Stemashan Construction Profile

Embed Size (px)

Citation preview

Page 1: Stemashan Construction Profile

Stemashan Construction

Civil Engineering ServicesProject Management

Programme ManagementGeneral Management

Plant & Logistics

Engineering Excellencethrough partnerships enhancing service

delivery

PROFILE

Storm Water Sanitation Roads Earthworks Housing

Page 2: Stemashan Construction Profile

General Information

STEMASHAN CONSTRUCTION was formed in 1995 after the founder Mr Stephen Bahula saw a major shortage of Construction firms from previously disadvantaged communities. The company has since grown significantly and is managed by highly multi-skilled professional team. Stemashan is a wholly “Black” owned and managed company and, is able to deliver projects on time and within budget. Our level 6CEPE CIDB grading attests to our capacity, efficiency and quality of work. In view of the level and status of company’s profile it has converted from a Close Corporation to and Pty Ltd entity in 2008.

Our vision is to provide excellent, cost effective services.

Our mission is to support the social, economic and infrastructure development requirements of our country. We aim to grow our capacity to be able to engage the challenges of building sustainable communities.

Page 3: Stemashan Construction Profile

General Information

OUR CLIENTS We are committed to and consider our client as first

priority. We believe that our Clients are key to our success and continued business innovation. It is for this reason that, we will continue to be advised by their needs and respond thereto by providing them with the very best service, in meeting their objectives within reasonable time, budget and quality.

EMPLOYEES It is our aim to provide a sound employment

opportunity to our employees, paying careful attention to the legal conditions of the country in which we operate, we further believe in the continuous development of our staff to full potential in response to the changing environment within which we operate.

CONTRACTOR’S DEVELOPMENT We transfer skills where needed during our

operational activities to potential sub-contractors in all construction activities where possible depending on the Client’s needs, without sacrificing quality and standards. We will advice the Client’s on outsourcing, such activities as and when required during project planning and implementation – with the full engagement of the Client directly, in pursuant of the above objective.

COMMUNITIES AND ENVIRONMENT Our company provides a safe environment at all

times during and after the completed operations. Where need arises, and within reach, we will advice on the mechanisms that will ensure that, the environment is restored to its original state- General and selective skill will be provided free, during operations, to enable them to operate and maintain the infrastructure provided.

In general, the firm provides a platform for needy student(s) of all races with a particular emphasis to previously disadvantaged groupings, by providing them with the following: Bursaries and loans scheme for higher

education needs Practical experience in the engineering fields. Ensuring Local Economic Benefit.

Page 4: Stemashan Construction Profile

General Information

BUSINESS APPROACH AND PHILOSOPHY We are fully aware that projects do not only

consist of an engineering component, but that financial - social and environmental, issues play a major role during planning and implementation stage.

Therefore, we adopt a holistic approach towards projects, incorporating the following:

Suggest alternative construction methods where practically possible within Client’s economic affordability

Formulating alternative solutions in terms of affordable standards for the project.

Project monitoring at all times with our qualified personnel to ensure product conformity to applicable standard.

COMMUNITY DEVELOPMENT AND INVOLVEMENT The firm has over the years gained valuable

experience in the implementation of projects with maximum community involvement.

The implementation of the projects supports the objective of economic and upliftment of the communities through the following:

Maximum employment creation Provision of skills training where required Full community participation through their appointed

representatives Maximum social and economic upliftment of the

local communities

LABOUR – INTENSIVE CONSTRUCTION The company has been involved in various projects

with maximum use of local labour resulting in Local Economic Benefit.

Page 5: Stemashan Construction Profile

Company StructureMD:

MR. STEPHEN BAHULA

TECHNICAL MANAGER:MR. ELVIS

NALEDZANE

TECHNICAL:MR. LUDICK

LEGONG

TECHNICAL:MR. KOMANE

MATHEBE

OFFICE MANAGER/ Accounts:

MS. BEVERLY SIBANYONI

PROCUREMENT/ HR MANAGER:MR. ROBERT

MATSEKE

OPERATIONAL MANAGER:

MR. MICHAEL LESHIKA

SITE MANAGER: MR. ISAAC DUMELA

SITE SAFETY MANAGER:

MR. COLBERT MASHABA

FOREMAN:MR. RICHARD

THOFU

FOREMAN:MR. EDWIN

MUTSHINYALO

RECEPTIONIST:MS. MATILDA

KGATLE

BUSINESS DEVELOPMENT

MANAGER:MR. TSHAMANO NENGOVHELA

HEALTH & SAFETY:

MR. MOSSES RINGANE

Quantity Survey

Projects & Coordination

LawrenceSamson

Page 6: Stemashan Construction Profile

Scope of Experience

Since its inception, the company has gained experience in various projects and subsequently grown into a fully-fledged construction company capable of handling all projects of varying sizes, discipline and value.

Stemashan Construction has provided project management services Gauteng, Kwazulu Natal, Freestate, North West Province and Mpumalanga focusing on infrastucture services to previously disadvantaged communities. The company works in close association with highly qualified engineers, quantity surveyors and designers.

The company participates in the prestigious MIG Programme of government.

The company enjoys the support of many esteemed civil engineering consulting companies. It draws on the expertise of the relevant professionals to ensure that the crucial elements of quantities and costs relating to quality are meticulously undertaken to guarantee on time – within budget services.

Project Management Services Project management, including project management of multidisciplinary projects. Procurement & contract documentation. Cost engineering and estimating. Construction management and site supervision. Quality assurance management. Contract administration. Programming, scheduling and time-control management. Engineering quantity surveying services and cost control.

Page 7: Stemashan Construction Profile

Statutory Compliances

Registration Number

Company Registration :2008/008432/07 VAT Registration Number :4490154509 Workman’s Compensation :0966-575-0500 Unemployment Insurance Fund :U620741522 PAYE :7620741522 SDL :L620741522 Construction Industry Development Board :103891 (6CE PE) National Home Builders Registration Council :3212

Page 8: Stemashan Construction Profile

Storm WaterEkhuruleni Metro

Stemashan Construction is active in township infrastructure and related municipal service initiatives. It is experienced in the design and implementation of projects utilising labour intensive methods.

•The company successfully completed the construction of concrete storm water channels for Ekhuruleni Metropolitan Council (formerly Eastern District Council)

Page 9: Stemashan Construction Profile

Water Reticulation & SanitationKgetleng Local Municipality (Koster)Moses Kotane Municipality & Kanana

Stemashan Construction participates in the provision of acceptable forms of ablution facilities to households through the Bucket Eradication Programme of Government. The company engages service providers and suppliers who are solutions based towards “closing the sanitation loop”, with eco-friendly and sustainable products.

VIP (Ventilated Improved Pit) toilets are constructed for the Rustenburg Local Municipality in the Kanana and Koster Districts. We have installed 4000 and 100 VIP’s respectively.

Water borne ablution facilities were built.

Sanitation and Water reticulation work was also successfully undertaken by the company.

Page 10: Stemashan Construction Profile

Roads Victor Khanye MunicipalityWestern Area Municipality

•Stemashan Construction is involved in the provision of infrastructure services for previously disadvantaged communities. The company successfully completed the supply of roads for Victor Khanye and Western Area Municipalities. One of our prestigious clients is the Joburg Roads Agency.

•Road construction using labour-intensive methods, creating employment through liaison with communities and the emerging contractor sector.

•Road improvements (conversion of gravel to tar roads) to increase capacity and safety of existing facilities, as well as routine road

maintenance services. Mamelodi

The Taxi is the primary mode of transport for millions of South Africans. Inclement weather often makes waiting for a taxi uncomfortable. Stemashan Construction has upgraded the Denneboom taxi rank.

Page 11: Stemashan Construction Profile

Roads UGU District Municipality KZN

One of the major challenges facing KZN is the large concentration of population in peri-urban districts. One of these is Port Shepstone which has a large population with a lack of road infrastructure supporting it’s peri-urban districts. Stemashan has participated rehabilitation of the Node Access Road for the UGU District Municipality. Stemashan Construction is able to undertake upgrading projects relating to new roads construction, and gravel to concrete or black top surface road rehabilitation.

Having made an entry in to the KZN Province, the company hopes to entrench it’s presence here so as to fast track service delivery to the local municipalities and districts.

Page 12: Stemashan Construction Profile

Water Pipelines & Pump Stations Victor Khanye Municipality

One of the biggest challenges facing communities is access to clean running water. Settlements for Previously Disadvantaged communities are characterised by low levels of bulk services. Stemashan Construction has the capacity for large water projects which contributes towards addressing the water and sanitation needs of poor communities.

Pipeline Project for Victor Khanye Municipality

Pump Station for Victor Khanye Municipality

Page 13: Stemashan Construction Profile

Residential & Commercial BuildingsOur government’s biggest challenge is the provision of housing for poor communities. The huge housing backlog requires the concerted efforts of all roleplayers and stakeholders.

Stemashan Construction is experienced and is involved in the construction of bonded, rental and RDP housing.

The company is also involved in commercial projects:

Upgrading of campus Tshwane North College in Mamelodi

Building of chalets in Piet Retief (retention of aesthetic features in view of local surroundings)

Building a community centre in Piet Retief

Page 14: Stemashan Construction Profile

Plant & Machinery

Over the years Stemashan Construction has acquired an array of plant, machinery and vehicles to execute projects on-time and within-budget.

All plant, machinery and vehicles are maintained and kept in readiness for projects that my arise. The company also hires plant and machinery to other smaller companies.

Page 15: Stemashan Construction Profile

Offices

Head OfficesGautengTel.: - 087 808 3819

Fax: - 012-804 6134

[email protected]

646 PRESIDENT STREET

SILVERTON 0127

POSTNET SUIT 92

PRIVATE BAG X 592

SILVERTON 0127

Kwazulu NatalGateway Autocity2 Jubilee GroveUmhlanga RocksDurbanPostal Address16 Erythrina AvenueCroftdeneChatsworth4092

Page 16: Stemashan Construction Profile

Completed Projects

YEAR DESCRIPTION CLIENT CONSULTING ENGINEERS VALUE DURATION

1999 Taxi Rank City of TshwaneV & V Consulting Eng.

(012) 323 9351230 000.00 2 Months

2000 Water SupplyEastern District

CouncilEyethu Engineers(012) 717 6296 2 000 000.00

6 Months

2000Rehabilitation of

StormwaterMogalakwena

MunicipalityDombo & Du Plessis

(015) 491 36151 500 000.00 5 Months

2001Upgrading of

Sports Facility

Nkangala District Municipality

SCIP Pty Ltd(013) 656 3615

700 000.00 2 Months

2002Rehabilitation of

RoadsMpumalanga

Provincial GovtMathaka Engineers

(012) 803 33982 500 000.00 6 Months

2003 Tarring of RoadsDelmas Municipal

CouncilMathaka Engineers

(012) 803 33982 500 000.00 3 Months

2004Rehabilitation of

RoadsCity of Tshwane Roads & Transport Dept. 24 000 000.00 24 Months

2004Rehabilitation of

GulliesCity of Tshwane GVM Inc. (012) 549 0422 1 600 000.00 3 Months

2005Water Supply

FlinksdriftMoretele Minicipality

Thebe-Lerumo Project Managers 073 4625469

1 600 000.00 4 Months

2006Water/Sewer

ReticulationMoretele Municipality

Mkgalakwena Projects 083 301 5992

6 000 000.00 7 Months

2007Sewer

RehabilitationKungwini Municipality

Tshwane Consulting (012) 349 1389

1 800 000.00 3 Months

2008Upgrading of roads

in simunyeWestonaria

Municipality

Pro-plan Consulting(011) 954 4441

Mr. Botha6 200 000.00 8 Months

Page 17: Stemashan Construction Profile

Recently Completed & Current projects

2008

Construction of Link Roads,Bridge and

Beautification

Gauteng ProvincialGovernment

Skip consulting engineers(011) 888 1425Mr. K Booysen

32 194 013.90 6 months

2008

Ekhuruleni: design, upgrading

& constriction ofgravel roads

(2010 & special projects)

Ekhuruleni Metropolitan municipality

Tau Pride Projects(011) 465 1530

Mr. Cyril20 000 000.00 12 months

2009Reagile water &

sanitation

Moses Kotane Local

Municipality- 15 344 771.77 8 months

2009

Upgrading from gravel to tar of internal streets

inZithibeni

Kungwini Local Municipality

Manes Consulting (013) 656 3826PS Thokwane

3 358 116.83 4 Months

2010 VIP ToiletsKanana

Rustenburg24 000 000 6 months

2010Upgrading of

RoadsDiepsloot Bigen Africa 6 000 000 2 months