35
Stormwater Control & Stormwater Control & Design Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Embed Size (px)

Citation preview

Page 1: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Stormwater Control & Stormwater Control & DesignDesign

By Ken Barber, CPESC

INSPECTION SERVICES

PROFESSIONAL

Page 2: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Certified Professional in Erosion and Sediment Control

Definition A Certified Professional in Erosion

and Sediment Control has educational training, demonstrated expertise, and experience in controlling erosion and sedimentation and that meet qualification standards.

Page 3: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Eligibility Requirements

Earn a BS degree or higher plus three (3) years of professional level experience in the soil erosion and sediment control profession - college transcripts are required.

Pass Written Exam www.cpesc.net

Page 4: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Stormwater Control

Background Application

Page 5: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Water Quality Act

Passed in 1987 Amended the Clean Water Act Federal Regulation of Pollutant

Discharge during Runoff Events

Page 6: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

National Pollutant Discharge Elimination System (NPDES)

Phase I Stormwater Regulations were Published by EPA in 1990

Mandated that states set a system for regulation by 1994

The New York State Department of Environmental Conservation is local NPDES permitting authority.

Page 7: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

State Pollutant Discharge Elimination System (SPDES)

Published Two Permits in 1993 One for Industrial Site Runoff One for Construction Site Runoff

for sites of 5+ Acres

Permits Regulated the manner in which Stormwater can leave a site

Page 8: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Phase II Regulations

Established in 1999 by the EPA Effective as of March 10, 2003 Lowered the Threshold to One Acre

of Disturbance Regulations published in New York

in SPDES General Permit GP-02-01 Effective in January of 2003

Page 9: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Project Evaluation:

Page 10: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Stormwater Pollution Prevention Plan (SWPPP)

Erosion and Sediment Control During Construction

Water Quality Control Water Quantity Control Maintenance, during and after

Page 11: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Water Quality & Quantity Design

Maintain Pre-Development Conditions

Page 12: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

The The “Blue Book”“Blue Book”

www.dec.state.ny.us

Page 13: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Responsibility of the Design Professional

Engineers typically handle SPDES permitting

Must educate the Operator and Contractors as to their responsibilities

Both are Mandated to sign SWPPP

Page 14: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

GP-02-01GP-02-01 Violations Violations Surface Run-off Turbid Discharge Adjacent Roadway Contamination Dust Pollution

Page 15: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Primary Means of Education

Detailing Inspection

Page 16: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Detailing:

Page 17: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Limited EffectivenessLimited Effectiveness

Page 18: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Roadway ContaminationRoadway Contamination

Page 19: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Proper Installation Adjacent ToProper Installation Adjacent To RoadwayRoadway

Page 20: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Erosion Control Erosion Control MattingMatting

Page 21: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL
Page 22: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Proper Construction & Proper Construction & Maintenance Prevent Maintenance Prevent ContaminationContamination

Page 23: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Lack of Maintenance Creates Lack of Maintenance Creates WorkWork

Page 24: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL
Page 25: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL
Page 26: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL
Page 27: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL
Page 28: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL
Page 29: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Inspection

GP-02-01 Mandates site be inspected by “qualified professional”

Every 7 calendar days After every 0.5” rainfall in a 24

hour period

Page 30: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Inspection Reporting Reports & Sketches generated for

each inspection Monthly Summaries are posted for

public viewing Quarterly Summaries are also

posted

All made available to NYSDEC upon request

Page 31: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Inspection Reports

Page 32: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Detailed Sketches

Page 33: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Work as a Team

Inspections are an excellent opportunity to plan with the Contractor

Contractor may have methods or ideas that are new to you

Remember: The goal is containment

Page 34: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Growing Pains

Non-Uniform Design Non-Uniform Enforcement

Page 35: Stormwater Control & Design By Ken Barber, CPESC INSPECTION SERVICES PROFESSIONAL

Questions?

INSPECTION SERVICES

PROFESSIONAL