Upgrade motivations 1/2 Large frequency noise in the ITF –When the power recycling mirror is aligned large fringes are seen Cavity effect between the IMC and the PR Due to the large amount of light scattered in the IMC The insertion of a Faraday Isolator at the IMC output was needed to interrupt the light path from the ITF to the IMC Locking was impossible in this condition –Temporary solution adopted decreasing by a factor 10 the light injected in the IT »Increase of shot noise »Increase of electronic noise
Citation preview
Status of Virgoa short update
Michele Punturo
A bit of History• July 29 – August 13 2005
– C6 run• Duty cycle: Locking 89%, Science Mode 86%
• September 14-19 2005– C7 run
• Duty cycle: Locking 70%, Science Mode 65%
• 19 September 2005– Shutdown of the interferometer and start of the ISYS upgrade
Upgrade motivations 1/2• Large frequency noise in the ITF
– When the power recycling mirror is aligned large fringes are seen
• Cavity effect between the IMC and the PR• Due to the large amount of light scattered in the IMC• The insertion of a Faraday Isolator at the IMC output was
needed to interrupt the light path from the ITF to the IMC• Locking was impossible in this condition
– Temporary solution adopted decreasing by a factor 10 the light injected in the IT
» Increase of shot noise» Increase of electronic noise
Upgrade motivations 2/2•Structures at ~40, ~54, ~80 and 150 Hz
•More evident when the sensitivity improves
•Many of them were due to the modes of the IB
•Visible on the spectrum because of a mismatch between fmod and IMC length•Excited by the control noise
C6
C7(beginning)
UpgradesLa
ser
LB
B2
B2
Q2 1
Q2 2
RFC_DT
IMC
IMC_D1T
Q1
2
Q1 1 B1p
B1p
B5
B1s
BSWI
WE
NI NE
PR
RFCIB
Q8 2
Q8 1
B7
Q8 1
Q8 2
B8WB
NB
L=6m
L=5.
6m
L=6.4m
L=3km
L=3k
m
OM
C
OB
EB
New IB
New PR• Internal modes of the composite PR were affecting the locking of the ITF
PR transfer function
• Standard Virgo size PR mirror installed
Others upgrade• Other changes:
– New Brewster window (IT/PR link)– New auto alignment system for the Input Mode Cleaner– Laser lab work– Update the layout of the benches– New injection tower flange– Cabling and electronic rack displacement– Laser electronic upgrade– Environmental Monitoring– Linear alignment hardware upgrade– New and low noise RF generator– DAQ upgrade– …
Current status• The suspension in tower of the main components has been completed the
18th of November• The ISYS towers have been closed the 19/12/2005 after a long integration
activity (alignment, local control reactivation,…)– Vacuum
• Failure in a picomotor: tower opened again the 3/01/2006• Locking of the IMC on 00 mode the 05/01/2006• 11/01/2006:
– Starting of the IMC autoalignment• Still failures in the picomotors
• Light start to be injected in the ITF
Noise budget in C7