Status of Regional Water Supply Plan Updates John Mulliken John Mulliken Director, Water Supply Planning Division Director, Water Supply Planning Division Water Supply Department Water Supply Department Water Resources Advisory Commission Water Resources Advisory Commission May 4, 2006 May 4, 2006

Status of Regional Water Supply Plan Updates

  • Upload
    hammer

  • View
    32

  • Download
    2

Embed Size (px)

DESCRIPTION

Status of Regional Water Supply Plan Updates. John Mulliken Director, Water Supply Planning Division Water Supply Department Water Resources Advisory Commission May 4, 2006. Today’s Topics. Background Recent workshops Issues. Kissimmee Basin. Upper East Coast. Lower West Coast. - PowerPoint PPT Presentation

Citation preview

Page 1: Status of Regional Water Supply Plan Updates

Status of Regional Water Supply Plan Updates

Status of Regional Water Supply Plan Updates

John MullikenJohn MullikenDirector, Water Supply Planning DivisionDirector, Water Supply Planning Division

Water Supply DepartmentWater Supply Department

Water Resources Advisory CommissionWater Resources Advisory CommissionMay 4, 2006May 4, 2006

John MullikenJohn MullikenDirector, Water Supply Planning DivisionDirector, Water Supply Planning Division

Water Supply DepartmentWater Supply Department

Water Resources Advisory CommissionWater Resources Advisory CommissionMay 4, 2006May 4, 2006

Page 2: Status of Regional Water Supply Plan Updates

Today’s TopicsToday’s Topics

Background

Recent workshops

Issues

Background

Recent workshops

Issues

Page 3: Status of Regional Water Supply Plan Updates

FourWater

Supply Plan Regions

FourWater

Supply Plan Regions

LowerLowerEast East

CoastCoast

LowerLowerEast East

CoastCoast

UpperUpper East East CoastCoast

UpperUpper East East CoastCoast

Kissimmee Kissimmee BasinBasin

Kissimmee Kissimmee BasinBasin

LowerLowerWest West CoastCoast

LowerLowerWest West CoastCoast

Page 4: Status of Regional Water Supply Plan Updates

BackgroundBackground

Senate Bills 444 & 360

Linkage with Local Government Comprehensive Planning Process

Plans to be updated by July 2006

Senate Bills 444 & 360

Linkage with Local Government Comprehensive Planning Process

Plans to be updated by July 2006

Page 5: Status of Regional Water Supply Plan Updates

Updated Water Supply Plans

Updated Water Supply Plans

Planning period: 2005 to 2025 Updated population and water supply

demands projections Traditional water sources can not meet

future needs List of water resource projects List of alternative water supply projects to

meet 2025 demands

Planning period: 2005 to 2025 Updated population and water supply

demands projections Traditional water sources can not meet

future needs List of water resource projects List of alternative water supply projects to

meet 2025 demands

Page 6: Status of Regional Water Supply Plan Updates

Recent MeetingsRecent Meetings

WRAC Issues Workshops Late April – all regions

Issues Finalize demand projections Regional water availability Recommended projects

WRAC Issues Workshops Late April – all regions

Issues Finalize demand projections Regional water availability Recommended projects

Page 7: Status of Regional Water Supply Plan Updates

Water Supply Plan DocumentsWater Supply Plan Documents

New Look Concise (< 100 pages) Enclosed CD

Technical reportsData and information

for local governments Reader-friendly plan

Deliver take home messages for public and decision-makers

New Look Concise (< 100 pages) Enclosed CD

Technical reportsData and information

for local governments Reader-friendly plan

Deliver take home messages for public and decision-makers

Page 8: Status of Regional Water Supply Plan Updates

Alternative Water Supply Projects

Alternative Water Supply Projects

Nine months collecting and analyzing information from water suppliers

Proposed projects

Supporting data

Some utilities have not yet participated

Showing gaps between projected growth and proposed capacity in some areas

Nine months collecting and analyzing information from water suppliers

Proposed projects

Supporting data

Some utilities have not yet participated

Showing gaps between projected growth and proposed capacity in some areas

Page 9: Status of Regional Water Supply Plan Updates

Planning Area

Increased Potable Demand

2005 to 2025

Capacity of Proposed Potable Projects

Additional Potable Capacity Needed

MGD MGD MGDLEC 329.8 165.6 164.2LWC 103.0 90.0 13.0UEC 43.8 21.4 22.4Kiss 92.6 67.6 25.3Total 569.2 344.6 224.9

Public Water SupplyProjected Demands and

Proposed Projects

Public Water SupplyProjected Demands and

Proposed Projects

Page 10: Status of Regional Water Supply Plan Updates

Proposed Non-Potable ProjectsProposed Non-Potable Projects

Planning Area

Reclaimed Water Projects

Surface Water Projects

Total Non-Potable

MGD MGD MGDLEC 96.1 57.5 153.6LWC 143.4 70.1 213.5UEC 68.1 3.6 71.7Kiss 150.6 167.3 317.9Total 458.2 198.5 756.7

Page 11: Status of Regional Water Supply Plan Updates

Planning Area

Total Non-Potable

Additional Potable Capacity Needed

MGD MGDLEC 153.6 164.2LWC 213.5 13.0UEC 71.7 22.4Kiss 317.9 25.3Total 756.7 224.9

Comparison of Non-Potable Capacity to

Potable Shortfall

Comparison of Non-Potable Capacity to

Potable Shortfall

Page 12: Status of Regional Water Supply Plan Updates

Linking Water Supply & Land Use Planning

Linking Water Supply & Land Use Planning

July2006

Within 12 months of District notification local governments tell SFWMD what projects that it will implement

November2008

January 2008

January2007

SFWMD Regional Water Supply Plans are updated

Within 6 months local governments are notified of projects recommendedin plans

Within 18 months after Regional Water Supply Plans are approved, local governments submit 10-year water facilities plan to DCA

Local governments report annually to the SFWMD by Nov. 15 on progress implementing projects

Page 13: Status of Regional Water Supply Plan Updates

Local Government ImpactLocal Government Impact

Formal response 10 year facilities plan Comp Plan Update DCA review for consistency

Comp plan amendments DRIs Facilities plan

Formal response 10 year facilities plan Comp Plan Update DCA review for consistency

Comp plan amendments DRIs Facilities plan

Page 14: Status of Regional Water Supply Plan Updates

Staff ProposalStaff Proposal Incorporate annual plan amendment process

for next three years Allow utilities to finish on-going feasibilities

study's and to propose projects Give agricultural community more time to

identify actual projects Time amendment to integrate with annual

AWS funding process

Incorporate annual plan amendment process for next three years Allow utilities to finish on-going feasibilities

study's and to propose projects Give agricultural community more time to

identify actual projects Time amendment to integrate with annual

AWS funding process

Page 15: Status of Regional Water Supply Plan Updates

Public & DEP Review of Drafts

Public & DEP Review of Drafts

Distribute documents when complete Submit plans to DEP Hold regional WRAC Issue Workshops in

May and June Present plans and workshop results to

WRAC in May and plans in June

Distribute documents when complete Submit plans to DEP Hold regional WRAC Issue Workshops in

May and June Present plans and workshop results to

WRAC in May and plans in June

Page 16: Status of Regional Water Supply Plan Updates

Next StepsNext Steps

Distribute draft documents to public and DEP as soon as possible

Develop process for annual plan amendments to update project lists in 2007, 2008 and 2009

Identify “recommended” projects for water suppliers with inadequate future capacity

Distribute draft documents to public and DEP as soon as possible

Develop process for annual plan amendments to update project lists in 2007, 2008 and 2009

Identify “recommended” projects for water suppliers with inadequate future capacity

Page 17: Status of Regional Water Supply Plan Updates

QuestionsQuestions

Page 18: Status of Regional Water Supply Plan Updates

Percent Increase Population -2005 to 2025

Percent Increase Population -2005 to 2025

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

LEC LWC Kiss UEC District Wide

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%

100.0%

LEC LWC Kiss UEC District Wide

Page 19: Status of Regional Water Supply Plan Updates

Population by RegionPopulation by Region

2025 Total Population = 10.3 Million

2025 Total PWS Demand = 1.9 BGD