Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
STEP 1Lay out the base stabilizers like this.
STEP 4Place the field bricks on top so they overlap the connectors like this.
Logo Logo
STEP 2Place connectors on the locations indicated.
STEP 3Lay out the remaining bricks so the field looks like this.
©2015 OYO Sports, Inc. All rights reserved.OYO Sportstoys, Inc. • 20 Main St. Acton MA, 01720
t 978.264.2000 • f 978.264.2024 CM-ISU-MIBGENFS1-G4
www.oyosports.com