Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-1 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60788.1885, (E) 314783.6928 SURF. ELEV. 17.318 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 3/16/09 DATE FINISH 3/18/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill See Note 2
Ahead J-1 3 7 Brown Silty SAND w/ Gravel Pieces M-NP 13 8
1.5 Spin J-2 10 10 Light Brown, Dark Brown and Gray Silty SAND w/ Gravel Pieces M-NP 17 Casing 11
3.0 J-3 17 22 Brown Silty SAND w/ Gravel Pieces M-NP 15 24
4.5 J-4 16 17 Brown Silty SAND w/ Gravel Pieces M-NP 14 17
6.0 J-5 17 18 Brown Silty SAND w/ Gravel Pieces M-NP 13 24
7.5 J-6 15 15 Brown Silty SAND w/ Gravel Pieces M-NP 12 17
9.0 Mud J-7 15 14 Brown Silty SAND w/ Gravel Pieces M-NP 13 Used 15
10.5 J-8 10 16 Brown Gravelly SAND, Silty M-NP 10 13
12.0 J-9 5 8 Brown Silty SAND w/ Gravel Pieces M-NP 13 8
13.5 J-10 8 6 Brown Silty SAND w/ Gravel Pieces M-NP 13 7
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D.Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-1
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-1 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60788.1885, (E) 314783.6928 SURF. ELEV. 17.318 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 3/16/09 DATE FINISH 3/18/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 10 11 Gray Silty SAND w/ Gravel Pieces M-NP 14
Used 10
16.5 J-12 15 100/.102 Gray Gravelly SAND, Silty M-NP 9 ----
18.0 J-13 12 20 Gray Silty SAND w/ Gravel Pieces M-NP 13 13
19.5 J-14 13 17 Gray Silty SAND w/ Gravel Pieces M-NP 12 18
21.0 J-15 11 39 Gray Silty SAND w/ Gravel Pieces M-NP 12 18
22.5 J-16 34 27 Gray Sandy GRAVEL, Silty M-NP 7 34
24.0 J-17 27 35 Brown Silty SAND M-NP 20 50
25.5 J-18 17 23 Brown Silty SAND w/ Gravel Pieces M-NP 16 27
27.0 J-19 16 19 Brown Silty SAND w/ Gravel Pieces M-NP 14 17
28.5 J-20 47 80 Brown Silty SAND w/ Gravel Pieces M-NP 12 57
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D.Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-1
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-1 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60788.1885, (E) 314783.6928 SURF. ELEV. 17.318 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 3/16/09 DATE FINISH 3/18/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 80 100 No Recovery ---- ----
Used ----
31.5 J-22 57 63 Brown Silty SAND w/ Gravel Pieces M-NP 12 61
33.0 J-23 32 36 Gray Silty SAND M-NP 19 35
34.5 J-24 26 23 Gray Silty SAND w/ Gravel Pieces M-NP 11 52
36.0 J-25 28 30 Gray Silty SAND M-NP 20 40
37.5 J-26 40 51 Light Brown Silty SAND M-NP 20 53
39.0 J-27 37 38 Brown Silty SAND w/ Gravel Pieces M-NP 14 44
40.5 J-28 36 48 Brown Silty SAND M-NP 19 48 End of Boring 40.95m Notes: (1) Safety Hammer used (2) Drilled 50mm of asphalt and 152mm of concrete before taking J-1 (3) Hard Drilling: (a) 30.3m - 31.1m (4) Driller cored Cobble at 19.5m – 19.7m and put in jar (5) Drilling Mud Used. Groundwater not determined (6) Mr. Philip Calise was the Drill Rig Inspector Supervisor for this Project
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D.Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-1
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-2 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60806.5126, (E) 314775.6303 SURF. ELEV. 16.700 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 3/16/09 DATE FINISH 3/18/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill
Ahead See Note 2
10 J-1 29 23 Gray Silty SAND w/ Gravel Pieces M-NP 14 14 23 21
1.5 29 18 J-2 7 16 1st Attempt: No Recovery 26 17 2nd Attempt: Gray Silty SAND w/ Gravel Pieces M-NP 17 29 33
3.0 36 16 J-3 9 12 Gray Silty SAND w/ Gravel Pieces M-NP 13 18 11 19 19
4.5 23 19 J-4 6 9 Brown Sandy SILT w/ Pockets of Gray Silty CLAY M-LPL 15 27 10 38 33
6.0 40 23 J-5 8 7 No Recovery: Two Attempts ---- ---- 30 6 31 39
7.5 41 26 J-6 13 8 Dark Brown Silty SAND w/ Gravel Pieces M-NP 14 28 9 33 37
9.0 41 Mud J-7 10 10 Gray Sandy GRAVEL, Silty M-NP 6 Used 9
10.5 J-8 12 18 Brown Silty SAND w/ Gravel Pieces M-NP 13 18
12.0 J-9 9 13 Gray Gravelly SAND, Silty M-NP 7 14
13.5 J-10 17 20 1st Attempt: No Recovery 19 2nd Attempt: Gray Silty SAND w/ Gravel Pieces M-NP 12
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P.Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-2
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-2 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60806.5126, (E) 314775.6303 SURF. ELEV. 16.700 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 3/16/09 DATE FINISH 3/18/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 26 27 1st Attempt: No Recovery
Used 27 2nd Attempt: Gray Silty SAND w/ Gravel Pieces M-NP 10
16.5 J-12 13 12 Gray Silty SAND w/ Gravel Pieces M-NP 10 14
18.0 J-13 11 11 Gray Silty SAND w/ Gravel Pieces M-NP 10 12
19.5 J-14 11 10 Gray Silty SAND w/ Gravel Pieces M-NP 11 17
21.0 J-15 10 14 Gray Silty SAND w/ Gravel Pieces M-NP 11 16
22.5 J-16 14 21 Gray Silty SAND w/ Gravel Pieces M-NP 12 18
24.0 J-17 21 28 Gray Silty SAND w/ Gravel Pieces M-NP 11 45
25.5 J-18 33 47 100 Brown Silty SAND M-NP 20
27.0 J-19 38 44 Brown Silty SAND M-NP 19 36
28.5 J-20 29 32 Brown Silty SAND w/ Gravel Pieces M-NP 16 33
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P.Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-2
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-2 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60806.5126, (E) 314775.6303 SURF. ELEV. 16.700 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 3/16/09 DATE FINISH 3/18/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 36 41 Red Brown Silty SAND w/ Gravel Pieces M-NP 10
Used 53
31.5 J-22 28 43 Brown Silty SAND M-NP 17 43
33.0 J-23 28 32 Brown Silty SAND M-NP 18 40
34.5 J-24 25 37 Gray Silty SAND M-NP 16 50
36.0 See Note 4 J-25 47 100/.076 Gray Silty SAND w/ Gravel Pieces M-NP 11 ---- See Note 5 End of Boring 36.5m Notes:
37.5 (1) Automatic hammer used (2) Drilled through 300mm of blacktop before taking J-1 (3) Drilled through boulders/cobbles at 25.0m to 25.2m (4) Core Drilled from 35.5m to 36.0m, COBBLES (5) Core Drilled from 36.27m to 36.5, BOULDER
39.0 (6) Drilling Mud Used. Groundwater not determined (7) Grouted hole upon completion
40.5
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P.Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-2
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-3 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60842.6519, (E) 314755.8350 SURF. ELEV. 15.601 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 03/18/09 DATE FINISH 03/24/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill See Note 2
Ahead J-1 9 10 Brown Silty SAND w/ Gravel Pieces and Asphalt M-NP 12 7 Spin
1.5 Casing J-2 15 18 Brown Silty SAND w/ Gravel Pieces M-NP 13 14
3.0 J-3 13 15 Brown and Gray Silty SAND, Gravelly M-NP 11 18 See Note 3
4.5 B-1 Run #B-1: Drilled from 4.5m to 5.5m, BOULDER J-4 11 16 Brown Silty SAND M-NP 17
6.0 20 J-5 20 55 Brown and Dark Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 100/.100
7.5 B-2 Run #B-2: Drilled from 7.3m to 8.5m, stacked COBBLES J-6 28 34 Brown and Dark Brown Silty SAND, Gravelly M-NP 11
9.0 100/.075 J-7 100/.050 ---- No Recovery ---- ---- ----
10.5 J-8 37 46 Brown and Dark Brown Silty SAND, Gravelly M-NP 10 50 B-3 Run #B-3: Drilled from 11.3m to 12.5m, BOULDER
12.0 J-9 17 17 Gray Silty SAND, Gravelly M-NP 10 33
13.5 Mud J-10 11 10 Gray Silty SAND w/ Gravel Pieces M-NP 13 Used 19
15.0 B-4 Run #B-4: Drilled from 14.8m to 15.5m, BOULDER The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-3
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-3 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60842.6519, (E) 314755.8350 SURF. ELEV. 15.601 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 03/18/09 DATE FINISH 03/24/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud
Used J-11 17 14 Brown and Red Brown Silty SAND w/ Gravel Pieces M-NP 23 15
16.5 J-12 13 19 Red Brown Silty SAND M-NP 22 30
18.0 J-13 15 21 Brown Silty SAND w/ Mica M-NP 22 27
19.5 J-14 22 23 Brown Silty SAND w/ Mica M-NP 20 22
21.0 J-15 16 21 Brown Silty SAND w/ Gravel Pieces M-NP 15 30
22.5 J-16 24 24 Brown and Red Brown Silty SAND w/ Gravel Pieces M-NP 15 23 B-5 Run #B-5: Drilled from 23.8m to 24.0m, BOULDER
24.0 J-17 28 51 Brown and Red Brown Silty SAND w/ Gravel Pieces M-NP 18 63
25.5 J-18 24 32 Gray and Black Silty SAND w/ Mica M-NP 26 40
27.0 J-19 23 43 Gray Silty SAND, w/ Mica M-NP 19 41
28.5 J-20 30 30 Gray and Black Silty SAND w/ Mica M-NP 22 35
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-3
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-3 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60842.6519, (E) 314755.8350 SURF. ELEV. 15.601 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 03/18/09 DATE FINISH 03/24/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 30 35 Gray Silty SAND, w/ Mica M-NP 24
Used 42
31.5 J-22 64 100/.127 Gray and Black Silty SAND w/ Mica M-NP 19 ----
33.0 J-23 50 64 Gray Silty SAND, w/ Mica M-NP 16 83
34.5 J-24 53 52 Gray and Black Silty SAND w/ Mica M-NP 23 55 End of Boring 34.95 m
36.0 Notes: (1) Safety Hammer Used (2) Drilled through 51mm of asphalt and 152mm of concrete (3) Core Drilled from 3.6m to 4.5m, COBBLES (4) Piezometer installed to 24.0m (5) Readings: (a) 4.0m on 3/24/09; (b) 9.45m on 3/25/09; (c) 10.5m on 3/27/09; (d) 11.3m on 3/31/09; (e) 11.3m on 4/07/09; (f) 11.8m on 4/14/09; (g) 11.7m on 06/15/09; (h) 11.1m on 7/14/09 (6) Lost water at 9.9m and 11.3m
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-3
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-4 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60850.4580, (E) 314773.636 SURF. ELEV. 10.456 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/01/09 DATE FINISH 06/08/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead J-1 11 7 Brown and Black Sandy SILT w/ Gravel Pieces, Mica and Asphalt M-NP 15 of 8 Casing
1.5 J-2 3 6 Brown Sandy SILT w/ Gravel Pieces, Mica and Pockets of Gray M-NP 17 9 Sandy SILT
3.0 J-3 8 14 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 16 21
4.5 J-4 56 50/.025 Gray GRAVEL, Silty M-NP 3 ----
6.0 J-5 18 28 Gray Sandy SILT w/ Gravel Pieces M-NP 11 25
7.5 Mud J-6 29 15 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 11 Used 14
9.0 J-7 9 8 Gray Sandy SILT w/ Gravel Pieces M-NP 11 10
10.5 J-8 11 48 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 10 50/.075
12.0 J-9 11 13 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 14 14
13.5 J-10 25 22 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 11 13
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-4
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-4 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60850.4580, (E) 314773.636 SURF. ELEV. 10.456 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/01/09 DATE FINISH 06/08/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 20 50/.075 Brown and Black Sandy SILT w/ Gravel Pieces and Mica M-NP 12
Used ----
16.5 J-12 19 25 Gray Sandy SILT, Gravelly w/ Mica M-NP 14 72
18.0 See Note 3
19.5 See Note 3
21.0 J-13 27 35 Light Brown and Brown Silty SAND w/ Gravel Pieces and Mica M-NP 22 32
22.5 J-14 15 17 Brown and Black Silty Fine SAND w/ Gravel Pieces and Mica M-NP 28 18
24.0 J-15 20 26 Gray and Black Silty Fine SAND w/ Mica M-NP 31 35
25.5 J-16 21 23 Gray Silty SAND w/ Mica and Pockets of Gray Clayey SILT M-LPL 26 28
27.0 J-17 31 28 Gray Silty Fine SAND w/ Mica M-NP 29 25
28.5 J-18 38 46 Gray Silty Fine SAND w/ Mica M-NP 25 44
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-4
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-4 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60850.4580, (E) 314773.636 SURF. ELEV. 10.456 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 06/01/09 DATE FINISH 06/08/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-19 78 68 Gray Silty SAND, Gravelly w/ Mica M-NP 12
Used 56
31.5 J-20 24 30 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 23 35
33.0 J-21 29 45 Brown Silty SAND w/ Mica M-NP 26 52
34.5 J-22 33 41 Gray Silty SAND, Gravelly w/ Mica M-NP 9 31
36.0 J-23 12 18 Brown Silty CLAY w/ Pockets of Gray Clayey SILT M-PL 43 26
37.5 J-24 25 32 1st Attempt: No Recovery 42 2nd Attempt: Brown Clayey SILT, Sandy M-LPL 27
39.0 J-25 26 35 Brown Clayey SILT, Sandy w/ Pockets of Red Brown Silty SAND M-LPL 27 48 End of Boring 39.45m
40.5 Notes: (1) Automatic Hammer Used (2) Drilled through 230mm of Asphalt and Base before taking sample J-1 (3) Possible Boulders at: (a) 4.675m – 5.132m; (b) 10.875m – 11.325m; (c) 15.225m – 16.0m; (d) 17.0m – 20.4m (4) Drilling mud used, Groundwater not determined (5) Grouted hole upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-4
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-5 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60869.2593, (E) 314738.5338 SURF. ELEV. 14.733 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 03/19/09 DATE FINISH 03/24/09 CASING O.D. 139.7 mm I.D. 127 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled
Casing J-1 6 10 Brown Silty SAND w/ Gravel Pieces M-NP 9 12
1.5 J-2 5 8 Brown Silty SAND w/ Gravel Pieces M-NP 11 9
3.0 J-3 9 6 Brown and Dark Gray Silty SAND w/ Gravel Pieces M-NP 14 7
4.5 J-4 11 22 1st Attempt: No Recovery 19 2nd Attempt: Brown and Gray Sandy GRAVEL, Silty M-NP 12
6.0 Mud J-5 8 9 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 Used 10
7.5 J-6 8 8 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 11
9.0 J-7 9 9 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 11
10.5 J-8 10 15 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 14
12.0 J-9 11 15 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 17
13.5 J-10 11 16 Brown Silty SAND w/ Mica M-NP 18 23
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 4 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-5
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-5 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60869.2593, (E) 314738.5338 SURF. ELEV. 14.733 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 03/19/09 DATE FINISH 03/24/09 CASING O.D. 139.7 mm I.D. 127 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 19 23 Dark Brown Silty SAND w/ Gravel Pieces and Mica M-NP 12
Used 23
16.5 J-12 16 25 Dark Brown Silty SAND w/ Gravel Pieces and Mica M-NP 11 23
18.0 J-13 20 28 Black Silty SAND w/ Mica M-NP 15 35
19.5 J-14 47 100/.051 Brown Sandy GRAVEL, Silty M-NP 10 ----
21.0 J-15 100 ---- Brown Sandy GRAVEL, Silty M-NP 9 ---- B-1 Run #B-1: Drilled from 21.15m to 21.25m, Rec. 100mm, BOULDER B-2 Run #B-2: Drilled from 21.27m to 21.3m, Rec. 300mm, BOULDER
22.5 J-16 19 25 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 20
24.0 J-17 24 43 Brown Sandy GRAVEL, Silty M-NP 9 47
25.5 J-18 28 35 Brown Silty SAND w/ Gravel Pieces M-NP 13 30
27.0 J-19 9 13 Top 150mm: Dark Gray Silty CLAY M-PL 27 J-19A 17 Bottom 300mm: Brown Silty CLAY M-PL 26
28.5 J-20 7 19 Brown Silty CLAY M-PL 24 25
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 4 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-5
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-5 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60869.2593, (E) 314738.5338 SURF. ELEV. 14.733 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 03/19/09 DATE FINISH 03/24/09 CASING O.D. 139.7 mm I.D. 127 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 25 34 Dark Brown Silty Fine SAND M-NP 23
Used 34
31.5 J-22 10 12 Brown Clayey SILT M-LPL 24 15
33.0 J-23 11 17 Brown Silty CLAY M-PL 34 19
34.5 J-24 11 15 Brown Silty CLAY M-PL 27 19
36.0 J-25 13 17 Brown Silty CLAY M-PL 27 21
37.5 J-26 7 10 Brown Silty CLAY M-PL 31 13
39.0 J-27 15 20 Layered Brown Silty CLAY/Clayey SILT M-PL 29 23
40.5 J-28 18 31 Brown Silty Fine SAND M-NP 23 34
42.0 J-29 18 23 Brown Silty Fine SAND M-NP 25 23
43.5 J-30 13 15 Layered Brown Silty CLAY/ Clayey SILT M-PL 27 19
45.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 4 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-5
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-5 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60869.2593, (E) 314738.5338 SURF. ELEV. 14.733 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 03/19/09 DATE FINISH 03/24/09 CASING O.D. 139.7 mm I.D. 127 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 45.0 Mud J-31 12 18 Layered Brown Silty CLAY/ Clayey SILT M-PL 23
Used 23
46.5 J-32 11 16 Layered Brown Silty CLAY/ Clayey SILT M-PL 26 20
48.0 J-33 10 14 Layered Brown Silty CLAY/ Clayey SILT M-PL 25 21
49.5 J-34 17 22 Layered Brown Silty CLAY/ Clayey SILT M-PL 22 28
51.0 J-35 10 29 Layered Brown Silty CLAY/ Clayey SILT M-PL 21 30
52.5 J-36 14 23 Layered Brown Silty CLAY/ Clayey SILT M-PL 23 29
54.0 J-37 12 27 Layered Brown Silty CLAY/ Clayey SILT M-PL 22 37 End of Boring 54.45m
55.5 Notes: (1) Automatic Hammer Used (2) Possible Cobbles at 19.7m to 20.9m; (3) Drilling mud used, Groundwater not determined (4) Grouted hole upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 4 OF 4 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-5
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-6 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60899.3015, (E) 314714.5364 SURF. ELEV. 13.683 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 03/24/09 DATE FINISH 03/27/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill See Note 2
Ahead J-1 10 18 Brown Silty SAND w/ Gravel Pieces M-NP 11 Spin 22
1.5 Casing J-2 10 7 Red Brown Silty SAND w/ Gravel Pieces and Pockets of M-NP 13 5 Gray Sandy SILT
3.0 J-3 40 17 Brown Sandy GRAVEL, Silty w/ Pieces of Ceramics M-NP 8 14 B-1 Run #B-1: Drilled from 3.96m to 5.18m, BOULDER
4.5 J-4 100/0 ---- No Recovery ---- ---- B-2 ---- Run #B-2: Drilled from 5.18m to 5.8m, COBBLES
6.0 J-5 25 32 Brown Silty Fine SAND w/ Mica M-NP 16 41
7.5 J-6 12 15 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 16
9.0 J-7 13 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 13
10.5 J-8 9 13 Dark Brown Silty SAND M-NP 20 13
12.0 J-9 12 12 Brown Silty SAND w/ Gravel Pieces M-NP 18 12
13.5 J-10 17 20 Brown Silty SAND w/ Gravel Pieces M-NP 16 23
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-6
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-6 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60899.3015, (E) 314714.5364 SURF. ELEV. 13.683 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 03/24/09 DATE FINISH 03/27/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Spin J-11 13 15 Brown Silty SAND w/ Gravel Pieces M-NP 19
Casing 17
16.5 J-12 30 31 Brown Silty Fine SAND M-NP 17 30
18.0 J-13 21 20 Brown Silty SAND w/ Gravel Pieces M-NP 17 20
19.5 J-14 45 100/.101 Brown Silty SAND w/ Gravel Pieces M-NP 14 B-3 ---- Run #B-3: Drilled from 20.12m to 21.0m, BOULDER
21.0 J-15 100/0 ---- No Recovery ---- ---- B-4 ---- Run #B-4: Drilled from 21.0m to 22.2m, BOULDER (See Note 3)
22.5 Revert J-16 47 52 Red Brown Silty SAND w/ Gravel Pieces M-NP 14 Used 70
24.0 J-17 40 45 Red Brown Silty SAND w/ Gravel Pieces M-NP 14 44
25.5 J-18 28 42 Red Brown Silty SAND w/ Gravel Pieces M-NP 13 45
27.0 J-19 39 45 Red Brown Silty SAND w/ Gravel Pieces M-NP 16 46
28.5 J-20 38 38 Brown and Gray Silty SAND w/ Mica M-NP 19 44
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-6
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-6 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60899.3015, (E) 314714.5364 SURF. ELEV. 13.683 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 03/24/09 DATE FINISH 03/27/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Revert J-21 25 40 Light Gray Silty SAND w/ Mica M-NP 17
Used 40
31.5 J-22 28 40 Gray Silty CLAY M-PL 27 52
33.0 J-23 29 32 Gray Silty SAND w/ Pockets of Gray Silty CLAY M-LPL 18 38 End of Boring 33.45m
34.5 Notes: (1) Safety Hammer Used (2) Drilled through 51mm of Asphalt & 127mm of concrete before taking J-1 (3) Hard Drilling, wore out core barrel bit. (4) Lost water at 6.9m and 22.2m (5) Piezometer installed to 18.0m (6) Water Level: (a) 9.44m @ 7AM on 3/31/09; (b) 9.5m on 4/7/09; (c) 9.5m on 4/14/09; (d) 9.5m on 6/15/09; (e) 9.4m on 7/14/09
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-6
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-7 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60927.43397, (E) 314715.722 SURF. ELEV. 6.486 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/02/09 DATE FINISH 06/04/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 ---- See Note 2
16 25 J-1 5 10 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 27 9
1.5 Drilled Ahead J-2 3 8 Brown Silty SAND w/ Mica and Pockets of Brown Sandy SILT M-NP 18 of 9 Casing
3.0 J-3 7 9 Brown Silty SAND w/ Mica M-NP 20 12
4.5 J-4 5 11 Brown Silty SAND w/ Mica M-NP 25 13
6.0 J-5 6 10 Brown Silty SAND w/ Mica M-NP 26 12
7.5 Mud J-6 7 10 Brown Silty Fine SAND w/ Mica M-NP 25 Used 11
9.0 J-7 7 12 Brown Silty SAND w/ Mica M-NP 25 16
10.5 See Note 3
12.0 J-8 33 23 Brown Silty SAND, Gravelly M-NP 9 14
13.5 J-9 9 7 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 18 15
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-7
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-7 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60927.43397, (E) 314715.722 SURF. ELEV. 6.486 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/02/09 DATE FINISH 06/04/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-10 23 26 Brown Sandy GRAVEL, Silty M-NP 9
Used 27
16.5 J-11 19 33 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 34
18.0 J-12 8 16 Dark Brown Silty SAND w/ Mica M-NP 19 21
19.5 J-13 12 11 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 13
21.0 J-14 15 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 17
22.5 J-15 10 11 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 15 14
24.0 J-16 26 38 Brown Silty SAND, Gravelly M-NP 9 68
25.5 J-17 25 29 Dark Brown Silty SAND w/ Gravel Pieces M-NP 13 38
27.0 J-18 26 42 Brown Silty Fine SAND w/ Mica M-NP 22 45
28.5 J-19 28 39 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 16 41 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-7
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-7 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60927.43397, (E) 314715.722 SURF. ELEV. 6.486 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 06/02/09 DATE FINISH 06/04/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Drilled through 76mm of Asphalt and 355mm of Concrete before taking sample J-1 (3) (a) Drilled from 10.3m to 12.0m, BOULDER (1.7m); (b) Possible Cobbles at 24.0m (4) Drilling mud used, Groundwater not determined (5) Grouted hole upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-7
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-8 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60939.2154, (E) 314733.0795 SURF. ELEV. 6.820 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/11/09 DATE FINISH 06/16/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead J-1 7 8 Black and Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 15 of 13 Casing
1.5 J-2 4 9 Brown Silty Fine SAND w/ Mica and Pockets of Brown Sandy SILT M-NP 19 12
3.0 J-3 5 4 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 7
4.5 J-4 3 5 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-NP 26 10 Sandy SILT
6.0 J-5 7 10 Brown Silty SAND w/ Mica M-NP 26 12
7.5 Mud J-6 10 11 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-NP 25 Used 14 Sandy SILT
9.0 J-7 14 17 Brown Silty SAND w/ Mica M-NP 20 20
10.5 See Note 3 J-8 11 29 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20
12.0 45 J-9 12 26 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 36
13.5 J-10 29 43 Brown Silty SAND, Gravelly M-NP 12 34
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-8
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-8 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60939.2154, (E) 314733.0795 SURF. ELEV. 6.820 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/11/09 DATE FINISH 06/16/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 19 28 Red Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16
Used 33
16.5 J-12 20 28 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20 28
18.0 J-13 19 23 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 31
19.5 J-14 17 29 Brown Silty SAND w/ Mica M-NP 19 39
21.0 J-15 20 23 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 29
22.5 J-16A 15 22 Brown Silty SAND w/ Mica M-NP 24 J-16B 31 Brown, Red Brown and Gray Clayey SILT w/ Mica M-LPL 25
24.0 J-17 29 39 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 40
25.5 J-18 19 32 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 53
27.0 J-19 20 27 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 30
28.5 J-20 26 32 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 18 36 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-8
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-8 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60939.2154, (E) 314733.0795 SURF. ELEV. 6.820 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 06/11/09 DATE FINISH 06/16/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Drilled through 100mm of Pavement and 100mm of Concrete before taking sample J-1 (3) Possible Boulders at 10.3m – 11.55m (4) Drilling mud used; Groundwater not Determined (5) Grouted hole upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-8
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-9 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60984.29, (E) 314691.53 SURF. ELEV. 4.376 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/11/09 DATE FINISH 06/17/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead of J-1 6 6 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 21 Casing 10
1.5 J-2 5 7 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 29 7
3.0 J-3 7 10 Brown Silty Fine SAND w/ Gravel Pieces and Mica M-NP 21 10
4.5 J-4 9 10 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 26 12
6.0 J-5 5 7 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 27 11
7.5 J-6 10 12 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20 14
9.0 J-7 4 13 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 15
10.5 J-8 12 17 Red Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 20
12.0 J-9 20 19 Brown and Gray Silty SAND w/ Gravel Pieces and Mica M-NP 18 18
13.5 J-10 10 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 31
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR See Note 5 estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-9
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-9 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60984.29, (E) 314691.53 SURF. ELEV. 4.376 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/11/09 DATE FINISH 06/17/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Drilled J-11 12 17 Brown and Gray Silty SAND w/ Gravel Pieces and Mica M-NP 24
Ahead 22 of Casing
16.5 J-12 11 60 Brown Silty SAND, Gravelly M-NP 12 64
18.0 J-13 6 18 Brown Silty SAND, Gravelly M-NP 15 64
19.5 See Note 4 J-14 5 10 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20 21
21.0 J-15 9 15 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 12 18
22.5 Mud J-16 28 33 1st Attempt: No Recovery Used 36 2nd Attempt: Gray Sandy GRAVEL w/ Mica M-NP 5
24.0 See Note 4 J-17 14 36 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 18 34
25.5 J-18 21 32 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 18 36
27.0 J-19 55 51 Gray Sandy GRAVEL, Silty w/ Mica M-NP 8 30
28.5 J-20 26 36 Brown Sandy GRAVEL, Silty w/ Mica M-NP 13 26 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR See Note 5 estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-9
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-9 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60984.29, (E) 314691.53 SURF. ELEV. 4.376 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 06/11/09 DATE FINISH 06/17/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer (2) Drilled through 150mm of Asphalt and 450mm of Road Base before taking sample J-1 (3) Possible Cobbles at 11.3m – 11.9m (4) Borehole collapsed at: (a) 19.0m; (b) 23.5m (5) Drillers: (a) Terry Hebert: 0.0m – 7.5m; (b) Doug Wood: 7.5m – 16.5m; (c) Dave Carter:16.5m–28.95m; (d) James Philbin: Piezometer installation (6) Piezometer installed to 7.62m (7) Well Reading: (a) 0.48m on 6/22/09; (b) 0.85m on 7/1/09; (c) 0.52m on 7/7/09; (d) 0.49m on 7/14/09
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR See Note 5 estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-9
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-10 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61033.191, (E) 314685.177 SURF. ELEV. 6.434 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 07/06/09 DATE FINISH 07/08/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead J-1 10 9 Gray Silty SAND w/ Mica, Wood and Asphalt Pieces (Petroleum Odor) M-NP 76 of 13 Casing
1.5 J-2 15 10 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 10 9
3.0 J-3 9 21 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 32
4.5 Mud J-4 11 17 Brown and Black Silty SAND w/ Gravel Pieces and Mica M-NP 15 Used 14
6.0 J-5 11 11 Brown Silty SAND w/ Mica M-NP 21 11
7.5 J-6 6 6 Dark Brown Silty SAND w/ Mica M-NP 19 8
9.0 J-7 12 16 Dark Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 16
10.5 J-8 10 12 Brown Silty SAND w/ Mica M-NP 18 13
12.0 J-9 13 19 Dark Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 19
13.5 J-10 11 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 25
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-10
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-10 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61033.191, (E) 314685.177 SURF. ELEV. 6.434 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 07/06/09 DATE FINISH 07/08/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 26 30 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-LPL 12
Used 38 Silty CLAY
16.5 J-12 24 26 Gray and Black Silty SAND w/ Mica M-NP 16 26
18.0 J-13 22 30 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 33
19.5 J-14 13 16 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 15 20
21.0 J-15 60 67 Brown Sandy GRAVEL, Silty M-NP 7 75
22.5 J-16 36 55 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 22 58
24.0 J-17 41 50 Brown Silty SAND w/ Mica M-NP 17 50
25.5 J-18 65 56 Brown Silty SAND, Gravelly w/ Mica M-NP 9 61
27.0 J-19 60/0.0 ---- No Recovery ---- ---- ---- See Note 3
28.5 J-20 31 48 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 47 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-10
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-10 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61033.191, (E) 314685.177 SURF. ELEV. 6.434 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 07/06/09 DATE FINISH 07/08/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Drilled through 600mm of Concrete and Road Base before taking sample J-1 (3) Possible Boulders/Cobbles at: (a) 14.5m – 14.8m; (b) 27.0m – 28.15m (4) Drilling mud used; Groundwater not Determined (5) Grouted hole upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-10
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-11 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61072.0103, (E) 314681.1846 SURF. ELEV. 7.282 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/28/09 DATE FINISH 5/1/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Hand J-1 See Note 2 Dark Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 18
Augured
1.5 Spin Casing J-2 4 17 1st Attempt: No Recovery 26 2nd Attempt: Brown Silty SAND, Gravelly w/ Mica M-NP 16
3.0 J-3 43 100/.050 Gray Silty GRAVEL, Sandy M-NP 6 ----
4.5 J-4 8 16 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 17
6.0 J-5 6 8 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 24 11
7.5 J-6 7 8 Brown Silty SAND w/ Mica M-NP 26 8
9.0 J-7 6 6 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 28 6
10.5 J-8 9 10 Brown Silty SAND, Gravelly w/ Mica M-NP 13 10
12.0 Revert J-9 7 9 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 22 Used 14
13.5 J-10 13 13 Brown Silty SAND w/ Mica M-NP 24 12
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P.Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-11
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-11 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61072.0103, (E) 314681.1846 SURF. ELEV. 7.282 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/28/09 DATE FINISH 5/1/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Revert J-11 10 18 Brown Silty SAND w/ Mica M-NP 22
Used 23
16.5 J-12 27 42 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-NP 15 18 Sandy SILT
18.0 J-13 55 100/.025 Brown Sandy SILT, Gravelly M-NP 8 ---- B-1 Run #B-1: Drilled from 18.2m to 19.0m, 3 pieces, Rec. 450mm, BOULDERS
19.5 J-14 48 100/.075 Gray Silty GRAVEL, Sandy M-NP 7 ---- B-2 Run #B-2: Drilled from 19.0m to 20.0m, 7 pieces, Rec. 380mm, BOULDERS +
21.0 COBBLES J-15 41 46 Gray Silty SAND, Gravelly M-NP 14 43
22.5 J-16 18 24 Gray Silty Fine SAND w/ Gravel Pieces M-NP 20 16
24.0 J-17A 11 17 Brown Sandy SILT M-NP 20 J-17B 27 Gray Silty SAND w/ Gravel Pieces and Pockets of Brown Sandy SILT M-NP 21
25.5 J-18 33 28 Brown Silty GRAVEL, Sandy M-NP 10 16
27.0 J-19 43 48 Gray Sandy GRAVEL, Silty M-NP 8 33
28.5 J-20 25 19 Gray Sandy GRAVEL, Silty M-NP 6 29
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P.Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-11
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-11 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61072.0103, (E) 314681.1846 SURF. ELEV. 7.282 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/28/09 DATE FINISH 5/1/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Revert J-21 23 33 Brown Silty SAND w/ Gravel Pieces and Pockets of Brown Sandy SILT M-NP 12
Used 42
31.5 J-22 27 40 Gray Silty SAND w/ Gravel Pieces M-NP 15 43 End of Boring 31.95m Notes: (1) Automatic Hammer Used (2) Hand Augured down to 1.21m because of utilities in the area. Sample J-1 was a hand augured sample. No blow counts available. (3) Possible Boulders/Cobbles at: (a) 3.2m – 3.35m; (b) 17.4m; (c) 28.5m; (d) 30.0m (4) Piezometer installed to 13.7m (5) Readings: (a) 4.5m on 05/01/09; (b) 3.8m on 05/04/09; (c) 3.6m on 05/11/09; (d) 3.6m on 05/18/09; (e) 3.6m on 6/11/09; (f) 3.6m on 6/15/09; (g) 3.6m on 7/14/09
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P.Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-11
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-12 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61119.0875, (E) 314664.6146 SURF. ELEV. 9.951 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 04/23/09 DATE FINISH 04/28/09 CASING O.D. 106 mm I.D. 100 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled J-1 6 10 Dark Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 21
Ahead 13 Of Casing
1.5 J-2 14 9 Brown Sandy SILT w/ Gravel Pieces M-NP 13 5
3.0 J-3 4 6 Brown Sandy SILT w/ Gravel Pieces M-NP 21 9
4.5 J-4 3 18 Brown Silty SAND w/ Gravel Pieces M-NP 12 72
6.0 Revert J-5 29 59 Brown Sandy GRAVEL, Silty M-NP 13 Used 72
7.5 J-6 21 18 Brown Silty SAND w/ Mica M-NP 15 16
9.0 J-7 16 15 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 12
10.5 50/0 See Note 3
12.0 J-8 25 25 Brown Sandy GRAVEL, Silty M-NP 9 37
13.5 J-9 48 74 Brown Sandy GRAVEL, Silty M-NP 9 37
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/ Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 4 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-12
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-12 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61119.0875, (E) 314664.6146 SURF. ELEV. 9.951 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 04/23/09 DATE FINISH 04/28/09 CASING O.D. 106 mm I.D. 100 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Revert J-10 53 67 Brown Sandy GRAVEL M-NP 8
Used 40
16.5 J-11 49 30 Brown Sandy GRAVEL M-NP 10 23
18.0 J-12 7 7 Brown Silty SAND w/ Mica M-NP 22 14
19.5 J-13 11 15 Brown Silty SAND w/ Mica M-NP 22 17
21.0 J-14 23 24 No Recovery ---- ---- 22
22.5 J-15 13 18 Brown and Gray Silty SAND w/ Mica M-NP 24 21
24.0 J-16 20 21 Brown Silty SAND w/ Mica M-NP 22 21
25.5 J-17 15 16 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20 17
27.0 J-18 16 20 Light Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 17
28.5 J-19 19 19 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 20
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/ Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 4 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-12
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-12 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61119.0875, (E) 314664.6146 SURF. ELEV. 9.951 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 04/23/09 DATE FINISH 04/28/09 CASING O.D. 106 mm I.D. 100 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Revert J-20 14 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17
Used 20
31.5 J-21 16 16 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 15
33.0 J-22 18 27 Gray Silty CLAY, Sandy M-PL 24 33
34.5 J-23 10 15 Dark Gray Silty CLAY, Sandy M-PL 26 23
36.0 J-24 13 25 Brown and Gray Fine Sandy SILT M-NP 24 25
37.5 J-25 12 16 Dark Gray Sandy SILT, Clayey M-LPL 24 20
39.0 J-26 9 12 Brown Silty CLAY / Clayey SILT M-PL 27 16
40.5 J-27 32 32 Brown Sandy SILT w/ Gravel Pieces M-NP 16 40
42.0 J-28 16 19 Brown Silty CLAY / Clayey SILT M-PL 25 27 End of Boring 42.45m
43.5
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/ Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 4 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-12
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-12 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61119.0875, (E) 314664.6146 SURF. ELEV. 9.951 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 04/23/09 DATE FINISH 04/28/09 CASING O.D. 106 mm I.D. 100 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Geo-textile fabric used for tree vegetation protection (15.8m²) (3) Possible Boulders/Cobbles at (a) 10.5m – 11.25m; (b) 11.3m – 11.75m; (c) 13.2m; (d) 15.9m – 16.8m; (e) 17.45m – 17.75m (5) Piezometer installed to 13.72m (6) Readings: (a) 6.0m on 4/29/09; (b) 6.0m on 5/12/09; (c) 6.0m on 5/18/09 (d) 6.0m on 6/12/09; (e) 6.0m on 6/15/09; (f) 6.0m on 7/14/09
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/ Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 4 OF 4 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-12
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-13 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61145.8545, (E) 314623.0736 SURF. ELEV. 9.272 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/07/09 DATE FINISH 05/08/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled J-1 4 12 Dark Brown Sandy SILT w/ Root Fibers M-NP 34
Ahead 15 of Casing
1.5 J-2 5 17 Brown Sandy GRAVEL w/ Mica M-NP 12 15
3.0 J-3 7 5 Brown Silty SAND w/ Gravel Pieces M-NP 10 6
4.5 J-4 4 2 Brown Silty SAND w/ Gravel Pieces M-NP 13 4
6.0 J-5 10 22 Gray Sandy SILT w/ Gravel Pieces, Root Fibers and Wood Pieces M-NP 20 20
7.5 Mud 17 15 1st Attempt: No Recovery Used J-6A 7 2nd Attempt: Light Brown, Brown, and Gray Sandy SILT, Clayey M-LPL 22 J-6B Light Brown, Brown, Gray, Black Silty SAND M-NP 23
9.0 J-7 5 10 Brown and Gray Sandy SILT, Clayey M-LPL 29 13
10.5 J-8 44 100/.300 Brown Sandy GRAVEL, Silty M-NP 9 ----
12.0 J-9 18 13 Brown Silty SAND w/ Mica M-NP 22 15
13.5 J-10 12 12 Brown Silty Fine SAND w/ Mica M-NP 30 13
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 1 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-13
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-13 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61145.8545, (E) 314623.0736 SURF. ELEV. 9.272 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/07/09 DATE FINISH 05/08/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 8 11 Brown and Black Silty SAND w/ Gravel Pieces and Mica M-NP 13
Used 11
16.5 J-12 12 10 Brown Silty SAND w/ Mica M-NP 26 13
18.0 J-13 18 22 1st Attempt: No Recovery 22 2nd Attempt: Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18
19.5 J-14 15 17 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 22 17
21.0 J-15 12 14 Brown Silty SAND w/ Mica M-NP 22 17
22.5 J-16 15 17 Brown Silty SAND w/ Mica M-NP 29 18 End of Boring 22.95m
24.0 Notes: (1) Automatic Hammer Used (2) Possible Boulder/Cobbles at 10.8m (3) Drilling mud used, Groundwater not determined (4) Geo-fabric, wood chips, and ground mats used for tree protection (33m²)
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 2 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-13
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-14 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61148.5315, (E) 314572.2893 SURF. ELEV. 5.277 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/14/09 DATE FINISH 05/15/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Spin J-1 2 5 Dark Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 12
Casing 100/.076
1.5 B-1 Run #B-1: Drilled from 1.2m to 1.5m, BOULDER J-2 5 2 Dark Gray Silty SAND, Gravelly M-NP 10 3
3.0 J-3 12 13 Brown Sandy GRAVEL w/ Pieces of Asphalt M-NP 8 20
4.5 J-4 6 14 1st Attempt: No Recovery 11 2nd Attempt: Brown Sandy GRAVEL, Silty M-NP 2
6.0 J-5 5 8 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 7
7.5 J-6 19 21 1st Attempt: No Recovery 19 2nd Attempt: Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19
9.0 Mud J-7 18 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 Used 20
10.5 J-8 10 13 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 15
12.0 J-9 9 16 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 12 16
13.5 J-10 9 17 Brown Silty Fine SAND w/ Mica M-NP 17 16
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 1 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-14
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-14 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61148.5315, (E) 314572.2893 SURF. ELEV. 5.277 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/14/09 DATE FINISH 05/15/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 13 16 Brown Silty Fine SAND w/ Mica M-NP 15
Used 16
16.5 J-12 16 21 1st Attempt: No Recovery 17 2nd Attempt: Brown Silty Fine SAND w/ Mica M-NP 20
18.0 J-13 11 19 Brown Silty Fine SAND w/ Mica M-NP 22 24
19.5 J-14 13 20 Brown Silty Fine SAND w/ Mica M-NP 20 19
21.0 J-15 14 22 Brown Silty Fine SAND w/ Mica M-NP 24 25 End of Boring 21.45m Notes: (1) Automatic Hammer Used (2) Groundwater at 2.9m as per temporary environmental well (3) Lost water at (a) 3.9m; (b) 5.4m
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 2 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-14
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-15 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61196.0693, (E) 314626.8423 SURF. ELEV. 7.544 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 04/06/09 DATE FINISH 04/13/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Spin See Note 2
Casing J-1 9 35 Black and Gray Silty SAND w/ Mica and Pieces of Gravel, Asphalt M-NP 11 50 and Metal (Possible Fill)
1.5 J-2 4 4 Black Sandy GRAVEL, Silty w/ Pieces of Asphalt, Concrete and M-NP 14 6 Wood (Possible Fill)
3.0 J-3 14 7 Wood w/ Gravel Pieces M-NP 106 8
4.5 J-4 5 4 Black and Gray Sandy SILT w/ Gravel Pieces and Wood M-NP 42 4
6.0 J-5 8 4 Brown Silty SAND w/ Mica, Gravel Pieces and Wood Fibers M-NP 18 7
7.5 J-6 4 7 Light Gray Sandy SILT Clayey w/ Gravel Pieces M-LPL 14 16
9.0 B-1 Run #B-1: Drilled from 9.0m to 9.75m, BOULDER/COBBLES J-7 33 100/.076 Brown Sandy GRAVEL, Silty M-NP 8 ----
10.5 J-8 11 18 27 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18
12.0 J-9 12 22 Red and Gray Clayey SILT w/ Gravel Pieces M-LPL 21 34
13.5 J-10 19 26 Brown and Gray Silty SAND w/ Gravel Pieces and Mica M-NP 14 41
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-15
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-15 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61196.0693, (E) 314626.8423 SURF. ELEV. 7.544 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 04/06/09 DATE FINISH 04/13/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Spin J-11 15 21 Gray Silty SAND Gravelly M-NP 14
Casing 19
16.5 J-12 22 49 Gray Silty SAND Gravelly w/ Shells M-NP 10 52
18.0 J-13 20 23 Gray Sandy GRAVEL w/ Shells M-NP 9 22
19.5 Revert J-14 26 32 Gray Sandy GRAVEL w/ Mica M-NP 8 Used 61 B-2 Run #B-2: Drilled from 20.4m to 21.0m, BOULDER/COBBLES
21.0 J-15 36 55 Gray Silty SAND Gravelly w/ Mica M-NP 10 81
22.5 J-16 34 51 1st Attempt: No Recovery 49 2nd Attempt: Gray Silty SAND Gravelly w/ Shells M-NP 19
24.0 J-17 30 41 Brown Sandy GRAVEL, Silty M-NP 8 39
25.5 J-18 41 59 Brown Silty SAND w/ Mica M-NP 18 78
27.0 J-19 33 58 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 64 End of Boring 27.45m
28.5
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-15
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-15 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61196.0693, (E) 314626.8423 SURF. ELEV. 7.544 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 04/06/09 DATE FINISH 04/13/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Safety Hammer Used (2) Drilled through 127mm of Asphalt before taking sample J-1 (3) Lost water at 5.7m, 8.7m, and 13.2m (4) Piezometer installed to 15.0m (5) Readings: (a) 3.4m on 4/14/09; (b) 3.6m on 4/21/09; (c) 3.6m on 4/29/09 (d) 3.6m on 6/15/09; 3.5m on 7/14/09
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-15
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-16 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61192.6240, (E) 314649.2992 SURF. ELEV. 8.856 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 04/03/09 DATE FINISH 04/07/09 CASING O.D. 106 mm I.D. 100 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill See Note 2
Ahead J-1 16 10 Dark Gray and Brown Silty SAND, Gravelly M-NP 9 12
1.5 J-2 15 18 Gray Silty SAND, Gravelly w/ Asphalt M-NP 11 20
3.0 J-3 4 5 Brown Sandy GRAVEL, Silty M-NP 10 6
4.5 J-4 24 32 Brown Sandy GRAVEL, Silty M-NP 10 26
6.0 J-5 4 5 Black and Brown Silty SAND M-NP 22 5
7.5 J-6 8 14 Brown Sandy GRAVEL, Silty M-NP 10 16
9.0 J-7 36 23 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 20 B-1 Run #B-1: Drilled from 9.7m to 10.0m, BOULDER
10.5 J-8 13 16 Brown Sandy SILT w/ Mica M-NP 23 20
12.0 Mud J-9 11 13 Gray and Red Brown Clayey SILT w/ Mica M-LPL 20 Used 17
13.5 J-10 15 13 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 11 22
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-16
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-16 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61192.6240, (E) 314649.2992 SURF. ELEV. 8.856 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 04/03/09 DATE FINISH 04/07/09 CASING O.D. 106 mm I.D. 100 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 16 21 Gray Sandy SILT w/ Gravel Pieces M-NP 12
Used 20
16.5 J-12 17 35 Gray Sandy SILT, Gravelly M-NP 8 23
18.0 J-13 18 23 Dark Gray Silty SAND, Gravelly w/ Mica M-NP 11 16
19.5 J-14 22 24 Dark Gray Silty SAND, Gravelly w/ Mica M-NP 10 24
21.0 J-15 19 22 Dark Gray Silty SAND, Gravelly w/ Mica M-NP 10 23
22.5 J-16 25 25 Dark Gray Silty SAND, Gravelly w/ Mica M-NP 13 26
24.0 J-17 27 34 Brown Silty SAND M-NP 18 36
25.5 J-18 16 23 Brown Silty SAND w/ Gravel Pieces M-NP 18 32
27.0 J-19 25 45 Brown Silty SAND M-NP 18 47
28.5 J-20 23 40 Brown Silty SAND M-NP 21 40 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct Data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-16
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-16 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61192.6240, (E) 314649.2992 SURF. ELEV. 8.856 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 04/03/09 DATE FINISH 04/07/09 CASING O.D. 106 mm I.D. 100 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Drilled through 100mm of Asphalt, 300mm of Fill, and another 100mm of Asphalt before taking J-1 (3) Possible Boulders/Cobbles at (a) 4.5m; (b) 16.0m; (c) 23.5m (4) Drilling mud used, Groundwater not determined (5) Grouted hole upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-16
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-17 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61223.3192, (E) 314631.6123 SURF. ELEV. 4.736 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 04/01/09 DATE FINISH 04/06/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Spin See Note 2
Casing
1.5 J-1 3 6 Brown Silty SAND w/ Gravel Pieces M-NP 20 6
3.0 J-2 21 41 Gray Gravelly SAND, Silty M-NP 12 100/.127 B-1 Run #B-1: Drilled from 3.6m to 4.5m, BOULDER
4.5 J-3 4 5 Black Sandy PEAT w/ Gravel Pieces M-NP 125 8
6.0 J-4 4 7 1st Attempt: No Recovery 16 2nd Attempt: Brown Sandy SILT w/ Gravel Pieces and Wood Pieces M-NP 16 B-2 Run #B-2: Drilled from 7.0m to 7.5m, BOULDER
7.5 J-5 7 8 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 20
9.0 J-6 22 29 Brown and Black Silty SAND w/ Gravel Pieces and Mica M-NP 12 37
10.5 J-7 15 18 Light Brown Gravelly SAND, Silty M-NP 10 18
12.0 J-8 13 14 Gray Gravelly SAND, Silty w/ Mica M-NP 9 25
13.5 J-9 22 22 Gray Gravelly SAND, Silty w/ Mica M-NP 10 19
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-17
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-17 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61223.3192, (E) 314631.6123 SURF. ELEV. 4.736 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 04/01/09 DATE FINISH 04/06/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Spin J-10 13 26 Gray Gravelly SAND, Silty w/ Mica M-NP 11
Casing 34
16.5 J-11 28 18 Gray Gravelly SAND, Silty w/ Mica M-NP 11 15
18.0 J-12 12 33 1st Attempt: No recovery 33 2nd Attempt: Brown Sandy GRAVEL, Silty M-NP 5
19.5 Mud J-13 62 29 Gray Sandy SILT w/ Gravel Pieces M-NP 12 Used 45
21.0 J-14 71 34 Red Brown Gravelly SAND, Silty M-NP 10 24
22.5 J-15 26 47 Brown Sandy GRAVEL, Silty M-NP 10 90
24.0 J-16 67 100 No Recovery. See Note 3 ---- ----
25.5 J-17 18 26 Brown Silty SAND M-NP 21 30
27.0 J-18 23 40 Brown Silty SAND M-NP 23 39
28.5 J-19 32 64 Brown Silty SAND M-NP 22 62 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-17
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-17 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61223.3192, (E) 314631.6123 SURF. ELEV. 4.736 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 04/01/09 DATE FINISH 04/06/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Safety Hammer Used (2) Cored 50.8mm of Asphalt & 406.4mm of concrete before taking J-1. Concrete core fell in hole. Drove casing down 1.5m to retrieve core. (3) Possible Boulders/Cobbles at (a) 3.35m; (b) 24.3m – possibly pushed Cobble (4) Drilling mud used, Groundwater not determined (5) Drilled thru the edge of a 0.3m metal pipe, causing pipe to leak. Pipe was hit at depth 2.4m. MTA Force Main later repaired
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-17
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-18 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61295.1069, (E) 314659.2284 SURF. ELEV. 12.444 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/26/09 DATE FINISH 05/29/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead J-1 5 7 Brown Silty SAND, Gravelly w/ Asphalt M-NP 9 7
1.5 J-2 2 2 Brown and Gray Sandy SILT w/ Gravel Pieces and Asphalt M-NP 13 2
3.0 J-3 20 31 Brown Silty SAND, Gravelly M-NP 7 36
4.5 J-4 3 7 Brown and Dark Gray Sandy SILT w/ Gravel Pieces and Root Fibers M-NP 15 6
6.0 J-5 2 6 Brown Sandy SILT w/ Gravel Pieces M-NP 14 9
7.5 J-6 8 11 Brown and Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 15 14
9.0 J-7 3 3 Brown Sandy SILT w/ Gravel Pieces M-NP 13 5
10.5 J-8 30 38 Brown Sandy SILT, Gravelly w/ Mica M-NP 9 44
12.0 J-9 3 3 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 5
13.5 Mud J-10 6 7 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 12 Used 8
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney/Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-18
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-18 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61295.1069, (E) 314659.2284 SURF. ELEV. 12.444 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/26/09 DATE FINISH 05/29/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 5 5 Brown Sandy SILT w/ Gravel Pieces M-NP 12
Used 4
16.5 J-12 16 100/.050 Brown Silty Fine SAND w/ Gravel Pieces and Mica M-NP 16 ----
18.0 J-13 24 30 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-NP 14 30 Sandy SILT
19.5 J-14 17 17 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 16 26
21.0 J-15 20 17 Brown and Black Silty SAND w/ Gravel Pieces, Mica and Pockets of M-NP 16 25 Brown Sandy SILT
22.5 J-16A 15 22 Brown Sandy SILT, Clayey w/ Mica M-LPL 27 J-16B 32 Gray Silty Fine SAND w/ Mica M-NP 23
24.0 J-17 25 41 Brown Sandy SILT, Clayey w/ Gravel Pieces and Mica M-LPL 19 66
25.5 J-18 16 22 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-NP 12 39 Sandy SILT
27.0 J-19 18 15 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 11 18
28.5 J-20 28 21 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 12 20 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney/Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-18
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-18 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61295.1069, (E) 314659.2284 SURF. ELEV. 12.444 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/26/09 DATE FINISH 05/29/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Drilled through 76.2mm of Asphalt and 76.2mm of Concrete before taking sample J-1 (3) Possible Boulder/Cobbles at: (a) 18.0m; (b) 22.5m (4) Grouted hole upon completion (5) Drilling mud used, Groundwater not determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney/Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-18
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-19 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61168.987, (E) 314610.5229 SURF. ELEV. 5.850 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/11/09 DATE FINISH 05/14/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 3 J-1 1 9 Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 13
16 19 28 42
1.5 Drilled Ahead J-2 10 4 1st Attempt: No Recovery of 3 2nd Attempt: Gray Sandy GRAVEL, Silty w/ Pieces of Concrete M-NP 8 Casing
3.0 J-3 2 2 Brown Silty Fine SAND w/ Gravel Pieces W-NP 19 2
4.5 J-4 5 8 Red Brown Silty Fine SAND, Gravelly M-NP 15 55
6.0 J-5 19 19 Brown Sandy GRAVEL M-NP 7 42
7.5 J-6 14 62 Brown Silty SAND w/ Gravel Pieces M-NP 15 15
9.0 J-7 17 12 Brown Silty SAND w/ Gravel Pieces M-NP 12 13
10.5 J-8 20 24 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 12 30
12.0 Mud J-9 15 13 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 10 Used 13
13.5 J-10 14 15 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 12 17
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-19
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-19 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61168.987, (E) 314610.5229 SURF. ELEV. 5.850 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/11/09 DATE FINISH 05/14/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 22 25 Gray Silty SAND, Gravelly w/ Mica M-NP 11
Used 20
16.5 J-12 25 39 Gray Sandy GRAVEL, Silty M-NP 9 70
18.0 J-13 14 12 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 11 24
19.5 J-14 13 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 22
21.0 J-15 16 26 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20 28
22.5 J-16 16 21 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20 23
24.0 J-17 19 32 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 36
25.5 J-18 17 27 Brown Silty Fine SAND w/ Gravel Pieces and Mica M-NP 24 29
27.0 J-19 19 26 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 21 31
28.5 J-20 24 38 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 21 43
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-19
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-19 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61168.987, (E) 314610.5229 SURF. ELEV. 5.850 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/11/09 DATE FINISH 05/14/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 23 35 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19
Used 43 End of Boring 30.45m
31.5 Notes: (1) Automatic Hammer Used (2) Possible Boulder/Cobbles at 6.0m (3) Drilling mud used, Groundwater not determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-19
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-20 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61389.1508, (E) 314671.2923 SURF. ELEV. 8.948 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/20/09 DATE FINISH 05/26/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead J-1 13 12 Brown Silty SAND, Gravelly M-NP 5 12
1.5 J-2 6 9 Gray Sandy SILT, Gravelly M-NP 12 25
3.0 Mud J-3 4 10 Brown and Gray Sandy SILT, Clayey w/ Gravel Pieces and Mica M-LPL 13 Used 10
4.5 J-4 13 15 1st Attempt: No Recovery 16 2nd Attempt: Gray Sandy GRAVEL, Silty M-NP 6
6.0 J-5 30 36 Dark Brown Silty SAND w/ Gravel Pieces M-NP 8 100/.127
7.5 J-6 18 16 1st Attempt: No Recovery 14 2nd Attempt: Brown Silty SAND w/ Gravel Pieces M-NP 14
9.0 J-7 6 8 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 8
10.5 J-8 3 4 No Recovery. Two Attempts. ---- ---- 6
12.0 J-9 9 8 Black and Gray Silty PEAT w/ Gravel Pieces and Pockets of M-NP 85 7 Gray Sandy SILT See Note 6
13.5 J-10 11 25 1st Attempt: No Recovery 30 2nd Attempt: Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 1 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-20
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-20 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61389.1508, (E) 314671.2923 SURF. ELEV. 8.948 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/20/09 DATE FINISH 05/26/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 13 21 Brown Silty SAND w/ Mica M-NP 25
Used 21 See Note 1
16.5 J-12 12 16 Brown Silty SAND w/ Mica M-NP 21 16
18.0 J-13 13 23 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Gray M-LPL 15 32 Clayey SILT
19.5 J-14 20 36 Gray Sandy SILT, Gravelly w/ Mica M-NP 10 29
21.0 J-15 38 100/.127 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 10 ---- End of Boring 21.6m
22.5 Notes: (1) Safety Hammer used for samples J-1 thru J-11. Automatic Hammer used for samples J-12 thru J-15. (2) Drilled through 101.6mm of Asphalt before taking sample J-1 (3) Lost water at 17.4m (4) Grouted hole upon completion (5) Drilling mud used, Groundwater not determined (6) Attempted Undisturbed Sample at 13.1m to 13.5m - No Recovery
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 2 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-20
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-21 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61495.8695, (E) 314668.2214 SURF. ELEV. 4.951 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/20/09 DATE FINISH 05/27/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead J-1 10 12 Brown and Gray Silty SAND w/ Gravel Pieces, Mica and Pockets of M-NP 10 of 12 Gray Sandy SILT Casing
1.5 J-2 14 10 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 17 7
3.0 J-3 24 21 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 10 21
4.5 J-4 2 3 Black and Brown PEAT M-NP 458 4
6.0 J-5 WH WH Gray Silty Organic CLAY w/ Root Fibers M-PL 84 WH
7.5 J-6 7 5 Gray Organic SILT, Clayey w/ Gravel Pieces and Mica M-LPL 60 8
9.0 J-7 23 34 No Recovery. Two Attempts. ---- ---- 18
10.5 J-8 25 8 Brown Silty SAND, Gravelly w/ Mica M-NP 8 18
12.0 J-9 24 41 Brown Silty SAND, Gravelly M-NP 8 18
13.5 Mud J-10 55 24 Brown Sandy GRAVEL M-NP 6 Used 20
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi / Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 1 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-21
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-21 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61495.8695, (E) 314668.2214 SURF. ELEV. 4.951 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/20/09 DATE FINISH 05/27/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 12 11 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18
Used 13
16.5 J-12 7 8 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 8
18.0 J-13 7 8 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 21 9
19.5 J-14 8 10 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 23 13
21.0 J-15 9 10 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 11
22.5 J-16 16 16 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 17
24.0 J-17 13 14 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 15 End of Boring 24.45m
25.5 Notes: (1) Automatic Hammer Used (2) Drilled through 450mm of Asphalt and Base before taking sample J-1 (3) Drilling mud used, Groundwater not determined (4) Grouted hole upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi / Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 2 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-21
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-22 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61613.3866, (E) 314626.8371 SURF. ELEV. 3.681 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/20/09 DATE FINISH 05/21/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 ---- See Note 2
14 J-1 11 15 Brown Silty SAND, Gravelly w/ Mica M-NP 9 27 12 29
1.5 42 Drilled J-2 17 19 Brown and Gray Silty SAND w/ Mica M-NP 18 Ahead 15
3.0 J-3 8 13 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 15
4.5 J-4 WH WH Black Silty PEAT w/ Gravel Pieces M-NP 162 1 T-5 Brown and Black PEAT M-FM-NP 336 Density 1090 Kg/m³
6.0 J-6 2 2 Dark Gray and Gray Organic SILT w/ Wood Pieces M-NP 111 2
7.5 J-7 WH WH Dark Gray and Gray Organic SILT w/ Wood Pieces M-NP 80 WH T-8 Dark Gray Organic CLAY w/ Layers of Black PEAT M-FM-PL 74 Density 1550 Kg/m³
9.0 J-9 5 10 Brown, Gray and Black Silty SAND w/ Gravel Pieces and Mica M-NP 18 32
10.5 J-10 6 6 Brown and Gray Sandy SILT, Gravelly w/ Mica M-NP 8 11
12.0 J-11 12 12 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20 14
13.5 Mud J-12 9 15 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 Used 16
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 1 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-22
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-22 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61613.3866, (E) 314626.8371 SURF. ELEV. 3.681 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/20/09 DATE FINISH 05/21/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-13 8 12 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 25
Used 12
16.5 J-14 6 13 Brown Silty Fine SAND w/ Mica M-NP 25 21
18.0 J-15 8 14 Brown Silty SAND w/ Mica M-NP 24 20
19.5 J-16 10 18 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-NP 16 21 Sandy SILT End of Boring 19.95m
21.0 Notes: (1) Automatic Hammer Used (2) Drilled 76mm of Asphalt before taking sample J-1 (3) Drilling mud used, Groundwater not determined (4) Grouted hole upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 2 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-22
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-23 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61617.2548, (E) 314654.6926 SURF. ELEV. 4.437 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/28/09 DATE FINISH 05/29/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead J-1 16 12 Brown and Gray Silty SAND w/ Gravel Pieces M-NP 14 12
1.5 J-2 13 15 Brown and Gray Sandy SILT, Gravelly M-NP 14 21
3.0 J-3 17 20 Brown and Gray Sandy SILT w/ Gravel Pieces W-NP 16 14
4.5 Revert J-4 2 2 Dark Gray Organic SILT w/ Layers of Black Silty PEAT M-NP 113 Used 4
6.0 J-5 6 4 Gray and Brown Silty Fine SAND, Clayey w/ Mica M-LPL 28 2
7.5 J-6 7 9 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20 7
9.0 J-7 7 10 Gray and Brown Silty SAND w/ Gravel Pieces and Mica M-NP 24 12
10.5 J-8 6 11 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 29 15
12.0 J-9 8 11 Brown Silty Fine SAND w/ Mica M-NP 28 14
13.5 J-10 10 14 Brown Silty Fine SAND w/ Mica M-NP 25 16
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 1 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-23
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-23 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61617.2548, (E) 314654.6926 SURF. ELEV. 4.437 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/28/09 DATE FINISH 05/29/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Revert J-11 13 19 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18
Used 17
16.5 J-12 14 16 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 21
18.0 J-13 14 15 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 23 15
19.5 J-14 19 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 17 End of Boring 19.95m
21.0 Notes: (1) Automatic Hammer Used (2) Drilled through 300mm of Asphalt and Base before taking sample J-1 (3) Piezometer installed to 15.24m (4) Readings: (a) 0.0m on 7/1/09; (b) 0.0m on 7/7/09; (c) 0.0m on 7/14/09; (Note: Water pressure forces well water above ground level)
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 2 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-23
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-24 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61133.0237, (E) 314609.0197 SURF. ELEV. 10.336 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/08/09 DATE FINISH 05/12/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled J-1 4 6 Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 10
Ahead 7 of Casing
1.5 J-2 2 7 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-NP 15 23 Sandy SILT
3.0 J-3 5 12 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-NP 13 19 Sandy SILT
4.5 J-4 19 16 Brown Silty SAND w/ Gravel Pieces M-NP 13 17
6.0 J-5 9 6 Brown Silty SAND w/ Gravel Pieces M-NP 12 5
7.5 J-6 8 11 Brown Silty SAND w/ Gravel Pieces and Pockets of Brown Sandy SILT M-NP 14 11
9.0 Mud 4 3 1st Attempt: No Recovery Used J-7A 1 2nd Attempt: Dark Gray Silty SAND w/ Gravel Pieces, Mica M-NP 16 J-7B Dark Gray Sandy SILT w/ Gravel Pieces, Mica M-NP 21
10.5 J-8 16 87 Brown Sandy GRAVEL, Silty M-NP 13 50/.025
12.0 J-9 29 50/.075 Brown and Black Silty SAND w/ Gravel Pieces and Mica M-NP 19 ----
13.5 J-10 22 24 No Recovery ---- ---- 23
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/ Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-24
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-24 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61133.0237, (E) 314609.0197 SURF. ELEV. 10.336 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/08/09 DATE FINISH 05/12/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 15 15 Brown Silty SAND w/ Mica M-NP 24
Used 19
16.5 J-12 13 14 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 25 16
18.0 J-13 13 16 Light Brown and Brown Silty SAND w/ Gravel Pieces and Mica M-NP 21 21
19.5 J-14 19 23 Light Brown and Brown Silty SAND w/ Gravel Pieces and Mica M-NP 24 21
21.0 J-15 16 17 Light Brown and Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 18
22.5 J-16 17 21 Brown Silty SAND w/ Mica M-NP 24 24
24.0 J-17 15 19 Brown Silty SAND w/ Mica M-NP 22 23
25.5 J-18 16 20 Brown Silty SAND w/ Mica M-NP 20 23
27.0 J-19A 10 9 Light Brown, Brown and Gray Clayey SILT / Silty CLAY, Sandy M-PL 33 J-19B 8 Dark Gray Silty CLAY M-PL 31
28.5 J-20 14 19 Light Brown Silty SAND w/ Pockets of Gray Clayey SILT M-LPL 23 23
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/ Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-24
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-24 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61133.0237, (E) 314609.0197 SURF. ELEV. 10.336 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/08/09 DATE FINISH 05/12/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 10 7 Gray Silty CLAY M-PL 33
Used 13
31.5 J-22 13 19 Gray Silty SAND w/ Pockets of Dark Gray Clayey SILT M-LPL 20 28
33.0 J-23 8 11 Dark Gray Silty CLAY M-PL 34 11
34.5 J-24 17 18 Dark Gray Clayey SILT, Sandy M-LPL 22 20
36.0 J-25 20 27 Light Gray Silty SAND M-NP 22 29
37.5 J-26 20 24 Light Gray Silty SAND M-NP 20 25
39.0 J-27 11 17 Brown Clayey SILT M-LPL 23 23
40.5 J-28 19 28 Brown Clayey SILT M-LPL 26 24
42.0 J-29 13 19 Brown Clayey SILT M-LPL 22 21 End of Boring 42.45m
43.5 Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at: (a) 10.8m – 11.9m; (b) 12.2m – 12.7m (3) Drilling mud used, Groundwater Not Determined
45.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/ Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Ramp to W/B Union Tpke data samples may not be indicative of the actual material encountered. B.I.N. 1-07609-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-24
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-25 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61467.7027, (E) 314699.5183 SURF. ELEV. 7.318 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/18/09 DATE FINISH 05/19/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Casing See Note 2
to 5.18m J-1 10 10 Brown Sandy GRAVEL, Silty M-NP 10 10
1.5 J-2 17 17 Gray and Black Sandy SILT, Gravelly M-NP 12 12
3.0 J-3 15 11 Brown and Gray Sandy SILT, Gravelly w/ Mica M-NP 12 10
4.5 J-4 19 27 Brown Sandy SILT, Gravelly M-NP 10 Mud 27 Used
6.0 J-5 16 15 Brown and Gray Sandy SILT w/ Gravel Pieces M-NP 13 13
7.5 J-6 6 6 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 13 21
9.0 J-7 11 12 Brown and Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 14 13
10.5 J-8 13 13 No Recovery ---- ---- 10
12.0 J-9 9 7 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 12 7
13.5 J-10 31 35 Brown Silty SAND, Gravelly w/ Mica and Pockets of Brown Sandy SILT M-NP 10 17
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 1 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-25
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-25 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61467.7027, (E) 314699.5183 SURF. ELEV. 7.318 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/18/09 DATE FINISH 05/19/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 24 23 Brown Sandy GRAVEL, Silty w/ Mica M-NP 8
Used 31
16.5 J-12 14 14 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 26 14
18.0 J-13 15 12 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 21 14
19.5 J-14 13 9 Brown Silty SAND, Clayey w/ Gravel Pieces and Mica M-LPL 24 14
21.0 J-15 10 13 Brown Silty SAND w/ Mica M-NP 24 15
22.5 J-16 20 22 Brown Silty Fine SAND w/ Mica M-NP 26 29 End of Boring 22.95m
24.0 Notes: (1) Automatic Hammer Used (2) Drilled through 150mm of Asphalt before taking sample J-1 (3) Drilling mud used, Groundwater not determined (4) Grouted hole upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 2 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-25
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-26 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61426.9983, (E) 314702.6086 SURF. ELEV. 8.650 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/14/09 DATE FINISH 05/19/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead J-1 8 8 Brown Silty SAND, Gravelly M-NP 10 of 4 Casing
1.5 J-2 47 43 Brown Sandy SILT w/ Gravel Pieces and Glass M-NP 8 40
3.0 J-3 17 6 Brown Sandy SILT w/ Gravel Pieces M-NP 11 8
4.5 J-4 5 10 Brown Sandy SILT w/ Gravel Pieces M-NP 10 21
6.0 J-5 6 8 Brown and Dark Gray Sandy SILT w/ Gravel Pieces M-NP 14 7
7.5 J-6 5 13 Dark Brown and Black Sandy SILT w/ Gravel Pieces and Root Fibers M-NP 22 7
9.0 J-7 18 24 Brown Sandy SILT w/ Gravel Pieces M-NP 12 22
10.5 J-8 16 13 Brown Sandy SILT w/ Gravel Pieces M-NP 10 11
12.0 J-9 12 15 Brown Sandy SILT, Gravelly M-NP 11 24
13.5 J-10 12 12 Brown Silty SAND w/ Gravel Pieces M-NP 10 14
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 1 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-26
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-26 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61426.9983, (E) 314702.6086 SURF. ELEV. 8.650 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/14/09 DATE FINISH 05/19/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Drilled J-11 19 20 Brown Silty SAND w/ Gravel Pieces M-NP 13
Ahead 16
16.5 See Note 3 Mud J-12 22 36 Brown Sandy GRAVEL, Silty M-NP 6 Used 26
18.0 J-13 36 42 Brown and Gray Sandy SILT w/ Gravel Pieces M-NP 13 50
19.5 J-14 24 47 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 11 36 End of Boring 19.95m
21.0 Notes: (1) Automatic Hammer Used (2) Drilled through 100mm of Asphalt and 50mm of Concrete before taking sample J-1 (3) Hole collapsed repeatedly, so 16.7m of 106mm casing was installed (4) Possible Cobbles at 18.0m (5) Drilling Mud used, Groundwater not determined (6) Grouted hole upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 2 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-26
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-27 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61416.3677, (E) 314682.2925 SURF. ELEV. 7.544 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/13/09 DATE FINISH 05/15/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead of J-1 11 10 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 10 Casing 9
1.5 J-2 8 7 Brown Sandy SILT w/ Gravel Pieces and Glass M-NP 14 11
3.0 J-3 10 13 Brown and Gray Sandy SILT w/ Gravel Pieces M-NP 12 13
4.5 J-4 10 8 Brown and Gray Sandy SILT, Clayey w/ Gravel Pieces M-LPL 12 9
6.0 Mud J-5 12 12 Brown and Black Sandy SILT, Gravelly w/ Root Fibers M-NP 10 Used 14
7.5 J-6 15 21 Brown and Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 12 30
9.0 J-7 31 24 Brown and Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 11 42
10.5 J-8 9 12 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 13 10
12.0 J-9 11 11 Brown Sandy SILT, Clayey w/ Gravel Pieces and Mica M-LPL 16 16
13.5 J-10 12 17 Brown Sandy SILT w/ Gravel Pieces M-NP 10 22
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 1 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-27
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-X-27 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61416.3677, (E) 314682.2925 SURF. ELEV. 7.544 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/13/09 DATE FINISH 05/15/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 12 50/.025 Black, Brown and Red Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 12
Used ----
16.5 J-12 16 18 Gray Sandy GRAVEL, Silty M-NP 7 28
18.0 J-13 20 21 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 11 23
19.5 J-14 24 24 Gray Sandy GRAVEL, Silty w/ Mica M-NP 7 24 End of Boring 19.95m
21.0 Notes: (1) Automatic Hammer Used (2) Drilled through 127mm of Asphalt and 473mm of Roadway Base before taking sample J-1 (3) Possible Boulders at: (a) 15.175m – 15.775m; (b) 17.0m – 17.45m (4) Drilling mud used, Groundwater not determined (5) Grouted hole upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME data samples may not be indicative of the actual material encountered. B.I.N. SHEET 2 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-X-27
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-28 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61270.7936, (E) 314710.4436 SURF. ELEV. 8.037 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 03/31/09 DATE FINISH 04/01/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Spin J-1 26 29 Dark Brown Silty SAND w/ Gravel Pieces M-NP 11
Casing 20
1.5 J-2 4 3 No Recovery: Two Attempts ---- ---- 2
3.0 J-3 10 16 Dark Brown Clayey SILT w/ Gravel Pieces M-LPL 14 22
4.5 J-4 100/.122 ---- Gray Silty SAND, Gravelly M-NP 11 B-1 ---- Run #B-1: Drilled from 4.7m to 5.4m, BOULDER
6.0 Mud J-5 16 21 Brown Sandy GRAVEL, Silty M-NP 9 Used 23
7.5 J-6 7 9 Brown Silty SAND w/ Gravel Pieces M-NP 20 11
9.0 J-7 22 37 Dark Brown and Black Silty SAND w/ Gravel Pieces M-NP 20 100/.101 B-2 Run #B-2: Drilled from 9.6m to 10.6m, BOULDER
10.5 J-8 15 27 Brown Silty SAND w/ Gravel Pieces M-NP 13 33
12.0 J-9 18 26 Brown and Red Brown Silty SAND w/ Gravel Pieces M-NP 18 27
13.5 J-10 16 21 Brown Silty SAND, Gravelly M-NP 8 19
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-28
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-28 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61270.7936, (E) 314710.4436 SURF. ELEV. 8.037 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 03/31/09 DATE FINISH 04/01/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 14 15 Brown Silty SAND w/ Gravel Pieces M-NP 17
Used 12
16.5 J-12 10 10 Brown Silty SAND w/ Gravel Pieces and Pockets of Brown Clayey SILT M-LPL 15 16
18.0 J-13 21 31 Brown Sandy GRAVEL, Silty M-NP 8 29
19.5 J-14 55 64 No Recovery ---- ---- 37
21.0 J-15 29 32 Brown Silty SAND w/ Gravel Pieces M-NP 14 31
22.5 J-16 17 22 Brown Silty SAND w/ Gravel Pieces M-NP 19 22
24.0 J-17 49 67 No Recovery : Two attempts ---- ---- 51
25.5 J-18 34 35 Brown Silty SAND M-NP 22 37
27.0 J-19 17 31 Brown Silty SAND w/ Gravel Pieces M-NP 19 30
28.5 J-20 22 35 Brown Silty SAND w/ Gravel Pieces M-NP 21 38
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-28
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-28 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61270.7936, (E) 314710.4436 SURF. ELEV. 8.037 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 03/31/09 DATE FINISH 04/01/09 CASING O.D. 114.3 mm I.D. 101.6 mm WEIGHT OF HAMMER-CASING 136 kg HAMMER FALL-CASING 450 mm SAMPLER O.D. 50 mm I.D. 35 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 760 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 23 31 Brown Silty SAND w/ Gravel Pieces M-NP 20
Used 33 End of Boring 30.45m
31.5 Notes: (1) Safety Hammer Used (2) Possible Boulders/Cobbles at (a) 2.9m; (b) 19.95m; (c) 24.0m (3) Drilling mud used, Groundwater not determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-28
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-29 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61228.7925, (E) 314710.1302 SURF. ELEV. 8.556 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 03/31/09 DATE FINISH 04/02/09 CASING O.D. 139.7 mm I.D. 127 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 5
Casing J-1 8 11 Black Silty SAND w/ Gravel Pieces and Cinders M-NP 18 38
1.5 J-2 14 17 Dark Brown Silty SAND, Gravelly M-NP 9 14
3.0 J-3 8 27 Dark Brown Silty SAND, Gravelly M-NP 12 30
4.5 Mud J-4 5 9 Brown Silty SAND w/ Gravel Pieces and Pockets of Dark Gray M-NP 24 Used 9 Sandy SILT
6.0 J-5 17 17 Brown Silty SAND, Gravelly M-NP 10 14
7.5 J-6 21 31 Brown Silty SAND, Gravelly M-NP 8 34
9.0 J-7 22 23 Red Brown Silty SAND w/ Gravel Pieces M-NP 13 18
10.5 J-8 9 20 Brown Sandy SILT w/ Gravel Pieces M-NP 14 22
12.0 J-9 21 27 Brown Silty SAND, Gravelly M-NP 8 34
13.5 J-10 23 22 Brown Silty SAND, Gravelly M-NP 10 20
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 4 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-29
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-29 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61228.7925, (E) 314710.1302 SURF. ELEV. 8.556 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 03/31/09 DATE FINISH 04/02/09 CASING O.D. 139.7 mm I.D. 127 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 17 20 Brown Silty SAND, Gravelly M-NP 11
Used 19
16.5 J-12 26 23 Brown Silty SAND, Gravelly M-NP 9 30
18.0 J-13 7 16 Brown Silty SAND w/ Gravel Pieces M-NP 18 18
19.5 J-14 13 19 Brown Silty SAND w/ Gravel Pieces M-NP 18 22
21.0 J-15 30 40 Brown Silty SAND w/ Gravel Pieces M-NP 21 38
22.5 J-16 21 31 Brown Silty SAND M-NP 18 36
24.0 J-17 17 26 Brown Silty SAND w/ Gravel Pieces M-NP 17 28
25.5 J-18 21 28 Light Brown Silty SAND M-NP 18 32
27.0 J-19 19 26 Brown Silty SAND w/ Gravel Pieces M-NP 15 28
28.5 J-20 20 24 Brown Silty SAND w/ Gravel Pieces M-NP 15 26
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 4 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-29
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-29 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61228.7925, (E) 314710.1302 SURF. ELEV. 8.556 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 03/31/09 DATE FINISH 04/02/09 CASING O.D. 139.7 mm I.D. 127 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 24 26 Brown Silty SAND w/ Gravel Pieces M-NP 16
Used 27
31.5 J-22 20 23 Brown Silty SAND w/ Gravel Pieces M-NP 17 28
33.0 J-23 15 25 Brown Silty SAND w/ Gravel Pieces M-NP 15 32
34.5 J-24 14 24 Brown Silty Fine SAND w/ Pockets of Brown Silty CLAY M-LPL 23 25
36.0 J-25 15 14 Brown Clayey SILT M-LPL 25 17
37.5 J-26 9 15 Brown Clayey SILT M-LPL 25 16
39.0 J-27 7 11 Brown Clayey SILT M-LPL 22 14
40.5 J-28 9 12 Brown Clayey SILT M-LPL 27 16
42.0 J-29 6 10 Brown Clayey SILT M-LPL 24 16
43.5 J-30 11 13 Brown Clayey SILT M-LPL 24 14 See Note 6
45.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 4 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-29
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-29 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61228.7925, (E) 314710.1302 SURF. ELEV. 8.556 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 03/31/09 DATE FINISH 04/02/09 CASING O.D. 139.7 mm I.D. 127 mm WEIGHT OF HAMMER-CASING 63.5 kg HAMMER FALL-CASING 762 mm SAMPLER O.D. 50.8 mm I.D. 34.9 mm WEIGHT OF HAMMER-SAMPLER 63.5 kg HAMMER FALL-SAMPLER 762 mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 45.0 Mud J-31 7 12 Brown Clayey SILT M-LPL 26
Used 16
46.5 J-32 10 12 Brown Silty CLAY M-PL 34 16
48.0 J-33 9 15 Brown Clayey SILT M-LPL 23 25
49.5 J-34 13 26 Brown Clayey SILT M-LPL 23 38 End of Boring 49.95m
51.0 Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at (a) 7.5m; (b) 18.0m (3) Drilling mud used, Groundwater not determined (4) Grouted hole upon completion (5) Drilled through 150mm of Asphalt before taking sample J-1 (6) Attempted tube at 44.8m; only 50mm of penetration with no recovery. Sample was too stiff to penetrate
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 4 OF 4 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-29
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-30 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61171.5478, (E) 314683.5527 SURF. ELEV. 10.971 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/28/09 DATE FINISH 4/30/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill J-1 11 12 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 8
Ahead 11 Spin
1.5 Casing J-2 9 7 Brown Silty SAND w/ Gravel Pieces and Pockets of Brown Sandy SILT M-NP 16 3
3.0 J-3 14 30 Brown Sandy SILT, Gravelly M-NP 9 20
4.5 J-4 63 33 Brown Sandy GRAVEL, Silty M-NP 6 32
6.0 Revert J-5 41 60 Brown Sandy GRAVEL, Silty M-NP 11 Used 45
7.5 J-6 28 28 Brown Sandy SILT, Gravelly M-NP 10 27
9.0 J-7 17 28 Brown Sandy SILT w/ Gravel Pieces M-NP 16 17
10.5 J-8 33 55 Brown Sandy SILT, Gravelly M-NP 10 61
12.0 J-9 22 39 Light Brown and Gray Silty SAND w/ Gravel Pieces M-NP 12 42
13.5 J-10 12 19 Brown Sandy SILT w/ Gravel Pieces M-NP 19 16
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-30
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-30 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61171.5478, (E) 314683.5527 SURF. ELEV. 10.971 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/28/09 DATE FINISH 4/30/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Revert J-11 14 66 Brown Silty SAND, Gravelly M-NP 16
Used 91
16.5 J-12 35 17 Brown Silty SAND, Gravelly M-NP 13 15
18.0 J-13 24 26 Brown Silty SAND w/ Gravel Pieces M-NP 17 23
19.5 J-14 16 21 Brown Silty SAND w/ Mica M-NP 20 23
21.0 J-15 13 12 19 Brown Silty SAND w/ Mica M-NP 19
22.5 J-16 18 26 Brown Silty SAND w/ Mica M-NP 22 29
24.0 J-17 23 27 Brown Silty SAND w/ Mica M-NP 25 29
25.5 J-18 23 28 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 27
27.0 J-19 24 27 Light Brown and Gray Silty SAND w/ Gravel Pieces M-NP 22 31
28.5 J-20 24 36 Brown Silty SAND w/ Mica M-NP 19 37
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-30
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-30 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61171.5478, (E) 314683.5527 SURF. ELEV. 10.971 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/28/09 DATE FINISH 4/30/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Revert J-21 30 38 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14
Used 42 End of Boring 30.45m Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at: (a) 3.5m; (b) 15.5m – 16.1m (3) Piezometer installed to 15.24m (4) Readings: (a) 6.8m on 05/11/09; (b) 6.8m on 05/18/09; (c) 6.8m on 6/12/09; (d) 6.8m on 6/15/09; 6.9m on 7/14/09
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-30
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-31 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61182.7345, (E) 314717.4086 SURF. ELEV. 10.665 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 04/02/09 DATE FINISH 04/07/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead J-1 5 6 Brown Silty SAND w/ Gravel Pieces M-NP 10 Spin 8
1.5 Casing J-2 9 50/.100 Brown Silty SAND w/ Gravel Pieces M-NP 15 ----
3.0 J-3 17 60 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 11 43
4.5 J-4 16 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 16
6.0 Revert J-5 20 100/.13 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 12 Used ----
7.5 J-6 Refusal No Recovery ---- ----
9.0 J-7 19 27 Brown Sandy GRAVEL, Silty M-NP 12 29
10.5 J-8 19 17 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 12 20
12.0 J-9 14 15 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 11 20
13.5 J-10 31 24 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 12 24
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert & Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-31
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-31 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61182.7345, (E) 314717.4086 SURF. ELEV. 10.665 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 04/02/09 DATE FINISH 04/07/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Revert J-11 20 24 Brown Silty SAND w/ Gravel Pieces M-NP 18
Used 25
16.5 J-12 19 20 Brown Silty SAND w/ Mica M-NP 22 24
18.0 J-13 22 27 Brown Silty SAND w/ Mica M-NP 22 28
19.5 J-14 19 23 Brown Silty SAND w/ Mica M-NP 23 28
21.0 J-15 18 25 Brown Silty SAND w/ Mica M-NP 22 30
22.5 J-16 25 31 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 33
24.0 J-17 30 35 Light Brown Silty SAND w/ Mica M-NP 22 35
25.5 J-18 30 30 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 40
27.0 J-19 30 36 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 39
28.5 J-20 32 34 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 38 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert & Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-31
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-31 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61182.7345, (E) 314717.4086 SURF. ELEV. 10.665 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 04/02/09 DATE FINISH 04/07/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Drilled thru 75mm of Asphalt and 450mm of Concrete before taking sample J-1 (3) Possible Boulders at (a) 1.75m – 2.2m; (b) 4.0m – 4.3m; (c) 6.28m – 6.43m; (d) 7.5m – 8.1m; (e) 13.4m – 14.0m (4) Piezometer installed to 18.3m (5) Readings: (a) 6.5m on 4/13/09; (b) 6.5m on 4/15/09; (c) 6.5m on 4/21/09; (d) 6.5m on 4/29/09; (e) 6.5m on 6/12/09; (f) 6.5m on 6/15/09 (g) 6.4m on 7/14/09
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert & Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-31
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DN-B-32 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61152.5806, (E) 314739.693 SURF. ELEV. 12.789 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/01/09 DATE FINISH 05/01/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead J-1 13 15 Brown and Gray Silty SAND w/ Gravel Pieces and Mica M-NP 12 of 10 Casing
1.5 J-2 6 7 Brown and Gray Sandy SILT w/ Gravel Pieces M-NP 20 4
3.0 J-3 2 3 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 3
4.5 J-4 2 3 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 23 3
6.0 J-5 2 3 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 21 2
7.5 J-6 16 14 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 6
9.0 J-7 9 8 Brown Silty SAND, Gravelly w/ Mica M-NP 17 9
10.5 End of Boring 10.5m Notes: (1) Automatic Hammer Used
12.0 (2) Drilled through 300mm of Asphalt and Road Base (3) Roller-bit lost in hole. Could not retrieve roller-bit. (4) Hole abandoned. Moved 4.0m Northwest and started DM-B-32a
13.5
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/ Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 1 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DN-B-32
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-32a COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61151.5154, (E) 314735.9328 SURF. ELEV. 12.681 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/04/09 DATE FINISH 05/06/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled DM-B-32a is a continuation of Hole DN-B-32, drilled to 10.5 m without sampling.
Ahead See Log DN-B-32 for samples from 0.0m to 10.5m. Casing
1.5 Used to 12.8m
3.0
4.5
6.0
7.5
9.0
10.5 J-1 WH 2 Light Brown and Light Gray Silty CLAY / Clayey SILT w/ Gravel Pieces M-PL 27 3
12.0 J-2 2 6 Light Brown and Light Gray Silty CLAY / Clayey SILT w/ Gravel Pieces M-PL 31 10 Mud
13.5 Used J-3 6 9 Brown and Black Silty SAND M-NP 24 12
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/ Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-32a
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-32a COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61151.5154, (E) 314735.9328 SURF. ELEV. 12.681 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/04/09 DATE FINISH 05/06/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-4 11 15 Red Brown Silty SAND w/ Pockets of Gray Sandy SILT M-NP 22
Used 15
16.5 J-5 10 10 Brown and Gray Silty CLAY, Sandy w/ Gravel Pieces and Mica M-PL 22 10
18.0 J-6 9 13 Gray Silty CLAY, Sandy M-PL 26 17
19.5 J-7A 5 6 Brown and Gray Sandy SILT, Gravelly w/ Mica M-NP 17 J-7B 8 Brown Sandy SILT w/ Gravel Pieces M-NP 27
21.0 J-8 6 9 Brown Silty CLAY/Clayey SILT M-PL 28 17
22.5 J-9 7 15 Brown and Gray Clayey SILT M-LPL 18 18
24.0 J-10 10 12 Brown Silty SAND M-NP 20 15
25.5 J-11 13 14 Brown and Gray Silty CLAY, Sandy M-PL 27 20
27.0 J-12A 12 17 Gray Silty CLAY, Sandy M-PL 24 J-12B 17 Red Brown Sandy SILT w/ Mica M-NP 24
28.5 J-13 10 10 No Recovery ---- ---- 9
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/ Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-32a
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-32a COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61151.5154, (E) 314735.9328 SURF. ELEV. 12.681 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/04/09 DATE FINISH 05/06/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-14 8 12 Brown Silty CLAY M-PL 29
Used 14
31.5 J-15 11 18 Brown Silty CLAY M-PL 32 24
33.0 J-16 24 31 Brown Fine Sandy SILT w/ Mica M-NP 26 37
34.5 J-17 8 23 Brown Silty CLAY M-PL 28 14
36.0 J-18 17 17 Brown Fine Sandy SILT M-NP 25 21
37.5 J-19 10 23 Brown Clayey SILT M-LPL 24 33
39.0 J-20 16 22 Brown Clayey SILT M-LPL 26 30
40.5 J-21 14 19 Brown Clayey SILT M-LPL 25 42
42.0 J-22 24 31 Brown Fine Sandy SILT M-NP 26 34 End of Boring 42.45m
43.5 Notes: (1) Automatic Hammer Used (2) Drilling mud used. Groundwater not determined (3) Grouted hole upon completion (4) DM-B-32a was drilled 4.0m Northwest of DN-B-32
45.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert/ Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-32a
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-33 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61124.379, (E) 314685.9284 SURF. ELEV. 10.550 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/20/09 DATE FINISH 4/22/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill J-1 10 7 Gray and Black Silty SAND w/ Gravel Pieces, Mica and Root Fibers M-NP 18
Ahead 12
1.5 Spin J-2 3 4 Gray and Black Silty SAND w/ Gravel Pieces M-NP 14 Casing 10
3.0 J-3 9 8 No Recovery ---- ---- 6
4.5 J-4 6 12 1st Attempt: No Recovery 28 2nd Attempt: Brown Silty SAND, Gravelly w/ Pockets of Brown M-NP 13 Sandy SILT
6.0 J-5 2 6 Brown Sandy SILT, Gravelly w/ Mica M-NP 14 11
7.5 Revert J-6 7 9 Brown Silty SAND w/ Mica M-NP 22 Used 8
9.0 J-7 8 7 Brown Silty SAND w/ Mica M-NP 19 8
10.5 See Note 2
12.0 J-8 31 26 Brown Silty SAND, Gravelly M-NP 10 26
13.5 J-9 20 29 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 26
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-33
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-33 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61124.379, (E) 314685.9284 SURF. ELEV. 10.550 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/20/09 DATE FINISH 4/22/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Revert J-10 18 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18
Used 22
16.5 J-11 22 26 Brown Silty Fine SAND w/ Mica M-NP 21 35
18.0 J-12 15 21 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 30
19.5 J-13 19 27 Brown Silty Fine SAND w/ Mica M-NP 19 31
21.0 J-14 37 40 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 27
22.5 J-15 34 59 Brown Sandy GRAVEL, Silty M-NP 6 32 See Note 3
24.0 J-16 26 29 Brown Silty SAND w/ Mica M-NP 24 27
25.5 J-17 37 34 Brown Silty SAND w/ Mica M-NP 20 35
27.0 J-18 23 25 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 24
28.5 J-19 21 31 Red Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 32
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-33
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-33 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61124.379, (E) 314685.9284 SURF. ELEV. 10.550 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/20/09 DATE FINISH 4/22/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Revert J-20 32 39 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19
Used 43 End of Boring 30.45m
31.5 Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at: (a) 9.6m – 11.7m (3) During sample J-15: (a) Spoon was bent taking sample; (b) Losing drill mud; (c) Gravel found in wash
33.0 (4) Drilling mud used. Groundwater not determined
34.5
36.0
37.5
39.0
40.5
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-33
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-34 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61128.8163, (E) 314711.1885 SURF. ELEV. 11.122 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/14/09 DATE FINISH 4/15/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Spin J-1 7 9 Black and Brown Silty SAND w/ Mica and Pieces of Gravel, M-NP 26
Casing 11 Wood and Root Fibers
1.5 J-2 3 3 Brown Silty SAND w/ Gravel Pieces M-NP 13 3
3.0 J-3 2 2 Brown Silty SAND w/ Pockets of Brown Sandy CLAY, Silty M-LPL 16 3
4.5 J-4 6 3 Brown Silty SAND w/ Gravel Pieces and Mica and Pockets of M-NP 10 4 Gray Sandy SILT
6.0 J-5 4 4 Brown Silty SAND w/ Gravel Pieces and Pockets of Brown Sandy SILT M-NP 13 5
7.5 J-6 4 6 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 21 7
9.0 J-7 17 13 Brown Silty SAND, Gravelly M-NP 13 16
10.5 10.7m J-8 11 12 Brown Sandy SILT w/ Mica M-NP 21 Mud 15 Used
12.0 J-9 12 15 Brown Silty SAND w/ Mica M-NP 18 19
13.5 J-10 39 48 Gray and Brown Sandy GRAVEL, Silty M-NP 8 42
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-34
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-34 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61128.8163, (E) 314711.1885 SURF. ELEV. 11.122 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/14/09 DATE FINISH 4/15/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 15 19 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16
Used 22
16.5 J-12 10 20 Brown Silty SAND w/ Mica M-NP 19 66
18.0 See Note 2 J-13 34 32 No Recovery ---- ---- 39
19.5 J-14 20 22 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 22
21.0 J-15 16 22 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 31
22.5 J-16 20 26 Gray Silty SAND w/ Gravel Pieces and Pockets of Gray Silty CLAY M-LPL 20 27
24.0 J-17 15 25 Gray Silty SAND w/ Gravel Pieces and Pockets of Gray Silty CLAY M-LPL 21 27
25.5 J-18 7 11 Brown Silty CLAY M-PL 27 17
27.0 J-19 10 15 Brown Silty CLAY w/ Layers of Brown Clayey SILT M-PL 24 28
28.5 J-20A 17 23 Brown Silty CLAY/Clayey SILT M-PL 20 J-20B 24 Brown and Gray Silty SAND w/ Mica and Pockets of Brown Silty CLAY M-LPL 16
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-34
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-34 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61128.8163, (E) 314711.1885 SURF. ELEV. 11.122 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/14/09 DATE FINISH 4/15/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 16 20 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15
Used 22
31.5 J-22 22 28 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 30
33.0 J-23 27 32 Brown Silty SAND w/ Mica M-NP 18 35 End of Boring 33.45m Notes: (1) Automatic Hammer used (2) Possible cobbles/boulders at (a) 14.5m – 14.8m; (b) 18.0m– 18.9m (3) Drilling mud used, Groundwater not determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-34
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-35 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61132.3635, (E) 314746.0332 SURF. ELEV. 12.549 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/16/09 DATE FINISH 4/20/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill J-1 6 6 Dark Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 22
Ahead 13
1.5 J-2 10 8 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 9
3.0 J-3 5 6 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 7
4.5 J-4 5 7 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20 8
6.0 J-5 6 6 Brown Silty SAND w/ Mica and Pockets of Brown Sandy SILT M-NP 24 8
7.5 J-6 8 9 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 23 11
9.0 Revert J-7 8 10 Brown Silty SAND w/ Mica M-NP 22 Used 13
10.5 J-8 11 14 Light Brown Silty SAND w/ Mica M-NP 22 16
12.0 J-9 11 12 Brown Silty SAND w/ Mica M-NP 22 13
13.5 J-10 13 14 Brown Silty SAND w/ Mica M-NP 22 16
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-35
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-35 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61132.3635, (E) 314746.0332 SURF. ELEV. 12.549 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/16/09 DATE FINISH 4/20/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Revert J-11 8 10 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Gray M-NP 19
Used 10 Sandy SILT
16.5 J-12 11 12 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 18 14
18.0 J-13 10 14 Gray Silty SAND w/ Mica M-NP 19 16
19.5 J-14 10 12 Gray Silty SAND w/ Mica M-NP 22 14
21.0 J-15 80 61 Dark Gray Sandy GRAVEL, Silty (See Note 2) M-NP 10 46
22.5 J-16 34 25 One Gray Piece of GRAVEL M-NP 1 32 J-17 24 32 Gray Silty SAND w/ Mica M-NP 16 37
24.0 J-18 24 38 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 19 45
25.5 J-19 30 58 Gray Silty SAND w/ Mica M-NP 19 66
27.0 J-20 35 57 Gray Silty SAND w/ Mica M-NP 19 63
28.5 J-21 41 60 Light Brown and Gray Silty SAND w/ Mica M-NP 17 56
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-35
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-35 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61132.3635, (E) 314746.0332 SURF. ELEV. 12.549 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/16/09 DATE FINISH 4/20/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Revert J-22 38 61 Light Brown and Gray Silty SAND w/ Mica M-NP 20
Used 65 End of Boring 30.45m Notes: (1) Automatic Hammer Used (2) Recovered piecies of BOULDER with J-15. Possible Boulder/Cobbles at: (a) 21.45m – 22.5m; (3) Piezometer installed to 12.2m (4) Readings: (a) 8.1m on 4/21/09; (b) 8.0m on 4/24/09; (c) 8.1m on 4/29/09 (d) 8.0m on 5/11/09; (e) 8.0m on 5/18/09; (f) 8.0m on 6/12/09; (g) 8.0m on 6/15/09; 8.0m on 7/14/09
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-35
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-36 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61070.0454, (E) 314708.4385 SURF. ELEV. 8.318 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/23/09 DATE FINISH 4/24/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill J-1 5 6 Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 35
Casing 8
1.5 J-2 30 18 Brown Sandy GRAVEL, Silty w/ Mica M-NP 8 8
3.0 J-3 26 37 Brown Sandy GRAVEL, Silty M-NP 10 30
4.5 J-4 7 11 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 12
6.0 Mud J-5 18 16 Brown Silty SAND, Gravelly M-NP 15 Used 13
7.5 J-6 6 9 Brown Silty SAND w/ Mica M-NP 25 8
9.0 J-7 10 12 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20 14
10.5 J-8 7 10 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 11
12.0 J-9 11 11 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 10
13.5 J-10 13 17 Brown Sandy GRAVEL, Silty w/ Mica M-NP 10 20
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gadddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mailine Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-36
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-36 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61070.0454, (E) 314708.4385 SURF. ELEV. 8.318 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/23/09 DATE FINISH 4/24/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 12 17 Brown Silty SAND w/ Mica M-NP 17
Used 20
16.5 J-12 17 23 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 25
18.0 J-13 28 41 Brown Sandy GRAVEL, Silty M-NP 11 46
19.5 J-14 8 11 Brown Silty CLAY / Clayey SILT M-PL 24 15
21.0 J-15 7 11 Brown Silty CLAY M-PL 43 14
22.5 J-16 5 11 Brown Silty CLAY / Clayey SILT M-PL 26 15
24.0 J-17 10 11 Brown Silty CLAY / Clayey SILT M-PL 25 15
25.5 J-18 7 11 Brown Silty CLAY / Clayey SILT M-PL 22 15
27.0 J-19 9 15 Brown Silty CLAY / Clayey SILT M-PL 24 17
28.5 J-20 9 13 Brown Silty CLAY / Clayey SILT M-PL 24 19
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gadddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mailine Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-36
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-36 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61070.0454, (E) 314708.4385 SURF. ELEV. 8.318 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/23/09 DATE FINISH 4/24/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 26 32 Brown Sandy SILT w/ Mica M-NP 18
Used 42
31.5 J-22 25 36 Brown Sandy SILT w/ Mica M-NP 19 49
33.0 J-23 25 32 Brown Sandy SILT w/ Mica M-NP 20 40 End of Boring 33.45m
34.5 Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at: (a) 18.7m – 19.1m; (b) 32.25m – 32.5m (3) Drilling mud used, Groundwater not determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gadddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mailine Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-36
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-37 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61080.2116, (E) 314732.602 SURF. ELEV. 9.327 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/17/09 DATE FINISH 4/23/09 CASING O.D. 139.7mm I.D. 127mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill J-1 5 5 Brown Sandy SILT, Gravelly w/ Mica M-NP 9
Ahead 7
1.5 J-2 33 18 Light Brown Sandy SILT, Gravelly M-NP 14 12
3.0 J-3 2 2 Light Brown Sandy SILT w/ Gravel Pieces M-NP 19 3
4.5 J-4 10 12 Light Brown Silty SAND w/ Gravel Pieces and Mica M-NP 11 14
6.0 Mud J-5 7 9 Light Brown Silty SAND w/ Mica M-NP 21 Used 10
7.5 J-6 6 9 Light Brown Silty SAND w/ Mica M-NP 21 10
9.0 J-7 7 10 Light Brown Silty SAND w/ Mica M-NP 20 14
10.5 J-8 9 9 Dark Brown Silty SAND w/ Mica M-NP 23 10
12.0 J-9 8 12 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 21 13
13.5 J-10 36 100/.05 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets M-NP 13 ---- of Brown Sandy SILT
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gadddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR G. Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-37
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-37 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61080.2116, (E) 314732.602 SURF. ELEV. 9.327 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/17/09 DATE FINISH 4/23/09 CASING O.D. 139.7mm I.D. 127mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 18 21 Brown Silty SAND, Gravelly w/ Pockets of Brown Sandy SILT M-NP 11
Used 23
16.5 J-12 15 25 Brown and Gray Silty Fine SAND w/ Gravel Pieces and Mica M-NP 17 29
18.0 J-13 24 43 Gray Silty SAND, Gravelly M-NP 11 31
19.5 J-14 22 30 Light Brown Silty SAND w/ Gravel Pieces M-NP 14 31
21.0 J-15 23 31 Light Brown Silty SAND w/ Gravel Pieces M-NP 14 28
22.5 J-16 18 100/.075 Gray Silty SAND w/ Gravel Pieces M-NP 16 ----
24.0 J-17 18 30 Gray Sandy SILT w/ Pockets of Dark Gray Sandy SILT M-NP 16 29
25.5 J-18 21 29 Light Brown Silty SAND w/ Gravel Pieces and Pockets M-LPL 16 31 of Gray Clayey SILT
27.0 J-19 17 26 Light Brown Silty SAND w/ Pockets of Light Gray Sandy SILT M-NP 19 35
28.5 J-20 20 29 Light Brown Silty SAND w/ Pockets of Gray Clayey SILT M-LPL 21 29
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gadddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR G. Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-37
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-37 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61080.2116, (E) 314732.602 SURF. ELEV. 9.327 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/17/09 DATE FINISH 4/23/09 CASING O.D. 139.7mm I.D. 127mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 18 27 Light Brown Silty SAND w/ Gravel Pieces and Pockets M-NP 20
Used 30 of Brown Sandy SILT
31.5 J-22 24 38 Brown Silty SAND M-NP 18 48
33.0 J-23 33 47 Gray Silty SAND w/ Pockets of Dark Gray Sandy SILT M-NP 18 54 End of Boring 33.45m Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at: (a) 13.7m – 14.0m; (b) 16.5m (3) Drilling mud used, Groundwater not determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gadddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR G. Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-37
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-38 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61089.0929, (E) 314768.1816 SURF. ELEV. 11.127 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/7/09 DATE FINISH 4/17/09 CASING O.D. 139.7mm I.D. 127mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 8 J-1 5 7 Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 11
12 14 17 20
1.5 29 17 J-2 10 18 Brown Silty SAND, Gravelly M-NP 12 32 12 34 37
3.0 41 16 J-3 6 5 Brown Silty SAND, Gravelly M-NP 10 21 6 26 27
4.5 33 19 J-4 3 5 Brown Sandy SILT w/ Gravel Pieces M-NP 19 20 7 24 31
6.0 38 Drilled J-5 5 8 Brown Sandy SILT w/ Gravel Pieces M-NP 15 0.1m 11 Casing
7.5 J-6 14 11 Brown Silty SAND w/ Gravel Pieces M-NP 13 13
9.0 J-7 13 11 Brown and Dark Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 10
10.5 J-8 8 12 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets M-NP 14 24 of Brown Sandy SILT
12.0 J-9 8 7 Brown and Gray Silty SAND w/ Gravel Pieces M-NP 13 5
13.5 J-10 18 23 Gray Sandy GRAVEL, Silty M-NP 7 41
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-38
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-38 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61089.0929, (E) 314768.1816 SURF. ELEV. 11.127 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/7/09 DATE FINISH 4/17/09 CASING O.D. 139.7mm I.D. 127mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 J-11 25 23 Gray Silty SAND, Gravelly M-NP 11
26
16.5 J-12 27 31 Gray Sandy GRAVEL, Silty M-NP 9 32
18.0 J-13 21 100 Gray Sandy GRAVEL, Silty M-NP 9 ---- See Note 3
19.5 Drilled J-14 24 25 Gray Sandy GRAVEL, Silty M-NP 9 Ahead 30 See Note 3
21.0 J-15 52 51 Gray Sandy GRAVEL, Silty M-NP 5 18
22.5 J-16 18 21 Gray Sandy GRAVEL, Silty M-NP 6 23
24.0 Mud J-17 19 21 Gray Silty SAND w/ Gravel Pieces M-NP 15 Used 20
25.5 J-18 27 25 Gray Silty SAND w/ Gravel Pieces M-NP 19 21
27.0 J-19 18 20 Gray Silty SAND w/ Gravel Pieces M-NP 20 22
28.5 J-20 15 19 Gray Silty SAND M-NP 20 22
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-38
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-38 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61089.0929, (E) 314768.1816 SURF. ELEV. 11.127 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/7/09 DATE FINISH 4/17/09 CASING O.D. 139.7mm I.D. 127mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 20 14 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 17
Used 13
31.5 J-22 13 14 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 20 13
33.0 J-23 46 55 Gray Silty SAND, Gravelly M-NP 14 24
34.5 J-24 8 9 Brown Silty SAND w/ Gravel Pieces M-NP 22 15
36.0 J-25 20 27 Light Brown Silty SAND w/ Gravel Pieces M-NP 17 30
37.5 J-26 21 29 Light Brown Silty SAND w/ Mica M-NP 19 30
39.0 J-27 25 43 Brown Silty SAND w/ Gravel Pieces M-NP 19 47 End of Boring 39.45m Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at: (a) 5.5m – 5.8m; (b) 6.7m – 7.1m; (c) 11.3m – 11.5m; (d) 14.0m – 14.4m; (e) 16.2m – 16.55m; (f) 17.7m – 18.0m; (g) 20.0m – 20.5m; (h) 27.5m – 28.0m; (i) 32.7m – 33.0m (3) Driller had trouble keeping hole open at 18.6m, so 0.1m casing was drilled down to 19.5m, also, lost drilling fluid at 18.6m. Used 4.5m of 139.7mm casing and 24.3m of 106mm casing. (4) Drilling mud used, Groundwater not determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-38
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-39 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61090.1905, (E) 314790.0112 SURF. ELEV. 13.027 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/07/09 DATE FINISH 05/08/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 3 J-1 1 2 Black and Brown Sandy SILT w/ Root Fibers M-NP 34
6 5 14 20
1.5 26 12 J-2 7 6 Brown Silty SAND, Gravelly w/ Mica M-NP 10 17 6 19 30
3.0 33 16 J-3 5 5 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 11 17 6 22 23
4.5 27 14 J-4 1 2 Brown and Gray Sandy SILT w/ Gravel Pieces M-NP 17 19 2 19 31
6.0 37 Drilled J-5 28 24 Brown Silty SAND w/ Gravel Pieces M-NP 10 Ahead 23 of Casing
7.5 J-6 13 14 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-LPL 15 28 Clayey SILT
9.0 Mud J-7 12 15 Brown Silty SAND w/ Gravel Pieces M-NP 15 Used 17
10.5 J-8 15 44 Brown and Gray Silty SAND, Gravelly M-NP 12 35
12.0 J-9 13 14 Brown and Gray Silty SAND, Gravelly M-NP 11 16
13.5 J-10 11 12 Gray and Brown Sandy SILT w/ Gravel Pieces M-NP 14 14
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-39
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-39 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61090.1905, (E) 314790.0112 SURF. ELEV. 13.027 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/07/09 DATE FINISH 05/08/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 23 25 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 12
Used 16
16.5 J-12 12 13 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 17 13
18.0 J-13 14 26 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 12 20
19.5 J-14 25 11 Dark Gray Silty SAND / Sandy SILT w/ Gravel Pieces M-NP 12 12
21.0 J-15 17 14 Dark Gray Silty SAND / Sandy SILT w/ Gravel Pieces M-NP 11 100/.100
22.5 J-16 19 16 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 13 18
24.0 J-17 36 35 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 12 41
25.5 J-18 26 29 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 16 33
27.0 J-19 32 58 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 14 62
28.5 J-20 27 38 Brown Silty SAND w/ Mica M-NP 18 43 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-39
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-39 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61090.1905, (E) 314790.0112 SURF. ELEV. 13.027 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/07/09 DATE FINISH 05/08/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Possible Boulders at: 21.4m – 22.0m (3) Drilling mud used, Groundwater not determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-39
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-40 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61046.7943, (E) 314710.9178 SURF. ELEV. 6.193 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/27/09 DATE FINISH 4/27/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 7 J-1 3 3 Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 16
12 6 18 23
1.5 28 16 J-2 3 3 Brown and Gray Sandy SILT, Clayey w/ Root Fibers M-LPL 21 17 3 30 31
3.0 35 27 J-3 12 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 36 14 38 44
4.5 49 Mud J-4 4 4 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 32 Used 5
6.0 J-5 6 7 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 22 10
7.5 J-6 7 10 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 23 12
9.0 J-7 6 10 Brown Silty SAND w/ Mica M-NP 24 13
10.5 J-8 11 12 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 14
12.0 J-9 9 11 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 14
13.5 J-10 9 12 Brown Silty SAND w/ Mica M-NP 24 13
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gadddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-40
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-40 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61046.7943, (E) 314710.9178 SURF. ELEV. 6.193 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/27/09 DATE FINISH 4/27/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 10 13 Brown and Black Silty SAND w/ Mica M-NP 23
Used 17
16.5 J-12 13 16 Dark Brown and Black Silty SAND w/ Gravel Pieces and Mica M-NP 18 18
18.0 J-13 19 24 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 28
19.5 J-14 9 12 Brown Silty CLAY M-PL 30 14
21.0 J-15 9 17 Brown Silty CLAY / Clayey SILT M-PL 22 26
22.5 J-16 33 38 Gray and Light Brown Silty GRAVEL, Sandy M-NP 8 45
24.0 J-17 24 39 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 11 45
25.5 J-18 36 50 Gray Silty SAND w/ Mica M-NP 16 55
27.0 J-19 36 56 Gray Silty Fine SAND w/ Mica M-NP 18 60 End of Boring 27.45m
28.5 Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at: (a) 24.0m (3) Drilling mud used, Groundwater not determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gadddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. G. Greinke same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-40
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-41 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61050.7248, (E) 314726.8866 SURF. ELEV. 8.052 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/01/09 DATE FINISH 05/06/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled J-1 2 2 Dark Brown Silty SAND w/ Root Fibers M-NP 25
Ahead 2 of Casing
1.5 J-2 9 15 Brown Silty SAND w/ Gravel Pieces, Mica and Root Fibers M-NP 12 18
3.0 J-3 8 2 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 21 3
4.5 J-4 18 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 12
6.0 J-5 14 14 Brown Silty SAND w/ Gravel Pieces and Mica (See Note 5) M-NP 21 11
7.5 J-6 19 20 No Recovery. Two Attempts. ---- ---- 18
9.0 J-7 8 7 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20 7
10.5 J-8 17 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 13
12.0 NW J-9 15 14 Dark Brown Silty SAND, Gravelly M-NP 13 Casing 13 to 27m
13.5 J-10 9 12 Brown Silty SAND w/ Mica M-NP 21 14
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-41
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-41 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61050.7248, (E) 314726.8866 SURF. ELEV. 8.052 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/01/09 DATE FINISH 05/06/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 NW J-11 33 26 Brown Silty SAND, Gravelly M-NP 10
Casing 18 to 27m
16.5 J-12 19 31 Brown Sandy GRAVEL, Silty M-NP 8 48
18.0 J-13 100/0 ---- No Recovery ---- ---- B-1 ---- Run #B-1: Drilled from 18.0m to 18.5m, Rec. 200mm, BOULDER B-2 Run #B-2: Drilled from 18.5m to 19.5m, BOULDER/COBBLES
19.5 J-14 8 14 Brown Silty CLAY / Clayey SILT M-PL 25 18
21.0 J-15 6 8 Brown Silty CLAY / Clayey SILT M-PL 22 18
22.5 J-16 5 10 Brown Silty CLAY / Clayey SILT M-PL 24 15
24.0 J-17 13 19 Brown Silty CLAY M-PL 27 27
25.5 J-18 7 11 Brown Silty CLAY M-PL 27 14
27.0 Mud J-19 4 9 Brown Silty CLAY / Clayey SILT M-PL 25 Used 10
28.5 J-20 6 10 Brown Silty CLAY / Clayey SILT M-PL 26 14
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-41
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-41 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61050.7248, (E) 314726.8866 SURF. ELEV. 8.052 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/01/09 DATE FINISH 05/06/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Revert J-21 9 9 Brown Silty CLAY / Clayey SILT M-PL 24
Used 13
31.5 J-22 4 10 Brown Silty CLAY / Clayey SILT M-PL 26 12
33.0 J-23 7 12 Brown Clayey SILT M-LPL 23 18
34.5 J-24A 14 48 Brown Clayey SILT M-LPL 22 J-24B 61 Brown Silty SAND w/ Gravel Pieces M-NP 14
36.0 J-25 22 24 Gray Silty SAND w/ Gravel Pieces M-NP 14 30
37.5 J-26 9 17 Brown Clayey SILT M-LPL 19 25
39.0 J-27 9 15 Brown Clayey SILT M-LPL 25 25
40.5 J-28 12 19 Brown Clayey SILT / Silty CLAY M-PL 22 24
42.0 J-29 10 19 Brown Clayey SILT / Silty CLAY M-PL 22 25 End of Boring 42.45m Notes:
43.5 (1) Automatic Hammer Used (2) Piezometer installed to 15.24m (3) Readings: (a) 4.04m on 05/08/09; (b) 4.26m on 05/11/09; (c) 4.26m on 05/18/09; (d) 4.26m on 6/15/09; (e) 4.33m on 7/14/09 (4) Very Poor Recovery of Material for J-5 (47 grams) without re-sampling
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-41
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-42 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61057.9501, (E) 314780.9218 SURF. ELEV. 12.337 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/05/09 DATE FINISH 05/11/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Spin J-1 3 3 Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 13
Casing 4
1.5 B-1 Run #B-1: Drilled from 1.2m to 1.5m, BOULDER + COBBLE J-2 4 9 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 16 15
3.0 J-3 3 4 1st Attempt: No Recovery 4 2nd Attempt: Brown Gravelly SILT, Sandy M-NP 19
4.5 J-4 6 9 Brown Silty SAND, Gravelly w/ Mica M-NP 11 10
6.0 J-5 3 4 Brown Silty SAND w/ Gravel Pieces M-NP 14 5
7.5 J-6 12 10 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 5
9.0 B-2 Run #B-2: Drilled from 8.8m to 9.0m, COBBLE J-7 43 57 Brown Silty SAND, Gravelly w/ Mica M-NP 8 60
10.5 B-3 Run #B-3: Drilled from 10.3m to 10.5m, COBBLE J-8 12 13 Brown and Gray Gravelly SILT, Sandy M-NP 12 14
12.0 J-9 27 21 Gray Gravelly SILT, Sandy M-NP 12 21 B-4 Run #B-4: Drilled from 13.1m to 13.5m, BOULDER + COBBLES
13.5 J-10 13 20 Gray Gravelly SILT, Sandy M-NP 10 27 B-5 Run #B-5: Drilled from 14.3m to 14.6m, COBBLE
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-42
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-42 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61057.9501, (E) 314780.9218 SURF. ELEV. 12.337 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 05/05/09 DATE FINISH 05/11/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Spin J-11 25 21 1st Attempt: No Recovery
Casing 17 2nd Attempt: Gray Gravelly SILT, Sandy M-NP 11
16.5 J-12 8 8 Gray Gravelly SILT, Sandy M-NP 12 8
18.0 J-13 8 15 Gray Gravelly SILT, Sandy M-NP 10 15
19.5 J-14 46 23 Gray Gravelly SILT, Sandy M-NP 9 24 B-6 Run #B-6: Drilled from 20.6m to 21.2m, COBBLES
21.0 J-15 16 20 Gray Gravelly SILT, Sandy M-NP 10 26
22.5 Revert J-16 68 100 No Recovery ---- ---- Used B-7 ---- Run #B-7: Drilled from 23.3m to 24.0m, BOULDER + COBBLES
24.0 B-8 Run #B-8: Drilled from 24.0m to 25.0m, BOULDER + COBBLES J-17 39 51 Gray Silty SAND w/ Mica M-NP 17 64
25.5 J-18 44 45 Gray Silty SAND w/ Mica M-NP 16 42
27.0 J-19 38 56 Brown and Gray Silty SAND w/ Gravel Pieces and Mica M-NP 14 58
28.5 J-20 28 42 Gray Silty SAND w/ Gravel Pieces M-NP 14 42 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-42
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-42 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61057.9501, (E) 314780.9218 SURF. ELEV. 12.337 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 05/05/09 DATE FINISH 05/11/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Lost water at: (a) 1.95m; (b) 7.95m; (c) 9.45m; (d) 14.6m; (e) 15.45m; (f) 21.45m; (g) 25.05m (3) Piezometer installed to 13.95m (4) Readings: (a) 7.0m on 5/12/09; (b) 7.8m on 5/13/09; (c) 7.7m on 5/18/09 (d) 7.7m on 6/10/09; (e) 7.8m on 6/15/09
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-42
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-43 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61008.3724, (E) 314723.2813 SURF. ELEV. 12.558 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/29/09 DATE FINISH 5/4/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Spin J-1 7 7 Brown Silty SAND w/ Gravel Pieces, Mica and Root Fibers M-NP 15
Casing 6
1.5 J-2 11 9 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 11
3.0 J-3 4 4 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 11 5
4.5 J-4 9 5 Brown and Gray Sandy SILT w/ Gravel Pieces M-NP 16 4
6.0 J-5 7 7 Brown and Gray Clayey SILT w/ Gravel Pieces and Asphalt M-LPL 17 9
7.5 B-1 Run #B-1: Drilled from 7.3m to 7.5m, COBBLES J-6 4 5 Light Brown and Gray Clayey SILT w/ Mica M-LPL 20 6
9.0 J-7 14 20 Brown Silty SAND w/ Gravel Pieces M-NP 16 20
10.5 J-8 12 15 Brown Silty SAND w/ Mica M-NP 20 15
12.0 J-9 18 22 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 20
13.5 J-10 17 21 Brown Silty SAND w/ Mica M-NP 22 25
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Rudy Rios / D. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-43
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-43 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61008.3724, (E) 314723.2813 SURF. ELEV. 12.558 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/29/09 DATE FINISH 5/4/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Spin J-11 17 22 Brown Silty SAND w/ Mica M-NP 15
Casing 26
16.5 Mud J-12 18 23 Black and Dark Brown Silty SAND w/ Gravel Pieces and Mica M-NP 12 Used 25
18.0 J-13 15 22 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 25
19.5 J-14 100/.076 ---- Brown Silty SAND w/ Gravel Pieces M-NP 12 ---- B-2 Run #B-2: Drilled from 20.7m to 21.9m, Rec. 350mm, BOULDER + COBBLE
21.0 J-15 27 32 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 33
22.5 J-16 22 33 Brown Silty SAND M-NP 16 44
24.0 J-17 24 35 Brown Silty SAND M-NP 19 35
25.5 J-18 25 41 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 12 46
27.0 J-19 47 34 Gray Silty SAND w/ Gravel Pieces M-NP 13 25
28.5 J-20 22 28 Gray Silty SAND w/ Gravel Pieces M-NP 12 23
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Rudy Rios / D. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-43
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-43 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61008.3724, (E) 314723.2813 SURF. ELEV. 12.558 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/29/09 DATE FINISH 5/4/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 14 24 Gray Silty SAND w/ Mica M-NP 17
Used 24
31.5 J-22 15 29 Gray Silty SAND w/ Gravel Pieces M-NP 13 25
33.0 J-23 22 37 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 35
34.5 J-24 30 41 Gray and Black Silty Fine SAND w/ Mica M-NP 24 44 End of Boring 34.95m
36.0 Notes: (1) Automatic Hammer Used (2) Drilling mud used, Groundwater not determined (3) Lost water at: (a) 2.6m; (b) 4.1m; (c) 5.6m
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Rudy Rios / D. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-43
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DN-B-44 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61025.485, (E) 314722.48 SURF. ELEV. 7.416 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/23/09 DATE FINISH 4/23/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill J-1 See Note 2 Dark Brown Silty SAND w/ Mica and Root Fibers M-NP 17
Ahead
1.5 Spin J-2 12 22 Brown Sandy GRAVEL, Silty M-NP 7 Casing 16
3.0 J-3 7 10 Brown Sandy GRAVEL, Silty M-NP 6 21 Hole Abandoned 3.6m
4.5 Notes: (1) Automatic Hammer Used (2) Sample J-1 was hand augured due to utilities in the area. Blow counts are not available. Numerous cobbles + boulders encountered while
6.0 hand digging. (3) Driller unable to advance boring, hole abandoned and moved 4.5m south. New hole designated DM-B-44a.
7.5
9.0
10.5
12.0
13.5
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul + P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 1 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DN-B-44
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-44a COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61021.742, (E) 314773.028 SURF. ELEV. 7.946 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/23/09 DATE FINISH 4/27/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Spin DM-B-44a is a continuation of Hole DN-B-44. Drilled to 4.5 m without sampling.
Casing See Log DN-B-44 for samples from 0m to 4.5m.
1.5
3.0 B-1 Run #B-1: Drilled from 3.0m to 3.7m, BOULDER + COBBLES
4.5 J-1 8 9 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 17 15
6.0 J-2 17 24 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-NP 13 25 Sandy SILT
7.5 J-3 20 20 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-NP 12 15 Sandy SILT
9.0 J-4 17 21 Gray Silty SAND, Gravelly w/ Mica M-NP 11 18
10.5 J-5 23 21 Gray Silty GRAVEL, Sandy M-NP 7 23 B-2 Run #B-2: Drilled from 11.6m to 12.0m, BOULDER + COBBLE
12.0 J-6 39 28 Dark Gray Silty SAND, Gravelly w/ Mica M-NP 10 33
13.5 J-7 28 38 Dark Gray Silty SAND, Gravelly w/ Mica M-NP 9 43
15.0 B-3 Run #B-3: Drilled from 14.9m to 15.0m, COBBLE The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-44a
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-44a COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61021.742, (E) 314773.028 SURF. ELEV. 7.946 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/23/09 DATE FINISH 4/27/09 CASING O.D. 114.3mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 760mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-8 14 23 Dark Gray Silty SAND, Gravelly w/ Mica M-NP 10
Used 20
16.5 J-9 26 32 Brown Silty GRAVEL, Sandy M-NP 7 27
18.0 J-10 16 21 No Recovery. Two Attempts. ---- ---- 21
19.5 J-11 14 25 Gray Silty SAND w/ Mica M-NP 18 36
21.0 J-12 31 48 Gray Silty SAND w/ Mica M-NP 19 48
22.5 J-13 42 56 Gray Silty SAND w/ Mica M-NP 18 53
24.0 J-14 21 29 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 18 37
25.5 J-15 19 36 Brown and Black Silty SAND w/ Mica M-NP 20 45
27.0 J-16 24 50 Brown Silty SAND w/ Gravel Pieces M-NP 11 57 End of Boring 27.45m
28.5 Notes: (1) Automatic Hammer Used (2) Drilling mud used, Groundwater not determined (3) Lost water at: (a) 1.5m; (b) 3.9m
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul & P. Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 2 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-44a
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-45 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60987.927, (E) 314752.657 SURF. ELEV. 12.777 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/7/09 DATE FINISH 4/9/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill J-1 1 1 Black and Brown Silty SAND w/ Root Fibers and Gravel Pieces M-NP 31
Ahead 3 Spin
1.5 Casing J-2 11 9 Brown Silty SAND w/ Gravel Pieces, Asphalt and Mica M-NP 12 7
3.0 J-3 2 3 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets M-NP 22 3 of Brown Sandy SILT
4.5 J-4 3 4 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets M-NP 18 4 of Brown Sandy SILT
6.0 Revert J-5 18 13 Brown Silty SAND, Gravelly M-NP 16 Used 10
7.5 J-6 4 5 Light Brown and Gray Sandy SILT, Clayey w/ Mica M-LPL 21 6
9.0 J-7 11 10 Light Brown and Gray Sandy SILT, Clayey w/ Gravel Pieces M-LPL 15 14
10.5 J-8 8 10 Gray Silty SAND w/ Mica and Pockets of Brown Silty CLAY M-LPL 23 11
12.0 J-9 50 11 Brown and Gray Silty SAND, Gravelly M-NP 15 12
13.5 J-10 7 9 No Recovery ---- ---- 12
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert/ L. Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. R. Dietz same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-45
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-45 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60987.927, (E) 314752.657 SURF. ELEV. 12.777 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/7/09 DATE FINISH 4/9/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Revert J-11 12 7 Gray Sandy GRAVEL, Silty M-NP 10
Used 23
16.5 J-12 19 17 Gray Sandy GRAVEL, Silty M-NP 7 15
18.0 J-13 20 36 Gray Sandy GRAVEL, Silty M-NP 9 26 End of Boring 18.45m Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at: (a) 6.6m – 7.2m; (b) 11.3m – 11.9m; (c) 15.5m – 17.0m (3) Lost core barrel in borehole. Multiple attempts to retrieve core barrel failed. (4) Hole abandoned and moved 0.9m west. New hole named DM-B-45a. (5) Open well not installed. See Boring DM-B-45a for water levels
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert/ L. Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. R. Dietz same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 2 OF 2 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-45
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-45a COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60987.5172, (E) 314753.7865 SURF. ELEV. 12.756 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/10/09 DATE FINISH 4/13/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill DM-B-45a is a continuation of Hole DM-B-45, drilled to 19.5 m without sampling.
Ahead See Log DM-B-45 for samples J-1 to J-13. Drilled
1.5 Casing
3.0
4.5
6.0
7.5
9.0
10.5
12.0
13.5
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert/ L. Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/R. Dietz same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-45a
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-45a COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60987.5172, (E) 314753.7865 SURF. ELEV. 12.756 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/10/09 DATE FINISH 4/13/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Drill DM-B-45a is a continuation of Hole DM-B-45, drilled to 19.5 m without sampling.
Ahead See Log DM-B-45 for samples J-1 to J-13. Drilled
16.5 Casing
18.0 Mud Used
19.5 J-14 45 52 Gray Sandy GRAVEL, Silty M-NP 11 45
21.0 J-15 6 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 21
22.5 J-16 29 37 Gray and Brown Silty SAND w/ Gravel Pieces M-NP 16 37
24.0 J-17 7 22 Gray Sandy SILT M-NP 30 33
25.5 J-18 23 24 Gray Silty SAND, Gravelly M-NP 12 23
27.0 J-19 20 20 Gray Silty SAND, Gravelly M-NP 11 26
28.5 J-20 30 20 Brown Silty SAND M-NP 19 18
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert/ L. Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/R. Dietz same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-45a
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-45a COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60987.5172, (E) 314753.7865 SURF. ELEV. 12.756 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/10/09 DATE FINISH 4/13/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 30 40 Gray and Brown Silty SAND w/ Gravel Pieces M-NP 15
Used 44
31.5 J-22 22 27 Gray Silty Fine SAND w/ Gravel Pieces and Mica M-NP 20 29
33.0 J-23 32 40 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 14 41 End of Boring 33.45m
34.5 Notes: (1) Automatic Hammer Used (2) DM-B-45a was drilled 0.9m west of DM-B-45 (3) Piezometer Installed to 12.2m (4) Readings: (a) 7.7m on 4/14/09; (b) 7.7m on 4/21/09; (c) 7.8m on 4/29/09 (d) 7.8m on 6/12/09; (e) 7.8m on 6/15/09; (f) 7.6m on 7/14/09
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert/ L. Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/R. Dietz same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-45a
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-46 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60957.7405, (E) 314750.9916 SURF. ELEV. 12.299 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 3/27/09 DATE FINISH 4/1/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill J-1 4 8 Dark Brown Silty SAND w/ Gravel Pieces M-NP 12
Ahead 12
1.5 Spin J-2 4 4 Light Brown Silty SAND w/ Gravel Pieces M-NP 14 Casing 13
3.0 J-3 24 46 Dark Gray Sandy GRAVEL, Silty M-NP 3 27
4.5 J-4 21 21 Light Brown Sandy GRAVEL, Silty M-NP 7 52
6.0 J-5 18 22 Light Brown Sandy GRAVEL, Silty M-NP 9 24
7.5 J-6 24 17 No Recovery ---- ---- 15
9.0 J-7 14 9 Red Brown Silty SAND w/ Gravel Pieces M-NP 14 50/.075
10.5 Mud J-8 12 26 Brown and Gray Silty SAND w/ Gravel Pieces M-NP 11 Used 12
12.0 J-9 32 35 Brown Silty SAND w/ Gravel Pieces M-NP 14 24
13.5 J-10 57 68 Brown Silty SAND, Gravelly M-NP 12 48
15.0 B-1 Run #B-1: Drilled from 14.0m to 14.75m, BOULDER + COBBLES The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert / G.Stringer estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-46
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-46 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60957.7405, (E) 314750.9916 SURF. ELEV. 12.299 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 3/27/09 DATE FINISH 4/1/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 26 33 Brown Silty SAND w/ Gravel Pieces M-NP 17
Used 28
16.5 J-12 32 40 Light Gray Silty SAND, Gravelly M-NP 9 28
18.0 J-13 31 55 Gray Silty SAND w/ Gravel Pieces M-NP 21 61
19.5 J-14 20 20 Red Brown Silty SAND w/ Gravel Pieces M-NP 14 20
21.0 J-15 13 17 No Recovery ---- ---- 18
22.5 J-16 20 23 Gray and Brown Silty SAND w/ Gravel Pieces M-NP 16 25
24.0 J-17 43 30 Brown Silty SAND w/ Gravel Pieces M-NP 17 27
25.5 J-18 32 41 Brown Silty SAND M-NP 18 58
27.0 J-19 34 50 Red Brown Silty SAND w/ Gravel Pieces M-NP 14 47
28.5 J-20 32 39 Brown Silty SAND w/ Gravel Pieces M-NP 14 41
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert / G.Stringer estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-46
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-46 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60957.7405, (E) 314750.9916 SURF. ELEV. 12.299 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 3/27/09 DATE FINISH 4/1/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 34 36 Brown Silty SAND M-NP 18
Used 50 End of Boring 30.45m Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at: (a) 3.45m – 4.5m; (b) 5.0m – 6.0m; (c) 6.6m (3) Drilling mud used, Groundwater not determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert / G.Stringer estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-46
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-47 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60901.7348, (E) 314735.0151 SURF. ELEV. 8.261 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/19/09 DATE FINISH 06/23/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled J-1 1 2 Brown and Black Silty SAND w/ Gravel Pieces and Mica M-NP 18
Ahead 3 of Casing
1.5 J-2 11 16 Red and Brown Silty SAND w/ Gravel Pieces and Mica M-NP 21 27
3.0 J-3 7 10 Brown Silty SAND w/ Mica M-NP 21 11
4.5 J-4 7 9 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 21 8
6.0 J-5 7 12 Brown Silty SAND w/ Mica M-NP 19 16
7.5 J-6 11 15 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 17
9.0 J-7 8 12 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 21 16
10.5 Mud J-8 14 25 Dark Brown Silty SAND, Gravelly w/ Mica M-NP 12 Used 37
12.0 J-9 9 9 Dark Brown Silty SAND, Gravelly w/ Mica M-NP 14 15
13.5 J-10 8 7 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 22 9
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR James Philbin estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/Wayne Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-47
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-47 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60901.7348, (E) 314735.0151 SURF. ELEV. 8.261 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/19/09 DATE FINISH 06/23/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud See Note 2
Used
16.5 J-11 17 20 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 20 21
18.0 J-12 32 26 Brown Silty SAND, Gravelly w/ Mica M-NP 10 27
19.5 J-13 32 30 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 27
21.0 J-14 22 25 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 29
22.5 J-15 25 30 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 29
24.0 J-16 26 25 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 30
25.5 J-17 49 60 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 37
27.0 J-18 18 20 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 28
28.5 J-19 25 32 Red Brown Silty SAND w/ Mica M-NP 19 41
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR James Philbin estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/Wayne Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-47
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-47 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60901.7348, (E) 314735.0151 SURF. ELEV. 8.261 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 06/19/09 DATE FINISH 06/23/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-20 29 34 Brown Silty SAND w/ Mica M-NP 22
Used 40 End of Boring 30.45m
31.5 Notes: (1) Automatic Hammer Used (2) Possible Boulder at 14.47m – 16.15m (3) Drilling mud used, Groundwater not Determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR James Philbin estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/Wayne Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-47
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-48 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60914.191, (E) 314778.4052 SURF. ELEV. 11.130 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 3/25/09 DATE FINISH 3/30/09 CASING O.D. 139.7mm I.D. 127mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill J-1 6 9 Black and Brown Silty SAND, Gravelly M-NP 14
Ahead 12
1.5 J-2 4 3 Brown Sandy GRAVEL, Silty M-NP 9 2
3.0 J-3 4 4 Brown Silty SAND, Gravelly M-NP 12 6
4.5 J-4 3 3 Brown Silty SAND w/ Gravel Pieces and Wood Pieces M-NP 29 11
6.0 J-5 7 9 Gray Silty SAND, Gravelly M-NP 10 12
7.5 Revert J-6 7 12 Gray Silty SAND, Gravelly M-NP 10 Used 15
9.0 J-7 11 10 Gray Sandy GRAVEL, Silty M-NP 10 12
10.5 J-8 16 100/.050 Gray Silty SAND, Gravelly M-NP 10 ---- B-1 Run #B-1: Drilled from 10.9m to 11.1m, Rec. 177mm, BOULDER
12.0 J-9 17 25 Gray Silty SAND, Gravelly M-NP 8 22 B-2 Run #B-2: Drilled from 13.1m to 13.5m, Rec. 381mm, BOULDER
13.5 J-10 53 100/.050 Gray Silty SAND, Gravelly M-NP 11 ---- B-3 Run #B-3: Drilled from 13.7m to 14.2m, Rec. 500mm, BOULDERS
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR G. Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-48
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-48 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60914.191, (E) 314778.4052 SURF. ELEV. 11.130 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 3/25/09 DATE FINISH 3/30/09 CASING O.D. 139.7mm I.D. 127mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Revert J-11 18 21 Gray Sandy GRAVEL, Silty M-NP 7
Used 100/.025
16.5 J-12 27 28 Gray and Brown Silty SAND, Gravelly M-NP 10 30
18.0 J-13 25 53 Gray Silty SAND, Gravelly M-NP 11 59
19.5 J-14 26 38 Black and Gray Silty SAND w/ Gravel Pieces M-NP 18 42
21.0 J-15 27 34 Black and Gray Silty SAND w/ Gravel Pieces M-NP 19 46
22.5 J-16 18 23 Gray Silty SAND w/ Gravel Pieces M-NP 16 23
24.0 J-17 17 28 Brown Silty SAND M-NP 22 31
25.5 J-18 22 23 Red Brown Silty SAND w/ Gravel Pieces M-NP 15 15
27.0 J-19 16 20 Brown Silty SAND M-NP 21 27
28.5 J-20 13 24 Gray and Brown Silty SAND M-NP 23 23
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR G. Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-48
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-48 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60914.191, (E) 314778.4052 SURF. ELEV. 11.130 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 3/25/09 DATE FINISH 3/30/09 CASING O.D. 139.7mm I.D. 127mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Revert J-21 16 20 Brown Silty SAND M-NP 19
Used 22
31.5 J-22 20 28 Red Brown and Gray Silty SAND w/ Gravel Pieces M-NP 18 30
33.0 J-23 26 26 Gray Silty SAND, Gravelly M-NP 9 37
34.5 J-24 31 39 Gray Silty SAND, Gravelly M-NP 8 32
36.0 J-25 55 61 Gray Silty SAND, Gravelly M-NP 9 100/.050 End of Boring 36.45m Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at (a) 3.5m – 4.5m; (b) 6.0m; (c) 9.8m – 10.1m; (d) 16.5m (3) Piezometer installed to 15.2m (4) Readings: (a) 5.79m on 3/30/09; (b) 7.62m on 3/31/09; (c) 6.7m on 4/7/09; (d) 6.9m on 6/12/09; (e) 6.9m on 6/15/09
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR G. Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-48
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-49 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60873.8578, (E) 314785.5185 SURF. ELEV. 10.22 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/05/09 DATE FINISH 06/10/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead J-1 6 13 Black and Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of M-NP 14 of 16 Brown Sandy SILT Casing
1.5 J-2 7 10 Brown and Red Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 13 15
3.0 J-3 14 14 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 11 19
4.5 J-4 9 10 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 15
6.0 J-5 12 15 Dark Gray Sandy SILT, Gravelly M-NP 9 17
7.5 Mud J-6 10 16 Dark Gray Sandy SILT, Gravelly M-NP 9 Used 15
9.0 J-7 27 19 Dark Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 12 23
10.5 J-8 12 16 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 10 17
12.0 J-9 13 16 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 10 22
13.5 J-10 12 18 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 10 18
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/W. Guo/J. Curely Same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-49
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-49 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60873.8578, (E) 314785.5185 SURF. ELEV. 10.22 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/05/09 DATE FINISH 06/10/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 24 24 Black and Gray Silty SAND w/ Gravel Pieces and Mica M-NP 11
Used 20
16.5 J-12 22 100 Gray Sandy GRAVEL, Silty M-NP 9 ----
18.0 See Note 3 J-13 20 23 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 20 21
19.5 J-14 29 45 Black and Gray Silty SAND w/ Mica M-NP 22 49
21.0 J-15A 19 25 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 21 J-15B 35 Black PEAT M-NP 60
22.5 J-16 9 10 Brown Silty SAND w/ Mica M-NP 22 11
24.0 J-17 16 16 Brown and Gray Silty SAND w/ Mica M-NP 22 8
25.5 J-18 26 39 Red Brown Silty SAND w/ Mica M-NP 18 35
27.0 J-19 26 34 Red Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 36
28.5 J-20 39 46 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 11 55 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/W. Guo/J. Curely same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-49
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-49 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60873.8578, (E) 314785.5185 SURF. ELEV. 10.22 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 06/05/09 DATE FINISH 06/10/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Drilled through 75mm of Asphalt and 75mm of Concrete before taking Sample J-1 (3) Possible Boulders at: (a) 15.7m – 16.0m, (b) 16.8m – 18.45m (4) Drilling mud used; Groundwater not Determined (5) Grouted hole upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/W. Guo/J. Curely same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Greg Marney fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-49
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-50 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60884.46, (E) 314796.6369 SURF. ELEV. 11.111 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 3/24/09 DATE FINISH 3/27/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill J-1 3 13 Dark Brown and Black Silty SAND w/ Root Fibers and Gravel Pieces M-NP 20
Ahead 14 Spin
1.5 Casing J-2 5 7 Light Brown and Red Brown Silty Fine SAND M-NP 20 10
3.0 J-3 13 15 Light Brown Silty SAND w/ Gravel Pieces M-NP 11 15
4.5 J-4 6 11 Light Brown Silty SAND w/ Gravel Pieces M-NP 10 10
6.0 J-5 12 12 1st Attempt: No Recovery 13 2nd Attempt: Brown and Gray Silty SAND w/ Gravel Pieces M-NP 10
7.5 J-6 19 17 1st Attempt: No Recovery 20 2nd Attempt: One Piece of Gravel ---- ----
9.0 J-7 12 17 1st Attempt: No Recovery 27 2nd Attempt: Dark Gray Silty SAND w/ Gravel Pieces M-NP 10
10.5 J-8 50/.076 ---- Black and Gray Silty SAND w/ Gravel Pieces and Mica M-NP 11 ----
12.0 J-9 14 12 Brown and Gray Silty SAND w/ Root Fibers and Gravel Pieces M-NP 10 24
13.5 Mud J-10 20 14 Dark Brown and Gray Silty SAND w/ Gravel Pieces and Mica M-NP 10 Used 15
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert / G.Stringer estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-50
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-50 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60884.46, (E) 314796.6369 SURF. ELEV. 11.111 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 3/24/09 DATE FINISH 3/27/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 14 13 Gray Silty SAND w/ Mica M-NP 23
Used 17
16.5 J-12 18 19 Gray Gravelly SAND, Silty M-NP 8 45
18.0 J-13 100/.150 ---- Gray Sandy GRAVEL, Silty M-NP 8 ----
19.5 J-14 100/.050 ---- No Recovery ---- ---- ----
21.0 J-15 30 36 Brown Silty SAND M-NP 16 43
22.5 J-16 25 33 Brown Silty SAND w/ Gravel Pieces M-NP 14 34
24.0 J-17 9 18 Brown and Red Brown Silty SAND M-NP 20 30
25.5 J-18 80 82 Brown and Red Brown Silty SAND, Gravelly M-NP 8 55
27.0 J-19 27 36 Brown and Red Brown Silty SAND M-NP 18 36
28.5 J-20 38 31 Gray Silty SAND w/ Gravel Pieces M-NP 20 33
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert / G.Stringer estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-50
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-50 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60884.46, (E) 314796.6369 SURF. ELEV. 11.111 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 3/24/09 DATE FINISH 3/27/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 39 42 Brown and Gray Silty SAND w/ Gravel Pieces M-NP 13
Used 55 End of Boring 30.45m Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at: (a) 2.3m – 2.75m; (b) 8.5m; (c) 10.576m – 11.2m; (d) 17.0m – 18.0m; (e) 18.15m – 18.90m; (f) 19.55m – 20.3m; (g) 20.375m – 20.675m; (h) 25.0m – 25.3m (3) Drilling mud used, Groundwater not determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Herbert / G.Stringer estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-50
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-51 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60832.959, (E) 314813.137 SURF. ELEV. 11.987 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/08/09 DATE FINISH 06/11/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled See Note 2
Ahead J-1 14 19 Brown Silty SAND w/ Gravel Pieces, Mica and Pockets of Brown M-LPL 14 of 24 Clayey SILT Casing
1.5 J-2 20 30 Red Brown and Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 14 27
3.0 J-3 37 36 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 10 19
4.5 J-4 24 15 Gray and Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 13
6.0 Mud J-5 31 35 No Recovery ---- ---- Used 30
7.5 J-6 10 10 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 14 14
9.0 J-7 11 9 Red Brown Silty SAND w/ Gravel Pieces and Mica M-NP 15 10
10.5 J-8 11 11 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 16 9
12.0 J-9A 9 9 Gray and Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 16 J-9B 10 Gray Sandy SILT w/ Gravel Pieces M-NP 12
13.5 J-10 8 8 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 12 10
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-51
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-51 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60832.959, (E) 314813.137 SURF. ELEV. 11.987 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/08/09 DATE FINISH 06/11/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 11 44 Gray Sandy SILT w/ Gravel Pieces M-NP 13
Used 16
16.5 J-12 12 11 Gray Sandy SILT w/ Gravel Pieces M-NP 13 14
18.0 See Note 3 J-13 18 33 Brown Silty Fine SAND w/ Mica M-NP 25 37
19.5 J-14 50 44 Gray Sandy GRAVEL M-NP 5 42
21.0 J-15 21 23 Gray and Black Silty SAND w/ Gravel Pieces and Mica M-NP 20 29
22.5 J-16 36 34 Gray Silty Fine SAND w/ Gravel Pieces and Mica M-NP 24 36
24.0 J-17 33 31 Gray Silty Fine SAND w/ Gravel Pieces and Mica M-NP 15 33
25.5 J-18 36 45 Gray Silty Fine SAND w/ Gravel Pieces and Mica M-NP 22 45
27.0 J-19 36 50/.050 Gray Silty Fine SAND w/ Gravel Pieces and Mica M-NP 19 ----
28.5 J-20 55 59 Gray Silty Fine SAND w/ Gravel Pieces and Mica M-NP 25 59 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-51
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-51 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60832.959, (E) 314813.137 SURF. ELEV. 11.987 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 06/08/09 DATE FINISH 06/11/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Drilled through 228mm of Asphalt and Base before taking sample J-1 (3) Possible Boulders at: (a) 6.55m – 6.85m, (b) 17.7m – 18.6m (4) Drilling mud used; Groundwater not determined (5) Borehole grouted upon completion
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-51
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-52 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60843.6528, (E) 314823.3083 SURF. ELEV. 15.237 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/14/09 DATE FINISH 4/16/09 CASING O.D. 114mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill J-1 See Note 2 Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 10
Ahead
1.5 Spin J-2 4 10 Brown Sandy GRAVEL, Silty M-NP 9 Casing 100/.102 B-1 Run #B-1: Drilled from 2.0m to 3.0m, BOULDER + COBBLES +
3.0 Reinforced Concrete J-3 6 7 Brown Silty SAND, Gravelly M-NP 11 27
4.5 J-4 31 41 Brown Sandy GRAVEL, Silty M-NP 5 42
6.0 J-5 16 16 Red Brown Silty SAND w/ Gravel Pieces M-NP 14 14
7.5 J-6 6 10 Red Brown Silty SAND w/ Gravel Pieces M-NP 12 13
9.0 Revert J-7 6 12 Red Brown Silty SAND w/ Gravel Pieces M-NP 14 Used 10
10.5 J-8 6 10 Light Brown Silty SAND w/ Gravel Pieces M-NP 20 8
12.0 J-9 11 11 1st Attempt: No Recovery 11 2nd Attempt: Brown Sandy GRAVEL, Silty M-NP 6
13.5 J-10 9 10 Brown Silty SAND w/ Gravel Pieces M-NP 13 10
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul / P Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-52
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-52 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60843.6528, (E) 314823.3083 SURF. ELEV. 15.237 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/14/09 DATE FINISH 4/16/09 CASING O.D. 114mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Revert J-11 9 12 Brown and Gray Silty SAND w/ Gravel Pieces and Mica M-NP 13
Used 17
16.5 J-12 5 6 Red and Brown SAND w/ Gravel Pieces and Mica M-NP 15 11
18.0 J-13 7 12 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 11
19.5 J-14 16 16 No Recovery ---- ---- 17
21.0 J-15 12 20 Gray Silty SAND w/ Gravel Pieces M-NP 11 15
22.5 J-16 57 100/.076 Brown Silty SAND, Gravelly M-NP 11 ----
24.0 J-17 24 31 Gray Silty SAND, Gravelly M-NP 11 37
25.5 J-18 31 37 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 34
27.0 J-19 27 36 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 38
28.5 J-20 36 56 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 57
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul / P Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-52
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-52 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60843.6528, (E) 314823.3083 SURF. ELEV. 15.237 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/14/09 DATE FINISH 4/16/09 CASING O.D. 114mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Revert J-21 32 47 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 15
Used 53 End of Boring 30.45m
31.5 Notes: (1) Automatic Hammer Used (2) Sample J-1 was hand dug due to fear of hitting utilities. No blow counts. (3) Possible Boulders/Cobbles at 22.56m (4) Lost water at 19.2m, 21.0m & 23.4m (5) Piezometer installed to 18.0m (6) Readings: (a) 4.8m on 4/17/09; (b) 5.2m on 4/20/09; (c) 5.3m on 4/21/09 (d) 9.0m on 6/15/09; (e) 9.1m on 7/1/09; (f) 9.3m on 7/7/09; (g) 9.4m on 7/14/09
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul / P Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-52
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-53 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60824.9379, (E) 314837.8052 SURF. ELEV. 14.083 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/17/09 DATE FINISH 4/20/09 CASING O.D. 114mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drill J-1 See Note 2 Dark Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 14
Ahead Spin
1.5 Casing J-2 16 14 Brown Sandy SILT w/ Gravel Pieces M-NP 9 16 B-1 Run #B-1: Drilled from 2.1m to 2.4m, COBBLE
3.0 J-3 6 8 Gray Sandy SILT w/ Gravel Pieces M-NP 11 9
4.5 J-4 11 15 Brown Silty SAND w/ Gravel Pieces and Pockets of Brown Sandy SILT M-NP 11 24
6.0 J-5 10 14 Brown Silty GRAVEL, Sandy M-NP 6 14
7.5 J-6 8 9 Brown Silty SAND w/ Gravel Pieces M-NP 13 11
9.0 J-7 11 22 1st Attempt: No Recovery 24 2nd Attempt: Brown Silty SAND w/ Gravel Pieces M-NP 15
10.5 J-8 9 11 1st Attempt: No Recovery ---- ---- 12 2nd Attempt: No Recovery
12.0 J-9 11 15 Red Brown Sandy SILT w/ Gravel Pieces M-NP 13 20
13.5 J-10 7 9 Gray Silty SAND w/ Gravel Pieces M-NP 12 9
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul / P Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-53
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-53 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60824.9379, (E) 314837.8052 SURF. ELEV. 14.083 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 4/17/09 DATE FINISH 4/20/09 CASING O.D. 114mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Spin J-11 13 100/.101 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 12
Casing B-2 ---- Run #B-2: Drilled from 15.3m to 15.6m, Rec. 300mm, COBBLE
16.5 Mud J-12 14 15 Gray Sandy GRAVEL, Silty w/ Mica and Root Fibers M-NP 8 Used 17
18.0 J-13 7 13 Dark Gray Sandy SILT, Gravelly M-NP 10 14
19.5 J-14 100/.140 ---- Brown Sandy GRAVEL, Silty M-NP 8 ----
21.0 J-15 33 43 Brown and Light Brown Silty SAND w/ Mica M-NP 18 63
22.5 J-16 30 45 Brown and Light Brown Silty SAND w/ Mica M-NP 21 50
24.0 J-17 30 39 Black and Gray Silty Fine SAND w/ Mica M-NP 21 47
25.5 J-18 32 75 Black and Gray Silty Fine SAND w/ Mica M-NP 20 98
27.0 J-19 32 47 Black and Gray Silty SAND w/ Mica M-NP 22 47
28.5 J-20 37 61 Gray Silty SAND w/ Mica M-NP 19 61
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul / P Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-53
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-53 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure & Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60824.9379, (E) 314837.8052 SURF. ELEV. 14.083 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 4/17/09 DATE FINISH 4/20/09 CASING O.D. 114mm I.D. 101.6mm WEIGHT OF HAMMER-CASING 136kg HAMMER FALL-CASING 450mm SAMPLER O.D. 50mm I.D. 35mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 41 65 Gray Silty SAND w/ Mica M-NP 19
Used 91 End of Boring 30.45m
31.5 Notes: (1) Automatic Hammer Used (2) Sample J-1 was hand dug due to fear of hitting utilities. No blow counts. (3) Possible Boulders/Cobbles at 20.1m (4) Drilling mud used, Groundwater not determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR D. Gopaul / P Gopaul estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Robert Sidorski fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling &Testing, Inc. HOLE DM-B-53
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-54 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60937.4464, (E) 314760.2072 SURF. ELEV. 11.543 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/23/09 DATE FINISH 06/25/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled J-1 5 8 Dark Brown Sandy SILT w/ Gravel Pieces and Metal M-NP 17
Ahead 10 of Casing
1.5 J-2 4 5 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 7
3.0 J-3 5 8 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 12 10
4.5 J-4 13 100 Brown Sandy GRAVEL, Silty M-NP 10 ----
6.0 J-5 29 26 Brown Silty SAND, Gravelly w/ Mica M-NP 11 18
7.5 J-6 11 24 Brown Silty SAND, Gravelly M-NP 10 22
9.0 Mud J-7 50/0.0 ---- No Recovery. Refusal ---- ---- Used ----
10.5 J-8 18 18 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 15
12.0 J-9 40 23 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 11 41
13.5 J-10 47 82 Brown Silty SAND, Gravelly w/ Mica and Pockets of Gray Sandy SILT M-NP 9 38
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/Wayne Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Phil Calise fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-54
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-54 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60937.4464, (E) 314760.2072 SURF. ELEV. 11.543 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/23/09 DATE FINISH 06/25/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 50/0.0 ---- No Recovery ---- ----
Used ----
16.5 J-12 17 41 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 12 71
18.0 J-13 21 36 Brown Silty SAND w/ Mica M-NP 15 43
19.5 J-14 13 24 Gray Silty SAND w/ Mica M-NP 20 29
21.0 J-15 20 23 Gray Silty Fine SAND w/ Mica M-NP 23 23
22.5 J-16 21 34 Brown and Black Silty SAND w/ Gravel Pieces and Mica M-NP 13 42
24.0 J-17 32 36 Brown Silty SAND w/ Mica M-NP 16 38
25.5 J-18 28 33 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 12 31
27.0 J-19 19 22 Brown Silty SAND w/ Mica M-NP 17 27
28.5 J-20 26 40 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 41 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/Wayne Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Phil Calise fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-54
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-54 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60937.4464, (E) 314760.2072 SURF. ELEV. 11.543 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 06/23/09 DATE FINISH 06/25/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Possible Boulder/Cobbles at: (a) 4.8m – 5.4m; (b) 17.1m – 17.4m (3) Drilling mud used; Groundwater Not Determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/Wayne Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Phil Calise fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME N/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-C SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-54
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-55 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60877.007, (E) 314753.951 SURF. ELEV. 9.158 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/17/09 DATE FINISH 06/22/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Spun J-1 2 12 Dark Brown and Black Silty SAND w/ Mica, Gravel Pieces and Glass M-NP 11
Casing 4
1.5 J-2 4 7 Brown Sandy SILT, Gravelly w/ Mica M-NP 6 4
3.0 J-3 12 22 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 11 34
4.5 J-4 11 30 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 10 22
6.0 J-5 19 28 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 10 36
7.5 J-6 17 29 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 9 29
9.0 Mud J-7 23 100/0.100 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 10 Used ----
10.5 J-8 51 40 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 11 44
12.0 J-9 18 24 Gray Sandy SILT w/ Gravel Pieces and Mica M-NP 12 17
13.5 J-10 15 23 Brown Silty SAND w/ Mica M-NP 24 25
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR G. Marney / P. Calise fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-55
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-55 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60877.007, (E) 314753.951 SURF. ELEV. 9.158 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/17/09 DATE FINISH 06/22/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 20 26 Red Brown Silty SAND w/ Mica M-NP 22
Used 27
16.5 J-12 15 17 Brown Silty SAND w/ Mica M-NP 16 21
18.0 J-13 35 40 Brown Silty SAND, Gravelly w/ Mica M-NP 10 57
19.5 J-14 27 17 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 19 19
21.0 J-15 48 63 No Recovery. Two Attempts. ---- ---- 56
22.5 J-16 47 76 Brown Silty SAND, Gravelly M-NP 9 66
24.0 J-17 24 56 Brown Silty Fine SAND w/ Gravel Pieces, Mica and Pockets of Brown M-NP 18 65 Sandy SILT
25.5 J-18 32 52 Brown Silty SAND w/ Mica M-NP 16 56
27.0 J-19 25 47 Brown Silty SAND w/ Mica and Pockets of Black and Gray Sandy SILT M-NP 18 57
28.5 J-20 38 47 Gray Silty SAND w/ Gravel Pieces and Mica M-NP 15 40 End of Boring 28.95m
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR G. Marney / P. Calise fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-55
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-55 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60877.007, (E) 314753.951 SURF. ELEV. 9.158 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 06/17/09 DATE FINISH 06/22/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 Notes: (1) Automatic Hammer Used (2) Possible Boulder/Cobbles at: (a) 6.0m; (b) 8.5m; (c) 17.0m – 18.0m (3) Drilling mud used; Groundwater not Determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR P. Gaddis estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR G. Marney / P. Calise fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME S/B VWE Mainline Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-0 SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-55
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-56 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61109.8564, (E) 314769.4242 SURF. ELEV. 11.383 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/29/09 DATE FINISH 07/01/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled J-1 3 3 Dark Brown Sandy SILT w/ Gravel Pieces and Root Fibers M-NP 19
Ahead 5 of Casing
1.5 J-2 7 5 Brown Sandy SILT w/ Gravel Pieces M-NP 16 5
3.0 J-3 15 7 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 16 10
4.5 J-4 14 31 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 13 24
6.0 J-5 21 18 Brown Sandy SILT w/ Gravel Pieces and Mica M-NP 11 17
7.5 Mud J-6 23 17 Brown Sandy GRAVEL, Silty M-NP 9 Used 24
9.0 J-7 26 22 Brown Silty SAND, Gravelly M-NP 12 21
10.5 J-8 33 33 Brown Silty SAND, Gravelly M-NP 14 27
12.0 J-9 77 91 Brown and Gray Sandy SILT, Gravelly w/ Marl M-NP 9 50/0.025
13.5 J-10 60/0.0 ---- No Recovery ---- ---- ---- See Note 2
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/Wayne Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-56
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-56 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61109.8564, (E) 314769.4242 SURF. ELEV. 11.383 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/29/09 DATE FINISH 07/01/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 19 13 1st Attempt: No Recovery
Used 15 2nd Attempt: Brown Silty Fine SAND w/ Gravel Pieces and Mica M-NP 17
16.5 J-12 22 20 1st Attempt: No Recovery 21 2nd Attempt: Brown Silty Fine SAND w/ Gravel Pieces and Mica M-NP 18
18.0 J-13 14 17 Brown Silty SAND w/ Mica M-NP 19 19
19.5 J-14 13 15 Brown Silty SAND w/ Mica M-NP 17 12
21.0 J-15 13 11 Brown Sandy GRAVEL, Silty M-NP 4 17
22.5 J-16 12 13 Brown Sandy GRAVEL, Silty w/ Mica M-NP 6 15
24.0 J-17 14 18 Brown Silty Fine SAND w/ Gravel Pieces and Mica M-NP 12 41
25.5 J-18 23 26 Brown Sandy GRAVEL, Silty M-NP 8 27
27.0 J-19 24 13 No Recovery ---- ---- 13
28.5 J-20A 10 9 1st Attempt: Brown Silty SAND w/ Gravel Pieces and Mica M-NP 17 J-20B 10 2nd Attempt: Brown Silty SAND, Gravelly w/ Mica M-NP 13
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/Wayne Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-56
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-56 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 61109.8564, (E) 314769.4242 SURF. ELEV. 11.383 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 06/29/09 DATE FINISH 07/01/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 28 29 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 12
Used 61
31.5 End of Boring 31.5m Notes: (1) Automatic Hammer Used (2) Possible Boulders/Cobbles at: (a) 5.0m – 5.25m; (b) 8.1m – 8.7m; (c) 12.325m – 13.5m; (d) 13.5m – 14.4m (3) Roller Bit broke off in hole at 31.5m. Roller bit could not be retrieved. Borehole could not be advanced further (4) Drilling mud used; Groundwater not Determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR Terry Hebert / Lionel Edwards estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich/A. Saakyan/Wayne Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-56
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-57 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60753.973, (E) 314801.776 SURF. ELEV. 12.432 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/24/09 DATE FINISH 06/25/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 0.0 Drilled J-1 3 4 Dark Brown Silty SAND w/ Gravel Pieces and Root Fibers M-NP 13
Ahead 11 of Casing
1.5 J-2 20 21 Brown Sandy GRAVEL, Silty w/ Marl M-NP 7 25
3.0 J-3 8 7 Brown Sandy GRAVEL, Silty w/ Marl M-NP 11 7
4.5 J-4 25 45 Black Silty SAND, Gravelly M-NP 10 50/0.05
6.0 J-5A 11 4 Brown Silty SAND w/ Gravel Pieces, Mica and Root Fibers M-NP 20 J-5B 3 Brown, Gray and Black Sandy SILT w/ Gravel Pieces and Root Fibers M-NP 20
7.5 J-6 13 14 Brown Silty SAND, Gravelly w/ Mica M-NP 10 16
9.0 Mud J-7 14 20 No Recovery ---- ---- Used 19
10.5 J-8 9 14 Brown Silty SAND w/ Mica M-NP 22 15
12.0 J-9 11 16 Brown Silty SAND w/ Mica M-NP 23 20
13.5 J-10 10 15 Brown Silty SAND w/ Mica M-NP 21 15
15.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR James Philbin estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Krueis fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 1 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-57
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-57 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60753.973, (E) 314801.776 SURF. ELEV. 12.432 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes
DATE START 06/24/09 DATE FINISH 06/25/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 15.0 Mud J-11 16 27 Red Brown Silty SAND M-NP 17
Used 32
16.5 J-12 18 27 Red Brown Silty SAND w/ Mica M-NP 18 31
18.0 B-1 Run #B-1: Drilled from 17.85m to 18.10m, BOULDER J-13 16 28 Brown Sandy SILT, Gravelly w/ Mica M-NP 10 37
19.5 J-14 35 45 Brown Sandy GRAVEL, Silty M-NP 8 37
21.0 J-15 21 26 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 18 30
22.5 J-16 22 34 Brown Silty SAND w/ Mica M-NP 19 34
24.0 J-17 22 41 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13 34
25.5 J-18 21 42 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 41
27.0 J-19 30 45 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 14 59
28.5 J-20 21 25 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 16 28
30.0 The subsurface information shown here was obtained for design and DRILL RIG OPERATOR James Philbin estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 2 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-57
SM 282e (00) STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION REGION 11 GEOTECHNICAL ENGINEERING BUREAU HOLE DM-B-57 COUNTY Queens SUBSURFACE EXPLORATION LOG LINE PIN X735.75 STA. PROJECT Kew Garden Interchange Infrastructure and Operational Improvements, Cntr-2 OFFSET ACTUAL COORDINATES (N) 60753.973, (E) 314801.776 SURF. ELEV. 12.432 DATUM V: NAVD88 H: NYSPCS-NAD83-96 DEPTH TO WATER See Notes Below
DATE START 06/24/09 DATE FINISH 06/25/09 CASING O.D. 106mm I.D. 100mm WEIGHT OF HAMMER-CASING 63.5kg HAMMER FALL-CASING 762mm SAMPLER O.D. 50.8mm I.D. 34.9mm WEIGHT OF HAMMER-SAMPLER 63.5kg HAMMER FALL-SAMPLER 762mm
DEPTH
(m)
CASING BLOWS / 0.3 m
SAMPLE
NO.
BLOWS ON SAMPLER (m)
DESCRIPTION OF SOIL AND ROCK
MOIST. CONT.
(%)
0 / .15
.15 / .30
.30 / .45
.45 / .60 30.0 Mud J-21 22 35 Brown Silty SAND w/ Gravel Pieces and Mica M-NP 13
Used 34 End of Boring 30.45m
31.5 Notes: (1) Automatic Hammer Used (2)Possible Boulder/Cobbles at: (a) 7.46m – 8.36m; (b) 17.25m – 17.85m (3) Lost water at 19.0m (4) Drilling mud used; Groundwater Not Determined
The subsurface information shown here was obtained for design and DRILL RIG OPERATOR James Philbin estimate purposes. It is made available so that users may have access to the SOIL & ROCK DESCRIP. A. Zerebovich / A. Saakyan / W. Guo same information available to the State. It is presented in good faith. By GEOTECH. ENGINEER the nature of the exploration process, the information represents only a small CHIEF INSPECTOR Arthur Kruesi fraction of the total volume of the material at the site. Interpolation between STRUCTURE NAME E/B JRP to N/B VWE Viaduct data samples may not be indicative of the actual material encountered. B.I.N. 1-05575-B SHEET 3 OF 3 CONTRACT D010285 CONTRACTOR Aquifer Drilling & Testing, Inc. HOLE DM-B-57
HBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHB
GR
AN
D C
EN
TR
AL
PA
RK
WA
Y
UN
ION
TU
RN
PIK
E
HBHBHBpppHBHBHBHBHBHBHBHBHBpppPEPEPEPEHBHBHBHBHBHBHBHBHB
PP
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
450 mm
450 mm
450 mm
375 mm
375 mm
450 mm
ST
INV=5.840INV=5.790
ST
RIM=11.751INV=5.681
INV=5.661
STST
INV=9.157
INV=9.390
INV=9.460
INV=9.671
STST
INV
=10.120
INV=10.170
STSTSTSTSTSTSTST
INV=5.925
STSTSTSTSTST
INV
=8.190
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
R.P.O.
R.P.O.
R.P.O.
R.P.O.
R.P.O.
R.P.O.
R.P.O.
R.P.O.
RIM=13.070
RIM=12.983INV=12.891
DS 290
DS 292
DS 2
93
INV=13.063
INV=13.086
INV=13.076
RIM=13.876
RIM=13.919
RIM=12.878
RIM=13.265
INV=13.106INV=12.876
300mm
METAL300mm
METAL
SUMP=11.919
RIM=15.614
INV=15.194
200mm METAL
RIM=14.991
SUMP=12.491
RIM=17.051
VERTICAL PIPE
16.641
RIM=19.344
RIM=18.743VERTICAL PIPE
18.363
VERTICAL PIPE18.363
RIM
=18.743
RIM=18.533
VERTICAL PIPE
18.083
RIM=19.519
RIM=20.172
VERTICAL PIPE
18.711
RIM
=19.126
VERTICAL PIPE17.111
RIM=17.541
RIM=19.739VERTICAL PIPE
19.379
SUMP=3.095
R.C
.P.
380.0
mm
R.C
.P.375.0m
m
CS
V.C
.P.
304.
8mm
INV=12.755
RIM=10.748
INV=8.948
INV
=9.
600
M.P
.150m
m
RIM
=6.4
46
INV
=5.196
R.C
.P.
300.0
mm
RIM=12.560
RIM=12.497
RIM=11.997
RIM=11.180
RIM=11.201
RIM
=12.220
RIM=17.004
RIM=17.184
RIM=16.053
C.I.P
.
300.0mm
RIM=15.312
C.I.P
.300.0
mm
C.I.P.300.0mm
RIM=14.912
RIM=15.013
RIM=12.761
INV=11.221
RIM=8.334
INV=7.374
INV=7.284
INV
=7.514
RIM=9.425
INV=6.845
INV=6.525
R.C.P.
750.0mm
INV=7.547
INV=8.567
RIM=11.057
RIM=12.165
INV=8.975
R.C.P.
381.0mm
M.P.
230m
m
RIM
=6.144
INV
=4.911
RIM=6.121
INV
=4.821
INV=4.721
RIM=13.296
INV=11.917
R.C.P.
380.0mm
RIM=13.099INV=11.719 INV=11.719
INV
=12.169
R.C.P.
380.0mm
PV
C
150.0mm
RIM=13.162INV=11.667
INV=9.885
M.P.
380.0mm
INV=12.841
INV=11.151
RIM=9.424
INV=8.524
M.P.
200mm
M.P.
150.0mmM.P.
150.0mm
300m
m
ME
TA
L
RIM
=11.860
300.0
mm
300.0
mm
RIM
=12.675
INV
=10.475
INV=10.675
RIM
=13.085
300.0mm
300.0
mm
INV
=9.108
INV
=9.389
INV
=9.3
39
600.0
mm
RIM
=13.380
450.0mm
INV
=10.100
RIM
=13.281
850.0
mm
300.0mm
INV
=9.38
INV
=11.15
INV
=9.08
INV
=10.161
INV=10.481
300.0mm
INV=11.431
INV
=10.201
INV
=10.181
R.C.P.
381.0mm
CS
V.C
.P.
304.8
mm
CS
CS
CS
CS
CS
CS
CS
R.C.P.
1.40 m
R.C.P.
600 mm
CS
CS
CS
CS
R.C
.P.
750 m
m
1650mm R.C.P.CHANNEL
380mmR.C.P.
R.C.P.
380mm
R.C.P.
300mm
380m
mR
.C.P
.
R.C.P.
1.20 m
380m
mR
.C.P
.
RIM
=13.3
39
SU
MP
=11.30
SU
MP
INV
=2.0
39
INV=10.342
INV
=10.362
INV=13.432
INV
=12.503
INV=10.733
INV=11.864
INV
=14.624
INV=11.864
INV=12.244
1500x1700mm
R.C
.P.
CH
AN
NE
L
INV=6.075
ST
AB
AN
DO
NE
D M
HIN
VE
RT
OU
TB
LO
CK
ED
W/ B
RIC
KS
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
NO FIELD
INVESTIGATION
SUMP=15.924
STSTST
300mm VCP
1.2m RCP
300m
m C
IP
300m
m R
CP
750mm RCP
750mm RCP
RIM
=12.20
CS
CS
BL
OC
KE
DIN
V=
10.06
INV
=5.58
1800m
m R
CP
RIM
=12.75
INV
=5.35
INV=5.34
INV
=5.24
RIM
=12.98
TO
DE
EP
TO DEEP
STSTSTST
RIM
=6.19
INV=3.31
INV
=3.38
450mm
ME
TA
L
RIM
=4.45
INV
=3.49
INV
=3.54
300m
m M
ET
AL
STSTSTST
INV
=10.74
600m
m R
CP
STSTSTSTST
RIM
=11.065
RIM
=10.547
SU
MP
=5.51
FDNY-MH
PHONE
BOX
F.D.N.Y.
FDNYC
5 PR
FDNYC
5 PR
FDNYC
5 PR
GG
4-500 7
5’
2-3-500,2-4/0 140’
N.Y.C. CABLE 119’
N.Y.C. 113’
2-4"I,4"C
UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE
FDNYC
4W
2-4W
FDNYC
GGGGGGUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTVUCTV
1.2
m S
T
300m
m D
IP
300mm
DIP
300m
m D
IP
300mm DIP
600m
m D
IP
300mm DIP
E
FOFOFOFOUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE
2-4" C
UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE
300mm DIP
200mm
DS
-402
DS
-401
DS
-403
R.P.O.
R.P.O.
R.P.O.
R.P.O.
R.P.O.
R.P.O.
R.P.O.
R.P.O.
150 m
m B
.S. D
ISU
SE
D
4-DB-FS-PE
(3) 1
00m
m C
50m
m C
50mm
C
50mm
C
(2) 100mm C
(2) 100mm C
(2) 100mm C
(2) 100mm
C
RANGING RADAR
DETECTOR ASSEMBLY
R.C.P.
381.0mm
CS
V.C
.P.
304.8
mm
CS
CS
CS
CS
CS
R.C.P.
1.40 m
R.C.P.
600 mm
CS
CS
CS
CS
R.C
.P.
750 m
m
1650mm R.C.P.CHANNEL
380mmR.C.P.
R.C.P.
380mm
R.C.P.
300mm
380m
mR
.C.P
.
R.C.P.
1.20 m
380m
mR
.C.P
.
UEUEUE
2-4" I, 4" C.
GG
FD
FDNYC
FDNYC
FOFOFOFOFOFOFO
300m
m D
IP
300mm VCP
1.2m RCP
GGGGGGGGGGGG
30
0 m
m D
IP
900m
m S
TE
EL
900m
m S
TE
EL
900m
m S
TE
EL
UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE
E
UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE
E
SE
RV
ICE
TO
NY
C
GA
RA
GE
2-1
00 m
m C
CO
NT
. CA
B.IN
BR
IDG
E W
AL
L
4-1
00 m
m W
4-1
00 m
m C
,
CO
NC
RE
TE
EN
VE
LO
PE4-1
00 m
m C
,
CO
NC
RE
TE
EN
VE
LO
PE
1-1
00 m
m W
1-100 mm W
1-100 mm W
1-100 mm C
2-10
0 m
m C
1-100 mm C
1-1
00 m
m C
1-100 mm C
2-1
00 m
m C
4-1
00 m
m C
4-1
00 m
m C
2-1
00 m
m C
UTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUT
50 mm I.P.
75 m
m C
.W.C
RIM
=9.8
50
STSTSTSTSTSTSTSTST
1820mm
1820mm
1820mm
1524mm
1524mm
1524mmS
TR
UC
TU
RE
TO
DE
EP
FO
RS
IZE
AN
D IN
VE
RT
TO
BE
OB
TA
INE
D
RIM
=1
3.5
00
RIM
=6.2
05
RIM=11.593
RIM=2.
438
RIM=11.678
RIM=7.480
RIM
=11.908
RIM
=12.386
RIM
=9.2
03
RIM=13.149
RIM
=11.890
RIM=11.358
RIM=4.198
RIM=3.
248
RIM=10.165
RIM
=6.7
43
RIM=2.9
28
RIM
=2.45
7
RIM=3.198
RIM
=12.356
RIM=5.717
RIM=8.564
RIM=13.091
UEUEUEUEUESTST
375m
m M
ET
AL
STSTSTSTSTSTSTSTSTSTSTST
300.0mm
300.0
mm
RC
P
600.0mm
900.0mm
200.0
mm
900.0mm
BO
X
450.0mm
STST
1050mm
600mm
450mm
200mm
450mm
STSTSTSTSTSTSTSTSTST
450m
m
STSTSTSTSTSTST
(FILL
ED
)
(FILL
ED
)
300.0
mm
300.0mm
450.0
mm
150.0
mm
300.0mm
300.0mm
300.0mm
300.0
mm
150.0mm
300.0mm
150.0mm
150.0mm
RIM
=6.2
65
(FIL
LE
D)
STSTSTST
1500m
m R
CP
STST
300mm RCP
STSTSTST
1500m
m R
CP
(ASSUMED)
INV
=7.285
INV
=7.125
INV
=8.965
STSTSTSTSTSTSTSTSTSTSTST
600mm RCP
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
RIM
=9.9
63
EM
PT
Y M
H
(NO
PIP
ES
IN/O
UT
)
STST
NY
PD
CO
MM
UN
ICA
TIO
N
BL
OW
-OF
F
VA
LV
E
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
1.2
m S
TE
EL
1.2
m S
TE
EL
300mm DIP
R.P.O200 mm
R.P
.O.
STSTSTSTSTSTSTSTSTSTSTSTSTST
BL
OC
KE
DR
.P.O
.
STSTST
R.P.O.
S
STST
R.P
.O.
S
S
STSTSTSTSTSTSTSTSTST
375m
m R
.C.P
.
R.P
.O.
R.P
.O.
STSTSTST
1.5
m x
1.5
m B
OX
R.P
.O.
R.P
.O.
R.P.O.
ST
INV=3.69
RIM
=18.733
FIL
LE
D
RIM
=13.640
INV
=6.723
INV
=6.743
RIM
=10.464
INV
=8.654
INV=6.614
INV=2.803
INV
=2.593
RIM
=5.800
INV=4.29
INV
=1.639
INV
=1.589
1.639
RIM
=3.789
INV
=2.188
INV=2.148
INV=2.081
INV=1.958
INV
=3.765
INV
=3.865
INV=7.103
INV=7.123
RIM=14.2130
INV=11.113
INV=7.285
S
ST
200mm C.I.P.
375mm R.C.P.
R.P.O.R.P.O.
S(S
EA
LE
D)
RIM
=6.174
200 m
m C
.I.P
BL
OC
KE
D
BL
OC
KE
D
ABANDONED
S
ST
S
STSTST
R.P.O
.
R.P
.O.
600 m
m R
.C.P
.
R.P.O
.
200mm
C.I.P.
R.P.O.
S
ST
150.0
mm
R.P
.O.
S
ST
375mm R.C.P. R.P.O.
R.P
.O.
INV=19.752
R.P.O.R.P.O.
R.P.O.
STSTSTSTST
150mm
UN
DE
RD
RA
IN
R.P.O
.
375m
m R
.C.P
.
R.P
.O.
STSTST
375mm R.C.P.R.P.O.
375mm
R.C.P.
R.P.O.
STST
375m
m R
.C.P
.
R.P
.O.
375m
m R
.C.P
.
S R.P.O.
ST
150mm
V.C.P.
FROM BRIDGE R.P.O.
600.0
mm
R.C
.P.
600.0mm
R.C
.P.
S
R.P.O.
STSTSTSTSTST
600.0
mm
R.C
.P.
600.0
mm
R.C
.P.
STSTSTSTSTSTSTSTSTSTST
375.0m
m R
.C.P
.
R.P.O
.
375.0mm
R.C
.P.
R.P.O
.
375.0mm R.C.P. R.P.O.
ST
S R.P.O.
STSTSTSTSTSTSTSTSTSTSTSTST
150.0
mm
C.I.P
R.P
.O.
SR.P.O
.
STSTST
600.0mm
R.C
.P.
ST
R.P.O.
STST
1650mm R.C.P.
STSTSTSTSTSTGGGGGGGGGGGGGGGGGGSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
134th. STREET
82N
D. A
VE
.
UN
ION
TP
KE
.
126th. STREET
GR
AN
D C
EN
TR
AL
PR
WY
.
JAC
KIE
RO
BIN
SO
N P
KW
Y.
GR
AN
D C
EN
TR
AL
PR
WY
.
UN
ION
TP
KE
.
CONC
PAD
REWALL
RAILING
CONC
POLE BASE
REWALL
RAILING
RAILING
CONC
PAD
132ND. STREET
S
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E-BOX
E-BOX
E-BOX
E-V
AU
LT
LIGHT
POLE
LIG
HT
PO
LE
E-B
OX
LIG
HT
PO
LE
E-B
OX
LIG
HT
PO
LE
E-B
OX
E-BOX
LIGHT
E-BOX
E-BOX
E-BOX
LIG
HT
PO
LE
LIG
HT
PO
LE
U-B
OX
LIG
HT
PO
LE
LIG
HT
PO
LE
LIG
HT
PO
LE
E-B
OX
LIG
HT
PO
LE
LIG
HT
PO
LE
E-BOX
N.Y.C.
E-BOX
E-BOX
E-B
OX
E-B
OX
LIG
HT
PO
LE
LIG
HT
PO
LE
LIG
HT
PO
LE
E-B
OX
E-B
OX
LIG
HT
PO
LE
ME
TA
L
BO
X
E-VAULT
LIG
HT
PO
LE
E-B
OX
E-BOX
E-BOX
E-BO
X
E-VA
ULT
E-VAULT
E
-BO
X
E-BOX
E-B
OX
E-BOX
ME
TA
LP
LA
CE
E-BOX
U-B
OX
E-BOX
E-BOX
E-BOX
E-BOX
E-BOX
E-B
OX
U-B
OX
E-B
OX
E-BOX
E-BOX
E-BOX
T-BOX
E-BOX
E-B
OX
T-B
OX
E-BOX
E-BOX
E-BOX
E-BOX
E-BOX
MON. WELL
E-B
OX
VAULT
E-B
OX
E-B
OX
E-B
OX
E-B
OX
E-B
OX
E-BOX
E-BOX
E-BOX
E-BOX
E-BOX
LIGHT
POLE
LIG
HT
PO
LE
LIG
HT
PO
LE
LIGHTPOLE
LIG
HT
PO
LE
LIG
HT
PO
LE
LIG
HT
PO
LE
LIG
HT
PO
LE
LIGH
T
POLE
LIG
HT
PO
LE
LIG
HT
PO
LE
LIG
HT
PO
LE
LIGHT
POLE
FDNY
Q036668
150mmSTEEL FACE CONC CURB
Q051837 100mm
300mm400mm
900mm300mm
300mm
200mm
200mm
350mm
250mm
Q051839
VWE 8203
MM 67
X5M1
2039
15H
"WET ROADWAY 700 FT"
VWE 8206
"69T
H R
D JE
WE
L A
VE
HA
R V
AN
AR
SD
AL
E
JR A
VE
1/2
MIL
E"
VWE 8209
N0975
100mm
100mm
100mm CLUMP
100mm
"NO COMMERCIA
L
TRAFFIC"
CANOPY
100mm
ONE WAY STREET
CONC SIDEWALK
460mm CONC REWALL
GRASS
ASPHALT
CONC CURB
1.8M CLF
150mm150mm
200mm 250mm250mm
250mm
300mm
300mm
350mm
250mm
Q051841
Q051842
760m
m
PARKING LOT
ASPHALT
CO
NC
WA
LK
FD
P
UN
ION
TP
KE
.
GR
AN
D C
EN
TR
AL
PR
WY
.
S
S
E-B
OX
E-B
OX
WW
S
W
S
S
S
W
S
E
W
S
S
FD
NY
-MH
FD
SE
S
W
E
D.
WA
N
Final Boring Plan 10_07_09.dgn
QUEENS
11
CONTRACT 2
X735.75RECONSTRUCTION OF THE KEW GARDENS INTERCHANGE
P:\
02202.0
2\3
000_P
rel_
Des\C
AD
D\5
0_G
eo\F
inal
Borin
g P
lan 1
0_07_09.d
gn
D010285
JOB
MA
NA
GE
RD
ES
IGN
ED
BY
11/3
/2009
FIL
E N
AM
E =
DA
TE
/TIM
E =
US
ER
=
DE
SIG
N S
UP
ER
VIS
OR
mm
ato
s
CH
EC
KE
D B
YE
ST
IMA
TE
D B
YD
RA
FT
ED
BY
CH
EC
KE
D B
Y
PREPARED BY: HARDESTY & HANOVER
ON:
ALTERED BY:
ON:
SIGNATURE DATE
CONTRACT NUMBERPIN
PS&E DATE
DRAWING NO.
SHEET NO.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION REGION DOCUMENT NAME:
BRIDGES CULVERTSAS BUILT REVISIONS
DESCRIPTION OF WORK:
ALL DIMENSIONS IN m UNLESS OTHERWISE NOTED
COUNTY:
NORTHBOUND VAN WYCK EXPRESSWAY MAINLINE
1-05575-C
++
C
+
C
C
C
B
C
0
0
0
B
C
C
C
B
B
C
A
61182.7345
61183.8692
61152.5806
61151.5154
61124.379
61124.564
61128.8163
61132.3635
61070.0454
61080.2116
61079.8941
61089.0929
61090.1905
61046.7943
61050.7248
61057.9501
61060.01547
61008.37237
61006.4567
61025.485
61021.742
60987.927
60987.5172
60957.7405
60944.7490
60901.7348
60914.1910
60873.8578
60884.4600
60832.9590
60843.6528
60841.2680
60824.9379
60937.4464
60877.0070
61145.8545
61146.397
61148.5315
61148.467
61389.1508
61495.8695
61495.279
61613.3866
61617.2548
61109.85637
314717.4086
314720.2734
314685.9284
314685.1911
314711.1885
314746.0332
314708.4385
314732.602
314730.9965
314768.1816
314790.0112
314710.9178
314726.8866
314780.9218
314780.5783
314723.2813
314721.3215
314772.48
314773.028
314753.7865
314750.9916
314751.1770
314735.0151
314778.4052
314785.5185
314796.6369
314813.1370
314823.3083
314822.8734
314837.8052
314760.2072
314753.9510
314623.0736
314622.945
314572.2893
314571.758
314671.2923
314668.2214
314668.3737
314626.8371
314654.6926
314769.4242
ENVIRONMENTAL SAMPLING LOCATION
BORING LOCATION
BORING LOCATION WITH OPEN WELL
ELECTRIC LINE
TELEPHONE LINE
SEWER LINE
WATER LINE
GAS LINE
FENCE
UNKNOWN MANHOLE
TELEPHONE MANHOLE
TRAFFICE CONTROL BOX
OVERHEAD SIGH
FIRE DEP. LINE
PROPOSED RETAINING WALL
R.O.W. LINE
ETSTSTSTSTG
CONTRACT 2
AS-BUILT SOIL BORING PLAN
SHEET 1 OF 2
FDNYC
PROPOSED BRIDGE
WINGWALL/RETAINING WALL
(TYP.)
PROPOSED BRIDGE ABUTMENT (TYP.)
PROPOSED BRIDGE PIERS (TYP.)
MA
TC
H L
INE
- S
EE
SH
EE
T 2
OF
2
NOTES:
1. ALL SURVEY WORK IN STATE PLANE
COORDINATE SYSTEM NORTH AMERICAN
DATUM (NAD83) AND IN NORTH AMERICAN
VERTICAL DATUM (NAVD88).
2. ENVRIORNMENTAL SAMPLING LOCATIONS
(EPM) WERE PREFORMED ADJACENT TO THE
ASSOCIATED BORING LOCATIONS.
EXISTING RAMP KB
EXISTING NB VWE
EXISTING SB VWE
PROPOSED KB BRIDGE ABUTMENT
PROPOSED SB VWE
PROPOSED NB VWE
PROPOSED RAMP KB
GUARDRAIL
314739.693
314735.9328
314752.657
60753.973 314801.776
BORING NOS
DMB01
DMB02
DMB03
DMB04
DMB05
DMB06
DMB07
DMB08
DMB09
DMB10
DMB11
DMB12
DMX13
DMX14
DMB15
DMB16
DMB17
DMB18
DMB19
DMX20
DMX21
DMX22
DMX23
DMB24
DMX25
DMX26
DMX27
DMB28
DMB29
DMB30
NORTHING
60788.1885
60806.5126
60842.6519
60850.4580
60869.2593
60899.3015
60927.4340
60939.2154
60984.2900
61033.1910
61072.0103
61119.0875
61196.0693
61192.6240
61223.3192
61295.1069
61168.987
61133.0237
61467.7027
61426.9983
61414.3677
61270.7936
61228.7925
61171.5478
60848.9053
60842.3928
60925.0496
60984.7660
61191.4020
61190.1150
61268.3450
61295.0970
61427.7438
DEPTH (M) EASTING
314783.6928
314775.6303
314755.8350
314773.6360
314738.5338
314714.5364
314715.7220
314733.0795
314691.5300
314685.1770
314681.1846
314664.6146
314626.8423
314649.2992
314631.6123
314659.2284
314610.5229
314609.0197
314699.5183
314702.6086
314682.2925
314710.4436
314710.1302
314683.5527
314744.3435
314756.0428314713.6878
314691.0450
314629.2670
314651.2790
314709.0120
314659.2305314702.3077
41.0
36.5
35.0
39.5
54.5
33.5
29.0
29.0
29.0
29.0
32.0
42.5
23.0
21.5
27.5
29.0
29.0
29.0
30.5
21.5
24.5
20.0
20.0
42.5
23.0
20.0
20.0
30.5
50.0
30.5
29.0
10.5
42.5
30.5
33.5
30.5
33.5
33.5
39.5
29.0
27.5
42.5
29.0
35.0
3.6
27.5
18.5
33.5
30.5
30.5
36.5
29.0
30.5
29.0
30.5
30.5
29.0
29.0
31.5
30.5
10.5
15.0
15.6
7.2
11.1
28.5
12.0
12.4
9.3
10.6
9.3
5.5
7.6
8.9
10.7
8.0
12.4
9.4
4.9
DMB31
DNB32
DMB32A
DMB33
DMB34
DMB35
DMB36
DMB37
DMB38
DMB39
DMB40
DMB41
DMB42
DMB43
DNB44
DMB44A
DMB45
DMB45A
DMB46
DMB47
DMB48
DMB49
DMB50
DMB51
DMB52
DMB53
DMB54
DMB55
DMB56
DMB57
EMP01
EMP02
EMP03
EMP05
EMP06
EMP07
EMP09
EMP10
EMP11
EMP12
EMP14
EMP15
EMP16
EMP17
EMP18
EMP19
EMP20
EMP21
EMP22
HBHBHBHB
77T
H A
VE
NU
E
HBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBpppppppppHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHBHB3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R
C
C
C
C
C
C
C
CC
C
C
C
C
C
C
CC
C
C
C
C
C
C
C
C
CC
CC
C
C
STSTSTSTSTSTSTST
C.I.
508 mm
C.I.
508 mm
254 mm
254 mm
254 mm
508 mm
STSTSTSTSTST
RIM=3.478
RIM=3.553
INV=2.047INV=2.177
RIM=3.477
INV=2.027
RIM=3.662INV=2.062INV=2.612
INV=2.312
INV=2.112
INV=2.242
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
381.0
mm
RIM=11.521INV=9.551
RIM=11.560T/WATER=9.609
RIM=11.808
RIM=9.475INV=7.479
RIM=9.785T/W=8.413
RIM=8.126T/WATER=6.693
RIM=7.600INV=5.604
RIM=5.708
INV=3.727
RIM=6.389
T/WATER=5.124
RIM=4.522
INV=2.724
RIM=5.180
T/WATER=3.839
RIM=3.658
INV=2.134
RIM=3.702
INV=F/DEBRIS
RIM=3.736
INV=2.441
RIM=3.780
T/WATER=2.500
RIM=3.544
INV=1.974
RIM=4.260
T/WATER=2.675
VERTICAL PIPE18.363
RIM
=18.743
RIM=14.485
RIM=14.584VERTICAL PIPE14.204
RIM=12.976
INV=9.446
RIM=11.686
VERTICAL PIPE15.954
RIM=16.364
VERTICAL PIPE15.283
RIM=15.693
VERTICAL PIPE13.828
RIM=14.188
VERTICAL PIPE11.196RIM=13.036
INV=11.006
RIM=4.041
381.0
mm
381.0
mm
381.0
mm
381.0
mm
381.0
mm
381.0
mm
RIM=12.833
RIM=11.252
RIM=9.396
RIM=7.532
RIM=4.567
RIM=3.928
381.0
mm
600mm
INV=7.096
INV=7.066
381.0
mm
INV=7.086 381.0mm
381.0mm
381.0mm
INV=8.702
INV=8.682
INV=8.652381.0
mm
INV=10.593
INV=10.623
381.0
mm
381.0mm
INV=2.118
INV=2.138
600mm
600mm
600mm
INV=2.257INV=2.277
INV=2.317
450mm
381.0mm
INV=5.492
INV=5.462INV=5.482
381.0
mm
381.0
mm
450mm
INV
=10.475
INV=10.675
300.0mm
INV
=9.108
INV
=9.389
INV
=9.3
39
INV
=10.100
INV
=9.38
INV
=11.15
INV
=9.08
INV
=10.161
INV=10.481
300.0mm
INV=11.431
600mm 300m
m
INV
=10.201
INV
=10.181
300m
m
381.0
mm
381.0
mm
381.0
mm
CS
508.0 mm
SAN. SEWER
INV=2.098
INV=2.118
INV=2.1076
STSTSTSTSTST
450mm
ME
TA
L
RIM
=4.45
INV
=3.49
INV
=3.54
300m
m M
ET
AL
FDNY-MH
FDNYC
5 PR
FD
NY
C2-4
PR
FD
NY
C
4 P
R
FD
NY
C2-4
PR
FD
NY
C
4 P
R
FDNYC
5 PR
FDNYC
4 PR
FDNYC
4 PR
FDNYC
4 PR
FDNYC
4 PR
FDNYC
4 PR
GGGUEUEUEUE
3-500,2
-4/0
-175’
2-4
"C
3-500,2
-4/O
49’
1-4
"C
FDNY-MH
FDNY-MH
FDNY-MH
FDNY-MH
FDNY-MH
UEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE
1 1
/4 "
H.P
. P
E(B
). 1
992
(IN
S.2
"S
T.1
93
9)
GGGGGG
R=3.927
R=4.529
381.0
mm
CS
UEUEUEUEUE
300 mm DIP
300 m
m D
IP
200 mm DIP
200 mm DIP
300 mm DIP
300 mm DIP
200 m
m D
IP
300 mm
DIP
300 mm DIP
FD
FD
FD
FD
FD
OTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTOTUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUEUE
500 mm SANITARY SEWER
E
UEUEUEUEUEUEUEUEUE
1-100 mm C
1-100 mm C
1-100 mm C
1-100 mm C
1-100 mm C
1-100 mm C
1-100 mm C
2-100 mm C
2-1
00 m
m C
1-100 mm C
1-100 mm C
1-100 mm C
1-100 mm C
30 mm H.P.
(50 mm ST. C)
30 mm H.P.
(50 mm ST. C)
UTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUT
TO PUMPSTATION
STSTSTSTSTSTST
RIM=4.10
INV
=3.
56
INV
=3.
3
150m
mM
ET
AL
50m
m P
VC
RIM=4.08INV
=3.3
1
150m
mM
ET
AL
OEOEOE
RIM=3.74
INV
=3.2
0150m
mM
ET
AL
OE
RIM=3.37
RIM
=2.
70
RIM
=3.
00
RIM
=3.1
2
RIM
=2.
89
RIM=3.22
RIM=2.96
INV
=2.
27
BL
OC
KE
D
STST
50mm PVC200mm PVC
INV=2.84INV=2.53
INV
=2.3
1
300m
m M
ET
AL
INV
=2.1
2380m
mM
ET
AL
INV
=2.
19
380m
m
ME
TA
L
INV
=2.59
INV
=2.44
INV=2.39
OE
300m
m M
ET
AL
ST
INV
=2.1
6
RIM
=2.
62
INV
=2.1
4
ST
300m
m M
ET
AL
RIM
=2.7
1
RIM
=2.
67INV
=2.
07
ST
INV
=2.1
1
300m
m M
ET
AL
INV
=2.1
1
300m
mM
ET
AL
INV
=2.
06
RIM
=2.
98
RIM
=3.1
4
INV
=2.
64
RIM
=3.
25
300mm
METAL
RIM
=3.
52
OE
RIM=13.255
RIM=11.593
RIM
=9.2
03
RIM=13.149
RIM=9.180
RIM=12.652
RIM=9.370
RIM=13.091
MH 16MH 15
MH 14
MH 12
MH 13
MH 18
MH 19
MH 20
MH 22
MH 23
MH 24MH 25
MH 26
MH 27
MH 28
ST
375m
m M
ET
AL
STSTSTST
RIM=10.570
FUEL TANK
COVER
RIM=9.674 EDGES
ARE
PAVED OVER
STST
(PAVED OVER)
LIN
E T
O PU
MP O
UT L
OW
AR
EA
PU
MPS A
PPR
X. E
VER
Y 20 M
IN
FD
R.P
.O.
S
STSTST
R.P.O.
R.P
.O.
S
STST
R.P
.O.
S
S
STSTSTSTSTSTSTSTSTST
375m
m R
.C.P
.
R.P
.O.
R.P
.O.
ST
R.P.O.
STSTST
R.P
.O.
R.P.O.
SR
.P.O
.
ST
375mm R.C.P. R.P.O.
200m
m C
.I.P.
RIM
=18.733
FIL
LE
D
INV
=6.723
INV
=6.743
STSTSTSTSTSTST
3.6m x 2.4mSTORM SEWER
12"
D.I
.P. W
AT
ER
MA
IN
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
12" D.I.M
.J. (F.M
.)
12" D.I.M.J. (F.M.)
12" D.I.P. WATER MAIN
12" D.I.M.J. (F.M.)
12" D.I.M.J. (
F.M.)
12"
D.I
.M.J
. (F
.M.)
12"
D.I
.P. W
AT
ER
MA
IN
OEOE
12" D.I.M.J. (F.M.)
12" D.I.P. WATER MAIN
8" PVC FIRE LINE
8" PVC FIRE LINE12" D.I.P. WATER MAIN
8" PVC FIRE LINE
12" D.I.M.J. (F.M.)
12" D.I.P. W
ATER MAIN
12" D
.I.M
.J. (F
.M.)
STSTSTSTSTST
8"
PV
C F
IRE
LIN
E
STSTST3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R3R
C
C
C
C
C
C
C
CC
C
C
C
C
CC
C
CCC
CC
C
C
CC
CC
C
PARK DRIVE EAST
78th
. D
R.
78th
. R
D.
77th
. A
VE
.
E-BOX
E-BOX
E-BOX
E-V
AU
LT
LIG
HT
PO
LE
E-B
OX
E-B
OX
FO-MH
LIG
HT
PO
LE
E-BOX
LIGHTPOLE
LIG
HT
PO
LE
LIG
HT
PO
LE
E-BOXE-BOX
METALBOX
E-BOX
LIG
HT
PO
LE
E-VAULT
LIG
HT
PO
LE
UT
ILIT
YP
OL
E
METALBOX
LIG
HT
PO
LE
E
-BO
X
E-BOX
E-BO
X
E-VA
ULT
E-VAULT
PHONE
BOXE-BOX
E-BOX
E-BOX
N.Y
.C.
MH
E-B
OX
LIGHTPOLE
LIGHTPOLE
LIGHTPOLE
LIGHTPOLE
LIGHTPOLELIGHT
POLELIGHT
POLE
LIG
HT
PO
LE
LIG
HT
PO
LE
LIG
HT
PO
LE
E-BOX
E-VAULT
E-BOX
E
E
E
WW
W
E
E
S
S
CO
NC
BA
RR
IER
TRACK
TRACK
TRACK
TRACK
TRACK
TR
AC
K
TR
AC
K
AS
PH
AL
TD
RIV
E
PAVEMENT EDGEPAVEMENT EDGE
PAVEMENT EDGE
PAVEMENT EDGE
PAVEMENT EDGE
PAVEMENT EDGE
PA
VE
ME
NT
ED
GE
PA
VE
ME
NT
ED
GE
PA
VE
ME
NT
ED
GE
PA
VE
ME
NT
ED
GE
PA
VE
ME
NT
ED
GE
PA
VE
ME
NT
ED
GE
CU
RB
CU
RB
CU
RB
CU
RB
CU
RB
CU
RB
CURB
CURB
CURB
CURB
CURB
CURB
CURB
CURB
CURB
CURB
1 STY TRAILER
TOWER
TOWER
HYD
HYD
SP
EE
DB
UM
P
SPEEDBUMP
SPEEDBUMP
CHAIN LINK FENCE
CHAIN LINK FENCE
CHAIN LINK FENCE
CH
AIN
LIN
K F
EN
CE
CH
AIN
LIN
K F
EN
CE
CH
AIN
LIN
K F
EN
CE
REWALL W/ CHAIN LINK FENCE
1 STY OFFICETRAILERS
PORCHSTEPSST
EPS
RIM=3.37
BOLLARDS
BOLLARDS
BOLLARDS
SIG
NA
L
SIG
NA
LX
L44
OEOEOEOEOEOEOEOEOE
GATE
OEOEOEOEOEOE
1 STY TRAILER
1 STY
CONC PAD
OEOEOEOEOEOEOEOE
POLE
POLE
POLE
POLE
POLE
POLE
PO
LE
PO
LE
PO
LE
PO
LE
PO
LE
EL
EC
TR
ICPA
NE
L
E
W
W
W
S
S
W
W
E
D.
WA
N
Final Boring Plan 10_07_09.dgn
QUEENS
11
CONTRACT 2
X735.75RECONSTRUCTION OF THE KEW GARDENS INTERCHANGE
P:\
02202.0
2\3
000_P
rel_
Des\C
AD
D\5
0_G
eo\F
inal
Borin
g P
lan 1
0_07_09.d
gn
JOB
MA
NA
GE
RD
ES
IGN
ED
BY
11/5
/2009
FIL
E N
AM
E =
DA
TE
/TIM
E =
US
ER
=
DE
SIG
N S
UP
ER
VIS
OR
mm
ato
s
CH
EC
KE
D B
YE
ST
IMA
TE
D B
YD
RA
FT
ED
BY
CH
EC
KE
D B
Y
PREPARED BY: HARDESTY & HANOVER
ON:
ALTERED BY:
ON:
SIGNATURE DATE
CONTRACT NUMBERPIN
PS&E DATE
DRAWING NO.
SHEET NO.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION REGION DOCUMENT NAME:
BRIDGES CULVERTSAS BUILT REVISIONS
DESCRIPTION OF WORK:
ALL DIMENSIONS IN m UNLESS OTHERWISE NOTED
COUNTY:
NORTHBOUND VAN WYCK EXPRESSWAY MAINLINE
1-05575-C
++
C
C
C
C
C
C
C
A
C
41.0
36.5
35.0
39.5
54.5
33.5
29.0
29.0
29.0
29.0
32.0
42.5
23.0
21.5
27.5
29.0
29.0
29.0
30.5
21.5
24.5
20.0
20.0
42.5
23.0
20.0
20.0
30.5
50.0
30.5
29.0
10.5
42.5
BORING NOS
STSTSTSTEGT
CONTRACT 2
AS-BUILT SOIL BORING PLAN
SHEET 2 OF 2
FDNYC
PROPOSED MSES RETAINING WALL (TYP.)
PROPOSED BRIDGE ABUTMENT (TYP.)
PROPOSED BRIDGE PIER (TYP.)
MA
TC
H L
INE
- S
EE
SH
EE
T 1
OF
2
NOTES:
1. ALL SURVEY WORK IN STATE PLANE
COORDINATE SYSTEM NORTH AMERICAN
DATUM (NAD83) AND IN NORTH AMERICAN
VERTICAL DATUM (NAVD88).
2. ENVRIORNMENTAL SAMPLING LOCATIONS
(EPM) WERE PREFORMED ADJACENT TO THE
ASSOCIATED BORING LOCATIONS.EXISTING SB VWE
EXISTING NB VWE
EXISTING RAMP KA
ENVIRONMENTAL SAMPLING LOCATION
BORING LOCATION
BORING LOCATION WITH OPEN WELL
ELECTRIC LINE
TELEPHONE LINE
SEWER LINE
WATER LINE
GAS LINE
GUARDRAIL
FENCE
UNKNOWN MANHOLE
TELEPHONE MANHOLE
TRAFFICE CONTROL BOX
OVERHEAD SIGH
FIRE DEP. LINE
R.O.W. LINE
PROPOSED
RAMP KA
BORING NOS
DMB01
DMB02
DMB03
DMB04
DMB05
DMB06
DMB07
DMB08
DMB09
DMB10
DMB11
DMB12
DMX13
DMX14
DMB15
DMB16
DMB17
DMB18
DMB19
DMX20
DMX21
DMX22
DMX23
DMB24
DMX25
DMX26
DMX27
DMB28
DMB29
DMB30
DMB31
DNB32
DMB32A
NORTHING
60788.1885
60806.5126
60842.6519
60850.4580
60869.2593
60899.3015
60927.4340
60939.2154
60984.2900
61033.1910
61072.0103
61119.0875
61145.8545
61148.5315
61196.0693
61192.6240
61223.3192
61295.1069
61168.987
61389.1508
61495.8695
61613.3866
61617.2548
61133.0237
61467.7027
61426.9983
61414.3677
61270.7936
61228.7925
61171.5478
61182.7345
61152.5806
61151.5154
EASTING
314783.6928
314775.6303
314755.8350
314773.6360
314738.5338
314714.5364
314715.7220
314733.0795
314691.5300
314685.1770
314681.1846
314664.6146
314623.0736
314572.2893
314626.8423
314649.2992
314631.6123
314659.2284
314610.5229
314671.2923
314668.2214
314626.8371
314654.6926
314609.0197
314699.5183
314702.6086
314682.2925
314710.4436
314710.1302
314683.5527
314717.4086
314739.693
314735.9328
DEPTH (M) DEPTH (M)
DMB33
DMB34
DMB35
DMB36
DMB37
DMB38
DMB39
DMB40
DMB41
DMB42
DMB43
DNB44
DMB44A
DMB45
DMB45A
DMB46
DMB47
DMB48
DMB49
DMB50
DMB51
DMB52
DMB53
DMB54
DMB55
DMB56
DMB57
EMP01
EMP02
EMP03
EMP05
EMP06
EMP07
EMP09
EMP10
EMP11
EMP12
EMP14
EMP15
EMP16
EMP17
EMP18
EMP19
EMP20
EMP21
EMP22
NORTHING
61124.379
61128.8163
61132.3635
61070.0454
61080.2116
61089.0929
61090.1905
61046.7943
61050.7248
61057.9501
61008.37237
61025.485
61021.742
60987.927
60987.5172
60957.7405
60901.7348
60914.1910
60873.8578
60884.4600
60832.9590
60843.6528
60824.9379
60937.4464
60877.0070
61109.85637
60753.973
60848.9053
60841.2680
60842.3928
60925.0496
60944.7490
60984.7660
61006.4567
61060.01547
61079.8941
61124.564
61146.397
61148.467
61191.4020
61190.1150
61183.8692
61268.3450
61295.0970
61427.7438
61495.279
EASTING
314685.9284
314711.1885
314746.0332
314708.4385
314732.602
314768.1816
314790.0112
314710.9178
314726.8866
314780.9218
314723.2813
314772.48
314773.028
314752.657
314753.7865
314750.9916
314735.0151
314778.4052
314785.5185
314796.6369
314813.1370
314823.3083
314837.8052
314760.2072
314753.9510
314769.4242
314801.776
314744.3435
314822.8734
314756.0428
314713.6878
314751.1770
314691.0450
314721.3215
314780.5783
314730.9965
314685.1911
314622.945
314571.758
314629.2670
314651.2790
314720.2734
314709.0120
314659.2305
314702.3077
314668.3737
30.5
33.5
30.5
33.5
33.5
39.5
29.0
27.5
42.5
29.0
35.0
3.6
27.5
18.5
33.5
30.5
30.5
36.5
29.0
30.5
29.0
30.5
30.5
29.0
29.0
31.5
30.5
10.5
15.0
15.6
7.2
11.1
28.5
12.0
12.4
9.3
10.6
9.3
5.5
7.6
8.9
10.7
8.0
12.4
9.4
4.9