19
Van Ness Avenue BRT EIR/EIS and PD Status Update GCAC 09.24.09

Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Van Ness Avenue BRTEIR/EIS and PD

Status UpdateGCAC 09.24.09

Page 2: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 2

Progress Since February

Coordination and Involvement

Environmental Impact Analysis Technical Studies

Transportation Analysis

Engineering

Implementation and Funding

Page 3: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 3

Status UpdateCoordination and Involvement

Federal, State, and Local SupportInteragency CoordinationOutreach and Public Involvement

Environmental Impact Analysis Technical StudiesCultural Resources Impact AnalysisVisual Impact Analysis

Transportation AnalysisTravel Demand ForecastingMultimodal Operations

Engineering12% Engineering Plans Prototypical Stations and Median(s)Caltrans Design Exception Fact Sheets

Implementation and FundingConstruction and Implementation PlanSmall Starts Annual ReportingCapital Cost EstimatesVehicle Selection and ProcurementFunding Plan

Page 4: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 4

Coordination and Involvement

Federal, State, and Local SupportBoard of Supervisors resolution – top small starts priorities

Interagency CoordinationQuarterly Technical Advisory Committee meetingsSub-TAC (focused group) meetingsStation platforms, utility conflicts, landscape design, construction plan, cultural resources analysis, sustainable design features

Outreach and Public Involvement12 CAC meetingsFocused discussions with stakeholder groups (Civic Center Arts organizations)

Page 5: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 5

EIR/EIS Progress

Cultural Resources Impact Analysis Historic Resource Inventory and Evaluation Report (HRIER) completed – May 2009Trolley poles appear ineligible for register

Trolley / light poles project development

SFPUC, SFDPW, SFMTA, AuthorityConceptual Engineering Report prepared

Visual Impact AnalysisPhotorealistic visualizations under development

Page 6: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 6

Transportation Analysis

Approach approved by Caltrans and Federal Transit Administration (FTA)

Travel Demand Forecasting – Complete

Multimodal OperationsCorridor auto operations – 2015 models nearing completionMultimodal microsimulation – existing condition model calibratedTransit Signal Priority scheme undergoing refinements

Page 7: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 7

Preliminary Engineering

12% Engineering plans complete

Prototypical station platform and median(s) designs complete

Page 8: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 8

Alternative 2 – Side Lane BRT

Page 9: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 9

Alternative 2 – Side Lane BRT

Page 10: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 10

Alt 3 – Right Side Loading / Dual Medians

Page 11: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 11

Alt 3 – Right Side Loading / Dual Medians

Page 12: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 12

Alt 4 – Left Side Loading / Center Median

Page 13: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 13

Alt 4 – Left Side Loading / Center Median

Page 14: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 14

Preliminary Engineering

Caltrans Design Exception Fact SheetsReady for Caltrans reviewAreas for negotiation – Corner bulb geometry, lane widths

Project Study Report / Project Report (PSR/PR)Caltrans review prior to circulation of DEIR/DEIS

Page 15: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 15

Project Development Progress

Construction Staging and Phasing Plan developed

14 to 18 month construction duration

Utilities CoordinationSFPUC to prepare condition assessment of potentially vulnerable sewer segments

Page 16: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 16

Alternatives Capital Costs

Left-side loading vehicles$119MAlternative 4 – Center Lane BRT, Left Side Loading / Center Median

Sewer replacement, median reconstruction, median drainage

$149MAlternative 3 – Center Lane BRT, Right Side Loading / Dual Medians

$106MAlternative 2 – Side Lane BRT

Page 17: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 17

Project Cost and Funding Plan

No significant changes since 2008

100.0%$ 118,608Total

19.7%$ 23,425PlannedOther (FPI, HSIP,SHOPP,SR2T)

17.3%$ 20,460CommittedProp K Sales Tax

63.0%$ 74,723AnticipatedSmall Starts Funding ($M)

Page 18: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 18

Implementation Schedule

2014 SpringRevenue Service

2012 November –2014 February

Construction

2011 April –2012 June

Final Design

2011 JulyRecord of Decision:

2011 AprilFEIS/FEIR for FTA review

2010 SummerLocally Preferred Alternative (LPA) Selection

2010 JuneDEIS/DEIR public review

2010 AprilAdministrative DEIR/DEIS for FTA review

2009 OctoberVehicle procurement: Specs kickoff

Page 19: Status Update GCAC 09.24 · Final Design Record of Decision: 2011 July FEIS/FEIR for FTA review 2011 April Locally Preferred Alternative (LPA) Selection 2010 Summer DEIS/DEIR public

Geary Citizens Advisory Committee, September 24, 2009 19

Van Ness Avenue BRT Progress Update

Thank you!