Status Report Status Report Fermilab Steering Group Fermilab Steering Group develop roadmap develop roadmap for accelerator-based HEP program at for accelerator-based HEP program at Fermilab Fermilab Young-Kee Kim Fermilab and University of Chicago DOE/NSF HEPAP Meeting, July 13, 2007

Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Embed Size (px)

Citation preview

Page 1: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Status ReportStatus ReportFermilab Steering GroupFermilab Steering Group

develop roadmap develop roadmap for accelerator-based HEP program at Fermilabfor accelerator-based HEP program at Fermilab

Young-Kee KimFermilab and University of Chicago

DOE/NSF HEPAP Meeting, July 13, 2007

Page 2: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

1. Are there undiscovered principles of nature: New symmetries, new physical laws?2. Are there extra dimensions of space?3. Do all the forces become one?4. Why are there so many kinds of particles?5. What happened to the antimatter?6. What is dark matter?

How can we make it in the laboratory?7. How can we solve the mystery of dark energy?8. How did the universe come to be?9. What are neutrinos telling us?

From “Quantum Universe”and

“Discovering Quantum Universe”

Fermilab’s Scientific ProgramFermilab’s Scientific Programenables our community to address:enables our community to address:

Page 3: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

FermilabFermilab

2006-2007: Extraordinary years for Physics!Much more expected in the near future

Planning further aheadin accelerator-based HEP program:

Fermilab’s highest priorities – LHC/LHC upgrades & ILC

Page 4: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

ILC Decision Timelines

Possible ILC Decision Timelines

LHC discoveries

International

Agreements

ILC

2010 ILC DecisionSite

selec

ted

US collidersShutdownGreat Opportunityfor ILC

EPP2010 & P5 Assumption

ILC

2010 ILC Decision

ILC RDR with Cost Estimate in Feb. 2007

Page 5: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Fermilab Director Pier Oddone Fermilab Director Pier Oddone formed Steering Group to develop roadmap formed Steering Group to develop roadmap

for Fermilab’s accelerator-based HEP program.for Fermilab’s accelerator-based HEP program.

March 22, 2007March 22, 2007

Page 6: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Steering Group Charge

In his remarks to HEPAP, Undersecretary Orbach requested a dialog with the HEP community:

"In making our plans for the future, it is important to be conservative and to learn from our experiences. Even assuming a positive decision to build an ILC, the schedules will almost certainly be lengthier than the optimistic projections. Completing the R&D and engineering design, negotiating an international structure, selecting a site, obtaining firm financial commitments, and building the machine could take us well into the mid-2020s, if not later. Within this context, I would like to re-engage HEPAP in discussion of the future of particle physics. If the ILC were not to turn on until the middle or end of the 2020s, what are the right investment choices to ensure the vitality and continuity of the field during the next two to three decades and to maximize the potential for major discovery during that period?"

Page 7: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Steering Group Charge (cont.)

With the encouragement of the Office of Science and the support of Professor Mel Shochet, the chair of HEPAP, Fermilab will develop a strategic roadmap for the evolution of the accelerator-based HEP program, focusing on facilities at Fermilab that will provide discovery opportunities in the next two to three decades. This roadmap should keep the construction of the ILC as a goal of paramount importance. To guide this proposal, the Fermilab Director has appointed a Steering Group consisting of members from Fermilab and the national particle and accelerator physics community to insure that the plan serves national needs. The Steering Group will also engage additional constituents in the analysis of the various physics opportunities.

Page 8: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Steering Group Charge (cont.)

The Steering Group will build the roadmap based on the recommendations of the EPP2010 National Academy report and the recommendations of the P5 subpanel of HEPAP. The Steering Group should consider the Fermilab based facilities in the context of the global particle physics program. Specifically the group should develop a strategic roadmap that:

1. supports the international R&D and engineering design for as early a start of the ILC as possible and supports the development of Fermilab as a potential host site for the ILC;

2. develops options for an accelerator-based high energy physics program in the event the start of the ILC construction is slower than the technically-limited schedule; and

3. includes the steps necessary to explore higher energy colliders that might follow the ILC or be needed should the results from LHC point toward a higher energy than that planned for the ILC.

Page 9: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Steering Group Charge (cont.)

I am asking Deputy Director Kim to chair the Steering Group.

Any recommendations that might be relevant to the FY09 budget should be transmitted as early as possible.

The Steering Group's final report should be finished and delivered to the Fermilab Director by August 1, 2007. This deadline would allow for presentations to the DOE and its advisory bodies before the structuring of the FY2010 budget.

Page 10: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Steering Group Membership

Eugene Beier U. Penn

Joel Butler Fermilab

Sally Dawson BNL

Helen Edwards Fermilab

Thomas Himel SLAC

Steve Holmes Fermilab

Young-Kee Kim (chair) Fermilab / U.Chicago

Andrew Lankford UC Irvine

David McGinnis Fermilab

Sergei Nagaitsev Fermilab

Tor Raubenheimer SLAC

Vladimir Shiltsev Fermilab

Maury Tigner Cornell

Hendrick Weerts ANL

Fermilab and national particle and accelerator physics community

Page 11: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Physics Groups

Eugene Beier U Penn

Deborah Harris Fermilab

Ed Kearns Boston Univ.

Boris Kayser Fermilab

Sacha Kopp UT Austin

Andy Lankford (chair) UC Irvine

Bill Louis Los Alamos

(Young-Kee Kim) UChicago/FNAL

Joel Butler Fermilab

Brendan Casey Brown

Sally Dawson (chair) BNL

Chris Hill Fermilab

Dan Kaplan IIT

Yury Kolomensky UCBerkeley/LBNL

William Molzon UC Irvine

Kevin Pitts UIUC

Frank Porter CalTech

Bob Tschirhart Fermilab

Harry Weerts ANL

(Young-Kee Kim) UChicago/FNAL

Neutrino Physics Flavor PhysicsNuSAG

+ Oscillation+CPV with multi MW proton sources

+ other measurements with beam

Quarks, Charged Leptons,Physics with anti-protons, etc.

Page 12: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Subgroups• Advice/Oversight (additional constituents)

– Make sure that roadmaps being developed are consistent with EPP2010 and P5 recommendations – J. Bagger, S. Dawson, A. Seiden, M. Shochet (chair)

• Neutrino Physics (additional constituents)– Develop roadmap for neutrino physics based on NuSAG studies

• Flavor Physics: quarks, charged leptons, ... (additional constituents)– Develop 10-year plan with reconfiguring existing accelerator complex

• Accelerator Facilities (based on technical and resources feasibilities)– Develop options of a roadmap that supports ILC R&D for early start, supports

Fermilab as a potential host site, and provides an accelerator-based high energy physics program in case of delayed start – H. Edward, T. Himel, S. Holmes (chair), D. McGinnis, S. Nagaitsev, T. Raubenheimer, V. Shiltsev, M. Tigner, (YKK)

• High Energy Colliders beyond the ILC– Develop steps necessary to explore higher energy colliders that might follow

ILC or be needed should results from LHC point toward a higher energy than that planned for ILC – H. Edward, V. Shiltsev, M. Tigner (chair), (YKK)

Page 13: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Steering Group Activities

• Steering group– Kick-off meeting on April 2– weekly telephone meeting, 2 face-to-face meetings at Fermilab– EPP2010 and P5 assumptions– ILC R&D needs, LHC Upgrades, ..– Intermediate Physics Opportunities– Conceivable Accelerator Facilities for Physics Opportunities– Web: http://www.fnal.gov/directorate/Longrange/Steering_Public/

• Agendas, presentations, minutes, documents, publicly accessible

• For all activities, we include – ILC GDE leaders, HEP / ILC program managers in DOE and NSF– HEPAP Chair / Deputy Chair, P5 Chair– Chairs of Fermilab/SLAC Users Executive committees– Subgroup members

• Subgroups - ~weekly telephone meetings: detailed analysis

Page 14: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Steering Group Activities (cont.)

• Reach out to HEP community for input / ideas

– Message sent out to DPF & DPB members– Meetings with FNAL staff– Meetings with HEP collaborations– Presentations at Users meetings at FNAL and SLAC– Presentations / Discussions at ANL, BNL, LBNL– Many meetings with individuals– Fermilab Today articles– Meeting with ILC GDE Executive Committee– ….

Page 15: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Letters and Proposals from the Community

• 6 letters

• 20 proposals– 16: one to a few pages– 3: EoI (Expression of Interest)– 1: LoI (Letter of Intent)

• Available on web:– http://www.fnal.gov/directorate/Longrange/Steering_Public/community_l

etters.html

Page 16: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Letters and Proposals from the Community• Letters from the Community

– John Marriner (May 5, 2007) – Norman Gelfand (May 8, 2007) – Stanley Brodsky (May 31, 2007) – Steve Geer et al. (June 8, 2007) – Buck Field (June 12, 2007) – Maury Goodman (July 7, 2007)

• One Page Proposals from the community– 6GeV ILC Test Linac - Giorgio Apollinari and Bob Webber (May 7, 2007) – LAr TPC in FNAL's Neutrino Beams - David Finley (May 29, 2007) – Precision Neutrino Scattering at Tevatron - Janet Conrad and Peter Fisher (May 29, 2007) – Very Large Cherenkov Detector - Milind Diwan et al (June 5, 2007) – From Tevatron to Muon Storage Ring - Terry Goldman (June 6, 2007) – Antimatter Gravity Experiment - Thomas Phillips (June 7, 2007) – Neutrino Oscillation with high energy/intensity beam - Henryk Piekarz (June 10, 2007) – Space-Time Ripples Study - Nikolai Andreev (June 11, 2007) – Fixed Targer Charm Expt - Jeff Appel and Alan Schwartz (June 11, 2007) – Stopped Pion Neutrino Source - Kate Scholberg (June 11, 2007) – UNO Experiment - Change Kee Jung (June 11, 2007) – n-nbar Transition Search at DUSEL - Yuri Kamyshkov (June 11, 2007) – 8GeV cw Superconducting Linac - Ankenbrandt et al. (June 12, 2007) – Neutrino Expt with 5kton LAr TPC - Fleming and Rameika (June 12, 2007) – MicroBooNE - Fleming and Willis (June 12, 2007) – delta_s - Rex Tayloe (June 14, 2007)

• Expression of Interest (EOI)– mu to e conversion - William Molzon (May, 2007) – me to e conversion - E.J. Prebys, J.P. Miller et al (May, 2007) – Klong to pi0 nu nu - D. Bryman et al (June 11, 2007)

• Letter of Intent (LOI) – Low- and Medium-Energy Anti-Proton Physics - D. Kaplan et al (June 1, 2007)

Page 17: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

US HEP Physics Priorities:

• EPP2010 and P5 have addressed US HEP priorities.

• Both stressed the importance of a diverse program– Priority doesn’t mean you only do items at the top of the list

• Both EPP2010 and P5 assumed– a fast decision on ILC construction (2010)– a technically driven schedule for ILC construction

Page 18: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

EPP2010 Priorities (in order)

• The energy frontier– LHC (including upgrades)– ILC: Emphasis on US bid to host

• The particle/astro connection– Emphasis on dark matter/dark energy

• Neutrinos– Focus was on a global program

• Flavor physics

Page 19: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

P5 Recommendations

• 60% of new investments to ILC R&D• 40% to smaller initiatives

– Attempt to quantify importance of diverse program

– DES– CDMS, 25 kg

– Daya Bay– NOvA

– For the long term, LSST & SNAP development

Particle Astro

Neutrinos

Page 20: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

P5 Recommendations (Fermilab)

• 60% of new investments to ILC R&D• 40% to smaller initiatives

– Attempt to quantify importance of diverse program

– DES– CDMS, 25 kg

– Daya Bay– NOvA

– For the long term, LSST & SNAP development

Particle Astro

Neutrinos

Page 21: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Steering Group’s Emphasis

• Need for an intermediate physics-driven program

– Will the physics be important when the experiment is done?

– Better at Fermilab than at other labs (e.g. JPARC)?

– Unique in its physics reach? - Will it answer questions not answered at the LHC?

• Alignment with ILC:

– Will this advance the ILC?– Development of an accelerator facility that helps ILC– Compatibility with the ILC Schedule

Page 22: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Steering Group: Physics Opportunities

• Science– Neutrino Physics– Precision measurements involving charged

leptons and quarks

• Needed facilities– Proton Intensity Frontier: intense , , K, p beams– Beta Beam– Collider Luminosity Frontier: Super B, Giga Z, …

Page 23: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Steering Group: Physics Opportunities

• Neutrino: Oscillation, CPV, X-Section, EWK Precision• Muon: Lepton Number Violation

• Kaon: CKM Matrix, Lepton Flavor Violation• Anti-proton: Hyperon CPV, Charm• B Physics• Electroweak Precision with Giga Z• …

Compositeness to 3000 TeV scale

Supersymmetric models predict Rμe~ 10-15 for weak scale SUSY

Page 24: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

• “Proton Intensity Frontier” offers rich menu of neutrino, muon, and kaon physics in near - mid term

– Physics driver is search for Beyond the Standard Model Physics

– Window to high energy scales in some scenarios– Physics reach is complementary to energy frontier

• “Beta Beam”– Longer term, No Synergy to ILC

• “Luminosity Frontier”– Large scale, longer term

Preliminary Conclusions on Science

Page 25: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

“Proton Intensity Frontier” Option:Reconfiguration of Existing Facilities

• Examples– sNuMI (super NuMI) – ~1.3 MW at 120 GeV

• Modification of Accumulator and Recycler– Debuncher as an 8 GeV Slow Spiller– Tevatron as a 120 GeV Slow Spill Stretcher Ring

• Capable of producing protons with– 120 GeV >1 MW– 8 GeV slow & fast spill– 120 GeV slow spill

• Alignment with ILC– No synergy– But modest cost for construction– Operations - the current 30+ year old complex

Page 26: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

ILC Style 8 GeV H- Linac9mA x 1 msec x 5 Hz

200 kW at 8 GeV

Stripping Foil

Recycler3 linac pulses / fill

Main Injector1.4 sec cycle

>2 MW at 120 GeV

“Proton Intensity Frontier” Option: Project X

Initially NOvAPossibly DUSEL later

Page 27: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

“Proton Intensity Frontier” Option: Project X

• 0 0.12 GeV:– Modest increase from current 60 MeV R&D program– Collaboration with other US lab.s

• 0.12 2 GeV Linac:– Potential strong international collaboration (e.g. India)

• 2 8 GeV ILC-like Linac: via strong ILC collaboration– Benefit to ILC under investigation

• Linac: R&D and Engineering, US industry involvement followed by industrialization, large system tests

– Same as ILC: 36 cryomodules, RF distribution, Cryogenic dist, Beam parameters

– ILC RDR Regional Cryomodule Industrialization Profile» Year 1: 3 / year, 1 year Doubling time, Year 4: 25 / year

• Further possibilities – injector to Tevatron ring for pre-assembling and testing ILC Damping Ring

Page 28: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

“Proton Intensity Frontier” Option: Project X

• ILC Synergy– Intention: does not delay but helps timely realization of ILC– Medium size project

• R&D, Engineering, Construction– required resources being analyzed

• Operations: expect to be simpler than the current 30+ year old complex – being analyzed

• Physics Opportunities and Connection to Future– Initially NOvA experiment– Possible addition – e.g. flavor experiment– Future possibility: optimized beam to DUSEL

• . oscillation / CP violation, Proton decay, ..– Stepping stone for longer-term programs

• neutrino factory• higher energy colliders (e.g. muon collider, VLHC)

Page 29: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Project X: Proton Beam Power*Project X: Proton Beam Power*

*Assumes all protons are injected into the Main Injector

Page 30: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Roadmap ExampleILC – Fermilab’s Highest Priority

sNuMIConstruction

Project X Construction

In all scenarios: LHC Upgrade, Higher Energy Colliders R&D, Particle Astrophysics (Dark Matter, Dark Energy)

BranchPoint

ILC R&D

ILC R&D

ILC R&D

ILC Decision and Construction (Industrialization) + Running

ILC Decision and Construction (Industrialization) + Running

sNuMI Running

ILC Decision and Construction

Project X Running

FundingCycle

ILC Industrialization, Large system test

Page 31: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

To Be Done in August

• Project X– Understand Benefit to the ILC– Estimate Resources needed

• Finalize roadmaps

• Write report emphasizing case for new physics

Page 32: Status Report Fermilab Steering Group develop roadmap for accelerator-based HEP program at Fermilab Status Report Fermilab Steering Group develop roadmap

Next Steps

Jul2007

Aug2007

Sep2007

Oct2007

Nov2007

Dec2007

Jan2008

Feb2008

Mar2008

Apr2008

May2008

Jun2008

Jul2008

Jun2007

P5 Review

FNALAAC

Review

SG Reportto P5

FNALPAC

Review

SG Reportto HEPAP

Steering Group (SG) Reportto Pier Oddone

FY10 BudgetPreparation

SG ReportPAC

P5 Reportto HEPAP

SG Reportto HEPAP

Public Report