Stormwater Pollution Prevention Plan (SWP3) for: Facility Name Facility Address City, State, Zip Code Telephone Number SWP3 Contact(s): Facility Name SWP3 Contact Name Address City, State, Zip Code Telephone Number Fax/Email SWP3 Prepared By: Compnay Name Preparer Name Address City, State, Zip Code Telephone Number Fax/Email DEQ Industrial SWP3 Template 2017, Version 1

Stormwater Team and Facility Information · Web viewStormwater Pollution Prevention Plan (SWP3) Facility Name And Date DEQ Industrial SWP3 Template, June 2017 Page 2-2 DEQ Industrial

  • Upload
    vuanh

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Stormwater Pollution Prevention Plan (SWP3)

for:Facility Name

Facility AddressCity, State, Zip CodeTelephone Number

SWP3 Contact(s):Facility Name

SWP3 Contact NameAddress

City, State, Zip CodeTelephone Number

Fax/Email

SWP3 Prepared By:

Compnay NamePreparer Name

AddressCity, State, Zip CodeTelephone Number

Fax/Email

SWP3 Preparation Date:__ __/ __ __ / __ __ __ __

DEQ Industrial SWP3 Template 2017, Version 1

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

This Page is Intentionally Left Blank

DEQ Industrial SWP3 Template 2017, Version 1

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Table of ContentsSection 1: Stormwater Team and Facility Information................................................................................1-1

1.1 Stormwater Pollution Prevention Team..................................................................................................1-1

1.2 Facility Information..................................................................................................................................1-2

1.3 Facility Contact Information....................................................................................................................1-3

Section 2: Site Description............................................................................................................................ 2-12.1 Activity at the Facility..............................................................................................................................2-1

2.2 Receiving Waterbody Information...........................................................................................................2-1

2.3 General Location Map............................................................................................................................2-3

2.4 Site Map2-3

Section 3: Potential Pollutant Sources.........................................................................................................3-13.1 Industrial Activities..................................................................................................................................3-1

3.2 List of Potential Pollutants......................................................................................................................3-1

3.3 Spills and Leaks......................................................................................................................................3-2

3.3.1 Areas of site where potential spills/leaks could occur............................................................................3-2

3.3.2 Description of spills/leaks occurred during last 3 years..........................................................................3-2

3.4 Allowable Non-stormwater Discharges Information................................................................................3-3

3.5 Unauthorized Non-stormwater Discharges Documentation...................................................................3-3

3.6 Salt Storage............................................................................................................................................3-4

3.7 Coal Storage Piles..................................................................................................................................3-4

3.8 Sampling Data Summary........................................................................................................................3-5

Section 4: Stormwater Control Measures.....................................................................................................4-14.1 Non-numeric Technology-based Effluent Limits.....................................................................................4-1

4.1.1 Minimize Exposure................................................................................................................................. 4-1

4.1.2 Good Housekeeping.............................................................................................................................. 4-1

4.1.3 Preventive Maintenance........................................................................................................................ 4-1

4.1.4 Spill Prevention and Response.............................................................................................................. 4-2

4.1.5 Erosion and Sediment Controls............................................................................................................. 4-2

4.1.6 Management of Runoff.......................................................................................................................... 4-2

4.1.7 Salt Storage Piles or Piles Containing Salt............................................................................................ 4-3

4.1.8 Dust Generation and Vehicle Tracking of Industrial Materials................................................................4-3

4.2 Sector-Specific Applicable Non-Numeric Effluent Limits........................................................................4-3

4.3 Applicable Numeric Effluent Limitations Guidelines-Based Limits.........................................................4-4

4.4 Applicable Numeric Effluent Limitations for Coal Pile Runoff.................................................................4-4

4.5 Water Quality-based Effluent Limitations................................................................................................4-4

4.6 Requirements Relating to Endangered Species and Historic Properties...............................................4-5

i

DEQ Industrial SWP3 Template 2017, Version 1

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Section 5: Procedures and Schedules......................................................................................................... 5-15.1 Pertaining to Control Measures Used to Comply with Effluent Limitations.............................................5-1

5.1.1 Good Housekeeping.............................................................................................................................. 5-1

5.1.2 Spill Prevention and Response Procedures...........................................................................................5-1

5.1.3 Preventive Maintenance........................................................................................................................ 5-1

5.1.4 Erosion and Sediment Control............................................................................................................... 5-2

5.1.5 Runoff Management.............................................................................................................................. 5-2

5.1.6 Salt Storage Piles.................................................................................................................................. 5-2

5.2 Employee Training..................................................................................................................................5-3

5.3 Routine Facility Inspections....................................................................................................................5-4

5.3.1 Rain Gauge Information......................................................................................................................... 5-4

5.3.2 Routine Facility Inspection Report......................................................................................................... 5-4

5.3.3 Exception to Routine Facility Inspections............................................................................................... 5-4

5.4 Corrective Actions...................................................................................................................................5-5

5.5 Monitoring...............................................................................................................................................5-5

5.5.1 Quarterly Visual Monitoring.................................................................................................................... 5-6

5.5.2 Annual Effluent Limitations Guidelines Monitoring.................................................................................5-7

5.5.3 Impaired Water Monitoring..................................................................................................................... 5-8

5.5.4 Discharge Monitoring Report................................................................................................................. 5-8

5.5.5 Inactive and unstaffed sites exception (if applicable).............................................................................5-8

5.5.6 Substantially identical discharge point (outfall) exception (if applicable)................................................5-8

5.6 Annual Comprehensive Site Compliance Evaluation Report (ACSCER)...............................................5-9

Section 6: Documentation to Support Other Eligibility...............................................................................6-16.1 Documentation Regarding Endangered Species...................................................................................6-1

6.2 Documentation Regarding Historic Properties........................................................................................6-1

6.3 Documentation Regarding Unauthorized Non-stormwater Discharges..................................................6-1

Section 7: SWP3 Certification....................................................................................................................... 7-1Section 8: SWP3 Modifications..................................................................................................................... 8-1Section 9: Additional Documentation & SWP3 Attachments......................................................................9-1

ii

DEQ Industrial SWP3 Template 2017, Version 1

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Section 1: Stormwater Team and Facility Information1.1 Stormwater Pollution Prevention Team

Stormwater pollution prevention team is responsible for overseeing development of the SWP3, making any modifications to it, implementing and maintaining control measures, taking corrective actions when required, performing routine facility inspection and monitoring, supervising the housekeeping program, providing staff training, and communicating changes in the SWP3 to the people working on the site. The following personnel, along with their role and responsibility, will be part of the stormwater pollution prevention team:

Team Leader Roles & ResponsibilitiesName

DutiesTitle

Telephone

Team Member # 1 Roles & ResponsibilitiesName

DutiesTitle

Telephone

Team Member # 2 Roles & ResponsibilitiesName

DutiesTitle

Telephone

Team Member # 3 Roles & ResponsibilitiesName

DutiesTitle

Telephone

Team Member # 4 Roles & ResponsibilitiesName

DutiesTitle

Telephone

[Repeat as necessary]

DEQ Industrial SWP3 Template, June 2017 Page 1

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

1.2 Facility Information

Facility Information (If the facility lacks a street address, indicate the general location of the facility)

Name of Facility:

Street:

City: State: ZIP Code:

County:

OPDES Permit Number: (if covered under a previous permit)

Primary Industrial Activity SIC Code or Activity Code and Sector (2017 OKR05, Table 1-3 and Part 11):

Co-located Industrial Activity(s) SIC code(s) or Activity Code and Sector(s) (2017 OKR05, Table 1-3):

Latitude/Longitude (To the nearest 15 seconds)

Latitude: Longitude:

_ _ ° _ _ ' _ _._ _'' N (degrees, minutes, seconds)

_ _ . _ _ _ _ º N (decimal degrees)

_ _ ° _ _ ' _ _._ _'' W (degrees, minutes, seconds)

_ _ _. _ _ _ _ º W (decimal degrees)

Method for determining latitude/longitude (check one):

☐ DEQ GIS Data viewer ☐ EPA My WATERS Mapper ☐ USGS National Map ☐ GPS

Status of the facility/industrial site: Click one to select your facility status

Total area of the facility/industrial site: (acres)

Estimated area of industrial activity at the facility exposed to stormwater: (acres)

Estimated impervious area of industrial facility/site: (acres)

DEQ Industrial SWP3 Template, June 2017 Page 2

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

1.3 Facility Contact Information

Facility Operator(s):

Name:

Address:

City: State: Zip Code:

Telephone Number:

Email address:

Fax number:

(repeat for multiple operators by copying and pasting the above rows)

Facility Owner(s):

Name:

Address:

City: State: Zip Code:

Telephone Number:

Email address:

Fax number:

(If owner is a separate entity)

SWP3 Contact(s):

SWP3 Contact Name (Primary):

Telephone number:

Email address:

Fax number:

SWP3 Contact Name (Backup):

Telephone number:

Email address:

Fax number:

DEQ Industrial SWP3 Template, June 2017 Page 3

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Section 2: Site Description2.1 Activity at the Facility

Click here to enter text.

2.2 Receiving Waterbody Information

Discharge Information

Does your facility discharge stormwater into a municipal separate storm sewer system (MS4)?

☐ Yes ☐ NoIf yes, what is the name of the MS4 operator?If you don’t know who the MS4s are in your area, see Table R-5 in the MS4 Permit’s Factsheet.

Do you have any stormwater discharges that must comply with the effluent limitation guidelines listed in Table 1-1 of the 2017 MSGP OKR05?

☐ Yes ☐ No

If “Yes”, which of the guidelines listed apply to your facility? ______________________

DEQ Industrial SWP3 Template, June 2017 Page 1

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Stormwater Outfall Information

Outfall ID Latitude/Longitude

What is the name of the waterbody that your facility’s

stormwater goes into? WBID

Is that waterbody impaired?If so, what are its impairments?

Is there a TMDL for that

impairment?

Is the discharge into an ORW or sensitive area?

001

Yes No Yes

No

Yes

No Name of impairments

002

Yes No Yes

No

Yes

No Name of impairments

003

Yes No Yes

No

Yes

No Name of impairments

004

Yes No Yes

No

Yes

No Name of impairments

005

Yes No Yes

No

Yes

No Name of impairments

006

Yes No Yes

No

Yes

No Name of impairments

If substantially identical to other outfall, list identical outfall ID:

DEQ Industrial SWP3 Template, June 2017 Page 2

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

2.3 General Location MapProvide a general location map (e.g., DEQ Data Viewer or U.S. Geological Survey (USGS) quadrangle map or aerial image from the internet) with enough detail to identify the location of your facility and all receiving waters for your stormwater discharges (include as Attachment A of this SWP3 Template).

2.4 Site MapThe site map or series of maps for this facility can be found in Attachment B of this SWP3. (See Part 4.2.2 of 2017 OKR05)

DEQ Industrial SWP3 Template, June 2017 Page 3

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Section 3: Potential Pollutant SourcesThis section describes all areas at my facility where industrial materials or activities are exposed to stormwater or from which allowable non-stormwater discharges originate.

3.1 Industrial Activities

List/Name(s) of the industrial activities that are exposed to stormwater:

3.2 List of Potential PollutantsList the potential pollutants suspected to be present or exposed to stormwater at each of the activity area listed above are described in the following table:

Industrial Activity/Area & Location Associated Pollutants

DEQ Industrial SWP3 Template, June 2017 Page 1

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

3.3 Spills and Leaks

3.3.1 Areas of site where potential spills/leaks could occur

Location of the Area where Spill/Leak could occur Affected Discharge Points

3.3.2 Description of spills/leaks occurred during last 3 yearsOccurrence

DateDescription of spill/leak where it occurred, what happened, types of pollutants, extent of damage

AffectedDischarge Points

DEQ Industrial SWP3 Template, June 2017 Page 2

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

3.4 Allowable Non-stormwater Discharges InformationThe following allowable non-stormwater is/will be discharged under the OKR05 permit:

Sources of Non-stormwater

Location where it is likely to be discharged

BMPs Used to Minimize the Impact on Water Quality

3.5 Unauthorized Non-stormwater Discharges DocumentationFacility’s unauthorized non-stormwater discharge testing or evaluation is included below:

Date of testing or evaluation: Click here to enter text.

Description of the evaluation criteria used: Click here to enter text.

Description of the results of testing or evaluation performed: Click here to enter text.

List of the drainage points that were directly observed during the evaluation: Click here to enter text.

Action(s) taken, such as a list of control measures used to eliminate unauthorized discharge(s), or documentation that a separate OPDES permit was obtained. For example, a floor drain was sealed, a sink drain was re-routed to the sanitary sewer or an OPDES permit application was submitted for an unauthorized cooling water discharge: Click here to enter text.

DEQ Industrial SWP3 Template, June 2017 Page 3

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

3.6 Salt Storage

Click here to enter text.

3.7 Coal Storage Piles

Click here to enter text.

3.8 Sampling Data Summary

A brief summary of stormwater sampling data collected during the last 3 years of previous permit-term are included below and attached laboratory results (if applicable) with the SWP3:

DEQ Industrial SWP3 Template, June 2017 Page 4

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Click here to enter text.

DEQ Industrial SWP3 Template, June 2017 Page 5

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Section 4: Stormwater Control Measures4.1 Non-numeric Technology-based Effluent Limits

The facility will comply with the following non-numeric effluent limits (except where otherwise specified in Part 11) as well as any sector-specific non-numeric effluent limits in Part 11 of the 2017 OKR05 permit:

4.1.1 Minimize Exposure

Click here to enter text.

4.1.2 Good Housekeeping

Click here to enter text.

4.1.3 Preventive Maintenance

Click here to enter text.

DEQ Industrial SWP3 Template, June 2017 Page 1

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

4.1.4 Spill Prevention and Response

Click here to enter text.

4.1.5 Erosion and Sediment Controls

Click here to enter text.

4.1.6 Management of Runoff

Click here to enter text.

DEQ Industrial SWP3 Template, June 2017 Page 2

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

4.1.7 Salt Storage Piles or Piles Containing Salt

Click here to enter text.

4.1.8 Dust Generation and Vehicle Tracking of Industrial Materials

Click here to enter text.

4.2 Sector-Specific Applicable Non-Numeric Effluent Limits

Click here to enter text.

DEQ Industrial SWP3 Template, June 2017 Page 3

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

4.3 Applicable Numeric Effluent Limitations Guidelines-Based Limits

Click here to enter text.

4.4 Applicable Numeric Effluent Limitations for Coal Pile Runoff

Click here to enter text.

4.5 Water Quality-based Effluent Limitations

Click here to enter text.

Note: If you are a new discharger and discharge to a waterbody or watershed designated ORW commencing after June 25, 1992, you are not eligible for coverage under this Permit.

DEQ Industrial SWP3 Template, June 2017 Page 4

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

4.6 Requirements Relating to Endangered Species and Historic Properties

Click here to enter text.

DEQ Industrial SWP3 Template, June 2017 Page 5

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Section 5: Procedures and Schedules 5.1 Pertaining to Control Measures Used to Comply with Effluent Limitations

5.1.1 Good Housekeeping

Click here to enter text.

5.1.2 Spill Prevention and Response Procedures

Click here to enter text.

In case of a toxic or hazardous material spill, notify: Phone Numbers

Project Manager/Team Leader

Emergency – Fire, Police 911

County Local Emergency Planning Committee (LEPC)

DEQ Spill Reporting Hotline (24-hr) 800-522-0206

NRC (National Response Center) 800-424-8802

Emergency Spill Notification

DEQ Industrial SWP3 Template, June 2017 Page 1

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

5.1.3 Preventive Maintenance

Click here to enter text.

5.1.4 Erosion and Sediment Control

Click here to enter text.

5.1.5 Runoff Management

Click here to enter text.

DEQ Industrial SWP3 Template, June 2017 Page 2

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

5.1.6 Salt Storage Piles

Click here to enter text.

5.2 Employee TrainingPerson Responsible for Staff Training

Name: Insert trainer’s first and last name. Title: Insert title of the trainer.

Staff Training Requirements

Personal with the following responsibilities shall be trained to understand all the requirements of the 2017 OKR05 permit their specific responsibilities with respect to those requirements:

Personnel who are responsible for the design, installation, maintenance, and/or repair of controls (including pollution prevention measures);

Personnel who are responsible for the storage and handling of chemicals and materials that could become contaminants in stormwater discharges;

Personnel who are responsible for conducting and documenting inspections and monitoring as required by the OKR05 permit; and

Personnel who are responsible for taking and documenting corrective actions as required by the OKR05 permit.

At minimum, all Personnel must be trained to understand (e.g., only personnel responsible for conducting inspections need to understand how to conduct inspections):

An overview of what is in the SWP3;

Spill response procedures, good housekeeping, maintenance requirements, and material management practices;

The location of all controls on the site required by this Permit, and how they are to be maintained;

The proper procedures to follow with respect to the permit’s pollution prevention requirements; and

When and how to conduct inspections, record applicable findings, and take corrective actions.

Frequency/Schedule of Employee Training:

(Note: Employee training shall be conducted at least annually or more often if employee turnover is high).

DEQ Industrial SWP3 Template, June 2017 Page 3

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Employee training records and documentations shall be maintained using the Employee Training Report located in Appendix I of this SWP3.

5.3 Routine Facility Inspections

Click here to enter text.

1. Person(s) responsible for inspection: Click here to enter text.

2. Schedules for conducting inspections: Click here to enter text.

3. Site-specific inspection objectives: Click here to enter text.

5.3.1 Routine Facility Inspection ReportRoutine Facility Inspection Report Form has been prepared in accordance with the requirements of Part 6.3.3 of OKR05. A copy of the Routine Facility Inspection Report form that will be used during the permit term included in Appendix E.

5.3.2 Exception to Routine Facility Inspections ☐ This site is inactive and unstaffed, and has no industrial materials or activities exposed to

stormwater, in accordance with the substantive requirements in 40 CFR 122.26(g)(4)(iii) as signed and certified in Section 7 below.

If you are invoking the exception for inactive and unstaffed sites for your routine facility inspections, include information to support this claim.

Click here to enter text.

DEQ Industrial SWP3 Template, June 2017 Page 4

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

5.4 Corrective ActionsDescribe the procedures for taking corrective action in compliance with 2017 OKR05 Part 4.2.5.3 and Part 6.

Click here to enter text.

1. Person(s) responsible for corrective actions: Click here to enter text.

2. Schedules for conducting corrective actions: All corrective actions will be performed immediately and will take all reasonable steps necessary to minimize or prevent the discharge of pollutants until a permanent solution is installed and made operational, including cleaning up any contaminated surfaces so that the material will not discharge in subsequent storm events.

Note: The term immediately requires you to, on the same day a condition requiring corrective action is found, take all reasonable steps to minimize or prevent the discharge of pollutants until a permanent solution is installed and made operational. However, if a problem is identified at a time in the work day when it is too late to initiate corrective action, the initiation of corrective action must begin no later than the following work day.

Corrective Action ReportCorrective Action Report Form has been prepared in accordance with the requirements of Part 6.3.3 of OKR05. A copy of the Corrective Action Report form that will be used during the permit term included in Appendix F.

5.5 MonitoringThe following monitoring activities apply to my facility:

☐ Quarterly visual monitoring

☐ Annual effluent limitations guidelines monitoring

☐ Impaired waters monitoring

☐ Other monitoring required by DEQ

For each type of monitoring checked above, provide information about that monitoring in the following subsections.

DEQ Industrial SWP3 Template, June 2017 Page 5

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

5.5.1 Quarterly Visual Monitoring

Click here to enter text.

1. Person(s) and positions of person(s) responsible for monitoring: Click here to enter text.

2. Sample location(s) and collection procedures: Click here to enter text.

3. Schedules for conducting sampling and monitoring: Click here to enter text.

4. Specific assessment activities: Click here to enter text.

A copy of the Quarterly Visual Monitoring Report form for quarterly stormwater discharges was prepared in accordance with the requirements of Parts 7.2.1.1 and 7.2.1.2 of OKR05 Permit. It is in Appendix G of the SWP3.

Substantially identical discharge point (outfall) exception (if applicable)The substantially identical discharge point exception will be used for quarterly visual monitoring requirements. The following information is included to substantiate the exception to substantially identical discharge points:

Location of each of the substantially identical discharge points: Click here to enter text.

List the general industrial activities conducted in the drainage area of each discharge point: Click here to enter text.

List the control measures implemented in the drainage area of each discharge point: Click here to enter text.

List the exposed materials located in the drainage area of each discharge point that are likely to be significant contributors of pollutants to stormwater discharges: Click here to enter text.

An estimate of the runoff coefficient of the drainage areas (low=under 40%; medium=40 to 65%; high =above 65%): Click here to enter text.

Why the discharge points are expected to discharge substantially identical effluents: Click here to enter text.

DEQ Industrial SWP3 Template, June 2017 Page 6

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Note that the substantially identical outfall exception could not be used if there are in fact differences in any of the required components defined above.

5.5.2 Annual Effluent Limitations Guidelines MonitoringIf you conduct Annual Effluent Limitations Guidelines Monitoring, complete the following for each site:1

Click here to enter text.

1. Person(s) and positions of person(s) responsible for monitoring: Click here to enter text.

2. Sample location(s): Click here to enter text.

3. Pollutants to be sampled: Click here to enter text.

4. Monitoring Schedules: Click here to enter text.

5. Numeric Limitations: Click here to enter text.

Note that numeric limits are only included for Sectors A, C, D, E, J, K, L, O and S.

Annual Discharge Monitoring Report (DMR) must be submitted to DEQ using eDMR tool available in the DEQ’s website.

5.5.3 Impaired Water MonitoringIf you conduct Impaired Water Monitoring, complete the following for each site:

1 The substantially identical outfall monitoring provisions are not available for annual effluent limitations guidelines monitoring.

DEQ Industrial SWP3 Template, June 2017 Page 7

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Click here to enter text.

1. Person(s) and positions of person(s) responsible for monitoring: Click here to enter text.

2. Sample location(s): Click here to enter text.

3. Pollutants to be sampled: Click here to enter text.

4. Monitoring Schedules: Click here to enter text.

5.5.4 Discharge Monitoring ReportDischarge Monitoring Report (DMR) must be submitted to DEQ using eDMR tool available in the DEQ’s website.

5.5.5 Inactive and unstaffed sites exception (if applicable)☐ This site is inactive and unstaffed, and has no industrial materials or activities exposed to

stormwater, in accordance with the substantive requirements in 40 CFR 122.26(g)(4)(iii) as signed and certified in Section 7 below.

5.5.6 Substantially identical discharge point (outfall) exception (if applicable)The substantially identical discharge point exception will be used for impaired water monitoring requirements. The following information is included to substantiate the exception to substantially identical discharge points:

Location of each of the substantially identical discharge points: Click here to enter text.

List the general industrial activities conducted in the drainage area of each discharge point: Click here to enter text.

List the control measures implemented in the drainage area of each discharge point: Click here to enter text.

List the exposed materials located in the drainage area of each discharge point that are likely to be significant contributors of pollutants to stormwater discharges: Click here to enter text.

An estimate of the runoff coefficient of the drainage areas (low=under 40%; medium=40 to 65%; high =above 65%): Click here to enter text.

DEQ Industrial SWP3 Template, June 2017 Page 8

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Why the discharge points are expected to discharge substantially identical effluents: Click here to enter text.

Note that the substantially identical outfall exception could not be used if there are in fact differences in any of the required components defined above.

5.5.7 Rain Gauge InformationRain Gauge Location:

5.6 Annual Comprehensive Site Compliance Evaluation Report (ACSCER)An Annual Comprehensive Site Compliance Evaluation Report (ACSCER) using the Form 606-005 will be submitted to DEQ each year by March 1 for each year of permit coverage, containing information generated from the past calendar year through inspections/monitoring/corrective actions and major observations relating to the implementation of the SWP3.

The comprehensive site compliance evaluation will include all the information required by the Part 8.3 of the 2017 OKR05 permit. Completed ACSCER form is available in Appendix H of this SWP3.

DEQ Industrial SWP3 Template, June 2017 Page 9

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Section 6: Documentation to Support Other Eligibility 6.1 Documentation Regarding Endangered Species

Click here to enter text.

6.2 Documentation Regarding Historic Properties

Click here to enter text.

6.3 Documentation Regarding Unauthorized Non-stormwater Discharges

Click here to enter text.

DEQ Industrial SWP3 Template, June 2017 Page 1

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Section 7: SWP3 CertificationI certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Name: Title:

Signature: Date:

DEQ Industrial SWP3 Template, June 2017 Page 1

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Section 8: SWP3 ModificationsIn response to Corrective Actions, per Part 6 of the 2017 OKR05 Permit, and other reasons, the following documents are included for SWP3 modifications and update:

Click here to enter text.

DEQ Industrial SWP3 Template, June 2017 Page 1

Stormwater Pollution Prevention Plan (SWP3)Facility Name And Date

Section 9: Additional Documentation & SWP3 AttachmentsThe following documentations are attached to the SWP3:

Attachment A – General Location MapA copy of general location map is included in Attachment A.

Attachment B – Site Map(s)Copy of the site map(s) is/are included in Attachment B.

Attachment C –2017 OKR05Note: it is helpful to keep a printed-out copy of the 2017 OKR05 so that it is accessible to you for easy reference. However, you do not need to formally incorporate the entire 2017 OKR05 into your SWP3. As an alternative, you can include a reference to the permit and where it is kept at the site.

Attachment D – Notice of Intent (NOI)A copy of your NOI is included in Attachment D.

Attachment E – Routine Facility Inspection ReportA copy of the Routine Facility Inspection Report Form is included in Attachment E.

Attachment F – Corrective Action ReportA copy of Corrective Action Report Form is included in Attachment F.

Attachment G – Quarterly Visual Monitoring ReportA copy of Quarterly Visual Monitoring Report Form is included in Attachment G.

Attachment H – Annual Site Evaluation ReportA copy of Annual Comprehensive Site Compliance Evaluation Report (ACSCER) form is included

in Attachment H.

Attachment I – Employee Training ReportA copy of Employee Training Log is included in Attachment I.

Attachment J – Report on Maintenance & Report of Control MeasuresA copy of Report on Maintenance is included in Attachment J.

Attachment K – Discharge Monitoring Report (DMR)A copy of Discharge Monitoring Report (DMR) is included in Attachment K.

Attachment L– Documentation on Inactive & Unstaffed SiteA copy of Documentation on Inactive & Unstaffed Site is included in Attachment L.

Attachment M – Other DocumentationsAny other Documentation required by this Permit is included in Attachment M.

DEQ Industrial SWP3 Template, June 2017 Page 1