PLANRECORD PREPAREDFORS .NO .1246 . AIRGUARD3AS(STERNTUBEAFTSEAL)INSTRUCTIONMANUAL . 1 . =~-j]-~3AS (~}'0)W! -J~)IIe#1>rHA1 STERNGUARDMK-II(STERNTUBEFWDSEAL)INSTRUCTIONMANUAL . 2 . X914-f ; MK-II (~Yp ` Aila(Si-JL)X74REBAS MEASUREMENTMANUALOFWEARDOWNOFSTERNTUBEBEARINGFORIN-WATERSURVEYS . 69^-78 3 . IIIRJ m A : *0B : *112O1C : #7cilD : I*f E :**F : fMG : *kM4JlrrPH :&M J : - CANK :X*' ."v 9,4i0 MC-22 - ~7-f NAMEOF JAPANMARINE MAKER'SDRAWING MAKER TECHNOLOGIESLTD . OON- FERRED I~f~I A it it )/aura tl /A1 CHFUM DRAWN ~ . III #~a A~ '~#4~ EIM I M I>3 a-#- H - SHIP&MARINEDEPARTMQII' HULL&MACKOUI'ETTDES.SECT. SCAM QUATOR FINISHED PLA E SHIPPING I NC . MI L EXCELLENC CLASSABS ORDER ITF .M DRAWINGNO . S.NO .12*/47/ GA-30821 - F ttHHHHHHH WBABC Wottf{ Ift . A XAA XSTTTEEit 7I$* 13ZI* I Ii BCECDRK212 bx f ~1 1- W~ toiim SHIPPINGINC . A4 A3 SUM MITSUBISHIHEAVYINDUSTRIES,LTD . Ak KOBESHIPYARDANDMACHINERYWORKS '79 INSTRUCTIONBOOKOF STERNTUBESEALING PAGE 1- 60 61^-68 S+11JWITH EQUATOR 4,500TEU CONTAINERSHIP E

STERN TUBE AIR GUARD SYSTEM.pdf

  • Upload
    kr-manu

  • View
    511

  • Download
    54

Embed Size (px)

Citation preview

Page 1: STERN TUBE AIR GUARD SYSTEM.pdf

PLAN RECORD PREPARED FOR S.NO.1246 .

AIR GUARD 3AS (STERN TUBE AFT SEAL) INSTRUCTION MANUAL.1 . =~-j]-~ 3AS (~}'0)W!

-J~)IIe#1>r HA1

STERN GUARD MK-II (STERN TUBE FWD SEAL) INSTRUCTION MANUAL .2 . X914 -f; MK-II (~Yp ` Aila(Si-JL)X74REBAS

MEASUREMENT MANUAL OF WEAR DOWN OF STERN TUBE BEARING FOR IN-WATER SURVEYS .69 ^- 783 .

IIIRJ m

A : *0 B : *112O1 C : #7cil D : I*f E : ** F : f M G : *kM4JlrrP H : &M J : -CAN K:X*'."v9,4i0

MC-22

- ~7-f

NAME OF

JAPAN MARINEMAKER'S DRAWING

MAKER

TECHNOLOGIES LTD.

OON-

FERRED

I~ f~I

A

it it

)/auratl/A1CHFUM

DRAWN

~• .•

III #~a A~ '~ # 4~

E I M I M

I>3 a - #-H -

SHIP&MARINEDEPARTMQII'

HULL&MACK OUI'ETTDES. SECT.

SCAM

QUATORFINISHED PLA

ESHIPPING I NC . MIL EXCELLENC

CLASS ABS

ORDER

ITF.M

DRAWING NO.

S.NO.12*/47/

GA- 30821 - F

• t t H H H H H H H WBABC Wottf{ Ift. AX A A X S T T T E E it 7I$ * 13Z I* IIi

B C E C D R K2 12 bx f

~11 - W~ to ii m

SHIPPING INC .

A4A 3

SUM

MITSUBISHI HEAVY INDUSTRIES, LTD .Ak

KOBE SHIPYARD AND MACHINERY WORKS

'79

INSTRUCTION BOOK OFSTERN TUBE SEALING

PAGE

1 - 60

61 ^- 68

S+11J WITH

EQUATOR

4,500 TEUCONTAINER SHIP

E

Page 2: STERN TUBE AIR GUARD SYSTEM.pdf

I ULNEHAL OU I-LINL :

SIHUC-I UHF

I S I LHN I UF~L SLAL1 . 1 AI- I SEAL .

: . 1 .2 FWD SEAL

NAMES OF HESPEC LIVE PAR I S ETCH AIHGUAHD'"' 3AS

:3. LOUIPME N I - AND PIPING SYSTEM

-1 . WLAH DOWN MEASURING

5. ME I - HOD OF USE5.1 PHEPARAI ION AND CONFIHMATION BEFORE USE5 .2 METHOD OF USE5 .3 MEASURES UNDER REST CONDITION

6. HOU I INE WORKS FOR CHECK AND OPERATION6 .1 ITEMS TO BE CHECKED UP AND CARRIED OUT AT THE TIME OF WATCH6 .2 ITEMS TO BE CARRIED OUT ON OCCASION6 .3 ITEMS TO BE CARRIED OUT PERIODICALLY6.4 1 I -EMS 10 BE REPLACED PERIODICALLY

/. CONFIRMATION METHOD OF TROUBLES OR ABNORMALITIES AND COUNTERMEASURES

8 . WORLD WIDE SERVICE NETWORK

J . RECOMMENDED L.O. FOR STERN TUBE BEARING AND SEAL

Al (ACHED 1 . MAINTENANCE FOR MICRO-MIST SEPARATOR2 . LUBE OIL FOR STERN TUBE SEALAND BEARING3. STERN TUBE SEAL DRAWINGS4. PIPING DIAGRAM5. FLUSHING PROCEDURE FOR AIR SUPPLYAND DRAIN LINE OF AIRGUARD"3AS6 . DATA OF AIRGUARD 3AS SEAL SYSTEM

CONTENTS

I

Page 3: STERN TUBE AIR GUARD SYSTEM.pdf

1 . GENERAL OUTLINE

" AIRGURD" 3AS" contains 3pcs of seal ring . And fwd seal is the same as conventional MK 11 typecontaining 2pcs of seal ring .

" AIRGURD" 3AS" as aft seal device shuts out sea water ingress by means of air bleeding fromaftrnost seal ring .

By bleeding air pressure into the sea, sea water pressure at aft seal is detected automatically. And itgets to control the pressure of the oil circulation going through seal chamber forward side of air chamber(between #2 - #3 seal rings)and stern tube. Consequently, it brings lightening a load to seal rings .

Furthermore, it is possible to save man power by adopting system components combining with aircontrol and oil circulation line and watch the condition of the seal . The following explanation will assist forsafety ocean going. And please see attached manual for fwd seal MKII(Y03-3612) .

2. STRUCTURE2.1 STERN TUBE SEAL2.1 .1 AFT SEAL (Refer to Attached 3 - 112)

The aft seal consists of three major parts, i .e ., (1) three rubber seal rings and P-ring, (2) a metalhousing holding the rubber seal rings, and (3) a liner which rotates together with the propeller shaft .

The metal housing is made up, in the order from the stern frame side, of spacer, aft casing flange, aftintermediate ring A, aft intermediate ring B and a split type aft seal cover and P-ring cover. Rubber sealrings are inserted between three metal rings, and bolted together . The clamp section of each seal ringsare securely fitted to the metal ring's inner circumferences and to the small grooves on the inner side ofthe metal rings, so that the clamp part is made rigidly oil-and-water-tight . Provide P-ring between aft sealcover and P-ring cover, so protection against fishing nets.

The material of the liner is highly resistant to corrosion and wear .

2 .1 .2 FWD SEAL (Refer to Attached 3 - 2/2)The fwd seal consists of four major parts, i .e ., (1) two rubber seal rings, (2) a metal housing holding the

rubber seal rings, (3) a liner which rotates together with the propeller shaft, and (4) a clamp ring whichholds the liner .

The metal housing is made up, in the order from the stern side, of casing flange, intermediate ring andseal cover.

The metal rings of the fwd seal are bolted together, so that the rubber seal rings can be readilyclamped and assembled, similar as in the case of the aft seal .

The material of the liner is used excellent wear-resistant and lip-lubricating properties .

2.2 NAME OF PARTS FOR AIRGUARD" 3ASAttached 3. for STERN TUBE SEAL "AIRGUARD°'3AS" shows name of parts for "AIRGUARD"3AS" .

3. EQUIPMENT AND PIPING SYSTEMA piping diagram is shown in the attached 4 . Flow controller in the air control unit transfer the air of

constant flow into the air chamber (between #1 and #2 seal rings) and purges the air to the sea waterside. Air relay controls the air pressure of the L .O. tank unit and maintains the oil pressure in the oilchamber (between #2 and #3 seal rings), and in the stern tube (between #3 and #4 seal rings) constantlyhigher tan the air pressure in the air chamber .

A small amount of the air flows constantly from the air chamber to inboard, thus leaking sea water andlube oil can be collected by the drain collection unit and press . gauge unit.

Page 4: STERN TUBE AIR GUARD SYSTEM.pdf

The functions of each chambers are as follows .OAir chamber between #1 and #2 seal rings

Sea water and lube oil are completely separated by this chamber . Air purges at the #1 seal ring tothe sea water side since the air pressure in the chamber is maintained a little higher than the seawater pressure. Thus #1 seal ring seals the sea water completely . When sea water or lube oil leaksinto this chamber, they can be led to inboard and collected .

OOil chamber between #2 and #3 seal ringsA part of oil delivered from stern tube L.O. pump is delivered into chamber of #2 and #3 seal rings,and return into stern tube through #3 seal ring . L.O. tank unit keeps oil pressure always higher thanthe pressure of the air chamber (between #1 and #2 seal rings) and follows the ship draft .

Oil chamber between #3 and #4 seal rings (in the stern tube)Oil is usually circulated by stern tube L .O. pump. The pressure in the stern tube is automatically setabout 0.015 MPa lower than the pressure in the #2 and #3 seal rings, and change following draft.

Oil chamber between #4 and #5 seal rings (Fwd seal)Forced circulation system .

Table 1 summarizes the above .

Item

Arrangementof seal rings

Working fluid _

PressureconditionMPa

Condition ofpressurecontrol

Number ofpipings

Table 1 . Composition and condition of respective sealing chambersComposition and condition

#1

#2

#3

#4(Outboard)

Pyw

Pte

P.

Bearing

P45part of

stern tube

Changeaccordingto draft

V

Sea water1AirOilOilOil

P,1 ° Psw

P23 = P12

P34 ° Pb

abt. 0 .01

abt.0.03--

abt. 0.0150.015

0.05

Pressurizing circulation

Equipped .following to change of the draft

Two

One(air, drain)

(inlet)

3

None

#5

P45 -

0.01^-0.02

Forcedcirculation

Two(inlet and exit

Twoof oil)

Page 5: STERN TUBE AIR GUARD SYSTEM.pdf

4.WEARDOWN MEASURING

After completely installing main engine, shafting and aft/twd seal, it records the outcome measured withwear down gauge .

This measuring is to be realized every docking . And when repairing and overhauling seal, it is to bedone before and after them . It is recommendable to consider the outcome, to measure wear down whenoverhauls on repairing seal, as the standard valve for the future .

In case of vessel adopting in-water survey, it depends on the manual No . Y03-1523 .

5. METHOD OF USE

The method of using this device is explained referring to attached 4 . In the air control unit, change overperiodically "A - LINE" and "B - LINE" . Stern tube L.O. pump are periodically change overed . Thehandling of a forward sealing device is as usual .

Before carrying out the operation in next 5 .1 ^-5 .3 confirm that main shaft is in stop condition in allcases.

Note) Adjustment of the aft seal pressure at first installation and in case of replacing each parts isaccording to "INSTALLATION MANUAL" .

5.1 PREPARATION AND CONFIRMATION BEFORE USE1) Supply oil to stern tube and #2-#3 L.O. circulation line .1 ! Confirm that respective valves V1 5,V1 7,V21,V22,V24,V25,V27,V28,V29,V32,V57,V58 and V107 areopen .

(2) Confirm that respective valves V1 8,V1 9,V30,V34,V50,V52 and V56 are closed .(3) Close V17, open V18 and supply L .O. into the L .O. tank unit by L .O . supply pump . Next, push the

automatic closing valves at the upper and lower parts of the oil level gauge of the L .O. tank unit forconfirmation of oil level. When oil level in the level gauge rising, open V17 .

(4) When the oil level in the L .O. tank unit has reached the position about between high and low level,close V18 .

(5) When air in oil in the L.O. circulating line is nearly disappeared, close V21 .2) Confirm the condition of the valves for the air control unit and the drain collection unit .1) Confirm that V1,B1,V6,V201 and VO on the air control unit are closed, and other valves (including V20on the top of the L.O. tank unit, and V31 in the vicinity of aft bulkhead .) are open .

2) Confirm that V100 and V103 are open, N1 is slightly open (Before shipment from our factory, it hasbeen adjusted to discharge air at a rate of 4 NL/min .), V101 is closed in the drain collection unit andV55 is closed .

3) Set respective changeover switch FV1 on the air control unit on "A - LINE" side .

5.2 METHOD OF USE(1) Open VO on the air source line slowly, and fill air into #1-#2 chamber .(2) Confirm that the indications of respective pressure gauges are starting .

In case of use "A- LINE" : G2, G3, G4, G9, G10, and G13In case of use "B - LINE": G2, G3, G5, G9, G10, and G13(When the which ever pressure gauges are not starting, please refer to confirmation method of troublesand abnormalities and the countermeasures .)

(3) Turn the knob of the flow controller FC1, and set the flow meter 01 around 35NL/min. (Usually, ithas been adjusted before shipment from our factory)

Page 6: STERN TUBE AIR GUARD SYSTEM.pdf

Note) If air venting from stern tube and piping is not sufficient, for a some time after operating, oil isreplaced with air and oil level is dropped to alarming in the L.O. tank unit . In this case oil to be filledaccording to the procedure of 6 .2-2) - b) .

(4) Confirm that respective valves V15 is open .

i5) Adjust the valve V32, and set the flow meter 03 120 ± 50 L/H, if necessary. With this, an aft sealand stern tube have become working condition . The pressure in respective chambers at the center of amain shaft can be determined as follows from the indicated values of pressure gauges G10,G13 and

others .

Sea water (MPa) : P,W = y, x (Da - Hs) x 0.0098 #1-#2 chamber (MPa) : P 12 = G10

#2-#3 chamber (MPa) : P,= P,,, + 0.015

Stern tube (MPa) : P,,, = G13+ (y, x H3 x 0.0098)

Where,

y s : specific gravity of sea water (1 .025)y 11 : specific gravity of oil (0.90)Da : draft of a ship (m)Hs : height from ship bottom to the center of a main shaft (m)

H3 : height from the center of a main shaft to G13 (m)

Accordingly, from these pressure values, the differential pressure on each seal ring can be calculated .

5.3 MEASURES UNDER REST CONDITIONIn the anQh_orage for a short period in_voyage . as far as an aft seal and stern tubeare in the usable

condition asmentioned in 5 .2. adjustment is not necessary at all .In the following cases, put an aft seal in rest condition by following the procedure shown respectively.

1) In case of dry docking(1) Switch off the alarm panel .(2) Close VO on the air source line and open B1 in the air control unit, after escape air, close B1,V9, V100and V103.

(3) Stop the stern tube L .O. pump, and open V21 on the top of the L.O. tank unit to escape the air. .At the time of the restoration, please bring an aft seal in the usable condition by the procedure

opposite to this .2) Following is disassembling procedure(4) Open the valve V19 and V52 to discharge the oil in stern tube and L .O. tank unit .(5) Open valve V56 and remove the plugs of at the top and bottom of intermediate ring to discharge the

oil between #2 to #3 chamber.(6) With this, an aft seal casing has become the condition of disassembling .

At the time of the restoration, please bring an aft seal in the usable condition by the procedureopposite to this .

3) In case of stopping a shaft for a long period on the sea (for example, laying up and others)(1) Switch off the alarm panel .(2) Close VO on the air source line and open B1 in the air control unit after escape air, close B1, V9, V100

and V103 .(3) Stop the stern tube L.O. pump, escape air pressure by opening V21 at L .O. tank unit .

5

Page 7: STERN TUBE AIR GUARD SYSTEM.pdf

~4 ) Close the valves V32 and V58 in the vicinity of the aft bulkhead .

5 ) Close the valve V15 and V17 in the vicinity of the L .O. tank unit .

In case of using again, please bring a system in the usable condition by the procedure opposite to

this .

Note) 1 . It possible to supply electric power and air to this system, it is not necessary to stop the system .

2. In case that the system is remained stopping without air for long time, drain may come out

through the drain collection unit, when supplying air again . Before starting the system, drain out

operation through the valves V55 is recommended .

3. After stopping air supply to the system, there is a possibility of oil translation from fwd seal tank

to stern tube side, due to decreasing air pressure, in this case supply oil to fwd seal tank after air

supplying .In shallow draft condition (within 1 meter from shaft center to sea water line), operate some as 1) . In

this condition, do not rotate the shaft .

6. ROUTINE WORKS FOR CHECK UP AND OPERATION

6.1 ITEMS TO BE CHECKED UP AND CARRIED OUT AT THE TIME OF WATCH AFT SEAL AND

"AIRGUARD 3AS"SYSTEM1) Are the indications of below respective pressure gauges are starting ?

In case of use "A- LINE" : G2,G3,G4,G9,G10,G13

In case of use "B - LINE" : G2,G3,G5,G9,G 1 0,G1 3

2) Is the flow meter Q1 (Q2) on the air control unit indicating around 35NLJmin?

3) Is the element for MICRO-MIST SEPARATOR F1 normal condition?(Is indicator of the condition

detecting device on the MICRO-MIST SEPARATOR at the normal position?)4) Are respective filters F1 and F3 on the air control unit not filled up with drain ?

5) Is the oil level in the L.O. tank unit at the normal position?(Confirm it by pushing automatic closing valves at the upper and lower parts of the oil level gauge .)

Besides, is there not any change in the hue of oil'? (Has the hue not changed from yellow to reddish

brown or white ? )6) Is oil circulating in the L .O. circulation line?

7) Is there not any abnormal noise or heat generation in the L .O. circulating pump?

8) Is there not any clogging of a L.O. filter?9) Is the drain collection unit tank not filled up with drain? Besides, is collect not too frequent?

10) Is a little quantity of air release from needle valve N1 of drain collection unit?11) Is the exit temperature T1 not higher than 45 °C ?

FWD SEAL PRESSURE1) Is the pressure normal ?2) Is there not any change in the hue of oil ?

When the above conditions are not satisfied, refer to next 6 .2 or 7, the confirmation method of troubles

and abnormalities and the countermeasures .

G

Page 8: STERN TUBE AIR GUARD SYSTEM.pdf

6.2 ITEMS TO BE CARRIED OUT OCCASION1) Confirm the level of drain by sight glass at bottom part of MICRO-MIST SEPARATOR, and also

confirm filter condition by a checker on top of it .2) In case of increase or decrease, the oil level in the L.O. tank unit . (Confirm by referring to the

flowcharts in fig 1-4 .)a) Case of increase

By opening a valve V19, discharge oil in the tank until normal level, there after, close V19.b) Case of decrease(1) Open V 18 to supply L.O. to L .O . tank unit .(2) Close V18 after fill up to the proper oil level .

6.3 ITEMS TO BE CARRIED ON PERIODICALLY

1) Exchange of the element F3, F4 of regulators in the air control unitonce every four years . Exchange the element of the fitter by the following procedure .

(1) Switch the changeover switch FV1 on the air control unit .(2) By pushing the lever at the lower part of a bowl, lower the pressure, thereafter, take off the bowl,

exchange the element, and fix the bowl back .(3) Change back the switch FV1 .

2) Cleaning of a filter at drain collection unit inlet : once every year.Take off the plug of filter, take out the element and clean it, thereafter, insert it and attach the plugagain .

3)Maintenance of pneumatic equipment on the air control unit : once every four years .As for the pneumatic equipment used for the air control unit maintenance to be replaced once everyfour years at the time of periodical survey in a principle .

Note) Maintenance manual for pre filter (F1), drain fitter (F3,F4) are according to attached 1 .4) Cleaning of the L .O . filter

By shipyard standard .5) Battery in the flow meter (Q3)

The life of battery in the flow meter depends on the condition . When the battery has run down, aflickering alarm "BATT" appears on the register display . The battery should be replaced as soon aspossible .

6.4 ITEMS TO BE REPLACED PREODICALLY ITEMS SYMBOL

AIR CONTROL UNIT : FILTER ELEMENTFOR PREFILTER

F1FOR MICRO-MIST SEPARATOR

FILTER ELEMENT

F3FOR REGULATORFILTER ELEMENT

F4FOR REGULATORFLOW METER:BATTERY

Q3

QUANTITY

1

1

1

PERIOD

2 YEARS

4 YEARS

4 YEARS

2.5 YEARS

Page 9: STERN TUBE AIR GUARD SYSTEM.pdf

7.CONFIRMATION METHOD OF TROUBLES AND ABNORMALITIES AND COUNTERMEASURES

When an abnormality occurred during the use of 3AS, investigate into the cause and take the

countermeasures by referring to the flowcharts in Fig . 1-1 . 8. (As to the symbols used for flowcharts,

see attached 4) When the cause is unknown or the countermeasures are difficult, please make inquiry

to Japan Marine Technologies Ltd .When contacting with us, please submit attached-6 data sheet after fill up necessary data on it .

Conversion of #1 -#2 chamber system to ordinary oil pressed type from air control type .

For instance, no control air for long periods, etc ., 3AS seal can convertible to ordinary oil pressed type

by change over oil system from air control system in the #1 -#2 chamber .

The method of changeover and handling are shown as follows.

(1) Switch off the alarm panel .

(2) Close V100 at drain collection unit.

(3) Connect a temporary piping between valve V55 and V56 .

(4) Open B1 on the air control unit, close V4,V7,V8 and inlet cock of pressure switch (PS1) .

(5) Open valves V55 and V56 .6) Under the condition of stern tube L .O. pump running, supply L.O. to the #1 -#2 chamber while

supplying oil to L .O. tank unit from L.O. supply line.

(7) After confirmation of oil flow from B1, close B1, V9,V18,V55 and V56 .

(8) Close valve V58 .(9) Adjust the pressure of stern tube so as to give 0 .015- 0.03 MPa higher pressure than the sea water

pressure by adjusting of valve V15 .

(i0) With this, conversion from 3AS to oil pressed type has been done .

At the time of restoration(1) Open B1,V9,V15 and V58 .(2) Disconnect a temporary piping between valves V55 and V56, after that, open valve V55 to drain L.O .

out .i3) Close B1,V55 and open V100 and inlet cock of pressure switch (PS) .

(4) Open V7 and V8, close V4 on air control unit slowly.

(5) Switch on the alarm panel .

Further, L.O. in the #1-#2 chamber is collected to inboard by drain collection unit .

8

Page 10: STERN TUBE AIR GUARD SYSTEM.pdf

CPlease keep the flow meter QI or Q2 always around 35 NL'min by adjusting with the knobs of FCI or FC2 .

1)

Vx~ to "H'^ on Fig . 1-3

------------------------------------------------------------Moreover. even if troubles occur. the use ispossible b\ the following temporary piping .Trouble of FC I . FC2 and Q I . Q2 : connect \ 1 1and B 1 .As for the details . make inquiry to Japan MarineTechnologies Ltd .

Switching over of FV 1 .Replacement of FCI (or QI ) at theTime of port call .(Inform to Japan Marine TechnologiesLid .)

---------------------------------------------------------------

VInvestigation into causeof malfunction alarm .

------------------------

Condition detecting ~,device red gauge on Fl

reach top position .

NO j

V

G4 pressure. j

YES I

YES

VSwitching over of FV l .-----------------Replacement of R I at thetime of port call .(Inform to Japan MarineTechnologies Ltd .)

YES Exchange of the elementsof Fl filters .

Exchange of theelement .

Page 11: STERN TUBE AIR GUARD SYSTEM.pdf

O

Abnomiality pressure of air,

YESpressure .(PS2)(PS3)(Alarm)

Leakage from air pipebetween L.O . tank unitand air control unit .

YES

YES

Switching over of FV 1 .Replacement of ARl at thetime of port call .

NOInvestigate into L .O .

tank unit of airleakage .

YES 1

Repair malfunction ~.part .

NO

VX to "A" on Fig . l-8

Page 12: STERN TUBE AIR GUARD SYSTEM.pdf

Frequentdischarge of

drain .

J

Increase purging air quantity .Most of drain is ~' 60NL/minwater.

(Adjust FC I )I

(Trouble #1 seal ring )I

1Most of drain is

' Use by lowering the bias ooil .

AR1. (Trouble of #2 seal ring .Inform to Japan MarinTechnologies Ltd .)

X from "B on Fig. 1 -4

Execute pipe line flushing withpure water, and clean filter inthe drain collection unit .

Operate as it is

Is oilDischarged frequently(1 time / l min .)

X from "C" on Fig . 1-5

INormal condition .

r Adjust the opening oN1

' Exchange seal rings . i

Close V58Load to #3 seal ring .Return to normal biasAR1L

i

fori,

Page 13: STERN TUBE AIR GUARD SYSTEM.pdf

4)

j Abnormality in S/T L .O. tank unit level .(Alarm)

Supply oil to the tank up,to normal level .

It

X to "F" on Fig . 1-6

YES

X to "B" on Fig . 1-3

iInvestigation into other

causes. Investigation into thecause of malfunction alarm .

NO, I( Operate as it is . (Oil1, decreases naturall)) j

Extract oil from the tan l~down to normal--el .

Does

oil

leveNO

Operate as it is . (Oily,increase

~frequently?

increases naturally)

YES

Investigate into other cause .Investigate into the cause of

`

Iinflow.

Page 14: STERN TUBE AIR GUARD SYSTEM.pdf

>J

X to "C" on Fig . 1-3

, ES

'Was the bias ofContinue operation as itAR1 lowered of taking

`is .countermeasures according to

3) .

NO

YES

Raise the bias of ARI to thepressure at which air does notmix. (Inform to Japan Marine i

Investigate into the cause of vibrationTechnologies Ltd.)J

` and remove it .

Switching over of FV F,.G3 >G2 on the NO replacement of ARI at the

air control unit .

/

time of port call .

Page 15: STERN TUBE AIR GUARD SYSTEM.pdf

6)

lAbnormality of oil level inforward seal tank . (Alarm)

Supply oil to forward seat

YEStank up to normal level .

II

NO

Adjustment of the height of forward sealtank - lower.(Trouble of #5 seal ring )

,,,,J,"Operate as it is .(Oil decreased naturally)

J

Decrease ofoil level .

Investigate

into

othercauseInvestigate into the causeof malfunction alarm

X from "F - on Fig. 1-4

NO

YES

IfExchange seal rings at proper

Adjustment of the height of forward sealtime. (Works inside a ship)

7 tank -increase .--------------------------------- ------(Trouble of #4 seal ring)

I NO

Operate as it is .(Oil increased naturally)

i

Page 16: STERN TUBE AIR GUARD SYSTEM.pdf

Oil does not circulate in

NO

1\L.O . circulation line . l

Abnormality of L.O .circulating pump .(working)

Raise the discharge pressureof P1 till circulation occurs .(Adjust a relief valve)

X from "G" on Fig . 1-8

I

Change over

YESPP,

from workingto spare .

NO

By raising the bias of ARI attainP23-P 12>0.049MPa

(Inform to Japan Marine Technologies Ltd .)I

Operate as it is .Repair or replace at an early time(Inform to Japan Marine Technologies Ltd .)

Normal conditionof use .Repair of workingpump .

Page 17: STERN TUBE AIR GUARD SYSTEM.pdf

i

VReplace AR 1 at the time ofport call .(Inform to Japan MarineTechnologies Ltd . j

Page 18: STERN TUBE AIR GUARD SYSTEM.pdf

8.WORLD-WIDE SERVICE NETWORKOur service network is as bellow . Please refer to shipyard, no ., parts no ., and parts name on

attached3-1/2, 2/2 drawings, when ordered .

Europe, The Middle and Near East, African∎ Wartsila Propulsion Netherlands .(NETHERLANDS)TEL 31-4163-88299FAX 31-4163-74853

North and South America• Wartsila Lips Inc .TEL 847-808-9240FAX 847-808-9295

Asia and Australia•

Japan Marine Technologies Ltd(JAPAN)

Head office (TOKYO)TEL (03)5442-2211FAX (03)5442-2260TELEX 232-4593 (CHUWAC J)

JMT Korean office (PUSAN)TEL 462-2666FAX 462-2667

Chuwac Engineering Pte . Ltd .(JMT's Subsidiary in SINGAPORE)TEL 65-8989-125FAX 65-8989-151

1 7

Page 19: STERN TUBE AIR GUARD SYSTEM.pdf

OMMENDED 1 .0 . FOR STERN TUBE BEARING AND SEAL

In selecting t . .U, for stem tube bearing and seals, it is necessary to avoid products that have

able effects on stern tube seal rings (made of either ni .tnile or tluuric rub,ber) . F-or use with Japan Marine

joyless stern tube bearing and seals, we recommend the products listed oil attached 2, as they have

sled and proven satisfactory . Upon request, similar tests are conducted on products other than those

T's standard fur L .U . viscosity is horn 300 to 600 SUS at 100 F(37 .8 `C ) . In case of emergency,

L.O . of preferably the same type as that for' regular use, with a higher' viscosity . However, do not use

er a long period .

Page 20: STERN TUBE AIR GUARD SYSTEM.pdf

MAIN I ENANCE FOR MICRO--MIST SEPARATOR

IU REPLACE ELL_MENF>lose V4 and Vb, open V6 in the air control unit .

scare pressure completely in the body with loose the drain cock for low part of micro -- moist

Make pressure U MPa)

011 !Please take care when louse the drain cock, because taking pressure in the body .

enwve four hexagon bucket head bolt .

eplacc element, gasket and O- - ring .lighten h exagorn socket head bolt for assembling of the micro-mist separator - .

Please reter to following)

Time replace the element : Elenment operates for 2 years .-

1 9

CONDITION DETECTING DEVICE

- O-RING(USED)

separator .

GASKET(USED)

Page 21: STERN TUBE AIR GUARD SYSTEM.pdf

431

4 Q

21 3

#1

I=364

#2

= 5 Zo

ru

Cue

c~

0 . R

0. 8

47

• 6

--4 I

#31

e

F3~:filt~~~

TOP

CENTER OF0 DIM

CUSTOMER

xm4m s

L -1L 1 i74+iCENTER OFSEAL RING

MITSUBISHI HEAVY INDUSTRIES LTD .

WEAR DOWN GAUGE

VBIOF49A'

#2^-#3MiH31.(A)DRAINPIPINGFORBETWEEN#1^#2 (OUTLET#1-#2MFLM ba

NO,

1246/7/8/9

Japan Marine Technologies Ltd.TITLESIZE

STERN TUBE SEAL AIRGUARD 3ASR1 060t-)Lzt)JL- F3ASR9 (AFT)

MA, L DATE

JUN. 1' 011

0 o I'

NOTE) 1 . THE CENTER OF CASING AND SEAL RING IS CONCENTRIC .BUT THE CENTER OF 0 DIM SHOULD BE ECCENTRIC

® 1 . 2 LTOWARDS TOP.2. AT CONDUCTING LEAKAGE TEST, COMPLETELY REMOVETHE AIR IN THE SPACE BETWEEN THE NOS.#2-#3 SEAL RINGS .

3. DO NOT FILL THE LUBRICATE OIL INTO THE AIR CHAMBER OFTHE SPACE THE NOS.#I-'#2 SEAL RINGS .

4. ITEM 18. 20 . 30. 71 AND 72 TO BE LOCKED USING WIRE5. AFTER INSTALLATION, ITEM 29/75 AND 31/76 AND 43 SHOULD

BE TAKEN OFF AND KEEP IN THE SPARE PARTS & TOOL BOX.6. REMOVE THE GUM-TAPES. WHICH ARE COVERING AIR-PURGEDHOLES. OF THE SEAL-COVER.

@L, aQ+fi711 1 . 21 mmTOP)~4011f%~l,tl ~a

2. J-7T~h o; #2~#3

k~3. #1-#2WjMZ*i4AL#ttiL .4 . 5918. 2 0 . 3 0 . 71 . 7 2Z-f1 -WJIbW:. L5 . --AIRM =2 9/7 5 J31/7 6. 4 3Ii LTi

DIRro C .6 . 7~d - Ii

i-1Liy1- ;ITEM&) ~ ~~3iJhT-T

L.

1

CLASS : ABSnrn . 1 rr.m /, PIT I n ERV KOBAYASHI

AT7ACPfD

DETAIL OF STOPPER FOR DETAIL OF HOLES TO FEED OIL/AIRWRARDOWN GAUGE&DRAIN BETWEEN #1^'#2 & #2"#37~9' 7%i~--~#1~#23t(I#2 #311~A~

IN WATER SURVEY

2NDREV

DEC . C 3' C 1KOBAYASH ~

1

DRAWNKOBAYASHI

NECKED997kg I Y . T.SUJIHASH ;

SCALE

_IAPPROVED

Page 22: STERN TUBE AIR GUARD SYSTEM.pdf

G= 0

2

ab 63

#4

1

76

10

ae!

ab, 2

3013

48

UI20

OILOUTLET 5K-25A TOP

46

AIR VENT

OIL DRAIN

_AJF•L/i OIL INLET 5K- 25A, -

B0TT :IM

VIEW

j

NOTE)1.THE CENTER OF CASING AND SEAL RING IS CONCENTRIC.AA\

BUT THE CENTER OF IDIM . SHOULD BE ECCENTRIC ONLY0.71mm TOWARD TOP.

2 . AFTER INSTALLATION, ITEM25/75 AND 23 SHOULD BE TAKEN OFF AND KEEP

IN THE SPARE PARTS & TOOL BOX .

1 . 7-ri79+i t~-A'U i'J4+i L1#e~i 3 ~L ff9

lY 0. 71 mm T 0 P

$i: LtL 13.

2. i-)L

112 5/7 5W2 31IWLTT~L

t. MASS :

A7ACHFu

MASSabt. 890kg

SC E 1 /

MITSUBISHI HEAVY INDUSTRIES LTD .

ABS IST~ SEP.33REV, KOBAYASHI

REQ : ISET/ ISHIP ; . .,

I

CUSTOMER Na

1246/7/8/9

Japan MarineTechnologles Ltd .TITLE STERN TUBE SEAL STERNGUARD WARKIIR5 ZE

1060 >-)L

.Z9

F'?-1IIR (FWD)MAT L

wN KOBAYASH ICHECKED

Y. TSUJIRASHIAPoROVE

DATE

IJUN . 01' 01

N

Page 23: STERN TUBE AIR GUARD SYSTEM.pdf

FOR

_f1

0

FLUSHINGPROCEDURE FOR AIR SUPPLY AND DRAIN LINEOF AIRGUARD 3AS

procedure is used for protection and repair of air supply and drain piping line choking .

ENTIONing is executed ballast condition (air pressure in #1 and #2 seal chamber is low) and during shaft stopping

on. At this time, G 10 pressure must be 0 .029MPa and over, and the differential pressure of #2 S/R bewance .

clean water only .

ute this flushing about once from 1 month to 2 month interval .

.not touch any valves and/or equipment except below mentioned .mber plates are attached on valves and equipment for indication .)

CEDUREa coupler (prepared by JMT) on flushing water supply hose (prepared by ship crew), and fix it using bandare by JMT). (See FIG . I )

sect the above mentioned hose with pipe flushing port in air control unit. (See FIG . I )firm the flushing water pressure is higher than G10 .n V201 for air control unit, after confirmation of closing of N4 . (See FIG . I III)

Front view of AIR CONTROL UNIT

Fi

I

26

WATER SUPPLY HOSE

X111 SOME410010

2

Page 24: STERN TUBE AIR GUARD SYSTEM.pdf

pen the valve of 11 us ping wader source .nerease of opening ofN-1 needle valve gradually and keep a float in flow meter to be scale 2 from

(Flushing water quantity is about 1liniin at scale 2) After one minute flushing, close V20 I top water supply .nfirm (12 pressure to he steady before and after water supply condition .ushing water is discharged through drain collection unit . (See FI(-', . II)nipletely discharged the flushing water, open V201 to supply flushing water again .peat this procedure 2 or 3 times)

t8connect flushing water supply hose, after confirmation of V20I closing .ose the valve at drain line, d16-assembly drain pot for cleaning .fter cleaning, restore drain collection unit and open the valve at drain line .

aloe numbers are referred to attached Figif . III some case, valve and gauge numbers areiferent horn I"igf . Should you have any question to this, please' connect us .

Fig . II DRAIN COLLECTION UNIT

2 7

Page 25: STERN TUBE AIR GUARD SYSTEM.pdf

M RIIRI

IIRI

V55J

TO DRAIN TANK

A-I INF

?V9

Vii1

8-Uw

-= 5K I 15A

FLUSHING

TO L .O. TANK UNIT

TO PRESS. GAUGE G10

D, IB C I I

5K-15A

IFIG.N

J

Page 26: STERN TUBE AIR GUARD SYSTEM.pdf

0 0

MOW

21.asO0,

1=364

® 152

H=3

70

#3

doOcom-a I

N'9-

Nm

O

OO

I

INL

24-35DRILL

'ma 997k

TOP

1

WEAR DOWN GAUGE

OIL PIPING FOR BETWEEN

-0010c

AIR PIPING FOR BETWEEN

20-28DRILL

DRAIN PIPING FOR BETWEEN

#1#2 (OUTLET)

WEAR DOWN GAUGE

INOTE) I. THE CENTER OF CASING AND SEAL RING IS CONCENTRIC .

BOTTQMBUT THE CENTER OF 0 DIM SHOULD BE ECCENTRIC

o

VIEW A"® ® 1. 21mm TOWARDS TOP.

2. AT CONDUCTING LEAKAGE TEST, COMPLETELY REMOVETHE AIR IN THE SPACE BETWEEN THE NOS.#2-'#3 SEAL RINGS.

3. DO NOT FILL THE LUBRICATE OIL INTO THE AIR CHAMBER OFTHE SPACE THE NOS. #I-#2 SEAL RINGS. MITSUBISHI HEAVY INDUSTRIES LTD.

4. ITEM 18.20.30.71 AND 72 TO BE LOCKED USING WIRE.

CUSTOMER NQ5. AFTER INSTALLATION. ITEM 29/75 AND 31/76 AND 43 SHOULD

BE TAKEN OFF AND_ KEEP IN THE SPARE PARTS & TOOL BOX ~`1 6/7/8Z 4>'

6.REMOVE THE GUM-TAPES WHICH ARE COVERING AIR-PURGEDHOLES OF THE SEAL-COVER.

DETAIL OF HOLES TO FEED OIL/AIR

Japan MarlneTechnologles Ltd .A A I

4±>-VJ~F~i.~ti#w~LPL,l

2 1 . 2I mmTOPm:.

&DRAIN BETWEEN #1-#2 & #2 #3gym,&.

DETAIL OF STOPPER FOR #h#2&(f#2#361TITLE STERN TUBE SEAL AIRGUARD 3AS3. #1

_

2. #I-N h#2W

•atX02('.#2~#3C

ISO

b

r7WEARDON

~

3RD JUL.A

SIZE1060

J-)

I- - 3AS 0- (AFT)3AL t~t,

KOBAY SHI 04.018. 20. 30. 71, 72U',7

)ibmoZ .

REVIN WATER SURVEY /~

5. S-A4

.029/75AU31/76 . 431ii(~L'tiiS6.77TtArvMi-Po~YI- (ITEM6) ~'~` T` CLASS : ABS IST SEP. 03' 01

2ND DEC. 03' 0}1.i 3EV KJBAYASH

REV KOBA ASHREQ : 1SET/1SHIPmJllllA L TA rA I.

Page 27: STERN TUBE AIR GUARD SYSTEM.pdf

A

76OIL OUTLET 5K-25A TOP

VI

S

OIL DRAIN

Ar~FL%

OIL INLET 5K-25AOBOTTOM

ykp

16

a0

I

1")N

.!)N-a

76

0O1-

d

abt.63

#4

~-

EU

®~ ~ 1

Gm

m~l mm

#5

230

C

mm m

120N

a

A45

H=3 r

~./'„ ~1.,

S=330 3

Q=350

MITSUBISHI HEAVY INDUSTRIES LTD.

N

m

d

y O

U 3

dA

N3

NOTE)1. THE CENTER OF CASING AND SEAL RING IS CONCENTRIC.A

BUT THE CENTER OF ODIM. SHOULD BE ECCENTRIC ONLY 0.71ma TOWARD TOP .2. AFTER INSTALLATION, ITEM25/75 AND 23 SHOULD BE TAKEN OFF AND KEEP

IN THE SPARE PARTS & TOOL BOX.A

1. > +i i~JW) pig uTg6b. *1^

iii0.71ma T0PlAz$i LTt4.

2. °r-J13fMM 02 5/7 5W2 31itk4bLT~

CLASS : A B S

REQ : 1SET/ 1SHIP

CUSTOMER

NO.

mzm IR

MAT I.

"" KOBAYASHI1ST SEP. 03' 01

aMASS

abt. 890kgCHECRE

Y. TSUJ IHASHIREV KOBAYASHI4 --, A ~.r+ SCALE 1/3

1246/7/8/9

Japan MarineTechnologies Ltd .

TITLE STERN TUBE SEAL STERNGUARD MARKIIRSIZE1060

>-)L

J~h'

IIR (FWD)

JUN. 01' 0 1 I

'P- K- TAB URA

um NO MK II R-F 10 6 - 0 0 0 9 a

Page 28: STERN TUBE AIR GUARD SYSTEM.pdf

CONTACT AC 250V 5ACAPACITY

125V 10ADC 100V IA

24V 5A

PLAN OF ITEM 7CIRCUIT

NORMAL :ON

OFF :

R D

ON

PNBSS SW170i

BLACK

q)

AUTOMATIC AIR CONTROL

UNIT FOR AFT SEAL & S/T

l~q..r.Ire~xrE ~.LA

a

NP2

NP5FLOW CONTROLLER

FCI (A-LINK)FC2 (8-LINE)

NP3

NP4

ITEM t89MIT' L

DBSCtlITI01

00 E ESTALES USED

IOIIIIlSPAIN

7-RI-ILA54a

2

1

3

1

4

2

5

1

8

2

1

1

2

122

13

G2 AFT SEAL PRESS.

G3 L. 0. TANK PRESS.

1

JIS F880) 15c

2 (ELEMENT ONLY)

l (ELEMENT ONLY) MICRO MIST SEPARATORFlv f90;xFti~ 9

FLOW CONTROLLERFC1.FC2

7o-3iFO-7-

0 .4MPaPRESSURE GAUGEG2

ED*0.4MPaPRESSURE GAUGE

G3FEW

SHUTTLE VALVE

itiI'MP

MILDSTEEL FRAME

SS40044WATER WASHING UNIT

FLOW METER7D-Y-9-

Q1,

CHANGE OVER SWITCHFVI

4ItUP

PRESSURE SWITCH

47REGULATOR (WITH FILTER)

L4 L-9- (7+A9-6

PSI

R1 . R2

~YNIAIR RELAYx7-

'1l_-COUPLER

CHANGE OVER SW. FVI

A-LINE

B -LINE

NP6

NP7

AIR RELAY

ARI (A-LINE)

NP8

AIR RELAY

AR2 (B-LINE)

CUSTOMER

N0 .

IR

1246/7/8/9

SI . S2. S3

(V201. Q4 . N4)

AR1 . AR2

FLOW INDICATORQI(A-LINE)Q2 (E-LINE)

NOTE :1 . THE AIR CIRCUIT DIAGRAM OF THIS UNIT IS SHOWN ON DRAWING Z-B1-14854a

=7ILMZ-B1- 14854a NND1LTFtL .

2. PAINT MUNSELL 7. 5BG-7/2

3. TUBE & FITTING COPPER TUBE (#8)& STEEL/COPPER ALLOY

a 7Q! t ;a-A*

MITSUBISHI HEAVY INDUSTRIES LTD .

Japan MarineTechnologies Ltd .TITLE

AIR CONTROL UNIT

MI-1:7 F ONYAT L

DRAWNKOBAYASH I DATE

MAY.0 4' 01

Page 29: STERN TUBE AIR GUARD SYSTEM.pdf

E->

sees

a a

Rc1/4

DRAIN COLLECTION U T(FOR AFT SEAL)

O SCALI'I'-ADT. 4NL/.1∎ppNuY.1d..Mdrla

1hO.D.#8 Cut ;

TO PRESS.GAUGE UNIT'

E-m

ITEM

1

2

3

4

5

6

7

8

9

10

11

1011115

2

1

1

3

1

1

1

1

1

TITLE

RIO.SPARE MAT L

WILD STEEL

SS400

STAINLESS STEEL

SCS13

STAINLESS STEEL

SUS304

BRONZE

BCMILD STEEL

SS400

ACRYLIC RESINS

BRASS

BiBF2

STAINLESS STEEL

SCS13

MILD STEEL

SS406

BILL or MAT L

STAINLESS STEEL

SUS316

PAINT

MUNSELL N- 9.0

MITSUBISHI HEAVY INDUSTRIES LTD.

CUSTOMER

1

DRAWNKOBAYASH I

FRAME71i-1

VALVE

IR51 l0E-IRA UG-3/0FLANGE JOINT

DESCRIPTION

7iii'M

5K-15A

FILTER 00 MESH

740- 80)712 YS-04

U BOLT

U 4;1bF

NAME PLATE

a

BITS JOINT

WAW IC0-PTI/4-BGATE VALVE

410 10K-15A US-1/2

DRAIN DISCHARGE UNIT

F11:1m silo-4cSTOPPER

METERING VALVE

itZOMJId SS-4MA

DRAIN COLLECTION UNIT

FD%J1/9Y3%1=7FDATEMAY. 04' 01

NO

1246/7/8/9

4 Japan Marine Technologies Ltd .

Page 30: STERN TUBE AIR GUARD SYSTEM.pdf

VII?

rPRESS. GAUGE_

I BOARD

i

G13 G10

C- m0 0

PRESS. GAUGE BOARD TO BEINSTALLED NEAR ABH.

n an

A15A SUS PIPE

eM

.v

I

I

I

ALARM TO CONTROL ROOM

DELAYEDRANGED

1

BY YARD

V50

nn

25A

A

(120L/H t50)

AI

I

IFORREFERENCE

.Y

G13

0. It #8 Cut

AO_YIITnjCR

E OYU

IV52

IV56 V55*A

TO DRAIN TANK

E _-_L011 PRES~Q O_MPa ALARIAIR CONTROL UNIT

HIGH i LOW LEVEL PRESS. SWITCHF ~ I PS I

FLOW CONTROLLER

REGULA

N FILTER

HIGH i L9 PRESS

,

G2

r4~ ~I

IF _-_ HICHELOLEVEL _

I

g x

FCI 1

RIF3fA-LINE

(

INLET PRESS.0. 4-0 . 7MPa

I

V5wA%T

V4

.v

G

.v

65A

A40A

V3 NEEDLE VALVE

FLOW METER

WITH LOCKU

V56

V57

V34

N 25Ac

AIR D4 4

i I

F1

110K-15A

'

B-LINE

jg

'

AFC2

Y

I'

`

T

G3

BYJMTl ocvl

II B1f

I

V9V201 4 N4

vioI

04

5K -5A

-

PIPE FLUSHING

5Kr~5A

A

A

BY YARD

FL O. PULP UN I T

,~,

-1

I

PUMPn (IQEMESIO

I

V24

P1

F -'TI1 V22 ,

A

A40A

V2

OU I

V30

AUTOMATIC CHANGE OVERSYSTEM FOR PUMP

K-

COLLECTION UNITBY JUT

5K-15

TITLESIZE

MITSUBISHI HEAVY INDUSTRIES LTD.

Japan MarineTechnologies Ltd.

A

FROM L.0. SUPPLY LINE

CUSTOMER

DRAWKOBAYASHI

OntCEDY.TSUJIHASHI

APPROVED

it's F3ASR OREMDATEMAY. 04' 01

Na

1246/7/8/9

PIPING DIAGRAM FOR AIRGUARD 3ASR

W. NO. Z-A1-14854a