26
Steinmüller Engineering Conference 2016 Steinmüller Engineering Conference 2016 1 IHI Corporation, the new 100% Shareholder of SE Strong Relation with Steinmüller Engineering GmbH (SE) Speaker: Tetsuya Iwasaki Managing Director Steinmüller Engineering Conference 2016

Strong Relation with Steinmüller Engineering GmbH (SE) · Strong Relation with Steinmüller Engineering GmbH (SE) Speaker: ... (9Cr problem in Japan / T24 problem in Europe) 2)

  • Upload
    lylien

  • View
    216

  • Download
    2

Embed Size (px)

Citation preview

Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016 1

IHI Corporation, the new 100% Shareholder of SEStrong Relation with

Steinmüller Engineering GmbH (SE)

Speaker: Tetsuya IwasakiManaging Director

Steinmüller Engineering Conference 2016

Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016 2

Employment Record Mr. Tetsuya Iwasaki

2014 – present Steinmüller Engineering GmbH, Gummersbach, GermanyMember to Board of DirectorsIHI Corporation, JapanAssistant to President Energy & Plant Operations

2013 – 2014 IHI Corporation, JapanDivision Director of Engineering CenterEnergy & Plant Operations

2009 - 2010 IHI Corporation, JapanDeputy General Superintendent of Aioi WorksGeneral Manager of Production Control Dept. Aioi WorksPower Plant Div. Energy Plants Operations

2009 - 2010 IHI Corporation, JapanGeneral Manager of Construction Dept.Power Plant Div. Energy & Plant

1984 - 2009 Ishikawajima-Harima Heavy Industries Co., Ltd., Japan(from 2007 name of Company change to IHI Corperation)Boilers Basic Design DepartmentProcess and Design Engineer / Manager / General Managerfor Coal, Oil and Gas Firing Plants

1979 - 1984 Hokkaido University , Sapporo, JapanFaculty of Engineering Department of Mechanical EngineeringBachelor in Mechanical Engineering

NeuesFotofür

Internetseite

Steinmüller Engineering Conference 2016 3

Contents

IHI Activity in Europe

Comparison between Germany and Japan

Technical Collaboration of IHI/SE

Comparison between Steinmüller and IHI

This is IHI - Company Profile -Business area / Products / Organization

Steinmüller Engineering Conference 2016 4

u Net Sales : JPY 1,455,844 mil(USD 12,660 mil)

u Founded : 1853

u Works : 8u Branch Offices : 17(Japan) , 15(Overseas)u Subsidiaries : 252

Overseas Office

Global SubsidiaryCompany

Global Network

The First Steamship Built by JapanesePrivate Company – “Tsu-un maru”.

1. This is IHI - Company Profile

Information is on consolidated basis and is corrected as of March 2015

Resources,Energy and

Environment29%

Aero Engines30%

IndustrialSystems

28%

SocialInfrastructure

13%

Total Sales Volume/ as of March, 2015

Copyright © 2016 IHI Corporation All Rights Reserved.

Steinmüller Engineering Conference 2016 5

Social Infrastructure and Offshore Facilities(Bridge, Transportation System, Security, etc.)

Aero Engines and Space(Jet Engine, Rocket)

General-Purpose Machinery(Compressor, Separator, Turbo charger, etc.)

Industrial Systems(Steel Manufacturing Furnaces, Heat/Surface Treatment

Equipment, Logistics Systems, Material Handling Equipment, etc.)

Resources, Energy and Environment(Boiler, Gas Turbine/Gas Engine, LNG Terminal, Process Plant, Nuclear Equipment, etc.)

Resources,Energy andEnvironment

Aero Engine,Space andDefense

Industrial Systemsand

General-PurposeMachinery

Social Infrastructureand

Offshore Facilities

1. This is IHI - Business Areas

Copyright © 2016 IHI Corporation All Rights Reserved.

Steinmüller Engineering Conference 2016 6

Aioi Works

Yokohama Works

Aioi CastingWorkshop

Aichi Works

President andChief Executive Officer

Tamotsu Saito

President andChief Executive Officer

Tamotsu SaitoCorporate

Energy & Plant Operations

Nuclear Power Operations

Aero-Engine & Space Operations

Rotating Machinery Operations

Vehicular Turbocharger Operations

Machinery & Logistics SystemsOperations

Infrastructure Operations

Offshore Project &Steel Structures Operations

Urban Development Operations

Mizuho Works

Kure No.2 Works

SomaNo.1 Works

SomaNo. 2 Works

Global Marketing Headquarters

Sales Headquarters

Resources,Energy and

Environment

SocialInfrastructureand Offshore

Facilities

IndustrialSystems

And General-Purpose

Machinery

AeroEngines

and Space

1. This is IHI - Organization

IHI Europe Ltd.Managing Director:Mr. Kadooka

Copyright © 2016 IHI Corporation All Rights Reserved.

Steinmüller Engineering Conference 2016 7

Energy Systems Center(PM & Engineering for Boiler & Gas Turbine)

Plant Project Center(PM & Engineering for Gas Process)

Production Center(Production, Procurement/Erection

& Site Management)

Business Development & Sales Center

Energy & Plant Operations

1. This is IHI - Energy & Plant Operations Organization

Mr. DomotoBoard Director and Managing Executive OfficerPresident of Energy & Plant OperationsChairman of SE Control Board Meeting

Mr. Yahagi Executive Officer, Vice PresidentMr. Sugitani Executive Officer, Vice PresidentMr. Yonezawa Associate Director, Vice President

Director: Mr. Yahagi

Director: Mr. Yonezawa

Director: Mr. Sugitani

Director: Mr. Takeda

Planning Dept.

Quality Assurance

IT Planning & Coordination

Associate Director:Mr. Nakamura

Copyright © 2016 IHI Corporation All Rights Reserved.

Steinmüller Engineering Conference 2016 8

IHI Paris Office

IHI Europe Ltd.

Niigata Power Systems (Europe) B.V.

IHI Moscow Office

IHI Algeria Office

Perkins-Shibaura Engines Ltd.

IHI Charging Systems International GmbH

IHI Charging Systems International S.p.A.

IHI Charging Systems International Germany GmbH

IHI Ionbond AG

IHIMER S.p.A.

IHI Hauzer Techno Coating B.V.

Felguera-IHI S.A.

IHI Cologne Office

IMBV b.v.

IHI Dubai Office

IHI Istanbul Office

Steinmüller Engineering GmbH

Copyright © 2016 IHI Corporation All Rights Reserved.

2. IHI Activity in Europe - European Network

IHI VTN GmbH

Steinmüller Engineering Conference 2016 9•

Client : Trianel Kohlekraftwerk LünenSteam Conditions

Capacity : 2,225 t/h (813 MWe)Temp. : 600/610 oC (SH/RH Outlet)Press. : 28.76 MPa (SH Outlet)Fuel : Pulverized Coal

General Arrangement of Boiler

The first IHI tower boiler in Europe & Latest IHI`s USC Boiler2. IHI Activity in Europe – Lünen Power Plant

・The Coal Top Plant Award Winner of POWER Magazine,2014・The Lowest Heat Rate Award at Power Gen International 2015・The 2015 Advanced Energy for Life Europe Clean Coal Awards

Copyright © 2016 IHI Corporation All Rights Reserved.

Steinmüller Engineering Conference 2016 10•

Fatih Sultan Mehmet Bridge (1988)(Second Bosphorus Bridge)

2. IHI Activity in Europe - Key Product (for Reference)PVD, CVD and Heat treatment

LNG storage tanks

TurbochargerDiesel engine, Z-Peller

Construction equipment

Copyright © 2016 IHI Corporation All Rights Reserved.

Steinmüller Engineering Conference 2016 11

3. Comparison of Germany and Japan - General

Germany JapanLand area 357.000 km2 (100) 378.000 km2 (106)Population 81.080.000 (100) 126.000.000 (155)Population density 226 / km2 (100) 340 / km2 (150)Forest area ratio 31% (100) 64% (206)

Steinmüller Engineering Conference 2016 12•

3. Comparison of独逸 and ⽇本 - 歴史History・⽂化Culture

1. The Oldest company in the countryGermany: Bayerische Staatsbrauerei Weihenstephan

(Brewery Beer : founded A.C. 1040)Japan : Keiunkan

(Hotel : founded A.C. 705)

To pursue High Quality technology for human beingDifferent applied material : Barley vs Rice, Stone vs Wood

2. The Famous Cathedral / TempleGermany: Köln Cathedral

(Construction from 1248 to 1880)Japan: Horyuji Temple in Nara

( founded 7th century)

3. The Characteristics of Business areaGermany: Distributed whole Germany

connected by AutobahnJapan: Concentrated at Tokyo

Source: Related website

Steinmüller Engineering Conference 2016 13•

3. Comparison of Germany and Japan – Energy

Germany JapanSelf-sufficiency rate of PrimaryEnergy Consumption

39,5 % (2012) 6,26 % (2012)

Electricity Generation 623 TWh (2012) 1.026 TWh (2012)Renewable energy rate(installed capacity basis)

24,3 % (2012) 12,5 % (2012)

Electric Grid Connection European Grid Stand Alone

Source : IEA Energy Balances of OECD Countries 2014 Edition

Steinmüller Engineering Conference 2016 14

4. Comparison of Steinmüller and IHI

Steinmüller IHIFounded 1872 1853Initial Products Steam driven vehicle Steam driven ShipLargest capacity Boiler Niederaußem Unit K

1100MWTachibanawan No.1

1050MW

Source: RWE website

No Photo

Steinmüller Engineering Conference 2016 15

Former Gummersbach (1980)

Office Building

Boiler Works

4. Comparison of Steinmüller and IHI – Location

Steinmüller Engineering Conference 2016 16

as of Sept. 2015Gummersbach

ShoppingMall

University

SE Headquarter

4. Comparison of Steinmüller and IHI – Location

Steinmüller Engineering Conference 2016 17

IHI Office BuildingShip Yard

as of Sept. 1972 Tokyo

4. Comparison of Steinmüller and IHI – Location

Steinmüller Engineering Conference 2016 18

as of Sept. 2015 Tokyo

University

ShoppingMall

IHI Headquarter

4. Comparison of Steinmüller and IHI – Location

Steinmüller Engineering Conference 2016 19

IHI Aioi Works

4. Comparison of Steinmüller and IHI – Location

Sakuragaoka-Works

Hinoura-Works

Works forShip

Combustion Test Facility

Outline Works (as of 2015)

Ground approx. 184.000m2

Floorage approx. 84.500 m2

Employees approx. 400

Aioi Works

IHI HQ(Tokyo)

Copyright © 2016 IHI Corporation All Rights Reserved.

Steinmüller Engineering Conference 2016 20

1980 First Supercritical Variable pressure Once throughReheat type Boiler in Japan in Commercial Operation(Hirono #1, Tokyo Electric Co., Ltd ) with LCS cooperation

1990 -

1985 License agreement on SCR systems with IHI Japanand contract award for a first 450 MW unit,Neckarwerke Altbach, again followed by a retrofitcontract wave entered by governmental regulations

Technical cooperation for Engineering ofIsogo New No.1 Boiler( First Tower type boiler in Japan)

5. Technical Collaboration of IHI and L. & C. Steinmüller

(Photo is provided by J-POWER (EPDC))

No Photo

Steinmüller Engineering Conference 2016 21

5. Technical Collaboration of IHI and Steinmüller Engineering

Date Contract / Activity

3rd April 2003 Establishment of SE

2004/08 Power plant study Europa

2005/05 Consultancy for product and marketing strategy

2005/06 Know-How transfer, design basics for lignite firing systems inutility steam generators

2004-2005 Collaboration for Preparation for Proposal of Moorburg,Vattenfall etc.

2008/01 Inquiry specification for NoBo, 800MWel steam generatorLünen

2008/01 Study on European lignite gasification plants with IGCCapplication

2008/09 Market survey in Europe for new PP-Projects anddevelopment new technologies

2009/05 Conceptual study for a 1100MWel dry lignite-fired steamgenerator

2011-2013 Collaboration for Preparation for Proposal of BoA+ Project

2013 Support for TBK test burners

Steinmüller Engineering Conference 2016 22

5. Technical Collaboration of IHI and SE after IHI Gr Company- Combustion System Field -

1) Combustion CFD for 1000MW : Technical Discussion for CFD analysis

2) Combustion test of SM-V burner in IHI Aioi test facility:Technical discussion for Bituminous coal burner technology

To propose/utilize more sofisticated technology for customer

Steinmüller Engineering Conference 2016 23

SE and IHI are sharing information each technology andknowledge for future development each others.

1) Boiler material knowledges(9Cr problem in Japan / T24 problem in Europe)

2) CFB technology based on each design

3) Fundamental Boiler design tool(DimBo and Dessan)

4) Coal Gasifier technology

Information exchange for technical integration

5. Technical Collaboration of IHI and SE after IHI Gr Company- Steam Generator Field -

IHI gasifier TIGAR®

DimBo

9cr Creep rupture

Neyveli CFBC

Steinmüller Engineering Conference 2016 24

Collaboration for modification / improvement FGD technology

SE / IHI collaborate for improvement /modification of FGD/SCR products for owndeveloped technology to apply recent customerenvironmental requirement.

Sieve Tray

5. Technical Collaboration of IHI and SE after IHI Gr Company- Air Polution Control Field -

1) None-Discharge Technology for WetAbsorber

2) Performance improvement forAbsorber with Sieve Tray Application

3) Mercury Removal TechnologyDevelopment

TEPCO HK-1 1000MWel Flue gas cleaning

Steinmüller Engineering Conference 2016 25

SE / IHI pursue to develop high efficiency / low emmision, high reliability /low maintenance cost lignite fired boiler to meet global Energy Security /Environmental / Economical requirement.

General Arrangement of600MW Raw lignite fired boiler

5. Technical Collaboration of IHI and SE after IHI Gr Company- Lignite fired boiler -

温度

[℃]

Example of CFD result forRaw/Pre-dried Lignite mixed combustion

Steinmüller Engineering Conference 2016Steinmüller Engineering Conference 2016 26

Thank you for your attention