18
Copyright © Tendeka 2013. All rights reserved. [email protected] May 2013 Introduction to Step change improvements to established reservoir completion technology SPE Seminar : Inwell flow surveillance and control: new frontiers [email protected] October 2013

Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Embed Size (px)

Citation preview

Page 1: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

[email protected] May 2013

Introduction to

Step change improvements to

established reservoir

completion technology

SPE Seminar : Inwell flow

surveillance and control: new

frontiers

[email protected]

October 2013

Page 2: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

A Presentation of Two Technologies

• Inflow Control Devices

– Horizontal wells: permeability contrasts, fractures, frictional losses, thin oil columns, mobility variations

• Intelligent Completions

– Multiple horizons, horizontal wells: zonal heterogeneity, critical production management

Page 3: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Passive ICD System – viscosity “independent”

• Pressure drop a function of density and rate squared

Page 4: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Autonomous ICD – “A levitator” ??

• Bernoulli – “Sum of Static Pressure, Dynamic Pressure and Friction loss along a streamline is constant”

• Low viscosity - reduces friction pressure, causes high velocity thereby “sucking” the disc against the seat restricting flow

• High viscosity - increases friction pressure – pushing the disc away from the seat and thereby increasing flow

Page 5: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

0

5

10

15

20

25

30

35

40

0 0.5 1 1.5 2 2.5 3 3.5

Dif

fre

nti

al P

ress

ure

(b

ar)

Actual Flow Rate (m3/hour)

TR7 Characteristics - Oil, Gas and Water

Low viscosity -High DP !!

High viscosity - Low DP !!

Gas Control with Choked Flow !!

High viscosity - Valve is open

AICD – viscosity dependency in “reverse”

Page 6: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Performance Simulator – Oil to Gas

SPE 159634– Halvorsen et al.

Page 7: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Performance Simulator– Heavy Oil

Page 8: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Autonomous vs. Passive ICDs

Time to Breakthrough

Vis

cosity R

atio

Page 9: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Intelligent Completions – Cabled Systems

• Surface control systems

• Modified wellheads

• Control line flat packs

• Cable clamps

• Feedthrough packers

• Hydraulic ICV (n+1)

• Electrohydraulic ICV

(<=12)

9

• For

– High cost wells

– New fields

– Main bores

Courtesy SLB

Page 10: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Intelligent Completions – Wireless Systems

• Surface software

• Remote power

and control ICV

10

• For

– Mature fields

– Margin applications

– In laterals

– Liner deployment

– ERD

– Underbalanced

Page 11: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Wireless Applications

• Retrofit Intelligent Capability

• Marginal applications

Plug design - commingled production,

water shut-off

Straddle design – zonal control

Page 12: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Wireless Applications

• Branch monitoring and control

• Zonal lateral control

• Openhole or cased hole

Page 13: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Pressure Pulse Telemetry for Multi-phase Wells

Input Signal Received Pulse

Page 14: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Pressure Pulse Telegram

Page 15: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Wireless Power

• Independent power supply

• Low temperature applications

• Retrofit applications

• Well commissioning applications

HT Lithium batteries used as primary power supply

Page 16: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Wireless Power

• Each ICV has an independent

power supply

• Provides long service life in low

temperature applications

• Used for retrofit applications

where the batteries can be

replaced

• Used for high utilisation, well

commissioning applications

16

HT Rechargeable Lithium batteries

Page 17: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

ICDs with ICVs

• “Found to have the best well performance with maximum production and minimum water”

OTC 21910 – Lauritzen et al.

Page 18: Step change improvements to established reservoir ... · Intelligent Completions – Wireless Systems •Surface software •Remote power and control ICV 10 •For –Mature fields

Copyright © Tendeka 2013. All rights reserved.

Thank-you

Questions please