Stranraer Flood Protection Scheme: A case Study
Juan Fernandez, Simon McGee, Alasdair Fraser
MouchelThe Beta Centre Stirling University Innovation ParkStirling, FK9 4NFScotland, UK
4th International Symposium on Flood Defence:Managing Flood Risk, Reliability and VulnerabilityToronto, Ontario, Canada, May 6-8, 2008
1
Introduction
- Stranraer is located in South West Scotland, in the Dumfries and Galloway Council
- Population of around 13,000- Ferry port connection- Historical flooding issues- October 2000 event- Scottish Water and Council competences - Drainage Area Plan Stranraer
October 2000 flooding around the Sheuchan Burn Stranraer Location
2
Stranraer Watercourses
- Black Stank- Town Burn- Laundry Burn- Sheuchan Burn- Surface water
sewers
Stranraer watercourses
3
Data Gathering
- Site visits- Topographic survey
- Watercourse survey- Floodplain survey- Structural survey- 3D survey
- CCTV survey- DAP survey
- Manhole survey- Pumping Station survey- CCTV survey- CSO survey
Stills from Millburn Court CCTV Survey (John Bunting, EEC - 7 July 2005)
Stranraer topography
4
Data Gathering
- Hydrology- Rainfall data from 4 raingauges (MET office, 2000)- Flood Estimation Handbook (FEH) methodology
- Climate Change (Price and McKenna, 2003)- Extreme sea-water levels for Stranraer (HR Wallingford, 2002)- Joint probability assessment (DEFRA, 2006)
Current Estimated Peak Flows (m3/s) Return Period (year) 2.33 5 10 25 50 100 200 500
Black Stank 3.16 4.38 5.24 6.66 7.83 8.98 10.35 12.48 Town Burn 1.26 1.62 1.88 2.22 2.4 2.53 2.65 2.81
Reach B 1.09 1.58 1.89 2.34 2.81 3.27 3.82 4.68 Reach A 1.06 1.57 1.89 2.36 2.75 3.21 3.77 4.63 Sheuchan Burn Whole 2.5 3.66 4.39 5.46 6.42 7.51 8.78 10.76
Laundry Burn 1.22 1.82 2.21 2.77 3.26 3.73 4.37 5.35
Estimated Peak Flows (m3/s) for Stranraer Watercourses
Return Period (years)
Extreme water level (m AOD)
1 2.65 10 3.00 25 3.14 50 3.23 100 3.38 250 3.52
Extreme Water Levels for Stranraer
5
Hydraulic Modelling
- Combination of different hydraulic software packages
- HEC-RAS (1D – open watercourses)
- InfoWorks CS (1D – long culverts and drainage system)
- MIKE21 (2D – overland flow)
- Watercourses and sewage system interactions
- Water depths were predicted at every single flooded property
6
Hydraulic Modelling – Upper Town Burn
- Highly modified- Wholly culverted- CCTV survey- InfoWorks Modelling- Draining assessment- Outputs for 1D/2D
70
MH
9W
136
MH
9V
220
MH
9U
300
MH
9T
333
MH
9S
403
MH
9R
452
MH
9Q
500
MH
9PM
H9N
562 628
MH
9J
762
MH
9L
809 899 1034 1062 1142 1220 12851307 1343
MH9X36.745
MH9W33.865
MH9V25.623
MH9U19.310
MH9T16.513
MH9S16.312
MH9R16.434
MH9Q16.464
MH9P-
MH9N-
--
--
MH9J-MH9K15.190
MH9L14.484
0559990114.802
0659090113.560
0659180413.079
--
-13.280
MH1412.993
0660200513.255
-12.250
--
--
--
MH9X.1375
34.90029.9900.471
MH9W.1375
29.99023.2900.567
MH9V.1375
23.29016.6500.497
MH9U.1450
16.65014.3800.486
MH9T.1600
14.38013.8600.769
MH9S.1750
13.86013.4300.749
MH9R.1750
13.43013.2600.600
MH9Q.1750
13.26013.0400.743
-----
MH9N.1750
12.88012.7900.434
-900---
-900
12.71612.5101.163
MH9K.1900
12.41011.9651.060
MH9L.1900
11.96511.8021.060
05599901.1105011.80211.3801.827
06590901.11200
11.38010.6702.683
-----
-----
06591819.11200
10.65910.2672.661
MH14.11200
10.26710.1051.732
06602005.1140010.1059.9702.951
-1200
---
-----
-----
-----
Nodeground (m AD)
Linkwidth (mm)us inv (m AD)ds inv (m AD)pfc (m3/s)
m A
D
9.0
37.0
11.0
13.0
15.0
17.0
19.0
21.0
23.0
25.0
27.0
29.0
31.0
33.0
35.0
m
Upper Town Burn inlets and profile
7
Hydraulic Modelling – Upper Town Burn 2D-Detailed topographic survey-Data Processing to get 3D model
-MIKE21 HD module-Manhole spills (from InfoWorks)-Assessment of several scenarios and return periods-Appropriate Manning numbers and grid size
3D model and survey data gathered for the Ochtralure area
2D model Ochtralure 1:200 year results
8
Hydraulic Modelling – Black Stank and Town Burn
-Topographic survey-Structures survey-Output from Upper Town Burn IW model-HEC-RAS modelling of both watercourses-Lateral structures definition-Peak flow in Town Burn caused by the Black Stank
Black Stank Flowing Into Town Burn (B. Eriksen, 2/1/98).
2400 0200 0400 0600 0800 1000 1200 1400 160001/01/1999
0.0
0.5
1.0
1.5
2.0
2.5Plan: final200yr07 River: TownBurn Reach: Upper Town RS: 1020
Time
Flow
(m3/
s)
Legend
Flow
Town Burn own peak
Black Stank caused peak
Town Burn culvertTown Burn 1:200 year predicted hydrograph
9
Hydraulic Modelling – Black Stank and Town Burn
1:200 year Town Burn and Black Stank combined model results
10
Hydraulic Modelling – Sheuchan Burn
- Topographic survey- CCTV survey- HEC-RAS modelling of Sheuchan A and B- InfoWorks CS modelling of Sheuchan culvert- MIKE21 modelling of Millburn Court manhole spills
Hillc
Palm y r
El mHou
Thi s tl ey c roft
Doon
gara
3 .0m
Pos ts
Pl ay Area
M
Ag new Park
TCB
Pos ts
Loch Ryan
Mean Low W
ater Spri ngs
FB
AGN EW CR ESCENT
A 718
HILLHEAD
Pos ts
BM 3.69m
Elvetha m
Pond
Glenti l t
Ca rraig
Uli dia
Benv ie
Pos ts
Li feboatStati on
Sand
Sand and Shing le
Sand and Shi ng le
Ca irnsmore
3.0m
18.9m
Sta
ElSub
Thornfi e ld
Av al on
BACKRAM
PART
Depot
Depo
t
BM 22.10m
LindenHous e
Hall
20.7mLam arton
Sheuc h anCo tt
Mans e
Park Hous e
The Hi gh Ki rkof Stranraer
LESWALT
HIGH R
OAD
Cemetery
Poin t Breez eBM 13.43m
CaribeSheuc hanCemetery
HIL LH EADRho vanian
Lodge
LBLady Stewart Park
Sand and Boul ders
El Sub Sta
Scaurbank
Gl enorc hy
Seaforth
WatersEdge
ARRA
N
THOR
NBAN
K RO
AD
WEST EN D TER RACE
B 73
7
COUR
T Seapark
Hawk s worth
Ry anbank
Birc hwood
The Moorings
Thornbank
A 718
2.7m
Sl ipway
Sand
BM 3.51m
Pos ts16.5m Sand a nd Shi n gle
Hannay' s H il l
BROADSTONE ROAD
Bri arbra e
Shea r-
water
Dunc li f fe
Cl a irmont
Rav enna
Whin latter
Hi gh Thornbank
M uizenberg
Wes trigKnoc k h aar
Cu i l-FionnHAWTHOR N ROAD
Ryan
leaFl
oatda
le
Glen
Otte
r
MS
Loc hlea
Nor-Is l e
Cra mond Dunm
ore
11.0 m
BM 13.04m
Bryn
Cl uden
Wes
tland
s
King
a rth
Rave
lston
Cra i g leac h
Fairfield
Dunk
e ld
Robin Hill
Farha
Braidwood
Seaforth
Greenm ount Sc otby
White Hous eTi gh-na-Mara
Fe nc e End
Birchgrov eCra iga the rie
Luya
Stone leigh
WHITE H OUSE ROAD
CHU RCHILL AVENU E
Am bles
San Marc o
Lori en
Chips
tead
Ki lm ory
Ca rnrose
Ra thla rg
LARG
RO
AD
Wind
b
Wi llowcroft
Cani s bay
Braefie ld
The Firs
ElSu
b Sta
L ARG AVENUE
Lynd
ale
Kas am a
Gl enk ens
Dorys ton
Da l ry
Craigoch
Lym phoy
Garage
Ark le
t
1 6.5m
Glen
i ffer
Wk s
19.5m
ElSubSta
LESWALT ROAD
MEADOWBANK
DALE CRESCENT
MAYFIELD AVENUE
Ros s ern
Englec ot
22.9m
HILLH
EAD
Falhaa r
B 737
El S
ub S
ta
Enc l if fe
The Stabl es
ENCL
I FFE
L ANE Ki nneil
Wi ndarra
17.1m
Woodl ea
BM 20.79m
QUEEN'S
Pos t
Om ega
Li nden
PARK
LAN
E
Mea n H
igh Wat er S pr i ngs
El Sub Sta
Posts
FORELAND PLACE
Swan Inn
(PH)
Hami l ton Court
FB
Sand and Shingl e
Spreads
Pi c ni c
M il lh ous e
Loc hend
M il lbu rnCou rt
Vil la
Area
SHEUCHAN STREET
Is s ues
Und
6.7m
Car Park
Kinty reCourt
WILLOWDEN ECRESC ENT
Ps
14.9m
Bowli ngGreen
BM 9.
32m
11.9m
3.7m
P
Seabank
Co ttageL och en d
As hgrov e
Bungalow
Sheuc han
PO
Highf iel d
Howpark
Darrochmhor
W indyb row
Parkhead
Sheena
Ancho rlea
Du rley
Ca stramont
Avoca Green
Gates
Club
By tor
Glen Fl ora
La i ngHous e
Cra ilo ch
HawthornBank
M ingary
Sandy way s
Craigal len
Col in da
Fourtrees
SeabankHous e
Prim ary Sc hool
RAND OLPH LANE
Ps
AILS
A CRE
SCEN
T
FINNART CRESCEN T
B 737
FOUN DRY LAN E
LESWALT HIGH RO
AD
DALRIADA AVENUE
MIL LFIELD AVENUE
SEABANK RO AD
21.3m
TCBLB
10.7m
ROWAN 'S H
ILL
OAKLAND AVENU E
LIDDESDALE ROAD
SPRING WELL ROAD
FINNART C
RES
LIDDESDALE
ENT
BM 19.62mAVENUE RO AD
CRAIG LEA AVENUE
Whitecro ft
Pen Hil l
Bona V
i sta
SeaforthNurs ery
Lin dumCraiglo ch
Buki t
Ora
ng
Aber
Fawnmo re
Wi ltonDean
Dunry an
M il leur
El don
Trentham
Lis m ore
Li ntrathen
Am bles i de
Ha mel and
Saarme n
Du nsc aith
Gle nis laCle strain
Lyna ire
Kil v ern
Cai rn
v iew
CR
Penry an
Cherrybank
Windrush
Col arn
L ad orven
Rowans Hill
RaymedeStra thmore
Torv aig
OAKLAND
WOOD
LANDRO
AD
WILLOWBANK
HAZEL GROVE
LAUREL GROVE
NUR SERY AVENUE
BM 20.37m18 .0m
BEEC
HWO
OD A
VENU
E
SE
8.2m
Inchyra
Wi ndarra
Anmaro
Mel ita
Chirma
Gl ens hie l
Ward Bdy
M ILLBANK ROAD
El Sub Sta
Ty ro l
CO RSEWALL CRESCENT
Sheuc hanBridge
BROOKF IELD CR
ESCENT
LEAFIELD
Dra in
Bra nd e lh ow
Da ima r
Homel and
ROWAN
'S HIL L CRESCENT
LB
Brae
Avon Beith
Heugh
SPRING BAN K R OAD
Cov i ngton
Gl enes k
Si nk s
Wi ndyridge
Drumj argonEl Sub Sta
WOO
DLA
NDR
OAD
NorthbraeGl engorm
CaladhGl as mont
Langdal e
Silv erdale
Ta yparkDuff ryn
Fairmile
In ver lei t hTo rcro ss
Frenchw ood
Fa ic an
Rub is law
Wem y s s
Mym
en sin ghKarori
Marn o ch
Ki nmo un tDru mlo gan
L och
Bank
Aodai
nn
Crai
gna ir Rowa nbrae
Sibb aldbie
Au chengith
The Anchorag e
The Sheil ing
M il hav en
Mea
ll an
CarnboM arc h
Ra n gi tot o
Sannox
Kel deen
As c og
Holmsle y
Ai ls a
Sherbro oke
L i ddes dale Hous e
Lidd es dale Cottage
Bungal owLiddes dal e
THE GROVE
BROOKF IEL D AVENU
E
BROOKFIEL D CR
ESCENT
Bu rnside
LEAFIELD
WOO
DLA
ND
ROAD
RI SE
Drai
n
Dra in
Aa rhauseCeud M il e
Fai lte
LIDDESDALE ROAD
SPRING BAN K R OAD
LEAF
IELD
Is s ues
Si nk s
Sink s
Is s ues
SpringbankCottage
Is s ues
Spri ngbank
Springb ank
Is s ues
Mas t
Coll ec ts
Is s ues
Track
Pond
Is s ues
y
Spring Bank Road Bridge
Liddesdale Farm
Structure 676
Structure 503
LegendWater Depths (m)
3.50.70.20.010
Masonry culvertTw in pipe culvertMain rectangular culvert
Sheuchan Burn area Sheuchan Burn 1:200 year results
11
Hydraulic Modelling – Laundry Burn
- CCTV survey- Totally culverted- Discharging into
the Town Burn- Reported capacity issues- No flooding predicted- Blockage issues
Laundry Burn location and 1:200 year profile
12
Wide Stranraer Results
Stranraer 1:200 year floodplain outline
13
Benefit / cost analysis
- Economic performance of flood protections schemes
- Benefits are measured in terms of the present value of damages avoided over the life of the scheme.
- Eight Flood Alleviation Schemes (FAS) identified through Stranraer Flood Study.
- For each FAS the following was considered in the modelling exercise:- Do nothing (current situation modelling results)- Do minimum- Do something (option modelling)
14
Stranraer Flood Alleviation Schemes (FAS)
Sand
Big Plant at ion
Blackpar ksI ndust r ial
Est at e
St ranraer Academ y
Loch Ryan
Sand
Loch Ryan
Loch Ryan
O cht r elur e
Black Stank
Black Stank
Town Burn
Laundry Burn
Town Burn
Sheuchan Burn
Sheuchan Burn
FAS-7: Localised Bunding
FAS-6: Town Burn Railway Culvert
FAS-8: Black Stank Mouth Diversion
FAS-2: Upper Sheuchan
FAS-3: Thorney Croft Inlet
FAS-4: Ochtralure Inlet
FAS-5: Stoneykirk Roundabout
FAS-1: Sheuchan Outfall
Legend
Watercourse
Predicted Floodplain
Historical Flooding
Flood Alleviation Scheme Option
Stranraer FAS areas
15
Stranraer Main Causes of Flooding
- Insufficient hydraulic capacity of culverts and inlets- Blocking issues in culverts and inlets.- Overland flow- Structural issues- Highly modified watercourses
Town Burn Downstream of Railway Culvert
16
FAS 1 and 2 – Sheuchan Outfall and Upper Sheuchan Burn- FAS 1 associated with flooding in lower Sheuchan due to lack of capacity- Structural issues- New Outfall designed.
- FAS 2 concerned with flooding along properties in Upper Sheuchan- Localised protection is the preferable option.
Sheuchan Outfall location and profile
17
FAS 3, 4 and 5 – Upper Town Burn- FAS 3 is associated with flooding in Thorney Croft Inlet whereas FAS 4 is
associated with Gallowhill Rise and Highcroft inlets- Inlets improvements is FAS 3 most practical solutions - Channel diversion is FAS 4 preferable option
- FAS 5 concerned with flooding in StoneyKirk Roundabout- Structural and hydraulic capacity issues.- Replacement not viable
FAS 4 diversion location and profile
18
FAS 6 - Town Burn Railway Culvert (Black Stank and Lower Town Burn)
- FAS 6 associated with flooding in the Station Road area (Town Burn)- Flooding caused by the Black Stank and Town Burn interaction- Poor culvert condition – Flow restriction
- Replacement of the railway culvert by a 750mm flow control - Modifications further downstream
Town Burn Railway Culvert
19
FAS 7 and 8 - FAS 7 associated with flooding in properties along the Black Stank- Localised protection proved to be the preferable option- FAS 8 concerned with alleviating flooding in the vicinity of properties at the
downstream end of the Black Stank- Diversion of the Black Stank peak flows
FAS 8 diversion option
12
25
39
1614
BURNSID
E TERRACE
Bishop Bur n
BM 4 .3 3m
De nv e r
Cairnv iew
Hi -Li te
Forf ie ld
Court
Loc hv ie wHous e
23
1
24
11
8 13
Bishop Burn Bridge
REPHAD C
RESCENT
LOCKVIEW ROAD
LOCHVIEW CRES
2
Chevron
1315
23
2
14
2a2b
Ay re
M ira
15
11
1
4
5
8
M are
Auld
Kildona n
Bishop
Burn
Cotts
1
2
1
7
9
Auchl and
Route AOption 2 - Excess Flow
20
Stranraer Discarded Options
Sand
Big Plant at ion
Blackpar ksI ndust r ial
Est at e
St r anr aer Academ y
Loch Ryan
Sand
Loch Ryan
Loch Ryan
O cht r elur e
Black Stank
Black Stank
Town Burn
Laundry Burn
Town Burn
Sheuchan Burn
Sheuchan Burn
Outfall Diversions
Culvert Replacement
Culvert Improvements
Storage
Storage
Black Stank & Town Burn Connector Channel
Railway Overflow
Cacthment Diversion to Ballyferry Burn
Open Section Culverted
Storage
Storage
Pipe Upsizing
Channel Realignment
Culvert Replacement
Channel Realignment
Storage
Legend
Watercourse
Surface water pipeFoul or Combined pipe
Discarded Option
21
Stranraer Preferable Options
Sand
Big Plant at ion
Blackpar ksI ndust r ial
Est at e
St r anr aer Academ y
Loch Ryan
Sand
Loch Ryan
Loch Ryan
O cht r elur e
Black Stank
Black Stank
Town Burn
Laundry Burn
Town Burn
Sheuchan Burn
Sheuchan Burn
FAS-8: Black Stank Outfall Diversion
FAS-7: Black Stank Bunding
FAS-6: Railway Culvert
FAS-5: Stoneykirk Roundabout Culverts
FAS-4: Ochtralure Diversion
FAS-1: Sheuchan New Outfall
FAS-3: Thorney Croft Inlet Improvements
FAS-2: Upper Sheuchan Bunding
Legend
Watercourse
Surface water pipeFoul or Combined pipe
Discarded Option
22
Summary and Conclusions
- A high level detail modelling identified properties at risk in Stranraer- Water depths were predicted at those properties - Eight flood alleviation schemes were assessed- Potential mitigation options were tested- A benefit/cost analysis approach was used- The diversion type option was the most viable for three FAS- Culvert or inlet improvements was the preferable options for other three FAS- Local bunding was the option chosen for two FAS