Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
CC'
BB'
AA
'
DD
'
E'
FF'
G G'
H H'
Weston Road
District Road
Lot 7
Lot 5 Lot 6
Lot 13
Lot 12
Lot 11
Lot 10
Lot 9
Lot 4
Lot 3
Lot 2
Lot 1
FutureStage 2
(Lots 9-13)
Lot 8(to vest as road)
ROW B
ROW A
78.349
60
70
VTP 63.000
VTP 69.000
Proposed Stormw
ater Line (Stage 2)
See Sheets 2 & 7
See Sheets 3 & 8
E
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:750 @ A3
6D11812
11812/6/00
Sheet 1 of 16
-Observation Point 2000
No. Revision
-
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
86 Weston Road SubdivisionStage 1
Index Sheet 1
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1. Location and extent of existing services shown on
these drawings are indicative only.2. Contractor to ascertain the extent and location of all
existing underground services prior to commencingany excavation work.
3. Contractor shall reinstate and make good anydamage to existing carriageways, road markings,street signs, footpaths, street furniture, berms, utilityservices and structures.
4. Refer to Sheets 4-6 for drainage long sections.5. Refer to Sheets 9 & 10 for ROW long sections.6. Refer to Sheets 11-13 for typical ROW cross sections.7. Refer to Sheet 14 for kerb profiles and typical
ROW/driveway details.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Plan View.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:05 PM
For Approval 4/12/2017 - -DRAWING STATUS:
FOR APPROVAL - - - - - - - -
Existing Overhead Pow
er
Existing Water Table
Lot 7
Lot 6
Lot 5
Lot 13
Lot 12
Lot 11 Lot 4
Existing 150mm
Ø Foul Sew
er
Edge of Existing Seal
FSA1Install new 1050mmØ foulsewer manhole in existing150mmØ foul sewer line
FSA2Construct
1050mmØ foulsewer manhole
FSA3Construct
1050mmØ foulsewer manhole
FSA4Construct
1050mmØ foulsewer manhole
Construct new 150mmØuPVC SN16 RRJ foul sewer
Constr
uct n
ew 15
0mmØ
uPVC S
N16 R
RJ fou
l sew
er
SWMT1Install Standard Hillside Sumpy(Fig. 3.10, NZS4404:2010) with150mmØ uPVC SN6 connection
to new stormwater line
SWA2Construct 150mmØ
uPVC SN16 lamphole
Construct new
150mm
Ø uPVC
SN16 R
RJ foul sew
er
Construct 25mm OD PE singlehousehold service connection,
with restrictor, for Lot 7
Construct 25mm ODPE single householdservice connection,
with restrictor, for Lot 6
Construct 300mmØHelcor culvert underaccessway entrance.
Construct100mmØ uPVCfoul sewer lateral
for Lot 7
Construct 100mmØuPVC foul sewerlateral for Lot 5
Construct 100mmØuPVC foul sewerlateral for Lot 6
Construct 100mmØuPVC foul sewer
lateral future for Lot 13
Construct100mmØ uPVCfoul sewer lateralfor future Lot 12
Construct 100mmØuPVC foul sewer
lateral for future Lot 11
Construct 100mmØuPVC foul sewerlateral for Lot 4
Construct 25mm OD PEsingle household service
connection for Lot 5
Install 25mm OD PEsingle household
service connection andelectricity and fibre
ducts for future Lot 13.
Reshape, regrade, and alignexisting watertable to join to
new culvert. See typical CrossSection G-G', Sheet 14 for newwatertable construction details.
Reshape, regrade, andalign existing watertable tojoin to new culvert outlet.See typical Cross Section
G-G', Sheet 14 for newwatertable construction
details
(Future Stage 2)
Construct 100mmØstormwater outlet for
Lot 5 to kerb & channel
Existing UndergroundChorus Cable
Existing UndergroundChorus Cable
Existing WD
C W
ater Scheme
New ChorusFibre Duct &
Cable
Lower existing watermainand Chorus cable to 1.0m
below finished level ofnew ROW entrance
New electricity , telecomms &water in common trench. See
typical Cross Section D-D',Sheet 12 for trench details.
Existing WD
C W
ater Scheme
Existing Overhead Pow
er
Construct new 150mmØ uPVCSN6 RRJ stormwater line.
Connect to new culvert
Construct new 100mmØ uPVCSN16 stormwater line from
subsoil drain, and connect tonew mudtank.
Edge of Existing Seal
ROW B
Existing Water Table
78.349
60
70
VTP 63.000
VTP 69.000Future Stage 2 Access Extension
New electrical &Chorus connections
to Lot 5
New electrical & Chorusconnections to Lot 6
New electrical & Chorusconnections to Lot 7
Construct 100mmØstormwater outlet for Lot7 to asphalt watertable
New Chorus FibreDuct & Cable
WESTO
N R
D
Construct 100mmØstormwater outlet for
Lot 6 to kerb & channel
Colvert end cut to 1:3taper, 150mm thick
in-situ concrete(25MPa) protectionaround culvert end.Trowel to smooth
finish.
See Detail D, Sheet 15for typical culvert end
construction detail.
See Detail D, Sheet 15for typical culvert end
construction detail.
Install 25mm OD PEsingle household service
connection andelectricity and fibre
ducts for future Lot 12.
Install 25mm OD PEsingle household service
connection andelectricity and fibre
ducts for future Lot 11.
Construct 25mmØ ODPE singlehousehold connection, with restrictor,for Lot 5 at Weston Road boundary.Manifold box to ve alloy frame & lid.
Note: Individual connections for futureLots 11-13 to be installed in Stage 2.
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:300 @ A3
Sheet 2 of 16
-Observation Point 2000
No. Revision
-
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
Drainage & Services DesignSheet 2
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1. Location and extent of xisting services shown on
these drawings are indicative only.2. Contractor to ascertain the extent and location of all
existing underground services prior to commencingany excavation work.
3. Contractor shall reinstate and make good anydamage to existing carriageways, road markings,street signs, footpaths, street furniture, berms, utilityservices and structures.
4. Contractor to obtain 'Close Approach Permit' fromNetwork Waitaki where excavations are within 5m ofa power pole.
5. Contractor to liaise with WDC & Chorus with regardsto lowering existing water scheme pipe andunderground telecommunications services beneaththe new entrance to ROW A, and shall coordinate thetrenching programme with the repsective authoritiesto ensure there are no delays to the overallconstruction programme.
6. 150mm x 50mm uPVC heavy wall kerb adaptors shallbe used where individual 100mmØ stormwaterlaterals connect to the ROW kerb & channel.
7. Individual water connections (with restrictors) to theexisting WDC water scheme pipe are to be made inaccordance with WDC water services requirements.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Plan View.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:08 PM
86 Weston Road SubdivisionStage 1
6D11812
11812/6/00
DRAWING STATUS:FOR APPROVAL
For Approval 4/12/2017 - - - - - - - - - -
Existing 400mm Ø Culvert
Lot 3
Lot 1
Lot 10
Lot 9
Lot 2
FSA05Install new 150mmØ
terminal maintenance shaft
Construct 25mm OD PE singlehousehold service connection,
with restrictor, for Lot 3
Construct 25mm OD PE singlehousehold service connection,
with restrictor, for Lot 2
SWB2Install new 150mmØ
uPVC SN16 lampholeConstruct new 150mmØ uPVC
SN16 RRJ stormwater line.Connect to new culvert
Construct 300mmØHelcor culvert under
accessway
Construct 100mmØuPVC foul sewerlateral for Lot 9
Construct 100mmØuPVC foul sewerlateral for Lot 10
Construct 100mmØuPVC foul sewerlateral for Lot 2
Construct 100mmØuPVC foul sewerlateral for Lot 3
Construct 25mm OD PEsingle household service
connection for Lot 9
Individual water connectionsfor future Lots 9 & 10 to be
installed in Stage 2.
Reshape, regrade, and alignexisting watertable to join to new
culvert. See typical CrossSection G-G', Sheet 14 for newwatertable construction details.
Construct new
150mm
Ø
uPVC SN
16 RR
J foul sewer
Lot 11
(Future Stage 2)
ROW A
Reshape, regrade, and alignexisting watertable to join to new
culvert. See typical CrossSection G-G', Sheet 14 for newwatertable construction details.
New Chorus FibreDuct & Cable
Existing Underground C
horus Cable
Existing 150mm
Ø
Foul Sewer
New electricity , telecomms &water in common trench. Seetypical Cross Section D-D' onSheet 12 for trench details.
Existing Watertable
Existing Watertable
Construct new 100mmØ uPVC SN16stormwater line from subsoil drain,
and connect to new mudtank.
Existing WDCWater Scheme
Existing Overhead Pow
er
SWE1Construct Humes 600series (or equivalent)
concrete wingwall,joint to existing
culvert.
New electrical &Chorus connections
to Lots 3 & 4
Lot 4
New electrical &Chorus connections
to Lot 2
Clean out & re-grade existingwatertable to new wingwall.Supply & place rock riprap
around corner (rock size 150mm,width 600mm x 8m length)
WESTO
N R
D
Construct 100mmØstormwater outlet for Lot4 to asphalt watertable
SWMT2Install Standard Hillside Sump(Fig. 3.10, NZS4404:2010) with150mmØ uPVC SN6 connection
to new stormwater line Construct 100mmØstormwater outletfor Lot 3 to kerb &
channel
Construct 100mmØstormwater outlet
for Lot 2 to asphaltwatertable
See Detail D, Sheet 15for typical culvert end
construction detail.
See Detail D, Sheet 15for typical culvert end
construction detail.
Construct 25mm OD PEsingle household service
connection for Lot 4
Install 25mm OD PE singlehousehold service connectionand electricity and fibre ducts
for future Lot 10.
Existing water, electrical &Chorus connections to new
dwelling on Lot 1
Construct 100mmØstormwater outlets for future
Lots 9 & 10 to kerb & channel
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:300 @ A3
Sheet 3 of 16
-Observation Point 2000
No. Revision
-
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
Drainage & Services DesignSheet 3
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1. Location and extent of existing services shown on
these drawings are indicative only.2. Contractor to ascertain the extent and location of all
existing underground services prior to commencingany excavation work.
3. Contractor shall reinstate and make good anydamage to existing carriageways, road markings,street signs, footpaths, street furniture, berms, utilityservices and structures.
4. Contractor to obtain 'Close Approach Permit' fromNetwork Waitaki where excavations are within 5m ofa power pole.
5. Contractor to liaise with WDC & Chorus with regardsto lowering existing water scheme pipe andunderground telecommunications services beneaththe new entrance to ROW B, and shall coordinate thetrenching programme with the repsective authoritiesto ensure there are no delays to the overallconstruction programme.
6. 150mm x 50mm uPVC heavy wall kerb adaptors shallbe used where individual 100mmØ stormwaterlaterals connect to the ROW kerb & channel.
7. Individual water connections (with restrictors) to theexisting WDC water scheme pipe are to be made inaccordance with WDC water services requirements.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Plan View.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:13 PM
86 Weston Road SubdivisionStage 1
6D11812
11812/6/00
DRAWING STATUS:FOR APPROVAL
For Approval 4/12/2017 - - - - - - - - - -
72.00
150m
mØ
uP
VC
(SN
16)
1 in 49.7
18.0m
80.6
80.
002.
21FS
A1
150mmØ uPVC (SN16)
1 in 101
36.4m
81.2
919
.09
78.8
2978
.979
2.46
2.31
FSA
2
150m
mØ
uP
VC
(SN
16)
1 in 58.0
3.4m
82.0
356
.57
79.3
3979
.389
2.69
2.64
FSA
3
150mmØ uPVC (SN16)
1 in 145
108.6m
82.0
661
.07
79.4
4979
.529
2.61
2.53
FSA
4
81.4
817
0.73
80.2
761.
20FS
A5
Chainage
Finished Surface Level
Invert Level
Depth to Invert
Pipe Gradient
Pipe Length
DATUM R.L.
Existing Ground Level
Finished Surface
78.3
8578
.465
2.29
Existing 150mmØFoul Sewer Main
Inst
all 1
050m
mØ
Man
hole
in e
xist
ing
foul
sew
er li
ne &
conn
ect n
ew fo
ul s
ewer
line
1050
mm
Ø P
reca
stC
oncr
ete
Man
hole
1050
mm
Ø P
reca
stC
oncr
ete
Man
hole
1050
mm
Ø P
reca
stC
oncr
ete
Man
hole
150m
mØ
Ter
min
alM
aint
enan
ce S
haft
Accessway A Accessway B
Lot 6
Edg
e of
Sea
l
Lot 11Lot 5 Lot 12
Lot 1
3
Lot 10
Wes
ton
Rd
Roa
d B
dy
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:750 @ A3
Sheet 4 of 16
-Observation Point 2000
No. Revision
1:200 @ A3
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
86 Weston Road SubdivisionStage 1
Foul Sewer Long SectionSheet 4
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:21 PM
6D11812
D11812/6/00
DRAWING STATUS:FOR APPROVAL
For Approval 4/12/2017 - - - - - - - - - -
76.00
Chainage
Finished Surface Level
Invert Level
Depth to Invert
Pipe Gradient
Pipe Length
DATUM R.L.
SW
A3
SW
A2
SW
A1
Existing Ground Level
Finished Surface
Sta
ndar
d H
illsi
de S
ump
150m
mØ
uP
VC
(SN
16) M
aint
enan
ce S
haft
Connect to300mmØ
Helcor culvert(SWB)
SW
B2
Existing Ground Level
Finished level of new road surface
New asphaltdish channelwatertable
New asphaltdish channelwatertable
SW
B1
SWA3150mmØ
300mmØ Helcor Culvert150mmØ uPVC
1 in 100
2.1m
80.9
40.
0080
.379
80.3
790.
560.
56
225m
mØ
uP
VC
1 in 100
1.1m
81.2
82.
1980
.400
80.4
000.
880.
88(-4
5°)
80.8
53.
6080
.411
79.8
500.
441.
00
1 in 100
10.8m
80.5
40.
0080
.253
80.2
3980
.239
1.00
1.01
1.01
80.6
510
.98
80.3
470.
60
Culvert end cut at 1:3 taper150mm thick in-situ site
concrete (25MPa) aroundculvert outlet. Trowel to smoothfinish. See Detail D, Sheet 15
for construction details
Culvert end cut at 1:3 taper150mm thick in-situ site
concrete (25MPa) aroundculvert outlet. Trowel to smoothfinish. See Detail D, Sheet 15
for construction details
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:100 @ A3
6D11812
D11812/6/00
Sheet 5 of 16
-Observation Point 2000
No. Revision
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
Stormwater Long SectionSheet 5
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1. Culvert and installation shall be in accordance with
the 'Concrete Pipe selection and Installation Guide bythe Concrete Pipe Association of Austalasia' HS2.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:23 PM
1:100 @ A3
86 Weston Road SubdivisionStage 1
DRAWING STATUS:FOR APPROVAL
For Approval 4/12/2017 - - - - - - - - - -
76.00
Chainage
Finished Surface Level
Invert Level
Depth to Invert
Pipe Gradient
Pipe Length
DATUM R.L.
1 in 100
1.9m
79.2
40.
0079
.707
79.7
07-0
.47
-0.4
7
1 in 101
0.9m
80.3
01.
9879
.726
79.7
0779
.707
0.57
0.59
0.59
(-41°
)80
.12
3.25
79.7
1679
.000
0.40
1.12
150m
mØ
uP
VC
150m
mØ
uP
VC
SW
C2
SW
C1Existing Ground Level
Finished Surface
Sta
ndar
d H
illsi
de S
ump
150m
mØ
uP
VC
(SN
16) M
aint
enan
ce S
haft
Connect to300mmØ
Helcor culvert(SWD)
1 in 100
8.0m
79.8
90.
0079
.595
79.5
950.
600.
60
80.0
98.
2679
.675
79.6
900.
620.
60
SW
D1
300mmØ Helcor Culvert
SW
D2Existing Ground Level
Finished level of new road surface
SWC3150mmØ
New asphaltdish channelwatertable
New asphaltdish channelwatertable
SW
C3
Culvert end cut at 1:3 taper150mm thick in-situ site
concrete (25MPa) aroundculvert outlet. Trowel to smoothfinish. See Detail D, Sheet 15
for construction details
Culvert end cut at 1:3 taper150mm thick in-situ site
concrete (25MPa) aroundculvert outlet. Trowel to smoothfinish. See Detail D, Sheet 15
for construction details
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
Sheet 6 of 16
-Observation Point 2000
No. Revision
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
Stormwater Long SectionsSheet 6
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1. Culvert and installation shall be in accordance with
the 'Concrete Pipe selection and Installation Guide bythe Concrete Pipe Association of Austalasia' HS2.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:28 PM
1:100 @ A31:100 @ A3
86 Weston Road SubdivisionStage 1
6D11812
D11812/6/00
DRAWING STATUS:FOR APPROVAL
For Approval 4/12/2017 - - - - - - - - - -
C
C'
B
B'
AA
'
H
H'
Existing Overhead Pow
er
Existing Water Table
Existing 150mm
Ø Foul Sew
er
Shape & grade turningbay at 3% crossfall to
drain to main accessway
Construct newkerb & channel
Top of Cut Batter (1vt:2hz)
Top of Cut Batter (1vt:2hz)
R5.00m
Shape & grade newentranceway to match
existing levels Weston Road
3.50m
5.50
m
3.00m
Existing UndergroundChorus Cable
Existing UndergroundChorus Cable
Existing WD
C W
ater Scheme
Existing WD
C W
ater Scheme
Existing Overhead Pow
er
Weston R
oad
Future Stage 2 Access Extension
Construct 40mmx150mm H4timber edge around turning bay
Top of Cut Batter (1vt:2hz)Construct40mmx150mm H4
timber edge
Construct40mmx150mm H4
timber edge
Neat saw cut200mm insideexisting edge
of seal
3.50m
Construct40mmx150mmH4 timber edge
10m Taper 1:10m
10m Taper 1:10m
Construct 40mm compactedasphalt (Table Mix 10) over100mm M4/AP40 over200mm AP65 (subject to CBR test)
Existing Top of Bank
Existing Top of Bank
Batter back existingTop of Bank (1vt:1.5hz)CH 101.20 - CH 120.39
Existing
Edge of Seal
Edge of Existing Seal
ROW BProposed Asphalt Accessway
1.0m
1.0m
Existing road shoulder andwatertable to be reconstructedand sealed. See typical CrossSection G-G' & H-H', Sheet 14
for construction details.
Reshape, regrade, and alignexisting watertable to join to new
culvert.
Reshape, regrade, and align existingwatertable to join to new culvert.
Existing Water Table
Lot 4
Lot 6
Lot 5
Lot 7
Lot 13
Lot 12
Lot 11
(Future Stage 2)
300mmØHelcor Culvert
Top of Cut Batter (1vt:2hz)
0.00
0
TP 2
0.85
2
TP 4
9.32
4
TP 55.342
78.349
10
20304050
60
70
SAG
4.0
23SA
G 4
.023
VTP 63.000
VTP 69.000
New Taper &shoulder to be
sealed with TwoCoat Chipseal(Grade 3 & 5)
New Taper &shoulder to be
sealed with TwoCoat Chipseal(Grade 3 & 5)
Extend two-coat chip seal to newasphalt watertable. See typicalCross Section H-H', Sheet 14.
153.463
80
90
100
110
120
130
140
150
R6.00m
R6.
00m
Batter back existingTop of Bank (1vt:1.5hz)CH 82.75 - CH 101.20
Extent of ROW Bconstruction in
Stage 1 Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:300 @ A3
Sheet 7 of 16
-Observation Point 2000
No. Revision
-
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
Roading Design - ROW BSheet 7
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1. Location and extent of xisting services shown on
these drawings are indicative only.2. Contractor to ascertain the extent and location of all
existing underground services prior to commencingany excavation work.
3. Contractor shall reinstate and make good anydamage to existing carriageways, road markings,street signs, footpaths, street furniture, berms, utilityservices and structures.
4. Contractor to obtain 'Close Approach Permit' fromNetwork Waitaki where excavations are within 5m ofa power pole.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Plan View.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:35 PM
86 Weston Road SubdivisionStage 1
6D11812
11812/6/00
DRAWING STATUS:FOR APPROVAL
For Approval 4/12/2017 - - - - - - - - - -
E
E'
F
F'
DD
'
G
G'
Existing 400mm Ø Culvert
Top of Cut Batter (1vt:2hz)
Top of Cut Batter (1vt:2hz)
Shape & grade turningbay at 3% crossfall to
drain to new dish channel
Construct new concretekerb & channel
CH 53.19 - CH 72.93
Construct new concrete dishchannel & join to new
concrete kerb & channelCH 42.14 - CH 53.19
Construct 40mm x 150mm H4timber edge around turning bay
Construct new concretekerb & channel
CH9.56 - CH 42.14
5.00
m
3.00
Shape & grade newentranceway to match
existing levels Weston Road
R5.00m
Existing Underground C
horus Cable
Existing 150mm
Ø
Foul Sewer
Existing Watertable
Existing Watertable
Existing WDCWater Scheme
Existing Overhead Pow
er
Construct 40mm compactedasphalt (Table Mix 10) over100mm M4/AP40 over200mm AP65 (subject to CBR test)
Batter back existingTop of Bank (1vt:1.5hz)
Batter back existingTop of Bank (1vt:1.5hz)
Weston R
oad
Neat saw cut200mm insideexisting edge
of seal
Existing Edge of Seal
10m Taper 1:10m
10m Taper 1:10m
Existing Top of Bank
Existing Top of Bank
Proposed Asphalt Accessway
1.0m 3.50m
1.0m 3.50m
300mmØHelcor Culvert
Existing road shoulder andwatertable to be reconstructedand sealed. See typical CrossSection G-G' & H-H', Sheet 14
for construction details.
Road shoulder and existingwater table to be reconstructedand sealed. See typical CrossSections G-G' & H-H' on Sheet
14 for construction details.
Reshape, regrade, and alignexisting watertable to join to new
culvert.
Reshape, regrade, and alignexisting watertable to join to new
culvert.
Lot 1
Lot 2
Lot 3Lot 11
Lot 10
(Future Stage 2)
Lot 9
ROW A
0.00
0
TP 6
.102
TP 1
3.54
2
TP 4
3.16
1
TP 52.824
72.933
10
203040
50
60
70
SAG
3.4
89SA
G 3
.489
New Taper &shoulder to be
sealed with TwoCoat Chipseal(Grade 3 & 5)
New Taper &shoulder to be
sealed with TwoCoat Chipseal(Grade 3 & 5)
R6.00m
R6.00m
0.000
10
20
30
40
50
60
70
Extend two-coat chip seal to newasphalt watertable. See typicalCross Section H-H', Sheet 14.
Existing water, electrical &Chorus connections to new
dwelling on Lot 1
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:300 @ A3
Sheet 8 of 16
-Observation Point 2000
No. Revision
-
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
Roading Design - ROW ASheet 8
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1. Location and extent of xisting services shown on
these drawings are indicative only.2. Contractor to ascertain the extent and location of all
existing underground services prior to commencingany excavation work.
3. Contractor shall reinstate and make good anydamage to existing carriageways, road markings,street signs, footpaths, street furniture, berms, utilityservices and structures.
4. Contractor to obtain 'Close Approach Permit' fromNetwork Waitaki where excavations are within 5m ofa power pole.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Plan View.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:38 PM
86 Weston Road SubdivisionStage 1
6D11812
11812/6/00
DRAWING STATUS:FOR APPROVAL
For Approval 4/12/2017 - - - - - - - - - -
Longsection: ROW B
IP C
H. 6
3.00
0 R
L.81
.266
IP C
H. 6
9.00
0 R
L.81
.467
6Vertical Curve Length
1:-33 1:174 1:16Vertical Geometry
Horizontal Geometry
0.00
81.0
470.
019
81.0
28
4.02
80.9
260.
012
80.9
15
20.0
081
.018
-0.5
4081
.558
20.8
581
.023
-0.5
3881
.561
40.0
081
.134
-0.5
3281
.666
49.3
281
.187
-0.5
0881
.695
55.3
481
.222
-0.5
2981
.751
60.0
081
.249
-0.5
4581
.794
63.0
081
.266
-0.5
5581
.821
66.0
081
.325
-0.5
2081
.845
69.0
081
.467
-0.4
2381
.890
78.3
582
.039
0.00
082
.039
Chainage
Finished Level
Cut(-)/Fill(+) to Finished Level
Existing Ground Level
Datum R.L. 69.00
Roa
d B
ound
ary
CH
10.
59
Wes
ton
Rd
CL
End
of A
cces
sway
Lot 1
3
Finished level ofnew ROW
Existing Ground Level
Proposed150mmØ Foul
sewer
Proposed300mmØ
Helcor Culvert
R50.00m R5.00m
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:500 @ A3
6D11812
D11812/6/00
Sheet 9 of 16
-Observation Point 2000
No. Revision
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
ROW B Long SectionSheet 9
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:46 PM
1:250 @ A3
86 Weston Road SubdivisionStage 1
DRAWING STATUS:FOR APPROVAL
For Approval 4/12/2017 - - - - - - - - - -
Longsection: ROW A
Proposed300mmØ
Helcor Culvert
Vertical Curve Length
1:-33 1:46Vertical Geometry
R20.00m R-5.00mHorizontal Geometry
0.00
80.1
320.
000
80.1
31
3.49
80.0
260.
087
79.9
39
6.10
80.0
82-1
.048
81.1
30
13.5
480
.242
-0.9
4981
.191
20.0
080
.381
-0.9
1281
.293
40.0
080
.812
-0.7
2181
.533
43.1
680
.880
-0.6
4481
.524
52.8
281
.088
-0.3
9281
.480
60.0
081
.243
-0.2
2481
.467
72.9
381
.521
-0.0
0081
.521
Chainage
Finished Level
Cut(-)/Fill(+) to Finished Level
Existing Ground Level
Datum R.L. 69.00
Wes
ton
Roa
d C
L
Roa
d B
ound
ary
CH
9.8
6
End
of A
cces
sway
Lot 1
Finished level ofnew ROW
Existing Ground Level
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:500 @ A3
6D11812
D11812/6/00
Sheet 10 of 16
-Observation Point 2000
No. Revision
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
ROW A Long SectionSheet 10
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:48 PM
1:250 @ A3
86 Weston Road SubdivisionStage 1
DRAWING STATUS:FOR APPROVAL
For Approval 4/12/2017 - - - - - - - - - -
RL 78.00
ROW B
1:2 Cut batterto join existingground level
1:2 Cut batterto join existingground level
3% crossfall3% crossfall
Turning Bay
See Detail A Sheet 15for subsoil drain details
5.50m
Lot 5
Lot 12(Future Stage 2)
Lot 11(Future Stage 2)
Cross Section B - B'CH 50.00
Pro
pose
dB
ound
ary
Pro
pose
dB
ound
ary
B B'
Existing Ground Level
4x25mm waterconnections
ChorusFibre Duct
Electricity LV Spare Ductfor Stage 2
Service trench, cover over services,and separation between services tobe in accordance with the respective
utility provider specifications
40mm x 150mm H4timber edge. Timber
Pegs 50mm x 50mm x600mm to be installed
at 750mm centres
See Detail B Sheet 15for subsoil drain details.
Concrete Standard Kerb &Channel as per
NZS4404-2010, Figure 3.7
40mm Asphalt over100mm TNZ M/4 AP40 over300mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade
See Detail A Sheet 15for subsoil drain details
5.50m
Existing Ground Level
3% Crossfall
Concrete Standard Kerb &Channel as per
NZS4404-2010, Figure 3.7
1:2 Cut batterto join existingground level
1:2 Cut batterto join existingground level
40mm Asphalt over100mm TNZ M/4 AP40 over300mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade
RL 78.00
Lot 6
Pro
pose
dB
ound
ary
Lot 12(Future Stage 2)
Lot 4
Pro
pose
dB
ound
ary
Cross Section A - A'CH 30.00A A'
Service trench details asper Section B-B', Sheet 11
40mm x 150mm H4timber edge. Timber
Pegs 50mm x 50mm x600mm to be installed
at 750mm centres See Detail B Sheet 15for subsoil drain details.
6.30m
ROW B
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:50 @ A3
6D11812
D11812/6/00
Sheet 11 of 16
-Observation Point 2000
No. Revision
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
ROW B Cross SectionsSheet 11
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:53 PM
86 Weston Road SubdivisionStage 1
DRAWING STATUS:FOR APPROVAL
1:50 @ A3
For Approval 4/12/2017 - - - - - - - - - -
3% Crossfall40mm x 150mm H4
timber edge. TimberPegs 50mm x 50mm x600mm to be installed
at 750mm centres
Existing Ground Level
Concrete Dish Channel as perNZS 4404-2010, Figure 3.7 to
be constructed at edge ofturning bay over basecourse
as specified. Reinforcing to be3xD12 bars, 50mm cover
40mm Asphalt over100mm TNZ M/4 AP40 over300mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade
Shape at 3% crossfall to drainto new concrete dish channel
1:2 Cut batterto join existingground levelROW A Turning Bay
Berm
0.60m
1:2 Cut batterto join existingground level
See Detail C Sheet 15for dish channel &subsoil drain details
See Detail B Sheet 15for subsoil drain details.
RL 78.00E E'Cross Section E - E'
CH 48.00
Lot 10(Future Stage 2)Lot 2
Pro
pose
dB
ound
ary
40mm x 150mm H4timber edge. Timber
Pegs 50mm x 50mm x600mm to be installed
at 750mm centres
See Detail B Sheet 15for subsoil drain details.
Service trench details as perSection B-B', Sheet 11
1:2 Cut batterto join existingground level
See Detail A Sheet 13for subsoil drain details
1:2 Cut batterto join existingground level
40mm Asphalt over100mm TNZ M/4 AP40 over
300mm AP 65(subject to CBR testing)
over Bidim (A19) geotextile laid on subgrade
3% CrossfallConcrete Standard Kerb &
Channel as perNZS4404-2010, Figure 3.7
4.50m
Existing Ground Level
RL 78.00D D'Cross Section D - D'
CH 24.00
Lot 10(Future Stage 2)
Lot 3Lot 2
Pro
pose
dB
ound
ary
Pro
pose
dB
ound
ary
See Detail B Sheet 15for subsoil drain details
40mm x 150mm H4timber edge. Timber
Pegs 50mm x 50mm x600mm to be installed
at 750mm centres
5.00m
Service trench details as perSection B-B', Sheet 11
ROW A
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:50 @ A3
6D11812
D11812/6/00
Sheet 12 of 16
Observation Point 2000
No. Revision
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
ROW A Cross SectionsSheet 12
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:42:58 PM
86 Weston Road SubdivisionStage 1
DRAWING STATUS:FOR APPROVAL
1:50 @ A3 -
For Approval 4/12/2017 - - - - - - - - - -
Concrete Standard Kerb &Channel as per
NZS4404-2010, Figure 3.7
1:2 Cut batterto join existingground level
1:2 Cut batterto join existingground level
40mm Asphalt over100mm TNZ M/4 AP40 over300mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade
See Detail A Sheet 15for subsoil drain details
3.00m
Existing Ground Level
Cross Section C - C'CH 70.00RL 78.00C C'
(CH 55.34 - CH 78.35)
40mm x 150mm H4timber edge. Timber
Pegs 50mm x 50mm x600mm to be installed
at 750mm centres
See Detail B Sheet 15for subsoil drain details.
Pro
pose
dB
ound
ary
Lot 6
Lot 12(Future Stage 2)
Service trench details as perSection B-B', Sheet 11
ROW B
RO
W E
asem
ent
Bou
ndar
y
4.50m
To be constructed in Stage 2
Cross Section F - F'CH 60.00RL 78.00F F'
Concrete Standard Kerb &Channel as per
NZS4404-2010, Figure 3.7
1:2 Cut batterto join existingground level
1:2 Cut batterto join existingground level
See Detail A Sheet 15for subsoil drain details
3.00m(CH 52.86 - CH 72.93)
40mm x 150mm H4timber edge. Timber
Pegs 50mm x 50mm x600mm to be installed
at 750mm centres
See Detail B Sheet 15for subsoil drain details.
Service trench detailsas per Section B-B',
Sheet 11
Lot 10(Future Stage 2)
Lot 2
Pro
pose
dB
ound
ary
ROW A
40mm Asphalt over100mm TNZ M/4 AP40 over300mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade R
OW
Eas
emen
tB
ound
ary
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:50 @ A3
6D11812
D11812/6/00
Sheet 13 of 16
-Observation Point 2000
No. Revision
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
ROW A & B Cross SectionsSheet 13
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:43:03 PM
86 Weston Road SubdivisionStage 1
DRAWING STATUS:FOR APPROVAL
1:50 @ A3
For Approval 4/12/2017 - - - - - - - - - -
Cross Section G - G'CH 35.00RL 77.00G G'
Existing Chip Seal Road Formation(≈ 4% crossfall)
New
Tap
er
Grade back1:1.5 Cut batterto join existingground level
Edge of existing seal to edge of dish channelbe constructed of:2 Coat Chipseal (Grade 3 & 5) over100mm TNZ M/4 AP40 over250mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade
See Detail C Sheet 15for subsoil drain details
Asphalt DishChannel
Neat saw cut200mm inside edge
of existing seal
50mm
600mm
CL
Weston Road
Lot 2
Dish channel be constructed of:40mm Asphalt over100mm TNZ M/4 AP40 over200mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade
Pro
pose
dB
ound
ary
Existing Bank
≈ 13% varies
Cross Section H - H'CH 137.27RL 77.00H H'
See Detail C Sheet 15for subsoil drain details
Upgrade existingwater table to Asphalt
Dish Channel600mm
100mmØ uPVC stormwater drain
SW outlet50mm abovechannel invert
100mm thich in-situ concrete(25MPa) protection around pipeoutlet. Trowel to smooth finish.
Existing Chip Seal Road Formation(≈ 4% crossfall)
CLEdge of existing seal to edge of dish channel be constructed of:2 Coat Chipseal (Grade 3 & 5) over100mm TNZ M/4 AP40 over250mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade
Dish channel be constructed of:40mm Asphalt over100mm TNZ M/4 AP40 over200mm AP 65(subject to CBR testing)over Bidim (A19) geotextile laid on subgrade
Weston RoadLot 7 Pro
pose
dB
ound
ary
0.9mvaries
1.00m
≈ 1:100≈ 13% varies
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:50 @ A3
6D11812
D11812/6/00
Sheet 14 of 16
-Observation Point 2000
No. Revision
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
Road Cross SectionsSheet 14
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:43:08 PM
86 Weston Road SubdivisionStage 1
DRAWING STATUS:FOR APPROVAL
1:50 @ A3
For Approval 4/12/2017 - - - - - - - - - -
Concrete Dish Channel
Road Subgrade
200mm cleandrainage chip
70mm
0.30m
Detail C - Kerb & Channel Subsoil DrainageScale 1:15
M/4 AP40
AP65
110mmØ perforatedsubsoil pipe
Filter fabric placedto trench perimeter
Dish Channel as perNZS 4404-2010,
Figure 3Reinforcing tobe 3xD12 bars,
50mm cover Asphalt
Road Subgrade
ConcreteKerb & Channel
200mm cleandrainage chip
110mmØ perforatedsubsoil pipe
70mm
0.30m
Detail A - Dish Channel Subsoil DrainageScale 1:15
Filter fabric placedto trench perimeter
M/4 AP40
AP65
Asphalt
Kerb & Channel as perNZS 4404-2010, Figure 3.7
110mmØ perforatedsubsoil pipe
70mm
0.30m
Filter fabric placedto trench perimeter
Road Subgrade
200mm cleandrainage chip
Detail B - Subsoil Drainage at Edge of SealScale 1:15
M/4 AP40
AP65
Asphalt
0.40m
300mmØ HelcorCulvert end cut
at 1:3 taper
0.40m
0.40m150mm thick in-situconcrete (25MPa)protection around
culvert outlet. Trowelto smooth finish.
0.60
mas
phalt
dish
chan
nel
Asphalt shoulder
Asphaltdrivewayentrance
1.30m
Detail D - Typical Culvert Taper ConstructionScale 1:25
1.10m
300mm
Ø H
elcor
Culvert
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
as shown
6D11812
D11812/6/00
Sheet 15 of 16
-Observation Point 2000
No. Revision
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
Road DetailsSheet 15
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:43:13 PM
86 Weston Road SubdivisionStage 1
-
DRAWING STATUS:FOR APPROVAL
For Approval 4/12/2017 - - - - - - - - - -
1
2
Lot 5
Lot 4
Lot 11(Stage 2)
Lot 12(Stage 2)
3
ROW A
Turning Circle for 85% vehicle, turning radius 5.8mROW A - Turning Circle
1
2
3
Lot 3
Lot 2
Lot 10(Stage 2)
ROW B
Turning Circle for 85% vehicle, turning radius 5.8mROW B - Turning Circle
Surveying, Resource Management & EngineeringDunedin 03-4774783 Mosgiel 03-4897107 Balclutha 03-4180470
1:150 @ A3
6D11812
D11812/6/00
Sheet 16 of 16
-Observation Point 2000
No. Revision
-
Verify all dimensions on site before commencing work. Do notscale off drawings. Refer all discrepancies to Terramark Ltd.
Turning Circles85th Percentile Vehicle
Sheet 16
Plan No.Job No.
Drawing
Revision
Scale DatumHorizontalVertical
Project Title
Sheet Title
Status Date
Notes1.
P:\JOB FOLDERS\Dunedin Jobs\D11812\Engineering\D11812-6 Engineering - Long & X Sections.dwg Plotted by: Aaron Date Plotted: 08-Dec-17 4:43:18 PM
86 Weston Road SubdivisionStage 1
DRAWING STATUS:FOR APPROVAL
For Approval 4/12/2017 - - - - - - - - - -