Structural BMP Compliance Approach for California State Parks in 5+ ASBS Brian Currier, Water Programs, Sacramento State CASQA 2015 Monterey

Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Structural BMP Compliance Approach for California State Parks in 5+ ASBS

Brian Currier, Water Programs, Sacramento State

CASQA 2015 ‐Monterey

Page 2: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Project Team• State Parks, Facilities Management

Division (FMD), Stormwater Program• Water Programs at Sacramento State• AMEC Foster Wheeler

2

Page 3: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Objectives• Review the ASBS Timeline for Phase II• Contrasting ASBS Submittal Requirements• Review Parks and Recreation Facilities

Requirements • Overview of the BMP retrofit program• Identify potential BMP partnership

opportunities

3

Page 4: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Regulations Timeline• 2009 letter accepts State Parks application• 2012 General Exception 2012-0012

adopted, but requires permit coverage• 2013 Phase II permit adopted• 2014/15 State Parks receives initial

funding

4

Page 5: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

15 Phase II ASBS Park Units

5

http://webpages.csus.edu/~smeyer/stateparks.htm

Page 6: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Phase II, Attachment C vs. 2012‐0031Submittal Requirements

I.A.3.b Compliance Schedule, Resolution No. 2012-0031“…a draft written ASBS Compliance Plan…”

I.A.3.b Compliance Schedule, Phase II, Attachment C“…a written ASBS Compliance Plan…”

6

Page 7: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Phase II, Attachment C vs. 2012‐0031Submittal Requirements

I.A.3.b Compliance Schedule, Resolution No. 2012-0031“The final ASBS Compliance Plan, including a description and final schedule for structural controls based on the results of runoff and receiving water monitoring, must be submitted within thirty (30) months from the effective date of the Exception”

I.A.3.b Compliance Schedule, Phase II, Attachment C“The ASBS Compliance Plan shall include a time schedule to implement appropriate non-structural and structural controls (implementation schedule) to comply with these special conditions.”

7

Page 8: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

RegulationsParks and Recreation FacilitiesAttachment C, II.A.6

…include BMPs or Management Measures/Practices to address runoff from parking areas and other developed features to ensure that the runoff does not alter natural water quality in the affected ASBS. BMPs or Management Measures/Practices shall include measures to reduce pollutant loading in runoff to the ASBS through installation of natural area buffers (LID), treatment, or other appropriate measures.

8

Page 9: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

BMP Retrofit Strategy• Inventory all parking lots• Identify direct drainage to

ASBS• Identify substantial erosion

prone areas with anthropogenic influence

9

Page 10: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Retrofit List• Del Norte State Park (Redwood National Park

ASBS): Parking lot near Wilson Creek• Prairie Creek State Park (Redwood National Park

ASBS): Beach Road parking lot• Salt Point State Park (Gerstle Cove ASBS):

Gerstle Cove visitor center parking lot• Aňo Nuevo State Park and Reserve (Aňo Nuevo

ASBS): Wheelchair Access parking lot • Point Lobos State Natural Reserve (Point Lobos

ASBS): 9 parking lots!

10http://webpages.csus.edu/~smeyer/stateparks.htm

Page 11: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Park Units with parking lots with direct runoff to ASBS (cont.)Retrofit list (cont.)• Point Mugu State Park (Laguna Point to Latigo

Point ASBS): Sycamore Canyon parking lot• Leo Carrillo State Park (Laguna Point to Latigo

Point ASBS): 2 parking lots • Robert H. Meyer Memorial State Beach (Laguna

Point to Latigo Point ASBS): 3 parking lots• Point Dume State Beach (Laguna Point to Latigo

Point ASBS): Cliffside Drive parking lot• Crystal Cove State Park (Irvine Coast ASBS): 4

parking lots

11http://webpages.csus.edu/~smeyer/stateparks.htm

Page 12: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

• Hierarchy of BMP technologies considered:– Stormwater capture and use

(groundwater recharge)– Bioretention and other LID techniques

that maximize infiltration– Stormwater filtration BMPs

12

BMP Retrofit Siting Study

Page 13: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Retrofit Locations

13

http://webpages.csus.edu/~smeyer/stateparks.htm

1. Search here

2. Select here

Page 14: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Wilson Beach

14

http://webpages.csus.edu/~smeyer/stateparks.htm Search: Del Norte State Park

Page 15: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Gerstle Cove Visitor Center

15

http://webpages.csus.edu/~smeyer/stateparks.htm Search: Salt Point State Park

Page 16: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Wheelchair Access Lot

16

http://webpages.csus.edu/~smeyer/stateparks.htm Search: Ano Nuevo State Park

Page 17: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

9 Lots at Point Lobos

17

http://webpages.csus.edu/~smeyer/stateparks.htm Search: Point Lobos State Natural Reserve

Page 18: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Sycamore Canyon

18

http://webpages.csus.edu/~smeyer/stateparks.htm Search: Point Mugu State Park

Page 19: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Leo Carrillo

19

http://webpages.csus.edu/~smeyer/stateparks.htm Search: Leo Carrillo

Page 20: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Robert H. Meyer: 3 lots

20

http://webpages.csus.edu/~smeyer/stateparks.htm Search: Robert H. Meyer

Page 21: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Cliffside Dr.

21

http://webpages.csus.edu/~smeyer/stateparks.htm Search: Point Dume State Beach

Page 22: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Crystal Cove: 4 lots

22

http://webpages.csus.edu/~smeyer/stateparks.htm Search: Crystal Cove SP

Page 23: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Carmel River Parking: Erosion Prone Area

23

http://webpages.csus.edu/~smeyer/stateparks.htm Search: Carmel River State Beach

Page 24: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Next Steps• Compliance Plans: Complete!• QAPP: under SWRCB review• 2015/16 wet season: begin monitoring• 2016/17: begin BMP planning

– Siting and design– Permitting: CEQA, drainage easements, Coastal

Commission, etc.– Construction via district contracting– Construction management via A&E contract to be

advertised late 2016.

24

Page 25: Structural BMP Compliance Approach for California State Parks in … · 2015. 10. 21. · “The final ASBS Compliance Plan, including a description and final schedule for structural

Contact Information

• Michael Stephens (916) 324-0412

[email protected]

• Brian Currier, OWP (916) 278-8109

[email protected]

25