ONE HOUR PEAK DEMAND AND MAXIMUM MONTHLY REQUIREMENT FOR RECEIVING STATIONS % CHANGE STATION ONE HOUR PEAK MAX. MONTHLY ENERGY RECEIVED LOAD FACTOR ONE HOUR PEAK MAX. MONTHLY ENERGY RECEIVED LOAD FACTOR PEAK LOAD MAX. MONTHLY ENERGY RECEIVED ( MWH ) ( MVAR ) ( GWH ) ( % ) ( MWH ) ( MVAR ) ( GWH ) ( % ) ( MWH ) ( GWH ) PAREL 128 40 66.43 69.7 124 13 61.72 66.8 3.2 7.6 MAHALAXMI 129 33 58.37 61.0 129 31 62.39 65.1 -0.1 -6.4 DHARAVI ( 22 KV ) 174 71 90.15 69.6 168 70 86.26 69.0 3.6 4.5 DHARAVI ( 33 KV ) 205 51 114.58 75.1 211 61.9 116.07 73.9 -2.8 -1.3 SALSETTE 114 42 58.88 69.4 103 40 52.01 67.9 10.7 13.2 SAKI 179 39 77.33 58.1 162 42 70.33 58.4 10.5 10.0 BORIVLI (22 KV) 169 28.5 90.68 72.1 142 34 72.16 68.3 19.0 25.7 BORIVLI (33 KV) 55 - 28.39 69.4 0 - 0.00 KOLSHET 38 9 14.31 50.6 28 10 13.42 64.4 35.7 6.6 AMBERNATH 54 20 24.55 60.7 53 16 24.06 61.0 2.6 2.1 KALYAN 93 73 45.72 66.1 94 76 45.54 65.1 -1.1 0.4 TROMBAY ( 110 KV + 22 KV ) 91 N.A. 37.46 55.3 94 N.A. 31.26 44.7 -3.2 19.8 CARNAC ( 22 KV ) 59 38 25.79 58.8 63 10.8 30.51 65.1 -6.3 -15.5 CARNAC ( 33 KV ) 205 N.A. 76.42 50.1 176 N.A. 68.10 52.0 16.5 12.2 CARNAC ( 110 KV ) 190 N.A. 116.94 82.7 196 N.A. 53.88 36.9 -3.1 117.0 CHEMBUR 92 21 53.79 78.6 97 32 57.14 79.2 -5.2 -5.9 VIKHROLI 110 41.176 55.93 68.6 92 25.5 48.50 70.9 19.1 15.3 MALAD 79 17 43.61 74.2 71 21 36.19 68.5 11.3 20.5 VERSOVA 82 17 42.50 69.7 78 23 39.80 68.6 5.1 6.8 MANKHURD 10 1 2.90 40.3 10 2 2.62 36.7 0.9 11.0 BACKBAY 94.8 16 35.59 50.5 99.47 9 30.52 41.2 -4.7 16.6 2 0 0 7 - 0 8 2 0 0 6 - 0 7 PRG/RSPEAK 2007-08

STATION - Tata Power Peak Data... · one hour peak demand and maximum monthly requirement for receiving stations % change station one hour peak max. monthly energy

  • Upload
    leliem

  • View
    223

  • Download
    2

Embed Size (px)

Citation preview

ONE HOUR PEAK DEMAND AND MAXIMUM MONTHLY REQUIREMENTFOR RECEIVING STATIONS

% CHANGE

STATIONONE HOUR PEAK

MAX. MONTHLY ENERGY

RECEIVED

LOAD FACTOR

ONE HOUR PEAK

MAX. MONTHLY ENERGY

RECEIVED

LOAD FACTOR

PEAK LOAD

MAX. MONTHLY ENERGY

RECEIVED

( MWH ) ( MVAR ) ( GWH ) ( % ) ( MWH ) ( MVAR ) ( GWH ) ( % ) ( MWH ) ( GWH )

PAREL 128 40 66.43 69.7 124 13 61.72 66.8 3.2 7.6

MAHALAXMI 129 33 58.37 61.0 129 31 62.39 65.1 -0.1 -6.4

DHARAVI ( 22 KV )

174 71 90.15 69.6 168 70 86.26 69.0 3.6 4.5

DHARAVI ( 33 KV )

205 51 114.58 75.1 211 61.9 116.07 73.9 -2.8 -1.3

SALSETTE 114 42 58.88 69.4 103 40 52.01 67.9 10.7 13.2

SAKI 179 39 77.33 58.1 162 42 70.33 58.4 10.5 10.0

BORIVLI (22 KV) 169 28.5 90.68 72.1 142 34 72.16 68.3 19.0 25.7

BORIVLI (33 KV) 55 - 28.39 69.4 0 - 0.00

KOLSHET 38 9 14.31 50.6 28 10 13.42 64.4 35.7 6.6

AMBERNATH 54 20 24.55 60.7 53 16 24.06 61.0 2.6 2.1

KALYAN 93 73 45.72 66.1 94 76 45.54 65.1 -1.1 0.4

TROMBAY ( 110 KV + 22 KV )

91 N.A. 37.46 55.3 94 N.A. 31.26 44.7 -3.2 19.8

CARNAC ( 22 KV )

59 38 25.79 58.8 63 10.8 30.51 65.1 -6.3 -15.5

CARNAC ( 33 KV )

205 N.A. 76.42 50.1 176 N.A. 68.10 52.0 16.5 12.2

CARNAC ( 110 KV )

190 N.A. 116.94 82.7 196 N.A. 53.88 36.9 -3.1 117.0

CHEMBUR 92 21 53.79 78.6 97 32 57.14 79.2 -5.2 -5.9

VIKHROLI 110 41.176 55.93 68.6 92 25.5 48.50 70.9 19.1 15.3

MALAD 79 17 43.61 74.2 71 21 36.19 68.5 11.3 20.5

VERSOVA 82 17 42.50 69.7 78 23 39.80 68.6 5.1 6.8

MANKHURD 10 1 2.90 40.3 10 2 2.62 36.7 0.9 11.0

BACKBAY 94.8 16 35.59 50.5 99.47 9 30.52 41.2 -4.7 16.6

2 0 0 7 - 0 8 2 0 0 6 - 0 7

PRG/RSPEAK 2007-08

% CHANGE

STATION LOAD FACTOR

LOAD FACTOR

ENERGY RECEIVED

( GWH ) ( % ) ( GWH ) ( % ) ( GWH )

PAREL 714.29 63.7 693.41 63.8 3.0

MAHALAXMI 638.98 56.7 673.36 59.6 -5.1

DHARAVI ( 22 KV )

1005.01 65.9 937.87 63.7 7.2

DHARAVI ( 33 KV )

1227.8468.4

1215.26 65.7 1.0

SALSETTE 648.41 64.9 593.02 65.7 9.3

SAKI 850.92 54.3 745.53 52.5 14.1

BORIVLI (22 KV) 799.66 54.0 770.69 62.0 3.8

BORIVLI (33 KV) 112.31 23.3 0.00

KOLSHET 152.65 45.9 145.55 59.3 4.9

AMBERNATH 263.83 55.4 268.09 57.7 -1.6

KALYAN 503.87 61.8 499.22 60.6 0.9

TROMBAY ( 110 KV + 22 KV )

303.35 38.1 312.01 37.9 -2.8

CARNAC ( 22 KV )

256.89 49.7 320.91 58.1 -19.9

CARNAC ( 33 KV )

811.56 45.2 733.66 47.6 10.6

CARNAC ( 110 KV )

1206.35 72.5 569.16 33.1 112.0

CHEMBUR 586.55 72.8 628.10 73.9 -6.6

VIKHROLI 574.61 59.9 508.47 63.1 13.0

MALAD 470.68 68.0 392.02 63.0 20.1

VERSOVA 442.76 61.6 403.60 59.1 9.7

MANKHURD 32.23 38.0 29.02 34.5 11.0

BACKBAY 383.22 46.1 337.85 38.8 13.4

ANNUAL ENERGY AND LOAD FACTOR STATISTICSFOR RECEIVING STATION

2 0 0 6 - 07

ENERGY RECEIVED FOR

THE YEAR

ENERGY RECEIVED FOR

THE YEAR

2 0 07 - 0 8

PRG/RSPEAK 2007-08

RECEIVING STATION PAREL

Sr. No: MONTH STATION ONE HOUR PEAK

Corresp 110Kv

Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )

1 April 07 124.1 16:00 11th 24 43.2 103 40 62.67 21.57 115.6 70 10717:00 hrs on

26th2 May 120 13:00 23rd 30.6 42.8 102.5 11.2 63.13 21.97 116.4 71 103

13:00 hrs on 29th

3 June 128.1 16:00 12th 26.1 44 103 18 63.53 18.80 122.2 69 10517:00 hrs on

11th4 July 118.5 12:00 20th 30.6 43.5 102.5 14.5 61.85 15.38 109.3 70 108

13:00 hrs on 26th

5 Aug. 116.3 12:00 2nd 40.8 47.5 103 14.8 61.26 17.89 114.5 71 10213:00 hrs on

31st6 Sep. 120 11:00 5th 38 27.4 102 10.6 61.65 18.38 121.4 71 99

13:00 hrs on 13th

7 Oct. 126.7 11:00 5th 36 28 104.5 12.5 66.43 24.42 128.6 70 9912:00 hrs on

5th8 Nov. 123.6 12:00 6th 24.8 43.6 104.5 37 58.56 19.58 114.1 66 108

13:00 hrs on 1st

9 Dec 106.8 19:00 4th 25.3 42.3 104.3 23 55.17 20.35 106.8 69 10012:00 hrs on

24th10 Jan.08 105.2 19:00 14th 25 18.4 105 16.5 51.26 18.57 93 65 113

12:00 hrs on 17th

11 Feb. 115.3 0:00 29th 16 17.4 104 23.4 46.86 18.89 108.7 58 10612:00 hrs on

28th12 March 118.9 12:00 26th 22.1 17.4 104 26.8 61.93 24.75 116.3 70 102

13:00 hrs on 28th

PEAK load for the Year--------------- = 128.10 MWHPeak Reactive for the Year -------- = 40.00 MvarMax. Monthly Energy received------ = 66.43 GWHTotal Energy received for the Year = 714.29 GWH

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

PRG/RSPEAK2007 08

RECEIVING STATION MAHALAXMI

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv

Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )

1 April 07 118.51 12:00 18th 16.42 8.61 98.57 22.22 55.73 28 110 65 10817:00 hrs on

26th2 May 124.4 16:00 21st 26.21 9.7 98.86 33.44 58.37 25 94 63 132

17:00 hrs on 26th

3 June 128.69 12:00 14th 16.17 8.66 98.86 22.11 56.19 24 117 61 11017:00 hrs on

11th4 July 120.7 16:00 25th 24.61 9.75 99.16 25.39 57.06 24 117 64 103

13:00 hrs on 26th

5 Aug. 116.69 0:00 22nd 14.68 8.54 104.57 16.59 55.63 23 104 64 11213:00 hrs on

31st6 Sep. 127.74 14:00 9th -8.01 -0.01 106.17 14.25 51.36 18 107 56 119

13:00 hrs on 13th

7 Oct. 112.46 0:00 12th 13.4 8.32 104.4 24.38 54.55 22 110 67 10212:00 hrs on

5th8 Nov. 116 0:00 7th 5.5 8.3 103.4 19.25 52.18 23 102 62 114

13:00 hrs on 1th

9 Dec 107 0:00 24th 0.5 8.9 103.4 19.93 50.77 20 107 66 10012:00 hrs on

24th10 Jan.08 100 0:00 10th 2.3 0 105.4 14 47.74 23 110 64 91

12:00 hrs on 17th

11 Feb. 106.95 0:00 28th 4.26 8.88 105.3 19.96 44.38 18 107 60 10012:00 hrs on

28 th12 March 116.87 0:00 11th 5.62 8.69 103.69 11.33 55.02 26 105 63 111

at 13:00 hrs on 28th

PEAK load for the Year--------------- = 128.69 MWHPeak Reactive for the Year -------- = 33.44 MvarMax. Monthly Energy received------ = 58.37 GWHTotal Energy received for the Year = 638.98 GWH

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

PRG/RSPEAK2007 08

RECEIVING STATION DHARAVI RECEIVING STATION DHARAVI

Sr. No: MONTH STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System

Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 10

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )1 April 07

22 KV 165 13:00 27th 18 44 104.2 62 86.80 118.81 146 73 11333KV 192 12:00 19th 34 0 101.1 34 109.37 89.81 190 79 101

17:00 hrs on 26th

2 May22 KV 162 12:00 30th 12 43 104.5 55 87.93 208.22 157 73 10333KV 196 13:00 4th 30 0 105.2 114.58 47.62 194 79 101

13:00 hrs on 29th

3 June22 KV 166 16:00 12th 14 46 103.4 60 87.76 231.32 153 73 10833KV 202 15:00 12th 31 0 103.5 31 103.98 1.79 197 71 103

17:00 Hrs on 11th

4 July22 KV 166 11:00 31st 15 47 102.1 63 89.10 233.38 145 72 11433KV 194 13:00 25th 23 0 104.2 23 107.62 0.00 188 75 103

13:00 hrs on 26th

5 Aug.22 KV 174 11:00 31st 23 48 104.2 71 88.89 235.02 145 69 12033KV 190 12:00 24th 36 0 101.6 36 102.25 0.00 182 72 104

13:00 hrs on 31st

6 Sep.22 KV 167 11:00 10th 19 45 102.4 64 86.53 234.84 147 72 11433KV 200 19:00 18th 51 0 102.9 51 107.24 0.00 187 74 107

13:00 hrs on 13th

7 Oct.22 KV 168 12:00 5th 15 46 102.6 61 90.15 253.36 168 72 10033KV 200 21:00 17th 43 0 102.5 43 113.80 0.00 181 76 110

12:00 hrs on 05th

8 Nov.22 KV 169 12:00 05/11/2007 8 45 106 53 81.04 213.08 157 64 10833KV 204 20:00 06/11/2007 31 0 103 31 104.54 13.88 193 69 106

13:00 hrs. on 1st

9 Dec.22 KV 156 11:00 11/12/2007 19 38 106.2 57 79.994 170.923 141 69 11133KV 180 19:00 04/12/2007 44 0 104.3 44 95.822 25.766 170 72 106

12:00 hrs on 24th

Corresp Mvar

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

PRG/RSPEAK2007 08

RECEIVING STATION DHARAVI

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 10

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )10 Jan.08

22 KV 146 20:00 18th 15 38 105.8 53 75.469 152.673 144 77 10133KV 177 11:00 25th 15 0 106.3 15 86.311 22.860 155 73 114

12:00 hrs on 27th

11 Feb22 KV 148 12:00 28th 19 37 104.3 56 67.288 147.821 148 65 10033KV 166 21:00 28th 30 0 105.6 24 79.175 15.780 160 69 104

12:00 Hrs on 28th

12 March22 KV 165 11:00 27th 11 46 104.5 57 84.058 205.299 146 68 11333KV 205 21:00 10th 29 0 105.4 29 103.168 0.000 180 68 114

13:00 hrs on 28th

22 KV PEAK load for the Year-------- = 174.0 MWHPeak Reactive requirement for 22 KV for the Year --- = 71.0 Mvar

Max. Monthly Energy received ( 22 KV )----------------- = 90.15 GWHTotal Energy received for the Year ( 22 KV )------------ = 1005.01 GWH

33 KV PEAK load for the Year------------------------------ = 205.00 MWHMax. Monthly Energy received ( 33 KV )----------------- = 114.578 GWHTotal Energy received for the Year ( 33 KV )------------ = 1227.835 GWH

Peak Reactive requirement for 33 KV for the Year --- = 51.0 Mvar

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

PRG/RSPEAK2007 08

RECEIVING STATION SALSETTE

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )

1 April 07 103 17 5th 4 34 100 38 54.233 71.198 98 73 10517:00hrs on

26th2 May 102 20 24th 6 34 100 42 58.879 79.070 94 78 109

13:00hrs on 29th

3 June 103 12 23rd 4 34 100 38 53.746 81.928 93 72 11117:00hrs on11th

4 July 100 12 18th 4 34 100 38 58.022 83.586 96 78 10413:00hrs on

26th5 Aug. 114 0.875 29th 3 33 100 36 57.903 79.546 80 68 143

13:00hrs on 31st

6 Sep. 109 0.5 3rd 4 34 100 38 56.332 75.491 97 72 11213:00hrs on

13th7 Oct. 101 0.6667 4th 5 34 100 39 56.575 80.252 77 75 131

12:00hrs on 5th

8 Nov. 97 0.7917 5th 5 34 101 39 50.407 74.035 72 72 13513:00 hrs on

1 st 9 Dec 97 0.7917 12th 5 34 100 39 51.250 72.334 72 71 135

12:00hrs on 24th

10 Jan.08 89 0.8333 16th 5 32 101 37 44.508 62.102 80 67 11112:00hrs on

17th11 Feb. 89 0.7917 27th 5 32 100 35 54.185 54.185 70 87 127

12:00hrs on 28tj

12 March 94 0.625 18th 6 32 100 38 52.372 78.900 75 75 12513;00HRS.o

n 28 th

PEAK load for the Year--------------- = 114.0 MWH Peak Reactive for the Year -------- = 42.0 MvarMax. Monthly Energy received------ = 58.88 GWHTotal Energy received for the Year = 648.41 GWH

Trans.+ C.Bank

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

PRG/RSPEAK2007 08

RECEIVING STATION SAKI

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )

1 April 07 166 13:00 16 0 34 100 34 74.33 39.27 154 62 10817:00 hrs on

26th2 May 167 0.6667 31 0 39 99 39 76.89 40.70 161 62 104

13:00hrs on 29th

3 June 170 0.5833 15 0 34 99 34 74.51 40.74 163 61 10417:00hrson

11th4 July 168 0.5417 27 0 34 101 34 75.09 38.67 163 60 103

13:00hrs on 26th

5 Aug. 166 0.625 21 0 34 100 34 70.08 35.13 146 57 11413:00hrs on

31st6 Sep. 166 0.5833 19 0 34 102 34 71.17 37.96 157 60 106

13:00hrs on 13th

7 Oct. 169 0.5 25 0 34 100 34 77.33 41.84 156 62 10812:00hrs on

5th8 Nov. 179 0.625 5 0 32 99 32 67.22 33.83 155 50 115

13:00hrs on 1 st

9 Dec 151 0.5 24 0 34 100 34 66.97 34.73 151 60 10012:00hrs on

24th10 Jan.08 146 0.5 10 0 34 100 34 63.90 30.89 144 59 101

12:00hrs on 17th

11 Feb. 152 0.5 28 0 34 100 34 59.55 28.05 152 56 10012:00hrs on

28th12 March 162 0.6667 5 0 33 101 33 73.88 34.39 140 61 116

13:00hrs on 28th

PEAK load for the Year--------------- = 179.00 MWHPeak Reactive for the Year -------- = 39.00 MvarMax. Monthly Energy received------ = 77.33 GWHTotal Energy received for the Year = 850.92 GWH

Corresp Mvar

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

PRG/RSPEAK2007 08

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )1 April 07

22 KV 125 20 11 1 26 100 27 68.98 50.0 111 77 11333KV 4

17:00hrs on 26th

2 May22 KV 117 1:00 21 0 26 100 26 65.11 51.2 93 75 12633KV 3.5

13:00hrs on 29th

3 June22 KV 122 0:00 15 2 26.5 100 28.5 65.44 49.1 118 74 10333KV 3.5

17:00hrs on 11th

4 July22 KV 125 0:00 2 1 18 100 19 65.96 49.4 117 73 10733KV 3.5

13:00hrs on 26th

5 Aug.22 KV 126 20 23 2 17 100 19 65.84 50.8 101 70 12533KV 3.5

13:00hrs on 31st

6 Sep.22 KV 136 20 27 2 17 100 19 70.78 49.7 111 72 12333KV 18

13:00hrs on 13th

7 Oct.22 KV 169 20 18 0 26 100 26 90.68 51.3 150 75 11333KV 38 20 24 34

12:00hrs on 5th

8 Nov.22 KV 120 20 20 1 26 100 27 64.59 47.5 114 75 10533KV 42 20 21 0 0 100 0 18.47 34

13:00hrs on1st

9 Dec.22 KV 118 20 24 0 17 100 17 65.42 39.7 115 77 10333KV 37 20 21 0 0 100 0 22.46 34

12:00hrs on 24th

RECEIVING STATION BORIVLIMONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

PRG/RSPEAK2007 08

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 10

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )10 Jan.08

22 KV 114 20 16 0 17 100 17 57.77 33.2 104 70 11033KV 49 02 5 0 0 100 0 22.75 40

12:00hrs on 17th

11 Feb22 KV 105 20 4 0 17 100 17 52.71 32.6 102 72 10333KV 45 20 4 0 0 10 0 20.24 33

12:00hrs on 28th

12 March22 KV 120 12 4 0 17 100 17 66.39 38.62 108 77 11133KV 55 20 4 0 0 100 0 28.39 46

13:00hrs of 28th

22 KV PEAK load for the Year-------- = 169.0 MWHPeak Reactive requirement for 22 KV for the Year --- = 28.5 Mvar

Max. Monthly Energy received ( 22 KV )----------------- = 90.68 GWHTotal Energy received for the Year ( 22 KV )------------ = 799.66 GWH

33 KV PEAK load for the Year------------------------------ = 55.00 MWHMax. Monthly Energy received ( 33 KV )----------------- = 28.39 GWHTotal Energy received for the Year ( 33 KV )------------ = 112.31 GWH

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

RECEIVING STATION BORIVLI

PRG/RSPEAK2007 08

RECEIVING STATION KOLSHET

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )

1 April 07 22 19 4th -2 9 100 7 11.742 11.52 18 74 12217:00hrs on

26th2 May 26 0:00 18th -2 9 100 7 13.020 12.09 19 70 137

19mw on 13:00hrs on

3 June 26 0:00 24th -2 9 100 7 13.778 11.7 20 74 13017:00hrs on

11th4 July 31 0:00 8th -2 9 100 7 12.578 12.09 18 55 172

13:00hrs on 26th

5 Aug. 29 11:00 16th -2 9 100 9 13.628 12.7 25 63 11613:00hrs on

31st6 Sep. 37 21:00 13th -2 9 100 7 14.305 11.29 28 54 132

13:hrs on 13th

7 Oct. 28 19:00 24th -2 9 100 7 13.047 12.12 19 63 14713:00hrs on

5th8 Nov. 26 19:00 22nd -2 9 101 7 12.570 11.93 15 67 173

13:00 hrs on 1st

9 Dec 28 11:00 31st -2 9 100 7 12.658 12.4 25 61 11212:00hrs on

24th10 Jan.08 28 11:00 18th -2 9 7 7 12.238 12.4 26 59 108

12:00hrs on 17th

11 Feb. 25 10:00 14th -2 9 100 7 10.296 11.6 20 59 12512:00hrs on

28th12 March 38 19:00 24th -2 9 100 7 12.789 12.4 18 45 211

13:00hrs on 28th

PEAK load for the Year--------------- = 38.0 MWHPeak Reactive for the Year -------- = 9.0 MvarMax. Monthly Energy received------ = 14.31 GWHTotal Energy received for the Year = 152.65 GWH

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

PRG/RSPEAK2007 08

RECEIVING STATION AMBERNATH

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )

1 April 07 52 12:00 4 -7 18.8 104 11.1 23.96 24.176 24 64 21717:00 hrs on

26th

2 May 54 19:00 20 2 17.5 101 19.5 23.69 24.72 23.2 59 23413:00 hrs of

29th

3 June 40.8 21:00 7 -5 18 103.5 13 21.99 23.27 33.6 75 1211700 hrs on

11th4 July 41.6 19:00 5 -7 18.2 104 20 20.65 23.2 28 67 149

13:00 hrs on 26th

5 Aug. 38.4 21:00 9 -7 17.5 104.2 10.5 20.68 22.57 21.6 72 17813:00 hrs on

31st6 Sep. 42.24 20:00 16 -7 17.5 102.5 10.5 22.79 21.9 40 75 106

13:00 hrs on 13th

7 Oct. 45.6 21:00 28 -9 17.9 102.4 11.5 24.55 22.2 30.91 72 14812:00 hrs on

5th8 Nov. 45.5 21:00 4 -6 8.4 102.5 14.7 23.29 19.7 39.36 71 116

13:00 hrs on 1st

9 Dec 40.13 0:00 23 -7 18.8 103.7 11.8 22.43 20.3 33.98 75 11812:00 hrs on

24th10 Jan.08 40.224 20:00 6 -7 17.8 103.6 11.8 21.57 19.4 34.368 72 117

12:00 hrs on 17th

11 Feb. 39.2 15:00 28 5 0 104.6 13.2 17.68 17.7 32.064 65 12212:00 hrs on

28th12 March 40.224 12:00 27 -11 17.1 103.6 11 20.53 17.99 18.432 69 218

13:00 hrs on 28th

PEAK load for the Year--------------- = 54.40 MWHPeak Reactive for the Year -------- = 20.00 MvarMax. Monthly Energy received------ = 24.55 GWHTotal Energy received for the Year = 263.83 GWH

Corresp Mvar

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

PRG/RSPEAK2007 08

RECEIVING STATION KALYAN

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv

Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )

1 April 07 92 0:00 4 -6 60 103 73.0 40.91 71.52 40 62 23017 hrs on

26th

2 May 90 23:00 22 -10 63 102 63.0 45.24 75.84 51 68 17613 hrs on

29th

3 June 90 23:00 12 5 51 102 62.0 44.12 68.16 52 68 17317 hrs on

11th

4 July 92 23:00 24 5 55 104 60.5 44.75 67.92 55 65 16713 hrs on

26th

5 Aug. 89 21:00 29 5 61 104 71.0 43.87 65.52 45 66 19813 hrs on

31st

6 Sep. 93 21:00 12 -12 61 103 64.0 45.72 66.00 60 68 15513 hrs on

13th

7 Oct. 92 21:00 3 -7 60 101 61.5 44.44 70.80 49 65 18812 hrs on

5th

8 Nov. 92 22:00 7 -1 61 103 57.0 40.66 63.60 42 61 21913 hrs on

1st

9 Dec 80 20:00 5 -4 50 103 50.0 38.66 60.48 51 65 15712 hrs on

24th

10 Jan.08 80 22:00 16 3 30 102 51.0 36.52 56.88 40 61 20012 hrs on

17th

11 Feb. 85 22:00 27 3 32 102 42.5 34.38 53.28 46 58 18512 hrs on

28th

12 March 91 22:00 12 -12 59 103.3 67.0 44.61 69.60 51 66 17813 hrs on

28th

PEAK load for the Year--------------- = 93.0 MWHPeak Reactive for the Year -------- = 73 MvarMax. Monthly Energy received------ = 45.72 GWHTotal Energy received for the Year = 503.87 GWH

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

PRG/RSPEAK2007 08

RECEIVING STATION TROMBAY Stn A

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv

Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )1 April.07

22 KV 42 10:00 18th 12.98 6032 43 110 KV 23 13:0 29th 10.82 65

2 May22 KV 49 11:00 17th 13.14 5021 36

110 KV 25 15:00 31st 11.01 59

3 June22 KV 66 09:00 23rd 26.81 4865 56

110 KV 25 14:00 12th 10.65 59

4 July22 KV 46 11:00 3rd 14.98 6230 44

110 KV 24 12:00 11th 11.14 62

5 Aug.22 KV 35 09:00 1st 13.90 990 53

110 KV 24 12:00 21st 10.92 61

6 Sep.22 KV 47 01:00 28th 13.75 3157 41

110 KV 23 11:00 6th 10.54 64

7 Oct.22 KV 51 15:00 30th 16.37 6158 43

110 KV 23 13:00 16th 10.45 61

8 Nov.22 KV 36 23:00 23rd 12.64 5573 49

110 KV 23 13:00 2nd 9.72 59

9 Dec.22 KV 32 12:00 14th 14.60 5426 61

110 KV 20 12:00 14th 9.49 64

Corresp Mvar

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

PRG/RSPEAK2007 08

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )10 Jan.08

22 KV 42 15:00 7th 14.65 5022 47110 KV 20 15:00 14th 9.34 63

11 Feb22 KV 23 11:00 28th 12.41 5462 78

110 KV 21 11:00 27th 8.61 59

12 March22 KV 35 17:00 29th 15.54 5835 60

110 KV 22 12:00 10th 8.89 54

22 KV PEAK load for the Year-------- = 66.00 MWH

Peak Reactive requirement for 22 KV for the Year --- =Max. Monthly Energy received ( 22 KV )----------------- = 26.81 GWHTotal Energy received for the Year ( 22 KV )------------ = 181.77 GWH

110 KV PEAK load for the Year-------- = 25.0 MWHPeak Reactive requirement for 110 KV for the Year --- =Max. Monthly Energy received ( 110 KV )----------------- = 11.14 GWHTotal Energy received for the Year ( 110 KV )------------ = 121.58 GWH

PEAK load for the Year ( 22 KV +110 KV )-------- = 91.0 MWH

Max. Monthly Energy received ( 22 KV +110KV )----------------- = 37.46 GWH

Total Energy received for the Year ( 22 KV +110KV )------------ = 303.35 GWH

Corresp Mvar

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

RECEIVING STATION TROMBAY Stn A

PRG/RSPEAK2007 08

RECEIVING STATION CARNAC RECEIVING STATION CARNAC

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv

Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 10

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )1 April 07

22 KV 59 15:00 3rd -16 20 99.5 4 23.89 37 37 56 15933KV 194 15:00 9th 74.70 155 172 53 113

110KV 190 12:00 21st 69.67 142 51 13417 hrs on

26.th2 May

22 KV 53 15:00 25th -18 20 99.8 2 25.79 209 49 68 10833KV 189 15:00 22th 19 76.42 175 56 108

110KV 154 16:00 23th 18 116.94 151 105 102

13 hrs on 29th3 June

22 KV 51 15:00 1st -22 19 97.6 -3 24.60 213.82 50 67 10233KV 205 16:00 11th 76.06 205 52 100

110KV 160 16:00 12th 113.61 153 99 1051700 hrs on

11th4 July

22 KV 47 11:00 2nd 34 0 101.6 34 22.76 202.1 40 65 11833KV 181 16:00 24th 72.31 173 54 105

110KV 146 12:00 20th 111.47 140 103 10413:00hrs on

26th5 Aug.

22 KV 46 11:00 30 38 0 99 38 21.19 187.9 45 62 10233KV 172 11:00 24 67.16 152 52 113

110KV 149 12:00 22 109.98 137 99 10913:00hrs on

31st6 Sep

22 KV 46 11:00 11 -4 10 99.2 6 21.44 175.5 41 65 11233KV 174 15:00 11 66.64 169 53 103

110KV 144 12:00 12 105.02 141 101 10213 hrs on 13

Sep7 Oct.

22 KV 48 12:00 12 2 0 98.3 2 23.44 42 66 11433KV 180 12:00 12 74.21 165 55 109.09091

110KV 147 12:00 12 112.76 140 103 10512 hrs on 05

Oct

Trans.+ Cond.

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

PRG/RSPEAK2007 08

RECEIVING STATION CARNAC

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv

Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 10

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 6 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )8 Nov

22 KV 46 11:00 6th -16 20 100.2 4 21.27 43 43 64 10733KV 179 15:00 6th 65.75 140.3 172 51 104

110KV 154 15:00 6th 102.44 139 92 11113 hrs on 1st

Nov9 Dec

22 KV 45 11:00 3rd 3 0 98.5 3 21.90 175.6 43 65 10533KV 157 13:00 24th 61.10 155 52 101

110KV 130 19:00 17th 93.92 129 97 101

10 Jan.0822 KV 41 11:00 7th 0 0 99.5 0 19.34 169.1 36 63 11433KV 148 15:00 16th 55.63 142 51 104

110KV 127 12:00 16th 90.44 122 96 10412 hrs on 17th Jan

11 Feb22 KV 36 11:00 5th 0 0 102.9 -12 15.69 150.03 34 63 10633KV 161 15:00 29th 51.04 150 46 107

110KV 125 12:00 22nd 81.36 115 94 10912hrs on 28th

feb12 March

22 KV 53 12:00 18th 4 0 99.1 4 15.58 211.5 40 40 13333KV 180 15:00 28th 70.53 176 53 102

110KV 133 11:00 25th 98.74 127 100 105

PEAK load for the Year ( 22 KV ) = 59.0 MWH( 33 KV ) = 205 MWH( 110 KV ) = 190 MWH

PEAK Reactive for the Year ( 22 KV ) = 38.0 MVAR

( 33 KV ) = 0 MVAR( 33 KV ) = 0 MVAR

Max. Monthly Energy received ( 22 KV ) = 25.8 GWH( 33 KV ) = 76.4 GWH( 110 KV ) = 116.9 GWH

Total Energy received for the Year ( 22 KV ) = 256.9 GWH

( 33 KV ) = 811.6 GWH( 110 KV ) = 1206.3 GWH

1300 hrs 0n 28th

Trans.+ Cond.

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

PRG/RSPEAK2007 08

RECEIVING STATION CHEMBUR RECEIVING STATION CHEMBURSr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv

Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 10

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) (3) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )1 April 07

STATION 85 23 9th 5 14 108 19 50.67 15.49 74 83 11511 KV 19 4 3rd 8.32 61

22 KV(M) 13 23 9th 8.00 85 22 KV(T) 58 23 9th 34.35 82

2 MaySTATION 87 23 7th 6 15 106 21 51.51 16.12 76 80 114

11 KV 15 5 30th 9.09 8122 KV(M) 14 21 22nd 8.83 85 22 KV(T) 63 23 7th 33.59 72

3 JuneSTATION 92 21 23rd 2 15 108 17 53.79 15.48 80 81 115

11 KV 22 18 12th 12.43 7822 KV(M) 13 20 2nd 7.45 8022 KV(T) 59 21 23rd 33.91 80

4 JulySTATION 83 20 13th 3 14 106 17 49.69 17.17 69 83 120

11 KV 16 08 30th 10.21 8922 KV(M) 12 20 13th 8.22 9522 KV(T) 58 20 13th 31.26 75

5 Aug. STATION 86 12 29th 3 14 106 17 50.62 16.48 81 79 106

11 KV 16 12 12th 9.96 at 13hrs 8422 KV(M) 12 12 29th 8.26 on31st 9322 KV(T) 58 12 29th 32.40 75

6 SepSTATION 87 21 12th 5 14 106 19 51.04 15.36 77 81 113

11 KV 16 9 26th 9.94 at 13hrs 8622 KV(M) 12 9 26th 7.84 on 13 th 9122 KV(T) 62 21 12th 33.26 75

7 Oct.STATION 84 20 17th 2 14 106 19 53.76 17.37 75 89 112

11 KV 15 9 2nd 9.76 at 12hrs 9022 KV(M) 12 20 17th 7.90 on 5th 9122 KV(T) 65 20 17th 36.10 77

Corresp Mvar

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

17:00 hrs on 26th

1700 hrs on 11th

13:00 hrs on 29th

1300 hrs on 26th

PRG/RSPEAK2007 08

RECEIVING STATION CHEMBURSr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv

Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 10

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )8 Nov

STATION 91 20 6 6 14 110 20 49.87 16.3 59 76 15411 KV 15 3 13 9.50 88

22 KV(M) 12 3 11 7.31 8522 KV(T) 68 20 6 33.06 68

9 Dec.STATION 84 20 26 5 14 106 19 46.12 14.53 72 76 117

11 KV 15 23 2 9.74 9022 KV(M) 11 20 2 5.68 7222 KV(T) 63 20 22 30.69 68

10 Jan.08STATION 80 20 11 6 14 106 20 43.71 58 76 138

11 KV 15 1 16 9.89 9222 KV(M) 11 20 16 5.57 7022 KV(T) 59 20 10 28.23 66

11 Feb.STATION 77 21 5 8 0 108 8 37.93 10.91 65 71 118

11 KV 15 4 17 8.95 8622 KV(M) 11 21 18 5.35 7022 KV(T) 54 21 5 23.63 63

12 March STATION 87 21 11th 15 0 107 15 47.84 16.2 67 76 130

11 KV 15 19 18th 9.81 9122 KV(M) 12 20 4th 4.75 5522 KV(T) 62 21 11th 33.28 75

PEAK load for the Year PEAK Reactive for the Year STATION TOTAL = 92.0 MWH STATION TOTAL = 21.0 MVAR

11 KV RCF = 22.0 MWH22 KV MRS = 14.0 MWH22 KV ( T ) = 68.0 MWH

Max. Monthly Energy received Total Energy received for the Year STATION TOTAL = 53.79 GWH STATION TOTAL = 586.55 GWH

11 KV RCF = 12.43 GWH 11 KV RCF = 117.60 GWH22 KV MRS = 8.83 GWH 22 KV MRS = 85.16 GWH22 KV Tata = 36.10 GWH 22 KV Tata = 383.76 GWH

Corresp Mvar

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

1300 hrs 0n 28th

1300 hrs on 1st

1200 hrs on 24th

12:00hrs on 17th

12:00hrs on 28th

PRG/RSPEAK2007 08

RECEIVING STATION VIKHROLI

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )

April 07 86 20 5th -9.84 23.7 100.1 13.86 45.031 24.231 69 73 12517:00hrs on

26th2 May 89 13 25th 0.94 24.1 102.1 25.04 47.683 24.150 80.6 72.01 110.42

13:00hrs oo 29th

3 June 90 17 11 8 24.9 104 32.9 46.304 24.060 96 71 9417:00 hrs.on

11th4 July 89 12 24 7.9 24.4 102.5 32.3 48.112 28.346 83 73 107

13:00hrs of 26th

5 Aug. 89 11.45 2 11 22.11 101.4 33.11 42.929 27.018 81 65 109.3013:00hrs on

31st6 Sep. 82.478 10:25 18th 4 23.6 101.06 27.6 49.794 25.450 84 84 98

13:00hrs of 13th

7 Oct. 109.55 13:10 17th 6.2 24.27 100.28 30.468 55.928 33.620 79.168 69 13813:00hrs on

5th8 Nov. 104.92 13:00 1 st 5.7 24.6 104.1 30.3 50.909 28.700 94.462 67 111

1300 hrs on 1st

9 Dec 87.972 18:50 5th 6.119 22.53 101.91 28.644 45.010 27.446 69.708 69 12612:00 hrs on

24th10 Jan.08 90.256 19:00 14th 9 24.6 100.92 33.6 45.600 22.564 79.476 68 114

12:00hrs on 17th

11 Feb. 94.988 19:20 26th 12.13 23.43 100.62 35.556 43.457 22.100 68.246 66 13912:00hrs on

28th12 March 100.65 20:35 28th 17.03 24.15 102.77 41.176 53.854 31.269 93.405 72 108

13:00hrs of 28th

PEAK load for the Year--------------- = 109.5 MWHPeak Reactive for the Year -------- = 41.2 MvarMax. Monthly Energy received------ = 55.93 GWHTotal Energy received for the Year = 574.61 GWH

Corresp Mvar

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

PRG/RSPEAK2007 08

RECEIVING STATION MALAD

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )

1 April 08 75 12 14 0 17 99 17 40.38 22.5 68 75 11017:00hrs on

26th2 May 75 16 28 0 17 99 17 42.86 23.3 71 77 106

13:00hrs on 29th

3 June 76 15 15 0 17 99.5 17 40.15 23.6 74 73 10317:00 hrs.on

11th4 July 76 1 28 0 17 99 17 41.05 23.3 69 73 110

13:00hrs on 26th

5 Aug 72 12 25 0 17 99 17 42.06 23.3 67 79 10713:00hrs on

31st6 Sep. 75 11 14 1 17 99 17 40.52 22.5 71 75 106

13:00hrs on 13th

7 Oct. 77 20 31 0 17 99 17 43.61 23.3 70 76 11012:00hrs on

5th8 Nov. 79 19 7 0 17 100 17 38.85 16.2 64 66 123

13:00hrs on 1st

9 Dec 72 19 21 0 17 100 17 36.30 14.5 65 68 11112:00hrs on

2410 Jan.08 65 12 17 0 17 100 17 35.17 14.1 64 73 102

12:00hrs on 17th

11 Feb. 68 12 15 0 17 100 17 29.88 12.9 63 63 10812:00hrs on

28th 12 March 70 12 28 0 17 100 17 39.85 13.67 68 77 103

13:00hrs of 28th

PEAK load for the Year--------------- = 79.0 MWHPeak Reactive for the Year -------- = 17.0 MvarMax. Monthly Energy received------ = 43.61 GWHTotal Energy received for the Year = 470.68 GWH

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

PRG/RSPEAK2007 08

RECEIVING STATION VERSOVA

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )

1 April 07 75 0:00 25 0 17 99 17 38.50 25.5 67 71 11217:00hrs on

26th2 May 75 20 4 0 17 99 17 42.50 26.4 66 79 114

13:00hrs on 29th

3 June 82 14 12 -2 17 99.5 15 39.70 26.2 68 67 12117:00hrs on

11th4 July 75 20 24 0 17 99 17 35.70 26.4 63 64 119

13:00hrs on 26th

5 Aug. 71 11 12 0 17 99 17 35.70 26.4 69 68 10313:00hrs on

31st6 Sep. 70 11 18 0 17 99 17 36.70 25.5 66 73 106

13:00hrs on 13th

7 Oct. 73 19 31 0 17 99 17 38.40 26.4 64 71 11412:00hrs on

5th8 Nov. 70 18 2 0 17 100 17 38.62 25.5 60 74 117

13:00hrs on 1st

9 Dec 64 20 19 0 17 100 17 36.84 25.3 63 71 10212:00hrs on

24th10 Jan.08 64 11 3 0 17 100 17 31.56 22.9 62 66 103

12:00hrs of 17th

11 Feb. 70 10 24 0 17 100 17 30.57 21.2 52 63 13512:00hrs on

28th 12 March 71 12 17 0 17 100 17 37.97 15.0 62 72 115

13:00hrs of 28th

PEAK load for the Year--------------- = 82.0 MWHPeak Reactive for the Year -------- = 17.0 MvarMax. Monthly Energy received------ = 42.50 GWHTotal Energy received for the Year = 442.76 GWH

Corresp Mvar

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

PRG/RSPEAK2007 08

RECEIVING STATION MANKHURD

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )

1 April 07 6.27 10:00 28th 0.77 NA 108.5 0.77 2.40 8.39 5 53 125(17:00 hrs on

26th )2 May 9.68 17:00 6th 0.01 NA 107.7 1.29 2.51 9.03 4.9 36 198

(13:00 hrs on 29th )

3 June 6.36 2:00 17th 0.02 NA 107.5 0.83 2.37 8.60 4.2 52 151( 11:00hrs on

17th )4 July 8.51 10:00 16th 0.00 NA 107 0.92 2.87 9.53 3.4 47 250

( 13:00hrs on 26th )

5 Aug. 7.49 18:00 30th -0.22 NA 107.67 1.18 2.76 8.13 4 51 187( 13:00hrs on

31st)6 Sep. 6.78 8:00 9th 0.44 NA 108.3 1.33 2.54 8.03 3.9 52 174

(13:00 hrs on 13th)

7 Oct. 8.03 16:00 10th 0.00 NA 106.15 1.44 2.68 6.62 4.4 45 183(12:00 hrs on

5th )8 Nov. 8.00 9:30 5th 0.58 NA 108.26 1.17 2.70 6.64 4.3 47 186

( 13:00 hrs on 1st )

9 Dec 8.00 10:00 13th -0.59 NA 107.74 1.01 2.87 9.01 5 48 160(12:00hrs on

24 th )10 Jan.08 8.06 19:00 31st -0.22 NA 106.36 0.95 2.90 7.96 3.9 48 207

( 12:00 hrs on 17th )

11 Feb. 8.83 19:00 15TH 0.00 NA 106.67 1.31 2.84 7.5 5.3 46 167( 12:00 hrs on

28th )12 March 8.32 10:00 28th -0.04 NA 107.08 1.42 2.79 8.4 5 45 166

( 13hrs on 28th )

PEAK load for the Year--------------- = 9.7 MWHPeak Reactive for the Year -------- = 1.4 MvarMax. Monthly Energy received------ = 2.90 GWHTotal Energy received for the Year = 32.23 GWH

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

PRG/RSPEAK2007 08

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System

Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 ( 10 )

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )1 April 07

110 KV 80 12:00 18th 3 0 101.2 3 32.28 NA 76 56 10533 KV NA NA NA NA NA NA NA NA NA NA

17:00 hrs on 26th

2 May110 KV 87.8 12:00 23rd 10 0 99.8 10 34.372 NA 79 54 11133 KV NA NA NA NA NA NA NA NA NA NA

13:00 hrs on 29th

3 June110 KV 94.8 16:00 11th 16 0 99.6 16 34.471 NA 90 51 10533 KV NA NA NA NA NA NA NA NA NA NA

17:00 hrs.on 11th

4 July110 KV 85.9 12:00 16th 7 0 101.4 7 35.587 NA 81.5 58 10533 KV NA NA NA NA NA NA NA NA NA NA

13:00 hrs on 26th

5 Aug.110 KV 85.4 11:00 29th 6 0 101.4 6 33.515 NA 74.5 55 11533 KV NA NA NA NA NA NA NA NA NA NA

13:00 hrs on 31st

6 Sep.110 KV 81.1 12:00 9th 3.1 0 102.6 3.1 30.677 NA 79.9 53 10233 KV NA NA NA NA NA NA NA NA NA NA

13:00 hrs on 13th

7 Oct.110 KV 88.1 11:00 27th 0.7 0 103.7 0.7 34.158 NA 78.8 50 10633 KV NA NA NA NA NA NA NA NA NA NA NA NA

12:00 hrs on 05th

8 Nov.110 KV 82.4 12:00 2nd 10.5 NA 102.5 10.5 31.545 NA 80.1 50 10633 KV NA NA NA NA NA NA NA NA NA NA NA NA

13:00 hrs. on 1st

9 Dec.110 KV 73.5 12:00 26/12/2007 1.3 NA 101.7 1.3 29.772 NA 70.8 54 10433 KV NA NA NA NA NA NA NA NA NA NA NA NA

12:0 hrs on 24th

RECEIVING STATION BACKBAYMONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

Corresp Mvar

PRG/RSPEAK2007 08

Sr. No:

MONTH

STATION ONE HOUR PEAK

Corresp 110Kv Voltage

Station Max. Mvar

Energy Received

Station Aux.

Cosum.

Station Load at System Peak

Load Factor ( 8)x 100

( 2) x Hrs of month

Diversity Factor

( 2 ) x 100 10

Peak Time Date C.B.+Trs.( Mwh ) (Hrs) Trans. C.Bank (Kv ) Mvar ( GWH ) ( Mwh ) ( Mwh ) ( % ) ( % )

( 1 ) ( 2 ) ( 3 ) ( 4 ) ( 5 A ) ( 5 B ) ( 6 ) ( 7 ) ( 8 ) ( 9 ) ( 10 ) ( 11 ) ( 12 )10 Jan.08

110 KV 83.3 12:00 12th 6.2 NA 102.5 6.2 29.21 NA 72.3 47 11533KV NA NA NA NA NA NA NA NA NA NA NA NA

12:00 hrs on 17th

11 Feb110 KV 71.4 12:00 29th 1.9 NA 103.3 1.9 25.69 NA 69.6 52 103

33KV NA NA NA NA NA NA NA NA NA NA NA NA12:00hrs on

28th 12 March

110 KV 83.2 12:00 28th 6.3 NA 101.8 6.3 31.95 NA 82.91 52 10033KV NA NA NA NA NA NA NA NA NA NA NA NA

13:00hrs of 28th

110 KV PEAK load for the Year-------- = 94.8 MWHPeak Reactive requirement for 22 KV for the Year --- = 16.0 Mvar

Max. Monthly Energy received ( 110 KV )----------------- = 35.59 GWHTotal Energy received for the Year ( 110 KV )------------ = 383.22 GWH

33 KV PEAK load for the Year------------------------------ = NA MWHMax. Monthly Energy received ( 33 KV )----------------- = NA GWHTotal Energy received for the Year ( 33 KV )------------ = NA GWH

MONTHLY STATISTICAL DATA FOR FINANCIAL YEAR 2007 - 08

RECEIVING STATION BACKBAY

Corresp Mvar

PRG/RSPEAK2007 08

April May June July August September October November December January February March Cum. For the year

( MWh ) ( MWh ) ( MWh ) ( MWh ) ( MWh ) ( MWh ) ( MWh ) ( MWh ) ( MWh ) ( MWh ) ( MWh ) ( MWh ) ( MWh )PAREL 21.57 21.97 18.80 15.38 17.89 18.38 24.42 19.58 20.35 18.57 18.89 24.75 240.55MAHALAXMI 28.00 25.11 23.52 24.21 22.67 17.78 22.42 23.19 19.86 22.96 18.22 26.16 274.10DHARAVI ( 22 KV ) 118.81 208.22 231.32 233.38 235.02 234.84 253.36 213.08 170.92 152.67 147.82 205.30 2404.75DHARAVI ( 33 KV ) 89.81 47.62 1.79 0.00 0.00 0.00 0.00 13.88 25.77 22.86 15.78 0.00 217.51SALSETTE 71.20 79.07 81.93 83.59 79.55 75.49 80.25 74.04 72.33 62.10 54.19 78.90 892.63SAKI 39.27 40.70 40.74 38.67 35.13 37.96 41.84 33.83 34.73 30.89 28.05 34.39 436.20BORIVLI (22 KV) 50.00 51.20 49.14 49.40 50.80 49.70 51.30 47.50 39.65 33.23 32.64 38.62 543.18KOLSHET 11.52 12.09 11.70 12.09 12.70 11.29 12.12 11.93 12.40 12.40 11.60 12.40 144.24AMBERNATH 24.18 24.72 23.27 23.20 22.57 21.85 22.22 19.72 20.33 19.40 17.69 17.99 257.14KALYAN 71.52 75.84 68.16 67.92 65.52 66.00 70.80 63.60 60.48 56.88 53.28 69.60 789.60CARNAC( 22 KV ) 37.00 209.00 213.82 202.10 187.90 175.50 0.00 43.00 175.60 169.10 150.03 211.50 1774.55CARNAC( 33 KV ) 155.00 0.00 0.00 0.00 0.00 0.00 0.00 140.30 0.00 0.00 0.00 0.00 295.30CHEMBUR 15.49 16.12 15.48 17.17 16.48 15.36 17.37 16.30 14.53 0.00 10.91 16.20 171.41VIKHROLI 24.23 24.15 24.06 28.35 27.02 25.45 33.62 28.70 27.45 22.56 22.10 31.27 318.95MALAD 22.50 23.25 23.60 23.25 23.25 22.50 23.25 16.19 14.53 14.06 12.90 13.67 232.95VERSOVA 25.50 26.35 26.20 26.35 26.35 25.50 26.35 25.50 25.30 22.87 21.24 15.02 292.53MANKHURD 8.39 9.03 8.60 9.53 8.13 8.03 6.62 6.64 9.01 7.96 7.49 8.42 97.84BACKBAY NA NA NA NA NA NA NA NA NA NA NA NA 0.00

TOTAL 813.98 894.44 862.13 854.58 830.98 805.63 685.94 796.97 743.24 668.52 622.82 804.19 9383.42TOTAL ( Mus ) 0.81 0.89 0.86 0.85 0.83 0.81 0.69 0.80 0.74 0.67 0.62 0.80 9.38

ENERGY

Monthly Auxiliary consumption For April 2007 to March 2008

ITEM

PRG/RSPEAK2007 08

April May June July Aug. Sep. Oct Nov Dec Jan Feb Mar Cum. April to Sep.

( Mus ) ( Mus ) ( Mus ) ( Mus ) ( Mus ) ( Mus ) ( Mus ) ( Mus ) ( Mus ) ( Mus ) ( Mus ) ( Mus ) ( Mus )ENERGY INPUTGeneration

a1 Thermal 901.84 893.82 852.32 805.22 791.93 797.05 919.33 851.21 858.94 649.23 752.13 928.71 10001.72a2 Hydro 125.17 134.08 161.61 289.00 114.87 98.37 101.50 86.63 79.35 103.69 88.59 106.28 1489.12a3 Solar 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01 0.06a4 Total Generation (a4 = a1+a2+a3) 1027.01 1027.90 1013.92 1094.22 906.81 895.41 1020.82 937.84 938.30 752.93 840.73 1035.00 11490.89a5 Auxiliary Consumption 36.12 35.70 34.46 36.31 30.02 32.26 36.17 35.50 34.97 25.92 30.45 36.16 404.01a6 990.89 992.20 979.47 1057.91 876.79 863.15 984.66 902.34 903.33 727.01 810.28 998.84 11086.88a7 MSEB interchange at 5 tie points 212.62 265.99 238.47 204.49 269.81 288.38 271.11 208.04 158.09 243.33 96.25 171.71 2628.29a8 BSES to TPC at 220 Kv Borivli. 0.00 0.00 0.04 0.00 0.00 0.02 0.00 0.00 0.42 6.89 4.55 0.02 11.94A. Input ( A = a6 + a7 + a8 ) 1203.51 1258.19 1217.98 1262.40 1146.60 1151.55 1255.77 1110.38 1061.84 977.23 911.08 1170.57 13727.11

ENERGY OUTPUT @ 220 KV

B. 220 KV Borivli 136.45 149.49 144.78 194.58 108.26 108.77 133.55 95.79 83.10 63.41 68.21 117.84 1404.22C. @ 110 KVc1 OFA 3.98 3.65 3.76 3.75 4.08 4.02 3.91 4.33 3.91 3.91 3.69 3.76 46.75c2 BMC Bhandup 3.67 3.52 3.40 3.67 3.87 3.88 3.73 3.85 3.65 3.51 3.90 3.40 44.05c3 BARC 10.82 11.01 10.65 11.14 10.92 10.54 10.45 9.72 9.49 9.34 8.61 8.89 121.58c4 C.Rly Chola 22.62 24.21 22.80 23.36 23.36 22.80 23.29 21.97 24.12 23.78 21.89 23.13 277.34c5 Grant Road ( Carnac+Parel ) 53.55 57.29 54.61 54.53 53.45 51.66 54.77 48.81 43.57 39.85 33.75 44.55 590.38c6 Carnac Backbay 21.46 24.73 21.61 20.76 23.17 22.83 23.54 21.92 20.59 18.94 18.61 22.25 260.40c7 Backbay AT # 1 32.28 34.37 34.47 35.59 33.52 30.68 34.16 31.55 29.77 29.21 25.69 31.95 383.22C. 148.37 158.79 151.30 152.80 152.36 146.41 153.86 142.14 135.11 128.53 116.13 137.92 1723.72D. @ 33 KV / 22 KV / 6.6 KVd1 Parel 62.67 63.13 63.53 61.85 61.26 61.65 66.43 58.56 55.17 51.26 46.86 61.93 714.29d2 Mahalaxmi 55.73 58.37 56.19 57.06 55.63 51.36 54.55 52.18 50.77 47.74 44.38 55.02 638.98d3 Dharavi ( 22 KV ) 86.80 87.93 87.76 89.10 88.89 86.53 90.15 81.04 79.99 75.47 67.29 84.06 1005.01d4 Dharavi ( 33 KV ) 109.37 114.58 103.98 107.62 102.25 107.24 113.80 104.54 95.82 86.31 79.18 103.17 1227.84d5 Salsette 54.23 58.88 53.75 58.02 57.90 56.33 56.58 50.41 51.25 44.51 54.19 52.37 648.41d6 Saki 74.33 76.89 74.51 75.09 70.08 71.17 77.33 67.22 66.97 63.90 59.55 73.88 850.92d7 Borivli (22 KV) 68.98 65.11 65.44 65.96 65.84 70.78 90.68 64.59 65.42 57.77 52.71 66.39 799.66d8 Borivli (33 KV) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.47 22.46 22.75 20.24 28.39 112.31d9 Kolshet 11.74 13.02 13.78 12.58 13.63 14.31 13.05 12.57 12.66 12.24 10.30 12.79 152.65

d10 Ambernath 23.96 23.69 21.99 20.65 10.50 22.79 24.55 23.29 22.43 21.57 17.68 20.53 253.64d11 Kalyan 40.91 45.24 44.12 44.75 43.87 45.72 44.44 40.66 38.66 36.52 34.38 44.61 503.87d12 Trombay ( 22 KV ) 12.98 13.14 26.81 14.98 13.90 13.75 16.37 12.64 14.60 14.65 12.41 15.54 181.77d13 Carnac ( 22 KV ) 23.89 25.79 24.60 22.76 21.19 21.44 23.44 21.27 21.90 19.34 15.69 15.58 256.89d14 Carnac ( 33 KV ) 74.70 76.42 76.06 72.31 67.16 66.64 74.21 65.75 61.10 55.63 51.04 70.53 811.56d15 Chembur 50.67 51.51 53.79 49.69 50.62 51.04 53.76 49.87 46.12 43.71 37.93 47.84 586.55d16 Vikhroli 45.03 47.68 46.30 48.11 42.93 49.79 55.93 50.91 45.01 45.60 43.46 53.85 574.61d17 Malad 40.38 42.86 40.15 41.05 42.06 40.52 43.61 38.85 36.30 35.17 29.88 39.85 470.68d18 Versova 38.50 42.50 39.70 35.70 35.70 36.70 38.40 38.62 36.84 31.56 30.57 37.97 442.76d19 Mankhurd 2.40 2.51 2.37 2.87 2.76 2.54 2.68 2.70 2.87 2.90 2.84 2.79 32.23D. 877.27 909.24 894.83 880.15 846.17 870.30 939.95 854.14 826.33 768.61 710.56 887.09 10264.63E. R/S Auxiliary ** 0.81 0.89 0.86 0.85 0.83 0.81 0.69 0.80 0.74 0.67 0.62 0.80 9.38F. 1161.27 1216.63 1190.04 1226.67 1105.97 1124.67 1226.67 1091.27 1043.80 959.88 894.28 1142.05 13383.19G. 42.24 41.57 27.95 35.73 40.64 26.88 29.09 19.11 18.04 17.35 16.80 28.52 343.93H. 1203.51 1258.19 1217.98 1262.40 1146.60 1151.55 1255.77 1110.38 1061.84 977.23 911.08 1170.57 13727.110.00I. 3.51 3.30 2.29 2.83 3.54 2.33 2.32 1.72 1.70 1.78 1.84 2.44 2.51

NOTES : 1) * Estimated 2) ** Back bay R/S aux. Consumption not available.

% Transmission Losses ( I = H*100/ A )

ITEM

Monthly Energy Balance for April 2006 to March 2007

Total Energy output ( H = F+G )

ENERGY

Total Ex-bus generation (a6 = a4 - a5)

Total ( C = c1 to c 7 )

Total ( D = d1 to d19 )

Net Energy output ( F=B+C+D-E ) Transmission Losses ( G= A - F )

PRG/RSPEAK2007 08