Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
Excellence i n Water Ma nage me nt 2008
National Award for Excellence in Wa ter Manageme nt 2008:CII
Sterlite Industries India Ltd- Silvassa
Excellence i n Water Ma nage me nt 2008
p A leading producer of ke y commodities
n Group turno ver FY 07 -08 $ 8.2 bn
p Listed on the London Stock
Exchange
p 30,000+ Employees
p US$ 2.2bn pipeline of bro wn –and greenfield projects
Copper
Aluminium
Zinc
Vedanta Alumina
(Alumina)
HZL(Zinc)
Balco(Aluminium)
Malco(Aluminium)
Sterlite(Copper)
KCM(Copper)
OVERVIEW STRUCTURE
Copper Zinc Aluminum Iron
Sesa Goa(Iron)
Iron
Excellence i n Water Ma nage me nt 2008
REFINERY CC ROD
ANODE
CATHODE
ELETRO REFI NING ROLLI NGCASTING
CC ROD COIL
Excellence i n Water Ma nage me nt 2008
PROJECTS WITH ZERO INVESTMENTS:
q Modification in Thermoshypon cooling water arrangement.
Savings : 4380 m3 : Rs. 1.4 Lacs.
q Condensate Re covery of RVD fo r Filter Pre ss Backwa shing.
Savings : 1284 m3 : Rs. 0.41Lacs
q Reu se of collected condensate water generated by anode casting cooling water.
Savings : 655 m3 : Rs. 0.21 Lacs
Excellence i n Water Ma nage me nt 2008
PROJECTS WITH INVESTMENTS:q Rain water harve sting.
Savings : Year - Water Sav ings
2005 - 4178 m3 (Rs. 1.25 Lacs)
2006 - 6225 m3 (Rs. 1.86 Lacs)
2007 - 9475 m3 (Rs. 2.84 Lacs)
2008 - 3560 m3 (Rs. 1.13 Lacs)
Total - 23438 m3 (Rs. 7.08 Lacs)
Investment : Rs. 10 Lacs
Payback Pe riod : 67 months
Excellence i n Water Ma nage me nt 2008
PROJECTS WITH INVESTMENTS:q Conv ersion of Gland Packing Pumps into Mechanical Seal
Savings : 1728 m3 Water (Rs. 0.55 Lacs)Investment : Rs. 3.0 Lacs
Payback Period : 65 months
q Prov ision of Electrolytic Cell cov ers in RefinerySavings : 3703 m3 Water (Rs. 1.18 Lacs)Investment : Rs. 1.0 Lacs
Payback Period : 14 months
q Control v alve prov ision in FO storage tank steam lineSavings : 1501 m3 Water (Rs. 0.5 Lacs)Investment : Rs. 0.98 Lacs
Payback Period : 24 months
q Installation of v acuum pump in Rotory Vaccum Drier Savings : 444 m3 Water (Rs. 0.41 Lacs)Investment : Rs. 0.48 Lac
Payback Period : 39 months
Excellence i n Water Ma nage me nt 2008
PROJECTS WITH INVESTMENTS:q Modification i n CSM for cathode washing
Savings : 1027 m3 Water (Rs. 0.34 Lacs)Investment : Rs. 0.49 Lacs
Payback Period : 17 months
q Special Nozzles for ASWM washingSavings : 148 m3 Water (Rs. 0.05 Lacs)Investment : Rs. 0.05 Lacs
Payback Period : 12 months
q Bosch tank renovationSavings : 375 m3 Water (Rs. 0.12 Lacs)Investment : Rs. 2.45 Lacs
Payback Period : 233 months
q Leaching process alteration for steam reductionSavings : 555 m3 Water (Rs. 0.186 Lacs)Investment : Rs. 0.9 Lacs
Payback Period : 58 months
Excellence i n Water Ma nage me nt 2008
WATER CONSERVATION PROJECTS - SUMMARY:
Total no of projects implemented = 13
ü Projects implemented without investments = 3
ü Projects implemented with investments = 10
Savings : 42015 m3 Water
Total Inv estments made : Rs 20.85 Lacs
Total Sav ings Ac hiev ed : Rs 13.05 Lacs
Excellence i n Water Ma nage me nt 2008
WATER SHARE - SILVASSA
58%
2%2%
18%
20%
RFNY CCRC CCRP PMP ACP
Excellence i n Water Ma nage me nt 2008
WATER CONSUMPTION (M3/MT)
Reduc tion in Specific Wa ter Consumption = 31.34 %
0.67
0.54 0.4 90.46
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
Sp. W
ater
Con
sum
ptio
n
2004-05 2005-06 2006-07 200 7-08
Fi sca l Ye a r
Excellence i n Water Ma nage me nt 2008
Waste Water Details : Industrial
10308
8260
5544 5300
0
2000
4000
6000
8000
10000
12000
Was
te G
ener
ated
( M
3 )
2004-05 2005-06 2006-07 2007-08
Fisca l Year
Excellence i n Water Ma nage me nt 2008
Waste Water Details : Domestic
7093 7054
5838 5808
0
10002000300040005000600070008000
Qua
ntity
Gen
erat
ed (M
3)
2004-05 2005-06 2006-07 2007-08
Fiscal Year
Excellence i n Water Ma nage me nt 2008
BENCHMARKING q Our ultimate objectiv e of our plant is to be 0.4 m3/MT of copper cathode.
q We are continuously committed towards natural resources conservation and water conserv ation is our prime f ocus. This we are achiev ing by TQM methodology , PEP and internal projects .
q To sustain as a ZERO discharge plant in copper industry .
ROAD MAP FOR THE FUTUREq Regular Water Audits & Identif ication of new projects.
q SPC techniques in Water Monitoring.
q Utilization of waste condensate water.
q Conv ersion of all gland seal pumps into mechanical seals.
q Exploring the possibility of Air Cooled heat exchangers in place of normal cooling towers.
Excellence i n Water Ma nage me nt 2008
KEY FACTOR FOR SUCESSFUL I MPLEMENTATIONTQM PROJECT 1: WATER CONSUMPTION REDUCTION
Problem Statement :
Reduction of water & steam in Cathode Stripping Machine from 10000 M3 to 7000 M3 per annum of cathode production.
Mission Statement :
Increase in washing effectiveness in CSM & thereby conservation of water & a saving of approx Rs 1.0 Lac per year.
Excellence i n Water Ma nage me nt 2008
TQM PROJECT 1: WATER CONSUMPTION REDUCTION
PUMP
High / low pressure
Leakages
NOZZLES
Less Maintenance
TANK
Leakages
Evaporation Losses
PIPELINES
leakages
improper angle Insuf fic ient
Number
choke-up
Tank overf low
HIGH STEAM CONSUMPTION
Improper lagging & cladding
Seepage to ground
No calibration of pressure gauge
Insuf f icient w idth
Cause And Effect Diagra m based on Brain Storming :
Excellence i n Water Ma nage me nt 2008
KEY FACTOR FOR SUCESSFUL I MPLEMENTATIONTQM PROJECT 1: WATER CONSUMPTION REDUCTION
q Overflow and leakages of tan k
q Evaporation losse s in CSM
q Cho ke-up of Nozzle s.
q High or low pressu re in wa shing line.
q Pump & Pipeline leakages
Formulation of Theories
Excellence i n Water Ma nage me nt 2008
KEY FACTOR FOR SUCESSFUL I MPLEMENTATIONTQM PROJECT 1: WATER CONSUMPTION REDUCTION
Reduc tion in Water Consumption : 4.7 % ( Rs. 0.34 Lacs )
835809.08
808.83
804.67
800.17
802
801.92
804845
751.75
819.83839.08
850
700
750
800
850
900
20 06-7 May-07 Jul-07 Sep-07 Nov-07 Jan-08 Mar-08
Month
Wat
er C
onsu
mpt
ion
(M3)
Af ter TQMBef ore TQM
Results & Benefits
Excellence i n Water Ma nage me nt 2008
KEY FACTOR FOR SUCESSFUL I MPLEMENTATIONTQM PROJE CT 2 : WATER CONSUMPTION REDUCTION IN ACP
Control v alv e prov ision in FO stora ge tank s team lineProble m Sta teme nt :
Reduction of steam for FO hea ting from 8 Tonnes/day to 4 Tonnes/day.
Missi on S tate me nt :
Effective utilisation of Steam for FO heating and there by a saving of Rs.50,000 per an num.
Me thodology of Imple mentati on :
§ Analytical study of Steam re quirement.
§ Installation of Steam Control Valve.
§ Continuous monitoring o f the s ystem and data analysis.
S team Readings in MT
8.1
5.64.1
4.2
3.644.1
3.6
7.9
0
2
4
6
8
10
Dec-07 Jan-08 Feb-08 Mar-08 A pr-08 May-08 Jun-08 Jul -08 Aug-08
Month 07-08
Be fore TQM Af te r TQM
Excellence i n Water Ma nage me nt 2008
APPROACHTOP D OW N APPR OACH
PEP M echanism
W ater Month
CSR Activities
Policy D ep lo yment
Continuou s Imp rovement
Daily Man ag ement
Employee & Communi ty Inv olvement
EDUCATIONSH AL A PR AV ESH MA HO TS AV :SH ALA PR AVE SH MA HO TS AV : we have sup por ted "Sh ala Pravesh Moho stav -20 07" under CS R i nit i ati ves at Vaso na Sch ool were 250 new st ude nts hav e t aken ad mi ssio n i n class 1 ( one) .
B OTT OM U P APPROACH CSR Activ ities
Excellence i n Water Ma nage me nt 2008
SUGGESTION CATEGORY
Process Improvement14%
Quality10%
COP Reduction18%
System Improvement17%
Wat er Conservation16% Safety Environment
25%
Excellence i n Water Ma nage me nt 2008
Water Month Celebration
q Celebrated Water Month on March 2008.
q Celebrated World Water Da y on March 22nd 2008.
q Each year carrie s a particular theme on WWD like…
2008 : Theme 2008: Sanita tion
2007 :
2006 : Water and Culture2005 : Water for Life2004 : Water and Di sa sters2003 : Water for the future etc….
q Organized various events related to water awarene ss.
Excellence i n Water Ma nage me nt 2008
WATER MONITORING & REPORTING SYSTEMS:
q Whole Plant is divided into 5 areas and Water Con sumption foreach plant is monitored and action plans taking according to it.
q Water norm s are fixed for all the equipments & any variation is alerted by DCS.
q Water audits being done internally by water champions and remedial actions immediately taken.
q Water report i s getting prepared by the Water Manager and is getting reviewed by the Head Operations in presence of Sectional Heads.
q The Water report con sists of Water Share, Specific Con sumption, Trend analysis, Internal & External Benchmarking, Concern s and Action plan for the next month.
Excellence i n Water Ma nage me nt 2008
KEY FACTOR FOR SUCESSFUL I MPLEMENTATIONLIST OF MAJOR ENVIRONMENT IMPROVEMENTSq Rain water harvesting in the plant. (10 Lacs)
q Zero Discharge Plant.
q Reduction in air pollution by introducing scrubbers. (3.5 Lacs)
q Installed Sewage Water Treatment facility. Treated water is being
used for gardening purpose. (2.5 Lacs)
q Installed air pre heater in the boiler to reduce fuel consumption.
(5.5 Lacs)
q Installed Acetylene Soot Collection System installed in CCR to
improve working Environment. (5.6 Lacs)
q Soil Correction Carried out in Refinery. (2.62 Lacs)q Installation of Air Ventilators in Refinery & CCR. (3.23 Lacs)
q Conversion of FO fired boiler into Biomass fuel fired furnace.
(11.4 Lacs )
Excellence i n Water Ma nage me nt 2008
KEY FACTOR FOR SUCESSFUL I MPLEMENTATIONAWARDS & CERTIFICATION
q ISO 9001,ISO 14001 and OHSAS 18001 Certified by DNV
qIEI Safety award by Gujarat State – 2007
qCII – Excellent Water Efficient Unit Award – 2007
qCII – Excellent Energy Efficient Unit Award – 2007
qIMEA-Platinum award for Metal Category by M/s Frost and Sullivan
qRBNQA- Commendation Certificate
qQualtech Innovation award – “Recovery of Nickel from Electrolyte Stream”
qCorporate award “ Creative Workplace ”- Sept 2008
qFirst prize for best Suggestor Award@INSSAN- July 2007
qSecond prize for best Suggestor Award@INSSAN- July 2007
qUnique employee involvement practices – INSSAN May 2007
qGolden Peacock National Training award for 2007