29
Status of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India 15 March, 2013 Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 1 / 29

Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Status of the MACE telescope

Kuldeep Yadavfor HiGRO collaboration

Bhabha Atomic Research CentreMumbai, India

15 March, 2013

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 1 / 29

Page 2: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Hanle, Ladakh ( 32.7◦N, 79◦E , 4200m asl)

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 2 / 29

Page 3: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

HiGRO: Himalayan Gamma Ray ObservatoryNew Indian initiative in GeV gamma-ray astronomy

Collaborators as of now:IIA, TIFR, BARC & SINP

7 element HAGAR wave-frontsampling array - operating

Stereo MACE (Major AtmosphericCherenkov Experiment) imagingtelescope

First element installation in progress

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 3 / 29

Page 4: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Site characteristics

Altitude 4200 m aslNumber of Spectroscopic Nights: ∼ 260/yr (few clouds)Number of Photometric Nights : ∼ 190/yr (no clouds)ExtinctionU = 0.353 ± 0.037B = 0.209 ± 0.029V = 0.121 ± 0.032Night Sky Brightness (mag/sq.arcsec) : 21.5 VUniform distribution of useful nightsLongitudinal Advantage:HESS : 16◦EMACE & HAGAR : 79◦ECANGAROO : 138◦EMAGIC : 20◦WVERITAS : 110◦W

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 4 / 29

Page 5: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Extensive Air Showers at Hanle

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 5 / 29

Page 6: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

MACE telescope : Design parameters

Lower the energy threshold to < 50 GeV by using all possibleparameters like Observatory altitude, light collector area, fastcoincidence gate width, appropriate pixel size, CPCs, intelligent triggergeneration schemeEmploy GHz signal processing for better discrimination particularly atenergies < 80 GeVUse a f# 1.2 instead of the f# 1.0 design for improving PSFImprove detection sensitivity at > 100 GeV by using coincident HAGARdata so that muon background can be rejected substantially. Usingcoincident data should also lead to improved energy resolution.Use modified instrumentation for the central pixel so that it can be usedfor optical monitoring of the source-photometric observations (finalsensitivity will depend on the PSF of the light collector)Fast repositioning of the telescope for observing high energy tails ofGRBs.Improve detection sensitivity to milli Crab level flux by employingmulti-telescope system in a phased manner.

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 6 / 29

Page 7: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

MACE telescope

MACE structure concept

Diameter: 21 m (large collectorarea)

Focal Distance: 25 m

Telescope weight: ∼ 167 T

Major sub-systems

Mechanical structure

Drive system

Light collector & mirror alignment

Camera electronics

Solar power plant

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 7 / 29

Page 8: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

MACE light collector detailsTotal light Collector Area: 337 m2

Facet Size: 500 mm × 500 mm

Number of Facets: ∼ 1500

Panel Size: 984 mm × 984 mm

Number of Panels: 352

Light collector configuration:Paraboloid with graded FL

Light D80@ D80@collector θ = 0.0◦ θ = 1.0◦

design (mm) (mm)Monolithic — 38.48Paraboloid (∼ 0.088◦)Tesselated 31.38 45.39Paraboloid (0.072◦) (∼ 0.104◦)(same f)

f=25000 mmTesselated 17.99 44.17Paraboloid (0.041◦) (∼ 0.101◦)(same f)

f=25490 mmTesselated 14.24 40.54Paraboloid (∼ 0.033◦) (∼ 0.093◦)(graded f)

Device 15.26 37.92Cotton (∼ 0.035◦) (∼ 0.087◦)

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 8 / 29

Page 9: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Mirror facet manufacture & panel alignement

1030 mirrors accepted as on 01.03.2013

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 9 / 29

Page 10: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Mirror Alignment control system

Prototype unit for one panel tested (laser diode based system)

Picture acquisition rate ∼ 20 Hz

50Ncm Stepper motor/car window motor/ BLDC motor basedactuators

Image Processing algorithms developedfor star image based system* Multiple overlaps* Vibrating structure

2 motorised actuators for each mirror panel

absolute encoder based actuators

704 actuators

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 10 / 29

Page 11: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Feasibility of one time alignment(Optimization of basket design)

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 11 / 29

Page 12: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

MACE drive control system

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 12 / 29

Page 13: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Compound Parabolic concentrator (CPC) designand testing results

Dia of circumscribed circle ∼ 62.35 mm

Dia of inscribed circle ∼ 55.0 mm

Max. acceptance angle ∼ 33.04◦

Height ∼ 74.06 mm

6 faces parallel to the optic axis ofCPC

CPC testing results

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 13 / 29

Page 14: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

MACE camera

Pixel size at CPC entry 55 mm (0.125◦)

Photo-cathode dia 38 mm

spectral range 280 − 600 nm

Integrated Camera (all signal processinginstrumentation housed within the camerastructure of 2 m × 2 m × 1.2 m size)

Temperature control of the camera duringoperation and standby condition.

16 channel CIM module

Total PMTs: 1088 (68 CIM)

PMTs in the trigger region: 576 (36 CIM)

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 14 / 29

Page 15: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Implementation of trigger algorithm

SLT hardware

Two level trigger generation

FLT: within the CIM

SLT: sytem level trigger

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 15 / 29

Page 16: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Trigger configuration 4NN tight cluster

Table: Number of combinationsTrigger Mode Desired desired + undesired

Due to implimentationFULL 756 756

single CIMN+N 240 6588

two CIMS+W 210 5582

two CIMW+S 210 5612

two CIMN+2W 100 ignored

three CIM4W 25 ignored

four CIM

Undesired combinations are recognizedand rejected at SLT

Combinations retained 14141541 = 91.88%

No individual connection

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 16 / 29

Page 17: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Estimates of chance trigger rates

SCR ( kHz)

100 1000

Ra

te (

Hz)

10-1

100

101

102

103

104

(1)

(2)

(3)

(4)

(1) Chance 4NN --full alone ( 5ns )

(2) Chance 4NN -- (N+N) alone ( 5ns , 10ns)

(3) Chance 4NN -- (S+W: W+S) alone ( 5ns , 10ns)

(4) Chance 4NN -- total (1)+(2)+(3)

(5) Rate at which trigger patterns need to be validated

Fu

ll

alo

ne

(4

9.0

5 %

pa

tte

rns

)

Fu

ll

+N

N+

SW

+W

S

(9

1.8

8 %

pa

tte

rns

)(5)

Chance rate : 20 Hz

Chance rate due to desired

combinations

1 Full triggers:36 × 21 × 4 × R4τ3

flt2 N+N triggers: 240 × 2 ×

(2R2τflt )(2R2τflt )τslt3 W+S triggers:

420 × 2 × (3R3τ2flt )(R)τslt

Total chance rate due to

implementation

1 N+N triggers:6588 × 2 ×

(2R2τflt )(2R2τflt )τslt2 W+S triggers: 11194 ×

2 × (3R3τ2flt )(R)τslt

TRIGGER INFORMATION IN TWOPHASES !

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 17 / 29

Page 18: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

EAS generation summary

CORSIKA ver. 6.990

Hadronic Interaction Models – Fluka, QGSJet01

Leptonic Interaction Model – EGS4

Atmosphere Model – US standard

Observation Level – Hanle site

EAS core scatter radius – 250m

zenith angle – 0o

105 EAS generated for γ-rays at 12 different energies,between 10 GeV to 100 GeV, in step of 10between 100 GeV to 190 GeV, in step of 30

106 EAS generated for proton at different energies

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 18 / 29

Page 19: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Trigger Efficiency and effective area

Framwork for checking valid triggers

Trigger probability depends on Cherenkovphoton density, trigger FOV, triggermultiplicity and single pixel threshold

These parameters can be programed

Effective area

10000

100000

100

Effe

ctiv

e A

rea

(m2 )

Energy (GeV)

5pe-4NN-FullCascade7pe-4NN-FullCascade

7pe-4NN-Full10pe-4NN-FullCascade

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 19 / 29

Page 20: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Gamma-ray trigger rates at various single pixelthresholds

Differential rate: Number of particles (E and E+dE)

trigger the telescope per unit time

0.01

0.1

1

10 100

Diff

. Rat

e (#

/GeV

/sec

)

Energy (GeV)

5pe-4NN-FullCascade7pe-4NN-FullCascade

7pe-4NN-Full10pe-4NN-FullCascade

D(E)dE = Aeff × N(E)dEPeak of differential trigger ratedetermines the energy thresholdNγ (E) = 2.79× 10−7( E

GeV )−2.59

ph m−2 s−1 GeV−1

Trigger Threshold IntegralMode Energy rate

(GeV) (Hz)

5peFC 16 8.0

7peFC 21 3.4

7peF 23 2.2

10peFC 30 1.5

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 20 / 29

Page 21: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Effective area and trigger rates for gamma ray andprotons

Effective area

0.1

1

10

100

1000

10000

100000

1e+06

10 100 1000 10000

Effe

ctiv

e A

rea

(m2 )

Energy (GeV)

7pe-4NN-FullCascade-Proton7pe-4NN-FullCascade-Gamma

For γ-ray (4NN, 7 pe)Threshold energy ∼ 21 GeV

Integral rate ∼ 3.4 Hz

Differential rates

0.01

0.1

1

10

1 10 100 1000 10000D

iff. R

ate

(#/G

eV/s

ec)

Energy (GeV)

7pe-4NN-FullCascade-Proton7pe-4NN-FullCascade-Gamma

For Proton (4NN, 7pe)Threshold energy ∼ 139.81 GeV

Integral rate ∼ 184.57 Hz

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 21 / 29

Page 22: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Salient features of event acquisition

Continuous sampling at 1GSPS using DRS4 (Domino RingSampler ASIC)Triggered mode of event acquisition: All the 1088 channelsare digitized continuosly but data is acquired based on acommon Master TriggerROI mode of operation using “Trigger delay loopmechanism” and sampling the trigger signal on the 9thchannel of DRS4.Online offset voltage and timing jitter correction for all thechannels of DRS4.1 kHz Sustained event rate. Event Dead time of 75 us.

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 22 / 29

Page 23: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

MACE DA&CS

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 23 / 29

Page 24: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

CIM testing

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 24 / 29

Page 25: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

CIM testing

Development Camera electronics and operator console: completed

Testing of integrated electronics of CIM with 16 PMTs: completed

CIM has been housed in a 64 ch camera housing and LED: test setupestablished

Entire chain of functions from loading configuration –up eventacquisition and archieving: tested

Performance related tests are in progress

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 25 / 29

Page 26: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

MACE trial assembly in progress at Hyderabad

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 26 / 29

Page 27: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Time-line

Trial installation at Hyderabad : Jan 12- May 13Testing of Drive and mirror alignment system : Jun -Jul 13Camera installation and testing : Oct-Dec 13Dismantling and packing : Jan - Mar 14Transportation to Hanle : April-May 14Installation at Hanle : June-Sept 14Engg. & Science Trials at Hanle : Oct-Dec 14

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 27 / 29

Page 28: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Summary

TACTIC telescope has observed the Crab Nebula and anumber of AGN & determined their spectrumMACE is the next logical stepHanle as a site for GRA offers major scientific advantagesand many challenges also !!!Technical expertise for setting up the MACE telescope isavailable in the countryWhen operational by 2014 the MACE telescope will be astate of the art instrumentThere is need to expand the HiGRO collaboration to derivemaximum scientific benefits

Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 28 / 29

Page 29: Status of the MACE telescopemoriond.in2p3.fr/J13/transparencies/yadav.pdfStatus of the MACE telescope Kuldeep Yadav for HiGRO collaboration Bhabha Atomic Research Centre Mumbai, India

Acknowledgements

Astrophysical Sciences Division

Centre for Design and Manufacture

Control Instrumentation Division

Electronics Division

Pecision Engineering Division

Reactor Control Division

Reactor Safety Division

Indian Institute of Astrophysics

Tata Institute of Fundamental Research

Saha Institute of Nuclear Physics

Electronics Corporation of India

Paul Scherrer Institute, Switzerland.

Thank you!Kuldeep Yadav (BARC Mumbai) VHEPU, Rencontres de Moriond 9-16 March, 2013 29 / 29