State Road 46 Pavement Replacement Owen Valley High School Wednesday, September 3, 2014. Welcome. Rickie Clark, INDOT Office of Public Involvement Purpose/explanation of public hearing Public hearing format Visit our sign-in table Informational handouts - PowerPoint PPT Presentation
Citation preview
Welcome
Rickie Clark, INDOT Office of Public Involvement
Purpose/explanation of public hearing Public hearing format Visit our sign-in table Informational handouts Submitting public comments for hearings
transcript Project display area
Welcome
Introduction of INDOT project officials Project Management Design Real Estate Public Involvement
HNTB – Design Team Lochmueller Group - Environmental
Team Town of Spencer Owen County Recognition of elected public officials
Public Hearing
Sign-in at attendance table to be added to project mailing list.
A public hearing notice was mailed to known property owners within project area.
Announcement of this hearing was posted to INDOT website. A media release was also issued.
Legal notice publishing: Spencer Evening World
August 19 and August 26
Project Stakeholders Indiana Department of Transportation Indiana Division Federal Highway
Administration Owen County Town of Spencer Local communities Elected public officials Community residents and citizens Commuters Trucking industry Schools Emergency services
Engineering Assessment
Environmental phase begins
Purpose & need Develop
alternatives
Preliminary design phase
Release environmental document for public review
and comment
Right-of-Way acquisition
phaseConstruction
Project Development Process
Public Hearing
Environmental Document
Requirement of the National Environmental Policy Act (NEPA) Requires INDOT to analyze and evaluate the
impacts of a proposed project to the natural and socio-economic environments
Impacts are described in environmental document
Categorical Exclusion (CE), Level 4 Environmental document was released for
public involvement in August 2014
Environmental Document Purpose and need Develop a number of possible
alternatives The “Do Nothing” alternative is a baseline for
comparison Screen alternatives to identify a
preferred alternative Solicit public comment on
environmental document and preliminary design plan
Solicit, address and fully consider public comment as part of decision making process
Elements of the Environmental Documentation
Real Estate Community Impacts Air Quality Wetlands and
Waterways Noise
Floodplains Farmland
Endangered Species Hazardous Materials
Environmental Justice Historic/Archaeological
Sole Source Aquifer
Cultural Resources Public Involvement
Environmental Documentation
S.R. 46 Pavement Replacement Historic resources
Hillside Historic District eligible for the National Register
0.1 acre of temporary right-of-way for grading and driveway construction
No Adverse Effect
Environmental DocumentationINDOT Seymour District OfficePlanning & Programming Department185 Agrico Lane, Seymour, IN (877) 305-7611; [email protected]
INDOT Office of Public InvolvementIndiana Government Center North, Room N642100 North Senate Avenue, Indianapolis, IN(317) 232-6601; [email protected]
Owen County Public Library 10 South Montgomery Street, Spencer, IN (812) 829-3392
S.R. 46 Pavement Replacement Purpose
Provide safe facility for roadway users and pedestrians
Address deteriorated roadway and sidewalk condition
Need Age and deteriorated condition of existing:
Curbs Sidewalks Pavement along State Road (S.R.) 46 through
Spencer Storm sewer system overloading Flooding occurring during significant rain events
S.R. 46 Pavement Replacement Project Description
Reconstruct S.R. 46 from S.R. 67/U.S. 231 west 1.1 miles to east of Fairview Ave.
Replace pavement, curbs, sidewalks, storm sewers and lighting
No horizontal alignment changes, slight vertical alignment changes
Realign Vandalia Ave.
S.R. 46 Pavement Replacement Project Description cont.
12-foot travel lanes, 14-foot two-way left turn lane, curb and gutter, and 6-foot sidewalk
Organize traffic flow (driveways and approaches)
Sidewalks meeting Americans with Disability Act (ADA) requirements
Replace storm sewers to improved drainage
Replace traffic signals at S.R. 46/Main and S.R. 46/Fletcher Ave.
Decorative street lighting in partnership with the Town of Spencer
S.R. 46 Pavement Replacement Maintenance of traffic
Divert east bound traffic onto Franklin St. Westbound traffic use S.R. 46 through the
project area Property access maintained through
construction Two construction seasons
Year 1 (2016): half of S.R. 46 Open through the winter season Year 2 (2017): other half of S.R. 46
Real Estate Acquisition Process "Uniform Act of 1970"
All federal, state and local governments must comply
Requires an offer for just compensation Acquisition Process
Appraisals Review Appraisals Negotiations
INDOT Real Estate Team to work with impacted property owners
S.R. 46 Pavement Replacement Right-of-way
Permanent R/W: 0.8 acre Strip R/W 0.7 acre commercial, 0.1 acre residential
Temporary R/W: 2.0 acres Grading Driveway and sidewalk reconstruction 1.7 acre commercial, 0.3 acre residential
No relocations
Project Schedule
Public Hearing: September 2014 Environmental Document finalized:
2014 Preliminary Design Plan refinement:
2014 Real Estate Acquisition activities:
2014 - 2015 Appraising Negotiations/Buying Utilities coordination/Relocation
Construction: 2016
Feedback
INDOT would like to hear from you Talk with INDOT project team members Comment sheet in information packet E-mail or mail comments to INDOT Sign-in to be added to project mailing list Visit INDOT Seymour District page at
http://www.in.gov/indot/2706.htm All comments are very much appreciated and
will be given full consideration by project team
Public Involvement Team
Rickie ClarkINDOT Office of Public Involvement (317) 232-6601 [email protected]
Glenda SealINDOT Seymour District Customer Service (877) 305-7611 [email protected]
Submit Public Comments Submit public comments using the options
described in first page of information packet:
Public Comment Form Via e-mail Participating during public comment session via
microphone Verbal comments recorded and transcribed for inclusion
into public hearings transcript INDOT respectfully requests comments be
submitted by Friday, September 19, 2014. All comments submitted will become part of
public record, entered into transcript, reviewed, evaluated and given full consideration during decision making process.
Next Steps Public and project stakeholder input
Submit comments via options described on page 1 of information packet
INDOT review and evaluation All comments are given full consideration during
decision-making process Address comments, finalize/approve environmental
document, complete project design Communicate a decision
INDOT will notify persons on mailing list of decision Work through local media outlets and paid legal notice Make project documents accessible via repositories
Questions? Contact Public Involvement Team
Thank You
Please visit with INDOT project officials following the public comment session
Project Open House Project maps, displays, real estate acquisition
table, INDOT project officials and informal Q & A