Passamaquoddy Tribe at Pleasant Point algae to Oil Project
Steve Crawford, M.ScEnvironmental Director
2
Overview and BackgroundTribal energy mission statement: To be 100% self-
sufficient in energy, while safeguarding the Tribe’s lands, waters, air, human health, and culture.
Projects under development:Commercial wind – 50.5 MW wind project on
Blueberry farmIn-stream tidal power, two-FERC approved sites in
Passamaquoddy BayHalf-moon Cove tidal barrage 10 MW projectGeothermal project with Passamaquoddy Bay for
heatDomestic wind turbines, solar panels
3
Wind power site
Windpower site
WINDPOWER SITES
Wind powersite
4
1
2
TIDAL PROJECT SITES
5
Subsea Aquamedics turbine
6
7
8
Sipayik 100 gal. bio-reactor, sewage treatment plant (250 ml/4 day)
9
Gothic Solar Greenhouse, 18’x 20; $4119.
10
11
Costs18’ x 10’ x 24’ greenhouse: $4,45060- 10” x 6 ft acrylic tubes = $3,760Air pump=$CO2 supply $500Plumbing= $3,000Floor and sill= $600Extraction process= $4,000Installation= 40 m-hr @$20/hr= $800TOTAL = $17110, rounded up to $20k
12
SummaryProjection and hopes:
If capital and installation costs = $20k;operating costs = $20/month or 100/yearAnd oil production is 400 gal/season, over a 15 yr period oil would be $3.58/gal. (Maine oil cost today is 3.24) 20 years = $2.75 gal.
KEY POINT-SELF SUFFICIENT!