Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
AS NOTED
By: DMF
Scale:
Issue Date:
Project No.
Revisions
No. Date
Cover
Sheet
A
2
2
A
D1
A
WESTERN CONNECTICUT
at
STATE UNIVERSITY
PINNEY RESIDENCE HALL
WALLCOVERING REMOVAL
WESTERN CONNECTICUT STATE UNIVERSITY
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
PRESIDENT
WESTERN CONNECTICUT STATE UNIVERSITY
GOVERNOR NED LAMONT
C-1
WESTSIDE
CAMPUS
LOCATION MAP
N. T. S.
WESTSIDE CAMPUS MAP
N. T. S.
KEY PLAN
SCALE : 1/32"=1'-0"
JOHN B. CLARKJOSH GEBALLECOMMISSIONER
WCSU Facilities,
Planning & Engineering
White Hall 001
181 White Street
Danbury, CT 06810
www.wcsu.edu
WCSU
2019-04
4/16/2019
FIRST FLOOR
SECOND FLOOR
THIRD THRU SIXTH FLOORS
RE
SID
EN
T A
PA
RT
ME
NT
WA
LL
CO
VE
RIN
G R
EM
OV
AL
PIN
NE
Y R
ES
ID
EN
CE
H
AL
L
RESIDENT APARTMENT
GENERAL PROJECT NOTES:- ALL DIMENSIONS ARE NOMINAL; V.I.F. ACTUAL DIMENSIONS.
- THERE ARE (74) APARTMENTS IN BUIDLING THAT ARE INCLUDED IN THIS SCOPE OF WORK;THE REMAINING (19) APARTMENTS ARE NOT INCLUDED.
- CLOSETS, KITCHENS, AND BATHROOMS ARE NOT INCLUDED IN THE SCOPE OF WORK.
- TYPICAL CEILING HEIGHT IS 8'-3" +/-
- TYPICAL HALLWAY CEILINGS ARE 7'-6" +/-
- CONTRACTOR GOAL SHALL BE TO PROVIDE MANPOWER TO COMPLETE A MINIMUM OF 8 UNITS PERWEEK. CONTRACTOR'S PROPOSED SCHEDULE TO BE REVIEWED WITH WCSU PROJECT MANAGER.
- ALL SMOKE DETECTORS IN APARTMENTS SHALL BE PROTECTED FROM DUST PARTICULATES &MOISTURE DURING WORK-DAY HOURS ONLY; PROTECTION TO BE REMOVED AT END OF EACHWORK DAY FOR FULL DETECTION FUNCTION DURING NON-WORKING PERIODS; CONTRACTORTO COORDINATE PROTECTION REQUIREMENTS WITH W.C.S.U. HEALTH & SAFETY DIRECTOR.
- ANY FORM OF "PROPPING" OF APARTMENT ENTRY DOORS IS PROHIBITED; DOORS ARE TO REMAINCLOSED AT ALL TIMES DURING WORK TO RETAIN PROPER CLIMATE CONTROL TEMPERATURES WITHINAPARTMENTS.
- USE OF ANY SINKS IN BUILDING FOR PAINT/CHEMICAL RINSING IS PROHIBITED.
- CONTRACTOR RESPONSIBLE FOR PROVISION/ENFORCEMENT OF CREW WEARING RESPIRATOR
MASKS DURING THE VWC STRIPPING, CHEMICAL TREATMENT, ADHESIVE SANDING, AND PRE-PRIMING DUST CONTAINMEN & CLEAN- UP TASKS.
- APARTMENTS CODED AS "PRIORITY" (ON DRAWINGS), MUST BE COMPLETED BY AUGUST 1ST .
- W.C.S.U. STAFF MAY BE PERFORMING HVAC MAINTENANCE IN APARTMENTS DURING SUMMER.THE W.C.S.U. PROJECT MANAGER WILL COORDINATE THAT WORK TO TAKE PLACE DURING/AFTERCONTRACTOR'S DEEP CLEANING OF APARTMENTS PHASE TAKES PLACE ON EACH FLOOR.
A. NOTES FOR "APARTMENT" PREPARATION FOR CONTRACTOR WORK
- ALL APARTMENT FURNITURE IS TO BE CLUSTERED/STACKED (W/UPHOLSTERED ITEMS WRAPPEDIN PROTECTIVE PLASTIC), WITHIN SPACE, IN ORDER TO BOTH PROVIDE PROTECTION (FROMDUST/MOISTURE/CHEMICALS/COATINGS )AND PROVIDE AMPLE ROOM FOR CONTRACTOR WORKTO TAKE PLACE.
- EXISTING DRAPERY PANELS (AT EACH APARTMENT'S SLIDING PATIO DOORS) ARE TO: BE REMOVED& FOLDED, BE CONTAINED IN PLASTIC BAGS, AND BE TEMPORARILY STORED INSIDE THERESPECTIVE APARTMENT'S KITCHEN CABINETS, UNTIL DEEP CLEANING PORTION OF WORK ISCOMPLETED.
- CAREFUL REMOVAL/SAFEKEEPING OF ALL ELECTRICAL WALL PLATES/GILLE COVERS, ETC.UPON COMPLETION OF SPACE, REINSTALL REMOVED ITEMS.
- CAREFUL REMOVAL OF ANY EXISTING CLEAR PLASTIC CORNER GUARDS (TYPE WITH W/ TAMPER-PROOF FASTENERS), WHERE NEEDED, IN ORDER TO REMOVE VWC SHEETS. IF GUARDS AREBROKEN DURING THEIR REMOVAL, CONTRACTOR TO REPLACE WITH SAME TYPE , AT NO CHARGE TOW.C.S.U. ANY RESULTANT CORNER BEAD DAMAGE CAUSED BY CORNER GUARD REMOVAL ARE TO BEREPAIRED BY CONTRACTOR AT NO COST TO WCSU.
- CAREFUL REMOVAL OF EXISTING VINYL BASE MOLDING (IN FULL 4' SECTIONS), ONLY AT WALLSTHAT ARE TO HAVE THEIR VWC REMOVED (AS HIGHLIGHTED IN YELLOW, ON DRAWINGS).
B. NOTES FOR STRIP REMOVAL OF VWC & ANTI-FUNGAL CHEMICAL TREATMENT OF BARE WALLS
- ONLY WALLS HIGHLIGHTED IN YELLOW (ON DRAWINGS) HAVE VWC TO BE STRIP REMOVED
- A W.C.S.U.-PROVIDED REFUSE CONTAINER (FOR STRIPPED VWC DISPOSAL) WILL BE LOCATED IN
PARKING LOT OF BUILDING.
- CONTRACTOR SHALL CARRY 350 S.F. (PER APARTMENT) ALLOWANCE FOR ANTI-FUNGAL CHEM-ICAL APPLICATION AREA. IF MOLD PRESENCE IS GREATER THAN THE ALLOTTED AREA, CONTRACTORIS NOT TO PROCEED PRIOR TO CONFERRING WITH THE W.C.S.U. PROJECT MANAGEMENTREPRESEN-TATIVE.
- CHEMICAL TREATMENT TASK IS TO TAKE PLACE PRIOR TO SANDING OF RESIDUAL VWC ADHESIVE.CHEMICAL SOLUTION IS TO BE THROUGHLY DRY BEFORE START OF SANDING.
- CONTRACTOR TO FOLLOW CHEMICAL MANUFACTURER'S RECOMMENDED HEALTH & SAFETYGUIDELINES/RECOMMENDATIONS (EYE/SKIN/RESPIRATORY) FOR HANLDING OF RESPECTIVEMATERIALS.
- FIBERLOCK TECHNOLOGIES "SHOCKWAVE" BRAND DISINFECTANT/SANITIZER/CLEANER/FUNGICIDE PRODUCT HAS BEEN USEDSUCCESSFULLY, IN PAST, AND IS THE "BASIS OF DESIGN"FOR THIS TASK.
C. NOTES FOR PREP & REPAIRS TO BARE G.B. WALLS & METAL ACCESS PANELS
- ONLY WALLS HIGHLIGHTED IN YELLOW (ON DRAWINGS) ARE TO BE PREPARED & REPAIRED· SAND/SMOOTH ANY VISIBLE/TANGIBLE RESIDUAL VWC ADHESIVE
· PATCH REPAIR ANY VISIBLE/HIDDEN WALL BOARD HOLES/DENTS/CRACKS OR COMPROMISED CORNER BEAD
- (1) METAL HVAC ACCESS PANEL AND (1) METAL ELECTRCIAL PANEL COVER, IN EACH APARTMENT· REMOVAL OF ANY DIRT, GREASE, AND OIL FROM METAL SURFACE
ALL RUST TO BE SANDED DOWN AND DENTS (IF ANY) REPAIRED
D. NOTES FOR PRIMING/PAINTING OF BARE G.B. WALLS & METAL ACCESS PANELS
- ONLY WALLS HIGHLIGHTED IN YELLOW (ON DRAWINGS) ARE TO BE PRIMED/PAINTED WITHCOATING PRODUCTS CONTAINING MOLD KILLING/MOLD PROHIBITIVE CHARACTERISTICSI(SEE SPECIFICATIONS)
- (1) METAL HVAC ACCESS PANEL AND (1) METAL ELECTRCIAL PANEL COVER, PER APARTMENT,ARE TO BE PRIMED AND PAINTED IN COATING PRODUCTS WITH RUST PREVENTATIVECHARACTERISTICS (SEE SPECIFICATIONS)
- BEFORE PAINTING IS STARTED IN ANY AREA, IT SHALL BE BROOM CLEANED AND EXCESSIVE DUSTPARTICULATES SHALL BE REMOVED. AFTER PAINTING OPERATIONS BEGIN IN ANY AREA, BROOMCLEANING WILL NOT BE ALLOWED. CLEANING SHALL THEN BE DONE ONLY WITH COMMERCIALVACUUMCLEANING EQUIPMENT.
- METAL DOOR FRAMES NOT INCLUDED IN SCOPE OF WORK.
- CONTRACTOR TO FOLLOW CHEMICAL MANUFACTURER'S RECOMMENDED HEALTH & SAFETYGUIDELINES/RECOMMENDATIONS (EYE/SKIN/RESPIRATORY) FOR HANLDING OF RESPECTIVEMATERIALS.
E. NOTES FOR VIINYL WALL BASE REPLACEMENT & PLASTIC CORNER GUARDS REPLACEMENTS
- ONLY WALLS HIGHLIGHTED IN YELLOW (ON DRAWINGS) ARE TO HAVE THEIR EXISTING VINYL BASEREMOVED/REPLACED.
- REPLACE ALL REMOVED VINYL WALL BASE (TO MATCH EXISTING BASE USED THROUGHOUTAPARTMENTS) WITH:· JOHNSONITE 6"H X 48"L X 1/8" (COLOR: "SILK")
- SEE SPECIFICATIONS FOR TYPE OF CORNER GUARDS USED IN APARTMENTS.
F. NOTES FOR PREPARATION OF APARTMENTS FOR OCCUPANCY & FINAL DEEP CLEANING
- ALL PREVIOUSLY REMOVED/STORED ELECTRICAL COVER PLATES, GRILL COVERS, ETC. ARE TOBE REINSTALLED.
- CLEANING SCOPE OF WORK:· ALL WALLS, BASEBOARDS, & HARD SURFACES NEED TO BE WIPED DOWN.
· REMOVE ALL TAPE, TACKS, NAILS AND HARD SPILLS FROM FLOORS/WALLS/DOORS/DOORFRAMES/CABINETS
· CLEAN ALL WINDOWS, SILLS AND BLINDS
· CLEAN ALL LIGHT FIXTURES BY REMOVING LENS OR COVERS AS REQUIRED
· CLEAN INTERIOR AND EXTERIOR OF KTICHEN & BATHROOM CABINETRY
· CLEAN STOVETOP/OVEN, AND UTILITY DRAWER
· CLEAN REFRIDGERATOR/FREEZER INSDIE AND OUT
· STOVE AND REFRIGERATOR NEED TO BE PULLED AWAY FROM WALLS SO THAT THE APPLIANCE, FLOOR ANDADJACENT WALLSURFACES CAN BE CLEANED.
· STOVETOP EXHAUST HOODS NEED TO HAVE GREASE/DIRT REMOVED ON EXTERIOR SURFACES AND UNDERNEATH(CLEANING OF EXHAUST FILTERS NOT INCLUDED IN SCOPE)
· CLEAN/DISINFECT BATHROOM SHOWER STALL, ALL BATHROOM FIXTURES, MIRRORS AND FLOOR
· REFILL TOILET PAPER DISPENSER (PAPER ROLLS TO BE SUPPLIED BY WCSU)
· CLEAN SURFACE OF BATHROOM WALL VENTS
· VACUUM AND DUST BEHIND ANY GRILES, LOUVERS, AND SCREENS
· WIPE DOWN ANY UNCOVERED NON-UPHOSLTERED FURNITURE (INCLUDING DRAWER INTERIORS)
· UNWRAP PLASTIC PROTECTED UPHOLSTERED FURNITURE & VACUUM CUSHIONS
· CLEAN FLOORING OF LOOSE MATERIALS FROM VARIOUS SURFACE CLEANINGS
· REMOVE ALL STAINS/SCUFFS FROM FLOORING
· FINAL OVERALL CLEANING VCT FLOORS AND APPLICATION OF A " QUICK SHINE" FINISH PRODUCT(NO WAX STRIPPING/WAXING)
DEEP CLEANING NOTES (CONT'D)
- CONTRACTOR TO MAINTAIN AN APARTMENT LOG (BY APARTMENT #) INDICATING IF THERE AREANY BURNED OUT LIGHT BULBS, BROKEN LIGHT FIXTURES, MISSING CABINETRY KNOBS, LIFTED VCTTILES, MISSING PATIO DOOR DRAPERIES, BROKEN WINDOW GLASS, BROKEN MIRROR GLASS,VISIBLE LEAKS, MISSING APPLIANCES/PARTS, OR STAINS OR DAMAGES THAT CANNOT BE CLEANED.LOG TO BE PROVIDED TO/REVIEWED WITH THE WCSU PROJECT MANAGER SO THAT ITEMSREPORTED CAN BE ADDRESSED BY WCSU STAFF.
- PREVIOUSLY REMOVED CURTAIN PANELS ARE TO BE RETRIEVED (FROM TEMP. STORAGE WITHINKITCHEN CABINETS)AND BE RE-HUNG ON EXISTING HARDWARE AT SLIDING PATIO DOORS.
- CONTRACTOR TO PROVIDE TO WCSU PROJECT MANAGER, PRIOR TO START OF THIS FINAL CLEANINGWORK, A COMPLETE PROGRAM LISTING FOR THE CLEANING OF THE APARTMENTS. THIS SHALLINCLUDE A SUB-LISTING OF CHEMICAL CLEANING PRODUCTS AND CLEANING PROCEDURES.
- CONTRACTOR TO CONDUCT CLEANING AND WASTE-REMOVAL OPERATIONS TO COMPLY WITHLOCAL LAWS AND ORDINANCES AND FEDERAL AND LOCAL ENVIRONMENTAL AND ANTI-POLLUTIONREGULATIONS.
- CONTRACTOR SHALL USE CLEANING MATERIALS/AGENTS APPROPRIATE FOR SURFACES TO BECLEANED. ENSURE THAT CLEANING AGENTS AND METHODS DO NOT REMOVE FINISHES ANDPERMANENT PROTECTIVE COATINGS ON SURFACES BEING CLEANED.
- CONTRACTOR TO FURNISH, AT ITS OWN EXPENSE, ALL CLEANING SUPPLIES/EQUIPMENT/MATERIALS. ALL SUPPLIES/ELECTRICALLY OPERATED EQUIPMENT SHALL BE PROPERLY GROUNDEDAND ALL EQUIPMENT SHALL BE IN SAFE WORKING ORDER.
- RESET FURNITURE UPON COMPLETION OF DEEP CLEANING TASKS. REFER TO DRAWING FOR FURNITURE LAYOUTS PER APARTMENT STYLE.
- LEAVE APARTMENTS CLEAN AND READY FOR OCCUPANCY. ALL FINAL CLEANING SHALL BESUBJECT TO ACCEPTANCE BY UNIVERSITY FACILITIES MANAGEMENT.
SUMMARY OF WORK
[SEE FLOOR PLANS FOR LOCATION OF WORK PHASES DESCRIBED BELOW]
A. PREPARATION OF APARTMENTS FOR CONTRACTOR WORK:
- CLUSTERING/PLASTIC WRAPPING OF EXISTING FURNISHINGS IN APARTMENTS
- REMOVAL/WRAPPING OF EXISTING DRAPERY PANELS AT PATIO DOORS
- REMOVAL OF ALL ELECTRICAL PLATE COVERS, GRILL COVERS, ETC. FROM WALLS
- REMOVAL OF EXISTING PLASTIC CORNER GUARDS (AT WALLS WHERE VWC IS TO BE REMOVED)
- REMOVAL OF EXISTING 6” VINYL BASE MOLDING (AT WALLS WHERE VWC IS TO BE REMOVED)
B. STRIP REMOVAL OF EXISTING 54” VWC AT NOTED LOCATIONS IN APARTMENTS:
- DISPOSAL OF STRIPPED VWC INTO OWNER -PROVIDED REFUSE CONTAINER
- APPLICATION OF ANTI-FUNGAL DISINFECTANT SOLUTION TO WALLS WHERE VWC IS TO BEREMOVED (ONLY AT AREAS WHERE MOLD/MILDEW IS OBSERVED )
C. REPAIRS TO STRIPPED WALLS AND METAL ACCESS PANELS AT NOTED LOCATIONS IN APARTMENTS:
- SANDING /SMOOTHING OF ANY OBSERVED RESIDUAL VWC ADHESIVE ON WALLBOARD
- PATCH REPAIRS TO BOTH EXISTING AND UNFORESEEN G.B. WALL BOARD DAMAGES
- SANDING REMOVAL OF RUST PATCHES AND DENT REPAIRS TO METAL ACCESS PANELS
D. PRIMING/PAINTING OF STRIPPED G.B. WALLS & METAL ACCESS PANELS AT NOTED LOCATIONS INAPARTMENTS
E. REPLACEMENT OF REMOVED VINYL BASE MOLDING AND PLASTIC CORNER GUARDS INAPARTMENTS
F. PREPARATION OF APARTMENTS FOR OCCUPANCY/FINAL DEEP CLEANING
- RE-INSTALL REMOVED ELECTRICAL COVER PLATES, GRILLE COVERS, ETC. ONTO PAINTED WALLS
- PERFORM COMPREHENSIVE ALL SURFACE/APPLIANCE CLEANING PROGRAM
- RE-INSTALL DRAPERY PANELS IN PATIO DOORS
- UNWRAP CLUSTERED/PROTECTED FURNISHING AND FINAL FURNITURE PLACEMENT
-
AS NOTED
GN-1
By:CDF
Scale:
Issue Date:
Project No.
Revisions
No. Date
WCSU
2019-04
4/16/2019
RE
SID
EN
T A
PA
RT
ME
NT
WA
LL
CO
VE
RIN
G R
EM
OV
AL
PIN
NE
Y R
ES
ID
EN
CE
H
AL
L
GENERAL
NOTES
WCSU Facilities,
Planning & Engineering
White Hall 001
181 White Street
Danbury, CT 06810
www.wcsu.edu
GENERAL NOTES 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME
THOROUGHLY ACQUAINTED WITH THE SITE AS IT EXISTS. THEDRAWINGS, SPECIFICATIONS & NOTES CONTAINED HEREIN AREINTENDED TO OUTLINE AND CLARIFY THE WORK REQUIRED FORVARIOUS PROJECTS FOR THE OWNER. HOWEVER, NOT ALLNOTES MAY PERTAIN TO THIS PARTICULAR PROJECT. IT SHALLBE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEEXACT EXTENT OF THE WORK BY PERSONAL FIELDOBSERVATIONS AND FAMILIARIZATION OF THE DRAWINGS,SPECIFICATIONS & NOTES. IT SHALL BE UNDERSTOOD UPONSUBMITTING A BID THAT THE CONTRACTOR HAS VISITED THESITE AND IS THOROUGHLY ACQUAINTED WITH THE WORKREQUIRED, AND HAS INCLUDED IN HIS BID, TO COMPLY WITHTHE INTENT OF THE APPLICABLE DRAWINGS, CODES ANDSPECIFICATION.
2. THE CONTRACTOR SHALL NOT SCALE THE DRAWINGS ANDSHALL ADVISE THE ARCHITECT, IN WRITING OF ANYDISCREPANCIES OR CHANGES REQUIRED CONFORMING TOSITE CONDITIONS. IN CASE OF DISCREPANCIES ON THEDRAWINGS DETAILS SHALL GOVERN OVER OVERALL PLANSAND SCHEDULES.
3. ALL ITEMS SPECIFIED ARE INTENDED TO ESTABLISH QUALITYOF WORK. IF SPECIFICATION CALLS FOR "OR EQUAL", THENPRODUCTS OF OTHER MANUFACTURERS, EQUAL IN DESIGN,COLOR AND QUALITY MAY BE SUBSTITUTED. APPROVAL ISNECESSARY BY THE ARCHITECT, IN WRITING, PRIOR TOPURCHASE, AS WELL AS MEETING ESTABLISHED DESIGN ANDFUNCTION CRITERIA. HOWEVER, ANY SPECIFICATION OMITTINGTHE "OR EQUAL" COMMENT CANNOT BE SUBSTITUTED FOR.
4. ALL DRAWINGS AND NOTES ARE COMPLEMENTARY AND WHATIS CALLED FOR BY ANY WILL BE BINDING AS IF CALLED FOR BYALL. EACH SUBTRADE WILL BE RESPONSIBLE FOR REVIEWINGTHE ENTIRE SET OF DRAWINGS AND NOTING HIS WORK ASAPPLICABLE. WORK INDICATED OR INFERRED ON THE DRAWINGSWILL BE DEEMED AND INCLUDED IN SUB-CONTRACTOR'SCOSTS. SAME SHALL APPLY TO GENERAL CONTRACTOR. THEGENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THEDISTRIBUTION OF ALL DRAWINGS TO ALL SUB-CONTRACTORS.
5. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL MATERIALAND EQUIPMENT AS SHOWN, UNLESS OTHERWISE NOTED BYTHE ARCHITECT ALL MATERIAL SHALL BE NEW AND OF BESTQUALITY UNLESS OTHERWISE INDICATED.
6. THE CONTRACTOR SHALL INCLUDE ALL CUTTING, DRILLING, ANDPATCHING REQUIRED PERMITTING THE INSTALLATION OF HISWORK.
7. ALL WORK AND MATERIALS SHALL COMPLY WITH ALLAPPLICABLE CODES, REGULATIONS AND BUILDINGREGULATIONS OR STANDARDS.
8. A COMPETENT PERSON SHALL BE IN DIRECT CHARGE ANDSUPERVISION OF THE WORK AND WORKMEN REQUIRED TOFULFILL THE WORK CALLED FOR ON THE APPLICABLEDRAWINGS AND SPECIFICATIONS, FROM THE BEGINNING TOCOMPLETION AND FINAL ACCEPTANCE OF THE PROJECT.
9. THE GENERAL CONTRACTOR SHALL ERECT ALL NECESSARYTEMPORARY SOLID AND/OR PLASTIC DROP CLOTH PARTITIONSTO PROTECT OCCUPIED AREAS WHILE DEMOLITION ANDCONSTRUCTION ARE IN PROGRESS.
10. THE CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS,SATISFACTORY TO THE BUILDING OWNER AND THE ARCHITECT,TO PROTECT THE WORKMEN AND THE BUILDING OCCUPANTSFROM HAZARDOUS CONDITIONS OR ACCIDENTS INCONNECTION WITH THE WORK IN PROGRESS.
11. THE CONTRACTOR SHALL MAINTAIN FREE AND UNOBSTRUCTEDACCESS FROM ALL AREAS TO THE BUILDING FIRE STAIRS ANDTO THE OUTSIDE OF THE BUILDING AT ALL TIMES DURINGCONSTRUCTION.
12. THE CONTRACTOR SHALL CONTROL CLEANING AND INSTALLTEMPORARY PROTECTION TO PREVENT DIRT OR DUST FROMLEAVING THE JOB SITE AND INFILTRATING AREAS NOTINVOLVED IN THE PROJECT. THIS INCLUDES THE ELEVATORS,ELEV. LOBBY & CORRIDORS. PROTECT ALL AREAS ASREQUIRED.
13. ANY DAMAGES TO EXISTING PARTITIONS, FLOORS, CEILINGS,FINISHED WORK, FURNITURE AND FURNISHINGS, OR ANY PARTOF THE BUILDING OR EQUIPMENT CAUSED BY THE WORK OF THECONTRACTOR OR HIS WORKMEN SHALL BE MADE GOOD AT NOADDITIONAL EXPENSE TO THE UNIVERSITY.
14. UPON COMPLETION OF JOB, THE GENERAL CONTRACTORSHALL SUBMIT CERTIFICATES OF INSPECTION FROM ALL THEAPPLICABLE DEPARTMENTS.
15. THE CONTRACTOR SHALL GUARANTEE ALL WORK ANDMATERIALS FOR A PERIOD OF EIGHTEEN (18) MONTHS, FROMTHE ACCEPTANCE OF THE PROJECT, AGAINST DEFECTIVEMATERIALS OR WORKMANSHIP.
16. A COPY OF THE LATEST SET OF ARCHITECTURAL DRAWINGSSHALL BE KEPT AT THE JOB SITE. THESE DRAWINGS ARE TO BEMOUNTED AND UPDATED BY THE CONTRACTOR DURINGCONSTRUCTION. THE SET IS TO BE RETURNED TO THEARCHITECT AT THE COMPLETION OF THE PROJECT AS "ASBUILT".
DEMOLITION NOTES:1. ALL DEMOLITION ACTIVITIES ARE TO CONFORM TO AND COMPLY
WITH ALL FEDERAL, STATE, AND LOCAL BUILDING CODES ®ULATIONS.
2. GENERAL CONTRACTOR TO NOTIFY THE UNIVERSITY AT LEAST48 HOURS PRIOR TO START OF DEMOLITION.
3. PUBLIC AREAS SUCH AS LOBBIES, PUBLIC CORRIDORS ANDSERVICE CORRIDORS SHALL BE PROTECTED AS DIRECTED BYTHE UNIVERSITY.
4. IN ALL OCCUPIED AREAS CONTRACTOR TO PROVIDEPROTECTION FOR ALL UNIVERSITY EQUIPMENT WHETHER TOREMAIN IN OPERATION OR STORED ON SITE.
5. ALL CONTRACTORS SHALL CONFORM WITH REGULATIONS ANDREQUIREMENTS OF THE UNIVERSITY AS TO PERMITTED HOURSAND SCHEDULING FOR DEMOLITION AND REMOVALS.
6. CONTRACTOR TO SCHEDULE DEMOLITION AND REMOVALS TOAVOID DELAYS IN THE WORK.
7. CONTRACTOR TO DEMOLISH AND REMOVE COMPLETELY ALLREQUIRED ELEMENTS OF THE EXISTING INSTALLATION AS PERPLAN SO AS TO PROPERLY PREPARE FOR THE EXECUTION ANDINSTALLATION OF THE NEW FINISHES.
8. CONTRACTOR TO TAKE PROPER PRECAUTIONS TO PREVENTDUST AND DIRT FROM RISING DURING DEMOLITION.
11. REMOVE LOOSE OR DEFECTIVE PLASTER ON EXISTINGCONSTRUCTION WHICH IS TO REMAIN. REMOVE DAMAGEDPLASTER BEADS AT EXISTING CORNERS WHERE NEWPARTITIONS ARE TO ALIGN WITH EXISTING FINISH.
12. PIPES AND CONDUITS ENCOUNTERED IN DEMOLISHEDPARTITIONS AND SERVING AREAS WHICH ARE TO REMAIN ACTIVESHALL BE REROUTED AND CONCEALED.
13. REMOVE PROMPTLY FROM THE PREMISES ALL PRODUCTS OFDEMOLITION NOT DESIGNATED TO BE SALVAGED. NO DEBRISSHALL BE ALLOWED TO ACCUMULATE.
14. REMOVAL FROM THE PREMISES AND THE BUILDING OF ALLDEMOLISHED ITEMS AND DEMOLITION DEBRIS OF ALL TRADESAND SUBCONTRACTORS SHALL BE THE RESPONSIBILITY OFTHE GENERAL CONTRACTOR.
15. GENERAL CONTRACTOR TO COORDINATE AND COOPERATEWITH OTHER CONTRACTORS TO VERIFY AND SCHEDULEREMOVALS OF CONDUIT, LIGHTING, ELECTRICAL OUTLETS,PLUMBING, PRIOR TO REMOVAL.
16. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FORTHE DISCONNECTION AND DISMANTLING OF ANY OR ALLPANELS, TRANSFORMERS, LIGHT FIXTURES, POWERCABLING AND OTHER DEVICES AS INDICATED OR REQUIRED TOBE PREPARED BY THE E. C. FOR REMOVAL FROM THEPREMISES BY THE G. C.
CONSTRUCTION NOTESGENERAL1. NOTES ON OTHER DRAWINGS SHALL APPLY TO THIS SECTION
OF THE WORK. THE CONTRACTOR SHALL FURNISH ALLNECESSARY LABOR, EQUIPMENT AND MATERIALS FOR THEIMPLEMENTATION OF THE INTENT OF THIS WORK.
2. ALL WORK SHALL CONFORM TO ALL APPLICABLE RULES,REGULATIONS, CODES AND ORDINANCES FOR THE STATE ANDLOCAL MUNICIPALITIES.
FINISH NOTES;
PAINT1. ALL PRIMERS AND UNDERCOATS SHALL BE TINTED TO
APPROXIMATE THE COLOR OF THE FINISHED COAT.
2. ALL SURFACES TO RECEIVE FINISHES ARE TO BE CLEANED,DRY AND SMOOTH BEFORE APPLICATIONS OF NEW FINISHES.WALL MARKINGS MUST BE SUFFICIENTLY SEALED BEFOREAPPLICATION OF PAINT SO AS TO PREVENT BLEED-THROUGH.
3. PAINTING MATERIAL PRODUCTS TO BE FACTORY PREPARED ANDAS RECOMMENDED FOR SPECIFIC TYPE OF PAINTING. COLORSTO MATCH THOSE SPECIFIED.
4. CONTRACTOR SHALL OBTAIN APPROVAL OF INSTALLATION OFALL WORK FROM ARCHITECT PRIOR TO LEAVING THE JOB.
5. REMOVE AND/OR PROVIDE AMPLE PROTECTION IN PLACEFOR HARDWARE, ACCESSORIES, DEVICE PLATES, LIGHTINGFIXTURES, FACTORY FINISHED WORK, AND COMPLETEDCABINETRY, FURNITURE OR SIMILAR ITEMS. UPONCOMPLETION OF EACH SPACE, CAREFULLY REPLACE ALLREMOVED ITEMS AND PROTECTION.
6. ALL ADJACENT WORK AND MATERIALS MUST BE PROTECTEDWITH SUITABLE COVERS DURING THE PROGRESS OF THEWORK.
7. THE CONTRACTOR SHALL TOUCH UP AND FINISH ANY PART OFHIS WORK REQUIRING SAME AFTER OTHER TRADES HAVEFINISHED AND SHALL REPAIR ANY DAMAGE TO HIS WORK.
2018 Connecticut Building Code2015 International Building Code2009 ICC/ANSI A117.1 Accessible and UsableBuildings and Facilities2015 International Existing Building Code2015 International Plumbing Code2015 International Mechanical Code2015 International Energy Conservation Code2017 NFPA 70, National Electrical Code, of theNational Fire Protection Association Inc.2015 International Residential Code of theInternational Code Council, Inc.
VINYL WALL COVERING TO BE REMOVED
VINYL WALLCOVERING PREVIOUSLY REMOVED
PRIORITY APARTMENTS
WALL COLOR KEY
APARTMENTS NOT IN CONTRACT
SCALE: 3/32" = 1'-0"
5'-4" 10'-8"0 21'-4"
SUMMARY OF WORK
[SEE NOTES ON GN-1 AND SPECIFICATION PACKAGE PERTAINING TO WORK PHASES DESCRIBED BELOW]
A. PREPARATION OF APARTMENTS FOR CONTRACTOR WORK:
- CLUSTERING/PLASTIC WRAPPING OF EXISTING FURNISHINGS IN APARTMENTS
- REMOVAL/WRAPPING OF EXISTING DRAPERY PANELS AT PATIO DOORS
- REMOVAL OF ALL ELECTRICAL PLATE COVERS, GRILL COVERS, ETC. FROM WALLS
- REMOVAL OF EXISTING PLASTIC CORNER GUARDS (AT WALLS WHERE VWC IS TO BE REMOVED)
- REMOVAL OF EXISTING 6” VINYL BASE MOLDING (AT WALLS WHERE VWC IS TO BE REMOVED)
B. STRIP REMOVAL OF EXISTING 54” VWC AT NOTED LOCATIONS IN APARTMENTS:
- DISPOSAL OF STRIPPED VWC INTO OWNER -PROVIDED REFUSE CONTAINER
- APPLICATION OF ANTI-FUNGAL DISINFECTANT SOLUTION TO WALLS WHERE VWC IS TO BEREMOVED (ONLY AT AREAS WHERE MOLD/MILDEW IS OBSERVED )
C. REPAIRS TO STRIPPED WALLS AND METAL ACCESS PANELS AT NOTED LOCATIONS IN APARTMENTS:
- SANDING /SMOOTHING OF ANY OBSERVED RESIDUAL VWC ADHESIVE ON WALLBOARD
- PATCH REPAIRS TO BOTH EXISTING AND UNFORESEEN G.B. WALL BOARD DAMAGES
- SANDING REMOVAL OF RUST PATCHES AND DENT REPAIRS TO METAL ACCESS PANELS
D. PRIMING/PAINTING OF STRIPPED G.B. WALLS & METAL ACCESS PANELS AT NOTED LOCATIONS INAPARTMENTS
E. REPLACEMENT OF REMOVED VINYL BASE MOLDING AND PLASTIC CORNER GUARDS INAPARTMENTS
F. PREPARATION OF APARTMENTS FOR OCCUPANCY/FINAL DEEP CLEANING
- RE-INSTALL REMOVED ELECTRICAL COVER PLATES, GRILLE COVERS, ETC. ONTO PAINTED WALLS
- PERFORM COMPREHENSIVE ALL SURFACE/APPLIANCE CLEANING PROGRAM
- RE-INSTALL DRAPERY PANELS IN PATIO DOORS
- UNWRAP CLUSTERED/PROTECTED FURNISHING AND FINAL FURNITURE PLACEMENT
AS NOTED
A-1
By:CDF
Scale:
Issue Date:
Project No.
Revisions
No. Date
WCSU
2019-04
4/16/2019
First &
Second
Floor Plans
& Notes
WCSU Facilities,
Planning & Engineering
White Hall 001
181 White Street
Danbury, CT 06810
www.wcsu.edu
D11 D13
D12 D14
D15
RES. DIR. APT.
LIVING
A
BAB
LAV BLAV A/B
LAV B/C
CB
LIVING
ACBA
LAV A/B LAV C LAV A
LAV A LAV C
CABC
LAV A
LIVING
LIVING
LIVING
LAV B/C
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
FLOOR PLAN G
C11 C13
C14
C16
AB
LAV A/B
LAV B/C
CB
LIVING
ACBA
LAV C LAV A
LAV A LAV C
CA
BC
LIVING
LIVING
LIVING
LAV B/C
LAV A/B
A
LAV
A
C12
LIVING
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN B-HC
FLOOR PLAN A-LEFT
FLOOR PLAN C-HC
A
B
C
D
A
B
C
D
D21 D23
D22 D24AB
CB
LIVING
ACBA
LAV C LAV A
LAV A LAV C
CABC
LIVING
LIVING
LIVING
LAV B/C
LAV A/B
D25
LIVING
ABC
LAV A/B
LAV ALAV B/C
LAV B/C
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
FLOOR PLAN F
C21
C23
C24
C26
AB
CB
LIVING
ACBA
LAV C LAV A
LAV A LAV C
CA
BC
LIVING
LIVING
LIVING
LAV B/C
LAV A/B
LAV B/C
A
LAV
A
C22
LIVING
LAV A/B
FLOOR PLAN A-LEFT
FLOOR PLAN A-RIGHT
FLOOR PLAN B-HC
FLOOR PLAN A-LEFT
FLOOR PLAN C-HC
NOTE:
SEE A-6 & A-7 FOR
DIMENSIONS OF
PROJECT UNITS
N.I.C.
N.I.C.
N.I.C.
RE
SID
EN
T A
PA
RT
ME
NT
WA
LL
CO
VE
RIN
G R
EM
OV
AL
PIN
NE
Y R
ES
ID
EN
CE
H
AL
L
VINYL WALL COVERING TO BE REMOVED
VINYL WALLCOVERING PREVIOUSLY REMOVED
PRIORITY APARTMENTS
WALL COLOR KEY
SCALE: 3/32" = 1'-0"
5'-4" 10'-8"0 21'-4"
APARTMENTS NOT IN CONTRACT
SUMMARY OF WORK
[SEE NOTES ON GN-1 AND SPECIFICATION PACKAGE PERTAINING TO WORK PHASES DESCRIBED BELOW]
A. PREPARATION OF APARTMENTS FOR CONTRACTOR WORK:
- CLUSTERING/PLASTIC WRAPPING OF EXISTING FURNISHINGS IN APARTMENTS
- REMOVAL/WRAPPING OF EXISTING DRAPERY PANELS AT PATIO DOORS
- REMOVAL OF ALL ELECTRICAL PLATE COVERS, GRILL COVERS, ETC. FROM WALLS
- REMOVAL OF EXISTING PLASTIC CORNER GUARDS (AT WALLS WHERE VWC IS TO BE REMOVED)
- REMOVAL OF EXISTING 6” VINYL BASE MOLDING (AT WALLS WHERE VWC IS TO BE REMOVED)
B. STRIP REMOVAL OF EXISTING 54” VWC AT NOTED LOCATIONS IN APARTMENTS:
- DISPOSAL OF STRIPPED VWC INTO OWNER -PROVIDED REFUSE CONTAINER
- APPLICATION OF ANTI-FUNGAL DISINFECTANT SOLUTION TO WALLS WHERE VWC IS TO BEREMOVED (ONLY AT AREAS WHERE MOLD/MILDEW IS OBSERVED )
C. REPAIRS TO STRIPPED WALLS AND METAL ACCESS PANELS AT NOTED LOCATIONS IN APARTMENTS:
- SANDING /SMOOTHING OF ANY OBSERVED RESIDUAL VWC ADHESIVE ON WALLBOARD
- PATCH REPAIRS TO BOTH EXISTING AND UNFORESEEN G.B. WALL BOARD DAMAGES
- SANDING REMOVAL OF RUST PATCHES AND DENT REPAIRS TO METAL ACCESS PANELS
D. PRIMING/PAINTING OF STRIPPED G.B. WALLS & METAL ACCESS PANELS AT NOTED LOCATIONS INAPARTMENTS
E. REPLACEMENT OF REMOVED VINYL BASE MOLDING AND PLASTIC CORNER GUARDS INAPARTMENTS
F. PREPARATION OF APARTMENTS FOR OCCUPANCY/FINAL DEEP CLEANING
- RE-INSTALL REMOVED ELECTRICAL COVER PLATES, GRILLE COVERS, ETC. ONTO PAINTED WALLS
- PERFORM COMPREHENSIVE ALL SURFACE/APPLIANCE CLEANING PROGRAM
- RE-INSTALL DRAPERY PANELS IN PATIO DOORS
- UNWRAP CLUSTERED/PROTECTED FURNISHING AND FINAL FURNITURE PLACEMENT
AS NOTED
A-2
By:CDF
Scale:
Issue Date:
Project No.
Revisions
No. Date
WCSU
2019-04
4/16/2019
Third Floor
Plans &
Notes
WCSU Facilities,
Planning & Engineering
White Hall 001
181 White Street
Danbury, CT 06810
www.wcsu.edu
A
B
C
D
D31 D33
D32 D34AB
CB
LIVING
ACBA
LAV C LAV A
LAV ALAV C
CABC
LIVING
LIVING
LIVING
D35
LIVING
ABC
LAV A/B LAV B/C
LAV B/C
LAV A/B
LAV B/C
LAV A
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
FLOOR PLAN F
C31 C33
C34
C36 AB
CB
LIVING
ACBA
LAV C LAV A
LAV A LAV C
CA
BC
LIVING
LIVING
LIVING
LAV B/C
LAV A/B
LAV B/C
A
LAV
A
C32
LIVING
LAV A/B
B
C
LAV B/C
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN B-HC
FLOOR PLAN A-LEFT
FLOOR PLAN D-HC
B31 B33
B32 B34AB
CB
LIVING
ACBA
LAV C LAV A
LAV ALAV C
CABC
LIVING
LIVING
LIVING
B36
LIVING
LAV A/B
LAV A
LAV B/CLAV A/B
LAV B/C
A
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
FLOOR PLAN F
A31 A33
A32 A34AB
CB
LIVING
ACBA
LAV C LAV A
LAV ALAV C
CABC
LIVING
LIVING
LIVING
LAV A/B
LAV B/CLAV A/B
LAV B/C
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
NOTE:
SEE A-6 & A-7 FOR
DIMENSIONS OF
PROJECT UNITS
N.I.C.
RE
SID
EN
T A
PA
RT
ME
NT
WA
LL
CO
VE
RIN
G R
EM
OV
AL
PIN
NE
Y R
ES
ID
EN
CE
H
AL
L
VINYL WALL COVERING TO BE REMOVED
VINYL WALLCOVERING PREVIOUSLY REMOVED
PRIORITY APARTMENTS
WALL COLOR KEY
SCALE: 3/32" = 1'-0"
5'-4" 10'-8"0 21'-4"
APARTMENTS NOT IN CONTRACT
SUMMARY OF WORK
[SEE NOTES ON GN-1 AND SPECIFICATION PACKAGE PERTAINING TO WORK PHASES DESCRIBED BELOW]
A. PREPARATION OF APARTMENTS FOR CONTRACTOR WORK:
- CLUSTERING/PLASTIC WRAPPING OF EXISTING FURNISHINGS IN APARTMENTS
- REMOVAL/WRAPPING OF EXISTING DRAPERY PANELS AT PATIO DOORS
- REMOVAL OF ALL ELECTRICAL PLATE COVERS, GRILL COVERS, ETC. FROM WALLS
- REMOVAL OF EXISTING PLASTIC CORNER GUARDS (AT WALLS WHERE VWC IS TO BE REMOVED)
- REMOVAL OF EXISTING 6” VINYL BASE MOLDING (AT WALLS WHERE VWC IS TO BE REMOVED)
B. STRIP REMOVAL OF EXISTING 54” VWC AT NOTED LOCATIONS IN APARTMENTS:
- DISPOSAL OF STRIPPED VWC INTO OWNER -PROVIDED REFUSE CONTAINER
- APPLICATION OF ANTI-FUNGAL DISINFECTANT SOLUTION TO WALLS WHERE VWC IS TO BEREMOVED (ONLY AT AREAS WHERE MOLD/MILDEW IS OBSERVED )
C. REPAIRS TO STRIPPED WALLS AND METAL ACCESS PANELS AT NOTED LOCATIONS IN APARTMENTS:
- SANDING /SMOOTHING OF ANY OBSERVED RESIDUAL VWC ADHESIVE ON WALLBOARD
- PATCH REPAIRS TO BOTH EXISTING AND UNFORESEEN G.B. WALL BOARD DAMAGES
- SANDING REMOVAL OF RUST PATCHES AND DENT REPAIRS TO METAL ACCESS PANELS
D. PRIMING/PAINTING OF STRIPPED G.B. WALLS & METAL ACCESS PANELS AT NOTED LOCATIONS INAPARTMENTS
E. REPLACEMENT OF REMOVED VINYL BASE MOLDING AND PLASTIC CORNER GUARDS INAPARTMENTS
F. PREPARATION OF APARTMENTS FOR OCCUPANCY/FINAL DEEP CLEANING
- RE-INSTALL REMOVED ELECTRICAL COVER PLATES, GRILLE COVERS, ETC. ONTO PAINTED WALLS
- PERFORM COMPREHENSIVE ALL SURFACE/APPLIANCE CLEANING PROGRAM
- RE-INSTALL DRAPERY PANELS IN PATIO DOORS
- UNWRAP CLUSTERED/PROTECTED FURNISHING AND FINAL FURNITURE PLACEMENT
AS NOTED
A-3
By:CDF
Scale:
Issue Date:
Project No.
Revisions
No. Date
WCSU
2019-04
4/16/2019
Forth Floor
Plans &
Notes
WCSU Facilities,
Planning & Engineering
White Hall 001
181 White Street
Danbury, CT 06810
www.wcsu.edu
A
B
C
D
D41 D43
D42 D44AB
CB
LIVING
ACBA
LAV C LAV A
LAV ALAV C
CABC
LIVING
LIVING
LIVING
D45
LIVING
ABC
LAV A/B LAV B/C
LAV B/C
LAV A/B
LAV B/C
LAV A
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
FLOOR PLAN F
C41 C43
C44
C46AB
CB
LIVING
ACBA
LAV C LAV A
LAV A LAV C
CA
BC
LIVING
LIVING
LIVING
LAV B/C
LAV A/B
LAV B/C
A
LAV
A
C42
LIVING
LAV A/B
B
C
LAV B/C
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN B-HC
FLOOR PLAN A-LEFT
FLOOR PLAN D-HC
B41
B43
B42 B44AB
CBLIVING
ACBA
LAV C LAV A
LAV ALAV C
CABC
LIVING
LIVING
LIVING
B46
LIVING
LAV A/B
LAV A
LAV B/CLAV A/B
LAV B/C
A
FLOOR PLAN A-LEFT
FLOOR PLAN A-RIGHT
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
FLOOR PLAN G
A41
A43
A42 A44AB
CB
LIVING
ACBA
LAV C LAV A
LAV ALAV C
CABC
LIVING
LIVING
LIVING
LAV A/B
LAV B/CLAV A/B
LAV B/C
FLOOR PLAN A-LEFT
FLOOR PLAN A-RIGHT
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
NOTE:
SEE A-6 & A-7 FOR
DIMENSIONS OF
PROJECT UNITS
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N.I.C.
RE
SID
EN
T A
PA
RT
ME
NT
WA
LL
CO
VE
RIN
G R
EM
OV
AL
PIN
NE
Y R
ES
ID
EN
CE
H
AL
L
VINYL WALL COVERING TO BE REMOVED
VINYL WALLCOVERING PREVIOUSLY REMOVED
PRIORITY APARTMENTS
WALL COLOR KEY
SCALE: 3/32" = 1'-0"
5'-4" 10'-8"0 21'-4"
APARTMENTS NOT IN CONTRACT
SUMMARY OF WORK
[SEE NOTES ON GN-1 AND SPECIFICATION PACKAGE PERTAINING TO WORK PHASES DESCRIBED BELOW]
A. PREPARATION OF APARTMENTS FOR CONTRACTOR WORK:
- CLUSTERING/PLASTIC WRAPPING OF EXISTING FURNISHINGS IN APARTMENTS
- REMOVAL/WRAPPING OF EXISTING DRAPERY PANELS AT PATIO DOORS
- REMOVAL OF ALL ELECTRICAL PLATE COVERS, GRILL COVERS, ETC. FROM WALLS
- REMOVAL OF EXISTING PLASTIC CORNER GUARDS (AT WALLS WHERE VWC IS TO BE REMOVED)
- REMOVAL OF EXISTING 6” VINYL BASE MOLDING (AT WALLS WHERE VWC IS TO BE REMOVED)
B. STRIP REMOVAL OF EXISTING 54” VWC AT NOTED LOCATIONS IN APARTMENTS:
- DISPOSAL OF STRIPPED VWC INTO OWNER -PROVIDED REFUSE CONTAINER
- APPLICATION OF ANTI-FUNGAL DISINFECTANT SOLUTION TO WALLS WHERE VWC IS TO BEREMOVED (ONLY AT AREAS WHERE MOLD/MILDEW IS OBSERVED )
C. REPAIRS TO STRIPPED WALLS AND METAL ACCESS PANELS AT NOTED LOCATIONS IN APARTMENTS:
- SANDING /SMOOTHING OF ANY OBSERVED RESIDUAL VWC ADHESIVE ON WALLBOARD
- PATCH REPAIRS TO BOTH EXISTING AND UNFORESEEN G.B. WALL BOARD DAMAGES
- SANDING REMOVAL OF RUST PATCHES AND DENT REPAIRS TO METAL ACCESS PANELS
D. PRIMING/PAINTING OF STRIPPED G.B. WALLS & METAL ACCESS PANELS AT NOTED LOCATIONS INAPARTMENTS
E. REPLACEMENT OF REMOVED VINYL BASE MOLDING AND PLASTIC CORNER GUARDS INAPARTMENTS
F. PREPARATION OF APARTMENTS FOR OCCUPANCY/FINAL DEEP CLEANING
- RE-INSTALL REMOVED ELECTRICAL COVER PLATES, GRILLE COVERS, ETC. ONTO PAINTED WALLS
- PERFORM COMPREHENSIVE ALL SURFACE/APPLIANCE CLEANING PROGRAM
- RE-INSTALL DRAPERY PANELS IN PATIO DOORS
- UNWRAP CLUSTERED/PROTECTED FURNISHING AND FINAL FURNITURE PLACEMENT
AS NOTED
A-4
By:CDF
Scale:
Issue Date:
Project No.
Revisions
No. Date
WCSU
2019-04
4/16/2019
Fifth Floor
Plans &
Notes
WCSU Facilities,
Planning & Engineering
White Hall 001
181 White Street
Danbury, CT 06810
www.wcsu.edu
A
B
C
D
D51 D53
D52 D54AB
CB
LIVING
ACBA
LAV C LAV A
LAV ALAV C
CABC
LIVING
LIVING
LIVING
LAV A/B
LAV B/C
LAV A/B
LAV B/C
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
C51 C53
C54
C56 AB
CB
LIVING
ACBA
LAV C LAV A
LAV A LAV C
CA
BC
LIVING
LIVING
LIVING
LAV B/C
LAV A/B
LAV B/C
A
LAV
A
C52
LIVING
LAV A/B
B
C
LAV B/C
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN B-HC
FLOOR PLAN A-LEFT
FLOOR PLAN D-HC
B51 B53
B52 B54AB
CB
LIVING
ACBA
LAV C LAV A
LAV ALAV C
CABC
LIVING
LIVING
LIVING
B56
LIVING
LAV A/B
LAV A
LAV B/CLAV A/B
LAV B/C
A
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
FLOOR PLAN E
A51 A53
A52 A54AB
CB
LIVING
ACBA
LAV C LAV A
LAV ALAV C
CABC
LIVING
LIVING
LIVING
LAV A/B
LAV B/CLAV A/B
LAV B/C
FLOOR PLAN A-LEFT FLOOR PLAN A-RIGHT
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
NOTE:
SEE A-6 & A-7 FOR
DIMENSIONS OF
PROJECT UNITS
N.I.C.
N.I.C.
RE
SID
EN
T A
PA
RT
ME
NT
WA
LL
CO
VE
RIN
G R
EM
OV
AL
PIN
NE
Y R
ES
ID
EN
CE
H
AL
L
VINYL WALL COVERING TO BE REMOVED
VINYL WALLCOVERING PREVIOUSLY REMOVED
PRIORITY APARTMENTS
WALL COLOR KEY
SCALE: 3/32" = 1'-0"
5'-4" 10'-8"0 21'-4"
APARTMENTS NOT IN CONTRACT
SUMMARY OF WORK
[SEE NOTES ON GN-1 AND SPECIFICATION PACKAGE PERTAINING TO WORK PHASES DESCRIBED BELOW]
A. PREPARATION OF APARTMENTS FOR CONTRACTOR WORK:
- CLUSTERING/PLASTIC WRAPPING OF EXISTING FURNISHINGS IN APARTMENTS
- REMOVAL/WRAPPING OF EXISTING DRAPERY PANELS AT PATIO DOORS
- REMOVAL OF ALL ELECTRICAL PLATE COVERS, GRILL COVERS, ETC. FROM WALLS
- REMOVAL OF EXISTING PLASTIC CORNER GUARDS (AT WALLS WHERE VWC IS TO BE REMOVED)
- REMOVAL OF EXISTING 6” VINYL BASE MOLDING (AT WALLS WHERE VWC IS TO BE REMOVED)
B. STRIP REMOVAL OF EXISTING 54” VWC AT NOTED LOCATIONS IN APARTMENTS:
- DISPOSAL OF STRIPPED VWC INTO OWNER -PROVIDED REFUSE CONTAINER
- APPLICATION OF ANTI-FUNGAL DISINFECTANT SOLUTION TO WALLS WHERE VWC IS TO BEREMOVED (ONLY AT AREAS WHERE MOLD/MILDEW IS OBSERVED )
C. REPAIRS TO STRIPPED WALLS AND METAL ACCESS PANELS AT NOTED LOCATIONS IN APARTMENTS:
- SANDING /SMOOTHING OF ANY OBSERVED RESIDUAL VWC ADHESIVE ON WALLBOARD
- PATCH REPAIRS TO BOTH EXISTING AND UNFORESEEN G.B. WALL BOARD DAMAGES
- SANDING REMOVAL OF RUST PATCHES AND DENT REPAIRS TO METAL ACCESS PANELS
D. PRIMING/PAINTING OF STRIPPED G.B. WALLS & METAL ACCESS PANELS AT NOTED LOCATIONS INAPARTMENTS
E. REPLACEMENT OF REMOVED VINYL BASE MOLDING AND PLASTIC CORNER GUARDS INAPARTMENTS
F. PREPARATION OF APARTMENTS FOR OCCUPANCY/FINAL DEEP CLEANING
- RE-INSTALL REMOVED ELECTRICAL COVER PLATES, GRILLE COVERS, ETC. ONTO PAINTED WALLS
- PERFORM COMPREHENSIVE ALL SURFACE/APPLIANCE CLEANING PROGRAM
- RE-INSTALL DRAPERY PANELS IN PATIO DOORS
- UNWRAP CLUSTERED/PROTECTED FURNISHING AND FINAL FURNITURE PLACEMENT
AS NOTED
A-5
By: CDF
Scale:
Issue Date:
Project No.
Revisions
No. Date
WCSU
2019-04
4/16/2019
Sixth Floor
Plans &
Notes
WCSU Facilities,
Planning & Engineering
White Hall 001
181 White Street
Danbury, CT 06810
www.wcsu.edu
A
B
C
D
D61 D63
D62 D64AB
A
LIVING
CB
A
LAV B/C
LAV A
LAV C
CABC
LIVING
LIVING
LIVING
LAV A/B
LAV A
LAV A
LAV B/C
FLOOR PLAN H FLOOR PLAN A-RIGHT
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
C61 C63
C64
C66AB
A
LIVING
CB
A
LAV B/C
LAV A
LAV C
CA
BC
LIVING
LIVING
LIVING
LAV A/B
LAV A
LAV A
LAV B/C
FLOOR PLAN H FLOOR PLAN A-RIGHT
FLOOR PLAN B-HC
FLOOR PLAN A-LEFT
B61 B63
B62 B64AB
A
LIVING
CB
A
LAV B/C
LAV A
LAV C
CABC
LIVING
LIVING
LIVING
LAV A/B
LAV A
LAV A
LAV B/C
FLOOR PLAN H FLOOR PLAN J
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
A61 A63
A62 A64AB
A
LIVING
CB
A
LAV B/C
LAV A
LAV C
CABC
LIVING
LIVING
LIVING
LAV A/B
LAV A
LAV A
LAV B/C
FLOOR PLAN H FLOOR PLAN J
FLOOR PLAN A-RIGHT FLOOR PLAN A-LEFT
NOTE:
SEE A-6 & A-7 FOR
DIMENSIONS OF
PROJECT UNITS
B66
LIVING
A
LAV
N.I.C.
N.I.C.
N.I.C. N.I.C. N.I.C.
N.I.C.
FLOOR PLAN E
RE
SID
EN
T A
PA
RT
ME
NT
WA
LL
CO
VE
RIN
G R
EM
OV
AL
PIN
NE
Y R
ES
ID
EN
CE
H
AL
L
AS NOTED
A-6
By: DMF
Scale:
Issue Date:
Project No.
Revisions
No. Date
WCSU
2019-04
4/16/2019
Apartment
Unit Floor
Plans With
Dimensions
WCSU Facilities,
Planning & Engineering
White Hall 001
181 White Street
Danbury, CT 06810
www.wcsu.edu
NOTE:
SEE A-1, A-2, A-3, A-4, & A-5
FOR LOCATIONS OF PROJECT UNITS
AND EXTENT OF WORK.
SCALE: 1/4" = 1'-0"
2' 4'0 8'
RE
SID
EN
T A
PA
RT
ME
NT
WA
LL
CO
VE
RIN
G R
EM
OV
AL
PIN
NE
Y R
ES
ID
EN
CE
H
AL
L
AS NOTED
A-7
By: DMF
Scale:
Issue Date:
Project No.
Revisions
No. Date
WCSU
2019-04
4/16/2019
Apartment
Unit Floor
Plans With
Dimensions
WCSU Facilities,
Planning & Engineering
White Hall 001
181 White Street
Danbury, CT 06810
www.wcsu.edu
NOTE:
SEE A-1, A-2, A-3, A-4, & A-5
FOR LOCATIONS OF PROJECT UNITS
AND EXTENT OF WORK.
SCALE: 1/4" = 1'-0"
2' 4'0 8'
RE
SID
EN
T A
PA
RT
ME
NT
WA
LL
CO
VE
RIN
G R
EM
OV
AL
PIN
NE
Y R
ES
ID
EN
CE
H
AL
L