Status of IAP radars on Andøya MAARSY May 2010: Operation with 210 transceiver modules (45%) Summer 2010: PMSE observation, first 3D-experiments December 2010: second expansion stage with 343 transceiver modules (80%) April 2011: completion of installation Andenes MF radar new foundation and air-condition installation of new power cable by Andøy Energy disturbances probably due to arcing isolators in overhead power lines are still present! Saura MF radar upgrade of local network started SKiYMET meteor radar disturbances probably due to arcing isolators in overhead power lines are still present investigation by IAP engineer is planned for April 2011 refurbishment of antennas is planned for 2011 18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011 1

Status of IAP radars on Andøya MAARSY –May 2010: Operation with 210 transceiver modules (45%) –Summer 2010: PMSE observation, first 3D-experiments –December

Embed Size (px)

Citation preview

Page 1: Status of IAP radars on Andøya MAARSY –May 2010: Operation with 210 transceiver modules (45%) –Summer 2010: PMSE observation, first 3D-experiments –December

Status of IAP radars on Andøya• MAARSY

– May 2010: Operation with 210 transceiver modules (45%)– Summer 2010: PMSE observation, first 3D-experiments – December 2010: second expansion stage with 343 transceiver modules (80%)– April 2011: completion of installation

• Andenes MF radar– new foundation and air-condition– installation of new power cable by Andøy Energy– disturbances probably due to arcing isolators in overhead power lines are still present!

• Saura MF radar– upgrade of local network started

• SKiYMET meteor radar– disturbances probably due to arcing isolators in overhead power lines are still present– investigation by IAP engineer is planned for April 2011– refurbishment of antennas is planned for 2011

18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011 1

Page 2: Status of IAP radars on Andøya MAARSY –May 2010: Operation with 210 transceiver modules (45%) –Summer 2010: PMSE observation, first 3D-experiments –December

Status of IAP radars on AndøyaStorm on 1 November 2010

18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011 2

Page 3: Status of IAP radars on Andøya MAARSY –May 2010: Operation with 210 transceiver modules (45%) –Summer 2010: PMSE observation, first 3D-experiments –December

Status of IAP radars on AndøyaStorm on 1 November 2010 – MAARSY

18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011 3

Page 4: Status of IAP radars on Andøya MAARSY –May 2010: Operation with 210 transceiver modules (45%) –Summer 2010: PMSE observation, first 3D-experiments –December

Status of IAP radars on AndøyaStorm on 1 November 2010 – Andenes MF radar and SKiYMET

18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011 4

Page 5: Status of IAP radars on Andøya MAARSY –May 2010: Operation with 210 transceiver modules (45%) –Summer 2010: PMSE observation, first 3D-experiments –December

Status of IAP radars on AndøyaStorm on 1 November 2010 – repair work

18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011 5

Page 6: Status of IAP radars on Andøya MAARSY –May 2010: Operation with 210 transceiver modules (45%) –Summer 2010: PMSE observation, first 3D-experiments –December

Status of IAP radars on AndøyaStorm on 1 November 2010 – repair work

18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011 6

Page 7: Status of IAP radars on Andøya MAARSY –May 2010: Operation with 210 transceiver modules (45%) –Summer 2010: PMSE observation, first 3D-experiments –December

Status of IAP radars on Andøya• MAARSY

– May 2010: Operation started with 196 transceiver modules (45%)– Summer 2010: PMSE observation, first 3D-experiments– December 2010: second expansion stage with 343 transceiver modules (80%)– April 2011: completion of installation

• Andenes MF radar– new foundation and air-condition– installation of new power cable by Andøy Energy– disturbances probably due to arcing isolators in overhead power lines are still present!

• Saura MF radar– upgrade of local network at radar hut started

• SKiYMET meteor radar– disturbances probably due to arcing isolators in overhead power lines are still present– investigation by IAP engineer is planned for April 2011– refurbishment of antennas is planned for 2011

18th Meeting of the ALOMAR Science Advisory Committee, Norderstedt, 22/23 March 2011 7