN

D

8X8

3X84

X4

3X8

8X8

2-2X12

3X8

2-2X12

12

RN

D

2-2X12

6X

6

2-3X8

8X8

Solid Bar 3/4"

2-2X12

8X8

10X

10

2-2X12

2-2X12

6X

6

2X12

3X8

8X8

3X8

8X8

3X8

2-2X12

2-2X12

8X8

3X8

8X8

6X

6

2-2X12

2-2X12

10X

10

Solid Bar 3/4"

8X8

6X

6

8X8

4X

4

3X8

8X8

12RN

D12

RN

D

8X8

3X8 8X8

2-2X12

3X8

8X8

2-2X12

8X8

3X8

10X

10

8X8

8X8

3X8

3X8

6X

6

8X8

3X8

8X8

3X86X

6

8X8

3X83X8

10X

101

0R

ND

8X8

2-3X8

3X8

2-3X8

8X8

3X8

3X8

3X8

3X8

3X8

8X8

16

RN

D

8X8

RB 1 RB 1

3X8

3X8

2-3X8

3X8

RB

1R

B 1

8X8

6X

6

8X8

Solid Bar 3/4"

3X8

10X

103X8

8X8 8X8

3X8

3X8

8X8

3X8

6X

6

2-3X8

8X8

8X88X8

8X8

12RN

D12

RN

D

2-2X12

3X8

3X8 8X88X8

8X8

2-3X8

3X8

4X

4

6X

6

8X8

SR 7/8 SR 7/8

3X8 3X8

10X

10

Solid Bar 3/4"S

R 7

/8S

R 7/8

6X

6

8X8

3X8

8X8

8X8

3X8

3X8

8X8 8X8

3X8

3X83X8

10X

108X8

2-3X8

8X8

3X81

2R

ND

10

RN

D3X8

3X8

8X8

6X

6

4X

4

8X8

3X8

4X

4

3X8

3X8

3X8

6X

6

8X8

3X8

2-3X8

8X8 3X810

X10

3X8

8X8

8X8

2-3X8

2-3X8

3X8

8X8

10R

ND

10RN

D

3X83X

8

2-2X12

3X8

8X8

3X8

2-3X8

3X8

8X8

6X

6

2-2X12

2-3X8

Solid Bar 3/4"

2X12 8X8

3X8

10X

106X

6

3X8

2-3X8

8X8

8X8

2X12

3X8

4X

4

2-2X12

8X8

3X8

2-2X122-2X12

3X8

2X128X8

8X8

3X8

2-2X12

2-2X12

6X

6

2-2X12

8X8

2X12

2-2X12

10X

101

2R

ND

Solid Bar 3/4"

3X83X8

8X8

6X

6

2X12

8X8

2X12

SR 7/8SR 7/8

8X8

SR

7/8

SR

7/8

8X88X8

8X8

4X

4

2-2X12

3X8

8X8

8X8

10X

10

8X8

2X12

2-2X12

6X

6

8X88X8

10R

ND

10RN

D

8X8

8X8

8X8 8X83X8

2X12

8X88X8

2X122-2X12

2-2X122-2X12

2-2X12

8X8

4X

4

2-2X122-2X12 2X12

10

RN

D

8X8

2-2X12

2X122X12

8X8

2-2X12

2X12

2X128X8 8X88X82X128X8

8X8

2X12

8X88X8

10

RN

D

8X88X8 8X88X88X8

Y

XZ

Page 52: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineer...

BPB

8016-12

Eagle Tower

SK - 5

May 19, 2015 at 2:42 PM

8016-12_Peninsula State Park Ob...

-.003k/ft

-.003k/ft-.007k/ft

-.007k/ft

-.007k/ft

-.003k/ft

-.007k/ft

-.007k/ft

-.003k/ft

-.007k/ft

-.007k/ft-.007k/ft

-.007k/ft-.007k/ft

-.007k/ft-.007k/ft

-.007k/ft-.007k/ft

-.007k/ft-.007k/ft

-.007k/ft-.007k/ft

-.007k/ft-.006k/ft

-.007k/ft

-.006k/ft

-.006k/ft

-.003k/ft

-.003k/ft-.007k/ft

-.007k/ft

-.007k/ft

-.007k/ft-.003k/ft

-.007k/ft

-.007k/ft-.003k/ft

-.007k/ft

-.007k/ft-.007k/ft

-.007k/ft

-.007k/ft-.007k/ft

-.007k/ft

-.007k/ft-.007k/ft

-.007k/ft

-.003k/ft

-.003k/ft-.007k/ft

-.007k/ft

-.006k/ft-.007k/ft

-.003k/ft

-.007k/ft

-.007k/ft

-.007k/ft

-.003k/ft

-.007k/ft

-.007k/ft-.007k/ft

-.007k/ft

-.007k/ft

-.007k/ft

-.007k/ft

-.007k/ft-.007k/ft

-.007k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft

-.006k/ft-.013k/ft

-.013k/ft

-.013k/ft

-.013k/ft

-.013k/ft

-.013k/ft

-.013k/ft

Y

XZ

Loads: BLC 1, DL

Page 53: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineer...

BPB

8016-12

Eagle Tower

SK - 6

May 19, 2015 at 2:42 PM

8016-12_Peninsula State Park Ob...

-.067k/ft

-.067k/ft-.133k/ft

-.133k/ft

-.133k/ft

-.067k/ft

-.133k/ft

-.133k/ft

-.067k/ft

-.133k/ft

-.133k/ft-.133k/ft

-.133k/ft-.133k/ft

-.133k/ft-.133k/ft

-.133k/ft-.133k/ft

-.133k/ft-.133k/ft

-.133k/ft-.133k/ft

-.133k/ft-.125k/ft

-.133k/ft

-.125k/ft

-.125k/ft

-.067k/ft

-.067k/ft-.133k/ft

-.133k/ft

-.133k/ft

-.133k/ft-.067k/ft

-.133k/ft

-.133k/ft-.067k/ft

-.133k/ft

-.133k/ft-.133k/ft

-.133k/ft

-.133k/ft-.133k/ft

-.133k/ft

-.133k/ft-.133k/ft

-.133k/ft

-.067k/ft

-.067k/ft-.133k/ft

-.133k/ft

-.125k/ft-.133k/ft

-.067k/ft

-.133k/ft

-.133k/ft

-.133k/ft

-.067k/ft

-.133k/ft

-.133k/ft-.133k/ft

-.133k/ft

-.133k/ft

-.133k/ft

-.133k/ft

-.133k/ft-.133k/ft

-.133k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft

-.125k/ft-.25k/ft

-.25k/ft

-.25k/ft

-.25k/ft

-.25k/ft

-.25k/ft

-.25k/ft

Y

XZ

Loads: BLC 2, LL

Page 54: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineer...

BPB

8016-12

Eagle Tower

SK - 7

May 19, 2015 at 2:42 PM

8016-12_Peninsula State Park Ob...

-.023k/ft

-.023k/ft-.045k/ft

-.045k/ft

-.045k/ft

-.023k/ft

-.045k/ft

-.045k/ft

-.023k/ft

-.045k/ft

-.045k/ft-.045k/ft

-.045k/ft-.045k/ft

-.045k/ft-.045k/ft

-.045k/ft-.045k/ft

-.045k/ft-.045k/ft

-.045k/ft-.045k/ft

-.045k/ft-.042k/ft

-.045k/ft

-.042k/ft

-.042k/ft

-.023k/ft

-.023k/ft-.045k/ft

-.045k/ft

-.045k/ft

-.045k/ft-.023k/ft

-.045k/ft

-.045k/ft-.023k/ft

-.045k/ft

-.045k/ft-.045k/ft

-.045k/ft

-.045k/ft-.045k/ft

-.045k/ft

-.045k/ft-.045k/ft

-.045k/ft

-.023k/ft

-.023k/ft-.045k/ft

-.045k/ft

-.042k/ft-.045k/ft

-.023k/ft

-.045k/ft

-.045k/ft

-.045k/ft

-.023k/ft

-.045k/ft

-.045k/ft-.045k/ft

-.045k/ft

-.045k/ft

-.045k/ft

-.045k/ft

-.045k/ft-.045k/ft

-.045k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft

-.042k/ft-.084k/ft

-.084k/ft

-.084k/ft

-.084k/ft

-.084k/ft

-.084k/ft

-.084k/ft

Y

XZ

Loads: BLC 3, SL

Page 55: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineer...

BPB

8016-12

Eagle Tower

SK - 8

May 19, 2015 at 2:42 PM

8016-12_Peninsula State Park Ob...

.071k/ft

.056k/ft

.071k/ft

.056k/ft

.071k/ft

.056k/ft

.071k/ft

.056k/ft.056k/ft

.046k/ft

.056k/ft

.046k/ft

.056k/ft

.046k/ft

.056k/ft

.046k/ft

.046k/ft

.036k/ft

.046k/ft

.036k/ft

.046k/ft

.036k/ft

.046k/ft

.036k/ft

.072k/ft

.06k/ft

.06k/ft

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

8k

6.3k

8.181k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

.305k

Y

XZ

Loads: BLC 4, WLx

Page 56: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineer...

BPB

8016-12

Eagle Tower

SK - 9

May 19, 2015 at 2:42 PM

8016-12_Peninsula State Park Ob...

.071k/ft

.056k/ft

.071k/ft

.056k/ft

.071k/ft

.056k/ft

.071k/ft

.056k/ft.056k/ft

.046k/ft

.056k/ft

.046k/ft

.056k/ft

.046k/ft

.056k/ft

.046k/ft

.046k/ft

.036k/ft

.046k/ft

.036k/ft

.046k/ft

.036k/ft

.046k/ft

.036k/ft

.072k/ft

.06k/ft

.06k/ft

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

8k

6.3k

8.181k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

.26k

Y

XZ

Loads: BLC 5, WLz

Page 57: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Company : Edge Consulting Engineers, Inc. May 20, 2015Designer : BPBJob Number : 8016-12 Checked By:_____Model Name : Eagle Tower

Envelope AISC 13th(360-05): ASD Steel Code ChecksMember Shape Code Check Loc...... Shea...Loc...... ... Pnc/o... Pnt/o... Mnyy/... Mnzz/... ... Eqn

1 M1 1 1/8" Rod 1.800 34....15 .007 34.... 16 .068 21.428 .402 .402 ... H1-1a

2 M2 1 1/8" Rod 1.659 34....16 .006 34.... 15 .068 21.428 .402 .402 ... H1-1a

3 M4 1 1/8" Rod 1.800 34....13 .007 34.... 16 .068 21.428 .402 .402 ... H1-1a

4 M5 1 1/8" Rod 1.666 34....16 .007 34.... 13 .068 21.428 .402 .402 ... H1-1a

5 M7 1 1/8" Rod 1.848 34....13 .007 34.... 14 .068 21.428 .402 .402 ... H1-1a

6 M8 1 1/8" Rod 1.663 34....14 .007 34.... 13 .068 21.428 .402 .402 ... H1-1a

7 M10 1 1/8" Rod 1.849 34....15 .007 0 14 .068 21.428 .402 .402 ... H1-1a

8 M11 1 1/8" Rod 1.654 34....14 .007 34.... 15 .068 21.428 .402 .402 ... H1-1a

9 M44 RB 1 1.123 27....14 .003 27.... 15 .07 16.931 .282 .282 ... H1-1a

10 M45 RB 1 1.153 27....15 .004 27.... 14 .07 16.931 .282 .282 ... H1-1a

11 M46 SR 7/8 .781 26....15 .004 0 23 .044 12.963 .189 .189 ... H1-1a

12 M47 SR 7/8 .726 26....14 .006 0 21 .044 12.963 .189 .189 ... H1-1a

13 M48 RB 1 1.152 27....13 .004 27.... 14 .07 16.931 .282 .282 ... H1-1a

14 M49 RB 1 1.121 27....14 .003 27.... 13 .07 16.931 .282 .282 ... H1-1a

15 M50 SR 7/8 .781 26....13 .004 0 12 .044 12.963 .189 .189 ... H1-1a

16 M51 SR 7/8 .732 26....14 .006 0 23 .044 12.963 .189 .189 ... H1-1a

17 M52 RB 1 1.170 27....13 .004 27.... 16 .07 16.931 .282 .282 ... H1-1a

18 M53 RB 1 1.120 27....16 .003 27.... 13 .07 16.931 .282 .282 ... H1-1a

19 M54 SR 7/8 .725 26....28 .005 0 24 .044 12.963 .189 .189 ... H1-1a

20 M55 SR 7/8 .747 26....13 .004 26.... 21 .044 12.963 .189 .189 ... H1-1a

21 M56 RB 1 1.123 27....16 .003 0 15 .07 16.931 .282 .282 ... H1-1a

22 M57 RB 1 1.170 27....15 .004 27.... 22 .07 16.931 .282 .282 ... H1-1a

23 M58 SR 7/8 .721 26....16 .005 26.... 24 .044 12.963 .189 .189 ... H1-1a

24 M59 SR 7/8 .747 26....15 .004 26.... 23 .044 12.963 .189 .189 ... H1-1a

25 M196 Solid Bar 3/4" .359 1.5 13 .013 0 22 1.801 9.524 .119 .119 ... H1-1a

26 M197 Solid Bar 3/4" .393 1.5 15 .005 0 22 1.801 9.524 .119 .119 ... H1-1a

27 M198 Solid Bar 3/4" .333 1.5 13 .005 0 14 1.801 9.524 .119 .119 ... H1-1a

28 M199 Solid Bar 3/4" .422 1.5 15 .005 0 14 1.801 9.524 .119 .119 ... H1-1a

29 M200 Solid Bar 3/4" .416 1.5 13 .007 0 24 1.801 9.524 .119 .119 ... H1-1a

30 M201 Solid Bar 3/4" .689 1.5 23 .009 0 24 1.801 9.524 .119 .119 ... H1-1a

31 M202 Solid Bar 3/4" .261 1.5 13 .015 0 22 1.801 9.524 .119 .119 ... H1-1a

32 M203 Solid Bar 3/4" .929 1.5 23 .010 0 14 1.801 9.524 .119 .119 ... H1-1a

33 M204 Solid Bar 3/4" .677 1.5 21 .021 0 16 1.801 9.524 .119 .119 ... H1-1a

Envelope Wood Code ChecksMember Shape Code Check Loc[ft] LC Shear ...Loc[ft]Dir LC Fc' [ksi] Ft' [ksi] Fb1' [k...Fb2' [k...Fv' [ksi] Eqn

1 M3 16RND .773 28.7... 22 .410 29.1... y 13 .671 1.32 1.887 1.397 .272 3.9-32 M6 16RND .723 28.7... 22 .410 29.1... y 15 .671 1.32 1.887 1.397 .272 3.9-33 M9 16RND .741 28.7... 24 .421 29.1... y 15 .671 1.32 1.887 1.397 .272 3.9-34 M12 16RND .785 28.7... 24 .421 29.1... y 13 .671 1.32 1.887 1.397 .272 3.9-35 M21 12RND .829 19.9... 24 .406 20.1... z 13 .753 1.32 1.92 1.421 .272 3.9-36 M24 12RND .845 21.0... 23 .414 20.1... z 15 .753 1.32 1.92 1.421 .272 3.9-37 M27 12RND .828 19.9... 24 .406 20.1... z 15 .753 1.32 1.92 1.421 .272 3.9-38 M29 12RND .836 19.9... 22 .414 20.1... z 13 .753 1.32 1.92 1.421 .272 3.9-39 M32 10RND .750 19.9... 13 .274 20.1... z 13 .549 1.32 1.92 1.421 .272 3.9-310 M35 10RND .706 19.9... 15 .262 20.1... y 15 .549 1.32 1.92 1.421 .272 3.9-311 M38 10RND .749 19.9... 15 .274 20.1... z 15 .549 1.32 1.92 1.421 .272 3.9-312 M41 10RND .707 19.9... 13 .261 20.1... y 13 .549 1.32 1.92 1.421 .272 3.9-313 M60 2-2X12 .721 9.884 9 .266 0 y 9 1.127 .45 1.005 1.208 .135 3.9-314 M61 8X8 3.214 2.337 9 1.495 2.337 y 9 .269 .55 .85 .629 .125 3.9-315 M62 2-2X12 .721 9.884 9 .265 0 y 9 1.127 .45 1.005 1.208 .135 3.9-316 M63 8X8 3.033 2.337 9 1.459 2.337 y 9 .269 .55 .85 .629 .125 3.9-117 M64 8X8 .849 1.03 9 .647 .824 y 9 .331 .55 .85 .85 .125 3.9-318 M65 8X8 .844 1.03 9 .647 .824 y 9 .331 .55 .85 .85 .125 3.9-3

RISA-3D Version 13.0.0 Page 1 [I:\...\...\...\...\...\8016-12_Peninsula State Park Observation Tower_2015-05-19.r3d]

Page 58: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Company : Edge Consulting Engineers, Inc. May 20, 2015Designer : BPBJob Number : 8016-12 Checked By:_____Model Name : Eagle Tower

Envelope Wood Code Checks (Continued)Member Shape Code Check Loc[ft] LC Shear ...Loc[ft]Dir LC Fc' [ksi] Ft' [ksi] Fb1' [k...Fb2' [k...Fv' [ksi] Eqn

19 M66 2-2X12 1.626 14.8... 9 .993 14.0... y 21 1.127 .45 1.005 1.208 .135 3.9-320 M67 2-2X12 .889 9.884 9 1.054 2.471 y 9 1.127 .45 1.005 1.208 .135 3.9-321 M68 2-2X12 1.035 9.884 9 1.094 2.471 y 9 1.127 .45 1.005 1.208 .135 3.9-322 M69 6X6 1.529 0 9 1.126 7 y 15 .872 .825 1.2 .888 .17 3.9-323 M70 2X12 .163 2.442 9 .560 4.884 y 9 1.064 .45 .999 1.208 .135 3.9-324 M71 2-2X12 1.367 9.884 9 .547 0 y 9 1.127 .45 1.005 1.208 .135 3.9-325 M72 2-2X12 1.367 9.884 9 .541 0 y 9 1.127 .45 1.005 1.208 .135 3.9-326 M73 2-2X12 1.367 9.884 9 .527 19.7... y 9 1.127 .45 1.005 1.208 .135 3.9-327 M74 2-2X12 1.367 9.884 9 .507 19.7... y 9 1.127 .45 1.005 1.208 .135 3.9-328 M75 2-2X12 1.367 9.884 9 .544 0 y 9 1.127 .45 1.005 1.208 .135 3.9-329 M76 2-2X12 1.367 9.884 9 .536 0 y 9 1.127 .45 1.005 1.208 .135 3.9-330 M77 2-2X12 1.367 9.884 9 .522 0 y 9 1.127 .45 1.005 1.208 .135 3.9-331 M78 2-2X12 1.367 9.884 9 .504 0 y 9 1.127 .45 1.005 1.208 .135 3.9-332 M79 2-2X12 1.367 9.884 9 .521 0 y 9 1.127 .45 1.005 1.208 .135 3.9-333 M80 2-2X12 1.367 9.884 9 .541 0 y 9 1.127 .45 1.005 1.208 .135 3.9-334 M81 2X12 .163 2.442 9 .919 0 y 9 1.064 .45 .999 1.208 .135 3.9-335 M82 2-2X12 .062 1.5 9 .860 0 y 9 .679 .45 .874 1.05 .135 3.9-336 M83 3X8 .916 6.45 9 .600 6.326 y 21 1.481 .81 1.198 1.38 .18 3.9-137 M84 2-2X12 .066 1.5 9 .493 0 y 9 .679 .45 .874 1.05 .135 3.9-338 M85 2X12 .072 1.618 9 .717 0 y 9 1.064 .45 .999 1.208 .135 3.9-339 M86 2-2X12 .024 1.5 9 .927 0 y 9 .679 .45 .874 1.05 .135 3.9-340 M87 2-2X12 .024 1.5 9 .927 0 y 9 .679 .45 .874 1.05 .135 3.9-341 M88 3X8 .896 6.283 23 .952 6.283 z 15 2.259 1.296 1.915 2.208 .288 3.9-142 M89 2-2X12 .024 1.5 9 .611 0 y 9 .679 .45 .874 1.05 .135 3.9-343 M90 2-2X12 .024 1.5 9 .611 0 y 9 .679 .45 .874 1.05 .135 3.9-344 M91 3X8 1.191 6.283 21 1.557 6.283 z 13 2.259 1.296 1.915 2.208 .288 3.9-145 M92 2X12 .955 8.237 9 .476 0 y 9 1.064 .45 .999 1.208 .135 3.9-346 M93 8X8 .802 11.0... 9 .693 16.1... y 9 .488 .825 1.2 .888 .17 3.9-347 M94 2X12 .955 8.237 9 .477 0 y 9 1.064 .45 .999 1.208 .135 3.9-348 M95 8X8 1.061 10.11 9 .758 16.1... y 9 .488 .825 1.2 .888 .17 3.9-349 M96 8X8 .671 15.4... 9 .446 15.4... y 9 .554 .825 1.2 .888 .17 3.9-350 M97 8X8 .707 15.4... 9 .439 15.4... y 9 .554 .825 1.2 1.2 .17 3.9-351 M98 2X12 1.264 8.237 9 .690 8.237 y 9 1.064 .45 .999 1.208 .135 3.9-352 M99 2-2X12 .877 8.237 9 .433 8.237 y 9 1.127 .45 1.005 1.208 .135 3.9-353 M100 2-2X12 1.815 8.237 9 1.025 3.089 y 21 1.127 .45 1.005 1.208 .135 3.9-354 M101 2X12 1.856 8.237 9 .812 0 y 9 1.064 .45 .999 1.208 .135 3.9-355 M102 2X12 1.856 8.237 9 .834 0 y 9 1.064 .45 .999 1.208 .135 3.9-356 M103 2X12 .072 1.619 9 .787 0 y 9 1.064 .45 .999 1.208 .135 3.9-357 M104 2X12 1.856 8.237 9 .859 0 y 9 1.064 .45 .999 1.208 .135 3.9-358 M105 2X12 1.856 8.237 9 .862 0 y 9 1.064 .45 .999 1.208 .135 3.9-359 M106 2X12 1.856 8.237 9 .857 0 y 9 1.064 .45 .999 1.208 .135 3.9-360 M107 2X12 1.856 8.237 9 .859 0 y 9 1.064 .45 .999 1.208 .135 3.9-361 M108 2X12 1.856 8.237 9 .863 0 y 9 1.064 .45 .999 1.208 .135 3.9-362 M109 2X12 1.856 8.237 9 .859 0 y 9 1.064 .45 .999 1.208 .135 3.9-363 M110 3X8 1.215 9.061 9 .326 0 y 9 1.481 .81 1.378 1.587 .18 3.9-364 M111 8X8 1.490 2.096 9 .848 2.096 y 9 .407 .825 1.2 .888 .17 3.9-365 M112 3X8 1.215 9.061 9 .326 0 y 9 1.481 .81 1.378 1.587 .18 3.9-366 M113 8X8 1.333 2.096 9 .795 2.096 y 9 .407 .825 1.2 .888 .17 3.9-167 M114 8X8 .502 1.133 9 .348 .944 y 9 .482 .825 1.2 1.2 .17 3.9-368 M115 8X8 .497 1.133 9 .348 .944 y 9 .482 .825 1.2 .888 .17 3.9-369 M116 3X8 .141 1.5 9 .425 3 y 9 1.532 .81 1.198 1.38 .18 3.9-370 M117 3X8 .843 6.283 23 .821 6.283 z 15 2.259 1.296 1.915 2.208 .288 3.9-171 M118 3X8 .117 1.5 9 .542 3 y 9 1.532 .81 1.198 1.38 .18 3.9-372 M119 2-3X8 .507 9.061 9 .856 9.061 y 21 1.481 .81 1.379 1.587 .18 3.9-373 M120 3X8 .827 9.061 9 .773 9.061 y 9 1.481 .81 1.378 1.587 .18 3.9-374 M121 3X8 1.019 9.061 9 .601 14.1... y 21 1.481 .81 1.378 1.587 .18 3.9-375 M122 3X8 2.358 9.061 9 .644 0 y 9 1.481 .81 1.378 1.587 .18 3.9-3

RISA-3D Version 13.0.0 Page 2 [I:\...\...\...\...\...\8016-12_Peninsula State Park Observation Tower_2015-05-19.r3d]

Page 59: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Company : Edge Consulting Engineers, Inc. May 20, 2015Designer : BPBJob Number : 8016-12 Checked By:_____Model Name : Eagle Tower

Envelope Wood Code Checks (Continued)Member Shape Code Check Loc[ft] LC Shear ...Loc[ft]Dir LC Fc' [ksi] Ft' [ksi] Fb1' [k...Fb2' [k...Fv' [ksi] Eqn

76 M123 3X8 2.358 9.061 9 .640 0 y 9 1.481 .81 1.378 1.587 .18 3.9-377 M124 3X8 2.358 9.061 9 .625 0 y 9 1.481 .81 1.378 1.587 .18 3.9-378 M125 3X8 2.358 9.061 9 .624 0 y 9 1.481 .81 1.378 1.587 .18 3.9-379 M126 3X8 .118 2.03 9 1.032 0 y 9 1.481 .81 1.378 1.587 .18 3.9-380 M127 3X8 .118 2.03 9 .456 4.061 y 9 1.481 .81 1.378 1.587 .18 3.9-381 M128 3X8 2.358 9.061 9 .644 0 y 9 1.481 .81 1.378 1.587 .18 3.9-382 M129 3X8 2.358 9.061 9 .639 0 y 9 1.481 .81 1.378 1.587 .18 3.9-383 M130 3X8 2.358 9.061 9 .625 0 y 9 1.481 .81 1.378 1.587 .18 3.9-384 M131 3X8 .707 7.25 15 .683 3.021 z 27 1.069 1.296 1.903 2.208 .288 3.9-185 M132 4X4 .246 0 14 1.157 0 z 15 .218 1.62 2.4 2.4 .288 3.6.386 M133 3X8 .568 3 22 .165 3 y 22 2.196 1.296 1.894 2.208 .288 3.9-387 M134 4X4 .193 0 14 1.194 0 z 15 .218 1.62 2.4 2.4 .288 3.6.388 M135 3X8 .771 7.25 23 1.001 3.021 z 15 1.069 1.296 1.903 2.208 .288 3.9-389 M136 4X4 .357 0 24 1.215 0 z 13 .218 1.62 2.4 2.4 .288 3.6.390 M137 3X8 .758 3 9 .322 3 y 9 1.46 .81 1.191 1.38 .18 3.9-391 M138 4X4 .304 0 24 1.152 0 z 13 .218 1.62 2.4 2.4 .288 3.6.392 M139 3X8 .669 3 24 .173 3 y 9 2.196 1.296 1.894 2.208 .288 3.9-393 M140 4X4 .040 0 24 1.876 0 z 15 .817 1.62 2.4 2.4 .288 3.6.394 M141 3X8 1.032 3 9 .374 3 y 9 1.46 .81 1.191 1.38 .18 3.9-395 M142 4X4 .092 0 22 1.983 0 z 15 .817 1.62 2.4 2.4 .288 3.6.396 M143 3X8 .696 7.25 15 .774 3.021 z 15 1.069 1.296 1.903 2.208 .288 3.9-397 M144 4X4 .076 0 22 1.890 0 z 13 .817 1.62 2.4 2.4 .288 3.6.398 M145 3X8 .723 7.25 13 .847 3.021 z 27 1.069 1.296 1.903 2.208 .288 3.9-199 M146 4X4 .044 0 24 1.964 0 z 15 .817 1.62 2.4 2.4 .288 3.6.3100 M147 3X8 .989 5.506 23 .880 0 z 27 2.259 1.296 1.915 2.208 .288 3.9-1101 M148 3X8 .965 5.62 21 1.140 5.506 z 27 2.259 1.296 1.915 2.208 .288 3.9-1102 M149 3X8 1.054 5.506 21 1.443 0 z 27 2.259 1.296 1.915 2.208 .288 3.9-1103 M150 3X8 .997 5.62 23 1.459 5.506 z 13 2.259 1.296 1.915 2.208 .288 3.9-1104 M151 3X8 .976 5.317 23 1.185 0 z 27 2.259 1.296 1.915 2.208 .288 3.9-1105 M152 3X8 .810 8.581 9 1.188 8.724 y 23 1.481 .81 1.198 1.38 .18 3.9-1106 M153 3X8 .532 7.25 25 .936 3.021 y 23 1.069 1.296 1.888 2.208 .288 3.9-3107 M154 4X4 .876 15 23 1.827 15 y 15 .419 1.62 2.4 2.4 .288 3.9-3108 M155 3X8 1.297 3 22 .294 3 y 9 2.196 1.296 1.894 2.208 .288 3.9-3109 M156 4X4 .763 15 21 1.690 15 y 13 .419 1.62 2.4 2.4 .288 3.9-3110 M157 3X8 1.065 5.668 21 1.585 5.668 z 15 2.259 1.296 1.915 2.208 .288 3.9-1111 M158 3X8 .830 0 21 1.096 4.229 y 23 1.069 1.296 1.903 2.208 .288 3.9-3112 M159 3X8 1.472 8.724 23 2.565 8.724 y 23 2.259 1.296 1.915 2.208 .288 3.9-3113 M160 3X8 1.518 3 24 .372 3 y 24 2.196 1.296 1.894 2.208 .288 3.9-3114 M161 4X4 .236 0 24 .882 0 z 25 .419 1.62 2.4 2.4 .288 3.6.3115 M162 3X8 .932 7.25 21 1.195 3.021 z 13 1.069 1.296 1.903 2.208 .288 3.9-1116 M163 4X4 .206 0 24 1.013 0 z 13 .419 1.62 2.4 2.4 .288 3.6.3117 M164 3X8 .767 0 25 .891 0 z 25 1.069 1.296 1.888 2.208 .288 3.9-1118 M165 3X8 1.081 5.668 23 1.247 5.668 z 25 2.259 1.296 1.915 2.208 .288 3.9-3119 M166 3X8 1.226 5.786 23 1.942 5.668 z 15 2.259 1.296 1.915 2.208 .288 3.9-1120 M167 3X8 .816 5.55 23 1.546 0 z 13 2.259 1.296 1.915 2.208 .288 3.9-1121 M168 3X8 .665 7.25 23 1.287 0 z 25 1.069 1.296 1.903 2.208 .288 3.9-1122 M169 3X8 1.076 3 22 .379 3 y 22 2.196 1.296 1.894 2.208 .288 3.9-3123 M170 3X8 .465 0 27 .874 0 z 27 1.069 1.296 1.888 2.208 .288 3.9-1124 M171 3X8 .948 5.458 21 1.430 0 z 13 2.259 1.296 1.915 2.208 .288 3.9-1125 M172 3X8 1.086 5.391 23 1.291 0 z 15 2.259 1.296 1.915 2.208 .288 3.9-1126 M173 3X8 1.099 5.506 23 1.557 5.506 z 15 2.259 1.296 1.915 2.208 .288 3.9-1127 M174 3X8 .873 5.506 21 1.017 5.506 z 13 2.259 1.296 1.915 2.208 .288 3.9-1128 M175 3X8 .893 5.506 13 1.728 5.506 z 15 2.259 1.296 1.915 2.208 .288 3.9-3129 M176 3X8 .716 0 13 .795 0 z 13 1.069 1.296 1.903 2.208 .288 3.9-1130 M177 3X8 .728 0 27 .880 0 z 27 1.069 1.296 1.888 2.208 .288 3.9-1131 M178 3X8 .758 0 23 .981 0 z 13 1.069 1.296 1.903 2.208 .288 3.9-1132 M179 3X8 .675 0 25 .663 0 z 15 1.069 1.296 1.888 2.208 .288 3.9-1

RISA-3D Version 13.0.0 Page 3 [I:\...\...\...\...\...\8016-12_Peninsula State Park Observation Tower_2015-05-19.r3d]

Page 60: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Company : Edge Consulting Engineers, Inc. May 20, 2015Designer : BPBJob Number : 8016-12 Checked By:_____Model Name : Eagle Tower

Envelope Wood Code Checks (Continued)Member Shape Code Check Loc[ft] LC Shear ...Loc[ft]Dir LC Fc' [ksi] Ft' [ksi] Fb1' [k...Fb2' [k...Fv' [ksi] Eqn

133 M180 6X6 1.914 11.25 9 1.358 11.25 z 21 .848 .825 1.2 .888 .17 3.9-3134 M181 6X6 2.784 7.5 23 1.221 15 y 25 1.167 1.32 1.92 1.421 .272 3.9-3135 M182 6X6 1.160 10.5 9 .910 10.5 y 15 .872 .825 1.2 .888 .17 3.9-3136 M183 6X6 1.351 10.5 9 .948 10.5 y 13 .872 .825 1.2 .888 .17 3.9-3137 M184 6X6 1.047 3.5 9 1.167 7 y 13 .872 .825 1.2 .888 .17 3.9-3138 M185 12X12 2.720 11.25 23 .601 30 y 15 .454 1.32 1.92 1.421 .272 3.9-3139 M186 10X10 1.751 0 23 .389 0 y 15 .608 1.32 1.92 1.421 .272 3.9-3140 M187 10X10 1.150 17.0... 9 .536 17.2... z 9 .549 .825 1.2 .888 .17 3.9-3141 M188 2-3X8 .596 3.021 9 .390 2.945 y 21 1.394 .81 1.197 1.38 .18 3.9-1142 M189 2-3X8 .853 3.021 9 .814 2.945 y 23 1.394 .81 1.197 1.38 .18 3.9-3143 M190 2-3X8 1.056 3.021 9 1.808 2.945 y 23 1.394 .81 1.197 1.38 .18 3.9-1144 M191 2-3X8 1.154 4.229 9 .584 4.305 y 9 1.394 .81 1.197 1.38 .18 3.9-1145 M192 2-3X8 1.126 3.021 9 1.273 2.945 y 21 1.394 .81 1.197 1.38 .18 3.9-3146 M193 2-3X8 1.090 4.229 9 .516 4.305 y 9 1.394 .81 1.197 1.38 .18 3.9-3147 M194 2-3X8 .689 4.229 9 .597 4.305 y 21 1.394 .81 1.197 1.38 .18 3.9-1

RISA-3D Version 13.0.0 Page 4 [I:\...\...\...\...\...\8016-12_Peninsula State Park Observation Tower_2015-05-19.r3d]

Page 61: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineer...

BPB

8016-12

Eagle Tower

SK - 10

May 19, 2015 at 2:44 PM

8016-12_Peninsula State Park Ob...

.74

1.30.83

1.91

1.30

1.06

2.72

.83

1.47

1.06

1.66 1.85

.53

.76

2.78

1.06

1.851.67

1.47

2.72

1.91

.81

1.23

.53

.81

2.78

2.72

.72 3.21

.68

1.91

3.21.84

.88

3.21

.74

NCNC

1.06

3.21

2.72

1.08.47

3.21

.93

2.78

.78.72

3.21

1.23

1.91

.76

3.21

1.08

1.13

2.72

1.15

.47

.93

3.21

.89

.82

.72

.82

.92

3.21

.67

2.78

.84

.77

.93

1.13

3.21

2.72

1.52

1.15

.89

.16

1.91

1.63

1.08

3.211.37

.88

1.08

.95

3.21.061.37

.83

.67

1.80

1.65

2.78

1.52 .77

3.21

1.63

2.72

.061.37

1.04

.26

.89

1.66

1.80

1.91

3.21

1.37

3.21

.21

.92

1.63

3.21

2.72

.72

.57.73

3.21

2.78

3.03

1.04

.72 .78

.89

3.21.84

NCNC

.95

1.16

3.03

NC

.85

NC

1.151.12

3.21

1.37

.57

.60

3.03

1.12

1.15

1.75

.72

.73

1.371.63

3.03

1.33

.07

.24

1.05

.89

1.33.50

.77

3.03

.96.1

9

1.05

1.33

.07

.71

1.37

.83

NCNC

1.63

1.53.60

3.03

.69

1.04

1.33

1.75

.89

1.37

1.16

.16

.99

3.03

1.00

1.33

.99

1.37

1.63

3.03

.71

1.33

1.53

1.37

1.04

1.75

.42

3.03

1.16

1.33

.25

.83

.85

.83.84

3.03

1.21 1.33

.72

.96

3.03

1.04

.50

.83

1.75

3.03

1.33

.72

2.36

1.53

3.03

1.02

1.33

1.001.16

3.03

2.36.12

1.75

.75

1.33

.51

.83

.69

3.03

1.02

2.36

.98

.14

.72

1.33

.77

3.03

1.17 1.12

.87

.98

.51

.14

NCNC

1.12

1.17

3.03

1.53

1.33

.42

1.02

1.75.68

3.03 .85

2.36

.84

1.33

.67

1.05

.69

3.03

1.33.50

NCNC

1.49

.83.84

.72

.89

.84 .501.49

NCNC

1.33

.51

.83

.04

1.53

1.49

.73 .78

.67 .68

1.15

.33.7

3 .78

1.05

1.49

1.02

1.49

1.06

.87

2.36

.67 1.06

.83

1.03.70

1.15

1.49

.51

1.06

.12.8

4.7

52.36

NCNC

.72

1.06

1.35

.04

1.49

1.02

.08

.12

.89

2.36

1.05

1.06

1.03

1.09

1.49 .121.

15

.70

.50

1.06

.85

.51

.72

1.49

.71 .75

1.211.

10

.88

.90

1.06

1.10

.51

.76

1.49

1.35

.88

1.09

.39

.95 1.06

.77

1.15

1.05

.76

.85

.67

1.49

.07

1.09

.09

1.82

1.06

1.19

.02.02

1.09

1.861.06

1.49

.76

1.82

.02

1.35

.02

1.06

1.86

.88

1.15

.84

.36

.77.76

1.49

1.05

1.26

1.06

NCNC

1.86

.73.75

1.49

.72.75

.501.49

1.06

.30

1.82

.90

1.49

1.06

1.15

1.06

1.26

.88

1.35

NC NC

1.06.67

.71 .75

.80

1.06

.80 .71

NC NC

1.19

1.86

.80.80

1.861.82

.02.02

.88

.80

.36

.02.021.86

.71

.80

.88

.071.86

.80

1.82

1.26

1.86.80 .71.80.95

.80.80

1.26

.80.80

.71

.80

NCNC

.80 .71.80.80

Y

XZ

Code Check( Env )

No Calc > 1.0.90-1.0.75-.90.50-.75 0.-.50

Member Code Checks Displayed (Enveloped)Envelope Only Solution

Page 62: STRUCTURAL CONDITION ASSESSMENTdnr.wi.gov/.../pdfs/Eagle_Tower_Condition_Assessment_Report.pdf · 22.04.2015 · 1.1 PROJECT OVERVIEW 1 1.2 PURPOSE OF REPORT 1 ... This Structural

Edge Consulting Engineer...

BPB

8016-12

Eagle Tower

SK - 11

May 19, 2015 at 2:45 PM

8016-12_Peninsula State Park Ob...

1.30

1.91

1.30

1.06

2.72

1.47

1.06

1.66 1.85

2.78

1.06

1.851.67

1.47

2.72

1.91

1.23

2.78

2.72

3.21

1.91

3.213.21

1.06

3.21

2.72

1.08

3.21

2.78

3.21

1.23

1.91

3.21

1.08

1.13

2.72

1.15

3.213.21

2.78

1.13

3.21

2.72

1.52

1.15

1.91

1.63

1.08

3.211.37

1.08

3.21

1.37

1.80

1.65

2.78

1.52

3.21

1.63

2.72

1.37

1.04

1.66

1.80

1.91

3.21

1.37

3.21

1.63

3.21

2.72

3.21

2.78

3.03

1.04

3.21

1.16

3.03

1.151.12

3.21

1.37

3.03

1.12

1.15

1.75

1.371.63

3.03

1.33

1.05

1.33

3.03

1.05

1.33

1.37

1.63

1.53

3.03

1.04

1.33

1.75

1.37

1.16

3.03

1.33

1.37

1.63

3.03

1.33

1.53

1.37

1.04

1.75

3.03

1.16

1.33

3.03

1.21 1.33

3.03

1.04

1.75

3.03

1.332.36

1.53

3.03

1.02

1.33

1.16

3.03

2.36

1.75

1.33

3.03

1.02

2.36

1.33

3.03

1.17 1.12

1.12

1.17

3.03

1.53

1.33

1.02

1.75

3.03

2.36

1.33

1.05

3.03

1.33

1.491.49

1.33

1.53

1.491.

15

1.05

1.49

1.02

1.49

1.06

2.36

1.06

1.03

1.15

1.49

1.06

2.36

1.06

1.35

1.49

1.02

2.36

1.05

1.06

1.03

1.09

1.491.

15

1.06

1.491.21

1.10

1.06

1.10

1.49

1.35

1.09

1.06

1.15

1.05

1.49

1.09

1.82

1.06

1.19

1.09

1.861.06

1.49

1.82

1.35

1.06

1.86

1.15

1.49

1.05

1.26

1.06

1.86

1.491.49

1.06

1.82

1.49

1.06

1.15

1.06

1.26

1.35

1.061.06

1.19

1.861.861.82

1.861.86

1.82

1.26

1.86

1.26

Y

XZ

Code Check( Env )

No Calc > 1.0.90-1.0.75-.90.50-.75 0.-.50

Member Code Checks Displayed (Enveloped)Envelope Only Solution