16
C C' B B' A A' D D' E' F F' G G' H H' Weston Road District Road Lot 7 Lot 5 Lot 6 Lot 13 Lot 12 Lot 11 Lot 10 Lot 9 Lot 4 Lot 3 Lot 2 Lot 1 Future Stage 2 (Lots 9-13) Lot 8 (to vest as road) ROW B ROW A 78.349 60 70 VTP 63.000 VTP 69.000 Proposed Stormwater Line (Stage 2) See Sheets 2 & 7 See Sheets 3 & 8 E Surveying, Resource Management & Engineering Dunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470 1:750 @ A3 6 D11812 11812/6/0 0 Sheet 1 of 16 - Observation Point 2000 No. Revision - Verify all dimensions on site before commencing work. Do not scale off drawings. Refer all discrepancies to Terramark Ltd. 86 Weston Road Subdivision Stage 1 Index Sheet 1 Plan No. Job No. Drawing Revision Scale Datum Horizontal Vertical Project Title Sheet Title Status Date Notes 1. Location and extent of existing services shown on these drawings are indicative only. 2. Contractor to ascertain the extent and location of all existing underground services prior to commencing any excavation work. 3. Contractor shall reinstate and make good any damage to existing carriageways, road markings, street signs, footpaths, street furniture, berms, utility services and structures. 4. Refer to Sheets 4-6 for drainage long sections. 5. Refer to Sheets 9 & 10 for ROW long sections. 6. Refer to Sheets 11-13 for typical ROW cross sections. 7. Refer to Sheet 14 for kerb profiles and typical ROW/driveway details. P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Plan View.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:05 PM For Approval 4/12/2017 - - DRAWING STATUS: FOR APPROVAL - - - - - - - -

Status Date DRAWING STATUS: For Approval 4/12/2017

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Status Date DRAWING STATUS: For Approval 4/12/2017

CC'

BB'

AA

'

DD

'

E'

FF'

G G'

H H'

Weston Road

District Road

Lot 7

Lot 5 Lot 6

Lot 13

Lot 12

Lot 11

Lot 10

Lot 9

Lot 4

Lot 3

Lot 2

Lot 1

FutureStage 2

(Lots 9-13)

Lot 8(to vest as road)

ROW B

ROW A

78.349

60

70

VTP 63.000

VTP 69.000

Proposed Stormw

ater Line (Stage 2)

See Sheets 2 & 7

See Sheets 3 & 8

E

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:750 @ A3

6D11812

11812/6/00

Sheet 1 of 16

-Observation Point 2000

No. Revision

-

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

86 Weston Road SubdivisionStage 1

Index Sheet 1

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1. Location and extent of existing services shown on

these drawings are indicative only.2. Contractor to ascertain the extent and location of all

existing underground services prior to commencingany excavation work.

3. Contractor shall reinstate and make good anydamage to existing carriageways, road markings,street signs, footpaths, street furniture, berms, utilityservices and structures.

4. Refer to Sheets 4-6 for drainage long sections.5. Refer to Sheets 9 & 10 for ROW long sections.6. Refer to Sheets 11-13 for typical ROW cross sections.7. Refer to Sheet 14 for kerb profiles and typical

ROW/driveway details.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Plan View.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:05 PM

For Approval 4/12/2017 - -DRAWING STATUS:

FOR APPROVAL - - - - - - - -

Page 2: Status Date DRAWING STATUS: For Approval 4/12/2017

Existing Overhead Pow

er

Existing Water Table

Lot 7

Lot 6

Lot 5

Lot 13

Lot 12

Lot 11 Lot 4

Existing 150mm

Ø Foul Sew

er

Edge of Existing Seal

FSA1Install new 1050mmØ foulsewer manhole in existing150mmØ foul sewer line

FSA2Construct

1050mmØ foulsewer manhole

FSA3Construct

1050mmØ foulsewer manhole

FSA4Construct

1050mmØ foulsewer manhole

Construct new 150mmØuPVC SN16 RRJ foul sewer

Constr

uct n

ew 15

0mmØ

uPVC S

N16 R

RJ fou

l sew

er

SWMT1Install Standard Hillside Sumpy(Fig. 3.10, NZS4404:2010) with150mmØ uPVC SN6 connection

to new stormwater line

SWA2Construct 150mmØ

uPVC SN16 lamphole

Construct new

150mm

Ø uPVC

SN16 R

RJ foul sew

er

Construct 25mm OD PE singlehousehold service connection,

with restrictor, for Lot 7

Construct 25mm ODPE single householdservice connection,

with restrictor, for Lot 6

Construct 300mmØHelcor culvert underaccessway entrance.

Construct100mmØ uPVCfoul sewer lateral

for Lot 7

Construct 100mmØuPVC foul sewerlateral for Lot 5

Construct 100mmØuPVC foul sewerlateral for Lot 6

Construct 100mmØuPVC foul sewer

lateral future for Lot 13

Construct100mmØ uPVCfoul sewer lateralfor future Lot 12

Construct 100mmØuPVC foul sewer

lateral for future Lot 11

Construct 100mmØuPVC foul sewerlateral for Lot 4

Construct 25mm OD PEsingle household service

connection for Lot 5

Install 25mm OD PEsingle household

service connection andelectricity and fibre

ducts for future Lot 13.

Reshape, regrade, and alignexisting watertable to join to

new culvert. See typical CrossSection G-G', Sheet 14 for newwatertable construction details.

Reshape, regrade, andalign existing watertable tojoin to new culvert outlet.See typical Cross Section

G-G', Sheet 14 for newwatertable construction

details

(Future Stage 2)

Construct 100mmØstormwater outlet for

Lot 5 to kerb & channel

Existing UndergroundChorus Cable

Existing UndergroundChorus Cable

Existing WD

C W

ater Scheme

New ChorusFibre Duct &

Cable

Lower existing watermainand Chorus cable to 1.0m

below finished level ofnew ROW entrance

New electricity , telecomms &water in common trench. See

typical Cross Section D-D',Sheet 12 for trench details.

Existing WD

C W

ater Scheme

Existing Overhead Pow

er

Construct new 150mmØ uPVCSN6 RRJ stormwater line.

Connect to new culvert

Construct new 100mmØ uPVCSN16 stormwater line from

subsoil drain, and connect tonew mudtank.

Edge of Existing Seal

ROW B

Existing Water Table

78.349

60

70

VTP 63.000

VTP 69.000Future Stage 2 Access Extension

New electrical &Chorus connections

to Lot 5

New electrical & Chorusconnections to Lot 6

New electrical & Chorusconnections to Lot 7

Construct 100mmØstormwater outlet for Lot7 to asphalt watertable

New Chorus FibreDuct & Cable

WESTO

N R

D

Construct 100mmØstormwater outlet for

Lot 6 to kerb & channel

Colvert end cut to 1:3taper, 150mm thick

in-situ concrete(25MPa) protectionaround culvert end.Trowel to smooth

finish.

See Detail D, Sheet 15for typical culvert end

construction detail.

See Detail D, Sheet 15for typical culvert end

construction detail.

Install 25mm OD PEsingle household service

connection andelectricity and fibre

ducts for future Lot 12.

Install 25mm OD PEsingle household service

connection andelectricity and fibre

ducts for future Lot 11.

Construct 25mmØ ODPE singlehousehold connection, with restrictor,for Lot 5 at Weston Road boundary.Manifold box to ve alloy frame & lid.

Note: Individual connections for futureLots 11-13 to be installed in Stage 2.

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:300 @ A3

Sheet 2 of 16

-Observation Point 2000

No. Revision

-

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

Drainage & Services DesignSheet 2

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1. Location and extent of xisting services shown on

these drawings are indicative only.2. Contractor to ascertain the extent and location of all

existing underground services prior to commencingany excavation work.

3. Contractor shall reinstate and make good anydamage to existing carriageways, road markings,street signs, footpaths, street furniture, berms, utilityservices and structures.

4. Contractor to obtain 'Close Approach Permit' fromNetwork Waitaki where excavations are within 5m ofa power pole.

5. Contractor to liaise with WDC & Chorus with regardsto lowering existing water scheme pipe andunderground telecommunications services beneaththe new entrance to ROW A, and shall coordinate thetrenching programme with the repsective authoritiesto ensure there are no delays to the overallconstruction programme.

6. 150mm x 50mm uPVC heavy wall kerb adaptors shallbe used where individual 100mmØ stormwaterlaterals connect to the ROW kerb & channel.

7. Individual water connections (with restrictors) to theexisting WDC water scheme pipe are to be made inaccordance with WDC water services requirements.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Plan View.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:08 PM

86 Weston Road SubdivisionStage 1

6D11812

11812/6/00

DRAWING STATUS:FOR APPROVAL

For Approval 4/12/2017 - - - - - - - - - -

Page 3: Status Date DRAWING STATUS: For Approval 4/12/2017

Existing 400mm Ø Culvert

Lot 3

Lot 1

Lot 10

Lot 9

Lot 2

FSA05Install new 150mmØ

terminal maintenance shaft

Construct 25mm OD PE singlehousehold service connection,

with restrictor, for Lot 3

Construct 25mm OD PE singlehousehold service connection,

with restrictor, for Lot 2

SWB2Install new 150mmØ

uPVC SN16 lampholeConstruct new 150mmØ uPVC

SN16 RRJ stormwater line.Connect to new culvert

Construct 300mmØHelcor culvert under

accessway

Construct 100mmØuPVC foul sewerlateral for Lot 9

Construct 100mmØuPVC foul sewerlateral for Lot 10

Construct 100mmØuPVC foul sewerlateral for Lot 2

Construct 100mmØuPVC foul sewerlateral for Lot 3

Construct 25mm OD PEsingle household service

connection for Lot 9

Individual water connectionsfor future Lots 9 & 10 to be

installed in Stage 2.

Reshape, regrade, and alignexisting watertable to join to new

culvert. See typical CrossSection G-G', Sheet 14 for newwatertable construction details.

Construct new

150mm

Ø

uPVC SN

16 RR

J foul sewer

Lot 11

(Future Stage 2)

ROW A

Reshape, regrade, and alignexisting watertable to join to new

culvert. See typical CrossSection G-G', Sheet 14 for newwatertable construction details.

New Chorus FibreDuct & Cable

Existing Underground C

horus Cable

Existing 150mm

Ø

Foul Sewer

New electricity , telecomms &water in common trench. Seetypical Cross Section D-D' onSheet 12 for trench details.

Existing Watertable

Existing Watertable

Construct new 100mmØ uPVC SN16stormwater line from subsoil drain,

and connect to new mudtank.

Existing WDCWater Scheme

Existing Overhead Pow

er

SWE1Construct Humes 600series (or equivalent)

concrete wingwall,joint to existing

culvert.

New electrical &Chorus connections

to Lots 3 & 4

Lot 4

New electrical &Chorus connections

to Lot 2

Clean out & re-grade existingwatertable to new wingwall.Supply & place rock riprap

around corner (rock size 150mm,width 600mm x 8m length)

WESTO

N R

D

Construct 100mmØstormwater outlet for Lot4 to asphalt watertable

SWMT2Install Standard Hillside Sump(Fig. 3.10, NZS4404:2010) with150mmØ uPVC SN6 connection

to new stormwater line Construct 100mmØstormwater outletfor Lot 3 to kerb &

channel

Construct 100mmØstormwater outlet

for Lot 2 to asphaltwatertable

See Detail D, Sheet 15for typical culvert end

construction detail.

See Detail D, Sheet 15for typical culvert end

construction detail.

Construct 25mm OD PEsingle household service

connection for Lot 4

Install 25mm OD PE singlehousehold service connectionand electricity and fibre ducts

for future Lot 10.

Existing water, electrical &Chorus connections to new

dwelling on Lot 1

Construct 100mmØstormwater outlets for future

Lots 9 & 10 to kerb & channel

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:300 @ A3

Sheet 3 of 16

-Observation Point 2000

No. Revision

-

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

Drainage & Services DesignSheet 3

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1. Location and extent of existing services shown on

these drawings are indicative only.2. Contractor to ascertain the extent and location of all

existing underground services prior to commencingany excavation work.

3. Contractor shall reinstate and make good anydamage to existing carriageways, road markings,street signs, footpaths, street furniture, berms, utilityservices and structures.

4. Contractor to obtain 'Close Approach Permit' fromNetwork Waitaki where excavations are within 5m ofa power pole.

5. Contractor to liaise with WDC & Chorus with regardsto lowering existing water scheme pipe andunderground telecommunications services beneaththe new entrance to ROW B, and shall coordinate thetrenching programme with the repsective authoritiesto ensure there are no delays to the overallconstruction programme.

6. 150mm x 50mm uPVC heavy wall kerb adaptors shallbe used where individual 100mmØ stormwaterlaterals connect to the ROW kerb & channel.

7. Individual water connections (with restrictors) to theexisting WDC water scheme pipe are to be made inaccordance with WDC water services requirements.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Plan View.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:13 PM

86 Weston Road SubdivisionStage 1

6D11812

11812/6/00

DRAWING STATUS:FOR APPROVAL

For Approval 4/12/2017 - - - - - - - - - -

Page 4: Status Date DRAWING STATUS: For Approval 4/12/2017

72.00

150m

uP

VC

(SN

16)

1 in 49.7

18.0m

80.6

80.

002.

21FS

A1

150mmØ uPVC (SN16)

1 in 101

36.4m

81.2

919

.09

78.8

2978

.979

2.46

2.31

FSA

2

150m

uP

VC

(SN

16)

1 in 58.0

3.4m

82.0

356

.57

79.3

3979

.389

2.69

2.64

FSA

3

150mmØ uPVC (SN16)

1 in 145

108.6m

82.0

661

.07

79.4

4979

.529

2.61

2.53

FSA

4

81.4

817

0.73

80.2

761.

20FS

A5

Chainage

Finished Surface Level

Invert Level

Depth to Invert

Pipe Gradient

Pipe Length

DATUM R.L.

Existing Ground Level

Finished Surface

78.3

8578

.465

2.29

Existing 150mmØFoul Sewer Main

Inst

all 1

050m

Man

hole

in e

xist

ing

foul

sew

er li

ne &

conn

ect n

ew fo

ul s

ewer

line

1050

mm

Ø P

reca

stC

oncr

ete

Man

hole

1050

mm

Ø P

reca

stC

oncr

ete

Man

hole

1050

mm

Ø P

reca

stC

oncr

ete

Man

hole

150m

Ter

min

alM

aint

enan

ce S

haft

Accessway A Accessway B

Lot 6

Edg

e of

Sea

l

Lot 11Lot 5 Lot 12

Lot 1

3

Lot 10

Wes

ton

Rd

Roa

d B

dy

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:750 @ A3

Sheet 4 of 16

-Observation Point 2000

No. Revision

1:200 @ A3

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

86 Weston Road SubdivisionStage 1

Foul Sewer Long SectionSheet 4

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:21 PM

6D11812

D11812/6/00

DRAWING STATUS:FOR APPROVAL

For Approval 4/12/2017 - - - - - - - - - -

Page 5: Status Date DRAWING STATUS: For Approval 4/12/2017

76.00

Chainage

Finished Surface Level

Invert Level

Depth to Invert

Pipe Gradient

Pipe Length

DATUM R.L.

SW

A3

SW

A2

SW

A1

Existing Ground Level

Finished Surface

Sta

ndar

d H

illsi

de S

ump

150m

uP

VC

(SN

16) M

aint

enan

ce S

haft

Connect to300mmØ

Helcor culvert(SWB)

SW

B2

Existing Ground Level

Finished level of new road surface

New asphaltdish channelwatertable

New asphaltdish channelwatertable

SW

B1

SWA3150mmØ

300mmØ Helcor Culvert150mmØ uPVC

1 in 100

2.1m

80.9

40.

0080

.379

80.3

790.

560.

56

225m

uP

VC

1 in 100

1.1m

81.2

82.

1980

.400

80.4

000.

880.

88(-4

5°)

80.8

53.

6080

.411

79.8

500.

441.

00

1 in 100

10.8m

80.5

40.

0080

.253

80.2

3980

.239

1.00

1.01

1.01

80.6

510

.98

80.3

470.

60

Culvert end cut at 1:3 taper150mm thick in-situ site

concrete (25MPa) aroundculvert outlet. Trowel to smoothfinish. See Detail D, Sheet 15

for construction details

Culvert end cut at 1:3 taper150mm thick in-situ site

concrete (25MPa) aroundculvert outlet. Trowel to smoothfinish. See Detail D, Sheet 15

for construction details

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:100 @ A3

6D11812

D11812/6/00

Sheet 5 of 16

-Observation Point 2000

No. Revision

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

Stormwater Long SectionSheet 5

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1. Culvert and installation shall be in accordance with

the 'Concrete Pipe selection and Installation Guide bythe Concrete Pipe Association of Austalasia' HS2.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:23 PM

1:100 @ A3

86 Weston Road SubdivisionStage 1

DRAWING STATUS:FOR APPROVAL

For Approval 4/12/2017 - - - - - - - - - -

Page 6: Status Date DRAWING STATUS: For Approval 4/12/2017

76.00

Chainage

Finished Surface Level

Invert Level

Depth to Invert

Pipe Gradient

Pipe Length

DATUM R.L.

1 in 100

1.9m

79.2

40.

0079

.707

79.7

07-0

.47

-0.4

7

1 in 101

0.9m

80.3

01.

9879

.726

79.7

0779

.707

0.57

0.59

0.59

(-41°

)80

.12

3.25

79.7

1679

.000

0.40

1.12

150m

uP

VC

150m

uP

VC

SW

C2

SW

C1Existing Ground Level

Finished Surface

Sta

ndar

d H

illsi

de S

ump

150m

uP

VC

(SN

16) M

aint

enan

ce S

haft

Connect to300mmØ

Helcor culvert(SWD)

1 in 100

8.0m

79.8

90.

0079

.595

79.5

950.

600.

60

80.0

98.

2679

.675

79.6

900.

620.

60

SW

D1

300mmØ Helcor Culvert

SW

D2Existing Ground Level

Finished level of new road surface

SWC3150mmØ

New asphaltdish channelwatertable

New asphaltdish channelwatertable

SW

C3

Culvert end cut at 1:3 taper150mm thick in-situ site

concrete (25MPa) aroundculvert outlet. Trowel to smoothfinish. See Detail D, Sheet 15

for construction details

Culvert end cut at 1:3 taper150mm thick in-situ site

concrete (25MPa) aroundculvert outlet. Trowel to smoothfinish. See Detail D, Sheet 15

for construction details

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

Sheet 6 of 16

-Observation Point 2000

No. Revision

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

Stormwater Long SectionsSheet 6

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1. Culvert and installation shall be in accordance with

the 'Concrete Pipe selection and Installation Guide bythe Concrete Pipe Association of Austalasia' HS2.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:28 PM

1:100 @ A31:100 @ A3

86 Weston Road SubdivisionStage 1

6D11812

D11812/6/00

DRAWING STATUS:FOR APPROVAL

For Approval 4/12/2017 - - - - - - - - - -

Page 7: Status Date DRAWING STATUS: For Approval 4/12/2017

C

C'

B

B'

AA

'

H

H'

Existing Overhead Pow

er

Existing Water Table

Existing 150mm

Ø Foul Sew

er

Shape & grade turningbay at 3% crossfall to

drain to main accessway

Construct newkerb & channel

Top of Cut Batter (1vt:2hz)

Top of Cut Batter (1vt:2hz)

R5.00m

Shape & grade newentranceway to match

existing levels Weston Road

3.50m

5.50

m

3.00m

Existing UndergroundChorus Cable

Existing UndergroundChorus Cable

Existing WD

C W

ater Scheme

Existing WD

C W

ater Scheme

Existing Overhead Pow

er

Weston R

oad

Future Stage 2 Access Extension

Construct 40mmx150mm H4timber edge around turning bay

Top of Cut Batter (1vt:2hz)Construct40mmx150mm H4

timber edge

Construct40mmx150mm H4

timber edge

Neat saw cut200mm insideexisting edge

of seal

3.50m

Construct40mmx150mmH4 timber edge

10m Taper 1:10m

10m Taper 1:10m

Construct 40mm compactedasphalt (Table Mix 10) over100mm M4/AP40 over200mm AP65 (subject to CBR test)

Existing Top of Bank

Existing Top of Bank

Batter back existingTop of Bank (1vt:1.5hz)CH 101.20 - CH 120.39

Existing

Edge of Seal

Edge of Existing Seal

ROW BProposed Asphalt Accessway

1.0m

1.0m

Existing road shoulder andwatertable to be reconstructedand sealed. See typical CrossSection G-G' & H-H', Sheet 14

for construction details.

Reshape, regrade, and alignexisting watertable to join to new

culvert.

Reshape, regrade, and align existingwatertable to join to new culvert.

Existing Water Table

Lot 4

Lot 6

Lot 5

Lot 7

Lot 13

Lot 12

Lot 11

(Future Stage 2)

300mmØHelcor Culvert

Top of Cut Batter (1vt:2hz)

0.00

0

TP 2

0.85

2

TP 4

9.32

4

TP 55.342

78.349

10

20304050

60

70

SAG

4.0

23SA

G 4

.023

VTP 63.000

VTP 69.000

New Taper &shoulder to be

sealed with TwoCoat Chipseal(Grade 3 & 5)

New Taper &shoulder to be

sealed with TwoCoat Chipseal(Grade 3 & 5)

Extend two-coat chip seal to newasphalt watertable. See typicalCross Section H-H', Sheet 14.

153.463

80

90

100

110

120

130

140

150

R6.00m

R6.

00m

Batter back existingTop of Bank (1vt:1.5hz)CH 82.75 - CH 101.20

Extent of ROW Bconstruction in

Stage 1 Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:300 @ A3

Sheet 7 of 16

-Observation Point 2000

No. Revision

-

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

Roading Design - ROW BSheet 7

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1. Location and extent of xisting services shown on

these drawings are indicative only.2. Contractor to ascertain the extent and location of all

existing underground services prior to commencingany excavation work.

3. Contractor shall reinstate and make good anydamage to existing carriageways, road markings,street signs, footpaths, street furniture, berms, utilityservices and structures.

4. Contractor to obtain 'Close Approach Permit' fromNetwork Waitaki where excavations are within 5m ofa power pole.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Plan View.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:35 PM

86 Weston Road SubdivisionStage 1

6D11812

11812/6/00

DRAWING STATUS:FOR APPROVAL

For Approval 4/12/2017 - - - - - - - - - -

Page 8: Status Date DRAWING STATUS: For Approval 4/12/2017

E

E'

F

F'

DD

'

G

G'

Existing 400mm Ø Culvert

Top of Cut Batter (1vt:2hz)

Top of Cut Batter (1vt:2hz)

Shape & grade turningbay at 3% crossfall to

drain to new dish channel

Construct new concretekerb & channel

CH 53.19 - CH 72.93

Construct new concrete dishchannel & join to new

concrete kerb & channelCH 42.14 - CH 53.19

Construct 40mm x 150mm H4timber edge around turning bay

Construct new concretekerb & channel

CH9.56 - CH 42.14

5.00

m

3.00

Shape & grade newentranceway to match

existing levels Weston Road

R5.00m

Existing Underground C

horus Cable

Existing 150mm

Ø

Foul Sewer

Existing Watertable

Existing Watertable

Existing WDCWater Scheme

Existing Overhead Pow

er

Construct 40mm compactedasphalt (Table Mix 10) over100mm M4/AP40 over200mm AP65 (subject to CBR test)

Batter back existingTop of Bank (1vt:1.5hz)

Batter back existingTop of Bank (1vt:1.5hz)

Weston R

oad

Neat saw cut200mm insideexisting edge

of seal

Existing Edge of Seal

10m Taper 1:10m

10m Taper 1:10m

Existing Top of Bank

Existing Top of Bank

Proposed Asphalt Accessway

1.0m 3.50m

1.0m 3.50m

300mmØHelcor Culvert

Existing road shoulder andwatertable to be reconstructedand sealed. See typical CrossSection G-G' & H-H', Sheet 14

for construction details.

Road shoulder and existingwater table to be reconstructedand sealed. See typical CrossSections G-G' & H-H' on Sheet

14 for construction details.

Reshape, regrade, and alignexisting watertable to join to new

culvert.

Reshape, regrade, and alignexisting watertable to join to new

culvert.

Lot 1

Lot 2

Lot 3Lot 11

Lot 10

(Future Stage 2)

Lot 9

ROW A

0.00

0

TP 6

.102

TP 1

3.54

2

TP 4

3.16

1

TP 52.824

72.933

10

203040

50

60

70

SAG

3.4

89SA

G 3

.489

New Taper &shoulder to be

sealed with TwoCoat Chipseal(Grade 3 & 5)

New Taper &shoulder to be

sealed with TwoCoat Chipseal(Grade 3 & 5)

R6.00m

R6.00m

0.000

10

20

30

40

50

60

70

Extend two-coat chip seal to newasphalt watertable. See typicalCross Section H-H', Sheet 14.

Existing water, electrical &Chorus connections to new

dwelling on Lot 1

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:300 @ A3

Sheet 8 of 16

-Observation Point 2000

No. Revision

-

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

Roading Design - ROW ASheet 8

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1. Location and extent of xisting services shown on

these drawings are indicative only.2. Contractor to ascertain the extent and location of all

existing underground services prior to commencingany excavation work.

3. Contractor shall reinstate and make good anydamage to existing carriageways, road markings,street signs, footpaths, street furniture, berms, utilityservices and structures.

4. Contractor to obtain 'Close Approach Permit' fromNetwork Waitaki where excavations are within 5m ofa power pole.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Plan View.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:38 PM

86 Weston Road SubdivisionStage 1

6D11812

11812/6/00

DRAWING STATUS:FOR APPROVAL

For Approval 4/12/2017 - - - - - - - - - -

Page 9: Status Date DRAWING STATUS: For Approval 4/12/2017

Longsection: ROW B

IP C

H. 6

3.00

0 R

L.81

.266

IP C

H. 6

9.00

0 R

L.81

.467

6Vertical Curve Length

1:-33 1:174 1:16Vertical Geometry

Horizontal Geometry

0.00

81.0

470.

019

81.0

28

4.02

80.9

260.

012

80.9

15

20.0

081

.018

-0.5

4081

.558

20.8

581

.023

-0.5

3881

.561

40.0

081

.134

-0.5

3281

.666

49.3

281

.187

-0.5

0881

.695

55.3

481

.222

-0.5

2981

.751

60.0

081

.249

-0.5

4581

.794

63.0

081

.266

-0.5

5581

.821

66.0

081

.325

-0.5

2081

.845

69.0

081

.467

-0.4

2381

.890

78.3

582

.039

0.00

082

.039

Chainage

Finished Level

Cut(-)/Fill(+) to Finished Level

Existing Ground Level

Datum R.L. 69.00

Roa

d B

ound

ary

CH

10.

59

Wes

ton

Rd

CL

End

of A

cces

sway

Lot 1

3

Finished level ofnew ROW

Existing Ground Level

Proposed150mmØ Foul

sewer

Proposed300mmØ

Helcor Culvert

R50.00m R5.00m

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:500 @ A3

6D11812

D11812/6/00

Sheet 9 of 16

-Observation Point 2000

No. Revision

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

ROW B Long SectionSheet 9

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:46 PM

1:250 @ A3

86 Weston Road SubdivisionStage 1

DRAWING STATUS:FOR APPROVAL

For Approval 4/12/2017 - - - - - - - - - -

Page 10: Status Date DRAWING STATUS: For Approval 4/12/2017

Longsection: ROW A

Proposed300mmØ

Helcor Culvert

Vertical Curve Length

1:-33 1:46Vertical Geometry

R20.00m R-5.00mHorizontal Geometry

0.00

80.1

320.

000

80.1

31

3.49

80.0

260.

087

79.9

39

6.10

80.0

82-1

.048

81.1

30

13.5

480

.242

-0.9

4981

.191

20.0

080

.381

-0.9

1281

.293

40.0

080

.812

-0.7

2181

.533

43.1

680

.880

-0.6

4481

.524

52.8

281

.088

-0.3

9281

.480

60.0

081

.243

-0.2

2481

.467

72.9

381

.521

-0.0

0081

.521

Chainage

Finished Level

Cut(-)/Fill(+) to Finished Level

Existing Ground Level

Datum R.L. 69.00

Wes

ton

Roa

d C

L

Roa

d B

ound

ary

CH

9.8

6

End

of A

cces

sway

Lot 1

Finished level ofnew ROW

Existing Ground Level

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:500 @ A3

6D11812

D11812/6/00

Sheet 10 of 16

-Observation Point 2000

No. Revision

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

ROW A Long SectionSheet 10

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:48 PM

1:250 @ A3

86 Weston Road SubdivisionStage 1

DRAWING STATUS:FOR APPROVAL

For Approval 4/12/2017 - - - - - - - - - -

Page 11: Status Date DRAWING STATUS: For Approval 4/12/2017

RL 78.00

ROW B

1:2 Cut batterto join existingground level

1:2 Cut batterto join existingground level

3% crossfall3% crossfall

Turning Bay

See Detail A Sheet 15for subsoil drain details

5.50m

Lot 5

Lot 12(Future Stage 2)

Lot 11(Future Stage 2)

Cross Section B - B'CH 50.00

Pro

pose

dB

ound

ary

Pro

pose

dB

ound

ary

B B'

Existing Ground Level

4x25mm waterconnections

ChorusFibre Duct

Electricity LV Spare Ductfor Stage 2

Service trench, cover over services,and separation between services tobe in accordance with the respective

utility provider specifications

40mm x 150mm H4timber edge. Timber

Pegs 50mm x 50mm x600mm to be installed

at 750mm centres

See Detail B Sheet 15for subsoil drain details.

Concrete Standard Kerb &Channel as per

NZS4404-2010, Figure 3.7

40mm Asphalt over100mm TNZ M/4 AP40 over300mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade

See Detail A Sheet 15for subsoil drain details

5.50m

Existing Ground Level

3% Crossfall

Concrete Standard Kerb &Channel as per

NZS4404-2010, Figure 3.7

1:2 Cut batterto join existingground level

1:2 Cut batterto join existingground level

40mm Asphalt over100mm TNZ M/4 AP40 over300mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade

RL 78.00

Lot 6

Pro

pose

dB

ound

ary

Lot 12(Future Stage 2)

Lot 4

Pro

pose

dB

ound

ary

Cross Section A - A'CH 30.00A A'

Service trench details asper Section B-B', Sheet 11

40mm x 150mm H4timber edge. Timber

Pegs 50mm x 50mm x600mm to be installed

at 750mm centres See Detail B Sheet 15for subsoil drain details.

6.30m

ROW B

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:50 @ A3

6D11812

D11812/6/00

Sheet 11 of 16

-Observation Point 2000

No. Revision

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

ROW B Cross SectionsSheet 11

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:53 PM

86 Weston Road SubdivisionStage 1

DRAWING STATUS:FOR APPROVAL

1:50 @ A3

For Approval 4/12/2017 - - - - - - - - - -

Page 12: Status Date DRAWING STATUS: For Approval 4/12/2017

3% Crossfall40mm x 150mm H4

timber edge. TimberPegs 50mm x 50mm x600mm to be installed

at 750mm centres

Existing Ground Level

Concrete Dish Channel as perNZS 4404-2010, Figure 3.7 to

be constructed at edge ofturning bay over basecourse

as specified. Reinforcing to be3xD12 bars, 50mm cover

40mm Asphalt over100mm TNZ M/4 AP40 over300mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade

Shape at 3% crossfall to drainto new concrete dish channel

1:2 Cut batterto join existingground levelROW A Turning Bay

Berm

0.60m

1:2 Cut batterto join existingground level

See Detail C Sheet 15for dish channel &subsoil drain details

See Detail B Sheet 15for subsoil drain details.

RL 78.00E E'Cross Section E - E'

CH 48.00

Lot 10(Future Stage 2)Lot 2

Pro

pose

dB

ound

ary

40mm x 150mm H4timber edge. Timber

Pegs 50mm x 50mm x600mm to be installed

at 750mm centres

See Detail B Sheet 15for subsoil drain details.

Service trench details as perSection B-B', Sheet 11

1:2 Cut batterto join existingground level

See Detail A Sheet 13for subsoil drain details

1:2 Cut batterto join existingground level

40mm Asphalt over100mm TNZ M/4 AP40 over

300mm AP 65(subject to CBR testing)

over Bidim (A19) geotextile laid on subgrade

3% CrossfallConcrete Standard Kerb &

Channel as perNZS4404-2010, Figure 3.7

4.50m

Existing Ground Level

RL 78.00D D'Cross Section D - D'

CH 24.00

Lot 10(Future Stage 2)

Lot 3Lot 2

Pro

pose

dB

ound

ary

Pro

pose

dB

ound

ary

See Detail B Sheet 15for subsoil drain details

40mm x 150mm H4timber edge. Timber

Pegs 50mm x 50mm x600mm to be installed

at 750mm centres

5.00m

Service trench details as perSection B-B', Sheet 11

ROW A

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:50 @ A3

6D11812

D11812/6/00

Sheet 12 of 16

Observation Point 2000

No. Revision

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

ROW A Cross SectionsSheet 12

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:58 PM

86 Weston Road SubdivisionStage 1

DRAWING STATUS:FOR APPROVAL

1:50 @ A3 -

For Approval 4/12/2017 - - - - - - - - - -

Page 13: Status Date DRAWING STATUS: For Approval 4/12/2017

Concrete Standard Kerb &Channel as per

NZS4404-2010, Figure 3.7

1:2 Cut batterto join existingground level

1:2 Cut batterto join existingground level

40mm Asphalt over100mm TNZ M/4 AP40 over300mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade

See Detail A Sheet 15for subsoil drain details

3.00m

Existing Ground Level

Cross Section C - C'CH 70.00RL 78.00C C'

(CH 55.34 - CH 78.35)

40mm x 150mm H4timber edge. Timber

Pegs 50mm x 50mm x600mm to be installed

at 750mm centres

See Detail B Sheet 15for subsoil drain details.

Pro

pose

dB

ound

ary

Lot 6

Lot 12(Future Stage 2)

Service trench details as perSection B-B', Sheet 11

ROW B

RO

W E

asem

ent

Bou

ndar

y

4.50m

To be constructed in Stage 2

Cross Section F - F'CH 60.00RL 78.00F F'

Concrete Standard Kerb &Channel as per

NZS4404-2010, Figure 3.7

1:2 Cut batterto join existingground level

1:2 Cut batterto join existingground level

See Detail A Sheet 15for subsoil drain details

3.00m(CH 52.86 - CH 72.93)

40mm x 150mm H4timber edge. Timber

Pegs 50mm x 50mm x600mm to be installed

at 750mm centres

See Detail B Sheet 15for subsoil drain details.

Service trench detailsas per Section B-B',

Sheet 11

Lot 10(Future Stage 2)

Lot 2

Pro

pose

dB

ound

ary

ROW A

40mm Asphalt over100mm TNZ M/4 AP40 over300mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade R

OW

Eas

emen

tB

ound

ary

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:50 @ A3

6D11812

D11812/6/00

Sheet 13 of 16

-Observation Point 2000

No. Revision

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

ROW A & B Cross SectionsSheet 13

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:43:03 PM

86 Weston Road SubdivisionStage 1

DRAWING STATUS:FOR APPROVAL

1:50 @ A3

For Approval 4/12/2017 - - - - - - - - - -

Page 14: Status Date DRAWING STATUS: For Approval 4/12/2017

Cross Section G - G'CH 35.00RL 77.00G G'

Existing Chip Seal Road Formation(≈ 4% crossfall)

New

Tap

er

Grade back1:1.5 Cut batterto join existingground level

Edge of existing seal to edge of dish channelbe constructed of:2 Coat Chipseal (Grade 3 & 5) over100mm TNZ M/4 AP40 over250mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade

See Detail C Sheet 15for subsoil drain details

Asphalt DishChannel

Neat saw cut200mm inside edge

of existing seal

50mm

600mm

CL

Weston Road

Lot 2

Dish channel be constructed of:40mm Asphalt over100mm TNZ M/4 AP40 over200mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade

Pro

pose

dB

ound

ary

Existing Bank

≈ 13% varies

Cross Section H - H'CH 137.27RL 77.00H H'

See Detail C Sheet 15for subsoil drain details

Upgrade existingwater table to Asphalt

Dish Channel600mm

100mmØ uPVC stormwater drain

SW outlet50mm abovechannel invert

100mm thich in-situ concrete(25MPa) protection around pipeoutlet. Trowel to smooth finish.

Existing Chip Seal Road Formation(≈ 4% crossfall)

CLEdge of existing seal to edge of dish channel be constructed of:2 Coat Chipseal (Grade 3 & 5) over100mm TNZ M/4 AP40 over250mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade

Dish channel be constructed of:40mm Asphalt over100mm TNZ M/4 AP40 over200mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade

Weston RoadLot 7 Pro

pose

dB

ound

ary

0.9mvaries

1.00m

≈ 1:100≈ 13% varies

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:50 @ A3

6D11812

D11812/6/00

Sheet 14 of 16

-Observation Point 2000

No. Revision

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

Road Cross SectionsSheet 14

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:43:08 PM

86 Weston Road SubdivisionStage 1

DRAWING STATUS:FOR APPROVAL

1:50 @ A3

For Approval 4/12/2017 - - - - - - - - - -

Page 15: Status Date DRAWING STATUS: For Approval 4/12/2017

Concrete Dish Channel

Road Subgrade

200mm cleandrainage chip

70mm

0.30m

Detail C - Kerb & Channel Subsoil DrainageScale 1:15

M/4 AP40

AP65

110mmØ perforatedsubsoil pipe

Filter fabric placedto trench perimeter

Dish Channel as perNZS 4404-2010,

Figure 3Reinforcing tobe 3xD12 bars,

50mm cover Asphalt

Road Subgrade

ConcreteKerb & Channel

200mm cleandrainage chip

110mmØ perforatedsubsoil pipe

70mm

0.30m

Detail A - Dish Channel Subsoil DrainageScale 1:15

Filter fabric placedto trench perimeter

M/4 AP40

AP65

Asphalt

Kerb & Channel as perNZS 4404-2010, Figure 3.7

110mmØ perforatedsubsoil pipe

70mm

0.30m

Filter fabric placedto trench perimeter

Road Subgrade

200mm cleandrainage chip

Detail B - Subsoil Drainage at Edge of SealScale 1:15

M/4 AP40

AP65

Asphalt

0.40m

300mmØ HelcorCulvert end cut

at 1:3 taper

0.40m

0.40m150mm thick in-situconcrete (25MPa)protection around

culvert outlet. Trowelto smooth finish.

0.60

mas

phalt

dish

chan

nel

Asphalt shoulder

Asphaltdrivewayentrance

1.30m

Detail D - Typical Culvert Taper ConstructionScale 1:25

1.10m

300mm

Ø H

elcor

Culvert

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

as shown

6D11812

D11812/6/00

Sheet 15 of 16

-Observation Point 2000

No. Revision

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

Road DetailsSheet 15

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:43:13 PM

86 Weston Road SubdivisionStage 1

-

DRAWING STATUS:FOR APPROVAL

For Approval 4/12/2017 - - - - - - - - - -

Page 16: Status Date DRAWING STATUS: For Approval 4/12/2017

1

2

Lot 5

Lot 4

Lot 11(Stage 2)

Lot 12(Stage 2)

3

ROW A

Turning Circle for 85% vehicle, turning radius 5.8mROW A - Turning Circle

1

2

3

Lot 3

Lot 2

Lot 10(Stage 2)

ROW B

Turning Circle for 85% vehicle, turning radius 5.8mROW B - Turning Circle

Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470

1:150 @ A3

6D11812

D11812/6/00

Sheet 16 of 16

-Observation Point 2000

No. Revision

-

Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.

Turning Circles85th Percentile Vehicle

Sheet 16

Plan No.Job No.

Drawing

Revision

Scale DatumHorizontalVertical

Project Title

Sheet Title

Status Date

Notes1.

P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:43:18 PM

86 Weston Road SubdivisionStage 1

DRAWING STATUS:FOR APPROVAL

For Approval 4/12/2017 - - - - - - - - - -