4
Sustainable Transport Ann Cunningham: Head of Traffic Management Sustainable Transport Level 5 Alexandra House 10 Station Road, Wood Green London N22 7TR 020 8489 1000 www.haringey.gov.uk Statutory Notification Northumberland Park Development Project (NDP) Phase 2 Highway Improvements Dear Resident or Business, Northumberland Park Development Project (NDP) Phase 1 was completed in 2013 and included construction of the Sainsbury’s superstore. Phase 2 includes construction of the new stadium and Phase 3 consists of proposals for homes, shops, and a hotel. Haringey’s responsibilities include measures designed to manage the likely impact of the new development on roads and traffic. Proposed highway improvements under the current Phase 2 of NDP are set out below and illustrated on the attached plans. Full details and plans are also on the website at www.haringey.gov.uk/road safety consultations. The proposals include: Bus priority measures in Northumberland Park, Willoughby Lane and Lansdowne Road, Road resurfacing, and converting existing on-street parking to ‘two-wheels up’ footway parking. Installing junction tables, crossing points, improved street lighting and footway repaving on Park Lane. Extending the Cycle Superhighway from its current planned termination point through to Northumberland Park Station. Work also includes converting speed cushions to sinusoidal speed humps, road resurfacing, street lighting improvements and provision of cycle stands. Converting the zebra crossing on Willoughby Lane, near its junction with Park Lane, to a ‘green man’ crossing. Re-phasing the High Road / Park Lane traffic signals, repositioning an existing zebra crossing, and installing a new ‘green man’ pedestrian crossing on the High Road. This will help improve the pedestrian route to the stadium. We welcome your views and comments on the proposals using the enclosed Freepost feedback card. For questions about the scheme please contact our Project Engineer Ojean Noorollahi on 0208 489 8301 or email [email protected] The closing date for receipt of comments is 26 February 2016. We look forward to hearing from you. Yours faithfully Sustainable Transport: Highways Engineering 29 January 2016

Statutory Notification Northumberland Park Development ... · Northumberland Park Development Project (NDP) Phase 2 Highway Improvements Dear Resident or Business, Northumberland

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Statutory Notification Northumberland Park Development ... · Northumberland Park Development Project (NDP) Phase 2 Highway Improvements Dear Resident or Business, Northumberland

Sustainable Transport Ann Cunningham: Head of Traffic Management

Sustainable Transport Level 5 Alexandra House 10 Station Road, Wood Green London N22 7TR 020 8489 1000

www.haringey.gov.uk

Statutory Notification Northumberland Park Development Project (NDP) Phase 2 Highway Improvements Dear Resident or Business, Northumberland Park Development Project (NDP) Phase 1 was completed in 2013 and included construction of the Sainsbury’s superstore. Phase 2 includes construction of the new stadium and Phase 3 consists of proposals for homes, shops, and a hotel. Haringey’s responsibilities include measures designed to manage the likely impact of the new development on roads and traffic. Proposed highway improvements under the current Phase 2 of NDP are set out below and illustrated on the attached plans. Full details and plans are also on the website at www.haringey.gov.uk/road safety consultations. The proposals include:

Bus priority measures in Northumberland Park, Willoughby Lane and Lansdowne Road, Road resurfacing, and converting existing on-street parking to ‘two-wheels up’ footway parking.

Installing junction tables, crossing points, improved street lighting and footway repaving on Park Lane.

Extending the Cycle Superhighway from its current planned termination point through to Northumberland Park Station. Work also includes converting speed cushions to sinusoidal speed humps, road resurfacing, street lighting improvements and provision of cycle stands.

Converting the zebra crossing on Willoughby Lane, near its junction with Park Lane, to a ‘green man’ crossing.

Re-phasing the High Road / Park Lane traffic signals, repositioning an existing zebra crossing, and installing a new ‘green man’ pedestrian crossing on the High Road. This will help improve the pedestrian route to the stadium.

We welcome your views and comments on the proposals using the enclosed Freepost feedback card. For questions about the scheme please contact our Project Engineer Ojean Noorollahi on 0208 489 8301 or email [email protected] The closing date for receipt of comments is 26 February 2016. We look forward to hearing from you. Yours faithfully

Sustainable Transport: Highways Engineering

29 January 2016

Page 2: Statutory Notification Northumberland Park Development ... · Northumberland Park Development Project (NDP) Phase 2 Highway Improvements Dear Resident or Business, Northumberland

SC

1

PARK LANE

W

ILLO

UG

HB

Y LA

NE

Date Drawing Created:

Rev:

ON ON

1:2000 @ A1

-

01/2016

*

This product includes mapping data licensed

from Ordnance Survey with the permission of

HMSO © Crown Copyright LBH 2011. All

rights reserved.

License number 100019199.

Checked DateDescriptionRev

Designed: Drawn:

Checked:

Scale:

Drg. No:

Title:

Project:

Path:

PLACE & SUSTAINABILITY

5th Floor, Alexandra House, 10 Station Road, Wood Green, London N22 7TR

Tel: 020 8489 0000 Fax: 020 8489 1251

Director Place and Sustainability: Lyn Garner

www.haringey.gov.uk

SINGLE FRONTLINE

D:\ENSSOXN\Desktop\map_new_logo.gifD:\ENSSOXN\Desktop\Chicken Store - Estimate\map_new_logo.gif

DG

NDP PHASE 2

IMPROVEMENT SCHEME

PRELIMINARY DESIGN

OVERVIEW

Page 3: Statutory Notification Northumberland Park Development ... · Northumberland Park Development Project (NDP) Phase 2 Highway Improvements Dear Resident or Business, Northumberland
Page 4: Statutory Notification Northumberland Park Development ... · Northumberland Park Development Project (NDP) Phase 2 Highway Improvements Dear Resident or Business, Northumberland

SC

1

PARK LANE

W

ILLO

UG

HB

Y LA

NE