10

Status of Private Power Projects for the Month of July 2010files.pspcl.in/status_of_private_projects2.pdfBOILER I PILE CAP (RIGHT SIDE) DONE, LEFT SIDE PILE CAP & PEDESTALS BEING CAST

Embed Size (px)

Citation preview