Status of the ITS Alignment Monitoring System
First resultsBy
Bjørn S. Nilsen
The Ohio State University
Outline
• ITS and ITSAMS Geometry
• Camera Sport measurements
• Camera Calibration
• ITSAMS raw measurements
• ITS geometry effects?
Camera spot analysis• Camera exposure… set for best image.• 25 images taken in series• Image smoothing to remove intensity
anomalies– Ring centers found for a series of intensity
thresholds.– Remove clearly anomalies centers
• Return Mean center and RMS.• Means & errors computed from all 25
images
Camera ResolutionPixels
• Camera 0, RMSx=7.39±0.18, RMSy=7.48±0.18.
• Camera 1, RMSx=1.91±0.04, RMSy=1.76±0.04.
• Camera 3, RMSx=7.52±0.24, RMSy=5.96±0.19.
Image Centers
Calibration
• Data taken from Test-bench setup
• Image centers used old algorithm
• Still some problems with test-bench setup
Image location
• Data with L3 on in solid markers
• Camera center at 0,0.
1/29/2008 W. Riegler TB Presentation
In order to explain the vertical movement of the front absorber nose by 2.4mm, the top fixation point of the FASS would have to move by d=3.7mm.
It seemed very improbable that the heavy magnet crown, that the FASS is attached to, is moving at all.
L3 Magnet Tests, Frontabsorber Movement
8
1/29/2008 W. Riegler TB Presentation
Beampipe on ITS rail
Lift beampipe (ITS) before TPC movement
Beampipe (ITS) hanging on TPC
+1 TRD, +8 TOF 1.5*9= 14T 2.3mm expected
mm
B-Field tests
0.17 T
0 T
0.17 T
0.5 T
0 T
0.5 T 0.5 T + dipole
0 T +1 TOF
Central Beampipe vs. FA
9
ITSAMS Installed/aligned
ITSAMS Realigned March
Spot position By day
• Clearly spot position shifted when L3 field is on.
• Timing correlation not 100%. images (file dates), Magnet (dcs data base).
Top View Side View
Many Cables
ITSAMS Mirrors
IT’S A-Side
View from Mirror 0
View of Mirror 0 mounting
ITS C-side
Stress free Mounting
ITS mounting
- 3 point mount- Stress Free
Status
• Low Voltage on USB hub improved– Better reliability of camera communications
• Low Voltage IP address conflict fixed• ITSAMS control system still improving
– Automation of image taking and analysis to come– Computation of ITS movement being debugged.
• Wednesday L3 magnet on, run ITSAMS
Spot
Missing Camera 2
Camera 0Camera 1
Camera 3