Aker Cool Sorption A/S 2008 Aker SolutionsSmedeland 6, DK-2600 Glostrup, DenmarkTel +45 (0) 4345 4745 Fax +45 (0) 4343 0090 www.akersolutions.comRegistered No. 87980014 Registered in Denmark Registered office: Smedeland 6, DK-2600 Glostrup
Company: Date: 08.02.2013
Attention: Telefax no/ E-
mail adr.
Copy: T Valbjoern, M Frederick, M Breum
From: Aker Cool Sorption A/S Ref. no.: 2012147/188
Subject: RFQ for-2012147 Tot. pages: 4
Request for Quote
2012xxx VRU Saudi Aramco
1. Introduction .......................................................................... 2
2. Scope Of WORK ..................................................................... 2
3. Documentation ...................................................................... 4
4. Delivery time/ period ............................................................. 65. Price ...................................................................................... 6
6. Terms and Conditions ............................................................ 6
7. Payment ................................................................................ 6
8. Validity .................................................................................. 6
9. Assumptions/ exclusions ........................................................ 6
10. Bid due date .......................................................................... 6
11. Attachment ........................................................................... 6
12. Contact person(s) ................................................................... 7
7/28/2019 Steel Vessel
2/7
1. Introduction
You are hereby invited to quote for the Vapour Recovery projects fabrication packages destined to be installed
at Saudi Aramco Jazan site Vessels, Steelworks, Piping and mechanical assembly.
2. Scope of WORK
Bidder is kindly requested to supply individual pricing for elements 1 through 37 commensurate with Saudi
Aramco standards & specifications. Any deviations, exceptions or omissions should be highlighted individually
per Item Number in the form of easily understandable list.
The Bidder/Supplier shall indicate by email their interest to bid & confirm they have the available man power &
shop capacity to carry out the work. Within this email they will state an estimated fabrication schedule for each
unit & the whole package.
We, Aker Solutions, reserve the right to visit your establishment & carry out QA/QC inspection prior to formal
award of contract. This will be arranged at the convenience of both parties.
Operating pressures, design pressures of vessels & pipe work can be found within the Document package.
The design will handle Hydrocarbon vapours emitted from sources such as Tank Breathing & filling, ship loadings,
truck loading.
7/28/2019 Steel Vessel
3/7
Item Description Reference
pack/drwgs
Notes Standards Price USD
1 Carbon Steel vessels as per
document pack for TS7500
model including anchor bolts
U-0114 ASME Stamped 32-SAMSS-004, 32-SAMSS-031,
32-SAMSS-036, SAES-A-004,
SAES-A-007
2 Process Pipe work, Class 150,
1CC1P
U-0114 Hot Dipped
Galvanised
01-SAMSS-017, 12-SAMSS-007,
12-SAMSS-005, SAES-L-105,
SAES-L-136, SAES-L-132, SAES-
L-109, SAES-L-133
3 Structural Steel, platforms,
ladders, pipe supports &
fasteners in Hot dipped
Galvanised including anchor
bolts
U-0114 Hot Dipped
Galvanised
12-SAMSS-007
4 Calculation, documentation-
ITP, TPI, NMR, testing,
fabrication, painting according
to Aramco standards
U-0114 NMR-7919-1, NMR-7927,
SAEP-352, SAES-A-112,SAES-A-
206,SAES-H-001, SAES-A-206,
SAEP-122
5 Pre-assembly & inspection at
bidders site with
instrumentation
U-0114
6 Packing/shipping to Jazan job
site
U-0114
7 Option-short term storage &
preservation techniques
U-0114 Assume 6
months
8 Carbon Steel vessels as per
document pack for TS4500
model including anchor bolts
U-0401 ASME Stamped 32-SAMSS-004, 32-SAMSS-031,
32-SAMSS-036
9 Process Pipe work, Class 150,
1CC1P
U-0401 Hot Dipped
Galvanised
01-SAMSS-017, 12-SAMSS-007,
12-SAMSS-005, SAES-L-105,
SAES-L-136, SAES-L-132, SAES-
L-109, SAES-L-133
10 Structural Steel, platforms,
ladders, pipe supports &
fasteners in Hot dipped
Galvanised including anchor
bolts
U-0401 Hot Dipped
Galvanised
12-SAMSS-007
11 Calculation, documentation-
ITP, TPI, NMR, testing,
fabrication, painting according
to Aramco standards
U-0401 NMR-7919-1, NMR-7927,
SAEP-352, SAES-A-112,SAES-A-
206,SAES-H-001, SAES-A-206,
SAEP-122
12 Pre-assembly & inspection at
bidders site with
instrumentation
U-0401
13 Packing/shipping to Jazan job
site
U-0401
14 Option-short term storage &
preservation techniques
U-0401 Assume 6
months
15 Carbon Steel vessels as per
document pack for TS2500
model including anchor bolts
U-0241 ASME Stamped 32-SAMSS-004, 32-SAMSS-031,
32-SAMSS-036
16 Process Pipe work, Class 150,
1CC1P
U-0241 Hot Dipped
Galvanised
01-SAMSS-017, 12-SAMSS-007,
12-SAMSS-005, SAES-L-105,SAES-L-136, SAES-L-132, SAES-
L-109, SAES-L-133
7/28/2019 Steel Vessel
4/7
Item Description Reference
pack/drwgs
Notes Standards Price USD
17 Structural Steel, platforms,
ladders, pipe supports &
fasteners in Hot dipped
Galvanised including anchor
bolts
U-0241 Hot Dipped
Galvanised
12-SAMSS-007
18 Calculation, documentation-
ITP, TPI, NMR, testing,
fabrication, painting according
to Aramco standards
U-0241 NMR-7919-1, NMR-7927,
SAEP-352, SAES-A-112,SAES-A-
206,SAES-H-001, SAES-A-206,
SAEP-122
19 Pre-assembly & inspection at
bidders site with
instrumentation
U-0241
20 Packing/shipping to Jazan jobsite
U-0241
21 Option-short term storage &
preservation techniques
U-0241 Assume 6
months
22 Carbon Steel vessels as per
document pack for DS850
model including anchor bolts
U-0901 ASME Stamped 32-SAMSS-004, 32-SAMSS-031,
32-SAMSS-036
23 Process Pipe work, Class 150,
1CC2P
U-0901 Hot Dipped
Galvanised
01-SAMSS-017, 12-SAMSS-007,
12-SAMSS-005, SAES-L-105,
SAES-L-136, SAES-L-132, SAES-
L-109, SAES-L-133
24 Structural Steel, platforms,
ladders, pipe supports &
fasteners in Hot dippedGalvanised including anchor
bolts
U-0901 Hot Dipped
Galvanised
12-SAMSS-007
25 Calculation, documentation-
ITP, TPI, NMR, testing,
fabrication, painting according
to Aramco standards
U-0901 NMR-7919-1, NMR-7927,
SAEP-352, SAES-A-112,SAES-A-
206,SAES-H-001, SAES-A-206,
SAEP-122
26 Pre-assembly & inspection at
bidders site with
instrumentation
U-0901
27 Packing/shipping to Jazan job
site
U-0901
28 Option-short term storage &preservation techniques U-0901 Assume 6months
7/28/2019 Steel Vessel
5/7
Item Description Reference
pack/drwgs
Notes Standards Price USD
29 Carbon Steel vessels as per
document pack for DS850model including anchor bolts
U-0121 ASME Stamped 32-SAMSS-004, 32-SAMSS-031,
32-SAMSS-036
30 Process Pipe work, Class 150,
1CC1P
U-0121 Hot Dipped
Galvanised
01-SAMSS-017, 12-SAMSS-007,
12-SAMSS-005, SAES-L-105,
SAES-L-136, SAES-L-132, SAES-
L-109, SAES-L-133
31 Structural Steel, platforms,
ladders, pipe supports &
fasteners in Hot dipped
Galvanised including anchor
bolts
U-0121 Hot Dipped
Galvanised
12-SAMSS-007
32 Calculation, documentation-
ITP, TPI, NMR, testing,
fabrication, painting according
to Aramco standards
U-0121 NMR-7919-1, NMR-7927,
SAEP-352, SAES-A-112,SAES-A-
206,SAES-H-001, SAES-A-206,
SAEP-122
33 Pre-assembly & inspection at
bidders site with
instrumentation
U-0121
34 Packing/shipping to Jazan job
site
U-0121
35 Option-short term storage &
preservation techniques
U-0121 Assume 6
months
36 Spreader beams, slings &
shackles suitable for lifting &
loading items/skids on to
transport
All packages,
per package
37 Gaskets, bolts, nuts, washers &
spare %
All packages,
per package
As per Std
Aramco
requirements
Notes:
1. Please ensure that you design & fabricate in accordance with the Meteorological Conditions shown in SAES-A-1122. Vessels are to be ASME Stamped
7/28/2019 Steel Vessel
6/7
3. Documentation
According to Saudi Aramco requirements
4. Delivery time/ period
TBC- please provide estimated on current work shop capacity.
5. Price
Please quote your best price based on the above described scope and the below mentioned Terms and
Conditions. You are requested to provide prices, on the total scope of work. Please divide your offer into the
sections detailed above. Where you feel that information is insufficient for accurate quotation then please
supply a unit rate price (for example per metre of cable tray including parts, installation, drawings)
6. Terms and Conditions
General Conditions for fabrication, shall apply for this RFQ. Copy is attached.
7. Payment
Terms & conditions TBC, bidder to supply their standard T&Cs with bid
8. Validity
We kindly ask you to make the quotation valid for 60 days as a minimum
9. Assumptions/ exclusions
If there are any specific assumptions/exclusions that are valid for your quotation please state specifically.
10. Bid due date
Please submit your Quote, including preliminary time schedule, latest 24th
February 2013. Please confirm within
2 working days if you intend to quote to my email:
[email protected]@akersolutions.com
11. Attachments
1. U-0241 Document Package-zipped
2. U-0121 Document Package-zipped
3. U-0901 Document Package-zipped
4. U-0401 Document Package-zipped
5. U-0114 Document Package-zipped
6. General Conditions for major purchases of goods.pdf
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]7/28/2019 Steel Vessel
7/7
12. Contact person(s)
For technical questions please contact:
Tender Manager:
Mike Frederick
Mobile: +45 29 99 86 33
e-mail:[email protected]
skype: asd.mf
We are looking forward to receive your best quotation!
Mike Frederick
Area Sales Manager
AkerSolutions
Mob:[email protected] | www.akersolutions.com
AkerCoolSorption ASSmedeland6,DK-2600,Glostrup,DenmarkRegistered in Denmark, registration no. DK 87980014 VAT
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]://www.akersolutions.com/http://www.akersolutions.com/http://www.akersolutions.com/mailto:[email protected]:[email protected]