6
Status of TDCpix full chip assembly Sandro Bonacini NA62 – GTK WG meeting

Status of TDCpix full chip assembly Sandro Bonacini NA62 – GTK WG meeting

Embed Size (px)

Citation preview

Page 1: Status of TDCpix full chip assembly Sandro Bonacini NA62 – GTK WG meeting

Status of TDCpix full chip assembly

Sandro Bonacini

NA62 – GTK WG meeting

Page 2: Status of TDCpix full chip assembly Sandro Bonacini NA62 – GTK WG meeting

Full chip floorplan

20.400x12.030 sq.mm PRELIMINARY

Floorplan work started June 2012

Top assembly done in Virtuoso

“South bank” P&R in Encounter Size: ~4.8 mm

Pixel matrix

“South bank”

Page 3: Status of TDCpix full chip assembly Sandro Bonacini NA62 – GTK WG meeting

South bank floorplan Assembly of TDC, qchip, bandgaps, serializer/PLL, I/O pads &

power Pad placement is preliminary

158 south + 4 west + 4 east 22 staggered power pads

TDC (x20)

qchip (x4)

config space, DLL clock & cal. fanoutSerializer & PLLs BGsBG

Staggered pads Staggered pads

Page 4: Status of TDCpix full chip assembly Sandro Bonacini NA62 – GTK WG meeting

Power distribution Regular 600-um-pitch power lines in matrix Sparse 60-um lines in pad ring

Page 5: Status of TDCpix full chip assembly Sandro Bonacini NA62 – GTK WG meeting

Power distribution

SW corner I/O pads Power/ground pads “Pitch adapter”

Dense connections in horizontal and vertical power lines

BG

Staggered pads

Page 6: Status of TDCpix full chip assembly Sandro Bonacini NA62 – GTK WG meeting

6

Status Completed

Floorplan Power planning / distribution

Next steps “South bank”

Place & route, DFM, chip finishing No major showstoppers

Verification (DRC, LVS) … might need some iterations at this stage.

Complex power distribution, global nets, …

Final chip assembly

July 3, 2012