46
0 O STATE OF UTAH FORM 3 DEPARTMENT OF NATURALRESOURCES DIVISION OF OIL, GAS AND MINING AMENDED REPORT (highlight changes) APPLICATION FOR PERMIT TO DRILL ð. MN ROA E EN5 Nc lAN 7 IF INDIAN,ALLÒTTEE OR TRIBE NAME: 1A. TYPEÖFWORK: DRILL REENTER DEEPEN UTE 8. UNIT or CA AGRFEMENT NAME: B. TYPE OF WGLL: OIL GAS OTHER SINGLE ZONE MULTIPLEZONE (TTU-76967 2. NAME OF OPERATOR: 9. WELL NAMËand NUMBER: BERRY PETROLEUM COMPANY UTE TRIBAL 6-27D-55 3. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELD AND POOL, ÓR WILDCAT: RT. 2 BOX 7735 CITY ROOSEVELT STATE UTAHzie 84066 (435)722-1325 BRUNDAGE CANYÖN 4. LOCATION OF WELL (FOOTA 11 QTR/QTR, SECTION, TOWNSHIP, RANGE. MERIDIAN: AT SURFAc : 2139' FN 112 FWL NAD 27 (SWINW) gLJgþg C/l/ Û. 0/9 /g|t t /O ff /¿ 40.019031 LAT SEC. 27, 7.58., R.5W. AT PROPOSED PR0DUCING ZONe 1920' FNL 2401' FWL 110.438367 LONG U.S.B.&M. 14. DISTANCE IN MILES ANODIRECTION FROM NEAREST TOWN ÓR POST OFFICE: 12 CÓUNTY: 13. STATE: 28.1 MILES FROM MYTON, UTAH DUCHESNE UTAH 15. DISTANCE TO NEAREST PROPERTY OR LEASE LINE (FEET) 16. NUMBER OF ACRES IN LEASE: 17. NLMBER OF ACRES ASSIGNED TOTHIS WELL: 1128' 640 40 18. DISTANCE TO NEAREST WELL (DRILLING, COMPLETED, OR 19. PR0FÖSED DEPTH: 20. B0ND DESCRIPTION: APPLIED FOR) ON THIS LEASE (FEET) 50' 5770' RLBOOO5651 21. ELEVATIÒNS (SHOW WHETHER DF, RT, GR, ETO.): 22. APPÄOXIMATE DATE WORK WILL START: 23. ESTlMATED DURATION: 7031' GR REFER TO ISPC SOP PLAN REFER BPC SOP PLAN 24. PROP SED CASING AND CEMENTING PROGRAM SlZE OF HOLE CASING SIZE, GRADE, AND WEIGHT PER FOOT SETÏING DEPÏH CEMENT TYPE, QUANTITY,YIELD, AND SLURRY WEIGHT I I i I 3 REFER TO BERRYPETROLEUM COIVIPANY SOP'S DRILLING PROGRAMICASING DESIGN i i i i i i I i I i i I i i I i i i ! I I 25. ATTACHMENTS VERIFY THE FOLLOWING ARE ATTACHED IN ACCORDANCE WITH THE UTAH OIL AND GAS ÓONSERVATIÒN GENERAL RULES: WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER CÖMPLETE DRILLINGPLAN (BPC SÒP ON FILE WITH STATE) EVIDENCE OF DIVISlÖN OF WATER RIGHTS APPROVAL FÖR USE OF WATER FORM 5, IF OPERATOR IS PERSÓN OR CÓMPANY OTHER THAN THE LEASE OWNER SNAMEPULEEASE PRINT) TIATLEE REGULATORY & ER6hmTING SPECIALIST Approvedby the (This space for state use only) Utah Division of API NUMI$ERASSIGNED: Rgi Mining RECEIVED (11/2001) (Se 0CT 22 2007 Approval of g DIV.0FOIL, GAS & MINING Action Is

STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

Embed Size (px)

Citation preview

Page 1: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

0 OSTATE OF UTAH FORM 3

DEPARTMENTOF NATURALRESOURCESDIVISION OF OIL, GAS AND MINING AMENDED REPORT

(highlight changes)

APPLICATION FOR PERMIT TO DRILL ð. MN ROA E EN5 NclAN

7 IF INDIAN,ALLÒTTEE OR TRIBE NAME:1A. TYPEÖFWORK: DRILL REENTER DEEPEN UTE

8. UNITor CA AGRFEMENT NAME:B. TYPE OF WGLL: OIL GAS OTHER SINGLE ZONE MULTIPLEZONE (TTU-769672. NAME OF OPERATOR: 9. WELL NAMËand NUMBER:

BERRY PETROLEUM COMPANY UTE TRIBAL 6-27D-553. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELD AND POOL, ÓR WILDCAT:

RT.2 BOX 7735 CITY ROOSEVELT STATE UTAHzie 84066 (435)722-1325 BRUNDAGE CANYÖN4. LOCATION OF WELL (FOOTA 11 QTR/QTR, SECTION, TOWNSHIP, RANGE.

MERIDIAN:AT SURFAc : 2139' FN 112 FWL NAD 27 (SWINW)

gLJgþg C/l/ Û.0/9 /g|tt /O ff /¿ 40.019031 LAT SEC. 27, 7.58., R.5W.AT PROPOSED PR0DUCING ZONe 1920' FNL 2401' FWL 110.438367 LONG U.S.B.&M.

14. DISTANCE IN MILES ANODIRECTION FROM NEAREST TOWN ÓR POST OFFICE: 12 CÓUNTY: 13. STATE:

28.1 MILES FROM MYTON,UTAH DUCHESNE UTAH15. DISTANCE TO NEAREST PROPERTY OR LEASE LINE (FEET) 16. NUMBER OF ACRES IN LEASE: 17. NLMBER OF ACRES ASSIGNED TOTHIS WELL:

1128' 640 4018. DISTANCE TO NEAREST WELL (DRILLING,COMPLETED, OR 19. PR0FÖSED DEPTH: 20. B0ND DESCRIPTION:

APPLIEDFOR) ON THIS LEASE (FEET)50' 5770' RLBOOO5651

21. ELEVATIÒNS (SHOW WHETHER DF, RT, GR, ETO.): 22. APPÄOXIMATE DATE WORK WILL START: 23. ESTlMATED DURATION:

7031' GR REFER TO ISPC SOP PLAN REFER TÖ BPC SOP PLAN24. PROP SED CASING AND CEMENTING PROGRAM

SlZE OF HOLE CASING SIZE, GRADE, AND WEIGHT PER FOOT SETÏING DEPÏH CEMENT TYPE, QUANTITY,YIELD,AND SLURRY WEIGHTI I

i I 3

REFER TO BERRYPETROLEUM COIVIPANYSOP'S DRILLING PROGRAMICASING DESIGNi i i

i i iI i Ii i I

i i Ii i i! I I

25. ATTACHMENTS

VERIFY THE FOLLOWING ARE ATTACHED INACCORDANCE WITH THE UTAH OIL AND GAS ÓONSERVATIÒN GENERAL RULES:

WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER CÖMPLETE DRILLINGPLAN (BPC SÒP ON FILE WITH STATE)

EVIDENCE OF DIVISlÖN OF WATER RIGHTS APPROVAL FÖR USE OF WATER FORM 5, IF OPERATOR IS PERSÓN OR CÓMPANY OTHER THAN THE LEASE OWNER

SNAMEPULEEASEPRINT) TIATLEE REGULATORY & ER6hmTING SPECIALIST

Approvedby the(This space for state use only)

UtahDivisionofAPI NUMI$ERASSIGNED: Rgi Mining RECEIVED

(11/2001) (Se0CT22 2007

Approval of g DIV.0FOIL,GAS&MININGAction Is

Page 2: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

BERRY PETROLEUM COMPANYT5S R5W U.S.B.&M Well location, UTE TRIBAL //6-27D-55, located '

as shown in the SW 1/4 NW 1/4 of Section 27,S89°58'42"W- 2604.03' (Meas.) SB9°47'J2"W

- 2599.94' (Meas.) T5S, R5W, U.S.B.&M., Duchesne County, Utah.Set Marked Stone L S•t stone set workedsto"* BASIS OF ELEVATION

BENCH MARK (M67) LOCATED IN THE SW 1/4 OF SECTION9, T5S, R4W, U.S.B.&M., TAKEN FROM THE DUCHESNE SEQUADRANGLE,UTAH, DUCHESNE COUNTY, 7.5 MlNUTE QUAD.(TOPOGRAPHIC MAP) PUBLISHEDBY THE UNITED STATESDEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAIDELEVATIONIS MARKED ON CAP AS BEING 6097 FEET.

----- BASIS OF BEARINGSBASIS OF BEARINGSIS A G.P.S. OBSERVATION.

Bottom2 01

TE R/BAL /6-270-55Elev. Graded Ground = 7031' N

2'7

o o - o

SCALE

THIS IS TO CERTIFYTHAT THE RED FROMFIELD NOTESOF ACTUAL SUR R MYSUPERVISIONAND THATTHE TRUE AN T 0 THEBEST OF MY KNOWLEDGEA

RE TE D SU EATION NO. 131Set Marked StoneSet Stone

$89 J2'O J"W - 5265.25' (Meas.)UINTAH ENGINEERING & SURVEYING

85 SOUTH 200 EAST = VERNAL, UTAH 84078LEGEND: (NAD 83) (435) 789-1017

LATlTUDE= 40'01'08.37" (40.018992) SCALE DATE SURVEYED: DATE DRAWN:= 90° SYMBOL LONGITUDE= 110°26'20.67" (110.439075) 1" = 1000' 04-23-07 10-03-07

= PROPOSED WELL HEAD (NAD 27) P^RTY REFERENCESLATITUDE= 40°01'08.51" (40.019031) S.H. J.0. P.M. G.L.O. PLAT

A = SECTIONCORNERSLOCATED. LONGITUOE= 110'26'18.12" (110.438367) WEATHER FILEWARM BERRY PETROLEUM

Page 3: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

Berry Petroleum CompanyBrundage Canyon Field

4000 South 4028 Wester 5, 2007 Route 2 Box 7735

Roosevelt, UT 84066

State of UtahPh. (435) 722-1325

Department of Natural Resources Fax: (435) 722-1321Division of Oil, Gas, and Mining www.bry.com

1594 West North Temple, Suite 1210Box 145801Salt Lake City, Utah 84114-5801

Re: Oil and Gas Conservation General RulesR649-3-3 Exception to Location and Siting of Wells.Ute Tribal No. 6-27D-55

Gentlemen:

Berry Petroleum Company is proposing to drill a development well in the Brundage CanyonField, Duchesne County, Utah. The well is located on lands within the Uintah and Ouray UteIndian Reservation. A copy of the Federal Application for Permit to Drill (APD) is attached foryour review. This APD has been submitted to the Bureau of Land Management (BLM) inVernal and the Bureau of Indian Affairs (BIA) at Ft. Duchesne.

As shown on the attached staking plat, the 6-27D-55 well is a directional well in which only thelower part of the objective section (lowermost Douglas Creek) falls outside of the allowedstandard well spacing (R649-3-2). Berry is requesting an exception to the spacing requirementper regulation R649-3-3 since Berry was unable to locate the proposed well within the allowedspacing "window" due to topographic constraints. To maintain orderly 40 acre spacing andefficient well drainage the well had to be drilled as a directional well. The rather long reachrequired of the well forced only the lowermost part of the Douglas Creek objective section to beplaced outside of the spacing "window".

In accordance with R649-3-3, Berry is providing a copy of the staking plat showing the proposedlocation in relation to the allowed spacing "window" and all tracts contacted by a circle with aradius of 460'. A second plat is also attached showing the actual or recently proposed locationfor all direct or diagonal offsetting wells. As to the 460' radius circle, Berry is also the owner ofthe adjacent SWNE of Section 27.

Berry is requesting approval of this excepted location as proposed. If additional information isrequired, please contact Dan Anderson at (303) 825-3344.

Sincerely,

RECEIVEDShelley E. CMzierRegulatory & Permitting Specialist f QCT2Ž20Û7enclosures DIV.0FOlL,GAS&MINING

Corporate Headquarters - 5201 Truxtun Ave., Ste. 300 • Bakersfield, CA 93309-0640 •

Page 4: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

l

Berry Petroleum Company

Brundage Canyon Project¯

Ute Tribal #6-27D-55

Exception Location Plat

Sec 27 TSS R5W - Duchesne Co, Utah

54

FEET

POSTED WELL DATA

-

Well Label

ATTRIBUTE MAPArvyŒgitat Lag IS PRESENTArly Raster Log IS PRESENT

WELL SYMBOLSConceptual Location

A APD WlO BIA- W/O Onsite

APD -W/OSurveyGeologic Prognosis Prepared20 Acre Pfog LocallonProg'd 40 Acre LocationOII WellDrfiled 2007WlO ArchWorking on APD

- ' October 15, 2007ETRA tW15f2007 2 59.15

Page 5: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

BERRY PETROLEUM COMPANYTSS R5W U.S. B. &M.' ' Well location, UTE TRIBAL #6-27D-55, locatedas shown in the SW 1/4 NW 1/4 of Section 27,SB9°SB'42"W

- 2604.03' (M¢«s.) SO9'47'J2"W - 2399.94' (weas-) TSS, R5W, U.S.B.&M., Duchesne County, Utah.set workea stone L. L ser stone set worked st°"* BASIS OF ELEVATION

BENCH MARK (M67) LOCATEDIN THE SW 1/4 OF SECTlON9, TSS, R4W. U.S.B.&M., TAKENFROM THE DUCHESNESEQUADRANGLE,UTAH, DUCHESNECOUNTY,7.5 MINUTEQUAD.

o (TOPOGRAPHIC MAP) PUSUSHED BY THE UNITEDSTATESDEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAIDELEVATION IS MARKEDON CAP AS BEING 6097 FEET.

---- BASIS OF BEARINGSBASIS OF BEARINGSIS A G.P.S. OBSERVATION.

2401'Hol

1128'y 1

UTE T /BÆ /6--270-55Ee . Groded Ground = 7031' = N

2'7

SCALECERTIFICAIûtu

THIS IS TO CERTIFY THAT THE E0 FROMFIELDNOTESOF ACTUALSUR BY ME MYSUPERVISIONAND TMATTHE THEBEST OF MY KNOWLEDGEA

R DS13Sei Marked Stone Sset stone

589 J2'03"W -- 5265.25' (Meas.)UINTAH ENGINEERING & LAND SURVEYING

85 SOUTH 200 EAST - VERNAL, UTAH 84078LEGEND: (NAD 83) (435) 789-1017

LATITUDE= 40'01'08.37" (40.018992) SCALE DATESURVEYED: DATEDRAWN:=

90° SYMBOL LONGITUDE= 110°26'20.67" (110.439075) 1" = 1000' 04-23-07 10-03-07(O NAD 273 PARTY REFERENCES= PROPOSED WELLHEAD /

LATlTUDE= 40'01'08.51" (40.019031) S.H. J.O. P.M. G.L.O. PLATA = SECTIONCORNERS LOCATED. LONGITUDE= 110'26'18.12" (110.438367) WEATHER FILEWARM SERRY PETROLEUM

Page 6: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

SELF-CERTIFICATION STATEMENT

The following self -certification statement is provided per federal requirements dated May 7, 2007.

Please be advised that Berry Petroleum Company is considered to be the operator of the following well.

Ute Tribal 6-27D-55SW 1/4, NW 1/4, 2139' FNL 1128' FWL, Section 27, T. 5 S., R. 5 W., U.S.B.& M.

BHL: SE ¼, NW ¼, 1920' FNL 2401' FWLLease BIA 14-20-H62-4753Duchesne, County, Utah

Berry Petroleum Company is responsible under the terms of the lease for the operations conducted upon thelease lands.

Shelley E. CrozierRegulatory & Permitting SpecialistBerry Petroleum Company4000 South 4028 WestRoute 2, Box 7735Roosevelt, Utah 84066

Page 7: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

O O

BERRY PETROLEUM COMPANYUte Tribal 6-27D-55

Surface location SW 1/4, NW 1/4, 2139' FNL l128' FWL, Section 27, T. 5 S., R. 5 W., U.S.B.& M.BHL: SE ¼, NW ¼, 1920' FNL 2401' FWL

Duchesne County, Utah

ONSHORE ORDER NO. 1

DRILLING PROGRAM

1,2 Estimated Tops of Geological Markers and Formations Expected to Contain Water, Oil andGas and Other Minerals

Formation Depth@BHL Depth SHLUinta On Surface On SurfaceGreen River 1,215' 1,179'Green River Upper Marker 1,788' 1,738'Mahogany 2,394' 2,343'Tgr3 Marker 3,419' 3,367'Douglas Creek 4,184' 4,133'*Black Shale 4,815' 4,750'*Castle Peak 5,071' 5,036'Uteland Butte Ls. 5,505' 5,455'Wasatch 5,720' 5,669'TD 5,820' 5,770'

Base of Moderately Saline 5,759' 5,915'

*PROSPECTIVE PAY

Berry is locating the well at the surface location and directionally drillingfrom this location to minimize surface disturbance and Berry will be able toutilize the existing road and pipelines in the area.

Furthermore, Berry hereby certifies that it is the sole working interest ownerwith 460 feet of the entire directional well bore and the remainder of the UteTribal section.

3 Pressure Control Equipment

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21, 2006).

4 Proposed Casing and Cementing Program

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21,

Page 8: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

O O

Berry Petroleum CompanyDrilling ProgramUte Tribal 6-27D-55Duchesne County, UtahPage Two

5 Drilling Fluids Program

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21, 2006).

6 Evaluation Program

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21, 2006).

7 Abnormal Conditions

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21, 2006).

8 Anticipated Starting Dates and Notification of Operations

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21, 2006).

9 Other information

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21,

Page 9: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

BERRY PETROLEUM COMPANYUte Tribal 6-27D-55

Surface location SW 1/4, NW 1/4, 2139' FNL 1128' FWL, Section 27, T. 5 S., R. 5 W., U.S.B.& M.BHL: SE ¼, NW ¼, 1920' FNL 2401' FWL

Duchesne County, Utah

ONSHORE ORDER NO. 1

MULTI POINT SURFACE USE & OPERATIONS PLAN

1 Existing Roads

To reach the Berry Petroleum Company well, Ute Tribal 6-27D-55 location, in Section 27-T5S-R5W:

Start in Myton, Utah. Proceed west on US Highway 40, 8.6 miles to the Antelope Creek/SowersCanyon Road at the Bridgeland turnoff. Turn south on the Sowers Canyon Road and proceedsouthwest 14.8 miles. Turn south and proceed 0.4 miles. Turn west and proceed south and west2.8 miles. Keep proceeding southwest 1.5 miles to the Ute Tribal 6-27D-55 location.

The existing oilfield service road may need some surface material to prevent or repair holes in theroad due to heavy truck traffic during the drilling and completion operation. If repairs are made theoperator will secure material from private sources.

Please see the attached map for additional details.

2 Planned Access Road

See Topographic Map "B" for the location of the proposed access road.

3 Location of Existing Wells

See Topographic Map "C" for the location of existing wells within a 1 mile radius.

4 Location of Tank Batteries, Production Facilities and Production Gathering and ServiceLines

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21,

Page 10: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

O O

Berry Petroleum CompanyMulti Point Surface Use & Operations PlanUte Tribal 6-27D-55Duchesne County, UtahPage Two

5 Location and Type of Water Supply

Water for the drilling and completion will be pumped or trucked from the Berry source wellslocated in Sec. 23, T5S, R5W or Sec. 24, T5S, R5W, permit # 43-11041, or from Duchesne CityCulinary Water Dock located in Sec. 1, T4S, R5W or from East Duchesne Water, Arcadia Feedlot,Sec. 28, T3S, R3W or Myton (Moon) Pit, SE/NE Sec. 27, T3S, R2W or from PetroglyphOperating Company 08-04 Waterplant, Sec. 8, T5S, R3W or from Kenneth V. & Barbara U.Richens source well located in Sec. 34, T3S, R2W, permit #43-1723 or Brundage Canyon Fieldproduced water or Leo Foy source well located in Sec. 34, T5S, R5W, permit #43-11324. Awater use agreement is also in place with the Ute Tribe.

6 Source of Construction Materials

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21, 2006).

7 Methods of Handling Waste Materials

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21, 2006).

8 Ancillary Facilities

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21, 2006).

9 Wellsite Layout

The attached Location Layout diagram describes drill pad cross-sections, cuts and fills, andlocations of the mud tanks, reserve pit, pipe racks, trailer parking, spoil dirt stockpile(s) andsurface material stockpile(s)

10 Plans for Restoration of the Surface

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21, 2006). If an Archaeological Study ispreformed, all seed mixture will match Archaeological recommendation.

11 Surface Ownership

Ute Indian Tribe

12 Other information

PLEASE REFER TO BERRY PETROLEUM COMPANY STANDARD OPERATINGPROCEDURE (SOP VERSION: SEPTEMBER 21,

Page 11: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

O O

Berry Petroleum CompanyMulti Point Surface Use & Operations PlanUte Tribal 6-27D-55Duchesne County, UtahPage Three

13 Operator's Representative and Certification

A) Representative

NAME: Shelley E. Crozier

ADDRESS: Berry Petroleum Company4000 South 4028 WestRoute 2, Box 7735Roosevelt, Utah 84066

PHONE: 435-722-1325

All lease and/or unit operations will be conducted in such a manner that full compliance is madewith all applicable laws, regulations and onshore oil and gas orders. The operator is fullyresponsible for the actions of its subcontractors. A copy of these conditions will be furnished tothe field representative to ensure compliance.

The drilling permit will be valid for a period of one year from the date of approval. After permittermination, a new application will be filed for approval for any future operations.

B) Certification:

I hereby certify that I, or persons under my direct supervision, have inspected the proposed drillsiteand access route; that I am familiar with the conditions which presently exist; that the statementsmade in this plan are, to the best of my knowledge and belief, true and correct; and that the workassociated with the operations proposed herein will be performed by Berry Petroleum Companyand its contractors and subcontractors in conformity with this plan and the terms and conditionsunder which it is approved. This statement is subject to the provisions of 18 U.S.C. 1001 for thefiling of a false statement.

DATE Shelley E. CrozierRegulatory & Perm ing SpecialistBerry Petroleum

Page 12: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

O O

ADMINISTRATIVE MODIFICATION FOR EXISTING

APPLICATION FOR GRANT OF CORRIDOR RIGHT-OF-WAY

MODIFICATION OF GRANT OF RIGHT-OF-WAY NO. H62-2004-405, for the Ute Tribal 5-27-55

BERRY PETROLEUM COMPANY, having a resident or principal place of business at Route 2 Box 7735,

Roosevelt, Utah 84066' hereby files an application with the Bureau of Indian Affairs, pursuant to the terms and

provisions of the Act of February 5, 1948 (62 Stat. 17; 25 U.S.C. 323), and to the regulations of the Department of

the Interior contained in Title 25, Code of Federal Regulations, Part 169, for the grant of a Right-of-Way for the

following purposed and reasons: APPLICATION IS FOR: NAME CHANGE ON ORIGINAL GRANT OF

EASEMENT (second well bore on; additional pipeline in, etc.) EXISTING (well pad; in existing ROW etc.) WITH

NO NEW SURFACE DISTURBANCE FOR THE (well pad; pipeline ROW etc.) AND ACCESS ROADS. This

APD will require BIA concurrence.

New Name: UTE TRIBAL 6-27D-55 & UTE TRIBAL 5-27-55

Across the following described Indian Lands SW/NW, SECTION 27, T5S, R5W.

Drill Site = N/A Ac.

Corridor R-O-W = N/A Ac. Total Acreage = N/A Acres(Access Road & Pipeline)

(Fill in below only for an additional pipe in existing ROW)

Said Pipeline Right-of-Way to be approximately N/A feet in length, N/A feet in width, and N/A Acres, and more

particularly described and shown on the map of definite location to be attached and made a part hereof.

The applicant understands and hereby expressly agrees to following stipulations:

a) To construct and maintain the Right-of-Way in a workmanlike manner

b) To pay promptly all damages and compensation, in addition to the deposit made pursuant to 169.4determined by the Secretary to be due the landowners and authorized users and occupants of the land onaccount of the survey, granting, construction and maintenance of the Right-of-Way.

c) To indemnify the landowners and authorized users and occupants against any liability for loss of life,personal injury and property damage arising from the construction, maintenance, occupancy or use of thelands by the applicant, his employees, contractors and their employees or subcontractors and theiremployees.

d) To restore the lands as nearly as may be possible to their original condition upon the completion of theconstruction to the extent compatible with the purpose for which the Right-of-Way was

Page 13: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

e Oe: To clear and keep clear the lands within the Right-of-Way to the extent compatible with the purpose of the

Right-of-Way; and to dispose of all vegetative and other material cut, uprooted, or otherwise accumulatedduring the construction and maintenance of the project.

f To take soil and resource conservation and protection measures, including weed control, on the landcovered by the Right-of-Way.

g: To do everything reasonable within its power to prevent and suppress fires on or near the lands to beoccupied under the Right-of-Way.

h To build and repair such roads, fences, and trails as may be destroyed or injured by construction work andto build and maintain necessary and suitable crossings for all roads and trails that intersect the worksconstructed, maintained, or operated under the Right-of-Way.

i That upon revocation or termination of the Right-of-Way, the applicant shall, so fàr as is reasonablypossible, restore the land to its original condition.

j To at all times keep the Secretary informed of its address, and in case of corporation of the address of itsprincipal officers.

k: That the applicant will not interfere with the use of the lands by or under the authority of the landownersfor any purpose not inconsistent with the primary purpose for which the Right-of-Way is granted.

IT WITNESS THEREOF, BERRY PETROLEUM COMPANY, has caused this instrument to be executed this

I i day of October, 2007.

BERRY PETROLEUM COMPANYWITNESS APPLICANT

ITNESS Shelley E. CroberRegulatory & Permitting SpecialistRoute 2 Box 7735Roosevelt, UT 84066Phone: (435) 722-1325

SUPPORTING DOCUMENTS:

( ) Written consent of landowners.( ) Evidence of good faith and financial responsibility.

( ) State certified copy of corporate charter or articles of corporation.

( ) Certified copy of resolution or bylaws of the corporation authorizing the filing of the stipulations.( ) State certification that the applicant is authorized to do business in the State where the land is

located.( ) Ceretified copy of the articles of partnership or association.(X) Map of definite location.( )

Page 14: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

O O250' Target Radius800

0 -- PBHLKOP, 3.50°/100' Build 600 Wasatch400.00' MD, 400.00' TVD Uteland Butte Ls,250 - 0.00° Inc, 80.25° Azm Castle Peak0.00' N, 0.00' E $ 400 . Target

500 - - Black ShaleHold 13.87° Inc .c

796.42' MD, 192.55' TVD t Douglas Creek750 - 13.87° Inc, 80.25° Azm 200 Tgr3 Marker

8.09' N, 47.07' E1000 Green River 0 Mahogany1250 - -

-- --- g) Green River Upper Marker-200 Green River

1500 - - Hold 13.87° IncGreen River Upper Marker KOP, 3.50°/100' Build

-400

1750 -

2000 - --600 i i i

-200 0 200 400 600 800 1000 12002250 _ _

Mahogany West - East (ft)

2500 - -

.C

2750 - -

O2 3000 - -

3250 -- Tgr3 Marker

-3 3500 --

3750 - -

Berry4000 - - Douglas Creek

4250 - - ÛIUPAAyCompany: Berry Petroleum

4500 -- Well: Ute Tribal 6-27D-55

Black Shale Location: Duchesne CountyState: Utah4750 - --

Target Rig: Frontier 5Castle Peak Correction:

5000 - -- North: Referenced to True NorthSubject: Prop Rev 0

5250 -- File Name: PO7498r0.dwgUteland Butte Ls, Date: 09/20/07

5500 - Wasatch Drawn By: Allen SlackPBHL Planning: (936) 442-2455

--

--- 5984.56' MD, 5829.32' TVD Fax: (936) 441-66205750 - - 13.87° Inc, 80.25° Azm Operations: (936) 441-6630

218.7T N, 1273.21' E Fax: (936) 539-10756000 I i I \ \ \ ------------------------

0 250 500 750 1000 1250 1500 1750 2000 ITlüLTI-SH®TVertical Section (ft) @80.25° Azm ufT s2ÀÏccoi

The custorner should only rely on this document after independently verifying all paths, targets, Joordinates, lease and hard linesrepresented. Any decisions made or wells drilled utilizingthis or any other information supplied by Multi-Shot, LLCare at the sole risk and

responsibility of the customer. Multi-Shot, LLCis not responsible for the accuracy of this schematic or the information contained

Page 15: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

O O

Job Number: PO7-498 StatelCountry: Utah

Company: Berry Petroleum Declination:

LeaselWell: Ute Tribal 6-27D-55 Grid: Referenced to True North

Location: Duchesne County File name: F:\WELLPL-1\2007\PO7490'S\PO7498\07498.SVY

Rig Name: Frontier 5 DatelTime: 20-Sep-07 I 15:18MMRWW-SMM-MMMW--RWMR@MWW

RKB: 14' Curve Name: Prop Rev 0

G.L. or M.S.L.: 7031'

WINSERVE SURVEY CALCULATIONSMinimum Curvature Method

Vertical Section Plane 80.25Vertical Section Referenced to Wellhead

Rectangular Coordinates Referenced to Wellhead

Measured IncI Drift True Vertical CLOSURE DoglegDepth Angle Direction Vertical N-S E-W Section Distance Direction Severity

FT Deg Deg Depth FT FT FT FT Deg Deg/100

KOP, 3.50°l100' Build

400.00 .00 80.25 400.00 .00 .00 .00 .00 .00 .00

500.00 3.50 80.25 499.94 .52 3.01 3.05 3.05 80.25 3.50600.00 7.00 80.25 599.50 2.07 12.03 12.20 12.20 80.25 3.50700.00 10.50 80.25 698.32 4.64 27.02 27.41 27.41 80.25 3.50Hold 13.87° Inc

796.42 13.87 80.25 792.55 8.09 47.07 47.76 47.76 80.25 3.50

Green River1199.70 13.87 80.25 1184.07 24.47 142.38 144.47 144.47 80.25 .00

Green River Upper Marker1784.12 13.87 80.25 1751.44 48.20 280.50 284.61 284.61 80.25 .00

Mahogany2414.78 13.87 80.25 2363.70 73.81 429.55 435.84 435.84 80.25 .00

Tgr3 Marker

3482.34 13.87 80.25 3400.11 117.16 681.85 691.84 691.84 80.25 .00

Douglas Creek

4280.19 13.87 80.25 4174.68 149.56 870.41 883.16 883.16 80.25 .00

Black Shale

4927.25 13.87 80.25 4802.86 175.83 1023.33 1038.33 1038.33 80.25 .00

Target

5080.33 13.87 80.25 4951.48 182.0 00010159.51 1075.04 1075.04 80.25

Page 16: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

O O

Measured Incl Drift True Vertical CLOSURE DoglegDepth Angle Direction Vertical N-S E-W Section Distance Direction Severity

FT Deg Deg Depth FT FT FT FT Deg Deg/100

Castle Peak

5203.90 13.87 80.25 5071.44 187.07 1088.71 1104.67 1104.67 80.25 .00

Uteland Butte Ls.

5656.01 13.87 80.25 5510.36 205.43 1195.56 1213.08 1213.08 80.25 .00

Wasatch

5880.61 13.87 80.25 5728.41 214.55 1248.64 1266.94 1266.94 80.25 .00

PBHL

5984.56 13.87 80.25 5829.32 218.77 1273.21 1291.87 1291.87 80.25 .00

Page 2Prop Rev 0 File:

Page 17: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

ry P

Brundage Canyon Project

Ute Tribal #6-27D-55

Directional Drilling Plat

Sec 27 T5S R5W - Duchesne Co, Utah

FEET

POSTED WELL DATA

Well Label

ATTRIBUTE MAPAny DigitalLog IS PRESENTAny Raster Log 1S PRESENT

WELL SYMBOLS. O Conceptual Location

A APD WIOBIA- WIO Onsile

APD - W/OSurveyGeologic Prognosis Pfapared

20 Acre Prog LocationProfd 40 Acre LocationOffWellOdiled 2007WlO ArthWorking on APD

October 15, 2007

Page 18: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

BERRY PETROLEUM COMPANYT6S, R5W U.S.B.&M.Well location, UTE TRIBAL #6-27D- 55, locatedos shown in the SW 1/4 NW 1/4 of Section 27,SO95ß'42"W - 2604.0J' (Meas.) SB9'47'J2"W - 2599.94' (Meas.) T5S, R5W, U.S.B.&M., Duchesne County, Utah,set workeastone Û L set stone set uosos stone" BASIS OF ELEVATIONBENCH MARK (M67) LOCATEDIN THE SW 1/4 OF SECTION9, TSS, R4W, U.S.B.&M., TAKENFROM THEDUCHESNESEQUADRANGLE,UTAH. DUCHESNECOUNTY,7.5 MINUTEQUAD,o b (TOPOGRAPHICMAP) PUBUSHED BY THEUNITEDSTATESDEPARTMENTOF THE INTERIOR,GEOLOGICALSURVEY. SAIDELEVATION IS MARKEDON CAP AS BEING6097 FEET.

-- BASIS OF BEARINGSBASIS OF BEARINGSIS A G.P.S. OBSERVATION.

2 o t om

1128- ~26 TE T /BÆ /6-270-55. Graded Ground = 70J1' N

SCALECERTIFICATEtW

THIS IS TO CERTIFY THAT THE ED FROMFIELDNOTESOF ACTUALSUR BY M MYSUPERVISloNANÛTHATTHE O THEBEST OFMY KNOWLEDGEA

Set Stone Set Marked StoneS

13

S3932'03"W - 5265.25' (Meas.)- Giukt

UINTAH ENGINEERING & LAND SURVEYING85 SOUTH 200 EAST - VßRNAL, UTAH 84078

LEGEND: (NAD 83) (435) 789-1017LATITUDE= 40°01'08.37" (40.018992) SCALE DATE SURVEYEO: OAT€ DRAWN.90° SYMBOL LONGITUDE= 110'26'20.67" (110.439075) 1" = 1000' 04-23-07 10-03-07

PROPOSED WELLHEAD (NAD 27) PARTY REFERENCES'LATITUDE= 40'01'08.51" (40.019031) S.H. J.0. P.M. G.L.O. PLATA = SECTION CORNERS LOCATED. LONGlTUDE= 110'26'18.12" (110.438367) WEATHER FILE

WARM BERRY PETROLEUM

Page 19: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

O OBERRY PETROLEUM COMPANYUTE TRIBAL #6-27D-55 & #12-27D-55

LOCATED IN DUCHESNE COUNTY, UTAHSECTION 27, T5S, R5W, U.S.B.&M.

PHOTO: VIEW OF LOCATION STAKE CAMERA ANGLE NORTHERLY

I

PHOTO: VIEW OF EXISTING ACCESS CAMERA ANGLE: WESTERLY

Uintah Engineering & Land Surveying LOCATIONPHOTos 06 29 07 moro85 South 200 East Vemal, Utah 84078 MONTIf DAY YEAR

-smee ix4 _ 435-789-1017 [email protected] TAKENBY:S.H. DRAWNBY:C.P. REVISED:

Page 20: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

O OBERRY PETROLEUM COMPANY

LOCATION LAYOUT FOR

UTE TRIBAL #6-27D-55 & #12-270-55 E "?;SECTION 27, T5S, R5W, U.S.B.&M.

DATE 1

SW 1/4 NW 1/4

mnt

I I Alnchork \ Á ( TyPJ

Proposed .We//) U TE 7R/BAE

,f6-27D-55

Proposed Wel/U7E TRIBAL

· sy 27D 55

37 N9,3°

l j NExisting We//

Pump Jack

(O

EXISTING PAD

ExistingRoad

> IIINTAIT ENGINEERING et· LAND SURVEYINGElev Graded Ground at /6-270-55 Location Stake - 7030.8 ,, ,, 24, ,,,, . ,,,,,,,, y,,, ,,,,, .

Page 21: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

DUCHESNE

PROPOSED LOCATION:UTE TRIBAL #6-27D-55 & #12-27D-55

LEGEND: BERRY PETROLEUM COMPANYPROPOSED LOCATION N UTE TRIBAL #6-27D-55 & #12-27D-55

SECTION 27, T5S, R5W, U.S.B.&M.

-SW 1/4 NW 1/4

Uintah Engineering & Land Surveying TOPOGR A PH I e 06 2 0785 South 200 East Vernal, Utah 84078 n

(435) 789-1017 * FAX (435) 789-1813 r ON DAY YEAR

SCALE:1:100,000 DRAWNBY:C.P. REVISED:00-00-00

Page 22: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

PROPOSED LOCATION

T5ST6S

LEGEND: BERRY PETROLEUM COMPANYEXISTING ROM N UTE TRIBAL #G27D-55 & #12-27D-55

SECTION 27, T5S, R5W, U.S.B.& M.SW 1/4 NW 1/4

- Uintah Engineering & Land Surveying TOPOGR A PHLc 06 29 07 ¡85 South 200 East Vernal, Utah 84078 M A P MONTH DAY YEAR |(435) 789-1017 * FAX (435) 789-1813SCALE:1" =2000' DRAWNBY:C.P. REVISED:

Page 23: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

PROPOSED LOCATION:

LEGEND: BERRY PETROLEUM COMPANYpf OfSPOSAL WELLS WATER WELLs N UTE TRIBAL #6-27D-55 & #12-27D-55e PRODUClNGWELLS ABANDONED WELLS SECTION 27, T5S, R5W, U.S.B.&M.

SHUTINWELLS -g- TEMPORARILYABANDONeo SW 1/4 NW 1/4

Uintah Engineering & Land Surveying TOPOGR A PH I CO 29 0785 South 200 East Vernat. Utah 24078 I A Ÿ ONT DAY VEAR

(435) 189-1017 * FAX (435) 789-1813SCALE:1" = 2000' DRARWBY:C.P. SED:

Page 24: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

OIR)RKSHEETAPPLICATION FOR PERMIT TO DRILL

APD RECEIVED: 10/22/2007 API NO. ASSIGNED: 43-013-33795

WELL NAME: UTE TRIBAL 6-27D-55

OPERATOR: BERRY PETROLEUM COMPANY ( N2480 ) PHONE NUMBER: 435-722-1325

CONTACT: SHELLEY CROZIER

PROPOSED LOCATION: INSPECT LOCATN BY: / /

SWNW 27 050S 050W Tech Review Initials DateSUO TFAM 211929 FFNNLL1242081FFWWLL

Engineering

COUNTY: DUCHESNEGeology

LATITUDE: 40.01904 LONGITUDE: -110.4385

UTM SURF EASTINGS:547917 NORTHINGS: 4429811 Surface

FIELD NAME: BRUNDAGE CANYON ( 72 )

LEASE TYPE: 2 - Indian

LEASE NUMBER: 14-20-H62-4753 PROPOSED FORMATION: GRRV

SURFACE OWNER: 2 - Indian COALBED METHANE WELL? NO

RECEIVED AND/OR REVIEWED: LOCATION AND SITING:

\/ Plat R649-2-3.

Bond:Fed[] Ind[2] Sta[] Fee[]Unit:

(No. RLBOOO5651 )Potash (Y/N) R649-3-2. General

Oil Shale 190-5 (B) or 190-3 or 190-13 Siting:460 From Qtr/Qtr & 920' Between Wells

v Water Permit / R649-3-3. ExceptionNo.43-11041 )

6- RDCC Review (Y/N)Drilling Unit

Board Cause No:(Date: )Eff Date:

Ain Fee Surf Agreement (Y/N) Siting:

ALÑ Intent to Commingle (Y/N) R649-3-11. Directional Drill

Page 25: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

LIA. Ellt

urE RIBM 1+22I>55UTE TRIBM B-22D-55

T5S R5W

HTE RIBM UTERIBM

BHLI-28D 55

BHL2 270 55

BRUNDAGE CANYON FIELD

WEETRIBAL UTE TRIBALBHI 7-27-55 * S-2(rš5 e6 55

UTE 1RIBAL<rXD-55

Œlli lRIBAL CANYON 8-275-27-55

27

BHL SOWERSo10-1 55 CANYON 9-27TETRIBAL il 27 55 _ -TETRIBAL l+ 27D 55

UTI TRIBAL10 D-51

BHL9-28D-55

BHL

BHL KIE TRIB 16-XD·55N I?D SS UTE TRIBAL 15-27-55

OPERATOR: BERRY PETRO CO (N2480)UTAH

SEC:27 T.5S R.5W DNRFIELD: BRUNDAGE CANYON FIELD (72)

COUNTY: DUCHESNEWells Status

SPACING: R649-3-11 / DIRECTIONAL DRILLING y GAS INJECTIONGASSTORAGE OIL, GAS & MINING

× LOCATION ABANDONEDg) NEW LOCATION NField Status Unit Status PLUGGED & ABANDONED

ABANDONED EXPLORATORY PRODUCING GASACTIVE SS LRAGE o PROD IN OILCOMBINED NF SECONDARY

+ SHUT-IN OIL W EINACTIVE _ NDING

)s( TEMP.ABANDONEDPROPOSED OGAS

O TEST WELLSTORAGE

PP GEOTHERML & WATER INJECTION STERMINATEDPP OIL g WATER SUPPLY PREPARED BY:DIANA MASONSECONDARY WATER DISPOSAL DATE: 23-OCTOBERR-2007TERMINATED

Page 26: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

StateÊUtahDEPARTMENT OF NATURAL RESOURCES

MICHAEL R. STYLERExecutive Director

JON M. HUNTSMAN, JR.Division of Oil Gas and Mining

Governor JOHN R. BAZADivision Director

GARY R. HERBERT October 23, 2007Lieutenant Governor

Berry Petroleum CompanyRt. 2, Box 7735Roosevelt, Ut 84066

Re: Ute Tribal 6-27D-55 Well, Surface Location 2139' FNL, l128' FWL, SW NW, Sec. 27,T. 5 South, R. 5 West, Bottom Location 1920' FNL, 2401' FWL, SE NW, Sec. 27,T. 5 South, R. 5 West, Duchesne County, Utah

Gentlemen:

Pursuant to the provisions and requirements of Utah Code Ann.§ 40-6-1 et seq., UtahAdministrative Code R649-3-l et seq., and the attached Conditions of Approval, approval to drillthe referenced well is granted.

Appropriate information has been submitted to DOGM and administrative approval ofthe requested exception location is hereby granted.

This approval shall expire one year from the above date unless substantial and continuousoperation is underway, or a request for extension is made prior to the expiration date. The APIidentification number assigned to this well is 43-013-33795.

Sincerely,

Gil HuntAssociate Director

pabEnclosures

cc: Duchesne County AssessorBureau of Land Management, Vernal Office

UTAH

DNR

1594 West North Temple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone (801) 538-5340 • facsimile (801) 359-3940 • TTY (801) 538-7458 • wwwogm.utah.gov OIL, GAS &

Page 27: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

O O

Operator: Berry Petroleum CompanyWell Name & Number Ute Tribal 6-27D-55

API Number: 43-013-33795Lease: 14-20-H62-4753

Surface Location: SW NW Sec. 27 T. 5 South R. 5 WestBottom Location: SE NW Sec. 27 T. 5 South R. 5 West

Conditions of Approval

1. GeneralCompliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and GasConservation General Rules, and the applicable terms and provisions of the approvedApplication for permit to drill.

2. Notification RequirementsNotify the Division within 24 hours of spudding the well.• Contact Carol Daniels at (801) 538-5284

Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dustin Doucet at work (801) 538-5281 home (801) 733-0983

3. Reporting RequirementsAll required reports, forms and submittals will be promptly filed with the Division,including but not limited to the Entity Action Form (Form 6), Report of WaterEncountered During Drilling (Form 7), Weekly Progress Reports for drilling andcompletion operations, and Sundry Notices and Reports on Wells requesting approval ofchange of plans or other operational actions.

4. State approval of this well does not supersede the required federal approval, which must beobtained prior to drilling.

5. In accordance with Utah Admin. R.649-3-11, Directional Drilling, the operator shall submita complete angular deviation and directional survey report to the Division within 30 daysfollowing completion of the well.

6. This proposed well is located in an area for which drilling units (well spacing patterns) havenot been established through an order of the Board of Oil, Gas and Mining (the "Board").In order to avoid the possibility of waste or injury to correlative rights, the operator isrequested, once the well has been drilled, completed, and has produced, to analyzegeological and engineering data generated therefrom, as well as any similar data fromsurrounding areas if available. As soon as is practicable after completion of its analysis,and if the analysis suggests an area larger than the quarter-quarter section upon which thewell is located is being drained, the operator is requested to seek an appropriate orderfrom the Board establishing drilling and spacing units in conformance with such analysisby filing a Request for Agency Action with the

Page 28: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

RECEVEDForm 3160-3 FORM APPROVED(April 2004) OMB No. 1004-0137

UNITED STATES Expires March 31, 2007

DEPARTMENT OF THE INTERIOR 5. Lease Serial No.

BUREAU OF LAND MANAGEMENT na 14-20-H62-4753

APPLICATION FOR PERMIT TO DRILL OR D lif an,AlloteeorTribeName

p- UTEia. TYPE OF WORK DRILL REENTER

7. Unit or CA Agreement, Name and No.

UTU-769678. Lease Name and Well No.

1b. Type of Well: Oil well Gas well Other Single zone Multiple zone UTE TRIBAL 6-27D-552. NameofOper

ERRY PETROLEUM COMPANY9. A W4|No.

3a, Address 4000 SOUTH 4028 WEST 3b Phone No. (include are code) 10. Field and Pool, or Exploratory

RT. 2 BOX 7735, ROOSEVELT, UT. 84066 (435) 722-1325 BRUNDAGE CANYON4. Location of Well (Repod location clearly and in accordance with any State requirernents. ) NAD 27 11. Sec., T. R. M. or BLK. and Survey or Area

Atsurface (SWINW) 2139' FNL, 1128' FWL 40.019031 LAT SEC. 27, T.5S., R.5W.Atproposedprod.zone BHL: 1920' FNL 2401' FWL EF 4 110.438367 LONG U.S.B.&M.

14. Distance in miles and dircetion from nearest town or post office* 12. County or Parrish 13. State

28.1 MILES FROM MYTON, UTAH DUCHESNE UTAH15. Distance from proposed* 16 No. ofacres in lease 17. Spacing Unit dedicated to thiswellp°rcapLonto nearees,

,, ,, 1128' 640 40(Also to neaset dng. Unit line, it any)

18. Distance from p<oposed* 19 Proposed Depth 20. BLMIBIABond No. on fle

to othanii.enasco pietea 50' 5770' UTBOOOO35/ RLBOOOS750

21. Elevations (Show whether DF,KDB,RT, GR, etc.) 22. Approximate date workwillstart* 23. Estimated duration

7031' GR REFER TO BPC SOP PLAN REFER TO BPC SOP PLAN

24. Attachments

The following, completed in accordance with the requirementsof Onshore Oil and Gas Order No. 1, shall be attached to this form:

1 Well plat certified by a registered surveyor 4 Bond to cover the operations unless covered by an existing bond on file (see2 A Drilling Plan, item 20 above.3 A Surface Use Plan (if the location is on National Forest System Lnads, the 5 Operator certification.

SUPO shall be filed with the appropriate Forest Service Office). 6 Such other site specific information and/or plans as may be required by theauthorized officer.

signature Name(PdnteSHLEY E. CROZIER 10/16/07

REGULATORY & PERMITTING SPE IALISTApproved by (Signat e) Name (Printed/Typed) Date

Title Office

a a y

rañaat

c

ecertify that the ic o e i eq be o e ts i s ci e i

LATTACHEDTitle 18 USC Section 1001 and Title 43 Ù.S C Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the UnitedStates any false, fictitious os fraudulent statements or representations as to any matter within its jurisdiction.

*(Instructions on page 2)

NO¶CEOFAPPROYM.RECEIVEDMARI O2008

DIVOFOIL,GAS&MINING

Page 29: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

UNITED STATES DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT

VERNAL FIELD OFFICE170 South 500 East VERNAL, UT 84078 (435) 781-4400

CONDITIONS OF APPROVAL FOR APPLICATION FOR PERMIT TO DRILL

Company: Berry Petroleum Company Location: SWNW, Sec 27, T5S, RSW (Surface)SENW, Sec 27, TSS, R5W (Bottom)

Well No: Ute Tribal 6-27D-55 Lease No: 14-20-H62-4753API No: 43-013-33795 Agreement N/A

Title Name Office Phone Number Cell Phone NumberPetroleum Engineer: Matt Baker (435) 781-4490 (435) 828-4470Petroleum Engineer: Michael Lee (435) 781-4432 (435) 828-7875Petroleum Engineer: James Ashley (435) 781-4470 (435) 828-7874Petroleum Engineer: Ryan Angus (435) 781-4430 (435) 828-7368Supervisory Petroleum Technician: Jamie Sparger (435) 781-4502 (435) 828-3913Supervisory NRS: Karl Wright (435) 781-4484

- (435) 828-7381NRS/Enviro Scientist: (435) 781- 4475 (435) 828-4029NRS/Enviro Scientist: Holly Villa (435) 781-4404NRS/Enviro Scientist: Chuck MacDonald (435) 781-4441 (435) 828-7481NRS/Enviro Scientist: Jannice Cutler (435) 781-3400 (435) 828-3544NRS/Enviro Scientist: Michael Cutler (435) 781-3401 (435) 828-3546NRS/Enviro Scientist: Anna Figueroa (435) 781-3407 (435)828-35484NRS/Enviro Scientist: Verlyn Pindell (435) 781-3402 (435) 828-3547NRS/Enviro Scientist: Darren Williams (435) 781-4447NRS/Enviro Scientist: Nathan Packer (435) 781-3405 (4350 828-3545

Fax: (435) 781-3420A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOUR

FIELD REPRESENTATIVE TO INSURE COMPLIANCEAll lease and/or unit operations are to be conducted in such a manner that full compliance is made with the applicablelaws, regulations (43 CFR Part 3160), and this approved Application for Permit to Drill including Surface and DownholeConditions of Approval. The operator is considered fully responsible for the actions of his subcontractors. A copy of theapproved APD must be on location during construction, drilling, and completion operations. This permit is approvedfor a two (2) year period, or until lease expiration, whichever occurs first. An additional extension, up to two (2)years, may be applied for by sundry notice prior to expiration.

NOTIFICATION REQUIREMENTS

Construction Activity - The Ute Tribe Energy & Minerals Dept. shall be notified inwriting 48 hours in advance of any construction activity. TheUte Tribal office is open Monday through Thursday.

Construction Completion - Upon completion of the pertinent APD/ROW construction,notify the Ute Tribe Energy & Minerals Dept. for a TribalTechnician to verify the Affidavit of Completion.

Spud Notice - Twenty-Four (24) hours prior to spudding the well.(Notify Petroleum Engineer)Casing String & Cementing - Twenty-Four (24) hours prior to running casing and cementing(Notify Supv. Petroleum Tech.) all casing strings.BOP & Related Equipment Tests - Twenty-Four (24) hours prior to initiating pressure tests.(Notify Supv. Petroleum Tech.)First Production Notice - Within Five (5) business days after new well begins or(Notify Petroleum Engineer) production resumes after well has been off production for more

than ninety (90)

Page 30: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

COAs: Page 2 of 8Well: Ute Tribal 6-27D-55

SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)

SURFACE COAs:

Additional Stipulations:• Stipulations included with the Ute Tribal 5-27-55

General Conditions of Approval:• A 1 foot corridor right-of-way shall be approved. Upon completion of each pipeline in corridor, they

shall be identified and filed with the Ute Tribe.

• A qualified Archaeologist accompanied by a Tribal Technician will monitor trenching construction ofpipeline.

• The Ute Tribe Energy & Minerals Department is to be notified, in writing 48 hours prior to constructionof pipeline.

• Construction Notice shall be given to the department on the Ute Tribe workdays, which are Mondaythrough Thursday. The Company understands that they may be responsible for costs incurred by the UteTribe after hours.

• The Company shall inform contractors to maintain construction of pipelines within the approvedROW's.

• The Company shall assure the Ute Tribe that "ALL CONTRACTORS, INCLUDING SUB-CONTRACTORS, LEASING CONTRACTORS, AND ETC." have acquired a current and valid UteTribal Business License and have "Access Permits" prior to construction, and will have these permits inall vehicles at all times.

• You are hereby notified that working under the "umbrella " of a company does not allow you to be inthe field, and can be subject to those fines of the Ute Tribe Severance Tax Ordinance.

• Any deviation of submitted APD's and ROW applications the Companies will notify the Ute Tribe andBIA in writing and will receive written authorization of any such change with appropriate authorization.

• The Company will implement "Safety and Emergency Plan." The Company's safety director willensure its compliance.

• All Company employees and/or authorized personnel (sub-contractors) in the field will have approvedapplicable APD's and/or ROW permits/authorizations on their person(s) during all phases ofconstruction.

• All vehicular traffic, personnel movement, construction/restoration operations shall be confined to thearea examined and approved, and to the existing roadways and/or evaluated access

Page 31: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

COAs: Page 3 of 8Well: Ute Tribal 6-27D-55

• All personnel shall refrain from collecting artifacts, any paleontological fossils, and from disturbing anysignificant cultural resources in the area.

• The personnel from the Ute Tribe Energy & Minerals Department shall be notified should culturalremains from subsurface deposits be exposed or identified during construction. All construction willcease.

• All mitigative stipulations contained in the Bureau of Indian Affairs Site Specific EnvironmentalAssessment (EA) will be strictly adhered.

• Upon completion of Application for Corridor Right-Way, the company will notify the Ute Tribe Energy& Minerals Department, so that a Tribal Technician can verify Affidavit of

Page 32: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

COAs: Page 4 of 8Well: Ute Tribal 6-27D-55

DOWNHOLE CONDITIONS OF APPROVAL

SITE SPECIFIC DOWNHOLE COAs:

• Production casing cement shall be brought up and into the surface.

• All blow back fluids from completion operations shall be contained in such a manner that no oil reachesthe reserve pit.

• Covering air/gas drilling operations, requirements will be adhered to covering air/gas drilling operationsas described in Onshore Order #2 III. E. 1. Drilling Operations, Special Drilling Operations, air/gasdrilling.

• A Gamma Ray Well Log shall be run from the well Total Depth to the surface.

• A copy of the Gamma Ray well Log shall be submitted to the BLM Vernal Field Office.

All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictly adhered to.The following items are emphasized:

DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS

• The spud date and time shall be reported orally to Vernal Field Office within 24 hours of spudding.

• Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least 24 hours in advanceof casing cementing operations and BOPE & casing pressure tests.

• Blowout prevention equipment (BOPE) shall remain in use until the well is completed or abandoned.Closing unit controls shall remain unobstructed and readily accessible at all times. Choke manifoldsshall be located outside of the rig substructure.

• All BOPE components shall be inspected daily and those inspections shall be recorded in the dailydrilling report. Components shall be operated and tested as required by Onshore Oil & Gas Order No. 2to insure good mechanical working order. All BOPE pressure tests shall be performed by a test pumpwith a chart recorder and NOT by the rig pumps. Test shall be reported in the driller's log.

• BOP drills shall be initially conducted by each drilling crew within 24 hours of drilling out from underthe surface casing and weekly thereafter as specified in Onshore Oil & Gas Order No. 2.

• Casing pressure tests are required before drilling out from under all casing strings set and cemented inplace.

• No aggressive/fresh hard-banded drill pipe shall be used within casing.

• Cement baskets shall not be run on surface

Page 33: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

COAs: Page 5 of 8Well: Ute Tribal 6-27D-55

• The operator must report all shows of water or water-bearing sands to the BLM. If flowing water isencountered it must be sampled, analyzed, and a copy of the analyses submitted to the BLM VernalField Office.

• The operator must report encounters of all non oil & gas mineral resources (such as Gilsonite, tar sands,oil shale, trona, etc.) to the Vernal Field Office, in writing, within 5 working days of each encounter.Each report shall include the well name/number, well location, date and depth (from KB or GL) ofencounter, vertical footage of the encounter and, the name of the person making the report (along with atelephone number) should the BLM need to obtain additional information.

• A complete set of angular deviation and directional surveys of a directional well will be submitted to theVernal BLM office engineer within 30 days of the completion of the well.

• While actively drilling, chronologic drilling progress reports shall be filed directly with the BLM,Vernal Field Office on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineers untilthe well is completed.

• A cement bond log (CBL) will be run from the production casing shoe to the top of cement and shall beutilized to determine the bond quality for the production casing. Submit a field copy of the CBL to thisoffice.

• Please submit an electronic copy of all other logs run on this well in LAS format [email protected]. This submission will supersede the requirement for submittal ofpaper logs to the BLM.

• There shall be no deviation from the proposed drilling, completion, and/or workover program asapproved. Safe drilling and operating practices must be observed. Any changes in operation must haveprior approval from the BLM Vernal Field

Page 34: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

COAs: Page 6 of 8Well: Ute Tribal 6-27D-55

OPERATING REQUIREMENT REMINDERS:

• All wells, whether drilling, producing, suspended, or abandoned, shall be identified in accordance with43 CFR 3162.6. There shall be a sign or marker with the name of the operator, lease serial number, wellnumber, and surveyed description of the well.

• In accordance with 43 CFR 3162.4-3, this well shall be reported on the "Monthly Report of Operations"(Oil and Gas Operations Report ((OGOR)) starting with the month in which operations commence andcontinue each month until the well is physically plugged and abandoned. This report shall be filed induplicate, directly with the Minerals Management Service, P.O. Box 17110, Denver, Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.

• Should the well be successfully completed for production, the BLM Vernal Field office must be notifiedwhen it is placed in a producing status. Such notification will be by written communication and must bereceived in this office by not later than the fifth business day following the date on which the well isplaced on production. The notification shall provide, as a minimum, the following informational items:

o Operator name, address, and telephone number.

o Well name and number.

o Well location (¼¼,Sec., Twn, Rng, and P.M.).

o Date well was placed in a producing status (date of first production for which royalty will bepaid).

o The nature of the well's production, (i.e., crude oil, or crude oil and casing head gas, or naturalgas and entrained liquid hydrocarbons).

o The Federal or Indian lease prefix and number on which the well is located; otherwise the non-Federal or non-Indian land category, i.e., State or private.

o Unit agreement and/or participating area name and number, if applicable.

o Communitization agreement number, if applicable.

• Any venting or flaring of gas shall be done in accordance with Notice to Lessees (NTL) 4A and needsprior approval from the BLM Vernal Field Office.

• All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in NTL 3A will bereported to the BLM, Vernal Field Office. Major events, as defined in NTL3A, shall be reportedverbally within 24 hours, followed by a written report within 15 days. "Other than Major Events" willbe reported in writing within 15 days. "Minor Events" will be reported on the Monthly Report ofOperations ançl Production.

• Whether the well is completed as a dry hole or as a producer, "Well Completion and RecompletionReport and Log" (BLM Form 3160-4) shall be submitted not later than 30 days after completion of

Page 35: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

COAs: Page 7 of 8Well: Ute Tribal 6-27D-55

well or after completion of operations being performed, in accordance with 43 CFR 3162.4-1. Twocopies of all logs run, core descriptions, and all other surveys or data obtained and compiled during thedrilling, workover, and/or completion operations, shall be filed on BLM Form 3160-4. Submit with thewell completion report a geologic report including, at a minimum, formation tops, and a summary andconclusions. Also include deviation surveys, sample descriptions, strip logs, core data, drill stem testdata, and results of production tests if performed. Samples (cuttings, fluid, and/or gas) shall besubmitted only when requested by the BLM, Vernal Field Office.

• All off-lease storage, off-lease measurement, or commingling on-lease or off-lease, shall have priorwritten approval from the BLM Vernal Field Office.

• Oil and gas meters shall be calibrated in place prior to any deliveries. The BLM Vernal Field OfficePetroleum Engineers will be provided with a date and time for the initial meter calibration and all futuremeter proving schedules. A copy of the meter calibration reports shall be submitted to the BLM VernalField Office. All measurement facilities will conform to the API standards for liquid hydrocarbons andthe AGA standards for natural gas measurement. All measurement points shall be identified as the pointof sale or allocation for royalty purposes.

• A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall be submitted to theBLM Vernal Field Office within 30 days of installation or first production, whichever occurs first. Allsite security regulations as specified in Onshore Oil & Gas Order No. 3 shall be adhered to. All productlines entering and leaving hydrocarbon storage tanks will be effectively sealed in accordance withOnshore Oil & Gas Order No. 3.

• Any additional construction, reconstruction, or alterations of facilities, including roads, gathering lines,batteries, etc., which will result in the disturbance of new ground, shall require the filing of a suitableplan and need prior approval of the BLM Vernal Field Office. Emergency approval may be obtainedorally, but such approval does not waive the written report requirement.

• No location shall be constructed or moved, no well shall be plugged, and no drilling or workoverequipment shall be removed from a well to be placed in a suspended status without prior approval of theBLM Vernal Field Office. If operations are to be suspended for more than 30 days, prior approval of theBLM Vernal Field Office shall be obtained and notification given before resumption of operations.

• Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of water produced fromthis well for a period of 90 days from the date of initial production. A permanent disposal method mustbe approved by this office and in operation prior to the end of this 90-day period. In order to meet thisdeadline, an application for the proposed permanent disposal method shall be submitted along with anynecessary water analyses, as soon as possible, but no later than 45 days after the date of first production.Any method of disposal which has not been approved prior to the end of the authorized 90-day periodwill be considered as an Incident of Noncompliance and will be grounds for issuing a shut-in order untilan acceptable manner for disposing of said water is provided and approved by this

Page 36: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

COAs: Page 8 of 8Well: Ute Tribal 6-27D-55

• Unless the plugging is to take place immediately upon receipt of oral approval the Field OfficePetroleum Engineers must be notified at least 24 hours in advance of the plugging of the well in orderthat a representative may witness plugging operations. If a well is suspended or abandoned, all pits mustbe fenced immediately until they are backfilled. The "Subsequent Report of Abandonment" (Form BLM3160-5) must be submitted within 30 days after the actual plugging of the well bore, showing location ofplugs, amount of cement in each, amount of casing in hole and the current status of the surface

Page 37: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

FOIÈM9

STATE OF UTAHDIVISION OF OIL, GAS, AND MINING

5. Lease Designation and Serial Number:

14-20-H62-4753

SUNDRY NOTICES AND REPORTS ON WELLS 6.Iffndian,AllotteeorTribeName:

UTE TRIBEDo not use this form for proposals to drill new wells, deepen existing wells, or to re-enter plugged and abandoned wells. 7. Unit Agreement Name:

Use APPLICATIONFOR PERMITTO DRILLOR DEEPEN form for such proposals UTU-769678. We11Name and Number:

1. Type of Well: OIL GAS ÒTHER:

UTE TRIBAL 6-27D-552. Name of Operator: 9. API Well Number:

BERRY PETROLEUM COMPANY 43-013-337953. Address and Telephone Number: 10. Field and Pool, or Wildcat:

4000 SOUTH 4028 WEST, RT. 2 BOX 7735 ROOSEVELT, UTAH 84066 (435) 722-1325 BRUNDAGECANYON4. Location of Well:

Footages: 2139'FNL,1128'FWL B BHL:1920'FNL,2401'FWL County: DUCHESNE,

QQ, Sec., T., R., M.: SWINW SEC. 27, T5S, R5W USB&M state: UTAH

11. CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE REPORT OR OTHER DATA

NOTICE OF INTENT SUBSEQUENT REËORT

(Submit in Duplicate) (Submit Original Form Only)

Abandon New Construction Abandon New Construction

Repair Casing Pull or Alter Casing itepair Casing Pull or Alter Casing

Change of Plans Recomplete Change of Plans Reperforate

Convert to Injection Reperforate Convert to Injection Vent or Flare

Fracture Treat or Acidize Vent or Flare Fracture Treat or Acidize Water Shut-Off

Multiple Completion Water Shut-0ff Other

Other ONE YEAR EXTENSIONDate of work completion

Approximate date work will start Report results of Multiple Completions and Recompletions to different reservoirs on WELL

COMPLETION OR RECÓMLEPTION REPORT AND LOG form.

* Must be accompanied by a cement verification report.

12. DËSCRIBËPROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, If well is dinactionallydrilled, give subsurface locations and measured and true

vertical depths for all markers and zones pertinent to this work.)

BERRY PETROEUM COMPANY RESPECTFULLY RËQUËSTS THAT THE APPROVED APPLICATION

TO DRILL FOR THE ABOVE SUBJECT WELL BE EXTENDED FOR A PËRIOD OF ONË (1) YEAR.

STATE BOND#RLBOOO5651 APproved by theUtah Divisionof

Oil,Gas and Mining

By:

13

Name & Signature: SHELLEY E. CROZIER REGULATORY8. PERMITTINGSPECIALIST Date: 10/20/08

(This space for Federal or State office use)

COPYSENTTOOPERATOR RECEIVED

(4/94) ÍÍSIS' (See instructionson reverse Side)

DIV.OFOIL,GAS&

Page 38: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

Application for Permit to DrillRequest for Permit Extension

Validation(thisform should accompany the Sundry Notice requesting permit extension)

API: 43-013-33795Well Name: UTE TRIBAL 6-27D-55Location: (SW/NW) 2139' FNL, 1128' FWL, SEC. 27-TSS-R5WCompany Permit Issued to: BERRY PETROLEUM COMPANYDate Original Permit Issued: 10/23/2007

The undersigned as owner with legal rights to drillon the property as permittedabove, hereby verifies thatthe information as submitted in the previouslyapproved application todrill, remains valid and does not require revision.

Following is a checklist of some items related to the application, which should beverified.

If located on private land, has the ownership changed, if so, has the surfaceagreement been updated? Yes O No O

Have any wells been drilled in the vicinityof the proposed well which would affectthe spacing or siting requirements for this location? YesO Nom

Has therebeen any unit or other agreements put in place thatcould affect thepermitting or operation of this proposed well? YesO NoU

Have therebeen any changes to the access route including ownership, or right-of-way, which could affect the proposed location? YesO No 2l

Has the approved source of water for drilling changed? YesO No2

Have there been any physical changes to the surface location or access routewhich willrequire a change in plans from what was discussed at the onsiteevaluation? YesO No2

Is bonding still in place, which covers this proposed well? YesŒNoO

Signature U L/ Date

Title: Regulatory & Permitting Specialist

Representing: Berry Petroleum Company

RECEIVEDOCT2 1 2008

DIV.0FOIL,GAS&

Page 39: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

O STATE OF UTAH FORM 9DEPARTMENTOFNATURALRESOURCES

DIVISIONOF OIL, GAS AND MINING 5. LEASE DESlGNATIONANDSERIAL NUMBER:14-20-H62-4753

6. IF INDIAN,ALLOTTEEOR TRlBE NAME:SUNDRY NOTICES AND REPORTS ON WELLS UTE

7. UNITor CA AGREEMENTNAME:Do not use thisform for proposals to drillnew wells, signiñcantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or t° UTU-76967

drillhorizontal laterals. Use APPLICATIONFOR PERMIT TO DRILLform forsuch proposals.1. TYPE OF WELL 8. WELL NAMEand NUMBER:

OIL WELL GAS WELL D OTHER UTE TRIBAL 6-27D-552. NAMEOF OPERATOR; 9. API NUMBER:

BERRY PETROLEUM COMPANY 43013337953. ADDRESS OF OPERATOR: PHONE NUMBER: 10. FIELDAND POOL, OR WILDCAT:4000 S. 4028 W. Roosevelt STATE UT z,p84066 (435) 722-1325 BRUNDAGE CANYON

4. LOCATIONOF WELL

FOOTAGESATSURFACE: 2139' FNL, 1128' FWL BHL:1920' FNL,2401' FWL g COUNTY: OUCHOGN

QTRIQTR, SECTION, TOWNSHIP, RANGE, MER1D1AN. SWNW 27 T5S R5W STATE:UTAH

11. CHECK APPROPRIATE BOXES TO INDICATENATUREOF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE DEEPEN REPERFORATE CURRENT FORMATIONNOTICE OF INTENT

(Submit in Duplicate) ALTER CASING FRACTURETREAT SlDETRACKTO REPAIR WELL

Approximate date work willstart: CASING REPAIR NEWCONSTRUCTION TEMPORARILYABANDON

CHANGETO PREVIOUS PLANS OPERATOR CHANGE TUBINGREPA1R

CHANGETUBING PLUGAND ABANDON VENT OR FLARE

O SUBSEQUENT REPORT CHANGE WELLNAME PLUG BACK WATER DISPOSAL(Submit Original Form Only)

O CHANGE WELLSTATUS PRODUCTION(START/RESUME) WATERSHUT-OFFDate of work completion:

O COMMINGLEPRODUCING FORMATIONS RECLAMATIONOF WELLSlTE OTHER: 1 YEAR EXTENSIONCONVERT WELLTYPE RECOMPLETE - DIFFERENT FORMATION

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Cleady show all pertinent details including dates, depths, volumes, etc.

BERRY PETROLEUM COMPANY REPSECTFULLY REQUESTS THATTHE APPROVED APPLICATIONTO DRILL FOR THE ABOVE SUBJECT WELL BE EXTENDED FOR A PERIOD OF (1) ONE YEAR.

Approved by theUtah Divisionof

STATE BOND #RLBOOO5651 Oil,Gas and Mining

COPYSENTTOOPEMTON .

NAME(PLEASEPRINT) SHELLEY E CROZIER TlTLE REGULATORY& PERMITTINGSPECIALIST

SIGNATURE DATE 10/19/2009

(This space for State use only)

RECEIVED0CT2O2009(5/2000) (See Instructions on Reverse Side)

DIV.OFOlL,GAS&

Page 40: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

Application for Permit to DrillRequest for Permit Extension

Validation(thisform should accompany the Sundry Notice requesting permit extension)

API: 43-013-33795

Well Name: UTE TRIBAL 6-27D-55

Location: (SW/NW) 2139' FNL, 1128' FWL, SEC. 27-T5S-R5W

Company Permit Issued to: BERRY PETROLEUM COMPANYDate Original Permit Issued: 10/23/2007

The undersigned as owner with legal rights to drill on the property as permittedabove, hereby verifies that the information as submitted in the previouslyapproved application to drill, remains valid and does not require revision.

Following is a checklist of some items related to the application, which should beverified.

If located on private land, has the ownership changed, if so, has the surfaceagreement been updated? Yes O NoO

Have any wells been drilled in the vicinity of the proposed well which would affectthe spacing or sitingrequirements for thislocation? YesO NoO

Has therebeen any unit or other agreements put in place thatcould affect thepermitting or operation of thisproposed well? YesO NoO

Have there been any changes to the access route including ownership,or right-of-way, which could affect the proposed location? YesO No IZI

Has the approved source of water for drilling changed? YesO NolZI

Have there been any physical changes tothe surface location or access routewhich willrequire a change in plans from what was discussed at the onsiteevaluation? YesO NolZI

Is bonding still in place, which covers thisproposed well? YesŒNoO

10/19/2009

Signature U Date

Title: Regulatory & Permitting Specialist

Representing: Berry Petroleum company

RECEIVEDOCT2O2009

DIV.OFOIL,GAS&

Page 41: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

United States Department of the Interior

o BUREAU OF LAND MANAGEMENTGreen River District-Vernal Field Office

170 South 500 East TAKE PRIDE*a s2A Vernal,UT 84078 mAMERICA

(435) 781-4400 Fax: (435) 781-4410http://www.blmsov/ut/st/en/fo/vernal.html

IN REPLY REFER TO:

3160UTGO11

April 1, 2010

Kathy K. FieldstedBerry Petroleum CompanyRoute 2, Box.7735Roosevelt, UT 84066

Re: Notice of ExpirationWell No. Ute Tribal 6-27D-55SWNW, Sec. 27, T5S, R5WDuchesne County, UtahLease No. 14-20-H62-4753Agreement: CA UTU76967

Dear Ms. Fieldsted:

The original Application for Permit to Drill (APD) for the above referenced well was approved onMarch 6, 2008. A two (2) year extension of the originalAPD was requested on March 19, 2010.The request was denied on March 30, 2010, due to the APD expiring prior to the submission ofthe extension request. According to our records, no known activity has transpiredat theapproved location. In view of the foregoing, this office is notifying you that the approval of thereferenced application has expired. Ifyou intend to drill at this location in the future, a newApplication for Permit to Drillmust be submitted.

This officerequires a letter confirmingthat no surface disturbance has been made for this drillsite. Any surface disturbance associated withthe approved location of thiswell is to berehabilitated. A schedule for this rehabilitationmust be submitted to this office. Yourcooperation in this matter is appreciated.

Ifyou have any questions regarding this matter, please contact me at (435) 781-4455.

Sincerely,

Cindy SeversonLand Law Examiner

cc: UDOGM RECE!VEDBIAUte Tribe AŸRÛ6 2010

DIV.0FC - .

Page 42: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

eu3M200

) UNITEDSTATES RECEIVED FORMAPPROVEDDEPARTMENT OF THE INTERIOR OMB NO. 1004-0135BUREAU OF LAND MANAGEMENT Expires: July 31, 2010

SUNDRYNOTICESAND REPORTS ON WELLS , 1420H624753Do not use this form for proposals to dri/I or to re-enter anabandoned we/I, Use form 3160-3 (APD) for such proposalBLM 6. It Indian, Allottee or I rlbe Name

SUBMIT IN TRIPLICATE - Other instructions on reverse side. 7. It Umtor CA/Agreement, Name and/or No.

1. Ìype of Well 8. WellName and No.g Oil Well O Gas Well g Other UTE TRIBAL 6-27D-55

2. Name of Operator Contact KAl Hy k Hi-LDS l l-D 9. APIWellNo.BERRY PETROLEUM E-Mail: [email protected] 43-013-337953a. Address 3b. Phone No. (mclude area code) 10. Fieldand Pool, or ExploratoryROUTE 2 BOX 7735 4000 SO 4028 WEST Ph: 435-722-1325 BRUNDAGE CANYONROOSEVELT, UT 84066 Fx: 435-722-13214. Locationof Well (Footage,Sec., T., R., Ai.,or surveybescription) 11. County or l'arish,and state

Sec 27 T5S R5W SWNW 2139FNL 1128FWL DUCHESNE COUNTY, UT

12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATATYPE OF SUBMISSION TYPE OF ACTION

g Notice of Intent g Acidize g Deepen O Production (Start/Resume) O Water Shut-Off

O Alter Casing 0 Fracture Treat O Reclamation 0 Well IntegrityO Subsequent Report

0 Casing Repair g New Construction O Recomplete g Other0 Final Abandonment Notice O Change Plans O Plug and Abandon g Temporarily Abandon

0 Convert to Injection 0 Plug Back O Water Disposal13. l>escribel'roposedor Completed operation(clearly state all pertment details,meludmg estimated startmg dateof any proposed work and approximate durationthereofIf the proposal is to deepen directionally or recomplete horizontally give subsurface locations and measured and true vertical depths of all pertinent markers and zonesAttach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports shall be filed within 30 daysfollowing completion of the involved operations, If the operation results in a multiple completion or recompletion in a new interval, a Form 3160-4 shall be filed oncetesting has been completed. Final Abandonment Notices shall be filed only after all requirements, including reclamation, have been completed, and the operator hasdetermined that the site is ready for final inspection.)

BERRYPETROLEUM RESPECTFULLY REQUESTS THAT THE APPROVED APPLICATION TO DRILL FOR THE ABOVE SUBJECTWELL BE EXTENDED FOR A PERIOD OF TWO (2) YEARS.

APRO6 2010VERNALFIELDOFFICE

ATTACHMENT TE

14. I herebycertity that the toregomgis true and correct. Vi |Electronic Submission #82939 verifie? by the BLM Well Information Systefn;For BERRY PETROLE 1M, sent to the Vernal ggp¡Committed to AFMSS for processing by GAIL JENKINS on 03/19/2010 ():

Name(Printed/Typed) KATHYK FIELDSTED Title AUTHORIZED REPRESENTATIVE

Signature (Electronic Submission) Date 03/19/2010THIS SPACE FOR FEDERAL OR STATE OFFICE USE

Approved By Title DatèConditions of approval Approval of this notice does not warrant orcertify that the applicant holds legal or equitable title to those rights in the subject leasewhich would entitle the applicant to conduct operations thereon. OfficeTitle 18 U.S.C. Section 1001 and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the

Page 43: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

REASON FOR DENIAL

Berry Petroleum Company

Notice of IntentAPD Extension

Lease: 14-20-H62-4753Well: Ute Tribal 6-27D-55Location: SWNW Sec 27-T5S-R5W

An extension for the referenced APD is denied for the following reason:

1. The APD was approved 3/6/2008 and the request for an extension was submitted3/19/2010. Therefore, the APD expired 3/6/2010, prior to the submissiori of theextension request.

This is an Order of the Authorized Office (see 43 CFR 3162.1(a)). Please see 43 CFR 3165.3 forinformation on your review and appeal rights. If you have any other questions concerning thismatter, please contact Ryan Angus of this office at (435)

Page 44: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

API Well No: 43013337950000

STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES

DIVISION OF OIL, GAS, AND MINING

FORM 9

5.LEASE DESIGNATION AND SERIAL NUMBER: 14-20-H62-4753

SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.

6. IF INDIAN, ALLOTTEE OR TRIBE NAME: UTE

7.UNIT or CA AGREEMENT NAME:

1. TYPE OF WELL Oil Well

8. WELL NAME and NUMBER: UTE TRIBAL 6-27D-55

2. NAME OF OPERATOR: BERRY PETROLEUM COMPANY

9. API NUMBER: 43013337950000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 4000 South 4028 West Rt 2 Box 7735 , Roosevelt, UT, 84066 303 999-4044 Ext

9. FIELD and POOL or WILDCAT: BRUNDAGE CANYON

4. LOCATION OF WELL FOOTAGES AT SURFACE: 2139 FNL 1128 FWL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: SWNW Section: 27 Township: 05.0S Range: 05.0W Meridian: U

COUNTY: DUCHESNE

STATE: UTAH

11.

CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

NOTICE OF INTENTApproximate date work will start:

10/23/2011

SUBSEQUENT REPORTDate of Work Completion:

SPUD REPORTDate of Spud:

DRILLING REPORTReport Date:

ACIDIZE ALTER CASING CASING REPAIR

CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

DEEPEN FRACTURE TREAT NEW CONSTRUCTION

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

BERRY PETROLEUM RESPECTFULLY REQUESTS THAT THE APPROVEDAPPLICATION TO DRILL THE ABOVE SUBJECT WELL BE EXTENDED FOR THE

PERIOD OF ONE (1) YEAR.

NAME (PLEASE PRINT) PHONE NUMBER Kathy K. Fieldsted 435 722-1325

TITLE Sr. Regulatory & Permitting Tech.

SIGNATURE N/A

DATE 9/13/2010

September 13, 2010

September 20, 2010

iPI Well No: 43013337950000

FORM 9STATE OF UTAH

DEPARTMENT OF NATURAL RESOURCESDIVISION OF OIL, GAS, AND MINING 4

DESI47N5A3TION AND SERIAL NUMBER:

SUNDRY NOTICES AND REPORTS ON WELLS QFEINDIAN,ALLOTTEEORTRIBENAME:

Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME:

DRILL form for such proposals.

1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well UTE TRIBAL 6-27D-55

2. NAME OF OPERATOR: 9. API NUMBER:BERRY PETROLEUM COMPANY 43013337950000

3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:4000 South 4028 West Rt 2 Bo× 7735 , Roosevelt, UT, 84066 303 999-4044 E×t BRUNDAGE CANYON

4.LOCATIONOFWELL COUNTY:FOOTAGES AT SURFACE: DUCHESNE

2139 FNL 1128 FWLQTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:

Qtr/Qtr: SWNW Section: 27 Township: 05.05 Range: 05.0W Meridian: U UTAH

11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA

TYPE OF SUBMISSION TYPE OF ACTION

ACIDIZE ALTER CASING CASING REPAIR

NOTICE OF INTENTApproximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME

10/23/2011CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE

SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of Work Completion:

OPERATOR CHANGE PLUG AND ABANDON PLUG BACK

PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION

SPUD REPORTDate of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON

TUBING REPAIR VENT OR FLARE WATER DISPOSAL

DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:

WILDCAT WELL DETERMINATION OTHER OTHER:

12. DESCRIBE PROPOSED OR CC MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.

BERRY PETROLEUM RESPECTFULLY REQUESTS THAT THE APPROVEDAPPLICATION TO DRILL THE ABOVE SUBJECT WELL BE EXTENDED FOR THE Approved by the

PERIOD OF ONE (1) YEAR. Utah Division ofOil, Gas and Mining

Date: September 20, 2010

By:

NAME (PLEASE PRINT) PHONE NUMBER TITLEKathy K. Fieldsted 435 722-1325 Sr. Regulatory & Permitting Tech.

SIGNATURE DATEN/A 9/13/2010

RECEIVED September 13,

Page 45: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

The Utah Division of Oil, Gas, and Mining

- State of Utah- Department of Natural Resources

Electronic Permitting System - Sundry Notices

Request for Permit Extension Validation Well Number 43013337950000

API: 43013337950000Well Name: UTE TRIBAL 6-27D-55

Location: 2139 FNL 1128 FWL QTR SWNW SEC 27 TWNP 050S RNG 050W MER UCompany Permit Issued to: BERRY PETROLEUM COMPANY

Date Original Permit Issued: 10/23/2007

The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies thatthe information as submitted in the previously approved application to drill, remains valid and does notrequire revision. Following is a checklist of some items related to the application, which should be verified.

If located on private land, has the ownership changed, if so, has the surface agreement beenupdated? Yes No

Have any wells been drilled in the vicinity of the proposed well which would affect the spacing orsiting requirements for this location? Yes No

Has there been any unit or other agreements put in place that could affect the permitting or operationof this proposed well? Yes No

Have there been any changes to the access route including ownership, or rightof- way, which couldaffect the proposed location? Yes No

Has the approved source of water for drilling changed? Yes No

Have there been any physical changes to the surface location or access route which will require achange in plans from what was discussed at the onsite evaluation? Yes No

Is bonding still in place, which covers this proposed well? Yes No

Signature: Kathy K. Fieldsted Date: 9/13/2010

Title: Sr. Regulatory & Permitting Tech. Representing: BERRY PETROLEUM COMPANY

September 13, 2010September 13, 2010

September 20, 2010

UTAH

[gg The Utah Division of Oil, Gas, and Mining- State of Utah- Department of Natural ResourcesElectronic Permitting System - Sundry Notices

OTI GAS & MINTNG

Request for Permit Extension Validation Well Number 43013337950000

API: 43013337950000Well Name: UTE TRIBAL 6-27D-55

Location: 2139 FNL 1128 FWL QTR SWNW SEC 27 TWNP 050S RNG 050W MER UCompany Permit Issued to: BERRY PETROLEUM COMPANY

Date Original Permit Issued: 10/23/2007

The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies thatthe information as submitted in the previously approved application to drill, remains valid and does notrequire revision. Following is a checklist of some items related to the application, which should be verified.

•If located on private land, has the ownership changed, if so, has the surface agreement beenupdated? I Yes I:$l No

• Have any wells been drilled in the vicinity of the proposed well which would affect the spacing orsiting requirements for this location? I

_

I Yes i i No

• Has there been any unit or other_agreements put in place that could affect the permitting or operationof this proposed well? :___:I Yes ig:I No

• Have there been any changes to the access route including ownership, or rightof- way, which couldaffect the proposed location? I

_

I Yes g:I No

• Has the approved source of water for drilling changed? I Yes i i No

• Have there been any physical changes to the surface location or access route which will require achange in plans from what was discussed at the onsite evaluation? I i Yes g:I No

Approved by the•Is bonding still in place, which covers this proposed well? I:gi Yes i No Utah Division of

Oil, Gas and MiningSignature: Kathy K. Fieldsted Date: 9/13/2010

Title: Sr. Regulatory & Permitting Tech. Representing: BERRY PETROLEUIMANY September 20, 2010

By:

RECEIVED September 13,

Page 46: STATE OF UTAH FORM 3 OF NATURAL RESOURCES · 0 o state of utah form 3 department of natural resources division of oil, gas and mining amended report (highlight changes) application

OState of UtahDEPARTMENT OF NATURAL RESOURCES

MICHAEL R. STYLER

GARY R. HERBERT ExecutiveDirector

Governor Division of Oil, Gas and MiningGREG BELL JOHN R. BAZA

Lieutenant Governor Division Director

October 21, 2010

Kathy FieldstedBerry Petroleum CompanyRt. 2, Box 7735Roosevelt, UT 84066

Re: APD Rescinded - Ute Tribal 6-27D-55, Sec. 27, T. 5S, R. 5WDuchesne County, Utah API No. 43-013-33795

Dear Ms. Fieldsted:

The Application for Permit to Drill (APD) for the subject well wasapproved by the Division of Oil, Gas and Mining (Division) on October 23, 2007.On October 30, 2008, October 21, 2009 and September 20, 2010 the Divisiongranted a one-year APD extension. On October 21, 2010, you requested that thedivision rescind the state approved APD. No drilling activity at this location hasbeen reported to the division. Therefore, approval to drill the well is herebyrescinded, effective October 21, 2010.

A new APD must be filed with this office for approval prior to thecommencement of any future work on the subject location.

If any previously unreported operations have been performed on this welllocation, it is imperative that you notify the Division immediately.

Sincerely,

Dia ä MasonEnvironmental Scientist

ec: Well FileBureau of Land Management, Vernal UTAH

DNR

1594 West North Temple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114-5801telephone(801) 538-5340 • facsimile (801) 359-3940 • TTY (801) 538-7458 . www.ogm.utah.gov on, GAS &