61
I-64/Route 15 (Zion Crossroads) Interchange Improvements Louisa County, Virginia | Design-Build State Project No.: 0064-054-703, P101, R201 & C501 Federal Project No.: IM-064-2(155) Contract ID Number: C00086453DB48 February 3rd, 2012 Statement of Qualifications

Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

I-64/Route 15 (Zion Crossroads) Interchange ImprovementsLouisa County, Virginia | Design-Build

State Project No.: 0064-054-703, P101, R201 & C501Federal Project No.: IM-064-2(155)

Contract ID Number: C00086453DB48

February 3rd, 2012

Statement of Qualifi cations

Page 2: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501

STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

1 of 3

Offerors shall furnish a copy of this Statement of Qualifications (SOQ) Checklist, with the page references added, with the Statement of Qualifications.

Statement of Qualifications Component Form (if any) RFQ Cross reference

Included within 20-

page limit?

SOQ Page

Reference Statement of Qualifications Checklist and Contents Attachment 3.1.2 Section 3.1.2 no

Acknowledgement of RFQ, Revision and/or Addenda Attachment 2.10 (Form C-78-RFQ) Section 2.10 no

Letter of Submittal (on Offeror’s letterhead)

Offeror’s point of contact information NA Section 3.2.1 yes

Authorized Representative’s signature NA Section 3.2.1 yes

Principal officer information NA Section 3.2.2 yes

Offeror’s Corporate Structure NA Section 3.2.3 yes

Affiliated/subsidiary companies NA Section 3.2.4 yes

Debarment forms Attachment 3.2.5(a)Attachment 3.2.5(b) Section 3.2.5 no

Offeror’s VDOT prequalification evidence NA Section 3.2.6 yes

Evidence of obtaining bonding NA Section 3.2.7 yes

Professional Services Evidence

Full size copies of SCC and DPOR registration documentation (appendix) NA Section 3.2.8 no

cdukes
Typewritten Text
A-1
cdukes
Typewritten Text
cdukes
Typewritten Text
cdukes
Typewritten Text
cdukes
Typewritten Text
A-1 - A-3
cdukes
Typewritten Text
A-4
cdukes
Typewritten Text
2
cdukes
Typewritten Text
cdukes
Typewritten Text
4
cdukes
Typewritten Text
cdukes
Typewritten Text
cdukes
Typewritten Text
2
cdukes
Typewritten Text
2
cdukes
Typewritten Text
2
cdukes
Typewritten Text
cdukes
Typewritten Text
cdukes
Typewritten Text
A-5 - A-10
cdukes
Typewritten Text
5-7
cdukes
Typewritten Text
8-10
cdukes
Typewritten Text
cdukes
Typewritten Text
A-11 - A-25
cdukes
Typewritten Text
Page 3: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501

STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

2 of 3

Statement of Qualifications Component Form (if any) RFQ Cross reference

Included within 20-

page limit?

SOQ Page

Reference SCC Registration NA Section 3.2.8.1 yes

DPOR Registration (Offices) NA Section 3.2.8.2 yes

DPOR Registration (Key Personnel) NA Section 3.2.8.3 yes

DPOR Registration (Non-APELSCIDLA) NA Section 3.2.8.4 yes

DBE statement within Letter of Submittal confirming Offeror is committed to achieving the required DBE goal NA Section 3.2.9 yes

Offeror’s Team Structure

Identity of and qualifications of Key Personnel NA Section 3.3.1 yes

Key Personnel Resume – DB Project Manager Attachment 3.3.1 Section 3.3.1.1 no

Key Personnel Resume – Quality Assurance Manager Attachment 3.3.1 Section 3.3.1.2 no

Key Personnel Resume – Design Manager Attachment 3.3.1 Section 3.3.1.3 no

Key Personnel Resume – Construction Manager Attachment 3.3.1 Section 3.3.1.4 no

Key Personnel Resume – Public Relations Manager Attachment 3.3.1 Section 3.3.1.5 no

Organizational chart NA Section 3.3.2 yes

Organizational chart narrative NA Section 3.3.2 yes

Experience of Offeror’s Team

Lead Contractor Work History Form Attachment 3.4.1(a) Section 3.4 no

cdukes
Typewritten Text
A-2
cdukes
Typewritten Text
cdukes
Typewritten Text
3
cdukes
Typewritten Text
3
cdukes
Typewritten Text
3
cdukes
Typewritten Text
cdukes
Typewritten Text
3
cdukes
Typewritten Text
cdukes
Typewritten Text
cdukes
Typewritten Text
4
cdukes
Typewritten Text
11-13
cdukes
Typewritten Text
A-26
cdukes
Typewritten Text
cdukes
Typewritten Text
A-27 - A-30
cdukes
Typewritten Text
cdukes
Typewritten Text
A-31 - A-32
cdukes
Typewritten Text
cdukes
Typewritten Text
A-33
cdukes
Typewritten Text
A-34
cdukes
Typewritten Text
14
cdukes
Typewritten Text
15-17
cdukes
Typewritten Text
cdukes
Typewritten Text
A-35 - A-37
Page 4: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501

STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

3 of 3

Statement of Qualifications Component Form (if any) RFQ Cross reference

Included within 20-

page limit?

SOQ Page

Reference Lead Designer Work History Form Attachment 3.4.1(b) Section 3.4 no

Project Risk

Identify and discuss three critical risks for the Project NA Section 3.5.1 yes

cdukes
Typewritten Text
A-3
cdukes
Typewritten Text
A-38 - A-40
cdukes
Typewritten Text
cdukes
Typewritten Text
18-20
cdukes
Typewritten Text
Page 5: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
A-4
cdukes
Typewritten Text
Page 6: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
Page 7: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
Page 8: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
Page 9: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
Page 10: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
cdukes
Typewritten Text
A-5
Page 11: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT NO. 3.2.5(a)

CERTIFICATION REGARDING DEBARMENT PRIMARY COVERED TRANSACTIONS

Project No.: 0064-054-703, P101, R201 & C501

1) The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals:

a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department

or agency.

b) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; and have not been convicted of any violations of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification, or destruction of records, making false statements, or receiving stolen property;

c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph 1) b) of this certification; and

d) Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default.

2) Where the prospective primary participant is unable to certify to any of the statements in

this certification, such prospective participant shall attach an explanation to this proposal. The undersigned makes the foregoing statements to be filed with the proposal submitted on behalf of the Offeror for contracts to be let by the Commonwealth Transportation Board. ______________________________________ _________________________ Signature Date Title ___________________________________________________________________ Name of Firm

mlkernan
Typewritten Text
January 18, 2012
mlkernan
Typewritten Text
Vice President
mlkernan
Typewritten Text
TranSystems Corporation
mlkernan
Danny Davis
cdukes
Typewritten Text
cdukes
Typewritten Text
A-6
cdukes
Typewritten Text
Page 12: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT NO. 3.2.5(b)

CERTIFICATION REGARDING DEBARMENT LOWER TIER COVERED TRANSACTIONS

Project No.: 0064-054-703, P101, R201 & C501 1) The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. 2) Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. The undersigned makes the foregoing statements to be filed with the proposal submitted on behalf of the Offeror for contracts to be let by the Commonwealth Transportation Board. ____________________________________ __________________ Signature Date Title ____________________________________________________________ Name of Firm

cdukes
Typewritten Text
A-7
Page 13: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT NO. 3.2.5rb)

CERTIFICATION REGARDING DEBARMENT LOWER TIER COVERED TRANSACTIONS

Project No.: 0064-054-703, P l O l , R201 & C501

1) The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency.

2) Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal.

The undersignpdsmakes-the foregoing statements to be filed with the proposal submitted on behalf of/ne Offeror lor contracts to be let by the Commonwealth Transportation Board.

Name of Firm

cdukes
Typewritten Text
A-8
Page 14: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
A-9
Page 15: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
A-10
Page 16: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

TRNSPORT - E22 COMMONWEALTH OF VIRGINIA 10/21/2011 LSPPREQ DEPARTMENT OF TRANSPORTATION 2:09 PM PREQUALIFIED VENDORS SORTED BY VENDOR NAME PAGE 25 THIS LIST INCLUDES ALL PREQUALIFIED LEVELS AS OF 10/21/2011 - A -

=============================================================================== A020 APEX CONTRACTING, INC. EMPLOYER ID: 61-0728559 PREQ. EXP : 01/31/2012

--PREQ ADDRESS ----------------- -- WORK CLASSES ----------------------- P. O. BOX 798 003 - MAJOR STRUCTURES PARIS, KY 40362-0798 007 - MINOR STRUCTURES PHONE : 859-987-1637 018 - ELECTRICAL INSTALLATION FAX : 859-987-0619 165 - VARIABLE MESSAGE SIGNING

BUSINESS CONTACT: WHITNEY, FRANK DALE EMAIL: [email protected] ------DBE INFORMATION------

DBE TYPE : N/A DBE CONTACT: N/A DBE/WBE EXP: N/A =============================================================================== A210 ARCHER WESTERN CONSTRUCTION, LLC EMPLOYER ID: 27-0887868 PREQ. EXP : 01/31/2013

--PREQ ADDRESS ----------------- -- WORK CLASSES ----------------------- 2410 PACES FERRY ROAD 002 - GRADING SUITE 600 003 - MAJOR STRUCTURES ATLANTA, GA 30339 006 - PORTLAND CEMENT CONCRETE PAVING PHONE : 404-495-8700 007 - MINOR STRUCTURES FAX : 404-495-8701

BUSINESS CONTACT: GILLIS, DONALD ALAN EMAIL: [email protected]@WALSHGROUP.COM ------DBE INFORMATION------

DBE TYPE : N/A DBE CONTACT: N/A DBE/WBE EXP: N/A ===============================================================================

cdukes
Typewritten Text
5
Page 17: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
6
cdukes
Typewritten Text
Page 18: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
7
Page 19: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
8
Page 20: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
cdukes
Typewritten Text
cdukes
Typewritten Text
9
Page 21: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
10
Page 22: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

Home | Site Map | About SCC | Contact SCC | Privacy Policy

Welcome to SCC eFile

Business Entity Details

TranSystems Corporation

Screen ID: e1000

SCC ID: F1150400

Business Entity Type: Foreign Corporation

Jurisdiction of Formation: MO

Date of Formation/Registration: 8/23/1993

Status: Active

Shares Authorized: 13500000

Principal Office

2400 PERSHING RD STE 400

KANSAS CITY MO 64108

Registered Agent/Registered Office

CT CORPORATION SYSTEM

4701 COX RD STE 301

GLEN ALLEN VA 23060-6802

HENRICO COUNTY 143

Status: Active

Effective Date: 1/5/2004

View Entity's eFile History

Users are encouraged to create an SCC eFile account to:

� Conveniently monitor business entities through the use of a "Favorites"

list

� Perform easy step-by-step online transactions for certain types of filings,

such as registered agent changes

� Quickly access online filing history

To view our Privacy Policy, click here

Login Create Account

Order certificate of good standing New Search Back Homepage

Need additional information? Contact [email protected] Website questions? Contact: [email protected]

We provide external links throughout our site.

PDF(.pdf) Reader Excel (.xls) Viewer PowerPoint (.ppt) Viewer Word (.doc) Viewer

Search SCC GoSCC eFile > My Services > Entity Search > Entity Details

SCC eFile

SCC eFile Home Page

Business Entity Search

Certificate Verification

Log In

FAQs

Give Us Feedback

Business Entities

UCC or Tax Liens

Court Services

Additional Services

Q u i c k L i n k s

Division Home

Division Contact

Laws & Regulations

Bulletin Archive

External Links

Page 1 of 1Business Entity Details

11/8/2011https://sccefile.scc.virginia.gov/BusinessEntity/BusinessEntityDetails.aspx?enc=C3mX59EdEzbAlSZiTswWiWuiYAx0EEJBb...

cdukes
Typewritten Text
A-11
Page 23: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
A-12
Page 24: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
cdukes
Typewritten Text
A-13
Page 25: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
A-14
Page 26: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
cdukes
Typewritten Text
A-15
Page 27: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

Home | Site Map | About SCC | Contact SCC | Privacy Policy

Welcome to SCC eFile

Business Entity Details

Schnabel Engineering Consultants, Inc.

Screen ID: e1000

SCC ID: 07126741

Business Entity Type: Corporation

Jurisdiction of Formation: VA

Date of Formation/Registration: 8/12/2009

Status: Active

Shares Authorized: 10000

Principal Office

1054 TECHNOLOGY PARK DR

GLEN ALLEN VA 23059

Registered Agent/Registered Office

CT CORPORATION SYSTEM

4701 COX RD STE 301

GLEN ALLEN VA 23060-6802

HENRICO COUNTY 143

Status: Active

Effective Date: 6/16/2011

View Entity's eFile History

Users are encouraged to create an SCC eFile account to:

Conveniently monitor business entities through the use of a "Favorites" list

Perform easy step-by-step online transactions for certain types of filings, such as registered agent changes

Quickly access online filing history

To view our Privacy Policy, click here

Login Create Account

Order certificate of good standing New Search Back Homepage

Need additional information? Contact [email protected] Website questions? Contact: [email protected]

We provide external links throughout our site.

PDF(.pdf) Reader Excel (.xls) Viewer PowerPoint (.ppt) Viewer Word (.doc) Viewer

Search SCC GoSCC eFile > My Services > Entity Search > Entity Details

SCC eFile

SCC eFile Home Page

Business Entity Search

Certificate Verification

Log In

FAQs

Give Us Feedback

Business Entities

UCC or Tax Liens

Court Services

Additional Services

Q u i c k L i n k s

Division Home

Division Contact

Laws & Regulations

Bulletin Archive

External Links

Page 1 of 1Business Entity Details

12/19/2011https://sccefile.scc.virginia.gov/BusinessEntity/BusinessEntityDetails.aspx?enc=KbW6cznmmj955YB9HYQtwnpH+vsTBcjE5...

cdukes
Typewritten Text
cdukes
Typewritten Text
A-16
Page 28: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
A-17
Page 29: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
A-18
Page 30: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

Home | Site Map | About SCC | Contact SCC | Privacy Policy

Welcome to SCC eFile

Business Entity Details

T3 Design Corporation

Screen ID: e1000

SCC ID: 06585392

Business Entity Type: Corporation

Jurisdiction of Formation: VA

Date of Formation/Registration: 5/18/2006

Status: Active

Shares Authorized: 5000

Principal Office

3927 OLD LEE HIGHWAY STE 101C

FAIRFAX VA

22030-

2422

Registered Agent/Registered Office

REES BROOME PC

8133 LEESBURG PIKE 9TH FL

VIENNA VA 22182-2706

FAIRFAX COUNTY 129

Status: Active

Effective Date: 5/1/2007

View Entity's eFile History

Users are encouraged to create an SCC eFile account to:

� Conveniently monitor business entities through the use of a "Favorites"

list

� Perform easy step-by-step online transactions for certain types of filings,

such as registered agent changes

� Quickly access online filing history

To view our Privacy Policy, click here

Login Create Account

Order certificate of good standing New Search Back Homepage

Need additional information? Contact [email protected] Website questions? Contact: [email protected]

We provide external links throughout our site.

PDF(.pdf) Reader Excel (.xls) Viewer PowerPoint (.ppt) Viewer Word (.doc) Viewer

Search SCC GoSCC eFile > My Services > Entity Search > Entity Details

SCC eFile

SCC eFile Home Page

Business Entity Search

Certificate Verification

Log In

FAQs

Give Us Feedback

Business Entities

UCC or Tax Liens

Court Services

Additional Services

Q u i c k L i n k s

Division Home

Division Contact

Laws & Regulations

Bulletin Archive

External Links

Page 1 of 1Business Entity Details

11/8/2011https://sccefile.scc.virginia.gov/BusinessEntity/BusinessEntityDetails.aspx?enc=9EauqArHMAZffYNp3SaIXkHezF9xx2r1DXv...

cdukes
Typewritten Text
A-19
Page 31: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
A-20
Page 32: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
A-21
Page 33: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

Home | Site Map | About SCC | Contact SCC | Privacy Policy

Welcome to SCC eFile

Business Entity Details

NXL Construction Co., Inc.

Screen ID: e1000

SCC ID: 03497427

Business Entity Type: Corporation

Jurisdiction of Formation: VA

Date of Formation/Registration: 11/17/1989

Status: Active

Shares Authorized: 5000

Principal Office

114 E CARY STREET SUITE 200

RICHMOND VA 23219

Registered Agent/Registered Office

NICOMEDES L DE LEON

9606 GEORGE'S BLUFF RD

RICHMOND VA 23229

HENRICO COUNTY 143

Status: Active

Effective Date: 10/8/1998

View Entity's eFile History

Users are encouraged to create an SCC eFile account to:

� Conveniently monitor business entities through the use of a "Favorites"

list

� Perform easy step-by-step online transactions for certain types of filings,

such as registered agent changes

� Quickly access online filing history

To view our Privacy Policy, click here

Login Create Account

Order certificate of good standing New Search Back Homepage

Need additional information? Contact [email protected] Website questions? Contact: [email protected]

We provide external links throughout our site.

PDF(.pdf) Reader Excel (.xls) Viewer PowerPoint (.ppt) Viewer Word (.doc) Viewer

Search SCC GoSCC eFile > My Services > Entity Search > Entity Details

SCC eFile

SCC eFile Home Page

Business Entity Search

Certificate Verification

Log In

FAQs

Give Us Feedback

Business Entities

UCC or Tax Liens

Court Services

Additional Services

Q u i c k L i n k s

Division Home

Division Contact

Laws & Regulations

Bulletin Archive

External Links

Page 1 of 1Business Entity Details

11/8/2011https://sccefile.scc.virginia.gov/BusinessEntity/BusinessEntityDetails.aspx?enc=a2tncMf3+KADWFMwHLy0OrtzTeELZuyH7...

Page 14

cdukes
Typewritten Text
A-22
cdukes
Typewritten Text
cdukes
Typewritten Text
cdukes
Text Box
Page 34: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

DEPARTMENT OF PROFESSIONAL AND OCCUPATIONAL REGULATION COMMONWEALTH OF VIRGINIA

o^H^8!feo3i

BOARD FOR ARCHITECTS, PROFESSIONAL ENGINEERS, LAND SURVEYORS, CERTIFIED INTERIOR DESIGNERS AND LANDSCAPE ARCHITECTS

BUSINESS ENTITY REGISTRATION PROFESSIONS: ENG, LS

NXL CONSTRUCTION CO INC NXL CONSTRUCTION SERVICES INC 114 E CARY ST STE 200 RICHMOND, VA 23219

Oordoil N. Dixon,

BUSINESS ENTITY REGISTRATION NUMBER: 0407003031 EXPIRES: 12-31-2013 PROFESSIONS: ENG, LS NXL CONSTRUCTION CO INC NXLfiQJMSTRUCTION SERVICES INC 114 E CARY ST STE 200 RICHMOND, VA 23219 r

- (DETACH HERE)

DEPARTMENT OF PROFESSIONAL AND OCCUPATIONAL REGULATION

cdukes
Typewritten Text
A-23
cdukes
Typewritten Text
Page 35: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

DEPARTMENT OF PROFESSIONAL AND OCCUPATIONAL REGULATION COMMONWEALTH OF VIRGINIA

EXPIRES ON

12-31-2013 9960 Mayland Dr., Suite 400, Richmond, VA 23233

Telephone: (804) 367-8500 0 W 4 " l 2 9 5

BOARD FOR ARCHITECTS, PROFESSIONAL ENGINEERS, LAND SURVEYORS, CERTIFIED INTERIOR DESIGNERS AND LANDSCAPE ARCHITECTS

PROFESSIONAL ENGINEER LICENSE

MICHAEL WILLIAM SAUNDERS 4500 LITCHFIELD DRIVE CHESTERFIELD, VA 23832

ALTERATION OF THIS DOCUMENT, USE AFTER EXPIRATION, OR USE BY PERSONS OR FIRMS OT>iER THAN THOSE NAMED MAY RESULT IN CRIMINAL PROSECUTION UNDER THE CODE OF VIRGINIA.

Gordon N. Dixon, Director/

(SEE REVERSE SIDE FOR NAME AND/OR ADDRESS CHANGE)

cdukes
Typewritten Text
A-24
Page 36: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

Home | Site Map | About SCC | Contact SCC | Privacy Policy

Welcome to SCC eFile

Business Entity Details

KDR Real Estate Services, Inc.

Screen ID: e1000

SCC ID: 05712104

Business Entity Type: Corporation

Jurisdiction of Formation: VA

Date of Formation/Registration: 1/30/2002

Status: Active

Shares Authorized: 100

Principal Office

2500 GRENOBLE RD

RICHMOND VA 23294

Registered Agent/Registered Office

ALLEN G DORIN JR

2500 GRENOBLE RD

RICHMOND VA 23294

HENRICO COUNTY 143

Status: Active

Effective Date: 7/9/2003

View Entity's eFile History

Users are encouraged to create an SCC eFile account to:

� Conveniently monitor business entities through the use of a "Favorites"

list

� Perform easy step-by-step online transactions for certain types of filings,

such as registered agent changes

� Quickly access online filing history

To view our Privacy Policy, click here

Login Create Account

Order certificate of good standing New Search Back Homepage

Need additional information? Contact [email protected] Website questions? Contact: [email protected]

We provide external links throughout our site.

PDF(.pdf) Reader Excel (.xls) Viewer PowerPoint (.ppt) Viewer Word (.doc) Viewer

Search SCC GoSCC eFile > My Services > Entity Search > Entity Details

SCC eFile

SCC eFile Home Page

Business Entity Search

Certificate Verification

Log In

FAQs

Give Us Feedback

Business Entities

UCC or Tax Liens

Court Services

Additional Services

Q u i c k L i n k s

Division Home

Division Contact

Laws & Regulations

Bulletin Archive

External Links

Page 1 of 1Business Entity Details

11/8/2011https://sccefile.scc.virginia.gov/BusinessEntity/BusinessEntityDetails.aspx?enc=8nJ1eHw2OaLgCws6sxKfCdXdah8txwplwZE...

cdukes
Typewritten Text
A-25
Page 37: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

StI-LoStC

T Sucoonbube OthofscfaofbuVOinoupein Tap D

TquKprtapuP Thiha Tasexhiye

tatement of Qu64/Route 15 (Zouisa County, tate Project Noontract ID No.

Team St

uccessful donstruction tn budget. Fouild deliveryest ideas fro

Our team foche Design anf building ichedule. Wacilitate comf this effort,uilding and

VDOT, to brOnce we movnspections tour Design-Bersonnel to ntent in the c

This SOQ wipproach; so

Design Tea

This team waualified and

Key staff androjects, haveask leaders aublic involvroject.

TranSystems istory, they has led to rec

This high stassigned Danxpertise inclighway and ears of struc

SUBMIT

ualifications Zion CrossroadVirginia

o. 0064-054-70. C00086453D

tructur

design-build team, and owor this VDOy method, som each grou

us on the dend Constructit, with the

When we entemmunication,, constructiohow we are

ring them intve to the Cono assure desiBuild Projec

incorporate construction

ill demonstrathat we can

am

as assembledd experienced design sue establishedand technicalvement, or c

brings natiohave served ognition as a

andard of acnny Davis, Plude projectbridge cons

ctural and ci

TTED BY: ARC

ds) Interchange

03 B48

re

projects rewner must co

OT project, ouo they unde

up into the de

esign build ption Phases. goal of opt

er the Desig, thereby imon leads pere building itto the team,nstruction Pign complianct Manager

constructioprocess.

ate that we heffectively m

d with a tremd individual

ubconsultantsd working rel staff have p

construction

onal experti38 DOT cli

a Top 15 Tra

chievement PE. Mr. Dat managemestruction plavil engineer

CHER WESTE

e Improvement

equire a fulollaborate tour team has rstand the imesign to mee

process starts We work t

timizing thegn Phase, we

mproving the form over-tht. We will a, including p

Phase, designnce and to e (Brian Qun means an

have assembmanage desi

mendous amls together as selected foelationships primary respactivities, e

se in interchients across ansportation

begins withavis currentlnt, project d

ans for majoring project m

ERN CONSTRU

ts

ly integrateo accomplishdesign and cmportance oet VDOT’s g

s during the together frome overall proe co-locate cefficiency a

he-shoulder also have anproviding ofn representatexpedite resoinlan, PE) w

nd methods

bled an expegn and cons

mount of thouand organizeor our teamand are pos

ponsibilities everyone is r

hange reconthe US. The

n Design Firm

h successfully serves as developmenor highway imanagemen

UCTION LLC.

ed approachh the goal ofconstructionof working tgoals and req

Proposal Phm the offset oject approaconstructionand effectivereviews to

n open doorffice space ftives activelyolution of coworks closeinto the des

erienced teamtruction to d

ught and cone them in an

m have worksitioned to hfor items suresponsible

nstruction preir reputatiom.

l Design MVice Presid

nt, and the pimprovemen

nt and design

and TRANSYS

h to the wof getting the n personnel etogether to equirements.

hase, then seto plan the j

ach in termn personnel ieness of the assure conc

r policy for for a design y participateonstruction cely with key sign process

m of professdeliver a succ

nsideration tn efficient sked togetherhit the grounuch as design

to some lev

rojects. Duron in comple

anagers. Fdent with Trpreparation ont programsn experience

STEMS

ork. The dproject built

experienced ensure integ

eamlessly trajob from thes of functioin the Desigdesign proc

currence on the Owner,champion i

e in project mchallenges. design and

s and to refl

sionals to imcessful proje

to bring eachstructure for r on previound running. n, environmevel for all as

ring the firmex transporta

or this projranSystems. of prelimina. Mr. Davis e for both th

design teamt on time andin the design

gration of the

ansitions intoe perspectiveon, cost, andgner office tocess. As parwhat we are in this caseif so desiredmeetings andThroughoutconstruction

flect designe

mplement thiect.

h firm’s besthis project

us successfu Though ouental aspectsspects of the

m’s 40+ yeaation project

ect we haveHis areas o

ary and finahas over 20

he design and

m, d n e

o e d o rt e e

d. d t, n r

s

st t.

ul ur s, e

ar s

e f

al 0 d

cdukes
Typewritten Text
11
Page 38: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

StI-LoStC

com SuRinyesein TJua TtrTen Insu TCV Ntrabarin SSgegeApr Sdrhaby Kan

tatement of Qu64/Route 15 (Zouisa County, tate Project Noontract ID No.

onstruction managerial sk

upporting thRFQ and thosncludes Amyear veteran everal VDOnvaluable on

T3 Design wuly 2006, wi

VDOT-cerTransportatioransportation

Traffic Operangineering, t

n addition tubconsultant

The role of QConstruction VDOT includ

NXL Constrransportationbroad. NXL re experiencncluding Ma

chnabel Enchnabel is aeostructural eosciences,

An ENR Toprivate and pu

chnabel prorawings, andave a longsty expertise a

KDR Real End easemen

SUBMIT

ualifications Zion CrossroadVirginia

o. 0064-054-70. C00086453D

of several mkills to highl

he Design Mse roles we sy Morris, Pof the constT projects.

n the I-64/Ro

will be taskedith Ms. Patrirtified Wom

on Systems (n professionaations Engintransportatio

to the indivts: NXL Co

Quality AssServices. M

ding oversee

uction Servn projects. B

has a dedicced, knowlearyland and V

ngineering an employeedesign, damconstruction

p 10 geotechublic sectors

ovides detaid resident etanding tradiand experien

Estate Servict acquisition

TTED BY: ARC

ds) Interchange

03 B48

major interchly complex in

Manager we hsee as neces

PE, PTOE wtruction induThe insight

oute 15 Inter

d with Publicia Timbroo

man Busine(ITS) planninals, the majo

neers (PTOEon planning a

viduals disconstruction

surance MaMr. Saundering quality c

vices is a proBased in Ricated staff ofdgeable, an

Virginia.

will perfoe-owned comm engineerinn monitoringhnical engines, solving pro

iled design ngineering sition of exce

nce.

ces will leadn company.

CHER WESTE

e Improvement

hanges and nterchange p

have selectedssary for the who will serustry and hat into underschange Proj

ic Relations ok, PE, PTOEess Enterprng, engineerority of who

Es), and Engand ITS serv

cussed abovServices, Sc

anager has rs brings sigcontrol progr

ofessional Cochmond, Virf engineers, cd responsiv

rm the geompany offerig, tunnel and

g, and resideeering firm, oblems relat

recommenservices, proellence in cl

d our ROW STheir servi

ERN CONSTRU

ts

bridge strucprojects.

d experiencedaily manag

rve as the Pas the uniquestanding theect.

and Traffic E, as its Pres

rise (WBE)ring and des

om are registgineers in Trvices to agen

ve we havechnabel Eng

been assigngnificant conrams for the

onstruction Mrginia, the fconstructione. Additiona

otechnical iing highly spd undergrou

ent engineeriSchnabel plted to the ear

dations, comoviding contlient service

Services respices include

UCTION LLC.

ctures. Mr.

ed individualgement of thublic Relate perspectiv

e public’s co

Engineeringsident. Loca, and spec

sign. The fitered Profesraining (EITncies through

e supplemengineering, a

ned to Michnstruction ex Richmond D

Managemenfirm providen inspectors, ally, NXL i

investigationpecialized s

und engineering from locays an importh and the e

mplete plantinuity from, high qualit

ponsibilitiese ownership

and TRANSYS

. Davis brin

ls to fill the he project antions Managve of havingoncerns on a

g. T3 officiated in Northcializes in irm currentlysional Engin

Ts). T3 Desihout Virgini

nted the teand KDR Re

hael Saundexperience thDistrict.

nt and Survees services i

land surveyis a certified

n and enviervices in g

ring, environcations throuortant role seenvironment

ns and specm design thro

ty, and valu

s. KDR is a verification

STEMS

ngs unique t

key role idend associatedger. Ms. M

g managed tha new projec

ially began ohern Virginitraffic and

y maintains neers (PEs), ign staff proia and Maryl

am with theal Estate Se

ers, PE, CChrough his 1

ying firm spin the Uniteyors and techd DBE in s

ironmental geotechnical nmental, geoughout the Uerving client.

cifications, ough construe-added solu

full service n that can r

echnical and

ntified in thed risks. Thi

Morris is a 20he design onct will prove

operations inia, the firm id Intelligena staff of 16Professiona

ovides trafficland.

he followingervices.

CM of NXL0 years with

pecializing ined States andhnicians whoseveral state

engineeringengineering

ophysical andUnited Statests in both the

constructionuction. Theyutions fueled

right of wayange from a

d

e s 0 n e

n s

nt 6 al c

g

L h

n d o s

g. g, d s. e

n y d

y a

cdukes
Typewritten Text
12
Page 39: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

StI-LoStC

cudolaovauprto C

ASfobegran

BloseexreW

SuWpoenis

ManC

Fsethve

tatement of Qu64/Route 15 (Zouisa County, tate Project Noontract ID No.

urrent owneocument preandowners, nverall projecuthority. Theroper acquiso rights acqu

Constructi

Archer Westeoutheast andocus on techeen a majorrowth has rend design-bu

Brian Quinlaocal roots. Deaboard, incxtensive exequirements

Washington D

upporting MWashington i

ortfolio inclncompasses ssues and dev

Mr. Washingtnd Recreatio

Contractor Ce

or the role everal years he Environmersed in VD

SUBMIT

ualifications Zion CrossroadVirginia

o. 0064-054-70. C00086453D

er rundown eparation annegotiationsct administrey have the esition proceduired through

on Team

ern is a med Mid-Atlan

hnically-challr contributoesulted in Aruild delivery

an, PE, our During his 3cluding projxperience co

and coordinDC, Richmo

Mr. Quinlanis well versludes interstboth the pr

velop solutio

ton already on (DCR) Rertification (

of Environmof industry

mental CompOT regulatio

TTED BY: ARC

ds) Interchange

03 B48

to a 60-yearnd compilatios with the laration to comexpertise to

dures are follh the eminen

erit-shop genntic regions, lenging projr to the grorcher Weste

y.

Design-Bui32 years in tects in Bosover multipnation with mnd, and Mia

n in the rolesed in the cotate construcrocurement aons adds gre

holds the reqResponsible (ESCCC).

mental Comexperience w

pliance Manaons and requ

CHER WESTE

e Improvement

r title searchon of relatedandowners, mplete the twork closelylowed in accnt domain pr

neral contraArcher We

ects. As theowth and surn being rec

ild Project the industry

ston, Philadeple project multiple entiami.

e of Constronstruction ction, urban and operatioeat value to t

quired certifLand Distur

mpliance Mwith the lastager on the Iuirements an

ERN CONSTRU

ts

h, appraisal d paperworkclearance otransfer of ty with VDOcordance witocess.

ctor based iestern provide largest subuccess of thcognized as

Manager brhe has wor

elphia, Baltitypes, typ

ities.. His c

ruction Manof highwaywidening,

ons side of othis project.

fications incrber (RLD),

Manager we t 3 focused oI-95 Bridge

nd will be a v

UCTION LLC.

of propertyk for the preof title, clostitle from th

OT and repreth the requir

in Atlanta. des a full ra

bsidiary of thhis 114-year an industry

rings a uniqrked on highimore, Miampically withcareer includ

nager will by and road pand bridge our industry

luding the Vand the VD

have selecton environmRehabilitati

valuable asse

and TRANSYS

y rights to besentation ofing and setthe property sentative leg

rements of th

Working pange of conshe Walsh Gro

old, familyleader in bo

que blend of hway programi, and Rich complex des design-b

be Carter Wprojects. Mreconstructi and his abi

Virginia DepDOT Erosio

ted Matt Phmental complion Project inet to this pro

STEMS

be acquired,f an offer totlement procowner to t

gal counsel the Virginia C

primarily thrstruction seroup, Archer

y-owned busoth highway

f national exams all alongchmond. M

and demanbuild highwa

WashingtonMr. Washingtion projects.ility to ident

partment of Cn and Sedim

hillips. Mr. liance. Recen Richmond

oject.

conveyance the affectedcedures, andhe acquiringto ensure thaCode relating

roughout thervices with aWestern ha

siness. Thiconstruction

perience andg the eastern

Mr. Quinlan’nding MOT

ay projects in

n, PE. Mrton’s projec. His careetify potentia

Conservationment Contro

Phillips haently, he wad. He is wel

e d d g at g

e a s s n

d n s T n

r. ct r

al

n ol

s s ll

cdukes
Typewritten Text
13
Page 40: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT 3.3.1

KEY PERSONNEL RESUME FORM

Brief Resume of Key Personnel anticipated for the Project. a. Name & Title: Brian Quinlan, P.E., Senior Project Manager b. Project Assignment: Design-Build Project Manager c. Name of Firm with which you are now associated: Archer Western Construction, LLC d. Years experience: With this Firm 3 Years With Other Firms 29Years Please list chronologically your employment history, position and general experience or fields of practice for the last fifteen (15) years. Archer Western, 2009 – Present, Senior Project Manager, Heavy Civil Construction Cherry Hill, 2006 – 2008, Vice President of Operations, Heavy Civil Construction Condotte America, 1998 – 2005, Vice President of Operations/Project Manager, Heavy Civil Construction Perini, 1995 – 1997, Project Manager, Heavy Civil Construction e. Education: Name & Location of Institution(s)/Degree(s)/Year/Specialization: Georgia Tech, BSCE, 1979 University of Maryland, MBA, 2006 f. Active Registration: Year First Registered/ Discipline/VA Registration #: 1999, P.E. (Civil), VA 033491 g. Document the extent and depth of your experience and qualifications relevant to the Project. MD SHA I-95/I-895 Interchange Reconstruction, Baltimore, MD – Contract Value: $54,000,000 Role: Vice President of Operations 1. Specific responsibilities and authorities included oversight of entire project and direct supervision of Project Manager and Safety Manager. Specific tasks included coordination and management of subcontract and supplier solicitation, negotiation, and award; selection of salaried staff; selection of means and methods for self-performed work; cost control for self-performed work; development of project schedule; and problem resolution with MdTA Project Manager and GEC Partners Construction Manager. Specific features of work included interstate and local MOT, utility relocation, bridge demolition, bridge construction, roadway construction,, retaining walls, piledriving, sound walls, and landscaping. 2. Experience was with Cherry Hill (Prime Contractor). 3. From 2006 to 2008. MDX Design-Build Dolphin Expressway and Florida Turnpike Interchange Reconstruction, Miami, FL – Contract Value: $36,000,000 Role: Vice President of Operations 1. Specific responsibilities and authorities included oversight of entire project and direct supervision of Project Manager and Safety Manager. Specific tasks included development of bid and construction design concepts; oversight of design for construction; coordination and management of subcontract and supplier solicitation, negotiation, and award; selection of salaried staff; selection of means and methods for self-performed work; cost control for self-performed work; development of project schedule, and problem resolution with MDX Program Manager. Specific features of work included interstate and local MOT, utility relocation, bridge demolition, bridge construction, roadway construction, pile driving, retaining walls, post-tensioned substructure, and landscaping. 2. Experience was with Condotte America (Prime Contractor). 3. From 2003 to 2005. VDOT Design-Build I-95/Route 150/Route 895 Interchange Reconstruction, Richmond, VA, Contract Value: $115,000,000 Role: Design-Build Project Manager 1. Specific responsibilities and authorities included day to day direction of onsite construction activities through supervision of General Superintendent, Site Safety Officer, and engineering staff. Specific tasks included coordination of segmental bridge design; coordination and management of construction engineering for segmental operations, coordination and management of subcontractor and supplier solicitation, negotiation, award, and contract administration; selection of means and methods for self-performed work; cost control for self-performed and subbed work; development and maintenance of CPM schedule, equipment procurement, material procurement, and daily interaction with FD/MK Project Manager. Specific features of work included interstate MOT, bridge construction, drilled shafts, post-tensioned superstructure, cast-in-place segmental superstructure, precast segmental superstructure, and casting yard. 2. Experience was with Condotte America (Subcontractor to joint venture of Fluor Daniel and Morris Knudsen). 3. From 1999 to 2002.

cdukes
Typewritten Text
A-26
Page 41: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT 3.3.1

KEY PERSONNEL RESUME FORM

Brief Resume of Key Personnel anticipated for the Project. a. Name & Title:

Michael W. Saunders, PE, CCM, Project Manager/Quality Assurance Manager b. Project Assignment:

Quality Assurance / Quality Control Manager c. Name of Firm with which you are now associated:

NXL Construction Services, Inc. d. Years experience: With this Firm <1 Years With Other Firms 7 Years Please list chronologically your employment history, position and general experience or fields of practice for the last fifteen(15) years: Name of Firm: NXL Construction Services, Inc., Richmond, Virginia Start Date: 11/2011 End Date: Present Position: Project Manager/Quality Assurance Manager Responsibilities: Mr. Saunders serves as Independent Quality Assurance Manager for joint Design-Build projects ensuring all contract requirements and specifications are appropriately administered and applied, all required quality control testing and independent quality assurance is carried out in accordance with applicable requirements ensuring construction quality standards are met and payments appropriately processed. Name of Firm: Virginia Department of Transportation, Richmond District Start Date: 5/2011 End Date: 11/2011 Position: Project Control Engineer/Area Construction Engineer for Design-Build & Locally Administered Projects Reponsibilities: Mr. Saunders was responsible for quality assurance and for coordinating constructability reviews to include developing pre-advertisement schedules and sequence of construction as well as for coordination of post-award schedule reviews and District Wide NOI and claims analysis. He was assigned as the Responsible Charge Project Manager for various Design Build projects throughout the Richmond District. The assignment included serving on the selection panel during the procurement phase and serving as Project Manager of the construction phase. Other responsibilities included attending weekly progress meetings and multiple design meetings and ultimately serving as the Responsible Charge Engineer, acting on behalf of the owner. His role was ensuring that the independent assurance and verification was performed for Design-Build projects, that all contract requirements and specifications are appropriately met, all required quality control testing and independent quality assurance is carried out in accordance with applicable requirements, and payments appropriately processed. Projects included the Route 36 BRAC Design-Build Project, I-295 Meadowville Interchange and the Fort Lee/Jefferson Park Road Roundabout Design-Build. Mr. Saunders was also responsible for Locally Administered Projects in the Richmond District. This assignment included handling post-award activities including monitoring project schedule and developments. He was also responsible for approving monthly pay vouchers on behalf of the Department prior to reimbursement to localities. Name of Firm: Virginia Department of Transportation Start Date: 1/2007 End Date: 5/2011 Position: Area Construction Engineer, Richmond District, Southern Area Construction Responsibilities: Mr. Saunders was responsible for executing a 6-year program to include managing all aspects of construction/maintenance contracts safely, with quality, on time and within budget. He provided Responsible Charge supervision and technical guidance to Construction Managers and Inspectors during project delivery for design-build and design-bid-build projects. He used Primavera for manpower planning and schedule reviews and approvals. He coordinated with project controls staff in preparation and review of Work Orders, Notices of Intent and Claims to validate the necessity of work and level of federal participation. Mr. Saunders performed Responsible Charge duties on no-plan projects, minimum-plan projects and full-plan projects of varying

cdukes
Typewritten Text
A-27
Page 42: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

complexity. He also assisted the Fredericksburg District with the administration of a Regional Design-Build Bridge Replacement project. His duties included making Responsible Charge decisions and coordination activities for projects in the Richmond District. Name of Firm: Virginia Department of Transportation Start Date: 11/2005 End Date: 1/2007 Position: Construction Project Manager, Salem District, Southern Area Construction Responsibilities: Mr. Saunders supervised all phases of multi-operational roadway and structural construction projects to ensure all work was performed in accordance with project plans, specifications and special provisions. He supervised the work and career development of several construction inspectors and he resolved contractual disputes with contractors. He prepared and presented the project showings and preconstruction conferences, prepared and submitted work orders and tracked project cost to assure projects remained within the designated budget, on multiple projects of varying complexity. He mitigated Notices of Intent with use of time impact and cost analysis, and prepared reports, correspondence and documents clearly and on time. Mr. Saunders conducted on-site field visits to ensure all elements of design and construction were within scope of contract and within established standards and specifications to provide feedback to the appropriate parties and perform follow-up reviews with project staff and management to support implementation of recommendations. He conducted periodic assessments to ensure compliance with the contract documents and established guidelines, procedures and policies. Projects involved but were not limited to new horizontal and vertical alignment projects, surface treatment, sidewalks, grading and drainage, bridge super structure/sub structure repair, concrete joint replacement and asphalt schedule work. Name of Firm: Virginia Department of Transportation, Christiansburg Residency Start Date: 4/2005 End Date: 10/2005 Position: Permits/Subdivision Supervisor Responsibilities: Mr. Saunders was responsible for the supervision and administration of the subdivision, rural streets and land use permits programs. Duties included networking with government officials and staff, developers, engineers and VDOT staff to discuss the engineering impacts of land development projects; responsibility for land development within the Residency to include utilities, commercial and subdivision streets, private entrances, land use permits, commercial development projects, etc. impacting transportation networks maintained by the State; participation in the development, plan review, inspection and acceptance of addition to the secondary system and ensuring compliance with rules and regulations. Name of Firm: Virginia Department of Transportation, Salem, Virginia Start Date: 3/2004 End Date: 4/2005 Position: Architect/Engineer I Responsibilities: Mr. Saunders assisted in the Land Development and Maintenance Program Operations for the Salem Residency. Duties included performing site plan reviews and providing comments to designers; involvement in the inspection and acceptance of additions to the secondary street system, and worked with the Maintenance Manager to set a budget for the Area Headquarters’ upcoming fiscal year. Also, he was assigned to the Bedford Residency to perform Acting Assistant Resident Engineering duties and Construction Project Management. Mr. Saunders duties included presenting the Six-Year Plan at a public hearing with the Board of Supervisors and involvement with the development of projects with the Contract Administrator to prepare for the advertisement phase, to include SAAP projects. Mr. Saunders also performed Construction Project Manager duties to include both bridge and grading projects of varying complexity. Responsibilities included preparing and presenting project showings and preconstruction conferences for the projects; reviewed work in progress and project records prepared by field staff to assure compliance with the contract documents and environmental regulations set by all agencies; handling potential work orders and claims issues and aiding in decisions made at the Residency level; tracking project cost and productivity to determine if projects would be completed on time and on budget; and performing final review and acceptance of projects from the contractor on behalf of the Department. Name of Firm: Virginia Department of Transportation, Salem District Start Date: 6/2001 End Date: 2/2004 Position: Transportation Engineer Associate Responsibilities: Mr. Saunders completed the Associate Engineers Program at the Christiansburg Residency in the

cdukes
Typewritten Text
A-28
Page 43: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

Salem District. While in this position, Mr. Saunders rotated through various sections within the Department to include Construction Management, Maintenance Operations, District Divisions, Contract Administration, and Residency Operations. Positions that were held during this period were Project Engineer, Assistant Resident Engineer, and Contract Administrator. Responsibilities with each of these various roles included meeting VDOT and FHWA standards and specifications. e. Education: Degree(s)/Year/Specialization:

Bachelor of Science/2001/Civil Engineering, Virginia Tech f. Active Registration: Year First Registered/ Discipline/VA Registration #:

2005/Professional Engineer/0402 041295 g. Document the extent and depth of experience and qualifications relevant to the Project.

1. Note your specific responsibilities and authorities for each assignment, not those of the firm. 2. Note whether experience is with current firm or with other firm. 3. Provide beginning and end dates for each assignment.

(List at least three (3), but no more than five (5) relevant projects for which you have performed a similar function.) Project: VDOT Rt. 36 Improvements Design-Build, Richmond District Name of Firm: NXL Construction Services, Inc. Start Date: 11/2011 Finish Date: 11/2012 (est.) Project Role: Quality Assurance Manager (QAM) Responsibilities: VDOT/ARRA Design-Build – Construction of improvements to Route 36 and Route 144 near Fort Lee’s Sisisky Gate located in Prince George County, Virginia. The project includes improvement to approximately 0.9 mile of Route 36 and approximately 0.5 miles of Route 144. There will be approximately 20 calendar months of construction-related activities requiring QA inspection and testing for the Abernathy team. Mr. Saunders serves as the project’s quality assurance manager where he is responsible for:

Preparation of project’s quality assurance and quality control plan Oversight of project QA procedures and plan Performance of QA testing and inspection in accordance with VDOT’s August 2008 design-build

guidelines Monitoring of contractor’s QC program Approving QC inspection staff assignment to project and the QC frequency testing plan before

submission to VDOT The preparation, maintenance, and submission of associated project documentation including but not

limited to diaries, EEO, ARRA, materials notebook/documentation, as-built sketches, and monthly pay documents including verifying and approving monthly pay packages, and preparation and submission of final records

Client/Owner Contact: VDOT – Tom Gilman, PE, Project Manager/Point of Contact, (804)266-1465 Project: Region 4 Design-Build Structures Project, Various Counties Name of Firm: Virginia Department of Transportation Start Date: 4/2010 Finish Date: 11/2011 Project Role: Project Manager Responsibilities: VDOT’s Project Manager during the construction of various bridge superstructure replacements throughout the Richmond District. Duties included making responsible charge decisions, attending regularly scheduled progress meetings, reviewing project documentation for compliance with contract documents, coordinated IA/IV testing and handled public/stakeholder concerns throughout the duration of the project. Client/Owner Contact: Mr. Rob Shackelford PE, Fredericksburg District Construction Manager, (540) 654-1511 Project: Meadowville Interchange, Chesterfield Virginia Name of Firm: Virginia Department of Transportation Start Date: 04/11 Finish Date: 11/11

cdukes
Typewritten Text
A-29
Page 44: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

Project Role: Project Manager Responsibilities: VDOT’s Project Manager during final design and construction of phase one, the diamond, of an ultimate cloverleaf interchange. Duties included attending regularly scheduled progress meetings, reviewing project documentation for compliance with contract documents, reviewed and approved pay applications and coordinated IA/IV testing. Client/Owner Contact: Mr. Harold Dyson PE, Richmond District Construction Manager, (804) 524-6211 Project: Route 10 Widening, Chesterfield Virginia Name of Firm: Virginia Department of Transportation Start Date: 04/11 Finish Date: 11/11 Project Role: Area Construction Engineer Responsibilities: Responsible charge engineer overseeing the construction of this project which included coordination with Chesterfield County, the contractor, Dominion Virginia Power, CSX railroad and the FHWA. Duties included but were not limited to acting on behalf of the Department during negotiations and problem resolution meetings, reviewing and approving monthly payment applications and ensuring project testing and documentation was being kept in accordance with contract and VDOT requirements Client/Owner Contact:: Mr. Harold Dyson PE, Richmond District Construction Manager, (804) 524-6211

cdukes
Typewritten Text
A-30
Page 45: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT 4.3.1.6

KEY PERSONNEL RESUME FORM

Brief Resume of Key Personnel anticipated for the Project.

a. Name & Title: Daniel (Danny) G. Davis, PE – Vice President / Senior Project Manager b. Project Assignment: Design Manager c. Name of Firm with which you are now associated: TranSystems Corporation

d. Years experience: With this Firm 1 Years With Other Firms 19 Years Please list chronologically your employment history, position and general experience or fields of practice for the last fifteen(15) years: TranSystems (December 2010 – present): Vice President – Bridge Design Halcrow (June 2008 – October 2010): Director, Bridge Sector – Bridge Design DMJM+Harris (December 1996 – June 2008): Regional Manager, Structures – Bridge Design e. Education: Degree(s)/Year/Specialization: Auburn University, Auburn, AL – Bachelor of Civil Engineering, 1990, Structures Auburn University, Auburn, AL – Masters of Science, 1995, Structural Engineering f. Active Registration: Year First Registered/ Discipline/VA Registration #: Professional Engineer: Florida/#0051342/1997, Virginia/#032685, Louisiana/#33462, New York/#086928, West Virginia/#18486, Pennsylvania/#077920, North Carolina/#037121, South Carolina/#29265 NCEES – National/#15809 g. Document the extent and depth of experience and qualifications relevant to the Project.

1. Note your specific responsibilities and authorities for each assignment, not those of the firm. 2. Note whether experience is with current firm or with other firm. 3. Provide beginning and end dates for each assignment.

(List at least three (3), but no more than five (5) relevant projects for which you have performed a similar function.)

Florida Avenue Bridge over IHNC, New Orleans, Louisiana; Project Manager (2004, 2006-2008) {previous firm} The Louisiana DOTD project includes 2.8 miles of high level structures and 1.4 miles of roadway. The total estimated construction cost is $220 million. Mr. Davis’ responsibilities included the overall management of

25 design team members located across 6 offices (states) along with 6 subconsultants to deliver over 1000 contract drawings and specifications. The design aspects include bridge design, roadway design, intersection design, roadway signs, roadway and navigation lighting, geotechnical design, surveying, and landscaping design. Danny was responsible for the Lead Technical role on the High Level Approaches and Main Span Unit. The project utilizes AASHTO PPC girder, curved steel plate girders, and Bulb-T PPC girders for the approaches and CIP concrete segmental box girders or steel plate girders for the main span unit. Danny served as Primary Point of Contact for the client and the client’s Program Manager. He was also responsible for internal cost controls, budgeting, staffing, internal project reviews, and ISO Quality Management System.

< CONTINUED ON NEXT PAGE >

cdukes
Typewritten Text
cdukes
Typewritten Text
A-31
Page 46: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

Daniel (Danny) G. Davis, PE – Design Manager (cont’)

Carolina Bays Parkway, Myrtle Beach, South Carolina; Senior Bridge Engineer (2001-2002) {previous firm} The South Carolina Department of Transportation consisted of a 21.53-mile bypass, including 22 precast, prestressed Bulb-T concrete structures, four over the Atlantic Intercostal Waterway. The total construction contract was $240 Million for the Design-Build project. Mr. Davis was the lead designer responsible for the design of the substructure in the highly seismic area (SPC C). Site specific response spectra were required for the development and analysis of the three-dimensional finite element model of the bridges.

I-64/I-295 Interchange Ramps F & D, Richmond, Virginia; Project Manager (2002-2008) {previous firm} The Virginia Department of Transportation project required the design of the two curved flyover steel plate girder bridges with a total construction cost estimated at $14 million. Ramp F is a 538m curved flyover ramp consisting of three continuous unit spans. The span lengths vary from 35 to 59m. Ramp D is a 240m curved flyover ramp consisting of two continuous unit spans. The span lengths vary from 39 to 54m. Mr. Davis was responsible for the development and delivery of the final contract bridge plans. He also served as the Principal Bridge Engineer responsible for the conceptual and final design of the curved steel plate girders and substructure elements; including the steel integral straddle bents, concrete hammerhead piers, abutments and footings. Madison Heights Bypass Project, Lynchburg, Virginia; Deputy Project Manager / Senior Bridge Engineer (1996-2000) {previous firm}

Route 29 over the James River - The bridges designed for the Virginia Department of Transportation were twin 2,300 foot long structures, with 100 foot tall piers, crossing the James River. Mr. Davis was responsible for the preliminary design of the superstructure elements; including steel plate girders, and segmental concrete box girders. He was also responsible for the preliminary and final design of the substructure elements; including the piers, the abutments, and the foundations (spread footings, Steel H-pile footings, and Drilled Shaft footings).

Route 460 EBL and WBL over Route 29 - The bridges designed for the Virginia Department of Transportation were twin 850 foot long structures, with 100 foot tall piers, crossing Route. 29. Mr. Davis was responsible for the preliminary and final design of the superstructure elements; including steel plate girders, and AASHTO prestressed girders. He was also responsible for the checking of the final design of the substructure elements; including the piers, and the foundations (spread footings and Steel H-pile footings).

Existing Route 460 over Route 29 - The bridge designed for the Virginia Department of Transportation was a 250 foot long jointless bridge crossing Route 29. Mr. Davis was responsible for the final design of the semi-integral abutments and the checking of the superstructure design; including the slab and steel plate girders. Route 210 over Route 29 - The bridge designed for the Virginia

Department of Transportation was a 38m long and 30m wide jointless bridge crossing Route. 29. Mr. Davis was responsible for the final design of the semi-integral abutments and the checking of the superstructure design; including the slab and steel plate girders. Franklin Turnpike Bridge Over Norfolk Southern Railroad and Fall Creek, Danville, Virginia; Project Manager (2003-2005) {previous firm}

The Virginia Department of Transportation project required the design of the 6-lane 600'-long curved bridge with a total construction cost estimated at $6.6 million. Mr. Davis was responsible for the development and delivery of the final contract bridge plans. He also served as the Principal Bridge Engineer responsible for the conceptual and final design of the prestressed Bulb-T girders and substructure elements; including the 60’ tall concrete hammerhead piers, abutments and footings.

cdukes
Typewritten Text
A-32
Page 47: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT 3.3.1

KEY PERSONNEL RESUME FORM

Brief Resume of Key Personnel anticipated for the Project. a. Name & Title: John Carter Washington, P.E., Assistant Project Manager b. Project Assignment: Construction Manager c. Name of Firm with which you are now associated: Archer Western Construction, LLC. d. Years experience: With this Firm 11 Years With Other Firms 21Years Please list chronologically your employment history, position and general experience or fields of practice for the last fifteen(15) years: Archer Western, 2010 – Present, Asst. Project Manager, Heavy Civil Construction Curtis Contracting, 2007 – 2010, Project Manager, Heavy Civil & Site Construction Archer Western, 2002 – 2007, Asst. Project Manager, Heavy Civil Construction Condotte America, Inc., 1998 – 2002, Project Engineer, Heavy Civil Construction Causseaux & Ellington, Inc., 1996 – 1997, Design Engineer, Site Design & Permitting Lawson, Noble & Webb, Inc., 1995 – 1996, Design Engineer, Site Design & Permitting e. Education: Degree(s)/Year/Specialization: Masters of Engineering – University of Florida – Construction Management – 1998 Bachelor of Science in Civil Engineering – University of Florida - 1995 f. Active Registration: Year First Registered/ Discipline/VA Registration #: 2001 –Professional Engineer – VA Registration #035328 g. Document the extent and depth of experience and qualifications relevant to the Project. VDOT I-95 Richmond Bridge Replacements, Richmond, VA – Contract Value: $68,000,000 Role: Environmental Compliance Manager 1. Specific responsibilities and authorities included coordination and management of: subcontractor solicitation, negotiation, award and contract administration; cost control for self-performed work and subcontractors; design and maintenance of primavera CPM schedule; material/equipment procurements; monthly job status summaries; estimating; chaired weekly progress and coordination meetings; staff training; execution of monthly pay applications; Owner's point of contact for project. 2. Experience is with the current firm, Archer Western. 3. From 2006 to 2009. Fort Eustis Tactical Equipment Maintenance Facility Project, Fort Eustis, VA - Contract Value: $14,000,000 Role: Environmental Compliance Manager 1. Specific responsibilities and authorities include: VA DCR, Army Corps of Engineers and Fort Eustis Department of Public Works environmental compliance during project construction. 2. Experience is with Curtis Contracting, Inc. 3. From 2009 to 2010. VDOT I-77 New River Bridge, Austinville, VA – Contract Value: $40,000,000 Role: Environmental Compliance Manager 1. Specific responsibilities and authorities include: VA DCR, Army Corps of Engineers and VDOT environmental compliance during project construction. 2. Experience is with current firm, Archer Western. 3. From 2006 to 2006.

cdukes
Typewritten Text
A-33
Page 48: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT 4.3.1.6

KEY PERSONNEL RESUME FORM

Brief Resume of Key Personnel anticipated for the Project. a. Name & Title: Amy Morris, PE, PTOE – Senior Traffic Engineer b. Project Assignment: Public Relations Manager c. Name of Firm with which you are now associated: T3 Design Corporation d. Years experience: With this Firm 5.5 Years With Other Firms 15.5 Years Please list chronologically your employment history, position and general experience or fields of practice for the last fifteen(15) years: T3 Design Corporation (2006 – Present): President – Responsible for all traffic and transportation engineering planning, engineering, and design operations.

Street Smarts (2001 – 2006): Traffic Engineer – Provided traffic and transportation planning, engineering and design services in support of public agencies located throughout the Washington Metropolitan region.

Federal Express/Transportation and HazMat Courier (1996 – 2001): Completed delivery routes and inspected hazardous materials packages in Ohio and in the Washington Metropolitan region.

e. Education: Degree(s)/Year/Specialization: B.S., 2002, Civil Engineering

f. Active Registration: Year First Registered/ Discipline/VA Registration #: Professional Engineer: Virginia/2005/Civil Engineering Professional Traffic Operations Engineer/2006 Certifications: VDOT Advanced Work Zone Traffic Control

g. Document the extent and depth of experience and qualifications relevant to the Project. 1. Note your specific responsibilities and authorities for each assignment, not those of the firm. 2. Note whether experience is with current firm or with other firm. 3. Provide beginning and end dates for each assignment.

(List at least three (3), but no more than five (5) relevant projects for which you have performed a similar function.)

VDOT Stringfellow Road Improvement Project, Fairfax County, Virginia; Project Manager (2007 – 2011) {current firm} Project Manager for T3 Design for the widening of Route 645, Stringfellow Road, from Route 50 to Route 7735, Fair Lakes Boulevard. Morris provides traffic engineering design services, including traffic data collection and analysis, sign, signal, pavement marking, and ITS design. Responsibilities include the design of traffic signal modification plans for seven existing signalized intersections along Stringfellow Road to be incorporated into the roadway widening construction plan set. Signal design plans include improvements to pedestrian accessibility to link the trail system through the corridor. Morris has also represented the design team during several citizens’ information meetings to address all traffic engineering impacts associated with the project.

VDOT Rt. 50 Widening, Northern Virginia; Project Engineer (2008 – 2011) {current firm} Project Engineer for T3 Design on a project to widen Route 50 from four lanes to six lanes. Morris’ responsibilities include providing traffic data, traffic analysis, signing and pavement marking plans, signal design and plans, local government planning coordination, and public involvement support. Specifically, Morris has represented the project team at Fairfax County citizens’ information meetings to present and address any traffic related issues.

Rt. 123 (Chain Bridge Road) over Accotink Bridge Replacement, Fairfax, Virginia; Task Manager {current firm}T3 Design Task Manager responsible for all traffic analyses and public involvement activities related to this bridge replacement project. Determined build-out year and design year traffic volumes for the bridge; and prepared traffic analysis report for the bridge project, including traffic analysis and recommendations for the traffic detour during the bridge construction period. Additionally, managed the public involvement activities associated with this project including attending citizens’ information meetings, presenting traffic engineering concepts, and addressing citizens’ questions and concerns.

cdukes
Typewritten Text
A-34
Page 49: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

I-64/Route 15 (Zion Crossroads)Interchange Improvements

State Project No. : 0064-054-703P101, R201, C501

Work Crews

Buck Washington

Superintendent

ConstructionQC Manager

Pete Faulkner, PE

Subcontractors

TruckingClearing

LandscapingAsphalt Paving

StripingElectricalGuardrail

Right of Way Manager

KDR Real Estate

Environmental Compliance Manager

Matt Phillips

Safety Manager

Mitch BiliasGeotechnical

Schnabel Engineering

Roadway

TranSystems

Construction Manager

Carter Washington, PE

Design Manager

TranSystemsDaniel Davis, PE

Quality Assurance Manager

NXLMichael Saunders PE,

CCMBrian Quinlan, PE

Design-Build Project Manager

Archer Western

TranSystems

Design Subconsultants

Key Personnel(Resume Included)

QC Lab

ECS

QA Lab

F&R

DemolitionEarthwork

Roadway ConstructionConcrete Pavement

Storm DrainageUtilities

Public Relations Manager

T3 DesignAmy Morris, PE, PTOE

Hydraulics

TranSystems

Environmental

Schnabel Engineering

Utilities

TranSystems

Traffic Management Plan

T3 Design

Traffic Control Devices

T3 Design

Survey

TranSystems

Structure and/or Bridge

TranSystems

cdukes
Typewritten Text
14
cdukes
Typewritten Text
Page 50: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

StI-6LoStCo

OOdeprfaelw TsePwdohath OAasarVcoco

NSinpr

WwinET

TSmT

Sprse

tatement of Qu64/Route 15 (Zouisa County, Vtate Project Noontract ID No.

OrganizaOn the I-64/R

etailed plannrocured in aacilitate a trliminating th

within budget

The importanetting. We rroject Mana

with in a timocument maas made ushroughout th

OrganizatiArcher Westspects throure the Desig

VDOT with oordination onstruction s

NXL Construaunders, PE

nto a contracroviding a cl

We have asseworking relatnto a contra

Engineering CThese firms w

TranSystems tructure and

manage the TranSystems

chnabel Engrovide transervices.

SUBMIT

ualifications Zion CrossroadVirginia

o. 0064-054-70C00086453DB

tion StruRoute 15 (Zning approaca timely maue Partnerinhe unknownt.

nce of contrrealize this

ager with themely manneranagement ane of this w

he life of the

ional Chartern will progh our Design Manageran organizaamong teamsequence and

uction ServE, CCM of Nct with Archlear separati

embled a detionships witact directly Consultants,will enter int

will performd/or Bridge,quality assuwill serve a

gineering wisportation m

TTED BY: ARC

ds) Interchange

3 B48

ucture Zion Crossroch to the woanner, and ang atmosphen, and acting

ractor-enginand therefore TranSyster. To speend project co

website throuproject.

rt Narrativovide overagn-Build Pr, Public Reation with a

m members. d activities.

vices will pNXL will serher Western. ion from the

sign team wth VDOT. T

with Arch Inc., T3 De

to a subconsu

m roadway,, and overalurance and s the Design

ill provide enmanagement p

CHER WESTE

e Improvement

ads) Interchork. This enall parties, inere and instig proactively

neer-owner ire are takingms Design t

ed communioordination ughout the

ve all project mroject Managlations Mana single poiMr. Quinlan

provide Quarve as the Q Mr. SaundeQuality Con

with direct reTranSystems

her Western.esign Corporultant agreem

, survey, hyll Design Pquality con

n Manager fo

nvironmentaplans, traffic

ERN CONSTRU

s

hange Projecnsures that encluding VDill a team my in designin

interfacing cg proactive mteam, to enscations, ourusing Microqualification

managementger Brian Qnager, and Cint of contan will foster

ality AssuraQuality Assuers will repontrol operati

elevant desigs Corporatio. The desration (DBEment with Tr

ydraulics, utiProject Mana

trol plan foor the projec

al and geotecc control de

UCTION LLC.

ct, as with aevery detail DOT, are fu

mindset of dng and build

cannot be omeasures, susure that as r Team has osoft’s Sharens stage and

t overseeingQuinlan, PEConstructionact for any r the integrat

ance for theurance Manaort directly tons on the p

gn experiencon will serveign activitie

E), and KDRranSystems.

ility relocatiagement. Tor the desigct.

chnical servevices plans,

and TRANSYS

all of our prois thoroughlully involveesign-buildiding a quali

overemphasiuch as co-lopotential isset up a c

ePoint softwd will conti

g both the d. Reporting

n Manager. issue and ation of our d

e constructiager for the pto the Designproject.

ce for this pe as the Leades will be

R Real Estate.

ions, adjustmTranSystemsgn activities

vices for the , and public

STEMS

ojects, we wly planned, m

ed with the ng this projity project, o

ized in the ocating our Dsues arise thollaborative

ware platforminue to util

design and g directly to

This structa structure tdesign soluti

ion activitieproject. NXn-Build Proj

project and lod Designer asupported b

e Services, In

ments and cs will also . Danny D

project. T3c involvemen

will initiate amaterials areprocess. Weect togetheron time, and

design-buildDesign-Buildhey are deal website fo

m. Our Teamize this too

constructionMr. Quinlan

ture providethat requireions with ou

es. MichaeXL will enteject Manage

ong standingand will enteby Schnabenc. (SWaM)

coordinationdevelop and

Davis, PE o

3 Design wilnt / relation

a e e r, d

d d lt r

m ol

n n s s

ur

el r r

g r

el ).

n, d f

ll s

cdukes
Typewritten Text
15
Page 51: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

StI-6LoStCo

TVR

InTthaccoexbrEP A“zFRthtecow Tcopldecoenprde PWwL

tatement of Qu64/Route 15 (Zouisa County, Vtate Project Noontract ID No.

The right-of-wVDOT prequReal Estate S

ntegrated The Team hahe project. Oction items oordination xperience onridges, MOT

Each team deroject Mana

An importantzipper” strator example,

Roadway Tashat benefit bechniques, anonstruction,

we deploy on

The transitiononstruction lanning and ecisions thaonstruction bnsure the worovide VDOesign throug

Project CoWe are commwith VDOT. Local Entities

Design-continumember

This teadesign-bCarolinIntercha

SUBMIT

ualifications Zion CrossroadVirginia

o. 0064-054-70C00086453DB

way serviceualified rightervices is a V

Team Apas held plannOur weekly so there is nplan includ

n those partiT, utilities, eesignates a

ager.

t step in detetegy. This a roadway sk Team. Tboth partiesnd the constthe construc

n all AW des

n from desigactivity pre-activity wor

at were madbegins, the Tork is being OT with an gh constructi

ordinationmitted to a pr

This relations (third parti

-Build Teame to do so rs are assign

am coordinabuild projecta, and Floriange Project

TTED BY: ARC

ds) Interchange

3 B48

es will be prt-of-way conVDOT prequ

pproach ning meetingcoordinationno confusion

des the use icular aspecttc. These Tleader who

ermining stastrategy invengineer de

This pairing, s and ultimatruction persction staff knign-build pr

gn phase to -task/work prk plan devede by the TTask Teams constructed integrated teion completi

n roactive andnship will eies). These a

m – The teamthroughout

ned action ite

ation has beets and pursuida. TranSyt in Jackson

CHER WESTE

e Improvement

rovided by Kntracting conualified Fee

gs since the n meetings hn about whiof “Task Tts of the proask Teams aprovides st

aff assignmevolves pairinesigning the similar to in

ately VDOTsonnel help snows instantrojects and h

constructionplan developelopment. TTask Team

are also assin accordaneam of desiion.

d effective coxtend to theare some of t

m has held pthe project.

ems that they

en developeduits. Our comystems comnville, Florid

ERN CONSTRU

s

KDR Real Ensultant. AlAppraiser a

RFQ was adhave a structich tasks haveams” desig

oject. Examare comprisetatus reports

ents to each ng designers

MOT will bnterlocking T. The desshape the detly who to c

have successf

n phase requpment. DesiThese plannin

during the signed the rece with the dign and cons

oordination e Public, Utithe key issue

planning me. These mey are then he

d over our tempanies hav

mpleted severda. Most r

UCTION LLC.

Estate Servicllen Dorin,

and a VDOT

dvertised, antured agendave been assigned to focu

mples of Tasked of personns to the Des

Task Team s with their cbe paired wteeth on a z

signers gainesign. Additcontact regarfully used in

uires our Taigners are inng activitiesdesign/cons

esponsibilitydesign. Thestruction pro

program, boility Companes in our app

eetings sinceeetings haveeld accounta

eam’s coopeve pursued dral of the b

recently, we

and TRANSYS

ces. KDR RJr., MAI, SR

T prequalified

nd will contia and all teamigned to whus individuak Teams incnel from botsign Manage

involves thconstruction

with the MOTzipper, createn valuable intionally, shording assistan the past wi

ask Teams tonvolved in ts are interactstructability

y to assist wie creation anofessionals

oth within thnies, Permittproach to thi

e the RFQ we a structure

able for comp

erative workdesign-build bridge desig are workin

STEMS

Real Estate SRA, R/W-Nd Review Ap

inue to do sm members

hich people. als with cerclude roadwath AW and Ter and the D

he implemenn personnel cT Superintees personal nsight into

ould an issueance. This isth TranSyste

o refocus frothe constructive and serv

review proith the QC innd use of thefrom comm

he design-buting Agencieis coordinati

was advertised agenda apleting.

k history, whprojects in T

gns on AWCng together

Services is aNAC of KDR

ppraiser.

o throughouare assignedOur interna

rtain specificay, drainage

TranSystemsDesign-Build

ntation of oucounterpartsndent on therelationshipconstruction

e arise durings a techniqueems.

om design totion pre-task

ve to confirmocess. Oncenspections to Task Team

mencement o

uild team andes, and otheon:

sed, and wiland all team

hich includeTexas, SouthC’s I-10/I-95on the $168

a R

ut d al c e, s. d

ur s. e s n g e

o k

m e o s f

d r

ll m

s h 5 8

cdukes
Typewritten Text
16
cdukes
Typewritten Text
Page 52: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

StI-6LoStCo

tatement of Qu64/Route 15 (Zouisa County, Vtate Project Noontract ID No.

million with gro

VDOT –meet thteam's amultipleinterchahandho

Additiomeet thand opemultiplemeetingcoordin

Public –with T3communand govon the p

Utility utility cdevelopwith eacof our tsingle p

Permittwith thVoluntafor Statand InlDepartmthey havNRCS.

Local Eand neeemergenrepresenin the pto keepsuccess

SUBMIT

ualifications Zion CrossroadVirginia

o. 0064-054-70C00086453DB

design-buildound breakin

– We are cohe project neactivities. We projects, ange projectolding neces

nally, we arhe project neen lines of ce projects angs with thenation.

– We unders3 Design to nicating infovernment orgproject.

Companies conflicts intop and includech entity to keam meeting

point of conta

ing Agenciehe Virginia ary Remediae projects, Sland Fisheriment of Histve worked th

Entities – Weed informatncy responsentatives of a

project are ke all of the a.

TTED BY: ARC

ds) Interchange

3 B48

d Central Flng imminent

ommitted to eeds and proWe recognizeand we ares and extens

ssary with ou

re committedeeds. Advacommunicatind we are de design re

stand that thicoordinatin

ormation regganizations

– Through o our designe their proviskeep them apgs and on thact.

es – SchnabeDepartment

ation DivisioSchnabel hasies, Departmtoric Resourhrough, and

e will coordiion, includie groups. O

all of these aept up to speagencies on

CHER WESTE

e Improvement

lorida Commt.

tailoring ouovide you we that the Ve sensitive sive knowleur team what

d to adaptinganced notificion will be odedicated to eviewers re

is is a highlyng the publigarding the dand will wo

a combinatn and constrsions in our pprised of ou

his project w

el Engineeriof Environ

ons. Similars experience ment of Corces. Throug

for, the U.S

inate with otng Louisa

Our team wilagencies as aeed on the pboard, info

ERN CONSTRU

s

muter Rail p

ur coordinatiwith whateveVDOT projec

to this. Odge of VDOtsoever.

g our commcation of suour team comhelping the

egarding tec

y visible projc involvemedevelopmentork closely w

tion of relocruction plansfinal plan seur progress.

we will assign

ng has mainnmental Qurly, through coordinatin

onservation gh Schnabel

S. Army Cor

ther entities tCounty andl make effecappropriate, project activiormed, and p

UCTION LLC.

project in Ce

ion and comer level of acct manager a

Our team haOT standards

munication prubmittals, summitment.

em approve chnical issu

ject. We haent effort. t of the projwith both th

cations and s. We will et. As we be They will h

gn a Utility C

ntained a lonuality, partic

developmenng agency rev

and Recreal’s many darps of Engin

that will havd various loctive use of to make sur

ities. We arpart of the

and TRANSYS

entral Florid

mmunication ccess you dand staff areas extensives and proced

rogram withubmittal pack

We undersour design.

ue resolutio

ave assigned Ms. Morrisect to all inte design and

avoidance meet with e

egin construhave an openCoordination

ngstanding pcularly its Wnt of Enviroviews with tation, Deparam design anneers, U.S. F

ve interest inocal law enfboth e-mailere that all agre dedicated commitmen

STEMS

da. Design

program wiesire to the

e busy people experiencedures. Ther

h the design kages that astand the rev We anticip

on, and per

Amy Morri will be resterested groud constructio

we will inceach utility

uction we wiln invitation tn Manager to

professionalWater, Solidonmental Imthe Departmrtment of Fnd construct

Fish and Wil

n the project forcement aed and faxedgencies withto doing wh

nt to make th

is underway

ith VDOT todesign-build

le, managinge on similare will be no

reviewers toare completeviewers havepate periodicrmit agency

is, PE, PTOEsponsible foups, personson personne

corporate theas our planll again meeto attend anyo act as thei

l relationshipd Waste and

mpact Reportment of GameForestry andtion projectsldlife and the

constructionagencies andd bulletins toh any intereshat is neededhis project a

y

o d g

ar o

o e, e c y

E r

s, el

e s

et y r

p d s e d s, e

n d o st d a

cdukes
Typewritten Text
17
Page 53: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT 3.4.1(a)

LEAD CONTRACTOR - WORK HISTORY FORM

(LIMIT 1 PAGE PER PROJECT)

Work by Lead Contractor - three (3) projects which best illustrates current qualifications relevant to this Project.

a. Project Name & Location

b. Narrative describing nature of Firm’s Responsibilities

c. Client/Owner/Project Manager who can verify Firm’s responsibilities. Include address and current phone number.

d. Contract Completion Date (Original)

e. Contract Completion Date (Actual or Estimated)

f. Estimated Value (in Thousands) Original Contract Value

Final or Estimated Contract Value

Dollar Value of Work for Which Firm Was/Is Responsible

(1) City of Carmel Keystone Parkway & 136th St. Carmel, IN

Archer Western (Walsh Group) was the Prime Contractor for this project which included the construction of a teardrop-shaped roundabout interchange, storm drainage, pavement and 2 two-span bridges. The interchange is part of the final phase to lower the grade of Keystone Parkway under six major intersections creating new interchanges and free-flow traffic at these locations making Carmel’s five-mile stretch of Keystone a much safer and more efficient roadway. The north-south traffic on Keystone Parkway is free-flowing with no traffic lights between 98th Street and 146th Street with teardrop-shaped roundabout interchanges managing the east-west traffic flow.

The City of Carmel One Civic Square Carmel, IN 46032 Mike McBride, P.E. (317) 571-2439

November 2009 November 2009 $14,929 $14,929 $14,929

cdukes
Typewritten Text
A-35
Page 54: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT 3.4.1(a)

LEAD CONTRACTOR - WORK HISTORY FORM

(LIMIT 1 PAGE PER PROJECT)

Work by Lead Contractor - three (3) projects which best illustrates current qualifications relevant to this Project.

a. Project Name & Location

b. Narrative describing nature of Firm’s Responsibilities

c. Client/Owner/Project Manager who can verify Firm’s responsibilities. Include address and current phone number.

d. Contract Completion Date (Original)

e. Contract Completion Date (Actual or Estimated)

f. Estimated Value (in Thousands) Original Contract Value

Final or Estimated Contract Value

Dollar Value of Work for Which Firm Was/Is Responsible

(2) INDOT – I-65 at US30 Design-Build Merrillville, Indiana

Archer Western (Walsh Group) was the Prime Contractor for this Design-Build Project which consisted of rehabilitating over 1 mile of US Route 30 and nearly 2.5 miles of Interstate 65 in Lake County, Indiana. The scope included a complete interchange modification whereby the traditional cloverleaf configuration is improved by eliminating two exit loops and constructing extra wide off ramps to accommodate the ever increasing volume of interstate traffic onto the US 30 corridor. The existing bridge structure over Route 30 was also removed and replaced. The close proximity of commercial and residential neighborhoods required careful planning and scheduling of work activities to avoid disturbances due to noise, dust, and construction traffic. Archer Western project management was able to maintain high traffic volumes safely during construction through extensive planning and implementation of MOT. Phasing and staging of traffic movements kept both the Archer Western workers and motorists safe during construction. Lead Designer: Janssen & Spaans

Indiana Department of Transportation 315 E. Boyd Blvd. LaPorte, IN 46350 Walter Land (317) 233-3699

June 2003 June 2003 $31,000 $31,000 $31,000

cdukes
Typewritten Text
A-36
Page 55: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT 3.4.1(a)

LEAD CONTRACTOR - WORK HISTORY FORM

(LIMIT 1 PAGE PER PROJECT)

Work by Lead Contractor - three (3) projects which best illustrates current qualifications relevant to this Project.

a. Project Name & Location

b. Narrative describing nature of Firm’s Responsibilities

c. Client/Owner/Project Manager who can verify Firm’s responsibilities. Include address and current phone number.

d. Contract Completion Date (Original)

e. Contract Completion Date (Actual or Estimated)

f. Estimated Value (in Thousands) Original Contract Value

Final or Estimated Contract Value

Dollar Value of Work for Which Firm Was/Is Responsible

(3) FDOT Palm Beach SR 80/I-95 West Palm Beach, FL

Archer Western was the Prime Contractor on this project which consisted of major interchange improvements at the intersection of SR 80 (Southern Boulevard) and I-95. The work included new construction of the bridges over I-95 and the railroad, structural work, resurfacing, signing, lighting, signalization and landscaping. Archer Western also managed all traffic disruption issues and resolved them around the commuters convenience.

CEI Florida Nexus Park – Suite 50 2705 Peters Road Fort Pierce, FL 34945 Mel Pollock, PE (772) 489-8410

July 2006 July 2006 $34,000 $34,000 $34,000

cdukes
Typewritten Text
A-37
Page 56: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

ATTACHMENT 3.4.1(b)

LEAD DESIGNER - WORK HISTORY FORM

(LIMIT 1 PAGE PER PROJECT)

Work by Lead Designer - three (3) projects which best illustrates current qualifications relevant to this Project.

a. Project Name & Location

b. Narrative describing nature of Firm’s Responsibilities

c. Client/Owner/Project Manager who can verify Firm’s responsibilities. Include address and current phone number.

d. Contract Completion Date (Original)

e. Contract Completion Date (Actual or Estimated)

f. Estimated Value (in Thousands) Original Contract Value

Final or Estimated Contract Value

Dollar Value of Work for Which Firm Was/Is Responsible

(1) Woods Chapel Road Reconstruction City of Blue Springs, MO

For this project, TranSystems serving as lead designer provided management and topographical/ROW surveys in addition to engineering design. The improvements to .8 miles of Woods Chapel Road in Blue Springs, MO incorporate pedestrian friendly, multi-modal amenities and landscaping as well as better traffic flow. The four-lane roadway with auxiliary turn lanes will become a three-lane roadway with central, two-way left-turn lane. Design elements include a roundabout and a "Diverging Diamond" interchange over I-70, one of the first in Missouri. A mixture of stilling basins and silt fences, particularly at Lake Tapawingo, will limit runoff pollution. TranSystems is also responsible for the DDI design on this project. TranSystems recommended this design for the area because it could resolve area’s issues at a lower cost. Since the design is ideal for the reuse of narrow structures, it would not be necessary to replace the bridge or modify I-70. The DDI will be one of the first of its kind to be constructed in the Kansas City area – two more are under design. “We are excited about the potential improvements made possible by this partnership with the City of Blue Springs,” said Beth Wright, District Engineer, MoDOT District 4. “We have seen the DDI as a practical solution which greatly reduces congestion and improves safety in other locations throughout the state. We are confident it is the right solution for improvements at the Woods Chapel interchange.” Design is complete on the project. Right of way is currently being acquired and a February 2012 letting date is anticipated.

Owner: City of Blue Springs, MO 903 W Main Street Blue Springs, MO 64015 Oliver DeGrate, III (816) 228-0121

February 2012 (Design)

February 2012 (Design)

$1,064 (Design) $12,551

(Construction) (Estimated)

$1,064 (Design) $12,551

(Construction) (Estimated)

$1,064 (Design) $12,551

(Construction) (Estimated)

cdukes
Typewritten Text
A-38
Page 57: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
A-39
Page 58: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS
cdukes
Typewritten Text
A-40
Page 59: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

StI-LoStC

P

R WAto Imdear McuTw

tatement of Qu64/Route 15 (Zouisa County, tate Project Noontract ID No.

Project

Risk #1 –

Why risk is cAmerica haveo ensure succ

mpact of Resign procesre a number

Mitigation Surrently in

TranSystems we have ident

1) Crossov

slows trwrong-wleast 45smaller the crosconsiderparticul

2) Traffic control under yconsiderin traffiI-44 andwithout this momovemeusing an

3) PedestriDDIs, eor downon the otraffic fnot the median,crosswa

SUBMIT

ualifications Zion CrossroadVirginia

o. 0064-054-70. C00086453D

Risk

DDI Des

critical: Whe proven to ocessful opera

Risk on Projsses in its eaof subtle, ye

Strategies: Toperation also has thr

tified a num

ver and Turnraffic and prway movem5 degrees toangles can b

ssovers and red as thesearly in areas

Signal Desilimited to t

yield controration. Trafc, when the d Route 13 yielding to vement evenent or to con auxiliary la

ian Accommeither placingn the medianoutside, it is for pedestria

same as pe, all of the calk lines rela

TTED BY: ARC

ds) Interchange

03 B48

sign Feat

hile the Diveoperate safelation.

ject: The Darly stages. et critical de

TranSystemsin the cou

ree domesticber of critica

n Design – Trovides posit

ments. Initialo the generabe utilized, bthe left-turn are typicall

s with higher

ign – Depenthe crossoveol. Howevffic making approachingDDI in Spricross street n though ca

onstruct the ane.

modations –g sidewalks n. There areimportant to

ans. This is aedestrians arcrossings arative to the m

CHER WESTE

e Improvement

tures

erging Diamoly and effect

DDI design pNevertheles

tails that are

s has visited untry; and c DDI projecal design ele

The design otive directiol guidance wl alignment.but that drive

n movementsly tight radiir proportions

nding on traer intersectiover, the rithis movemg traffic is acingfield, Mitraffic creati

apacity-wise movement s

– There havon the outs

e design cono review visia similar issure typically re protected,mast arm sig

ERN CONSTRU

ts

ond Interchatively, there

process has ss, while thee important t

and the obsdiscussed tcts nearing cements. Belo

of the crossoon toward thwas that the . However,er perceptions to and fromi. Placing bus of large ve

affic volumon only, witght-turn maent tends to ctually usingssouri, manying a safety it is not ne

so that traff

ve been twoide of the br

nsiderations ibility of “freue to the rigused to loo however, it

gnal placeme

UCTION LLC.

ange projectsare still a nu

similaritiese overall conto provide sa

served operatheir operatcompletion oow is a discu

overs needs he downstrea

crossovers s, evaluation n of the travm ramps, ofuffer areas oehicles.

mes, DDIs thth the right aneuver frolook to the

g the far laney vehicles wconcern. M

eeded. Our fic makes th

o approachesridge, as wiwith either oee-flow” croght-turn desioking for. Wt is importaent. In som

and TRANSYS

s that have oumber of les

s to the devncept is fairafe and effic

ation of mortion with thof design. ussion of a f

to be at an am receivingshould have

of operatinvel path musff-tracking byor utilizing w

heoretically and left-tur

om the offnear-side cr

es upstream were observe

MoDOT has srecommend

he turn and

s to accommth traditionaoption. If thossings for vign above, aWhen placin

ant to considme configurat

STEMS

opened to trassons that ca

elopment ofrly straightfoient operatio

re than half he managinBased on th

few of these

angle and ag lanes in or an approach

ng DDIs hast be addressy large vehiwider lanes

can operatern movemenf-ramp requross street laof the cross

ed making tsince installedation is to s

then merge

modating peal diamond ihe crosswalk

vehicles and as the trafficng the crosder the placetions the cro

affic so far inan be applied

f roundabouorward, thereon.

f of the DDIng agencieshis expertiseelements:

an offset tharder to avoidh angle of as shown thaed. For bothicles must beis important

e with signants operatinguires speciaanes for gapsover. At thethe right-turned signals fosignalize this into traffic

edestrians ainterchangesks are placedof oncoming

c patterns areswalk in theement of theosswalk line

n d

ut e

s s. e,

at d at at h e t,

al g al s e n r s c

at s, d g e e e s

cdukes
Typewritten Text
18
Page 60: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

StI-LoStC

VPas

R Wlo Imwwco Mpr

VcotoPan

R

tatement of Qu64/Route 15 (Zouisa County, tate Project Noontract ID No.

can be location

VDOT’s Rolrovide notics soon as po

Risk #2: M

Why Risk is ocal resident

mpact of Rworkers couldwill be encouonstruction a

Mitigation Sroject.

1) Desigbusineconstrmost l

2) Utilizethe wi

3) Continprovid

VDOT’s Roonstraints duo accommodartner with ny potential

Risk #3 –

SUBMIT

ualifications Zion CrossroadVirginia

o. 0064-054-70. C00086453D

mistaken fons when the s

le: Partner wce of any chassible so tha

Maintena

Critical: Mts and busine

Risk on Projd be placed untering a dand the deve

Strategies:

n and execesses and rruction manalogical and c

e off peak hidening of th

nuous commding informa

le: Reviewuring the desdate commuour team in issues or im

Public I

TTED BY: ARC

ds) Interchange

03 B48

or stop linessignal chang

with our teamanges to the at we can inc

ance of T

Minimizing esses through

ject: Within unsafe coiverging dia

elopment of t

Below are e

cute a feasibresidences wagement teacomprehensi

hours for conhe existing ra

munication bation on key

w and approsign phase.

unity desiresthe assistan

mpacts that V

nvolvem

CHER WESTE

e Improvement

s. At someges despite b

m to determiproject requ

corporate the

Traffic (M

impacts to thout constru

hout an effeconditions. Aamond interctraffic patter

examples of

ble, well thwhile minim

am and Tranive MOT Pla

nstruction acamps that lea

between theconstruction

ove our MOProvide not as soon as

nce of providVDOT feels c

ent/Educ

ERN CONSTRU

ts

e locations vbeing downst

ine the most uirements orem into our p

MOT)

traffic alonguction is criti

ctive MOT pAdditionally, change specrns during co

f our approa

hought out Mmizing impnSystems dean for this pr

ctivities that ad to and fro

Design Bun activities.

OT plan anice of any ch possible soding all partcan be mitig

cation

UCTION LLC.

vehicles havtream of the

appropriater provisions plans. Revie

g Rt. 15 and ical to a succ

plan and apbecause this

cial emphasionstruction t

ach to the M

MOT Plan pacts on thesign team wroject.

will have thom I-64.

uild team, lo

nd provide hanges to tho that we caties with appated prior to

and TRANSYS

ve been obsintersection

design soluto accommo

ew and appro

I-64, as wecessful proje

pproach the ts is the first s will be plato alleviate m

Maintenance

that will mhrough traffwill work in

he greatest im

ocal residen

any informhe project reqan incorporapropriate info constructio

STEMS

served stoppn.

ution for this odate commove our desi

ll as limitingect.

traveling putime that loaced on the motorist con

of Traffic a

maintain accfic. Archen concert to

mpacts on tr

ts, and busi

mation regardquirements oate them intformation anon activities t

ping at these

interchangemunity desire

ign plans.

g impacts on

ublic and oucal motoristsequence o

nfusion.

aspect of the

cess to locaer Western’

develop the

raffic such a

iness owner

ding activityor provisionto our plansnd discussingtaking place

e

e. s

n

ur s f

e

al s e

s

s

y s s. g .

cdukes
Typewritten Text
19
Page 61: Statement of Qualifi cations … · February 3rd, 2012 Statement of Qualifi cations. ATTACHMENT 3.1.2 0064-054-703, P101, R201 & C501 STATEMENT OF QUALIFICATIONS CHECKLIST AND CONTENTS

StI-LoStC

Wistrcothroto Impodiowto Med

Vthm

tatement of Qu64/Route 15 (Zouisa County, tate Project Noontract ID No.

Why Risk is s no exceptioravelling puontractor, anhe safest mooadway systeo the success

mpact of Rotentially exifficult than wnership onowards the p

Mitigation Sducational a

1) Beginprojecwill anthe puconstr

2) The Apublicof ourstep is

3) In addeduca

VDOT‘s Rolhe project te

meetings to a

SUBMIT

ualifications Zion CrossroadVirginia

o. 0064-054-70. C00086453D

Critical: Aon. New traublic and lond owner if ost efficient em, involvins of this proj

Risk on Proxposes all panecessary.

n all sides wproject.

Strategies: spects of the

nning in the dct informationswer any qublic to voicruction activ

Archer Westc and our tear team that ws crucial as i

dition to queational meetin

le: Assist ineam. Providassist in creat

TTED BY: ARC

ds) Interchange

03 B48

As with anythaffic designs ocal residentnot handled travelling ex

ng the publicect.

oject: Failuarties to negaBy fostering

which greatl

Below are e project.

design phaseonal meetingquestions thace their con

vities take pla

tern Public am throughowill allow tht creates a re

estion and angs in which

n promoting de and maketing a partne

CHER WESTE

e Improvement

hing new, pusuch as DDts which caproperly. B

xperience poc and educat

ure to educaative public g an interactily reduces t

examples o

e and lastinggs where we at the public ncerns whileace.

Relations Mut the projec

he public to eal relationsh

answer type h we will exp

public invole available Vership enviro

ERN CONSTRU

ts

ublic percepDI’s have thean develop Because the ossible for tting them on

ate and utiloutlook wh

ive and educthe possibili

f our mitiga

g throughoutwill explainmay have re

e also allow

Manager wilct. By definvoice any anhip between

informationplain not on

lvement andVDOT repreonment with

UCTION LLC.

ption is of the potential to

into negatigoal of Arc

those utilizinn the benefit

lize public ihich then cancational atmity of confu

ation strateg

t the projectn the aspectsegarding theing our team

l be the sinning the contnd all conce

n the public a

nal sessions nly how DDI

d the flow ofesentatives fo

the public.

and TRANSYS

e utmost impo create an uive public ocher Westernng the Commts of DDI’s e

involvementn make even

mosphere we usion and ne

gies for the

t, the Archers of our desie project. Thm to addres

ngular point tact person werns they havand the proje

the Archer Is function, b

f informationfor all inform

STEMS

portance anduneasy feelinoutlook on n and VDOTmonwealth oearly and oft

t throughoutn the simpleshope to crea

egative publ

public invo

r Western tegn and conshese meetingss those con

of contact we put a faceve. We beliect.

Western teabut also their

n between thmational and

d this projecng among the

the projectT is to createof Virginia’

ften is critica

t the projecst tasks moreate a sense olic sentimen

olvement and

am will holdstruction, andgs will allow

ncerns before

between thee to the nameieve that thi

am will holdr benefits.

he public andd educationa

ct e t, e s

al

ct e f

nt

d

d d w e

e e s

d

d al

cdukes
Typewritten Text
20