The application for approval to install / construct / alter a sewage management system process STEP 1 1. Complete the Request for a Sustainable Effluent Application Area form and submit it to Council (Note: this form must be completed by the property owner, fees in accordance with Councils fees and charges shall be paid at the time of lodgement) You are required to complete all parts of the request form You are required to attach a copy of the floor plan for the proposed /existing dwelling that the system is to service, including any additional connections (e.g. a toilet within a shed external to the dwelling). 2. Council will then supply you in writing with details regarding the sustainable effluent application area required for your premises based on the information that has been supplied to Council. The area provided by Council will include the sustainable effluent application area (to be installed) and a reserve area which shall be an additional area set aside for future use (this area does not need to be installed) STEP 2 Complete the Application for Approval to Install / Construct / Alter a Sewage Management System form and submit it to Council. Included with your application must be all information as detailed on the reverse side of the application form. You will be required at this stage to pay the appropriate fees in accordance with Councils Fees and Charges. ASSESSMENT OF YOUR APPLICATION 1. Council will assess your application and will either: Approve your application; or, Request additional information to support your application; or, Refuse your application. YOUR RESPONSIBILITY ONCE YOUR APPLICATION HAS BEEN APPROVED 1. As the owner and / or applicant for the approved system it is important to read your consent and ensure that you understand the conditions of your approval. 2. As the owner and / or applicant you are responsible for ensuring that all conditions of consent are complied with. This includes ensuring that the appropriate inspections are arranged during the installation process (as detailed in your conditions of consent) Do Your Part - Be Septic Smart For more information phone Camden Council on 4654 7777 ·Drainage ·Tank ·REAA ·Approval ·Drainage Tank INFORMATION

STEP 1 - camden.nsw.gov.au · The application for approval to install / construct / alter a sewage management system process STEP 1 1. Complete the Request for a Sustainable Effluent

  • Upload
    lamminh

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

The application for approval to install / construct / alter a sewage

management system process

STEP 1 1. CompletetheRequestforaSustainableEffluentApplicationAreaformandsubmititto Council(Note:thisformmustbecompletedbythepropertyowner,feesinaccordance withCouncilsfeesandchargesshallbepaidatthetimeoflodgement)

• Youarerequiredtocompleteallpartsoftherequestform

• Youarerequiredtoattachacopyofthefloorplanfortheproposed/existing dwellingthatthesystemistoservice,includinganyadditionalconnections (e.g.atoiletwithinashedexternaltothedwelling).

2. Councilwillthensupplyyouinwritingwithdetailsregardingthesustainableeffluent applicationarearequiredforyourpremisesbasedontheinformationthathas beensuppliedtoCouncil.

• TheareaprovidedbyCouncilwillincludethesustainableeffluentapplication area(tobeinstalled)andareserveareawhichshallbeanadditionalareaset asideforfutureuse(thisareadoesnotneedtobeinstalled)

STEP 2CompletetheApplicationforApprovaltoInstall/Construct/AlteraSewageManagementSystemformandsubmitittoCouncil.Includedwithyourapplicationmustbeallinformationasdetailedonthereversesideoftheapplicationform.YouwillberequiredatthisstagetopaytheappropriatefeesinaccordancewithCouncilsFeesandCharges.

ASSESSMENT OF YOUR APPLICATION1. Councilwillassessyourapplicationandwilleither: • Approveyourapplication;or, • Requestadditionalinformationtosupportyourapplication;or, • Refuseyourapplication.

YOUR RESPONSIBILITY ONCE YOUR APPLICATION HAS BEEN APPROVED 1. Astheownerand/orapplicantfortheapprovedsystemitisimportanttoread yourconsentandensurethatyouunderstandtheconditionsofyourapproval.

2. Astheownerand/orapplicantyouareresponsibleforensuringthatall conditionsofconsentarecompliedwith.Thisincludesensuringthatthe appropriateinspectionsarearrangedduringtheinstallationprocess(as detailedinyourconditionsofconsent)

Do Your Part - Be Septic Smart FormoreinformationphoneCamdenCouncilon4654 7777