    Request for Quote

    2012xxx VRU Saudi Aramco

    1. Introduction .......................................................................... 2

    2. Scope Of WORK ..................................................................... 2

    3. Documentation ...................................................................... 4

    4. Delivery time/ period ............................................................. 65. Price ...................................................................................... 6

    6. Terms and Conditions ............................................................ 6

    7. Payment ................................................................................ 6

    8. Validity .................................................................................. 6

    9. Assumptions/ exclusions ........................................................ 6

    10. Bid due date .......................................................................... 6

    11. Attachment ........................................................................... 6

    12. Contact person(s) ................................................................... 7

  • 7/28/2019 Steel Vessel

    2/7

    1. Introduction

    You are hereby invited to quote for the Vapour Recovery projects fabrication packages destined to be installed

    at Saudi Aramco Jazan site Vessels, Steelworks, Piping and mechanical assembly.

    2. Scope of WORK

    Bidder is kindly requested to supply individual pricing for elements 1 through 37 commensurate with Saudi

    Aramco standards & specifications. Any deviations, exceptions or omissions should be highlighted individually

    per Item Number in the form of easily understandable list.

    The Bidder/Supplier shall indicate by email their interest to bid & confirm they have the available man power &

    shop capacity to carry out the work. Within this email they will state an estimated fabrication schedule for each

    unit & the whole package.

    We, Aker Solutions, reserve the right to visit your establishment & carry out QA/QC inspection prior to formal

    award of contract. This will be arranged at the convenience of both parties.

    Operating pressures, design pressures of vessels & pipe work can be found within the Document package.

    The design will handle Hydrocarbon vapours emitted from sources such as Tank Breathing & filling, ship loadings,

    truck loading.

  • 7/28/2019 Steel Vessel

    3/7

    Item Description Reference

    pack/drwgs

    Notes Standards Price USD

    1 Carbon Steel vessels as per

    document pack for TS7500

    model including anchor bolts

    U-0114 ASME Stamped 32-SAMSS-004, 32-SAMSS-031,

    32-SAMSS-036, SAES-A-004,

    SAES-A-007

    2 Process Pipe work, Class 150,

    1CC1P

    U-0114 Hot Dipped

    Galvanised

    01-SAMSS-017, 12-SAMSS-007,

    12-SAMSS-005, SAES-L-105,

    SAES-L-136, SAES-L-132, SAES-

    L-109, SAES-L-133

    3 Structural Steel, platforms,

    ladders, pipe supports &

    fasteners in Hot dipped

    Galvanised including anchor

    bolts

    U-0114 Hot Dipped

    Galvanised

    12-SAMSS-007

    4 Calculation, documentation-

    ITP, TPI, NMR, testing,

    fabrication, painting according

    to Aramco standards

    U-0114 NMR-7919-1, NMR-7927,

    SAEP-352, SAES-A-112,SAES-A-

    206,SAES-H-001, SAES-A-206,

    SAEP-122

    5 Pre-assembly & inspection at

    bidders site with

    instrumentation

    U-0114

    6 Packing/shipping to Jazan job

    site

    U-0114

    7 Option-short term storage &

    preservation techniques

    U-0114 Assume 6

    months

    8 Carbon Steel vessels as per

    document pack for TS4500

    model including anchor bolts

    U-0401 ASME Stamped 32-SAMSS-004, 32-SAMSS-031,

    32-SAMSS-036

    9 Process Pipe work, Class 150,

    1CC1P

    U-0401 Hot Dipped

    Galvanised

    01-SAMSS-017, 12-SAMSS-007,

    12-SAMSS-005, SAES-L-105,

    SAES-L-136, SAES-L-132, SAES-

    L-109, SAES-L-133

    10 Structural Steel, platforms,

    ladders, pipe supports &

    fasteners in Hot dipped

    Galvanised including anchor

    bolts

    U-0401 Hot Dipped

    Galvanised

    12-SAMSS-007

    11 Calculation, documentation-

    ITP, TPI, NMR, testing,

    fabrication, painting according

    to Aramco standards

    U-0401 NMR-7919-1, NMR-7927,

    SAEP-352, SAES-A-112,SAES-A-

    206,SAES-H-001, SAES-A-206,

    SAEP-122

    12 Pre-assembly & inspection at

    bidders site with

    instrumentation

    U-0401

    13 Packing/shipping to Jazan job

    site

    U-0401

    14 Option-short term storage &

    preservation techniques

    U-0401 Assume 6

    months

    15 Carbon Steel vessels as per

    document pack for TS2500

    model including anchor bolts

    U-0241 ASME Stamped 32-SAMSS-004, 32-SAMSS-031,

    32-SAMSS-036

    16 Process Pipe work, Class 150,

    1CC1P

    U-0241 Hot Dipped

    Galvanised

    01-SAMSS-017, 12-SAMSS-007,

    12-SAMSS-005, SAES-L-105,SAES-L-136, SAES-L-132, SAES-

    L-109, SAES-L-133

  • 7/28/2019 Steel Vessel

    4/7

    Item Description Reference

    pack/drwgs

    Notes Standards Price USD

    17 Structural Steel, platforms,

    ladders, pipe supports &

    fasteners in Hot dipped

    Galvanised including anchor

    bolts

    U-0241 Hot Dipped

    Galvanised

    12-SAMSS-007

    18 Calculation, documentation-

    ITP, TPI, NMR, testing,

    fabrication, painting according

    to Aramco standards

    U-0241 NMR-7919-1, NMR-7927,

    SAEP-352, SAES-A-112,SAES-A-

    206,SAES-H-001, SAES-A-206,

    SAEP-122

    19 Pre-assembly & inspection at

    bidders site with

    instrumentation

    U-0241

    20 Packing/shipping to Jazan jobsite

    U-0241

    21 Option-short term storage &

    preservation techniques

    U-0241 Assume 6

    months

    22 Carbon Steel vessels as per

    document pack for DS850

    model including anchor bolts

    U-0901 ASME Stamped 32-SAMSS-004, 32-SAMSS-031,

    32-SAMSS-036

    23 Process Pipe work, Class 150,

    1CC2P

    U-0901 Hot Dipped

    Galvanised

    01-SAMSS-017, 12-SAMSS-007,

    12-SAMSS-005, SAES-L-105,

    SAES-L-136, SAES-L-132, SAES-

    L-109, SAES-L-133

    24 Structural Steel, platforms,

    ladders, pipe supports &

    fasteners in Hot dippedGalvanised including anchor

    bolts

    U-0901 Hot Dipped

    Galvanised

    12-SAMSS-007

    25 Calculation, documentation-

    ITP, TPI, NMR, testing,

    fabrication, painting according

    to Aramco standards

    U-0901 NMR-7919-1, NMR-7927,

    SAEP-352, SAES-A-112,SAES-A-

    206,SAES-H-001, SAES-A-206,

    SAEP-122

    26 Pre-assembly & inspection at

    bidders site with

    instrumentation

    U-0901

    27 Packing/shipping to Jazan job

    site

    U-0901

    28 Option-short term storage &preservation techniques U-0901 Assume 6months

  • 7/28/2019 Steel Vessel

    5/7

    Item Description Reference

    pack/drwgs

    Notes Standards Price USD

    29 Carbon Steel vessels as per

    document pack for DS850model including anchor bolts

    U-0121 ASME Stamped 32-SAMSS-004, 32-SAMSS-031,

    32-SAMSS-036

    30 Process Pipe work, Class 150,

    1CC1P

    U-0121 Hot Dipped

    Galvanised

    01-SAMSS-017, 12-SAMSS-007,

    12-SAMSS-005, SAES-L-105,

    SAES-L-136, SAES-L-132, SAES-

    L-109, SAES-L-133

    31 Structural Steel, platforms,

    ladders, pipe supports &

    fasteners in Hot dipped

    Galvanised including anchor

    bolts

    U-0121 Hot Dipped

    Galvanised

    12-SAMSS-007

    32 Calculation, documentation-

    ITP, TPI, NMR, testing,

    fabrication, painting according

    to Aramco standards

    U-0121 NMR-7919-1, NMR-7927,

    SAEP-352, SAES-A-112,SAES-A-

    206,SAES-H-001, SAES-A-206,

    SAEP-122

    33 Pre-assembly & inspection at

    bidders site with

    instrumentation

    U-0121

    34 Packing/shipping to Jazan job

    site

    U-0121

    35 Option-short term storage &

    preservation techniques

    U-0121 Assume 6

    months

    36 Spreader beams, slings &

    shackles suitable for lifting &

    loading items/skids on to

    transport

    All packages,

    per package

    37 Gaskets, bolts, nuts, washers &

    spare %

    All packages,

    per package

    As per Std

    Aramco

    requirements

    Notes:

    1. Please ensure that you design & fabricate in accordance with the Meteorological Conditions shown in SAES-A-1122. Vessels are to be ASME Stamped

  • 7/28/2019 Steel Vessel

    6/7

    3. Documentation

    According to Saudi Aramco requirements

    4. Delivery time/ period

    TBC- please provide estimated on current work shop capacity.

    5. Price

    Please quote your best price based on the above described scope and the below mentioned Terms and

    Conditions. You are requested to provide prices, on the total scope of work. Please divide your offer into the

    sections detailed above. Where you feel that information is insufficient for accurate quotation then please

    supply a unit rate price (for example per metre of cable tray including parts, installation, drawings)

    6. Terms and Conditions

    General Conditions for fabrication, shall apply for this RFQ. Copy is attached.

    7. Payment

    Terms & conditions TBC, bidder to supply their standard T&Cs with bid

    8. Validity

    We kindly ask you to make the quotation valid for 60 days as a minimum

    9. Assumptions/ exclusions

    If there are any specific assumptions/exclusions that are valid for your quotation please state specifically.

    10. Bid due date

    Please submit your Quote, including preliminary time schedule, latest 24th

    February 2013. Please confirm within

    2 working days if you intend to quote to my email:

    [email protected]@akersolutions.com

    11. Attachments

    1. U-0241 Document Package-zipped

    2. U-0121 Document Package-zipped

    3. U-0901 Document Package-zipped

    4. U-0401 Document Package-zipped

    5. U-0114 Document Package-zipped

    6. General Conditions for major purchases of goods.pdf

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • 7/28/2019 Steel Vessel

    7/7

    12. Contact person(s)

    For technical questions please contact:

    Tender Manager:

    Mike Frederick

    Mobile: +45 29 99 86 33

    e-mail:[email protected]

    skype: asd.mf

    We are looking forward to receive your best quotation!

    Mike Frederick

    Area Sales Manager

    AkerSolutions

    Mob:[email protected] | www.akersolutions.com

    AkerCoolSorption ASSmedeland6,DK-2600,Glostrup,DenmarkRegistered in Denmark, registration no. DK 87980014 VAT

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]://www.akersolutions.com/http://www.akersolutions.com/http://www.akersolutions.com/mailto:[email protected]:[email protected]