8
STI 2007 A look back

STI 2007 A look back. STI 07 Concept Map: Being a Successful Team Sponsor

Embed Size (px)

Citation preview

Page 1: STI 2007 A look back. STI 07 Concept Map: Being a Successful Team Sponsor

STI 2007STI 2007

A look backA look back

Page 2: STI 2007 A look back. STI 07 Concept Map: Being a Successful Team Sponsor

STI ‘07 Concept Map: Being a

Successful Team Sponsor

STI ‘07 Concept Map: Being a

Successful Team Sponsor

Page 3: STI 2007 A look back. STI 07 Concept Map: Being a Successful Team Sponsor

Concerns Raised STI ‘07Concerns Raised STI ‘07

• Getting Support• “Selling” the Challenge • Determining a Challenge

Project

• Getting Support• “Selling” the Challenge • Determining a Challenge

Project

Page 4: STI 2007 A look back. STI 07 Concept Map: Being a Successful Team Sponsor

Expertise: Pre and Post STI comparison

Expertise: Pre and Post STI comparison

PRE-WORKSHOP (n=16)Web usage Powerpoint Excel ssh + FTP

mean 2.44 2.13 1.75 1.00sd 0.81 0.96 0.68 0.63

POST-WORKSHOP (n=10, response rate 63%)mean 2.70 2.60 2.70 1.80

sd 0.67 1.17 1.06 1.03

1=none, 2=beginner, 3=intermediate, 4=advanced, 5=expert

Page 5: STI 2007 A look back. STI 07 Concept Map: Being a Successful Team Sponsor

Expertise: Pre and Post STI comparison 2

Expertise: Pre and Post STI comparison 2PRE-WORKSHOP (n=16)

StarLogo Unix Programming Math packagesmean 0.94 0.63 0.50 0.38

sd 0.85 0.72 0.89 0.50

POST-WORKSHOP (n=10, response rate 63%)mean 2.00 0.90 1.20 1.10

sd 0.94 0.99 1.03 0.74

Page 6: STI 2007 A look back. STI 07 Concept Map: Being a Successful Team Sponsor

KNOWLEDGE OFÉ Mean SDnetwork thinking 3.7 1.06

scientific process 3.58 1.08data visualization 3.42 0.79

equity issues 3.18 1.17selecting appropriate technology tools 3 0.6

computational science 2.92 0.67agent-based models 2.92 0.9

algorithms 2.83 0.72mathematical models 2.75 0.62

programming 2.75 0.62

STI ‘07 Survey (Expo’08)n=12 (75% response rate)

STI ‘07 Survey (Expo’08)n=12 (75% response rate)

1=no knowledge at all; 5=very knowledgeable

Page 7: STI 2007 A look back. STI 07 Concept Map: Being a Successful Team Sponsor

STI ‘07 Survey (Expo ‘08) 2

STI ‘07 Survey (Expo ‘08) 2

COMFORT WITHÉ Mean SDunderstanding challenge year 4.08 1

mentoring teams 4.08 0.9project development process 3.92 1.08

Modeling in STARLOGO TNG 3.17 0.83modeling in netlogo 2.42 1.24

Modeling in Java 1.92 1.31Modeling in mathematica 1.4 0.7

1=not at all comfortable; 5=very comfortable

Page 8: STI 2007 A look back. STI 07 Concept Map: Being a Successful Team Sponsor

Observations, questions, comments?

Observations, questions, comments?