ANNUAL REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800, 2701600, 2660015, 2668586 Fax : (+91761) 2664343,2660015 Website : www.sldcmpindia.com email : [email protected], [email protected] Not for Commercial Purpose vkbZ,lvks : 9001-2008 ISO : 9001-2008

STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Embed Size (px)

Citation preview

Page 1: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

 

 

 

ANNUAL REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD.

STATE LOAD DESPATCH CENTRE, 

JABALPUR 

 

 

okf"kZd fjiksVZ 2011-2012

Phone : (+91761) 2706800, 2701600, 2660015, 2668586 Fax : (+91761) 2664343,2660015 Website : www.sldcmpindia.com

email : [email protected], [email protected]

Not for Commercial Purpose

vkbZ,lvks : 9001-2008ISO : 9001-2008

Page 2: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sl. No. P A R T I C U L A R S Page No.

1 INTRODUCTION1.1 Functions of State Load Despatch Centre 1

1.2 Functions of State Transmission Utilities 2

1.3 Salient Features 3

2 STATE GRID PERFORMANCE2.1 Installed Capacity : All India, Western Region, Madhya Pradesh 4

2.2 MP Transmission System 5

2.2.1 Growth of HV Lines 5

2.2.2 Growth of MVA Capacity 5

2.2.3 MP Transmission Loss 6

2.3 Power Supply Position

2.3.1 Demand Profile 6-10

2.3.2 Load Pattern : Western Region, MP and MP Discom 10-13

2.3.3 Hourly Load Curve of MP on Peak day and Portfolio of Maximum Demand Met 13-14

2.3.4 Growth of Demand Met 14

2.3.5 Annual Load Curve 15

2.3.6 Energy Supply 15-18

2.4 Frequency Profile 18-19

2.5 Voltage Profile 19

2.6 Supply Hours 20

2.7 Automatic defence Mechanism 20

2.8 Grid Disturbance 21-22

2.9 Energy Generation

2.9.1 State Thermal Generation / Performance 22-23

2.9.2 Hydel Generation 24

2.9.3 Wind Generation 24

2.10 Reservoir Level of Hydel Power Stations 25-26

2.11 Other Information : Additional Power Purchase, Banking, Sale of Power and UI etc. 26

2.12 TTC message issued by WR to MP 26

3 OCC Meeting of MP 27

4 Black-Start mock drill of Hydel Power Stations (ISP & Bargi) 27-31

5 System Operators Training Organised by PSTI, Bangalore 31

6 COMMERCIAL6.1 Balancing & Settlement Mechanism Under Intra State Availability Based Tariff 31

6.2 Scheduling & Despatch 31

6.3 Meter Data Collection & Analysis 31

I N D E X : 2011-2012

Page 3: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sl. No. P A R T I C U L A R S Page No.

I N D E X : 2011-2012

6.4 Energy Accounting

6.4.1 State Energy Account 32

6.4.2 Plant Availability Factor 32

6.4.3 Availability of MP Transmission System 33

6.4.4 State UI Account, UI Charges and settlement 34-37

6.4.7 State Reactive Account 37

6.5 Exchange of Information through Web Server 37

6.6 SHORT TERM OPEN ACCESS 38

7.0 SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM(SCADA)

7.1 Maintenance of logistic support systems : 38

7.2 Integration of new sub-stations with SCADA SYSTEM 38-39

8.0 ANNEXURES A General Information

1 Transmision Capacity 40

2 Installed Capacity : Thermal 41

3 Installed Capacity : Hydel 42

4 Share of MP from Central Sector 43-44

5 Monthwise Maximums (Daily) 45

6 Daily, Monthly and Yearly Maximums of MPPGCL Thermal Gen / PLF 46

B Demand Profile1 Year wise Maximum Unrestricted Demand and Demand Met (Source wise Break up)

2001-02 to 2011-12 47

2 Month wise Average Availability, Demnd and Shortage/Surplus at the time of Evening Peak 48

3 Month wise Availability, Demnd and Shortage / Surplus at the time Maximum Unresticted Deamnd 49

4 Month wise Availability, Demnd and Shortage / Surplus at the time Maximum Deamnd Met 50

5 Month wise Average Availability, Demand and Shortage/Surplus 51

6 Monthwise Maximum, Minimum , Average Demand Met /Unrestricted Demand 52

7 Monthwise Maximum / Average Unrestricted Demand Met 2011-12 Vs 2010-11 53

8 Monthwise Maximum / Average Demand Met 2011-12 Vs 2010-11 54

9 Monthwise Hourly Average availability and Demand 55-66

10 Discom wise / Monthwise Maximum, Minimun and Average Demand Met / Unrest Demand 67

11 Monthwise / Discomwise Hourly Average Demand Met 68-79

12 Discom wise / Monthwise Average supply hours 80

13 System Disturbance 81-84

Page 4: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sl. No. P A R T I C U L A R S Page No.

I N D E X : 2011-2012

C Energy Profile1 Executive Summary ( Power Supply : Energy ) 85

2 Executive Summary ( Power Supply : Demand ) 86

3 Monthwise Energy Balance Sheet (Power Supply : Energy) 87

4 Monthwise Demand , Supply Hours & Frequency Analysis 88

5 Year wise Energy Supply (Source wise Break up) 2001-02 to 2011-12 89

6 Month wise Energy Supply (Source wise Break up) 2003-04 to 2011-12 90-94

7 Monthwise Details of UI Charges of MP 95

8 Monthwise UI Payable & Receivable by MP 96

9 Monthwise Schedule of MP in NTPC / NPC Station 97

10 Regionwise / Discom wise Monthwise Discom Drawl at Discom Periphery 98

D Voltage Profile1 Monthwise Maximum / Minimum Voltage of Major Substations 99-100

E Generation1 Actual Maintenance Programme of MPPGCL Thermal Unit 101

2 Generation Performance Report 102

3 Hydel Generation Performance 103

4 Monthwise Thermal/Hydel Generation & PLF 104-105

5 Monthwise/Progressive Thermal Generation & Plant Load Factor 2002-03 to 2011-12 106

6 Monthiwse /Stations wise Furnace oil Consumption 107-108

7 Monthiwse /Stations wise Coal Consumption 109

8 Monthiwse /Stations wise Auxiliary Consumption 110-111

9 Monthwise Max / Min Reservoir Level of Hydel Power Stations 112

10 Yearly Stationwise PLF : 2002-03 to 2011-12 113

F Commercial1 Discom wise Energy as per State Energy Account 114-115

2 Summary of State UI Pool Account 116

3 Monthwise Details of schedule, Actual and UI Charges of Discoms 117

4 Monthwise Details of schedule, Actual and UI Charges of MPPGCL and ISP 118

5 Monthwise Details of schedule, Actual and UI Charges of CPP injecting Power at 132KV 119

6 Monthwise Details of schedule, Actual and UI Charges of CPP injecting Power at 33 KV 120

7 Monthwise Details of schedule, Actual and UI Charges of OAC/CPP drawing power 121

8 Availability of Transmission System of Madhya Pradesh 122

9 Monthwise/ Cummulative % Plant Availability Factor of MPPGCL Thermal and Hydel 123-124

10 Consent Given for Short Term Open Acces by SLDC 125

G Transmision System1 Details of MP Transmission Losses in MP System 126-127

2 EHV Transmission / Transformer work Completed during 2011-12 128-130

Page 5: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

ANNUAL REPORT

YEAR : 2011-2012

1. INTRODUCTION. The Annual Report of MP power System performance for the year 2011-12 has

been prepared by State Load Despatch Center on the basis of, 15 minutes time block /daily/hourly/monthly, data/information of real time SCADA system, Implemented Schedule of WRLDC, Regional Energy Account of Western Regional Power Committee(WRPC), Mumbai, and data /information furnished by the state entities. Additional data/information in respect of performance of all the State Entitles which may be very useful for the analysis and record purpose are also included in the Annual Report.

Ministry of Power (MOP), Government of India, has formulated a committee on Manpower, Certification and Incentives for System Operation and Ring fencing of Load Despatch Centres. As per the recommendation of the committee, SLDC’s are required to obtain ISO certification. The Quality Management System of State Load Despatch Centre, has been accessed and confirms to the quality management system standard ISO 9001: 2008 for “operation of Integrated Grid Services with a focus on reliable, Secure and Economic Operations in accordance with Grid Standard laid down in the Gird Codes ( IEGC & MPEGC)” by M/s Integrated Quality Certification Pvt. Ltd. Bangalore, a certification body having accreditation with National Accreditation Board of Certification Bodies (NABCB) and found in conformance to the ISO Quality Management Standards. The ISO 9001:2008 Certificate has been issued for SLDC on 15th March 2011. The certification body has conducted surveillance audit during FY 2011-12 and observed the status as per quality standards.

1.1 FUNCTIONS OF STATE LOAD DESPATCH CENTRE As per Electricity Act 2003 the functions of State Load Despatch centre are as

under :-

(1) The State Load Despatch Centre shall be the apex body to ensure integrated operation of the power system in a State.

(2) The State Load Despatch Centre shall -

(a) be responsible for optimum scheduling and Despatch of electricity within a State, in accordance with the contracts entered into with the licensees or the generating companies operating in that State;

(b) monitor grid operations;

(c) keep accounts of the quantity of electricity transmitted through the State grid;

(d) exercise supervision and control over the intra-State transmission system; and

Annual Report 2011-12, SLDC, MPPTCL, JBP 1

Page 6: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

(e) be responsible for carrying out real time operations for grid control and despatch of electricity within the State through secure and economic operation of the State grid in accordance with the Grid Standards and the State Grid Code.

(3) The State Load Despatch Centre may levy and collect such fee and charges from the generating companies and licensees engaged in intra-State transmission of electricity as may be specified by the State Commission.

1.2 FUNCTIONS OF STATE TRANSMISSION UTILITY

As per Electricity Act 2003, the functions of the State Transmission Utility shall be -

(a) to undertake transmission of electricity through intra-State transmission system;

(b) to discharge all functions of planning and co-ordination relating to intra-State transmission system with -

(i) Central Transmission Utility;

(ii) State Governments;

(iii) generating companies;

(iv) Regional Power Commi ttees;

(v) Authority;

(vi) licensees;

(vii) any other person notified by the State Government in this behalf;

(c) to ensure development of an efficient, co-ordinated and economical system of intra-State transmission lines for smooth flow of electricity from a generating station to the load centres;

(d) to provide non-discriminatory open access to its transmission system for use by-

(i) any licensee or generating company on payment of the transmission charges ; or

(ii) any consumer as and when such open access is provided by the State Commission under sub-section (2) of section 42, on payment of the transmission charges and a surcharge thereon, as may be specified by the State Commission:

Annual Report 2011-12, SLDC, MPPTCL, JBP 2

Page 7: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SALIENT FEATURES2011-12 2010-11 2009-10

A INSTALLED CAPACITY / SHARE Total M.P.'s Share Total M.P.'s

Share Total M.P.'s Share

1 Thermal OWN MW 2932.5 2807.5 2932.5 2807.5 2932.5 2807.52 Hydel OWN MW 915.0 917.2 915.0 917.2 915.0 917.23 Mini / Micro OWN MW 5.5 5.5 5.5 5.5 5.5 5.54 Sub Total MW 3853.0 3730.2 3853.0 3730.2 3853.0 3730.25 INDIRA SAGAR MW 1000.0 1000.0 1000.0 1000.0 1000.0 1000.06 OMKARESHWAR MW 520.0 520.0 520.0 520.0 520.0 520.07 Wind Farms MW 261.1 181.1 158.97 CENTRAL SECOR : WR MW 2491.1 2356.5 2180.98 CENTRAL SECOR : ER MW 74.0 74.0 74.09 Bargi Left Bank Canal MW 10.0 10.0 10.0

10 ISP NVDA MW 15.0 15.0 15.011 SARDAR SAROVAR MW 826.5 826.5 826.512 RIHAND + MATATILA MW 55.0 55.0 55.013 Sujen (Torant) MW 100.0 100.0 0.014 DVC ER MW 400.0 200.0 200.015 TOTAL MW 9482.81 9068.26 8770.5B GENERATIONI. THERMAL1 Thermal Generation MU 15811 15148 15695 14991 16011 152922 Plant Load Factor % 61.38 61.10 62.86II. HYDEL1 Hydel Geneartion MU 3230 3197 1731 1724 1738 16181 Total Actual Generation MU 19041 18345 17427 16715 17750 16910C POWER SUPPLY1 MP(Thermal + Hydel) Availability MU 16833 15148 154242 Central Sector Schedule MU 16455 16395 150093 DVC Schedule MU 1057 691 3994 Sujen (Torant) MU 572 64 05 Sardar Sarovar Schedule MU 2424 2002 13956 Indira Sagar MU 3275 2195 21137 Omakareshwar MU 1366 993 9388 Unschedule Interchange (WR+NR) MU -472 444 -7379 Additional Power Purchase MU 1282 102 0

10 Sale of Power MU -849 -416 -14711 Exchange of Power MU 0 18 012 Banking MU -147 23 8713 Other imports / exports MU 1152 1139 108114 M.P.Supply Ex-Power Station Bus MU 42945 38799 3556315 Unrestricted Requirement MU 51338 48619 4376716 % Shortage % 16.35 20.20 18.7415 Maximum Daily Energy Supply MU 154.10 137.36 128.2216 Average Daily Energy Supply MU 117.34 71.06 97.43D DEMAND MET1 Morning Peak Demand Met MW 7720 6829 59452 Evening Peak Demand Met MW 8546 8331 62153 Maximum Registered Demand Met MW 8546 8331 62154 Maximum Unrestricted Demand MW 8946 8758 7309E TRANSMISSION AVAILABILITY1 AVAILABILITY OF INTRA-STATE TRANSMISSION

SYSTEM OF M.P. % 99.23% 99.13% 98.82%

F MP TRANSMISSION LOSS1 TRANSMISSION LOSS OF MP SYSTEM % 3.51% 3.74% 4.19%

G INTRA-STATE TRANSMISSION CAPACITY1 27118.65 26468.90 24622.17

2 EHV Substation (440KV +220KV+132KV+66KV) : MVA Capacity 35704.00 34232.00 32039.50

3 No. of EHV Substations : No. 250 242 228

Transmission Lines (400KV+220KV+132KV+66KV) : Ckt Kms

Annual Report 2011-12, SLDC, MPPTCL, JBP 3

Page 8: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

2 STATE GRID PERFORMANCE

2.1 INSTALLED CAPACITY

ALL INDIA INSTALLED CAPACITYAS ON 31.03.2012 - 199551 MW

53676, 27%

64394, 33%

52740, 26%

26286, 13%

2455, 1%

NR WR SR ER NER

INSTALLED CAPACITY OF WESTERN REGION AS ON 31.03.2012- 53562 MW

38924.5, 60%7447.5, 12%

8254.81, 13%

1840, 3%

7909.95, 12%17.48, 0%

Coal Hydro Gas Nuclear RES Diesel

Installed Capacity of MP (MP Share) as on 31.03.2012 - 9458 MW

T hermal, 2807.5, 29%

H ydro Own, 917.2, 10%

M ini / M icro , 5.455, 0%

ISP , 1000, 11%

OSP , 520, 5%

C S WR , 2491.05, 26%

C S ER , 74, 1%

B argi N VD A , 10, 0%

ISP N VD A , 15, 0%

SSP , 826.5 , 9%

R IH A N D + M A T A T ILA , 55, 1%

T o rant , 100, 1% Wind F arms, 261.1, 3%

D VC ER , 400, 4%

Annual Report 2011-12, SLDC, MPPTCL, JBP 4

Page 9: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

2.2 M.P. Transmission System 2.2.1 EHV Lines

During 2011-12, 228.92 ckt. km.of 220 kV and 420.83 Ckt.km of 132 kV transmission lines were added in MP Transmission System. Total 400kV MP transmission network as on 31.03.2012 was of 2343.01 ckt.km, 220 kV of 111085.41 ckt.km, 132 KV of 13629.23 ckt km and 66 KV of 61 ckt km. The growth of EHV lines during the period 2002-03 to 2011-12 is shown below

GROWTH OF EHV LINES (Ckt.KM)

0

5000

10000

15000

20000

25000

30000

Year

Ckt

Km

Ckt Km 17562 17987 19250 19811 20888 21606 22900 24622 26469 271192002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

2.2.2 Transformation Capacity (MVA)

The total transformation of capacity of MP Transmission system as on 31.03.2012 was 35564 MVA. The growth of transformation capacity during the period 2002-03 to 2010-12 is shown below

GROWTH OF TRANSFORMATION CAPACITY(MVA)

0

5000

10000

15000

20000

25000

30000

35000

40000

YEAR

MVA

MVA 17095 19449 21793 23155 24835 25995 29058 32040 34232 355642002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

Annual Report 2011-12, SLDC, MPPTCL, JBP 5

Page 10: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

2.2.3 Transmission Loss of Madhya Pradesh

The Transmission Loss of Madhya Pradesh in 2011-12 was 3.51 % as against 3.74 % in 2010-11. The year wise actual transmission loss of MP is shown below

Yearwise MP Transmission Losses

3.74

3.51

4.194.094.09

5.00

3.00

4.00

5.00

6.00

2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

Year

%

Actual

2.3 Power Supply Position – 2.3.1 Demand Profile

(i) Western Region

The Western Regional maximum demand met in the year 2011-12 was 38073 MW on 28th March,2012 at 21:00 hrs. which is so far highest demand met in Western Region. Peak demand growth was 4.54% against previous year (2010-11) whereas the unrestricted demand growth is 3.40%. The minimum demand of 23245 MW was observed on 2nd September,2011. Compared to last year average shortage was reduced from 15.67% to 13.74%.

(ii) Madhya Pradesh

The maximum demand met by MP recorded during the year was 8546 MW on dtd. 03.03.2012, which is highest ever so far and is 2.6% more than the previous year maximum demand met of 8331 MW. The unrestricted maximum demand was 8946 MW on 03.03.2012, which is highest ever so far and is 2.1% more than the previous recorded year maximum unrestricted demand of 8758 MW. The minimum registered demand was 2507 MW on 23rd July 2011. The peak demand met growth was 11.9% whereas the unrestricted demand growth was 6.4% with respect to last year. The average shortage of power was 17% during the year.

Annual Report 2011-12, SLDC, MPPTCL, JBP 6

Page 11: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

YEAR YEAR S.

No. P A R T I C U L A R S 2011-

2012 2010-2011

A MAXIMUM DEMAND MET MW 8546 8331

B MAXIMUM MORNING PEAK DEMAND MET MW 7720 6829

C MAXIMUM EVENING PEAK DEMAND MET MW 8546 8331

D MAXIMUM UNRESTRICTED DEMAND MW 8946 8758

Maximum Unrerstricted Demand, Demand Met and Shortage : 2011-12

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

MW

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

%

Unrestricted Demand (MW)

7488 7168 6944 5767 5680 6576 8766 8846 8874 8859 8808 8946

Demand Met (MW)

7339 6155 6069 5170 5403 6025 7973 7548 7399 7720 7477 8546

Shortage % 1.99 14.14 12.59 10.35 4.88 8.38 9.05 14.68 16.62 12.85 15.11 4.47

Apr-11

May-11

Jun-11 Jul-11 Aug-

11Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Average Unrerstricted Demand, Demand Met and Shortage

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

MW

0.00

5.00

10.00

15.00

20.00

25.00

%

Unrestricted Demand (MW)

5481 5246 4249 4065 3946 4194 6307 7780 7831 6820 7039 6814

Demand Met (MW)

4451 4353 3784 3612 3694 4048 5103 6246 6199 5607 5578 5433

Shortage % 18.79 17.03 10.95 11.14 6.39 3.47 19.09 19.73 20.84 17.79 20.75 20.27

Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12

Annual Report 2011-12, SLDC, MPPTCL, JBP 7

Page 12: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

(iii) MP DISCOMs

The Maximum demand met of East Discom was 2786 MW on dtd. 03-03-12, maximum demand Met of Central Discom was 2676 MW on dtd.05.03.12 and the maximum demand met of West Discom was 3300 MW on dtd. 25.03.12. The average shortage of power of East Discom was 11.61%, Central Discom was 15.04% and West Discom was 20.90% during the year.

Maximum Unrerstricted Demand, Demand Met and Shortage of EAST DISCOM : 2011-12

0

500

1000

1500

2000

2500

3000

3500

MW

-2.00

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

%

Unrestricted Demand (MW)

2584 2388 2149 1915 1989 2114 2727 2805 3068 2863 2931 2998

Demand Met (MW)

2588 2291 2003 1864 1956 2009 2736 2758 2611 2729 2683 2786

Shortage % -0.15 4.06 6.78 2.65 1.64 4.97 -0.33 1.69 14.89 4.68 8.46 7.08

Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12

Maximum Unrerstricted Demand, Demand Met and Shortage of Central Discom : 2011-12

0

500

1000

1500

2000

2500

3000

3500

MW

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

20.00

%

Unrestricted Demand (MW)

2221 2268 2053 1834 1878 2081 2671 2852 3061 2816 2925 2799

Demand Met (MW)

2103 1898 1772 1652 1806 1841 2346 2439 2480 2593 2529 2676

Shortage % 5.32 16.30 13.67 9.92 3.82 11.52 12.17 14.49 18.99 7.92 13.55 4.39

Apr-11

May-11

Jun-11 Jul-11 Aug-

11Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Annual Report 2011-12, SLDC, MPPTCL, JBP 8

Page 13: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Maximum Unrerstricted Demand, Demand Met and Shortage of West Discom : 2011-12

0

500

1000

1500

2000

2500

3000

3500

4000

4500M

W

0.00

5.00

10.00

15.00

20.00

25.00

%

Unrestricted Demand (MW)

2784 2973 2642 2347 2014 2448 3831 4245 4115 3836 3655 3461

Demand Met (MW)

2648 2366 2319 1967 1878 2308 3146 3297 3153 3053 2863 3300

Shortage % 4.91 20.42 12.22 16.21 6.75 5.73 17.90 22.31 23.39 20.41 21.68 4.65

Apr-11

May-11

Jun-11 Jul-11 Aug-

11Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Average Unrerstricted Demand, Demand Met and Shortage of East Discom : 2011-12

0

500

1000

1500

2000

2500

MW

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

%

Unrestricted Demand (MW)

1694 1596 1280 1339 1302 1344 1717 2004 2121 1694 1935 1859

Demand Met (MW)

1461 1402 1161 1208 1237 1310 1517 1731 1765 1494 1670 1622

Shortage % 13.80 12.11 9.29 9.79 5.04 2.59 11.65 13.62 16.79 11.76 13.69 12.78

Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12

Annual Report 2011-12, SLDC, MPPTCL, JBP 9

Page 14: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Average Unrerstricted Demand, Demand Met and Shortage of Central Discom : 2011-12

0

500

1000

1500

2000

2500

MW

0.00

5.00

10.00

15.00

20.00

25.00

%

Unrestricted Demand (MW)

1530 1562 1267 1290 1330 1366 1874 2311 2349 2179 2313 1925

Demand Met (MW)

1309 1368 1198 1197 1256 1309 1482 1887 1912 1820 1766 1590

Shortage % 14.42 12.46 5.47 7.26 5.53 4.21 20.92 18.36 18.57 16.46 23.66 17.42

Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12

Average Unrerstricted Demand, Demand Met and Shortage of East Discom : 2011-12

0

500

1000

1500

2000

2500

3000

3500

4000

MW

-5.00

0.00

5.00

10.00

15.00

20.00

25.00

30.00

%

Unrestricted Demand (MW)

2257 2093 1701 1446 1324 1483 2716 3465 3361 2947 2789 2515

Demand Met (MW)

1681 1583 1424 1211 1330 1429 2104 2627 2521 2292 2142 1880

Shortage % 25.49 24.38 16.29 16.31 -0.41 3.60 22.52 24.17 24.98 22.22 23.20 25.26

Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12

2.3.2 Load Pattern

(i) Western Region

Load in the quarter April -June is mainly residential and commercial loads due to summer conditions. July-September is generally lean period due to rainy season and peak demand met came down 31000 MW to 33500 MW. The quarter October-December is having high demand in the grid due to onset of Rabi season when agricultural demand is predominant with many pump sets operating. This quarter, also being the festival season, commercial and residential demands are also on the higher trajectory. But The quarter January-March is also high demand period similar to that of previous quarter due to continuation of agricultural activities. The industrial demand is also at its peak as this is the last quarter of the financial year and thrust is on achieving targets before the end of financial year. Regional peak demand met varied monthly between 31000 to 38100.

(ii) Madhya Pradesh

The load in the first quarter April-June, is mainly residential and commercial due to summer conditions. The peak demand met during first quarter was to the tune of 3600

Annual Report 2011-12, SLDC, MPPTCL, JBP 10

Page 15: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

MW to 5300 MW. Second quarter July-September, is generally lean period due to rainy season and peak demand met came down in the range of 3300 MW to 4800 MW. The third quarter October-December is high demand period in the grid due to onset of Rabi season when agricultural demand is predominant with many pump sets operating. This quarter, being the festival season, commercial and residential demands are also on the higher trajectory. The peak demand met pattern was seen in the range of 5000 MW to 7000 MW. During the last quarter of the year ie January-March demand pattern was similar to third quarter because of continue supply to all groups during night hours for final examinations in addition to continuation of agricultural activities. MP peak demand met varied monthly between 6800 to 8500 MW during last quarter of the year. Hourly Quarterly Average Seasonal load curve for summer, monsoon and winter is shown below

Quarterly Hourly Average Unrestrcited Demand of MP

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24Hours

MW

Apr-Jun Jul-Sep Oct-Dec Jan-Mar

Quarterly Hourly Average Demand Met of MP

0

1000

2000

3000

4000

5000

6000

7000

8000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Hours

MW

Apr-Jun Jul-Sep Oct-Dec Jan-Mar

(ii) DISCOMs

The quarterly hourly average demand met of each DISCOM is given below

Annual Report 2011-12, SLDC, MPPTCL, JBP 11

Page 16: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Quarterly Hourly Average Demand Met of East Discom

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

2400

2600

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Hours

MW

Apr-Jun Jul-Sep Oct-Dec Jan-Mar

Quarterly Hourly Average Demand Met of Central Discom

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

2400

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Hours

MW

Apr-Jun Jul-Sep Oct-Dec Jan-Mar

Annual Report 2011-12, SLDC, MPPTCL, JBP 12

Page 17: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Quarterly Hourly Average Demand Met of West Discom

0

200

400

600

800

1000

1200

1400

1600

1800

2000

2200

2400

2600

2800

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Hours

MW

Apr-Jun Jul-Sep Oct-Dec Jan-Mar

2.3.3 Hourly Load Curve & Portfolio of MP on Peak Day

(Maximum Demand met)

Hourly Load curve on Peak day (Maximum Demand Met 8546 MW on 03.03.2012)

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Hours

MW

49

49.2

49.4

49.6

49.8

50

50.2

50.4

50.6

Hz

Demand MetFREQ.

Annual Report 2011-12, SLDC, MPPTCL, JBP 13

Page 18: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

1939

610

826

337

-20

1915

226

71

513

10

490

0 0 21 27 55

1526

0

341

-200

0

200

400

600

800

1000

1200

1400

1600

1800

2000

MW

THER

(Exc

l. Au

x)

HYD

EL ISP

OSP

STO

A In

ject

ion

C.S

.S.

WR

+ER

DVC

ER

Bank

ing

SSP

SEZ

Pow

er P

urch

ase

Sale

Exch

ange

STO

A (W

heel

ing)

Rih

and+

Mat

atila

TOR

RAN

T

O/D

SCH

.

UN

SCH

.

Portfolio of Maximum Demand Met ( Maximum Demand Met 8546 MW on dtd 03.03.12 AT 20.25 HRS.)

2.3.4 Growth of Demand Met

4632 46524984

52415780

61096501

7019

6215

8331 8546

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

MW

2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

Year

GROWTH OF DEMAND MET

Annual Report 2011-12, SLDC, MPPTCL, JBP 14

Page 19: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

2.3.5 Annual Load Duration Curve

LOAD DURATION CURVE : DEMAND MET YEAR : 2011-2012

0

10

20

30

40

50

60

70

80

90

100

2100

2200

2300

2400

2500

2600

2700

2800

2900

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

4100

4200

4300

4400

4500

4600

4700

4800

4900

5000

5100

5200

5300

5400

5500

5600

5700

5800

5900

6000

6100

6200

6300

6400

6500

6600

6700

6800

6900

7000

7100

7200

7300

7400

7500

7600

7700

7800

7900

8000

8100

8200

8300

8400

8500

MW

%Ti

me

2.3.6 Energy Supply –

(i) Western Region

In the year 2011-12 total energy availability of Western region was 274 billion units against the requirement of 305 billion units. Energy shortages varied from 6.20% to max.14.15 %. Average energy consumption per day was 680 to 740 MUs. The maximum energy consumption per day exceeded 800 Mus i.e 840 Mus on 29.03.2012. The increase in daily average energy consumption compared to last year is 9.14% as against the generation capacity addition of 8825 MW.

(ii) Madhya Pradesh

The total energy supplied (ex-power station bus) into MP grid including power received from Central Sector, over drawal / under drawal, additional power purchase and other sources during the year 2011-12 was 42944.98 MUs which is 10.68 % more than 38799.30 MUs supplied in the 2010-11 i.e.. The total requirement of the Energy was 51337.87 MU which is 5.59% more than the energy requirement of last year 48619.26 MU. Energy Shortage was observed varying from 3.51% to 20.55%. Average Energy Supplied per day was 117.30 MU. The Maximum Energy Supplied in day was

Annual Report 2011-12, SLDC, MPPTCL, JBP 15

Page 20: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

154.10 MU on dtd. 05.11.2011. The Maximum monthly energy supplied (ex-power station bus) was 4693.93 MU in the month of Dec 2011.

CONTRIBUTION IN MP SUPPLY YEAR : 2011-2012

MP SUPPLY - 42944.98 MU

THERMAL AVAILABILITY, 13669, 30%

HYDEL AVAILABILITY, 3163, 7%

ISP, 3275, 7%SSP, 2424, 5%

OSP, 1366, 3%

C.SECTOR (WR+ER), 16687, 37%

DVC ER , 1057, 2%

Torant(Sugen), 572, 1%

Power Purchase, 1282, 3%Sale of Power, -849, 2%

Banking, -147, 0%

Energy Exchange, 0, 0%

UI, -472, 1%Wind injection, 321, 1%

OTHER IMP / EXP, 598, 1%

Monthwise Energy Requirement , Energy Supply and Shortage

Year : 2011-12

0

1000

2000

3000

4000

5000

6000

7000

MU

0.00

5.00

10.00

15.00

20.00

25.00%

Energy Supply Energy Requirement % Shortage

Energy Supply 3278.4 3319.0 2792.2 2729.2 2787.3 2885.8 3839.4 4548.9 4685.3 4224.8 3962.8 3891.9Energy Requirement 4020.1 3983.7 3127.3 3061.5 2969.6 2990.7 4735.1 5653.9 5899.5 5127.1 4978.4 4790.9% Shortage 22.62 16.69 10.71 10.86 6.14 3.51 18.92 19.54 20.58 17.60 20.40 18.77

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

Annual Report 2011-12, SLDC, MPPTCL, JBP 16

Page 21: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Monthwise Energy SupplyYear : 2011-12 Vs 2010-11

0.0

500.0

1000.0

1500.0

2000.0

2500.0

3000.0

3500.0

4000.0

4500.0

5000.0

MU

-5.00

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

%

2011-12 2010-11 % Increase

2011-12 3278.4 3319.0 2792.2 2729.2 2787.3 2885.8 3839.4 4548.9 4685.3 4224.8 3962.8 3891.92010-11 3014.2 3010.2 2697.5 2490.6 2570.4 2731.6 3361.0 3416.5 4013.7 4244.7 3616.8 3632.1% Increase 8.77 10.26 3.51 9.58 8.44 5.64 14.24 33.15 16.73 -0.47 9.56 7.15

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

Datewise MP Supply Year : 2011-12 Vs 2010-11 Vs 2009-10

600650700750800850900950

1000105011001150120012501300135014001450150015501600

01-A

pr

15-A

pr

29-A

pr

13-M

ay

27-M

ay

10-J

un

24-J

un

08-J

ul

22-J

ul

05-A

ug

19-A

ug

02-S

ep

16-S

ep

30-S

ep

14-O

ct

28-O

ct

11-N

ov

25-N

ov

09-D

ec

23-D

ec

06-J

an

20-J

an

03-F

eb

17-F

eb

03-M

ar

17-M

ar

31-M

ar

LU

2011-2012 2010-2011 2009-2010

Maximum MP Supply in Day :- 154.10 MU on 05.11.11

Annual Report 2011-12, SLDC, MPPTCL, JBP 17

Page 22: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

26437.61 27094.0828598.90

30624.4432231.55

33434.65

36072.84 35502.64 35562.9138799.30

42944.98

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

MU

2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12Year

GROWTH OF ENERGY SUPPLY

2.4 Frequency Profile Frequency profile in the year 2011-12 was better as compared to last year

2010-11. The average frequency of WR varied between 49.65 Hz to 49.89 Hz.. Frequency profile deteriorated in the month of Sep, 2011 to Dec.2011 due to heavy drawal by neighboring regions, more unit outages and inadequate load shedding under over drawl situations. The frequency touched 48.8 Hz. for 217 times and touched 48.6 Hz for 4 times. The frequency remained with in IEGC band for 89.57 Percentage of time and the frequency remained within IEGC band for than 90 % from Sept’11 to Jan’12

2.4.1 FREQUENCY BANDWSISE VARIATION IN 2011-12

Annual Report 2011-12, SLDC, MPPTCL, JBP 18

Page 23: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

FREQUENCY BAND VARIATION IN 2011-12

7.49

0.10 4.

56

4.96

4.18

10.7

4

23.5

5

10.7

5 17.4

8

5.23

2.87

2.3

91.0

9 97.0

0

90.9

3

93.1

8

91.3

4

84.1

3

75.6

5

88.7

0

82.0

2 89.6

6 95.3

2

95.1

8

1.42 2.90 4.51

1.86 4.

48 5.13

0.80

0.55

0.50 5.

11

1.81 2.52

0.00

20.00

40.00

60.00

80.00

100.00

120.00

Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12

Month

% T

ime

<49.5 49.5-50.2 >50.2 ` 2.4.2 Maximum, Minimum and Average Frequency : 2011-12

Month Max(Hz) Min(Hz) Avg(HZ)Apr-11 50.65 48.80 49.79

May-11 50.95 49.00 49.89Jun-11 50.60 48.82 49.89Jul-11 50.49 48.80 49.84

Aug-11 50.69 48.78 49.89Sep-11 50.66 48.78 49.84Oct-11 50.63 48.57 49.65Nov-11 50.58 48.85 49.73Dec-11 50.42 48.82 49.70Jan-12 50.84 48.99 49.85Feb-12 50.54 49.05 49.84Mar-12 50.61 49.04 49.85

Maximum, Minimum and Average Frequency : 2010-11

Month Max(Hz) Min(Hz) Avg(HZ)April'10 50.50 48.56 49.27May`10 50.80 48.76 49.73June`10 50.54 48.84 49.82July`10 50.72 48.70 49.83Aug`10 50.65 48.73 49.85Sep`10 50.79 48.76 49.98Oct`10 50.59 49.09 49.94Nov`10 50.73 49.12 50.00Dec`10 50.68 48.94 49.92Jan'11 50.60 48.89 49.85Feb'11 50.73 49.01 49.87Mar'11 50.64 49.00 49.86

2.5 Voltage Profile The voltage profile of the region during 2011-12 was better, however instances of

low and high voltages beyond the IEGC specified operating range were observed at some of the EHV substations in the region. The High voltage prevailed during monsoon months of June, July, August and September during night hours. High Voltage areas were Khandwa, SSP, Rajgarh, Nagda and Itarsi. Number of 400KV / 220 KV lines kept open continuously to control high voltages

During the Rabi season, agricultural load picked up and the voltage profile began to show downward trend. Due to high reactive power requirement of agricultural loads

Annual Report 2011-12, SLDC, MPPTCL, JBP 19

Page 24: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

specifically during morning time low voltage observed at places around Indore, Bhopal, Nagda and Bina.

2.6 SUPPLY HOURS TO DIFFERENT SECTORS Discom wise Average supply hours per day to different sectors during the year 2011-

12 is given below :

Discomwise Supply Hours : Year : 2011-12Ea

st, 2

2:58

East

, 21:

35

East

, 16:

58

East

, 13:

25

Cen

tral

, 23:

11

Cen

tral

, 21:

21

Cen

tral

, 17:

32

Cen

tral

, 13:

17

Wes

t, 23

:37

Wes

t, 22

:03

Wes

t, 17

:13

Wes

t, 12

:59

MP,

23:

11

MP,

21:

39

MP,

17:

13

MP,

13:

15

00:00

02:00

04:00

06:00

08:00

10:00

12:00

14:00

16:00

18:00

20:00

22:00

24:00

Commissinary HQ District HQ Tehsil HQ Rural

HH

:MM

2.7 Automatic Defence Mechanism : The approved AUFLS scheme in Western region and the recommended df/dt with

changed scenario in NEW grid is as follows. AUFLS is basically defense mechanism against disturbance and other factors affecting frequency profile and includes both discrete relays and trend relays. The feeders for discrete and trend automatic under frequency and df/dt relays need to be widely dispersed as operation of these relays is sensitive to the location of the disturbance.

2.7.1 APPROVED UNDER FREQUENCY LOAD SHEDDING SCHEME IN WESTERN REGION

A. Discrete Under Frequency Relays (UFR):

Load Relief (MW) Recommended Setting Freq(Hz)

Time Delay (Sec)

Recommended Load

Relief (MW) GETCO MPPTCL MSETCL CSPTCL

48.8 Inst. 960 220 152 550 38

48.6 Inst. 960 220 152 50 38

48.2 Inst. 1280 295 205 730 50

Total 3200 735 509 1830 126

Excludes load relief of Mumbai system under AUFLS (which is around 20%) of MSETCL system)

B. Recommended Frequency Trend Relays (df/dt) with changed scenario:

Annual Report 2011-12, SLDC, MPPTCL, JBP 20

Page 25: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

In view of changed power scenario with the integrated operation of New grid, following df/dt relay settings have been agreed for implementation as given below :

Setting of df/dt relay

NR WR ER

Stage-I 2000 MW at 0.1

Hz/sec at 49.9 Hz 2000 MW at 0.1

Hz/sec at 49.9 Hz

800 MW (600 MW ER +200 MW SR) at 0.125

Hz/sec at 49.9 Hz

Stage-II 2000 MW at 0.2 Hz/sec at 49.9 Hz

2000 MW at 0.2 Hz/sec at 49.9 Hz

Nil

Stage-I of df/dt is designed to protect the NEW grid, from the loss of generation of a large power station whereas Stage-II of df/dt is designed to protect the split grid from loss of generation of a large power station. Stage-III of df/dt which was set at 49.2 Hz, 0.4 Hz/sec has to be upgraded to 49.9 Hz in line with above revision.

The above df/dt settings has been further classified constituent-wise in Western Region in the present ratio as given below :

Load Relief (MW) Recommended Settings

Hz/ (Hz Sec) Region GETCO MPPTCL MSETCL CSEB TPC

49.9/(0.1 Hz/sec) 2000 1006 361 546 27 60

49.9/(0.2 Hz/sec) 2000 905 355 621 37 82

49.9/(0.4 Hz/sec) 2472 1001 392 686 120 273

2.8 GRID DISTRUBANCE As per CEA regulations 2010, the Grid Standards and Grid Incidents are classified

as under :

(a)“Grid disturbance” means tripping of one or more power system elements of the grid like a generator, transmission line, transformer, shunt reactor, series capacitor and Static VAR Compensator, resulting in total failure of supply at a substation or loss of integrity of the grid, at the level of transmission system at 220 kV and above.

(b) “Grid incident” means tripping of one or more power system elements of the grid like a generator, transmission line, transformer, shunt reactor, series capacitor and Static VAR Compensator, which requires re-scheduling of generation or load, without total loss of supply at a sub-station or loss of integrity of the grid at 220 kV and above.

In the event of a grid disturbance, highest priority is to be accorded to early restoration / revival of the system. During restoration, it is possible that system may have to be operated with reduced security standards and under suspension of all commercial incentives / penalties. This chapter forms the guidelines for classifications of disturbances into different categories for the purpose of analysis and reporting.

Annual Report 2011-12, SLDC, MPPTCL, JBP 21

Page 26: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Classification of Grid incidents and disturbances:

As per CEA regulations on Grid standards 2010, the categorisation of grid incidents and grid disturbances shall be as follows:-

(a) Categorisation of grid incidents in increasing order of severity -

Category GI-1 - Tripping of one or more power system elements of the Grid like a generator, transmission line, transformer, shunt reactor, series capacitor and Static VAR Compensator, which requires re-scheduling of generation or load, without total loss of supply at a sub-station or loss of integrity of the grid at 220 kV.

Category GI-2 - Tripping of one or more power system elements of the grid like a generator, transmission line, transformer, shunt reactor, series capacitor and Static VAR Compensator, which requires re-scheduling of generation or load, without total loss of supply at a sub-station or loss of integrity of the grid at 400 kV.

(b) Categorisation of grid disturbance in increasing order of severity,-

Category GD-1 - When less than ten per cent. of the antecedent generation or load in a regional grid is lost;

Category GD-2 - When ten per cent. to less than twenty percent of the antecedent generation or load in a regional grid is lost.

Category GD-3 - When twenty per cent. to less than thirty per cent. of the antecedent generation or load in a regional grid is lost;

Category GD-4 - When thirty per cent. to less than forty per cent. of the antecedent generation or load in a regional grid is lost;

Category GD-5 - When forty per cent. or more of the antecedent generation or load in a regional grid is lost.

There were no major disturbances in Western Regional/MP Grid during the year 2011-12. However the system disturbance occurred during the year is enclosed in the annexure.

2.9 Energy Generation 2.9.1 State Thermal Generation / Performance

The actual thermal generation of MPPGCL Thermal Units (100 %) was 15810.58 MU which is 0.73% more than the previous year generation 15695.48 MU. The Maximum Daily Generation of MPPGCL Thermal was 59.355 MU on 31.03.2012 which is highest ever daily generation so far. The Year wise total Thermal generation from 1999-2000 to 2011-2012 is given below :

Annual Report 2011-12, SLDC, MPPTCL, JBP 22

Page 27: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

1278

7.91

1327

7.79

1252

1.89 14

559.

09

1401

5.12

1435

0.85

1354

0.83

1401

6.57

1450

0.34 1607

9.89

1601

1.21

1569

5.48

1581

0.58

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

MU

1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

Yearwise Generation of MPPGCL Thermal Units

Plant Load / Utilisation Factor (PLF / PUF %)

The Annual Plant Load Factor of thermal station of MPPGCL in the year 2011-12 is 61.38% as against PLF of 61.10% in 2010-11 . The Year wise % PLF of MPPGCL thermal units from 1999-2000 to 2011-2012 is given below :

70.5

8

66.7

0

62.9

0

73.1

4

70.2

1 72.0

9

68.0

2

70.4

1

68.9

1

67.2

1

62.8

6

61.1

0

61.3

8

54.00

56.00

58.00

60.00

62.00

64.00

66.00

68.00

70.00

72.00

74.00

%

1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

Yearwise %Plant Load Factor of MPPGCL Thermal Units

Planned Maintenance

Planned outages percentage for Thermal units of MPPGCL was 13.38 % in 2011-12 as against 12.38 % in 2010-11.

Forced Outages

The forced outage at various thermal power stations of MPPGCL during 2011-11 was 8.86% as against 8.27% in the year 2010-11.

Annual Report 2011-12, SLDC, MPPTCL, JBP 23

Page 28: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Secondary fuel oil consumption

The specific fuel oil consumption of MPPGCL during the year 11-12 was 3.62 ml/kwh as compared to 3.82 ml/kwh in the year 2010-11.

Auxiliary consumption

Percentage Auxiliary consumption in the thermal stations of MPPGCL during the year was 9.30% as against 9.48% of the previous year 2010-11.

2.9.2 HYDEL GENERATION

State Hydel Generation

The total hydel generation of MPPGCL (irrespective of share) was 3230.53 MU which is 86.61% more than 1731.14 MU during last Year. The total hydel generation MP's share was 3305.05 MU as compared to last year 1724.23 MU .

Indira Sagar HPS (NHDC) Generation –

The total Ex-bus Schedule of ISP was 3274.79 MU during the year as against 2195.43 MU in previous year 2010-11

Omkareshwar HPS (NHDC) Generation –

The total injection into MP grid from Omkarshwar Hydel Power Stations was 1365.79 MU during the year as against 993.26 MU in previous year 2009-10

Sardar Sarovar Project -

The total Schedule of MP in Sardar Sarovar was 2423.83 MU during the year as compared to 2001.85 MU during previous year 2010-11.

2.9.3 Wind Generation

In MP the wind generation is situated in western area (West Discom) only. The total Wind generation at common metering point during the year was 328.01 MU as against 267.81 MU during the year 2010-11. The month wise wind generation for the year 2009-10 to 2011-12 is given below

Monthwsie Wind Genration at common Metering Point

0

10

20

30

40

50

60

MU

2011-12 2010-11 2009-10

2011-12 24.8854 41.4016 43.4684 45.3843 29.2896 21.486 15.7234 10.0564 13.9191 21.3967 30.6986 30.29852010-11 32.77 36.42 48.53 24.19 22.44 13.23 10.40 14.89 15.11 13.45 15.52 20.872009-10 20.62 31.55 42.36 26.28 32.51 24.40 18.76 9.40 8.35 14.05 14.50 17.36

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

Annual Report 2011-12, SLDC, MPPTCL, JBP 24

Page 29: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

2.10 Reservoir Levels

Date wise level of major reservoir of Hydel Stations is shown below

GANDHISAGAR

1240.001250.001260.001270.001280.001290.001300.001310.00

1-A

pr

16-A

pr

1-M

ay

16-M

ay

31-M

ay

15-J

un

30-J

un

15-J

ul

30-J

ul

14-A

ug

29-A

ug

13-S

ep

28-S

ep

13-O

ct

28-O

ct

12-N

ov

27-N

ov

12-D

ec

27-D

ec

11-J

an

26-J

an

10-F

eb

25-F

eb

11-M

ar

26-M

ar

11-1210-11

PENCH

465.00467.00469.00471.00473.00475.00477.00479.00481.00483.00485.00487.00489.00491.00

1-A

pr

16-A

pr

1-M

ay

16-M

ay

31-M

ay

15-J

un

30-J

un

15-J

ul

30-J

ul

14-A

ug

29-A

ug

13-S

ep

28-S

ep

13-O

ct

28-O

ct

12-N

ov

27-N

ov

12-D

ec

27-D

ec

11-J

an

26-J

an

10-F

eb

25-F

eb

11-M

ar

26-M

ar

11-1210-11

BARGI

400.00402.00404.00406.00408.00410.00412.00414.00416.00418.00420.00422.00424.00426.00

1-A

pr

16-A

pr

1-M

ay

16-M

ay

31-M

ay

15-J

un

30-J

un

15-J

ul

30-J

ul

14-A

ug

29-A

ug

13-S

ep

28-S

ep

13-O

ct

28-O

ct

12-N

ov

27-N

ov

12-D

ec

27-D

ec

11-J

an

26-J

an

10-F

eb

25-F

eb

11-M

ar

26-M

ar

11-1210-11

INDIRA SAGAR

240.00242.00244.00246.00248.00250.00252.00254.00256.00258.00260.00262.00264.00

1-A

pr

16-A

pr

1-M

ay

16-M

ay

31-M

ay

15-J

un

30-J

un

15-J

ul

30-J

ul

14-A

ug

29-A

ug

13-S

ep

28-S

ep

13-O

ct

28-O

ct

12-N

ov

27-N

ov

12-D

ec

27-D

ec

11-J

an

26-J

an

10-F

eb

25-F

eb

11-M

ar

26-M

ar

11-1210-11

Annual Report 2011-12, SLDC, MPPTCL, JBP 25

Page 30: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

BANSAGAR

320.00322.00324.00326.00328.00330.00332.00334.00336.00338.00340.00342.00344.00

1-A

pr

16-A

pr

1-M

ay

16-M

ay

31-M

ay

15-J

un

30-J

un

15-J

ul

30-J

ul

14-A

ug

29-A

ug

13-S

ep

28-S

ep

13-O

ct

28-O

ct

12-N

ov

27-N

ov

12-D

ec

27-D

ec

11-J

an

26-J

an

10-F

eb

25-F

eb

11-M

ar

26-M

ar

11-1210-11

2.11 Other Information

Additional Power Purchase -

During the year 2011-12 MP has purchased 1281.87MU as additional power whereas additional power purchase done in previous year 2010-11 was 102.49 MU.

Sale of Power -

During the year 2011-12 MP has sold 849.347 MU as against 416.38 MU in last year 2010-11.

Banking of Power -

During the year 2011-12 net banking of power by MP was -147.39 MU.

Unscheduled Interchange

During the Year 2011-12 State of MP has under drawn 726.60 MU and Under drawn 1198.47 MU from the western grid i.e. net Under drawn by MP from Grid was 471.87 MU. UI payable on account of Overdrawal was 310.39 Crores. & UI receivable for under drawal was 296.88 Crores. This corresponds to net UI payable by MP which corresponds to net payable by MP for 13.51 Crores. The Total Additional Charges payable by MP was 23.35 crores on account of over drawl by MP at frequency below 49.5 Hz.

2.12 TTC Messages issued by WR to MP

During the Year 2011-12 total 23 Number of TTC messages were issued by WRLDC to MP. The month wise details of same is given below :

MonthTTC Messages issued by WR to

MPApril'11 0May'11 0June'11 7July'11 2Aug.'11 6Sep'11 3Oct'11 0Nov'11 3Dec'11 0Jan'12 1Feb'12 0Mar'12 1Total 23

Annual Report 2011-12, SLDC, MPPTCL, JBP 26

Page 31: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

3 OCC Meeting

During the Year 2011-12 the SLDC has conducted the Operation coordination committee meeting as detailed below :-

1. 24th OCCM on 25.06.2011 2. 25th OCCM on 20.08.2011 3. 26th OCCM on 28.11.2011 4. 27th OCCM on 27.02.2012

4 Black-Start mock drill of Hydel Power Stations

Electrical power system comprising transmission, sub-transmission and distribution networks facilitating the transfer of power from widely spaced generating stations to the consumer load centers is one of the critical infrastructures for any country. A blackout in a power system can be conceived as the total failure of power supply in an area due to failure of associated generation or transmission facilities. The restoration of the area blacked out in the least possible time assumes highest precedence for a power system operator post the event since the impact of a black out multiplies with the duration of the event. The strategy for restoration depends on the degree of system failure. A blackout might be a partial one covering a certain pocket of the large power system or in the worst case it could be a complete system blackout. Accordingly the strategy adopted may be a ‘top-down’ approach where in start-up power is extended from neighboring healthy system up to the nearest generating unit in the affected area, else it may be a ‘bottom-up’ approach where in the generating units capable of self-start are black-started [generally with local diesel generator(DG) sets] and subsystems are gradually built around the self-started units with some radial load, expanded gradually by synchronization of those small sub-systems among themselves and finally with the main grid. All efforts are made to restore the system post black out in the minimum possible time. Black start exercises in an islanded real time sub-system comprising loads and generating stations capable of self start, is a learning exercise to gain preparedness all form of blackouts. Such exercises are beneficial for reducing the time taken during actual system restoration following a disturbance and also to address systemic deficiencies detected during the process. Another aspect of robustness of a system can be illustrated by the fact that a weaker system that has a well-tested plan for emergency procedures and for restoration may be more reliable than a stronger system with no such plan. The Central Electricity Regulatory Commission (CERC), India also mandates such exercises biannually

The black start exercises have been carried out at Indira Sagar Hydro Power Station located in Khadwa District, on 22nd May 2011 and at Rani Awanti Bai Sagar Hydel Power Station, Bargi on 10th February 2012.

4.1 Black Start Exercise at Indirasagar HPS

The exercise has been jointly carried out by engineers from MP State Load Despatch Centre Jabalpur, Western Regional Load Despatch Centre Mumbai, Indira Sagar Hydro Power Station, MP Power Transmission Co. Limited, Indore and Paschim Kshetra Vidyut Vitaran Company Limited Indore.

Annual Report 2011-12, SLDC, MPPTCL, JBP 27

Page 32: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Indira Sagar hydro power station (ISP) is located at Narmada Nagar, 10 km away from the village Punasa in Khandwa district of Madhya Pradesh. It is a multipurpose project on the river Narmada with installed generation capacity of 1000 MW (8 x 125 MW). In order to create a total black out scenario at ISP, a detailed procedure based on the ‘bottom up’ strategy for black start exercise was prepared. A small area around ISP was identified to be islanded from rest of the grid. The planned is-land comprised of one 125 MW unit at ISP, radially feeding identified block loads at 220/132/33 kV Jetpura S/S through 400/220 kV Indore S/S. The above sub-system thus created was planned to be synchronized with rest of the grid at Indore S/S. Since Indore S/S was having facility for check-synchronization with its 400 kV bus-couplers, the same was identified as the point of synchronization of the island with rest of the grid. Availability of one 50 MVAR line reactor (L/R) on 400 kV ISP-Indore line at Indore end was an added advantage for reactive power management during the exercise. Further the shorter line length of 400 kV ISP-Indore (80kms each circuit) lines compared to 400 kV ISP – Nagda (188 kms each circuit) lines also went in favor of selection of Indore for the exercise instead of Nagda. The schematic diagram of the island is indicated below.

The transmission and distribution operators involved in the black start

exercise were kept in synchronism with the modus operandi of the entire exercise, well in advance to avoid any inadvertent switching operation during the exercise. The procedure of switching arrangements at different substations involved in the exercise along with targeted time line for each step was released well in advance. The black start exercise was suitably planned on 22nd July, 2011 (Sunday) in consultation with all concerned. That day being a holiday, alternative supply to the loads fed from 132 kV Jetpura bus could be ensured without any major constraint. The black start plan was executed in 4 major steps viz. (1) Preparatory activities such as bus splitting and shifting of identified elements on to the desired bus, (2) Formation of the is-land by separation of the sub-system with one unit at ISP feeding identified radial load at Jetpura via Indore S/S, (3) Self-Starting one unit with a stand-alone DG set at ISP and gradually building up the Is-land after complete blackout of Fig. the is-landed sub-system., (4) Synchronization of the subsystem with rest of the grid at Indore 400/220 kV S/S. The exercise was

Annual Report 2011-12, SLDC, MPPTCL, JBP 28

Page 33: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

successfully completed and Black start capability of the Generator got tested. The performance as recorded in the SCADA system is given below :

This black start exercise was unique in regards to using a large generator

(125 MW), 400 KV line with reactor, 400/220 KV ICT, 200 KV line, 220/132 KV transformer, 132 KV line, 132/33 KV transformer and 33 KV lines. Apart from Generating stations three substations of different voltage ratings have participated in the exercise.

The exercise also tested various capabilities of the generator and transmission system. The capabilities of the generator that got tested include the capability to self-start from a DG set, to regulate the active and reactive power output so as to operate the island at reduced standards of frequency and voltage, to operate in partial loading condition without losing stability etc. The transmission capabilities that were put to test include the ability of switch gear to charge dead bus, healthiness of bus coupler breakers, capability of reactive resources (line reactor etc.), flexibility available in protection systems in terms of operating at other than normal settings for a temporary period, healthiness of synchronizing facilities available at important substations etc.

4.2 Black Start Exercise at Bargi HPS :

The black-start exercise for Bargi HPS unit was carried out on 10th February, 2012. This black start exercise involved two major stages viz creating an islanded subsystem by separating out unit #2 (45 MW) at Bargi HPS along with radial load at 132/33 kV Lakhnadaun s/s fed through 132 KV bus #1 of Bargi HPS, followed by operation of the created island around the Bargi unit for some time, and then creating a blackout in the islanded subsystem created with one unit (45 MW unit #2) of Bargi and radial load at 132/33 kV Lakhnadaun s/s, start of one unit at Bargi, charging of one dead 132 KV bus at Bargi, charging 132 kV Bargi-Lakhnadaun line, islanded operation of the Bargi HPS unit with radial load at Lakhnadaun s/s followed by synchronising this island at Bargi HPS.

Bargi is the multipurpose hydro power station nearest to Jabalpur city having capacity of 2x45 MW. Bargi HPS is interconnected with Jabalpur 220 KV sub-station through 132 KV D/C line and to Lakhnadaun 132 KV S/s through 132 KV S/C line. One 132/33 KV 40 MVA transformer at Lakhnadaun S/s feeds consumer load through 5 Nos. 33 KV feeders. The maximum loading of about 28 MW was recorded in morning hours

Annual Report 2011-12, SLDC, MPPTCL, JBP 29

Page 34: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

on 40 MVA transformer in February 2012. The complete black start mock exercise was conducted successfully at Bargi HPS between 10:25 Hrs to 11.42 Hrs on 10th February 2012.

The performance as recorded in the SCADA system is given below :

The results of black start exercise of Bargi HPS have been quite satisfactory. The restoration of the supply to Lakhnadaun area post black out took about 23 minutes which could have been reduced to 16 minutes if the bus PT fuse did not blow out at Bargi. The restoration of the system within this short time without any abnormal behavior of voltage, frequency and other electrical parameters will help in restoration process in real time. The frequency of the island remained close to 50.0 Hz, which shows that the unit is perfectly working in free governor mode. The DG set at Bargi HPS do not have auto start facility and thus started manually.

The capabilities of the generator that got tested during black start exercise

include the capability to start from a DG set, to regulate the active and reactive power output so as to operate the island at reduced standards of frequency and voltage, to

Annual Report 2011-12, SLDC, MPPTCL, JBP 30

Page 35: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

operate under partial loading condition without losing stability, primary response of the generator, healthiness of synchronisation facility etc. The transmission capability that were put to test include the ability of switch gear to charge dead bus, healthiness of bus breakers, flexibility available in protection systems in terms of operating at other than normal settings for a short period.

5 System Operators Training Organised by PSTI, Bangalore

As per recommendation of Pradhan Committee on “ Man Power Certification, Incentive and ring fencing Load Despatch Centre”, the Load Despatch personals are required to undergo basic level System Operator Training. The National Power Training Institute, PSTI, Bangalore has been identified as trainee agency. Total 10 Engineers from SLDC / Sub SLDC from MP has been deputed to obtain the training. All the participants from SLDC/SUB SLDC, after Completion of training, appeared from Certification Examination and have been qualified as Certified System Operators.

6 Commercial

6.1 Balancing & Settlement Mechanism Under Intra State Availability Based Tariff

The National Electricity Policy (NEP) envisages implementation of the Availability Based Tariff (ABT) at State level to establish a credible settlement mechanism for Intra- day power transfers among Intra State Entities. Madhya Pradesh Electricity Regulatory Commission (MPERC) has notified the Balancing & Settlement Code (BSC) 2009 on 30th Oct’2009 which has come into force in the State of M.P. w.e.f. 1st November 2009. The BSC’ 2009 specify that SLDC shall prepare and issue State Energy Account (SEA), State Energy UI Account (SUA) & State Reactive Account (SRA) to all Intra State Entities and settlement of active & reactive energy imbalances. The Intra State ABT has been implemented in the State of Madhya Pradesh as one of the key aspects of National Electricity Policy. The MP has become first state in the country to implement the Intra State Availability Base Tariff.

The activities performed under Intra State ABT are Scheduling & Despatch, Meter Data Collection & Analysis, Energy Accounting and exchange of information through Web Server. The activities are briefly described as under –

6.2 Scheduling & Despatch –

The basic idea behind the scheduling & dispatch is to match the demand and supply on day ahead basis. It includes the preparation of requisition to WRLDC and drawal schedule of various Distribution Companies and Injection Schedules of State Sector Generating Stations on day ahead basis as well as real time revisions during the course of day of operation.

6.3 Meter Data Collection & Analysis –

ABT compliant energy meters are installed at all the interface points of each SSGS / Open Access Generator and Discoms / Open Access Customer for recording actual net kWh interchanges on 15-minute time block and kVARh injection / drawals on daily basis. The ABT meter data of all the interface points are downloaded and communicated to the SLDC through email on fornighlty basis by the MPPTCL / MPPGCL / Discoms / Inter State Utility in whose area of jurisdiction ABT meter is

Annual Report 2011-12, SLDC, MPPTCL, JBP 31

Page 36: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

installed. After verification and validation, meter data of all the interface meters is processed.

The entity wise ABT meters installed at various interface points which are being used for processing and computation of State UI Accounts and State Reactive Accounts are as follows –

6.4 Energy Accounting –

The preparation and issuance of monthly State Energy Account, State UI Account and State Reactive Account are being done under Energy Accounting. The State Energy Accounts are prepared on the basis of Implemented Schedules issued by SLDC to State Sector Generating Stations (SSGS), Discoms, Open Access Customers and Regional Energy Account issued by Western Region Power Committee (WRPC). State UI Accounts is prepared on the basis of implemented schedules issued by SLDC, WRLDC and actual ABT meter data of the interface points. At present State UI Accounts and State Reactive Accounts for the constituents including Open Access Customers (OACs) are being issued on monthly basis in place of weekly basis due to non- availability of ABT meter data on weekly basis from field offices.

6.4.1 State Energy Account (SEA) –

Monthly State Energy Account (SEA) is prepared by SLDC for the billing and settlement of Capacity Charges, Energy Charges and Incentives. It comprises of availability of generating stations and Ex-Bus energy scheduled to Discoms from generating stations.

6.4.2 Plant Availability Factor (PAF %)

In ABT, Plant Availability Factor is a basis for generator to recover its Fixed Cost or Capacity Charge. MPERC has already notified the Normative PAF target of Satpura Complex (unit 1 to9), Amarkantak PH-II (unit 3 & 4), Amarkantak Unit 5 Sanjay Gandhi

S. No. Description of Entity No. of SEM’s

1. MPMKVVCL 178

2. MPPuKVVCL 162

3. MPPaKVVCL. 218

4. MPPGCL Thermal 49

5. MPPGCL Hydel 36

6. ISP & OSP 9

7. Inter Discom 8

8. MPAKVN (Including check meters) 3

9. IPP 4

8. OAC & OAG (Including check meters) 34

9. Central Sector 53

TOTAL 754

Annual Report 2011-12, SLDC, MPPTCL, JBP 32

Page 37: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Unit 1 to 4 and Sanjay Gandhi unit 5. Similary Normative PAF target of each Hydel Station has also been notified by the MPERC. The Normative PAF and annual PAF for the year 2011-12 of each SSGS is shown below :

60.0

0

19.8

0

85.0

0 94.0

4

80.0

0

64.1

7

85.0

0 93.5

3

80.0

0

53.8

3

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

%

AMK-II AMK-III SGTPS-I & II SGTPS -III Satpura

ANNUAL PLANT AVAILABILITY FACTOR OF MPPGCL THERMAL

Target Actual

85.0

072

.39

85.0

088

.74

85.0

0 89.7

9

85.0

078

.19 85

.00

60.1

1

85.0

052

.55

85.0

011

.73

85.0

035

.31

85.0

060

.05

85.0

072

.80

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

%

Gan

dhis

agar

Penc

h

Barg

i

Tons

Birs

ingp

ur

SILP

ARA

(BS

II)

DEV

LON

D (B

S III

)

RAJ

GH

AT

JHIN

NA

(BS

IV)

MAN

IKH

EDA

ANNUAL PLANT AVAILABILITY FACTOR OF HYDEL STATIONS Target Actual

6.4.3 Availability of Transmission System of Madhya Pradesh

The Overall Availability of Madhya Pradesh Transmission System was 99.23 % in 2011-12 as against 99.13 % in 2010-11. The year wise target and Actual MP transmission availability is shown below

Annual Report 2011-12, SLDC, MPPTCL, JBP 33

Page 38: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

UI vector w.e.f 03-05-10

0

100

200

300

400

500

600

700

800

900

1000

49.34

49.38

49.42

49.46 49

.549

.5449

.5849

.6249

.66 49.7

49.74

49.78

49.82

49.86 49

.949

.9449

.9850

.0250

.06 50.1

50.14

50.18

50.22

50.26 50

.3

Frequency in Hz.

UI r

ate

in P

s/u

49.7Hz 403ps/u

49.5Hz 873ps/u

50.2Hz 0 ps/u

50.0Hz 155 ps/u

92.00

93.00

94.00

95.00

96.00

97.00

98.00

99.00

100.00

%

Yearwise MP Trasmission System Availability (%)

Target Actual

Target 95.00 97.00 97.00 97.50 98.00 98.00 98.00Actual 98.41 98.96 99.02 98.16 98.82 99.13 99.23

2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

6.4.4 State UI Account (SUA) –

UI Regulations –

The UI charges are calculated as per latest regulation of Central Electricity Regulatory Commission (CERC) on “Unscheduled Interchange charges and related matters” and Balancing and Settlement Code(BSC) notified by MPERC on 30th Oct’2009. The CERC Regulation on UI, 2009 has been amended by notification dt.28.04.2010 and notified as Central Electricity Regulatory Commission (Unscheduled Interchange charges and related matters) (Amendment) Regulations, 2010 w.e.f 05.03.2011 in which grid operating frequency narrowed down from 49.2 to 50.3 Hz to 49.5 Hz to 50.2 Hz. and limits on UI volumes below 49.7 Hz for over drawal as well as under injection and UI rates also changed. Following is the new UI curve.

Annual Report 2011-12, SLDC, MPPTCL, JBP 34

Page 39: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

6.4.5 Settlement of Active Energy Imbalance and UI Charges –

Settlement of active energy imbalance and UI charges is done as per the provision of MPERC Balancing & Settlement Code (BSC) 2009, Retail Supply Tariff Order 2010-11 and subsequent directives of Govt. of MP obtained by SLDC for adjustment of surplus energy available with Discom(s) to the Discom(s) having shortfall.

As per Clause No. 7.13 of the BSC, settlement of UI charges is done through State UI Pool Account presently being maintained by MP Tradeco. Payment of UI Charges to the UI Pool Account shall be made within 10 days from the date of issue of bills by MP Tradeco. Payment received after 12 days shall attract simple interest @ 0.04% for each day of delay. The payment to be received from the UI Pool Account shall be paid within next three (3) working days.

6.4.6 UI Charges of Discoms after Adjustment of Intra Discom s trading for FY 2011-12

The adjustment of Intra Discoms trading was done as per MPERC Retail Supply Tariff Order 2011-12 and subsequent directives of Govt. of MP obtained by SLDC. Under the Intra Discoms adjustments, excess energy available in 15 minutes time block with a Discoms was apportioned in the same block to the Discoms having shortfall. Thus, the Discoms which were in under drawal has received the UI Charges and energy charges at the pool rate specified in MPERC tariff order on account of Intra Discom trading whereas the Discoms which were in over drawal has paid the UI Charges and energy charges for the energy received from surplus Discoms.

Discomwise Schedule Drawal, Actual Drawal and UI Charges

1281

1.10

1338

6.62

1389

4.70

121.

64

1175

0.37

1279

3.14

120.

30

1589

3.93

-52.71

237.79

-0.81

-180.54

-98.81

-58.24

279.35

0400800

1200160020002400280032003600400044004800520056006000640068007200760080008400880092009600

100001040010800112001160012000124001280013200136001400014400148001520015600160001640016800

East Discom Central Discom West Disom SEZ

MU

-300.00

-200.00

-100.00

0.00

100.00

200.00

300.00

400.00

Rs.

Cr.

Sch Drl MU Act Drl MU UI Charges RS. Cr Intra Discom trading unit Charges Rs Cr

From the above graph, it could be seen that East Discom and Central Discom were in under drawal and has received the UI charges and energy charges on account of Intra Discom adjustments whereas West Discom was in over drawal & has to pay the UI Charges and energy charges on account of Intra Discom

Annual Report 2011-12, SLDC, MPPTCL, JBP 35

Page 40: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

adjustments. The charges paid / received by the Discoms during the FY 2011-12 are as under –

Discoms UI Energy

Under drawal (-) / Over drawal (+)

in MU

UI Charges

Payable (+) / Receivable (-) after adjustment of Intra DISCOM Trading

Rs. Cr.

Energy Charges on account of Intra Discom adjustments

Payable (+) / Receivable (-)

in Rs. Cr.

Net total Charges paid (+) / Received (-) in Rs. Cr.

(UI + Intra DISCOM Trading)

East Discom -1060.73 -52.71 -180.54 -233.26

Central Discom -593.48 -58.24 -98.81 -157.05

West Discom 1999.23 237.79 279.35 517.14

UI Charges of State Sector Generating Stations for FY 2011-12 –

UI SUMMARY OF MPPGCL THERMAL AND ISPYEAR : 2011-12

375.

68

1559

.19

4047

.93

3505

.55

4768

.51

3273

.96

1567

.06

4092

.94

3533

.59

4772

.84

3278

.14

383.

57

-4.63-4.26

-14.74

-10.56

-5.00

-6.06

0200400600800

1000120014001600180020002200240026002800300032003400360038004000420044004600480050005200

AMK-II AMK-III SGTPS I&II SGTPS III SATPURA ISP

MU

-16.00

-14.00

-12.00

-10.00

-8.00

-6.00

-4.00

-2.00

0.00

UI C

harg

es R

S. C

R.

Sch Inj MU Act Inj MU UI Charges RS. Cr

UI Charges of Intra State Entities for FY 2011-12 –

The summary of UI Accounts issued for the FY 2011-12 to Intra State entities is shown below –

Annual Report 2011-12, SLDC, MPPTCL, JBP 36

Page 41: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

6.4.7 State Reactive Energy Account (SRA) –

In accordance with clause No.7.15 of BSC’2009, SLDC is preparing and issuing (to all Intra-State Entities) monthly State Reactive Account (SRA) complying with the requirements of IEGC and MPERC Grid Code. The SRA comprises of weekly reactive energy charges payable / receivable by the Discoms, Open Access Customers and Open Access Generators based on actual net reactive energy. The Summary of State Reactive Accounts (SRA) issued for the FY 2011-12 to Intra State entities is shown below –

6.5 Exchange of Information through Web Server

A reliable and fast communication arrangement is being used for exchange of information to various State Grid Entities. All the Schedules, Entitlements, State UI Accounts, State Reactive Energy Accounts, Monthly State Energy Accounts (including Day wise and block wise data) prepared by SLDC are simultaneously updated to SLDC Web Site, so that desired information could reach State Grid Entities immediately. Further, Drawl Schedules of the (3) three Discoms is also uploaded in SCADA System for monitoring of their drawal during real time operation.

Annual Report 2011-12, SLDC, MPPTCL, JBP 37

Page 42: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

6.6 SHORT TERM OPEN ACCESS -

Non-discriminatory Short Term Open Access (STOA) permission for trading of power through bilateral transaction and collective transaction is being granted to Open Access Customers (OACs) by SLDC on fulfillment of conditions/ requirements / criteria specified in the CERC & MPERC Regulations on open access. The total 20 Nos. OACs apart from MP Tradeco have traded power through Intra State & Inter State STOA during the financial year 2011-12.

SLDC is the nodal agency for Short Term Open Access in the state. The consent / NOC from 2.1 MW to 39.5 MW for sale of power has been given for collective mode (through IEX) and bilateral mode. For purchase of power by CPPs and Short term open access customers from 3.2 MW to 28.5 MW, Consent / Standing Clearance/ No Objection Certificates has been given. The Intra State Short Term Approval for Sale and Purchase of power has also been given. Against above consent / standing clearance/ no objection certificate/ Approval 124.13 MU power has been injected in the grid from CPPs and Short term open access customers and 386.03 MU power has been drawn from the grid by CPPs and Short term open access customers during the year. There was no pending application in SLDC for Short Term open Access during the year.

Apart from above, the consent / standing clearance / approval for injection & drawal of power in collective mode (through IEX / PX) and through bilateral mode has been given to MP Tradeco for sale / purchase of power during 2011-12.

7 SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA)

7.1 Maintenance of logistic support systems :

The SCADA/EMS system, Wideband Communication system, Auxiliary Power Supply system, Air Conditioning system and other logistic support services provided at SLDC Jabalpur and at Sub-LDCs Bhopal & Indore have been maintained in healthy working condition through out the year, thereby real time data from sub-stations and power stations of MP have been made available for system monitoring and control.

7.2 Integration of new sub-stations with SCADA SYSTEM :

Real time data from EHV Sub-stations commissioned after 2006 are also required for system monitoring and control. Accordingly, the requirement of RTUs and PLCC equipments for data & voice communication from the RTU station have been worked out & orders for procurement, installation & commissioning of Remote Terminal Units has been finalised by MPPTCL during 2010-11. The Factory acceptance test has been conducted and twenty number RTU’s has been delivered at site in 2011-12. The telemetry of four S/s namely 220KV Sukha 220KV Sagar, 220KV Mandideep & 220Kv Indore (E) commissioned during 2011-12.

(i) REPLACEMENT OF EXISTING AI R CONDITIONING PL ANT :- The old Air Conditioning Plant at SLDC has been replaced by new one. The plant has been supplied, installed by M/s Batliboi Limited, Mumbai. The commissioning of the Air Conditioning Plant is in advance stage of completion.

The new Air Conditioning Plant is semiautomatic and micro processor based and has a better control, than the old plant. This comprises of 06 cylinder compressor as compared to 04 cylinder of the earlier plant and therefore gives better control at partial

Annual Report 2011-12, SLDC, MPPTCL, JBP 38

Page 43: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

load operation. It is more balanced, has less vibration and low noise level. Earlier the cooling tower was of spray pond type, this has been replaced by Induced draft rectangular Cooling Tower for better performance, similarly the Air Handling Units are compact, consumes less power, have low noise level and thus gives better efficiency.

(ii) REPLACEMENT OF FIRE ALARM SYSTEM BY NEW ONE AT SLDC, JABALPUR :- The replacement of survey reported fire alarm system at SLDC Jabalpur during the year. The scope of work included supply, installation, testing & commissioning of fire alarm system i.e. supply, laying and termination of signal/power cables, interface wiring form main control units to individual sensors and detectors, mounting of extinguishers at appropriate places etc.

The new Fire Alarm System comprises of Intelligent Fire Alarm Panel - having Min. 2 loop capacity expandable up to 4 loops, each loop having capacity of 127 (approx.) detectors/devices, an operating front with zone indication, Maintenance free Lead Acid (VRLA) battery of adequate capacity to provide 30 minutes of alarm condition back up with charger, Heat / Smoke detectors - Dual scatter principle Multisensor having capacity to decipher between genuine and false alarms, Fixed cum Rate of Rise Heat detector complete with base and built in isolator, Manual call points - addressable type with built in isolator, Hooters, Output control module - for control of Air Handling Units, DG set, Mains Power etc., 40 Extension speech dialer, cable - Multithreaded Shielded Armoured 2C, 1.5 sq mm, FRLS Copper cable, spares etc.

(III) DG SET, UPS & DCPS System :-

Trial run of DG set is being taken on weekly / Fortnightly basis. Battery backup for UPS & DCPS Systems is also being tested on Weekly / Fortnightly basis and found to be in healthy condition.

(iv) Physical & Cyber Security in SLDC :-

The salient feature points & status of Physical & Cyber Security in SLDC are being summarized hereunder

1. 2 Armed Security Guards are deployed in round the clock shift duty. 2. Sonic Fire Wall protection has been provided for access to internet through broad

band connection. 3. Server & Client computers provided for SCADA, Communication and ABT Systems

has been provided with licensed Antivirus Software with regular update. 4. Off line computers / Laptop used for general office works are also provided with

licensed Antivirus Software with regular update. 5. Fire Extinguishers (DCP & CO2 types) have been provided at distinct locations in

SLDC. 6. Refilling of fire extinguishers have been completed in the month of March’ 2012. 7. New Fire Alarm System has been installed and commissioned on 20.10.2012. 8. Trial run of DG set has been taken on weekly / Fortnightly basis. 9. Battery backup for UPS & DCPS Systems has been tested on Weekly / Fortnightly

basis and found to be in healthy condition.

-----xx-----

Annual Report 2011-12, SLDC, MPPTCL, JBP 39

Page 44: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sr.No. Nominal Voltage UnitTransmission System as on

31.03.2011

Additions During

2011-2012

Transmission System as on

31.03.2012

A

1 400 KV 2343.01 0.00 2343.01

2 220 KV 10856.49 228.92 11085.41

3 132 KV 13208.40 420.83 13629.23

4 66 KV 61.00 0.00 61.00

5 Total 26468.90 649.75 27118.65

B

1 400 KV 4515.00 0.00 4515.00

2 220 KV 14350.00 800.00 15110.00

3 132 KV 15347.00 672.00 15919.00

4 66 KV 20.00 0.00 20.00

5 Total 34232.00 1472.00 35704.00

C

1 400 KV 5.00 0.00 5.00

2 220 KV 53.00 2.00 55.00

3 132 KV 183.00 6.00 187.00

4 66 KV 1.00 0.00 1.00

5 Total 242.00 8.00 250.00

TRANSMISSION CAPACITY ADDITION DURING 2011-12

Transmission Lines

Circuit KMS

Number of EHV Substaions

MVA Capacity

EHV Substaions MVA Capacity

Number

Annual Report 2011-12, SLDC, MPPTCL, JBP 40

Page 45: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

INSTALLED CAPACITY : THERMAL : MPUnit

Capacity

Installed Capacity

Derated Capacity

YEAR of Commi- ssioning

M.P.'s Share

Shares of Other States

MW MW MW MW MW

THERMAL

AMARKANTAK II 2 120 240.0 240.0 1977-78 240.0

AMARKANTAK III 1 210 210.0 210.0 1977-78 210.0

AMARKANTAK COMPLEX 3 450.0 450.0 450.0

SATPURA I 5 62.5 312.5 312.5 1967-70 187.5 125 RSEB

SATPURA II 1 200 } 410.0 410.0 1979-80 410.0

1 210 }

SATPURA III 2 210 420.0 420.0 1983-84 420.0

SATPURA COMPLEX 9 1142.5 1142.5 1017.5

SANJAY GANDHI I 2 210 420.0 420.0 1993-94 420.0

SANJAY GANDHI II 2 210 420.0 420.0 1998-99 420.0

SANJAY GANDHI III 1 500 500.0 500.0 2007 500.0

SGTPS COMPLEX 4 1340.0 1340.0 1993-2007 1340.0

MP THERMAL 16 2932.5 2932.5 2807.5

*** Amarkantak - I retired wef 01.04.2009

POWER

HOUSE

NO. of

Units

as on 31.03.2012

Annual Report 2011-12, SLDC, MPPTCL, JBP 41

Page 46: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

INSTALLED CAPACITY : HYDEL : MP

STATION NAME Unit Capacity

Installed Capacity

Derated Capacity

M.P.'s Share Shares of Other States

MW MW MW MW

HYDEL

GANDHISAGAR 5 23 115.0 115.0 1960-61 57.5 57.5 of RSEB M.P.

RANAPRATAPSAGAR 4 43 172.0 172.0 1968.69 86.0 86.0 of RSEB RAJASTHAN

JAWAHARSAGAR 3 33 99.0 99.0 1972-73 49.5 49.5 of RSEB RAJASTHAN

TOTAL CHAMBAL 12 386.0 386.0 193.0 193.0 of RSEB

PENCH 2 80 160.0 160.0 1986-87 106.7 53.3 of MSEB MS

BARGI 2 45 90.0 90.0 1988 90.0 M.P.

BIRSINGHPUR 1 20 20.0 20.0 1991 20.0 M.P.

BANSAGAR-I(TONS) 3 105 315.0 315.0 1991-92 315.0 M.P.

RAJGHAT 3 15 45.0 45.0 1999-2000 22.5 22.5 of UPSEB M.P.

BANSAGAR-III(DEV) 3 20 60.0 60.0 01-02& 02-03 60.0

BANSGAR-II(SILPARA) 2 15 30.0 30.0 2002-03 30.0

BANSGAR-IV(Jinha) 2 10 20.0 20.0 2006-07 20.0

Madikheda 3 60 60.0 60.0 2006-07 60.0

Total Hydel 1106.0 1106.0 917.2

MPSEB HYDEL 915.0 915.0

MINI\MICRO 5.46 5.5 5.5

MORAND 3 0.335 1.0 1.0 1990-91 1.0 M.P.

TILWARA 1 0.250 0.3 0.3 1996-97 0.3 M.P.

CHARGAON : Jatlapur 1 0.800 0.8 0.8 1996-97 0.8 M.P.

SATPURA 2 0.500 1.0 1.0 1995-96 1.0 M.P.

BHIMGARH 2 1.200 2.4 2.4 1997-98 2.4 M.P.

Total Hydel (Incl. Mini Micro) 1111.5 1111.5 922.6

920.5 920.5

3187.5 3187.5 3064.7

3193.0 3193.0 3070.1

TAWA HEG(Private) 2 6.750 13.5 13.5 1996-97 Private

RIHAND 6 50.0 300.0 300.0 1962-66 37.5 15% Max U.P.

MATATILA 3 10.0 30.0 30.0 10.0 33.33% U.P.

INDIRA SAGAR (NHDC) 8 125.0 1000.0 1000.0 2003-2004 2004-2005 1000.0

Omkareshwar (NHDC) 8 65.0 520.0 520.0 2007-2008 520.0

5 50.0 250.0 250.0 2005-2007 142.5

6 200.0 1200.0 1200.0 2005-2007 684.0

Total 1450.0 1450.0 2005-2007 826.5

as on 31.03.2012

Situated in

MP HYDEL INCL. MINI/MICRO

MP Th+Hy (Excl. Mini Micro)

NO. of Units

YEAR of Commis sioning MW

Joint Venture of Govt of MP & NHDC

Joint Venture of Govt of MP & NHDC

Sardar Sarovar

MP Th+Hy (Incl. Mini Micro)

Annual Report 2011-12, SLDC, MPPTCL, JBP 42

Page 47: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

(As on 31.03.2012)

( Figures in MW)

Sr. No. Name of Power Station Unit Capacity Total

CapacityFirm

Share

Allocation from from Unallocated

share

Specific Allocation

out of Unallocated

Share for

Total Allocated

Share

1Korba Super Thermal Station 3x200+3x500 2100.00 400.00 32.58 52.63 485.21

(Chhatisgarh) 19.05%

1 KSTPS # 71X500 500.00 62.50 12.81 0.00 75.31

(Chhatisgarh) 12.50%

2

Vindhyachal Super Thermal Power Stations -I

6x210 1260.00 385.00 24.47 32.26 441.73

(Madhya Pradesh) 30.56%

32x500 1000.00 273.00 19.75 25.47 318.22

27.30%4

2x500 1000.00 200.00 21.24 25.47 246.71 20.00%

5 2X500 1000.00 143.00 21.24 25.47 189.71 14.30%

6 1X600 660.00 94.33 16.91 0.00 111.24 14.29%

6Kawas Gas Power Project) 4x106 + 2x116.1 656.20 140.00 0.00 0.00 140.00

(Gujarat) 21.33%

7Gandhar Gas Project 3x144.3+224.49 657.39 117.00 0.00 0.00 117.00

(Gujarat) 17.80%

8 KAPP 2x220 440.00 93.00 6.34 11.21 110.55

(Gujarat) 21.14%

9 TAPS 2x540 1080.00 180.00 23.16 27.50 230.66

(Gujarat) 16.67%

10 Total 9853.59 2087.83 178.50 200.00 2466.33

2 743 74

1 NTPC WR 2466.33 MW2 NTPC ER 74 MW3 Total 2540.33 MW

II. SHARE OF M.P. IN EASTERN REGION NTPC GENERATING STATIONS

Vindhyachal Super Thermal Power Stations -II

Vindhyachal Super Thermal Power Stations -III **Sipat Super Thermal Power Station(CS)-II

Share fro Kahalgaon Stage-IITotal Share from Eastern Region

III. TOTAL SHARE OF M.P. IN CENTRAL SECTOR

I. SHARE OF MP IN WESTERN REGIONAL NTPC GENERATING STATIONS

Period off Peak Hours 00.00 to 18.00 hrs & 22.00 to 24.00 hrs

Sipat Super Thermal Power Station(CS)-i

Annual Report 2011-12, SLDC, MPPTCL, JBP 43

Page 48: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

(As on 31.03.2012)

( Figures in MW)

Sr. No. Name of Power Station Unit Capacity Total

CapacityFirm

Share

Allocation from from Unallocated

share

Specific Allocation out of Unallocated

Share for Bundelkhand

Total Allocated

Share

1Korba Super Thermal Station

3x200+3x500 2100.00 400.00 37.27 52.63 489.90

(Chhatisgarh) 19.05%

1 KSTPS # 71X500 500.00 62.50 14.54 0.00 77.04

(Chhatisgarh) 12.50%

2

Vindhyachal Super Thermal Power Stations -I

6x210 1260.00 385.00 27.97 32.26 445.23

(Madhya Pradesh) 30.56%3

2x500 1000.00 273.00 22.58 25.47 321.05 27.30%

42x500 1000.00 200.00 24.10 25.47 249.57

20.00%

5 2X500 1000.00 143.00 24.10 25.47 192.57 14.30%

6 1X600 660.00 94.33 19.19 0.00 113.52 14.29%

6Kawas Gas Power Project) 4x106 + 2x116.1 656.20 140.00 0.00 0.00 140.00

(Gujarat) 21.33%

7Gandhar Gas Project 3x144.3+224.49 657.39 117.00 0.00 0.00 117.00

(Gujarat) 17.80%

8 KAPP 2x220 440.00 93.00 7.19 11.21 111.40

(Gujarat) 21.14%9 TAPS 2x540 1080.00 180.00 26.28 27.50 233.78

(Gujarat) 16.67%

10 Total 9853.59 2087.83 203.22 200.00 2491.05

2 743 74

1 NTPC WR 2491.05 MW2 NTPC ER 74 MW3 Total 2565.05 MW

Share fro Kahalgaon Stage-IITotal Share from Eastern Region

III. TOTAL SHARE OF M.P. IN CENTRAL SECTOR

I. SHARE OF M.P. IN WESTERN REGIONAL NTPC GENERATING STATIONS

Period Peak Hours 18.00 hrs to 22.00 hrs

Sipat Super Thermal Power Station(CS)-i

II. SHARE OF M.P. IN EASTERN REGION NTPC GENERATING STATIONS

Vindhyachal Super Thermal Power Stations -IIVindhyachal Super Thermal Power Stations -III **

Sipat Super Thermal Power Station(CS)-II

Annual Report 2011-12, SLDC, MPPTCL, JBP 44

Page 49: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

M A X I M U M S (DAILY)Year : 2011 - 2012

Registered Peak

Month Morning Evening

LU Date LU Date MW Date MW Date MW Date MW Date MW Date MW Date

Apr 508.69 2 1216.50 2 7339 2 3156 7 4567 28 7310 2 7488 2 2191 5

May 494.24 31 1079.32 6 6155 17 3134 22 4246 28 6155 17 7168 18 2217 31

Jun 488.69 6 1055.57 6 6069 6 2540 23 4482 1 6069 6 6944 6 2101 16

Jul 452.55 8 919.66 30 5170 4 2507 23 3853 28 5170 4 5767 4 2053 8

Aug 417.24 2 1020.04 31 5403 31 2800 14 4188 31 5403 31 5680 2 1826 1

Sep 376.65 21 1077.98 30 6025 30 3053 3 4709 30 5979 30 6576 28 1782 21

Oct 487.00 29 1519.30 26 7973 25 3474 11 5975 26 7835 26 8766 31 2087 29

Nov 534.25 18 1541.01 5 7548 3 4743 1 6872 4 7548 3 8846 2 2331 28

Dec 574.58 31 1536.95 9 7399 9 4953 21 6130 13 7399 9 8874 9 2621 23

Jan 562.79 19 1523.07 26 7720 16 3965 2 7720 26 7376 18 8859 18 2404 19

Feb 535.42 16 1364.16 14 7477 13 4339 29 5456 11 7477 13 8808 14 2289 16

Mar 593.55 31 1383.29 3 8546 3 3717 25 5467 2 8546 3 8946 3 2555 30

Maximum Unrestricted

Demand

Thermal Generation

Min. Reg. Demand

Max.Thermal

Generation

Maximum M.P. Supply

Max. Reg. Demand

Met

Annual Report 2011-12, SLDC, MPPTCL, JBP 45

Page 50: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

MAXIMUMAS ON 31.03.2012 DAILY MONTHLY YEARLY

STATION No. UNIT No. MU PUF DATE MU PUF MONTH MU PUF YEAR

I 1 0.720 100.00 05.10.70 21.350 95.65 Oct-70 236.00 89.56 75-76

I 2 0.720 100.00 05.10.70 21.330 95.56 Oct-70 239.00 90.70 75-76

TOTAL 1.461 101.46 20.06.88 42.690 95.63 Oct-70 475.71 90.26 75-76

II 3 2.860 99.31 26.02.83 74.920 83.92 Oct-80 664.07 63.17 85-86

II 4 2.880 100.00 28.12.82 78.935 88.41 Jan-84 724.34 68.91 82-83

TOTAL 5.784 100.42 31.03.79 150.440 84.25 Dec-83 1335.10 63.50 84-85

III 5 5.240 104.05 12/31/2010 157.552 100.84 Oct-11 1734.33 94.02 2011-12

AMARKANTAK 9.266 95.97 Gen 11.03.12PLF 02.07.83 243.305 83.68 Gen Mar 12

PLF Dec 83 2160.75 65.80 Gen 11-12PLF 84-85

I 1 1.540 102.67 19.03.97 44.930 96.62 Jan-2K 468.31 85.54 01-02

I 2 1.580 105.33 03.02.98 45.620 98.11 May-99 446.33 81.52 02-03

I 3 1.590 106.00 19.03.97 44.980 96.73 Dec-83 444.32 81.16 02-03

I 4 1.560 104.00 17.11.99 45.790 101.76 Nov-99 454.25 82.74 99-2K

I 5 1.570 104.67 16.8.99 45.900 98.71 Aug-99 433.63 79.20 02-03

TOTAL 7.550 100.67 19.03.97 218.830 94.12 Mar-2K 2197.68 80.28 02-03

II 6 4.978 103.71 07.02.2K 145.010 97.45 Mar-02 1442.33 82.32 98-99

II 7 5.190 102.98 08.02.2K 156.870 100.40 Mar-2K 1439.54 78.25 98-99

TOTAL 10.113 102.77 07.02.2K 295.810 96.97 Mar-2K 2881.93 80.24 98-99

III 8 5.310 105.36 31.12.2k 155.330 99.42 Dec-00 1651.85 89.55 99-2K

III 9 5.300 105.16 31.12.2k 156.180 99.96 Dec-00 1441.65 78.15 99-2K

TOTAL 10.610 105.26 31.12.2k 311.510 99.69 Dec-00 3093.51 83.85 99-2K

SATPURA 27.566 100.53 15.03.2K 793.050 93.30 Mar-2K 7889.07 78.61 02-03

I 1 5.087 100.93 06.01.98 143.320 91.73 Jan-98 1328.17 72.20 06-07

I 2 5.248 104.13 20.02.97 146.250 93.61 Mar-99 1304.22 70.90 98-99

TOTAL 10.144 100.63 20.02.97 268.720 86.00 Mar-98 2518.15 68.44 98-99

II 3 5.170 102.58 11/30/2004 153.760 98.41 Dec-04 1553.12 84.43 04-05

II 4 5.180 102.78 10/31/2004 155.350 99.43 Oct-04 1526.57 82.98 07-08

TOTAL 10.310 102.28 10/31/2004 300.230 96.08 Mar-01 3027.17 82.28 04-05

SANJAY GANDHI III 12.590 104.90 31.12.10 369.920 99.44 Dec-10 3726.47 84.85 11-12

SANJAY GANDHI 30.193 97.07 Gen 26.01.12PLF 31.10.04 865.638 88.38 Gen Dec 11

PLF Mar 07 8263.16 74.34Gen 11-12

PLF 5/4/2012

TOTAL 59.355 89.41 Gen-31.03.12PLF-11.01.03 1627.158 83.29 Gen-Dec11

PLF-Jan 03 16079.89 73.14 Gen-08-09PLF-02-03

SANJAY GANDHI

SATPURA

AMARKANTAK

Annual Report 2011-12, SLDC, MPPTCL, JBP 46

Page 51: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sr. No. Particulars 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12Maximum Unrestricted Demand 5862 6063 6033 6148 6734 7114 7132 7593 7309 8758 8946

Date 23/Jan/02 19/Dec/02 1/Jan/04 13/Dec/04 12/Dec/05 15/Jan/07 1/Jan/08 13/Nov/08 26/Jan/10 3/Feb/11 3/Mar/12

Time 19.00 19.15 19.15 18.15 8.30 8.45 8.15 20.00 19.30 20.00 20.25

Maximum Demand Met / Availability 4632 4652 4984 5241 5780 6109 6501 7019 6215 8331 8546

Date 14/Nov/01 4/Nov/02 18/Jan/04 12/Nov/04 1/Nov/06 21/Dec/06 9/Nov/07 27/Nov/08 21/Jan/10 28/Feb/11 3/Mar/12

Time 19.00 22.00 18.30 19.00 20.00 4.00 19.00 7.45 19.15 20.30 20.25

1 THERMAL ** 1644 1806 1843 1920 1922 1804 1737 1858 1948 2013 1939

2 HYDEL 707 670 626 646 594 430 554 595 518 534 610

3 Indira Sagar --- --- 169 442 970 505 1005 935 733 939 826

4 Omkareshwar --- --- --- --- --- --- 306 305 292 377 337

5 Injection from STOA --- --- --- --- --- --- --- 11 57 -37 -21

6 CSS 1521 1349 1446 1423 1453 1555 1492 1652 1739 2065 1925

7 DVC ER --- --- --- --- --- --- --- 83 39 112 226

8 Sugen --- --- --- --- --- --- --- --- --- --- 55

8 Addl Power Purchase+Banking+Sale+Energy Exhange --- --- 490 155 33 1375 92 436 116 713 561

9 Sardar Sarovar --- --- --- 26 281 310 675 455 547 232 513

10 Rihand + Matatila --- --- --- --- --- --- --- 13 5 5 27

11 Schedule of STOA --- --- --- --- --- --- --- -11 -57 37 21

12 Over / Under DRAWAL 721 827 389 625 524 127 640 617 278 1341 1526

13 OTHER IMPORT 39 0 21 4 3 3 0 70 0 1 1

14 Availability / DEMAND MET 4632 4652 4984 5241 5780 6109 6501 7019 6215 8331 8546

15 SCH LS 615 610 630 450 250 0 0 200 733 99 0

16 UNSCH LS 0 117 0 0 0 0 0 0 0 0 341

17 Frequency Correction 615 684 419 457 704 1005 631 374 28 7 19

15 Maximum Daily MP Supply : MU 94.895 95.292 105.696 106.692 119.01 119.023 134.776 149.801 128.217 137.358 154.100

16 Date 14.11.02 04.11.03 12/1/2003 11/12/2004 10/31/2005 30.11.06 11/9/2007 11/27/2008 1/24/2009 1/26/2011 11/5/2011

** upto 2007-08 Thermal Availability Including Auxiliary Consumption

Maximum Unrestricted Demand and Maximum Demand Met / Availability

C. Availability from Different Sources at the time of Maximum Demand Met

A

B

Fig in MW

Annual Report 2011-12, SLDC, MPPTCL, JBP 47

Page 52: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

THER (Excl. Aux)

HYDEL ISP OSP BLASTOA

Injection

Intra State STOA

C.S.S.WR+ER Torrant DVC

ERBankin

g SSP SEZPower Purcha

seSale Excha

nge

STOA (Wheeli

ng)

Rihand+Matati

laTotal SCH UNSCH TOTAL

wrt to Demand

Met

wrt Availabi

lity

Apr-11 49.65 1778 422 518 224 -- 11 5 1821 96 96 0 489 10 286 0 0 -11 3 5749 3037 290 6039 839 92 932 6196 7035 996 1286

May-11 49.86 1682 323 612 276 -- 1 1 1842 95 115 0 442 10 160 0 0 -1 4 5563 2926 258 5821 801 35 836 5881 6682 861 1119

Jun-11 49.71 1614 362 594 285 -- -8 1 1623 32 32 -128 491 10 107 -1 0 8 2 5024 2067 -108 4915 498 14 512 4972 5469 554 445

Jul-11 49.69 1557 345 633 306 -- 5 1 1599 34 0 -316 575 10 0 -18 0 -5 10 4736 1905 16 4751 448 3 451 4799 5248 496 512

Aug-11 49.65 1303 494 951 343 -- 12 -1 1701 28 0 -475 683 9 0 -218 0 -12 19 4837 1636 -100 4737 374 21 396 4808 5182 445 346

Sep-11 49.58 1215 681 1007 355 -- 8 -1 1484 95 0 -371 747 7 18 -323 0 -8 29 4943 1902 223 5167 41 244 286 5476 5518 351 574

Oct-11 49.68 1581 645 927 360 -- 24 0 1789 94 66 0 690 9 212 -39 0 -24 25 6358 3275 453 6812 720 180 900 7054 7774 962 1416

Nov-11 49.85 1772 618 659 272 -- 7 0 1989 66 169 204 578 11 410 0 0 -7 19 6768 3827 387 7155 1194 130 1324 7317 8511 1355 1743

Dec-11 49.81 2065 542 496 203 -- 19 7 1922 52 263 162 343 10 485 0 0 -19 17 6566 3564 329 6894 1173 397 1570 7330 8503 1610 1937

Jan-12 49.81 1962 454 572 248 -- 13 1 1961 64 310 136 522 9 274 0 0 -13 15 6529 3482 203 6731 1282 73 1355 6842 8124 1393 1595

Feb-12 49.88 1813 587 716 326 -- 5 1 2065 57 247 89 546 11 34 0 0 -5 25 6517 3677 608 7124 1139 300 1439 7450 8589 1465 2072

Mar-12 50.06 2286 585 765 333 39 0 -2 1959 62 352 92 498 10 0 -102 0 0 16 6894 2844 -44 6850 801 0 801 6837 7638 789 745

Avg 49.77 1719 505 704 294 39 8 1 1813 65 138 -51 550 10 166 -58 0 -8 15 5909 2845 209 6083 776 124 900 6247 7023 940 1113

Shortage

AVERAGE AVAILABILITY, AVERAGE DEMAND & SHORTAGE AT THE TIME OF EVENING PEAK YEAR : 2011-12

(FIGURES IN M.W.)

MONTH FREQ. ACTUAL DRAWAL O/D

DEMAND

MET

AVAILABILITY RELIEFREST DEMAND

UNREST DEMAND

Annual Report 2011-12, SLDC, MPPTCL, JBP 48

Page 53: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

THER (Excl. Aux)

HYDEL ISP OSPSTOA Injecti

on

C.S.S.WR+ER Sugen DVC

ERBankin

g SSP SEZPower Purcha

seSale Excha

nge

STOA (Wheeli

ng)

Rihand+Matati

laTOTAL SCH. UNSCH

. TOTAL wrt to Demand

wrt Availabili

ty

Apr-11 02/04/11 19:30 49.19 1916 470 785 330 7 1753 96 94 0 530 10 739 0 0 -1 3 6731 3803 579 7310 0 0 0 7488 7488 178 756

May-11 18/05/11 21:45 50.17 1538 338 630 328 0 1886 96 131 0 481 10 0 0 0 1 4 5443 3276 667 6110 865 224 1089 6303 7168 1058 1725

Jun-11 06/06/11 21:30 49.89 1858 392 726 286 -5 1726 96 131 0 480 11 64 0 0 6 4 5773 2812 296 6069 709 145 854 6234 6944 874 1171

Jul-11 04/07/11 21:15 49.71 1714 374 659 328 19 1598 0 0 -305 550 12 0 0 0 -18 6 4937 2076 233 5170 481 70 551 5285 5767 596 830

Aug-11 02/08/11 21:15 49.23 1564 412 864 372 5 1867 96 0 -505 609 10 0 -97 0 0 13 5211 1825 -169 5042 521 0 521 5159 5680 638 469

Sep-11 28/09/11 19:15 49.00 1336 753 1009 385 11 998 97 0 -380 768 5 0 -300 0 -12 30 4701 1833 626 5327 190 899 1089 6386 6576 1249 1875

Oct-11 31/10/11 22:00 49.87 1645 667 850 336 -2 1899 66 97 0 577 10 149 0 0 1 19 6314 3816 998 7312 1309 116 1425 7457 8766 1454 2451

Nov-11 02/11/11 20:45 50.00 1458 644 864 332 -24 1997 66 145 0 578 11 39 0 0 29 22 6161 4073 1186 7347 1180 319 1499 7666 8846 1499 2686

Dec-11 09/12/11 20:45 49.95 2077 557 498 203 42 2077 62 242 152 552 11 343 0 0 -31 20 6805 4022 594 7399 1140 324 1464 7734 8874 1475 2069

Jan-12 18/01/12 19:15 50.11 2152 529 607 294 4 1964 63 252 103 549 9 287 0 0 -3 10 6821 3790 555 7376 1447 60 1507 7412 8859 1483 2037

Feb-12 14/02/12 20:15 49.79 1802 605 702 335 2 2098 61 259 78 614 11 0 0 0 -1 19 6586 3933 793 7379 987 396 1383 7821 8808 1429 2222

Mar-12 03/03/12 20:25 49.77 1939 610 826 337 0 -20 1915 55 226 71 513 10 490 0 0 21 28 7021 4854 1526 8546 0 341 341 8946 8946 400 1925

Max 09/12/11 20:45 49.95 2077 557 498 203 43 2077 62 242 152 552 11 343 0 0 -31 20 6806 4022 594 7399 1140 324 1464 7734 8874 1475 2068

UNREST.

DEMAND

Hrs FREQ.

AVAILABILITY

ACTUAL DRAWAL

Shortage

AVAILABILITY, DEMAND AND SHORTAGE AT THE TIME OF MAXIMUM UNRESTRICTED DEMANDYEAR : 2011-12

(FIGURES IN M.W.)

MONTH DATE O/D DEMAND MET

RELIEFREST.

DEMAND

Annual Report 2011-12, SLDC, MPPTCL, JBP 49

Page 54: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

THER (Excl. Aux)

HYDEL ISP OSPSTOA Injecti

on

C.S.S.WR+ER Sugen DVC

ERBankin

g SSP SEZPower Purcha

seSale Excha

nge

STOA (Wheeli

ng)

Rihand+Matati

laTOTAL SCH. UNSCH. TOTAL

wrt to Deman

d

wrt Availabi

lity

Apr-11 02/04/11 20:00 50.05 1950 567 777 331 6 1753 96 94 0 530 10 739 0 0 1 3 6857 3707 483 7339 0 0 0 7328 7328 -11 471

May-11 17/05/11 21:30 49.99 1659 296 635 328 -4 1818 96 131 0 481 10 46 0 0 6 3 5506 3241 650 6155 904 65 969 6221 7125 971 1620

Jun-11 06/06/11 21:30 49.89 1858 392 726 286 -5 1726 96 131 0 480 11 64 0 0 6 4 5773 2812 296 6069 709 145 854 6234 6944 874 1171

Jul-11 04/07/11 21:15 49.71 1714 374 659 328 19 1598 0 0 -305 550 12 0 0 0 -18 6 4937 2076 233 5170 481 70 551 5285 5767 596 830

Aug-11 31/08/11 20:15 49.58 1117 640 1014 351 18 2037 0 0 -367 738 12 0 -203 0 -18 27 5364 2265 40 5403 0 0 0 5471 5471 68 107

Sep-11 30/09/11 21:00 49.65 1573 760 1009 381 18 1304 97 0 -380 760 6 197 -300 0 -13 30 5443 2284 588 6025 184 84 268 6172 6356 331 913

Oct-11 25/10/11 22:00 49.92 1836 701 989 377 32 1406 99 97 0 583 12 535 0 0 -32 22 6657 4038 1317 7973 174 29 203 8021 8195 222 1537

Nov-11 03/11/11 20:30 49.93 1682 625 867 334 -14 2051 66 218 0 579 11 39 0 0 19 21 6497 4054 1051 7548 1121 0 1121 7564 8685 1137 2188

Dec-11 09/12/11 20:45 49.95 2077 557 498 203 43 2077 62 242 152 552 11 343 0 0 -31 20 6806 4022 594 7399 1140 324 1464 7734 8874 1475 2068

Jan-12 26/01/12 9:00 49.74 2010 574 839 338 1 2058 63 329 0 41 10 292 0 0 -1 24 6579 3957 1141 7720 665 0 665 7780 8445 725 1867

Feb-12 13/02/12 20:30 49.86 1537 663 819 376 38 2114 56 261 78 614 11 0 0 0 -37 26 6556 4044 921 7477 953 326 1279 7835 8788 1310 2231

Mar-12 03/03/12 20:25 49.77 1939 610 826 337 0 -20 1915 55 226 71 513 10 490 0 0 21 28 7021 4854 1526 8546 0 341 341 8946 8946 400 1925

Maximum 25/10/11 22:00 49.92 1836 752 989 377 32 1406 99 97 0 583 12 535 0 0 -32 22 6708 4038 1317 7973 174 29 203 8021 8195 222 1486

MONTH DATE

AVAILABILITY AND DEMAND AT THE TIME OF MAXIMUM DEMAND METYEAR : 2011-12

(FIGURES IN M.W.)

Hrs FREQ.

AVAILABILITYACTUAL DRAWAL O/D

ShortageDEMAND MET

RELIEFREST.

DEMANDUNREST. DEMAND

Annual Report 2011-12, SLDC, MPPTCL, JBP 50

Page 55: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

THER. Excl Aux HYD. ISP OSP BLA

Power

Injection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange STOA

Rihand+Matat

ilaTotal SCH UNSCH TOTAL

wrt to Demand

Met

With wrt Availabil

ity

Apr-11 49.86 1737 166 188 87 -- 5 2184 1830 96 96 171 11 -76 -3 113 0 -5 3 2232 4420 2262 26 5 4451 1001 10 1011 4481 5481 1030 1056

May-11 49.96 1563 168 209 99 -- -5 2035 1847 105 95 187 10 -66 0 123 0 5 4 2305 4344 2317 8 1 4353 880 8 888 4366 5246 893 901

Jun-11 49.96 1571 204 303 159 -- -27 2210 1617 31 31 287 10 -222 -66 61 0 27 2 1777 3989 1573 -207 1 3784 457 3 460 3792 4249 465 259

Jul-11 49.91 1464 209 320 176 -- -19 2150 1800 0 35 261 10 -391 -84 0 0 19 7 1651 3808 1465 -196 1 3612 433 3 436 3632 4065 453 256

Aug-11 49.92 1236 384 795 291 -- -18 2688 1584 0 22 578 9 -477 -330 0 0 18 19 1405 4112 1024 -400 -1 3711 233 3 235 3724 3946 235 -165

Sep-11 49.90 1119 568 1003 354 -- -26 3017 1268 0 88 732 7 -414 -491 5 0 26 29 1221 4267 1031 -219 -1 4048 70 62 132 4123 4194 146 -73

Oct-11 49.72 1529 489 449 183 -- 16 2665 1392 63 94 332 9 -16 -102 169 0 -16 25 1925 4616 2437 486 0 5103 996 167 1163 5311 6307 1204 1690

Nov-11 49.81 1762 493 289 119 -- 7 2687 2000 169 66 150 11 283 0 538 0 -7 19 3210 5874 3600 372 0 6246 1271 229 1500 6509 7780 1535 1906

Dec-11 49.81 1988 459 263 112 -- 13 2836 2043 260 52 98 10 363 0 536 0 -13 17 3349 6178 3379 13 7 6199 1250 346 1596 6581 7831 1632 1645

Jan-12 49.94 1913 318 275 120 -- 4 2630 1897 230 62 181 9 375 0 256 0 -4 15 3005 5633 2993 -28 1 5607 1139 63 1203 5680 6820 1213 1185

Feb-12 49.90 1922 443 243 108 -- -5 2594 1939 237 57 158 11 253 0 8 0 5 25 2668 5287 2982 290 1 5578 1375 73 1447 5663 7037 1459 1749

Mar-12 49.93 1961 386 221 100 11 -5 2674 2169 198 59 144 10 193 -84 23 0 5 21 2717 5413 2418 -321 -1 5091 1145 50 1196 5154 6299 1208 888

Average 49.89 1647 357 380 159 11 -5 2531 1782 116 63 273 10 -16 -97 153 0 5 16 2289 4828 2290 -15 1 4815 854 85 939 4918 5771 956 941

Shortage

Intra State STOA

FREQ.

Own Generation Schedule from

Monthwise Average Availability, Demand Met, Unrestricted Demand and ShortageYear : 2011-12

Month DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

TotAvl.

Act.Drl UI

Annual Report 2011-12, SLDC, MPPTCL, JBP 51

Page 56: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Max Min Avg Max Min Avg Max Min Avg Max Min Avg Max Min Avg Max Min Avg

Apr 7488 4414 5481 7339 3156 4451 6885 4061 5263 5576 2807 4058 8.8 8.7 4.1 31.6 12.4 9.7

May 7168 3579 5246 6155 3134 4353 6516 3728 5006 5233 2845 3911 10.0 -4.0 4.8 17.6 10.2 11.3

Jun 6944 2682 4249 6069 2540 3784 6334 3179 4680 5110 2578 3599 9.6 -15.6 -9.2 18.8 -1.5 5.1

1st Qtr 7488 2682 4992 7339 2540 4196 6885 3179 4983 5576 2578 3856 8.8 -15.6 0.2 31.6 -1.5 8.8

Jul 5767 2577 4065 5170 2507 3612 5585 2803 4018 4255 2457 3270 3.3 -8.1 1.2 21.5 2.0 10.4

Aug 5680 2833 3946 5403 2844 3694 5446 2951 4020 4467 2307 3357 4.3 -4.0 -1.8 21.0 23.3 10.0

Sep 6576 3046 4194 6025 3053 4048 6747 2747 4025 5726 2624 3744 -2.5 10.9 4.2 5.2 16.4 8.1

2nd Qtr 6576 2577 4068 6025 2507 3785 6747 2747 4021 5726 2307 3457 -2.5 -6.2 1.2 5.2 8.7 9.5

Oct 8766 4147 6307 7973 3474 5103 7058 3909 5438 6153 3103 4439 24.2 6.1 16.0 29.6 12.0 15.0

Nov 8846 6540 7780 7548 4743 6246 7965 4031 6101 7786 3309 4680 11.1 62.2 27.5 -3.1 43.4 33.4

Dec 8874 6203 7831 7181 5195 6199 8718 4194 6849 7245 3673 5263 1.8 47.9 14.3 -0.9 41.4 17.8

3rd Qtr 8874 4147 7306 7973 3474 5849 8718 3909 6129 7786 3103 4794 1.8 6.1 19.2 2.4 12.0 22.0

Jan 8859 4228 6820 7720 3965 5607 8744 5759 7140 7298 4313 5582 1.3 -26.6 -4.5 5.8 -8.1 0.4

Feb 8808 5396 7039 7477 4339 5578 8758 4745 6817 8331 3706 5260 0.6 13.7 3.3 -10.3 17.1 6.1

Mar 8946 4258 6814 8546 3867 5433 8449 4085 6151 8180 3326 4793 5.9 4.2 10.8 4.5 16.3 13.3

4th Qtr 8946 4228 6891 8546 3867 5539 8758 4085 6702 8331 3326 5212 2.1 3.5 2.8 2.6 16.3 6.3

Max/Min/Avg 8946 2577 5814 8546 2507 4842 8758 2747 5459 8331 2307 4330 2.1 -6.2 6.5 2.6 8.7 11.8

MONTH Unrestricted Demand Demand Met

% Change wrt last YearYear : 2011-12

Unrestricted Demand

Monthwise Maximum , Minimum and Average Unrestricted Demand and Demand Met in MW

Unrestricted Demand Demand MetDemand Met

Year : 2010-11

Annual Report 2011-12, SLDC, MPPTCL, JBP 52

Page 57: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Monthwise Maximum Unrestrcited DemandYear : 2011-12 Vs 2010-11

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

MW

-5

0

5

10

15

20

25

30

%

2011-12 2010-11 % Increase

2011-12 7487.6 7168.2 6943.9 5767 5680 6575.8 8766 8846.3 8874.4 8858.7 8808 8946

2010-11 6885 6516 6334 5585 5446 6747 7058 7965.2 8718.3 8743.7 8758 8449

% Increase 8.7528 10.009 9.6288 3.2587 4.2967 -2.537 24.199 11.062 1.791 1.3148 0.5713 5.8824

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar7

Monthwise Average Unrestrcited DemandYear : 2011-12 Vs 2010-11

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

MW

-15

-10

-5

0

5

10

15

20

25

30

%

2011-12 2010-11 % Increase

2011-12 5481.2 5246.4 4248.9 4065 3946 4193.5 6307 7780.5 7830.8 6819.6 7039 6814

2010-11 5263 5005.9 4679.7 4018.2 4020.1 4025.1 5437.7 6101.1 6849.3 7139.9 6816.9 6150.6

% Increase 4.1462 4.8045 -9.206 1.1656 -1.843 4.1853 15.986 27.525 14.329 -4.487 3.2579 10.786

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar7

Annual Report 2011-12, SLDC, MPPTCL, JBP 53

Page 58: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Monthwise Maximum Demand MetYear : 2011-12 Vs 2010-11

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

MW

-15-10-505101520253035

%

2011-12 2010-11 % Increase

2011-12 7338.6 6154.6 6069.5 5170 5403 6024.6 7973 7547.9 7399.4 7720.1 7477 8546

2010-11 5576 5233 5110 4255 4467 5726 6153 7786.4 7244.6 7297.9 8331.1 8180

% Increase 31.61 17.61 18.776 21.504 20.954 5.215 29.579 -3.062 2.1365 5.7859 -10.25 4.4743

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar7

Monthwise Average Demand MetYear : 2011-12 Vs 2010-11

0

1000

2000

3000

4000

5000

6000

7000

MW

0

5

10

15

20

25

30

35

40

%

2011-12 2010-11 % Increase

2011-12 4451.2 4353 3783.6 3612 3694 4047.9 5103 6245.7 6198.7 5606.7 5578.4 5433

2010-11 4058 3911.5 3598.5 3270.3 3357.3 3744 4438.5 4680.3 5263.2 5581.8 5260.1 4793.2

% Increase 9.6883 11.288 5.1434 10.449 10.028 8.1176 14.97 33.447 17.776 0.4459 6.0529 13.349

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar7

Annual Report 2011-12, SLDC, MPPTCL, JBP 54

Page 59: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSPInjection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.81 1896 1725 259 242 68 4 2298 1836 96 96 14 11 -35 0 102 0 -4 3 2119 4417 2243 124 5 4546 843 0 843 4573 5416

2:00 49.84 1907 1736 190 218 43 2 2189 1837 96 96 14 11 -35 0 102 0 -2 3 2122 4311 2245 123 5 4439 847 0 847 4460 5307

3:00 49.84 1913 1741 151 200 41 3 2137 1838 96 96 14 11 3 0 117 0 -3 3 2175 4312 2370 194 5 4511 799 0 799 4533 5331

4:00 49.88 1908 1736 120 156 35 4 2051 1837 96 96 14 11 52 0 123 0 -4 3 2229 4280 2382 154 5 4438 722 0 722 4454 5176

5:00 49.76 1903 1732 116 142 31 5 2026 1835 96 96 11 11 52 0 124 0 -5 3 2223 4250 2327 104 5 4359 704 2 706 4392 5096

6:00 49.86 1894 1724 105 131 50 5 2014 1835 96 96 11 11 52 0 89 0 -5 3 2189 4203 2168 -21 5 4187 960 20 980 4225 5185

7:00 49.88 1893 1723 73 103 54 4 1956 1834 96 96 11 11 87 0 66 0 -4 3 2201 4157 2149 -52 5 4110 1103 0 1103 4124 5227

8:00 50.01 1897 1726 71 97 57 3 1955 1835 96 96 11 11 87 0 68 0 -3 3 2204 4159 2150 -55 5 4110 1016 0 1016 4109 5125

9:00 49.90 1900 1729 61 84 57 4 1935 1836 96 96 19 11 53 0 67 0 -4 3 2177 4113 2136 -41 5 4076 1223 3 1226 4091 5314

10:00 49.95 1895 1725 98 63 57 4 1946 1838 96 96 310 11 -207 0 67 0 -4 3 2211 4157 2235 24 5 4186 984 12 997 4204 5189

11:00 49.91 1895 1724 98 59 59 4 1944 1838 96 96 375 11 -238 -7 74 0 -4 3 2244 4189 2244 0 5 4193 933 6 939 4210 5143

12:00 49.88 1889 1719 94 56 59 5 1933 1835 96 96 372 11 -238 -7 74 0 -5 3 2237 4170 2177 -60 5 4115 867 2 870 4131 4999

13:00 50.00 1898 1728 64 33 52 5 1882 1822 96 96 375 10 -238 -7 70 0 -5 3 2224 4106 2172 -52 5 4059 1008 0 1008 4059 5067

14:00 49.90 1902 1730 50 39 57 6 1882 1815 96 96 375 10 -238 -1 65 0 -6 3 2217 4099 2010 -207 5 3897 941 0 941 3909 4850

15:00 49.83 1895 1725 52 48 58 4 1887 1819 96 96 106 10 -238 -24 63 0 -4 3 1930 3817 1923 -6 5 3815 1294 0 1294 3835 5129

16:00 49.86 1900 1729 49 48 59 4 1890 1818 96 96 32 10 -238 -17 63 0 -4 3 1860 3749 1869 10 5 3764 1286 0 1286 3780 5066

17:00 49.93 1893 1723 64 47 59 4 1898 1820 96 96 32 10 -238 -7 63 0 -4 3 1873 3771 1942 70 5 3846 1166 0 1166 3854 5020

18:00 50.03 1921 1749 93 184 86 4 2115 1817 96 96 32 10 -238 0 63 0 -4 3 1876 3991 1926 50 5 4046 1151 0 1151 4043 5193

19:00 49.82 1939 1765 242 328 138 5 2478 1808 96 96 389 10 0 0 69 0 -5 3 2467 4945 2515 48 5 4997 1075 0 1075 5025 6099

20:00 49.83 1959 1783 386 486 196 11 2862 1817 96 96 489 10 0 0 194 0 -11 3 2696 5558 2592 -104 5 5459 1194 7 1201 5494 6688

21:00 49.76 1961 1784 428 510 218 12 2952 1823 96 96 486 10 0 0 293 0 -12 3 2796 5748 2856 60 5 5814 969 55 1023 5910 6879

22:00 49.82 1943 1768 423 509 231 11 2943 1827 96 96 483 10 0 0 300 0 -11 3 2804 5747 2911 108 5 5859 805 94 899 5983 6788

23:00 49.69 1906 1734 379 436 201 9 2759 1847 96 96 113 10 0 0 212 0 -9 3 2368 5127 2443 75 5 5206 1054 21 1075 5276 6330

24:00 49.72 1901 1730 327 298 127 5 2487 1846 96 96 22 11 -35 0 180 0 -5 3 2214 4701 2303 89 5 4794 1075 22 1097 4856 5931

Avg. 49.86 1909 1737 166 188 87 5 2184 1830 96 96 171 11 -76 -3 113 0 -5 3 2232 4420 2262 26 5 4451 1001 10 1011 4481 5481

00 TO 06 HRS. 49.83 1903 1732 157 182 45 4 2119 1836 96 96 13 11 15 0 110 0 -4 3 2176 4296 2289 113 5 4413 812 4 816 4440 5252

06 TO 12 HRS. 49.92 1895 1724 83 77 57 4 1945 1836 96 96 183 11 -76 -2 69 0 -4 3 2213 4157 2182 -31 5 4132 1021 4 1025 4145 5166

12 TO 18 HRS. 49.93 1902 1731 62 67 62 5 1926 1819 96 96 159 10 -238 -9 65 0 -5 3 1996 3922 1974 -23 5 3905 1141 0 1141 3913 5054

06TO 18 HRS. 49.92 1898 1727 72 72 60 4 1935 1827 96 96 171 11 -157 -6 67 0 -4 3 2104 4040 2078 -27 5 4018 1081 2 1083 4029 5110

18 TO 24 HRS. 49.77 1935 1761 364 428 185 9 2747 1828 96 96 330 10 -6 0 208 0 -9 3 2557 5304 2603 46 5 5355 1028 33 1062 5424 6453

REST. DEMA

ND

UNREST.

DEMAND

Own Generation Schedule from

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- April 2011

FIGURES IN MWLoad Shedding

Act.Drl UI

Other

Imp/ Exp

DEMAND

MET

TotAvl.Hrs. FREQ.

Annual Report 2011-12, SLDC, MPPTCL, JBP 55

Page 60: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSPInjection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.89 1681 1530 259 416 112 -6 2310 1844 104 96 37 10 -35 0 173 0 6 4 2240 4550 2345 105 1 4656 736 12 748 4684 5420

2:00 50.00 1684 1533 246 362 101 -7 2234 1854 104 96 37 10 -35 0 173 0 7 4 2250 4485 2355 104 1 4590 817 8 824 4598 5415

3:00 50.01 1677 1526 226 336 98 -9 2178 1858 104 95 31 10 -35 0 171 0 9 4 2247 4424 2436 189 1 4614 677 0 677 4614 5291

4:00 50.07 1675 1524 216 265 87 -10 2082 1856 104 95 3 10 -35 0 171 0 10 4 2219 4301 2375 156 1 4458 563 0 563 4449 5012

5:00 49.93 1682 1530 198 231 79 -10 2028 1855 104 95 3 10 -35 0 169 0 10 4 2215 4243 2225 9 1 4253 522 0 522 4262 4785

6:00 50.11 1686 1534 156 136 67 -11 1883 1852 104 95 3 10 -35 0 169 0 11 4 2213 4096 2091 -122 1 3975 811 0 811 3962 4774

7:00 50.07 1690 1538 44 50 55 -11 1677 1844 100 96 3 10 0 0 85 0 11 4 2152 3829 2004 -149 1 3682 957 0 957 3674 4632

8:00 50.12 1691 1539 36 13 52 -11 1629 1850 101 96 3 10 0 0 85 0 11 4 2160 3789 1983 -177 1 3613 1008 0 1008 3600 4608

9:00 50.05 1687 1535 37 7 52 -9 1622 1849 101 96 16 10 -16 0 85 0 9 4 2154 3776 2103 -50 1 3726 1075 0 1075 3721 4795

10:00 49.96 1691 1539 67 14 54 -5 1668 1836 101 96 349 10 -148 0 85 0 5 4 2338 4006 2334 -4 1 4003 899 8 907 4016 4915

11:00 49.87 1702 1548 85 20 54 -4 1704 1822 101 95 406 10 -148 0 85 0 4 4 2379 4083 2487 108 1 4192 820 23 843 4232 5051

12:00 49.90 1710 1556 122 23 54 -2 1753 1838 101 95 427 10 -148 0 85 0 2 4 2415 4168 2450 36 1 4204 746 30 776 4247 4994

13:00 49.99 1712 1558 133 30 55 -1 1775 1844 101 95 409 10 -148 0 89 0 1 4 2405 4181 2539 134 1 4316 895 20 915 4338 5232

14:00 49.83 1698 1545 133 40 57 -1 1774 1846 101 95 400 10 -148 0 89 0 1 4 2398 4172 2343 -55 1 4118 909 16 926 4155 5065

15:00 49.80 1681 1530 133 40 57 -1 1759 1844 101 95 196 10 -148 0 89 0 1 4 2192 3951 2259 67 1 4018 1050 7 1057 4050 5100

16:00 49.98 1679 1528 134 50 55 -1 1767 1844 101 95 109 10 -148 0 89 0 1 4 2105 3871 2100 -5 1 3867 1123 23 1146 3893 5016

17:00 50.02 1688 1537 109 43 55 -2 1742 1848 101 95 58 10 -148 0 89 0 2 4 2059 3801 1956 -102 1 3699 1147 4 1151 3701 4848

18:00 50.20 1750 1593 96 64 55 -3 1804 1854 103 95 15 10 -148 0 89 0 3 4 2025 3830 1855 -171 1 3660 1071 0 1071 3638 4708

19:00 49.98 1822 1658 121 206 74 -5 2054 1839 107 95 283 10 0 0 88 0 5 4 2432 4485 2429 -3 1 4483 851 0 851 4485 5337

20:00 49.92 1857 1690 257 507 188 1 2642 1844 115 95 424 10 0 0 160 0 -1 4 2652 5294 2537 -116 1 5180 933 0 933 5192 6125

21:00 49.89 1859 1692 325 609 266 1 2893 1841 115 95 442 10 0 0 160 0 -1 4 2667 5561 2709 41 1 5603 892 4 895 5625 6517

22:00 49.94 1827 1663 324 605 283 1 2875 1843 115 95 442 10 0 0 160 0 -1 4 2669 5544 2817 148 1 5693 790 23 813 5727 6517

23:00 49.79 1702 1549 304 494 216 0 2563 1860 115 95 280 10 0 0 160 0 0 4 2526 5088 2505 -21 1 5068 923 0 923 5101 6024

24:00 49.85 1697 1544 281 444 156 -2 2424 1856 115 95 106 10 -35 0 160 0 2 4 2313 4737 2374 60 1 4799 907 7 914 4827 5734

Avg. 49.96 1718 1563 168 209 99 -5 2035 1847 105 95 187 10 -66 0 123 0 5 4 2305 4344 2317 8 1 4353 880 8 888 4366 5246

00 TO 06 HRS. 50.00 1681 1530 217 291 91 -9 2119 1853 104 95 19 10 -35 0 171 0 9 4 2231 4350 2304 74 1 4424 688 3 691 4428 5116

06 TO 12 HRS. 49.99 1695 1543 65 21 53 -7 1675 1840 101 96 201 10 -77 0 85 0 7 4 2266 3942 2227 -39 1 3903 918 10 928 3915 4833

12 TO 18 HRS. 49.97 1702 1548 123 45 56 -2 1770 1847 101 95 198 10 -148 0 89 0 2 4 2197 3968 2175 -22 1 3946 1033 12 1044 3962 4995

06TO 18 HRS. 49.98 1698 1545 94 33 55 -4 1723 1843 101 95 199 10 -112 0 87 0 4 4 2232 3955 2201 -31 1 3925 975 11 986 3939 4914

18 TO 24 HRS. 49.89 1794 1633 269 478 197 -1 2575 1847 114 95 330 10 -6 0 148 0 1 4 2543 5118 2562 18 1 5138 883 6 888 5160 6042

REST. DEMA

ND

UNREST.

DEMAND

Own Generation Schedule from

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- May 2011

FIGURES IN MWLoad Shedding

Act.Drl UI

Other

Imp/ Exp

DEMAND

MET

TotAvl.Hrs. FREQ.

Annual Report 2011-12, SLDC, MPPTCL, JBP 56

Page 61: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSPInjection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.92 1733 1577 249 410 181 -33 2384 1637 31 30 169 10 -162 -91 78 0 33 2 1737 4120 1632 -105 1 4017 547 0 547 4027 4574

2:00 49.99 1730 1574 235 380 164 -36 2317 1645 31 30 165 10 -160 -87 76 0 36 2 1749 4066 1660 -89 1 3978 539 1 540 3981 4520

3:00 50.07 1717 1562 229 372 155 -41 2277 1639 31 30 165 10 -162 -82 78 0 41 2 1754 4031 1674 -80 1 3952 437 0 437 3945 4382

4:00 50.12 1711 1557 214 309 138 -43 2176 1640 31 30 162 10 -160 -81 78 0 43 2 1757 3933 1600 -157 1 3777 406 0 406 3763 4169

5:00 49.95 1716 1561 162 241 122 -43 2043 1638 31 30 159 10 -160 -80 78 0 43 2 1753 3796 1534 -220 1 3578 401 2 402 3584 3985

6:00 50.07 1718 1563 123 138 100 -48 1877 1639 31 30 159 10 -157 -55 78 0 48 2 1786 3663 1468 -318 1 3346 418 0 418 3339 3757

7:00 50.06 1712 1558 92 79 83 -48 1764 1625 31 30 159 10 -113 -56 36 0 48 2 1773 3537 1373 -400 1 3138 544 0 544 3132 3675

8:00 50.09 1704 1551 78 56 78 -49 1715 1625 31 30 153 10 -113 -58 36 0 49 2 1766 3481 1368 -398 1 3084 565 5 570 3081 3646

9:00 50.02 1703 1550 75 91 76 -43 1749 1624 31 30 156 10 -114 -56 36 0 43 2 1763 3512 1369 -394 1 3119 466 0 466 3117 3583

10:00 50.01 1715 1561 121 156 108 -43 1904 1598 29 29 426 10 -352 -68 36 0 43 2 1753 3657 1531 -222 1 3436 393 4 397 3439 3832

11:00 49.95 1722 1567 156 208 124 -35 2020 1605 36 32 463 10 -352 -73 36 0 35 2 1794 3814 1680 -115 1 3700 265 8 273 3714 3980

12:00 49.94 1723 1568 207 256 151 -17 2165 1593 31 32 466 10 -352 -116 36 0 17 2 1721 3886 1632 -89 1 3797 271 6 277 3810 4080

13:00 50.03 1706 1552 216 281 161 -12 2198 1587 31 32 472 10 -352 -112 36 0 12 2 1718 3916 1697 -21 1 3896 295 14 308 3907 4201

14:00 49.80 1712 1558 218 303 168 -9 2238 1585 31 32 475 10 -352 -115 36 0 9 2 1714 3952 1558 -156 1 3797 349 6 355 3826 4175

15:00 49.80 1719 1564 208 308 173 -6 2247 1587 31 32 275 10 -352 -117 34 0 6 2 1510 3757 1397 -112 1 3646 486 0 486 3668 4154

16:00 50.00 1713 1558 216 307 165 -6 2241 1587 31 32 181 10 -352 -117 34 0 6 2 1414 3655 1247 -167 1 3490 586 7 593 3497 4083

17:00 49.99 1711 1557 186 257 149 -17 2132 1594 31 32 166 10 -352 -116 34 0 17 2 1418 3550 1160 -259 1 3292 599 1 600 3295 3894

18:00 50.12 1733 1577 133 188 115 -37 1977 1613 33 32 169 10 -369 -65 34 0 37 2 1496 3473 1296 -200 1 3274 490 0 490 3262 3752

19:00 49.95 1751 1594 149 268 132 -39 2104 1621 33 32 401 10 -129 -32 33 0 39 2 2011 4114 1818 -193 1 3922 323 0 323 3928 4250

20:00 49.77 1771 1611 309 536 238 -6 2687 1625 33 32 463 10 -128 -5 107 0 6 2 2145 4833 1893 -253 1 4581 436 0 436 4613 5049

21:00 49.84 1776 1616 369 593 283 -9 2854 1622 33 32 488 10 -128 -1 107 0 9 2 2173 5026 1950 -223 1 4805 480 0 480 4827 5306

22:00 49.91 1775 1615 367 595 288 -9 2857 1628 32 32 494 10 -128 -6 108 0 9 2 2181 5037 1942 -239 1 4799 454 14 468 4826 5280

23:00 49.83 1744 1587 309 498 248 -14 2627 1634 32 32 305 10 -155 -1 109 0 14 2 1982 4609 1658 -324 1 4286 616 1 617 4310 4925

24:00 49.88 1719 1564 272 448 211 -18 2477 1622 25 27 198 10 -166 0 109 0 18 2 1845 4322 1619 -226 1 4097 609 0 609 4112 4722

Avg. 49.96 1726 1571 204 303 159 -27 2210 1617 31 31 287 10 -222 -66 61 0 27 2 1777 3989 1573 -207 1 3784 457 3 460 3792 4249

00 TO 06 HRS. 50.02 1721 1566 202 308 143 -41 2179 1640 31 30 163 10 -160 -79 78 0 41 2 1756 3935 1595 -161 1 3775 458 1 458 3773 4231

06 TO 12 HRS. 50.01 1713 1559 121 141 104 -39 1886 1612 31 31 304 10 -233 -71 36 0 39 2 1762 3648 1492 -270 1 3379 417 4 421 3382 3799

12 TO 18 HRS. 49.96 1716 1561 196 274 155 -14 2172 1592 32 32 290 10 -355 -107 35 0 14 2 1545 3717 1393 -153 1 3566 468 5 472 3576 4043

06TO 18 HRS. 49.98 1714 1560 159 208 129 -27 2029 1602 31 31 297 10 -294 -89 35 0 27 2 1653 3683 1442 -211 1 3472 442 4 447 3479 3921

18 TO 24 HRS. 49.86 1756 1598 296 490 233 -16 2601 1625 31 31 391 10 -139 -8 96 0 16 2 2056 4657 1813 -243 1 4415 486 3 489 4436 4922

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- June 2011

FIGURES IN MWLoad Shedding

Act.Drl UI

Other

Imp/ Exp

DEMAND

MET

TotAvl.Hrs. FREQ.

REST. DEMA

ND

UNREST.

DEMAND

Own Generation Schedule from

Annual Report 2011-12, SLDC, MPPTCL, JBP 57

Page 62: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSPInjection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.92 1595 1451 222 464 257 -31 2364 1834 0 33 97 11 -333 -99 0 0 31 10 1583 3947 1539 -44 1 3904 472 3 475 3916 4388

2:00 49.90 1598 1454 212 432 242 -36 2303 1834 0 33 94 11 -333 -72 0 0 36 10 1614 3917 1559 -55 1 3863 463 1 464 3875 4337

3:00 49.96 1601 1457 206 399 220 -41 2241 1834 0 33 94 11 -333 -48 0 0 41 10 1642 3883 1628 -14 1 3870 358 2 359 3877 4234

4:00 50.01 1595 1452 204 334 192 -41 2141 1836 0 33 94 11 -333 -36 0 0 41 10 1655 3796 1563 -92 1 3705 292 1 293 3705 3997

5:00 49.86 1583 1441 188 292 167 -40 2047 1825 0 33 91 11 -333 -38 0 0 40 10 1638 3685 1429 -209 1 3477 276 1 277 3493 3769

6:00 49.99 1587 1444 176 211 133 -37 1926 1824 0 33 91 11 -357 -43 0 0 37 10 1605 3532 1281 -324 1 3208 339 0 339 3210 3549

7:00 49.98 1564 1423 147 161 100 -36 1795 1815 0 34 91 10 -276 -88 0 0 36 10 1633 3428 1220 -413 1 3016 406 0 406 3018 3424

8:00 50.03 1534 1396 145 141 91 -35 1737 1808 0 34 91 11 -276 -91 0 0 35 10 1623 3360 1253 -370 1 2991 457 0 457 2988 3445

9:00 49.94 1568 1427 146 159 93 -29 1796 1798 0 34 91 10 -279 -150 0 0 29 10 1543 3339 1255 -288 1 3053 413 0 413 3058 3471

10:00 49.97 1586 1443 149 187 109 -24 1864 1790 0 44 443 10 -499 -91 0 0 24 10 1732 3596 1428 -304 1 3293 324 6 329 3302 3626

11:00 49.87 1593 1450 158 218 124 -15 1935 1786 0 37 508 10 -498 -120 0 0 15 10 1749 3684 1509 -239 1 3445 338 0 338 3459 3797

12:00 49.88 1597 1454 176 232 134 -10 1986 1778 0 37 510 10 -498 -141 0 0 10 10 1716 3703 1486 -230 1 3474 337 6 342 3492 3828

13:00 50.01 1598 1454 178 231 131 1 1995 1775 0 37 508 10 -504 -146 0 0 -1 10 1689 3684 1544 -145 1 3540 415 2 417 3542 3957

14:00 49.86 1591 1448 187 238 133 0 2005 1766 0 37 476 10 -504 -145 0 0 0 10 1651 3656 1408 -242 1 3414 434 1 435 3429 3863

15:00 49.85 1597 1453 190 237 131 3 2014 1767 0 37 205 10 -504 -157 0 0 -3 10 1366 3380 1317 -49 1 3332 557 17 573 3364 3921

16:00 49.91 1603 1459 199 232 133 -4 2019 1763 0 37 108 10 -504 -141 0 0 4 10 1289 3308 1201 -88 1 3221 557 25 582 3254 3811

17:00 49.96 1593 1450 192 239 140 -25 1997 1764 0 37 102 10 -504 -124 0 0 25 10 1321 3318 1117 -205 1 3114 577 3 580 3121 3698

18:00 50.06 1627 1480 192 233 137 -32 2011 1765 0 37 98 10 -534 -88 0 0 32 10 1330 3341 1201 -130 1 3213 400 2 402 3209 3609

19:00 49.87 1674 1524 206 278 153 -31 2130 1750 0 34 455 10 -315 -73 0 0 31 10 1902 4032 1659 -243 1 3790 408 4 412 3808 4216

20:00 49.72 1688 1536 307 453 216 6 2518 1805 0 34 575 10 -315 -28 0 0 -6 10 2086 4605 1844 -242 1 4363 576 1 576 4401 4977

21:00 49.74 1717 1562 344 620 301 6 2834 1807 0 34 575 10 -316 -23 0 0 -6 10 2091 4925 1840 -251 1 4675 432 5 438 4717 5149

22:00 49.87 1694 1542 343 624 312 5 2825 1809 0 34 552 10 -316 -17 0 0 -5 10 2078 4903 1797 -281 1 4623 396 0 396 4642 5037

23:00 49.84 1617 1471 295 577 304 3 2651 1830 0 34 211 10 -369 -22 0 0 -3 10 1702 4352 1553 -149 1 4204 528 0 528 4224 4752

24:00 49.92 1601 1457 254 485 282 -18 2459 1830 0 34 110 10 -343 -41 0 0 18 10 1630 4089 1521 -108 1 3981 643 0 643 3992 4635

Avg. 49.91 1608 1464 209 320 176 -19 2150 1800 0 35 261 10 -391 -84 0 0 19 10 1651 3811 1465 -196 1 3615 433 3 436 3629 4062

00 TO 06 HRS. 49.94 1593 1450 201 355 202 -38 2170 1831 0 33 93 11 -337 -56 0 0 38 10 1623 3793 1500 -123 1 3671 367 1 368 3679 4046

06 TO 12 HRS. 49.95 1574 1432 154 183 108 -25 1852 1796 0 37 289 10 -388 -113 0 0 25 10 1666 3518 1359 -307 1 3212 379 2 381 3220 3599

12 TO 18 HRS. 49.94 1601 1457 190 235 134 -10 2007 1767 0 37 249 10 -509 -133 0 0 10 10 1441 3448 1298 -143 1 3306 490 8 498 3320 3810

06TO 18 HRS. 49.94 1588 1445 172 209 121 -17 1930 1781 0 37 269 10 -448 -123 0 0 17 10 1553 3483 1328 -225 1 3259 434 5 440 3270 3704

18 TO 24 HRS. 49.83 1665 1515 291 506 261 -5 2569 1805 0 34 413 10 -329 -34 0 0 5 10 1915 4484 1702 -213 1 4273 497 2 499 4297 4794

REST. DEMA

ND

UNREST.

DEMAND

Own Generation Schedule from

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- July 2011

FIGURES IN MWLoad Shedding

Act.Drl UI

Other

Imp/ Exp

DEMAND

MET

TotAvl.Hrs. FREQ.

Annual Report 2011-12, SLDC, MPPTCL, JBP 58

Page 63: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSPInjection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.93 1365 1243 390 864 347 -26 2817 1641 0 22 513 9 -443 -414 0 0 26 19 1374 4191 1210 -163 -1 4027 263 0 263 4035 4298

2:00 49.93 1361 1239 378 834 342 -37 2755 1629 0 22 513 9 -443 -310 0 0 37 19 1476 4232 1206 -270 -1 3961 262 0 262 3969 4231

3:00 49.92 1361 1239 373 820 336 -39 2729 1618 0 22 514 10 -443 -259 0 0 39 19 1519 4248 1226 -293 -1 3954 196 0 196 3963 4159

4:00 49.96 1356 1234 373 789 332 -39 2690 1527 0 22 514 10 -443 -236 0 0 39 19 1452 4141 1219 -233 -1 3908 142 0 142 3913 4055

5:00 49.90 1354 1232 374 755 314 -44 2632 1528 0 22 514 10 -443 -228 0 0 44 19 1466 4097 1034 -431 -1 3665 143 0 143 3676 3819

6:00 49.99 1363 1240 358 711 305 -51 2563 1524 0 22 514 10 -443 -243 0 0 51 19 1453 4016 829 -624 -1 3391 155 5 161 3397 3552

7:00 49.99 1357 1235 338 696 291 -57 2504 1523 0 22 514 9 -360 -238 0 0 57 19 1546 4050 788 -758 -1 3292 91 0 91 3292 3383

8:00 50.07 1355 1233 336 690 287 -55 2492 1525 0 22 514 9 -360 -240 0 0 55 19 1544 4036 749 -795 -1 3241 81 0 81 3234 3314

9:00 49.95 1325 1206 334 703 281 -37 2486 1521 0 22 516 9 -360 -401 0 0 37 19 1363 3850 747 -617 -1 3232 60 0 60 3237 3297

10:00 50.00 1327 1207 351 735 279 -24 2548 1517 0 22 655 9 -519 -308 0 0 24 19 1419 3967 798 -621 -1 3345 74 0 74 3346 3419

11:00 49.90 1343 1222 354 747 280 -12 2590 1523 0 22 684 9 -519 -422 0 0 12 19 1327 3917 915 -412 -1 3505 94 0 94 3516 3610

12:00 49.92 1336 1216 364 760 277 -10 2607 1517 0 19 684 9 -526 -447 0 0 10 19 1285 3892 905 -380 -1 3512 143 0 143 3520 3663

13:00 50.05 1336 1216 370 764 250 -7 2593 1542 0 19 678 9 -526 -459 0 0 7 19 1288 3881 895 -393 -1 3487 211 0 211 3482 3693

14:00 49.96 1330 1210 365 756 209 -6 2533 1572 0 19 671 9 -535 -432 0 0 6 19 1329 3862 871 -459 -1 3403 195 0 195 3408 3603

15:00 49.84 1303 1186 365 764 209 -6 2517 1578 0 19 532 9 -535 -481 0 0 6 19 1148 3665 808 -340 -1 3325 251 0 251 3340 3591

16:00 49.92 1321 1202 375 757 217 -6 2546 1517 0 19 510 9 -535 -458 0 0 6 19 1087 3633 698 -390 -1 3243 254 4 258 3254 3509

17:00 50.03 1309 1191 373 751 216 -11 2520 1509 0 19 517 9 -541 -373 0 0 11 19 1169 3688 697 -471 -1 3217 260 0 260 3214 3473

18:00 49.96 1343 1222 373 753 235 -11 2573 1508 0 19 517 9 -571 -355 0 0 11 19 1156 3729 768 -388 -1 3340 220 0 220 3345 3565

19:00 49.77 1400 1274 399 781 266 -3 2716 1672 0 25 651 9 -475 -337 0 0 3 19 1567 4284 1322 -245 -1 4038 295 0 295 4067 4362

20:00 49.74 1433 1304 454 890 311 11 2969 1697 0 28 683 9 -475 -217 0 0 -11 19 1732 4701 1517 -215 -1 4486 492 6 499 4526 5019

21:00 49.80 1442 1312 493 960 345 12 3122 1699 0 28 683 9 -475 -218 0 0 -12 19 1734 4856 1525 -208 -1 4647 383 18 401 4694 5076

22:00 49.82 1439 1310 491 958 349 12 3120 1708 0 28 683 9 -475 -205 0 0 -12 19 1756 4876 1480 -275 -1 4600 310 20 330 4645 4955

23:00 49.86 1375 1251 439 936 348 6 2981 1717 0 28 568 9 -544 -352 0 0 -6 19 1440 4420 1187 -253 -1 4167 512 10 522 4195 4707

24:00 49.92 1369 1246 403 904 348 3 2903 1717 0 28 533 9 -469 -278 0 0 -3 19 1555 4458 1185 -370 -1 4087 492 8 501 4106 4598

Avg. 49.92 1359 1236 384 795 291 -18 2688 1584 0 22 578 9 -477 -330 0 0 18 19 1405 4112 1024 -400 -1 3711 233 3 235 3724 3956

00 TO 06 HRS. 49.94 1360 1238 374 795 329 -39 2698 1578 0 22 514 9 -443 -282 0 0 39 19 1457 4154 1121 -336 -1 3818 194 1 194 3826 4019

06 TO 12 HRS. 49.97 1340 1220 346 722 283 -33 2538 1521 0 21 594 9 -441 -343 0 0 33 19 1414 3952 817 -597 -1 3354 90 0 90 3357 3448

12 TO 18 HRS. 49.96 1324 1205 370 757 223 -8 2547 1538 0 19 571 9 -541 -426 0 0 8 19 1196 3743 789 -407 -1 3336 232 1 233 3340 3572

06TO 18 HRS. 49.97 1332 1212 358 740 253 -20 2542 1529 0 20 583 9 -491 -385 0 0 20 19 1305 3847 803 -502 -1 3345 161 0 161 3349 3510

18 TO 24 HRS. 49.82 1410 1283 446 905 328 7 2969 1702 0 28 633 9 -486 -268 0 0 -7 19 1631 4599 1369 -261 -1 4337 414 10 424 4372 4786

REST. DEMA

ND

UNREST.

DEMAND

Own Generation Schedule from

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- August 2011

FIGURES IN MWLoad Shedding

Act.Drl UI

Other

Imp/ Exp

DEMAND

MET

TotAvl.Hrs. FREQ.

Annual Report 2011-12, SLDC, MPPTCL, JBP 59

Page 64: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

THER.Incl Aux

THER. Excl Aux

HYD. HYD.MSEB

Share in Pen

ISP OSPInjection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.93 1222 1112 575 613 -38 1003 353 -37 3006 1292 0 93 726 7 -383 -461 7 0 37 29 1347 4353 1407 60 -1 4412 17 39 56 4462 4479

2:00 49.95 1229 1119 569 607 -38 1002 352 -39 3003 1303 0 90 726 7 -383 -446 7 0 39 29 1372 4375 1292 -80 -1 4295 17 53 70 4354 4371

3:00 49.98 1219 1110 564 601 -37 1001 352 -42 2985 1321 0 86 726 7 -383 -434 7 0 42 29 1401 4386 1258 -143 -1 4243 16 55 71 4302 4317

4:00 50.02 1207 1098 552 589 -37 1001 352 -47 2957 1297 0 86 726 7 -333 -410 7 0 47 29 1456 4413 1212 -244 -1 4169 12 52 64 4219 4231

5:00 49.93 1203 1095 549 586 -37 1002 352 -47 2950 1265 0 86 726 7 -333 -438 7 0 47 29 1397 4348 1166 -231 -1 4116 14 39 54 4165 4179

6:00 49.99 1210 1101 545 582 -37 1002 352 -47 2953 1244 0 83 726 7 -333 -454 0 0 47 29 1350 4303 989 -361 -1 3942 18 40 58 3984 4002

7:00 49.99 1193 1085 519 555 -37 1003 353 -45 2915 1142 0 83 727 7 -250 -507 0 0 45 29 1276 4191 753 -524 -1 3667 51 0 51 3669 3720

8:00 50.04 1197 1089 505 541 -36 1001 353 -45 2904 1153 0 83 727 7 -250 -548 0 0 45 29 1246 4150 679 -567 -1 3582 48 0 48 3580 3628

9:00 49.92 1192 1085 504 541 -37 1002 354 -41 2904 1140 0 83 727 7 -250 -613 0 0 41 29 1163 4067 619 -544 -1 3522 60 0 60 3532 3592

10:00 49.91 1186 1079 498 534 -36 1002 356 -30 2904 1128 0 81 747 7 -480 -522 0 0 30 29 1021 3925 694 -326 -1 3598 70 5 75 3614 3684

11:00 49.85 1187 1080 509 546 -36 1000 357 -30 2916 1154 0 85 746 7 -530 -551 0 0 30 29 971 3886 746 -225 -1 3661 93 9 101 3687 3780

12:00 49.93 1190 1083 532 568 -36 999 356 -27 2943 1146 0 85 746 7 -530 -622 0 0 27 29 888 3831 666 -222 -1 3608 133 6 138 3622 3754

13:00 50.01 1189 1082 532 567 -35 999 355 -27 2941 1176 0 85 727 7 -530 -648 0 0 27 29 872 3813 645 -228 -1 3585 146 16 162 3600 3746

14:00 49.88 1192 1085 541 578 -37 1002 357 -27 2957 1169 0 85 727 7 -530 -640 0 0 27 29 874 3831 574 -300 -1 3530 145 19 165 3563 3708

15:00 49.87 1207 1099 545 583 -37 1004 356 -24 2980 1164 0 85 727 7 -530 -659 0 0 24 29 847 3827 547 -300 -1 3527 135 9 144 3550 3685

16:00 49.88 1196 1088 535 571 -36 1004 356 -25 2957 1159 0 85 727 7 -530 -639 0 0 25 29 863 3820 508 -354 -1 3465 123 6 129 3485 3609

17:00 49.88 1195 1087 530 567 -36 1004 354 -28 2947 1158 0 84 727 7 -530 -574 0 0 28 29 929 3877 481 -448 -1 3428 133 2 134 3442 3575

18:00 49.97 1254 1141 539 576 -37 1003 355 -28 3010 1184 0 84 727 7 -560 -567 0 0 28 29 932 3942 701 -231 -1 3710 132 6 139 3720 3852

19:00 49.54 1322 1203 626 665 -39 1006 355 0 3190 1457 0 95 747 7 -371 -365 7 0 0 29 1604 4794 1631 28 -1 4821 76 76 152 4964 5040

20:00 49.82 1349 1227 684 723 -40 1005 354 7 3277 1483 0 95 747 7 -371 -327 12 0 -7 29 1667 4944 1794 127 -1 5071 48 262 310 5360 5408

21:00 49.78 1348 1227 708 749 -41 1006 354 7 3301 1486 0 95 747 7 -371 -323 18 0 -7 29 1681 4982 1754 73 -1 5055 30 242 272 5331 5361

22:00 49.84 1318 1200 690 732 -42 1005 353 7 3254 1479 0 95 747 7 -371 -324 15 0 -7 29 1670 4924 1685 15 -1 4939 57 203 260 5164 5222

23:00 49.84 1260 1146 661 703 -42 1004 353 -4 3160 1494 0 95 727 7 -424 -371 28 0 4 29 1589 4749 1527 -62 -1 4687 62 192 254 4902 4963

24:00 49.96 1245 1133 616 656 -40 1003 353 -10 3095 1445 0 95 727 7 -383 -344 3 0 10 29 1589 4685 1424 -166 -1 4518 51 163 214 4687 4738

Avg. 49.90 1230 1119 568 605 -38 1003 354 -26 3017 1268 0 88 732 7 -414 -491 5 0 26 29 1221 4267 1031 -219 -1 4048 70 62 132 4123 4194

00 TO 06 HRS. 49.97 1215 1106 559 596 -37 1002 352 -43 2976 1287 0 87 726 7 -358 -441 5 0 43 29 1387 4363 1221 -167 -1 4196 16 46 62 4248 4263

06 TO 12 HRS. 49.94 1191 1083 511 547 -36 1001 355 -36 2914 1144 0 83 736 7 -382 -560 0 0 36 29 1094 4008 693 -401 -1 3606 76 3 79 3617 3693

12 TO 18 HRS. 49.92 1205 1097 537 574 -37 1003 355 -26 2965 1168 0 84 727 7 -535 -621 0 0 26 29 886 3852 576 -310 -1 3541 136 10 146 3560 3696

06TO 18 HRS. 49.93 1198 1090 524 560 -36 1002 355 -31 2940 1156 0 84 732 7 -458 -591 0 0 31 29 990 3930 634 -356 -1 3574 106 6 112 3589 3694

18 TO 24 HRS. 49.80 1307 1189 664 705 -41 1005 353 1 3213 1474 0 95 740 7 -382 -342 14 0 -1 29 1633 4846 1636 3 -1 4848 54 189 243 5068 5122

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- September 2011

FIGURES IN MWLoad Shedding

Act.Drl UI

Other

Imp/ Exp

DEMAND

MET

TotAvl.Hrs. FREQ.

REST. DEMA

ND

UNREST.

DEMAND

Own Generation Schedule from

Annual Report 2011-12, SLDC, MPPTCL, JBP 60

Page 65: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

THER.

Incl Aux

THER. Excl Aux

HYD. ISP OSPInjection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.63 1672 1521 491 538 244 15 2809 1392 60 93 174 9 -8 -39 319 0 -15 25 2010 4819 2630 620 0 5439 890 158 1048 5654 6544

2:00 49.67 1665 1515 479 501 219 15 2729 1392 58 93 171 9 -8 -39 320 0 -15 25 2006 4734 2528 522 0 5257 895 274 1169 5581 6476

3:00 49.73 1663 1513 472 478 208 14 2687 1392 58 93 171 9 -8 -39 319 0 -14 25 2006 4692 2536 530 0 5222 922 244 1165 5506 6427

4:00 49.65 1660 1510 473 385 171 14 2554 1392 58 93 171 9 -8 -48 320 0 -14 25 1998 4551 2559 562 0 5113 640 251 890 5415 6055

5:00 49.58 1658 1508 472 379 165 8 2532 1393 58 93 171 9 -8 -47 315 0 -8 25 1999 4532 2476 476 0 5008 648 242 890 5310 5958

6:00 49.73 1672 1521 467 270 125 8 2391 1393 60 93 171 9 -8 -80 295 0 -8 25 1948 4339 2392 444 0 4783 676 341 1017 5161 5837

7:00 49.72 1673 1522 453 178 80 4 2238 1393 60 93 171 9 -8 -154 97 0 -4 25 1680 3918 2115 435 0 4353 1127 161 1288 4549 5676

8:00 49.78 1664 1515 424 166 75 7 2186 1393 63 93 171 9 -8 -158 96 0 -7 25 1676 3863 2047 370 0 4233 1301 106 1407 4364 5665

9:00 49.68 1663 1513 411 174 72 12 2182 1393 66 94 194 9 -8 -166 96 0 -12 25 1691 3872 2077 386 0 4259 1305 82 1387 4379 5684

10:00 49.67 1657 1508 399 242 89 13 2251 1393 66 94 458 9 -35 -160 83 0 -13 25 1920 4171 2179 259 0 4430 1347 54 1401 4526 5873

11:00 49.63 1661 1512 408 259 104 15 2298 1392 63 94 465 9 -35 -154 105 0 -15 25 1949 4247 2442 493 0 4740 1233 97 1330 4887 6120

12:00 49.68 1667 1517 419 260 109 16 2321 1392 63 94 469 9 -35 -155 105 0 -16 25 1951 4272 2309 358 0 4630 1203 198 1400 4871 6073

13:00 49.80 1675 1524 422 267 109 17 2339 1392 64 94 476 9 -35 -155 99 0 -17 25 1952 4291 2515 563 0 4855 1087 177 1264 5059 6147

14:00 49.67 1676 1525 418 271 110 17 2342 1392 66 94 479 9 -35 -155 99 0 -17 25 1957 4298 2312 355 0 4654 1219 190 1409 4886 6105

15:00 49.71 1674 1523 415 224 95 12 2269 1392 68 94 306 9 -35 -150 99 0 -12 25 1796 4065 2219 423 0 4489 1256 141 1397 4665 5921

16:00 49.73 1653 1504 418 154 72 14 2163 1392 68 94 225 9 -35 -152 118 0 -14 25 1730 3893 2255 525 0 4419 1087 280 1367 4732 5820

17:00 49.74 1648 1500 417 218 91 18 2244 1392 68 94 207 9 -35 -159 118 0 -18 25 1701 3945 2294 593 0 4538 932 234 1166 4803 5735

18:00 49.87 1698 1545 475 494 190 22 2726 1392 61 94 207 9 -35 -150 90 0 -22 25 1673 4399 2085 412 0 4811 855 262 1117 5091 5946

19:00 49.73 1724 1569 657 752 296 21 3295 1393 64 94 549 9 0 -73 131 0 -21 25 2171 5466 2629 457 0 5924 997 59 1056 6028 7025

20:00 49.77 1744 1587 670 924 356 22 3558 1393 64 94 696 9 0 -39 188 0 -22 25 2409 5967 2782 373 0 6340 900 42 941 6425 7325

21:00 49.75 1747 1589 652 931 360 23 3555 1393 66 94 696 9 0 -39 212 0 -23 25 2434 5989 3184 750 0 6740 591 191 782 6979 7570

22:00 49.79 1737 1580 640 933 361 24 3538 1393 66 94 619 9 0 -39 217 0 -24 25 2361 5899 3017 656 0 6555 739 155 894 6749 7488

23:00 49.72 1684 1533 618 932 361 23 3467 1393 66 94 343 9 0 -39 134 0 -23 25 2002 5469 2558 557 0 6026 996 29 1025 6102 7098

24:00 49.73 1682 1531 564 837 337 22 3291 1393 66 93 199 9 0 -47 84 0 -22 25 1801 5092 2354 553 0 5645 1053 49 1103 5738 6792

Avg. 49.72 1680 1529 489 449 183 16 2665 1392 63 94 332 9 -16 -102 169 0 -16 25 1925 4616 2437 486 0 5103 996 167 1163 5311 6307

00 TO 06 HRS. 49.66 1665 1515 476 425 188 12 2617 1392 59 93 171 9 -8 -49 315 0 -12 25 1994 4611 2520 526 0 5137 778 251 1030 5438 6216

06 TO 12 HRS. 49.70 1664 1514 419 213 88 11 2246 1392 63 94 321 9 -21 -158 97 0 -11 25 1811 4057 2195 384 0 4441 1253 116 1369 4596 5848

12 TO 18 HRS. 49.75 1671 1520 428 271 111 17 2347 1392 66 94 317 9 -35 -153 104 0 -17 25 1801 4149 2280 479 0 4628 1073 214 1287 4873 5946

06TO 18 HRS. 49.72 1667 1517 423 242 100 14 2297 1392 65 94 319 9 -28 -156 100 0 -14 25 1806 4103 2237 431 0 4534 1163 165 1328 4734 5897

18 TO 24 HRS. 49.75 1720 1565 634 885 345 22 3451 1393 65 94 517 9 0 -46 161 0 -22 25 2196 5647 2754 558 0 6205 879 87 967 6337 7216

REST. DEMA

ND

UNREST.

DEMAND

Own Generation Schedule from

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- October 2011

FIGURES IN MWLoad Shedding

Act.Drl UI

Other

Imp/ Exp

DEMAND

MET

TotAvl.Hrs. FREQ.

Annual Report 2011-12, SLDC, MPPTCL, JBP 61

Page 66: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Annexure-4.3(i)

THER.

Incl Aux

THER. Excl Aux

HYD. ISP OSPInjection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.78 1891 1720 442 290 79 6 2537 2000 167 66 30 11 652 0 602 0 -6 19 3540 6077 3996 456 0 6534 1199 53 1252 6629 7828

2:00 49.85 1892 1722 448 170 73 5 2418 2000 167 66 30 11 652 0 663 0 -5 19 3602 6020 4098 496 0 6516 1199 81 1280 6625 7824

3:00 49.91 1893 1722 453 166 68 5 2413 1999 167 66 30 11 652 0 662 0 -5 19 3600 6014 4253 653 0 6667 890 114 1004 6800 7690

4:00 49.90 1881 1711 449 157 64 6 2387 1999 172 66 30 11 652 0 668 0 -6 19 3611 5998 4268 657 0 6656 783 64 847 6740 7523

5:00 49.82 1879 1709 455 164 66 4 2399 2000 174 66 30 11 652 0 666 0 -4 19 3613 6012 4146 533 0 6546 810 68 879 6649 7459

6:00 49.74 1903 1732 459 112 69 5 2376 2000 176 66 30 11 560 0 812 0 -5 19 3670 6046 4043 374 0 6420 843 161 1004 6632 7475

7:00 49.65 1903 1732 466 75 69 5 2347 2000 176 66 45 11 65 0 803 0 -5 19 3179 5527 3657 478 0 6005 1074 528 1602 6595 7670

8:00 49.91 1905 1733 462 62 67 5 2330 2000 178 66 45 11 65 0 774 0 -5 19 3152 5482 3358 206 0 5689 1291 576 1867 6281 7572

9:00 49.70 1903 1731 453 54 66 5 2308 2000 178 66 49 11 65 0 604 0 -5 19 2986 5295 3248 262 0 5557 1492 77 1568 5685 7176

10:00 49.71 1917 1745 492 151 77 5 2470 2000 175 66 147 11 65 0 584 0 -5 19 3062 5531 3364 302 0 5834 1561 185 1747 6072 7633

11:00 49.69 1907 1735 501 255 105 8 2604 2000 171 66 136 11 65 0 532 0 -8 19 2990 5594 3455 465 0 6059 1318 609 1927 6725 8042

12:00 49.73 1902 1730 488 286 104 10 2619 2000 172 66 136 11 65 0 529 0 -10 19 2987 5606 3522 536 0 6142 1341 550 1891 6741 8083

13:00 49.86 1906 1734 486 291 106 10 2627 2000 172 66 140 11 65 0 539 0 -10 19 3000 5627 3540 540 0 6168 1200 555 1755 6749 7948

14:00 49.78 1905 1733 466 294 98 11 2602 2000 169 66 136 11 65 0 539 0 -11 19 2993 5595 3564 571 0 6167 1239 388 1627 6596 7835

15:00 49.70 1892 1722 452 290 98 10 2572 2000 162 66 99 11 65 0 553 0 -10 19 2965 5536 3421 456 0 5993 1362 338 1701 6385 7747

16:00 49.77 1899 1728 442 243 98 10 2521 2000 162 66 41 11 65 0 552 0 -10 19 2906 5428 3319 413 0 5841 1292 343 1635 6225 7517

17:00 49.77 1895 1725 430 236 87 9 2486 2000 163 66 41 11 65 0 540 0 -9 19 2896 5382 3244 349 0 5731 1323 244 1567 6014 7337

18:00 49.88 1932 1758 514 363 128 8 2770 2000 164 66 40 11 154 0 433 0 -8 19 2877 5647 3152 275 0 5923 1563 167 1730 6111 7674

19:00 49.90 1955 1779 630 459 209 6 3082 2000 163 66 467 11 156 0 196 0 -6 19 3072 6154 3231 159 0 6314 1480 63 1543 6396 7876

20:00 49.83 1962 1785 620 600 258 7 3271 2000 163 66 578 11 204 0 279 0 -7 19 3312 6583 3360 48 0 6631 1455 20 1475 6685 8140

21:00 49.85 1953 1778 631 655 264 7 3335 2000 167 66 571 11 204 0 404 0 -7 19 3434 6768 3690 256 0 7025 1141 109 1250 7165 8306

22:00 49.90 1929 1755 590 646 272 7 3270 2000 169 66 564 11 204 0 411 0 -7 19 3436 6706 3694 258 0 6965 1311 110 1421 7094 8405

23:00 49.91 1893 1722 535 510 211 5 2983 2000 169 66 149 11 662 0 244 0 -5 19 3313 6297 3425 112 0 6409 1653 36 1689 6462 8115

24:00 49.93 1903 1732 473 411 129 6 2751 1999 172 66 37 11 662 0 333 0 -6 19 3292 6043 3356 64 0 6107 1685 49 1733 6170 7855

Avg. 49.81 1908 1736 493 289 119 7 2645 2000 169 66 150 11 283 0 538 0 -7 19 3210 5874 3600 372 0 6246 1271 229 1500 6509 7780

00 TO 06 HRS. 49.83 1890 1720 451 176 70 5 2422 2000 170 66 30 11 636 0 679 0 -5 19 3606 6028 4134 528 0 6556 954 90 1044 6679 7633

06 TO 12 HRS. 49.73 1906 1735 477 147 81 6 2446 2000 175 66 93 11 65 0 638 0 -6 19 3059 5506 3434 375 0 5881 1346 421 1767 6350 7696

12 TO 18 HRS. 49.79 1905 1733 465 286 102 10 2597 2000 165 66 83 11 80 0 526 0 -10 19 2939 5536 3373 434 0 5970 1330 339 1669 6347 7677

06TO 18 HRS. 49.76 1905 1734 471 217 92 8 2521 2000 170 66 88 11 72 0 582 0 -8 19 2999 5521 3404 404 0 5926 1338 380 1718 6348 7686

18 TO 24 HRS. 49.89 1932 1758 580 547 224 6 3115 2000 167 66 394 11 349 0 311 0 -6 19 3310 6425 3459 150 0 6575 1454 64 1519 6662 8116

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- November 2011

FIGURES IN MWLoad Shedding

Act.Drl UI

Other

Imp/ Exp

DEMAND

MET

TotAvl.Hrs. FREQ.

REST. DEMA

ND

UNREST.

DEMAND

Own Generation Schedule from

Annual Report 2011-12, SLDC, MPPTCL, JBP 62

Page 67: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Annexure-4.3(ii)

THER.

Incl Aux

THER. Excl Aux

HYD. ISP OSPInjection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.88 2188 1991 234 24 15 4 2268 2043 258 52 41 10 1086 0 524 0 -4 17 4027 6295 4052 25 7 6327 1160 0 1160 6351 7511

2:00 49.89 2187 1990 230 20 8 0 2248 2043 258 52 41 10 1105 0 525 0 0 17 4050 6299 4082 32 7 6338 1166 5 1171 6364 7530

3:00 49.93 2178 1982 238 20 8 -2 2247 2043 258 52 41 10 1106 0 525 0 2 17 4053 6300 4166 113 7 6420 708 4 712 6438 7147

4:00 50.00 2186 1989 250 44 15 -2 2295 2043 258 52 41 10 1094 0 527 0 2 17 4044 6340 4098 54 7 6400 712 0 712 6401 7113

5:00 49.86 2174 1978 266 117 46 1 2408 2043 258 52 41 10 1003 0 527 0 -1 17 3950 6358 3930 -21 7 6345 752 0 752 6372 7124

6:00 49.77 2172 1976 372 185 79 7 2618 2043 258 52 41 10 760 0 543 0 -7 17 3717 6335 3691 -26 7 6316 795 22 817 6381 7176

7:00 49.72 2174 1979 515 189 79 12 2773 2043 258 52 41 10 0 0 558 0 -12 17 2967 5741 3067 99 7 5847 1129 596 1725 6492 7621

8:00 49.81 2171 1975 532 189 79 14 2789 2043 258 52 41 10 0 0 541 0 -14 17 2948 5736 2840 -108 7 5636 1445 579 2024 6247 7692

9:00 49.67 2163 1969 552 185 78 15 2799 2043 257 52 41 10 0 0 564 0 -15 17 2968 5767 3048 80 7 5854 1665 185 1850 6097 7762

10:00 49.69 2147 1954 580 194 80 18 2825 2043 257 52 41 10 0 0 598 0 -18 17 3000 5825 3048 48 7 5880 1608 573 2181 6507 8115

11:00 49.66 2136 1944 602 273 114 19 2953 2043 260 52 41 10 0 0 608 0 -19 17 3011 5963 3035 24 7 5994 1200 1149 2349 7205 8405

12:00 49.73 2129 1937 608 434 177 20 3176 2043 260 52 48 10 0 0 600 0 -20 17 3010 6186 2957 -53 7 6140 1289 942 2232 7132 8421

13:00 49.86 2146 1953 556 422 172 18 3120 2043 261 52 48 10 0 0 645 0 -18 17 3057 6177 3221 164 7 6349 1172 817 1989 7192 8364

14:00 49.78 2140 1947 544 429 176 19 3115 2043 261 52 54 10 0 0 602 0 -19 17 3020 6135 3203 182 7 6324 1366 518 1884 6885 8250

15:00 49.69 2131 1939 520 430 176 16 3082 2043 261 52 51 10 6 0 617 0 -16 17 3040 6122 3037 -4 7 6125 1435 518 1953 6700 8135

16:00 49.76 2139 1946 459 423 177 16 3021 2043 261 52 44 10 6 0 593 0 -16 17 3011 6032 2974 -36 7 6003 1402 501 1903 6546 7948

17:00 49.81 2164 1969 338 362 160 17 2845 2043 261 52 44 10 6 0 595 0 -17 17 3011 5856 2967 -44 7 5819 1476 283 1759 6134 7611

18:00 49.86 2205 2007 371 358 158 19 2912 2044 261 52 48 10 85 0 545 0 -19 17 3042 5954 3130 88 7 6049 1484 408 1892 6483 7967

19:00 49.70 2265 2061 506 378 165 22 3132 2044 261 52 340 10 78 0 439 0 -22 17 3219 6351 3287 68 7 6426 1387 189 1576 6672 8059

20:00 49.77 2274 2069 587 477 196 23 3353 2044 261 52 346 10 171 0 388 0 -23 17 3265 6618 3179 -86 7 6539 1341 177 1517 6760 8101

21:00 49.83 2277 2072 553 523 211 21 3380 2043 263 52 346 10 171 0 496 0 -21 17 3377 6757 3252 -125 7 6639 1058 449 1507 7122 8180

22:00 49.92 2265 2061 479 491 207 19 3257 2043 263 52 346 10 171 0 506 0 -19 17 3390 6646 3566 177 7 6830 1232 273 1506 7119 8351

23:00 49.84 2220 2021 332 126 86 15 2579 2043 260 52 143 10 757 0 289 0 -15 17 3556 6135 3653 97 7 6239 1560 69 1628 6338 7897

24:00 49.90 2210 2011 238 32 32 6 2319 2043 262 52 41 10 1110 0 506 0 -6 17 4035 6354 3607 -428 7 5933 1449 60 1509 6011 7460

Avg. 49.81 2185 1988 436 263 112 13 2813 2043 260 52 98 10 363 0 536 0 -13 17 3349 6178 3379 13 7 6199 1250 346 1596 6581 7831

00 TO 06 HRS. 49.89 2181 1984 265 68 29 1 2347 2043 258 52 41 10 1026 0 529 0 -1 17 3974 6321 4003 30 7 6358 882 5 887 6384 7267

06 TO 12 HRS. 49.71 2153 1960 565 244 101 16 2886 2043 258 52 42 10 0 0 578 0 -16 17 2984 5870 2999 15 7 5892 1389 671 2060 6613 8003

12 TO 18 HRS. 49.79 2154 1960 465 404 170 17 3016 2043 261 52 48 10 17 0 600 0 -17 17 3030 6046 3089 58 7 6112 1389 507 1897 6657 8046

06TO 18 HRS. 49.75 2154 1960 515 324 135 17 2951 2043 259 52 45 10 9 0 589 0 -17 17 3007 5958 3044 37 7 6002 1389 589 1978 6635 8024

18 TO 24 HRS. 49.83 2252 2049 449 338 150 18 3003 2043 262 52 260 10 410 0 437 0 -18 17 3474 6477 3424 -50 7 6434 1338 203 1541 6670 8008

REST. DEMA

ND

UNREST.

DEMAND

Own Generation Schedule from

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- December 2011

FIGURES IN MWLoad Shedding

Act.Drl UI

Other

Imp/ Exp

DEMAND

MET

TotAvl.Hrs. FREQ.

Annual Report 2011-12, SLDC, MPPTCL, JBP 63

Page 68: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Annexure-4.3(iii)

THER.

Incl Aux

THER. Excl Aux

HYD. ISP OSPInjection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 50.04 2093 1905 157 8 3 -7 2066 1888 77 60 53 9 1088 0 224 0 7 15 3422 5488 3280 -142 1 5347 633 0 633 5341 5974

2:00 50.09 2092 1904 153 8 3 -12 2057 1888 71 60 53 9 1132 0 224 0 12 15 3465 5522 3198 -267 1 5256 633 0 633 5243 5876

3:00 50.14 2084 1897 149 8 3 -11 2045 1889 52 60 53 9 1130 0 224 0 11 15 3443 5489 3142 -301 1 5189 602 0 602 5167 5769

4:00 50.16 2074 1888 149 23 13 -9 2065 1888 52 58 53 9 1059 0 224 0 9 15 3368 5433 3176 -191 1 5242 616 0 616 5217 5833

5:00 50.07 2070 1884 160 118 45 -10 2197 1888 52 58 53 9 1019 0 224 0 10 15 3329 5526 3100 -228 1 5299 658 0 658 5289 5946

6:00 49.96 2083 1895 283 173 73 3 2427 1886 52 58 53 9 993 0 224 0 -3 15 3288 5715 2973 -315 1 5401 703 0 703 5407 6110

7:00 49.84 2094 1905 389 174 78 7 2553 1895 301 60 53 9 0 0 269 0 -7 15 2596 5149 2693 97 1 5247 1223 55 1278 5328 6551

8:00 49.88 2097 1908 408 185 78 8 2587 1895 297 60 53 9 0 0 269 0 -8 15 2591 5178 2581 -10 1 5169 1426 35 1461 5222 6649

9:00 49.71 2111 1921 382 193 82 8 2587 1895 299 60 53 9 0 0 269 0 -8 15 2591 5179 2731 140 1 5319 1481 24 1505 5389 6870

10:00 49.81 2092 1904 404 279 120 9 2716 1902 295 60 250 9 0 0 272 0 -9 15 2794 5510 2862 68 1 5579 1355 156 1511 5768 7122

11:00 49.77 2089 1901 394 444 187 10 2936 1902 304 62 273 9 0 0 275 0 -10 15 2830 5766 2780 -50 1 5717 1345 382 1727 6138 7483

12:00 49.83 2092 1904 385 475 200 10 2974 1902 314 64 276 9 0 0 275 0 -10 15 2847 5820 2878 31 1 5853 1294 143 1437 6025 7319

13:00 49.95 2084 1896 328 464 193 10 2890 1902 315 64 276 9 0 0 275 0 -10 15 2848 5738 2887 39 1 5778 1166 186 1352 5972 7138

14:00 49.91 2093 1905 324 443 187 8 2867 1902 312 64 276 9 0 0 275 0 -8 15 2846 5713 2985 139 1 5852 1151 145 1296 6013 7164

15:00 49.86 2085 1897 301 436 184 8 2825 1902 317 64 115 9 6 0 269 0 -8 15 2690 5515 2903 213 1 5729 1238 105 1344 5859 7097

16:00 49.88 2088 1900 285 432 182 8 2807 1902 317 64 53 9 33 0 263 0 -8 15 2648 5455 2695 47 1 5503 1429 45 1474 5567 6996

17:00 49.94 2092 1904 244 337 148 7 2640 1902 312 64 53 9 96 0 263 0 -7 15 2707 5347 2639 -68 1 5280 1499 2 1501 5291 6790

18:00 50.04 2113 1922 292 377 150 10 2751 1902 312 64 53 9 174 0 269 0 -10 15 2788 5540 2904 116 1 5656 1455 41 1496 5690 7146

19:00 49.89 2155 1961 455 550 223 13 3202 1904 310 64 450 9 105 0 269 0 -13 15 3113 6316 3231 118 1 6434 1391 38 1429 6494 7885

20:00 49.85 2161 1967 453 576 253 14 3263 1902 310 64 529 9 132 0 263 0 -14 15 3212 6474 3422 210 1 6686 1270 40 1310 6757 8026

21:00 49.95 2150 1957 444 566 240 12 3219 1904 310 64 529 9 144 0 274 0 -12 15 3238 6457 3285 47 1 6505 1231 58 1288 6573 7804

22:00 49.96 2140 1947 304 297 155 7 2711 1904 289 64 516 9 136 0 269 0 -7 15 3196 5906 3259 63 1 5971 1326 60 1386 6039 7365

23:00 50.05 2118 1927 201 24 52 5 2209 1895 145 64 155 9 691 0 263 0 -5 15 3232 5441 3074 -159 1 5283 1390 0 1390 5276 6666

24:00 50.05 2105 1915 161 8 23 -1 2107 1889 101 62 53 9 1065 0 224 0 1 15 3420 5526 3158 -261 1 5266 834 0 834 5258 6092

Avg. 49.94 2102 1913 300 275 120 4 2613 1897 230 62 181 9 375 0 256 0 -4 15 3005 5633 2993 -28 1 5607 1139 63 1203 5680 6820

00 TO 06 HRS. 50.08 2083 1895 175 56 24 -8 2143 1888 59 59 53 9 1070 0 224 0 8 15 3386 5529 3145 -241 1 5289 641 0 641 5277 5918

06 TO 12 HRS. 49.81 2096 1907 394 292 124 9 2726 1898 302 61 160 9 0 0 272 0 -9 15 2708 5434 2754 46 1 5481 1354 133 1487 5645 6999

12 TO 18 HRS. 49.93 2092 1904 296 415 174 8 2797 1902 314 64 138 9 52 0 269 0 -8 15 2754 5551 2835 81 1 5633 1323 87 1410 5732 7055

06TO 18 HRS. 49.87 2094 1906 345 353 149 8 2761 1900 308 63 149 9 26 0 270 0 -8 15 2731 5493 2795 63 1 5557 1339 110 1449 5688 7027

18 TO 24 HRS. 49.96 2138 1946 337 337 158 8 2785 1900 244 64 372 9 379 0 260 0 -8 15 3235 6020 3238 3 1 6024 1240 33 1273 6066 7306

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- January 2012

FIGURES IN MWLoad Shedding

Act.Drl UI

Other

Imp/ Exp

DEMAND

MET

TotAvl.Hrs. FREQ.

REST. DEMA

ND

UNREST.

DEMAND

Own Generation Schedule from

Annual Report 2011-12, SLDC, MPPTCL, JBP 64

Page 69: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Annexure-4.2(i)

THER.

Incl Aux

THER. Excl Aux

HYD. ISP OSPInjection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.92 2003 1823 313 24 11 -15 2156 1938 212 57 36 11 729 0 0 0 15 25 3022 5178 3458 436 1 5615 802 0 802 5628 6430

2:00 49.99 2009 1828 308 24 11 -16 2154 1939 212 57 36 11 732 0 0 0 16 25 3027 5181 3326 299 1 5481 802 14 816 5496 6297

3:00 50.03 2011 1830 289 24 11 -17 2137 1939 212 57 36 11 732 0 0 0 17 25 3028 5165 3111 83 1 5249 805 0 805 5243 6048

4:00 50.07 2002 1822 288 32 12 -18 2137 1939 212 57 36 11 729 0 0 0 18 25 3025 5162 3202 176 1 5339 810 0 810 5328 6138

5:00 49.98 1996 1816 291 96 41 -18 2226 1939 212 57 36 11 729 0 0 0 18 25 3026 5252 3094 68 1 5321 899 0 899 5323 6222

6:00 49.93 1997 1817 372 142 63 -7 2387 1939 212 57 36 11 729 0 0 0 7 25 3014 5401 2961 -53 1 5349 925 0 925 5360 6285

7:00 49.92 2004 1824 468 143 63 -5 2493 1939 246 57 36 11 0 0 0 0 5 25 2317 4811 2663 346 1 5157 1305 149 1454 5319 6624

8:00 49.94 2005 1825 466 143 62 -4 2493 1939 246 57 36 11 0 0 0 0 4 25 2317 4809 2485 168 1 4979 1604 43 1647 5030 6633

9:00 49.79 1991 1812 455 147 64 -4 2475 1939 244 57 42 11 0 0 0 0 4 25 2321 4797 2678 356 1 5154 1877 0 1877 5186 7063

10:00 49.84 1995 1815 484 277 113 -4 2686 1939 244 57 184 11 0 0 0 0 4 25 2463 5149 2625 162 1 5312 1758 161 1920 5498 7256

11:00 49.79 1990 1811 507 283 123 -4 2720 1939 247 57 198 11 0 0 14 0 4 25 2494 5214 2842 349 1 5564 1732 242 1974 5841 7573

12:00 49.81 1962 1785 516 291 125 -4 2713 1939 247 57 201 11 0 0 14 0 4 25 2497 5210 2826 329 1 5540 1794 164 1958 5735 7529

13:00 49.95 1963 1787 529 291 126 -5 2727 1939 246 57 201 11 0 0 14 0 5 25 2497 5225 2863 366 1 5592 1554 149 1703 5749 7303

14:00 49.92 1965 1788 532 289 126 -6 2730 1939 248 57 201 11 0 0 14 0 6 25 2500 5230 3093 593 1 5825 1407 119 1527 5958 7366

15:00 49.85 1962 1786 515 270 118 -7 2681 1939 248 57 123 11 0 0 0 0 7 25 2410 5091 2808 399 1 5490 1464 68 1532 5583 7047

16:00 49.92 1947 1772 469 265 116 0 2622 1939 250 57 56 11 0 0 0 0 0 25 2338 4960 2548 210 1 5171 1644 0 1644 5183 6827

17:00 50.05 1938 1763 410 253 111 0 2536 1939 250 57 39 11 0 0 0 0 0 25 2321 4857 2333 12 1 4871 1590 0 1590 4863 6454

18:00 50.05 1955 1779 414 374 153 3 2723 1939 247 57 39 11 82 0 0 0 -3 25 2397 5120 2377 -20 1 5101 1396 4 1400 5097 6493

19:00 49.85 1964 1787 582 628 267 6 3271 1939 247 57 422 11 79 0 34 0 -6 25 2807 6079 3260 453 1 6533 1544 17 1560 6579 8122

20:00 49.89 1986 1808 591 719 332 7 3456 1939 247 57 550 11 89 0 34 0 -7 25 2944 6400 3535 590 1 6992 1325 114 1439 7129 8454

21:00 49.90 1993 1813 579 713 310 5 3421 1939 250 57 550 11 89 0 34 0 -5 25 2949 6370 3463 514 1 6885 1061 371 1432 7278 8338

22:00 50.02 2002 1822 508 322 182 -4 2830 1939 250 57 523 11 89 0 34 0 4 25 2932 5761 3581 650 1 6412 1530 75 1605 6483 8013

23:00 49.94 1995 1816 403 52 50 -5 2316 1939 227 57 133 11 539 -4 0 0 5 25 2933 5249 3235 302 1 5552 1842 7 1849 5568 7411

24:00 49.92 1997 1817 333 24 11 -9 2177 1939 227 57 36 11 739 -5 0 0 9 25 3037 5214 3212 175 1 5390 1520 44 1564 5446 6966

Avg. 49.93 1985 1806 443 243 108 -5 2594 1939 237 57 158 11 253 0 8 0 5 25 2668 5287 2982 290 1 5578 1375 73 1447 5663 7037

00 TO 06 HRS. 49.99 2003 1823 310 57 25 -15 2200 1939 212 57 36 11 730 0 0 0 15 25 3024 5223 3192 168 1 5392 840 2 843 5396 6237

06 TO 12 HRS. 49.85 1991 1812 483 214 92 -4 2597 1939 246 57 116 11 0 0 5 0 4 25 2402 4998 2686 285 1 5284 1678 127 1805 5435 7113

12 TO 18 HRS. 49.96 1955 1779 478 290 125 -2 2670 1939 248 57 110 11 14 0 5 0 2 25 2411 5080 2671 260 1 5342 1509 57 1566 5406 6915

06TO 18 HRS. 49.90 1973 1796 480 252 108 -3 2633 1939 247 57 113 11 7 0 5 0 3 25 2406 5039 2678 272 1 5313 1594 92 1685 5420 7014

18 TO 24 HRS. 49.92 1990 1811 499 410 192 0 2912 1939 242 57 369 11 270 -1 23 0 0 25 2934 5845 3381 448 1 6294 1470 104 1575 6414 7884

REST. DEMA

ND

UNREST.

DEMAND

Own Generation Schedule from

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- February 2012

FIGURES IN MWLoad Shedding

Act.Drl UI

Other

Imp/ Exp

DEMAND

MET

TotAvl.Hrs. FREQ.

Annual Report 2011-12, SLDC, MPPTCL, JBP 65

Page 70: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Annexure-4.2(ii)

THER.

Incl Aux

THER. Excl Aux

HYD. ISP OSP BLA Power

Injection from STOA

Total CSS DVC ER

Sugen SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.86 2166 1971 325 59 35 11 -4 2397 2169 160 59 32 10 407 -52 0 0 4 21 2811 5209 2443 -369 -1 4839 1154 0 1154 4859 6013

2:00 49.92 2164 1969 308 55 32 11 -5 2369 2169 160 59 32 10 407 -87 0 0 5 21 2777 5146 2404 -373 -1 4772 1055 0 1055 4784 5839

3:00 49.97 2169 1973 302 55 30 11 -7 2365 2169 160 59 32 10 407 -87 0 0 7 21 2779 5144 2360 -419 -1 4724 896 0 896 4729 5625

4:00 50.00 2164 1969 306 55 27 11 -8 2359 2169 160 59 32 10 407 -87 0 0 8 21 2780 5139 2394 -385 -1 4753 833 0 833 4753 5586

5:00 49.86 2153 1959 313 58 23 11 -8 2356 2169 160 59 32 10 407 -92 0 0 8 21 2775 5131 2473 -301 -1 4828 816 0 816 4849 5665

6:00 49.98 2155 1961 344 145 60 10 -5 2516 2169 161 59 32 10 373 -43 0 0 5 21 2788 5303 2531 -257 -1 5046 907 18 925 5068 5975

7:00 49.96 2152 1959 366 145 67 10 -5 2541 2169 171 59 32 10 49 -68 0 0 5 21 2450 4991 2090 -360 -1 4630 1343 39 1382 4676 6019

8:00 49.99 2152 1958 351 137 67 10 -3 2520 2169 172 59 32 10 59 -140 0 0 3 21 2386 4905 1894 -492 -1 4412 1604 17 1620 4430 6034

9:00 49.93 2144 1951 342 142 67 11 -5 2507 2169 173 59 32 10 59 -169 0 0 5 21 2359 4866 1869 -490 -1 4376 1677 0 1677 4385 6062

10:00 49.96 2148 1955 328 145 67 11 -5 2501 2169 170 59 170 10 59 -172 0 0 5 21 2492 4993 1932 -560 -1 4432 1765 20 1785 4458 6222

11:00 49.87 2120 1930 385 142 67 11 -5 2528 2169 170 59 170 10 83 -76 0 0 5 21 2613 5141 2402 -211 -1 4929 1377 114 1492 5062 6440

12:00 49.90 2109 1919 372 149 67 11 -5 2513 2168 170 59 170 10 83 -115 0 0 5 21 2573 5086 2140 -433 -1 4652 1565 56 1621 4722 6287

13:00 49.99 2115 1925 347 106 67 10 -5 2450 2168 170 59 173 10 83 -132 0 0 5 21 2559 5009 2024 -535 -1 4472 1658 24 1682 4498 6155

14:00 49.96 2121 1930 346 92 59 10 -5 2431 2168 170 59 173 10 83 -42 0 0 5 21 2649 5080 2504 -145 -1 4934 1334 15 1349 4955 6289

15:00 49.91 2134 1942 357 82 38 10 -5 2425 2169 170 59 99 10 86 -49 0 0 5 21 2571 4995 2341 -230 -1 4764 1245 48 1293 4826 6071

16:00 49.96 2141 1948 297 51 27 11 -5 2329 2169 170 59 32 10 86 -118 0 0 5 21 2435 4764 1883 -552 -1 4211 1544 17 1561 4234 5778

17:00 50.08 2145 1952 267 60 25 9 -5 2308 2169 170 59 32 10 86 -166 0 0 5 21 2387 4695 1714 -673 -1 4021 1479 29 1509 4040 5519

18:00 50.15 2145 1952 328 183 80 10 -4 2549 2169 170 59 32 10 155 -171 0 0 4 21 2450 4999 1939 -511 -1 4488 702 5 706 4472 5174

19:00 49.83 2163 1969 545 543 229 10 -2 3294 2169 309 59 394 10 148 -66 0 0 2 21 3046 6340 2877 -169 -1 6170 840 0 840 6201 7041

20:00 49.85 2188 1991 587 760 309 11 -4 3654 2169 309 59 520 10 124 -39 57 0 4 21 3234 6888 3135 -98 -1 6788 831 50 881 6870 7700

21:00 49.83 2201 2002 601 757 322 10 0 3692 2169 309 59 529 10 124 0 261 0 0 21 3483 7175 3743 260 -1 7434 144 351 495 7823 7968

22:00 49.81 2194 1997 594 756 321 12 -1 3679 2169 309 59 507 10 124 -10 234 0 1 21 3425 7104 3343 -82 -1 7021 239 329 569 7391 7630

23:00 49.82 2189 1992 551 449 231 12 -4 3230 2169 252 59 127 10 369 -13 0 0 4 21 2999 6229 2820 -179 -1 6049 1184 55 1240 6137 7322

24:00 49.87 2195 1998 397 165 95 13 -4 2663 2169 252 59 35 10 369 -13 0 0 4 21 2907 5570 2773 -135 -1 5434 1293 18 1311 5474 6767

Avg. 49.93 2155 1961 386 221 100 11 -5 2674 2169 198 59 144 10 193 -84 23 0 5 21 2717 5413 2418 -321 -1 5091 1145 50 1196 5154 6299

00 TO 06 HRS. 49.93 2162 1967 316 71 34 11 -6 2394 2169 160 59 32 10 402 -75 0 0 6 21 2785 5179 2434 -351 -1 4827 944 3 947 4840 5784

06 TO 12 HRS. 49.94 2138 1945 357 144 67 10 -5 2518 2169 171 59 101 10 65 -123 0 0 5 21 2479 4997 2054 -424 -1 4572 1555 41 1596 4622 6177

12 TO 18 HRS. 50.01 2134 1942 324 96 49 10 -5 2415 2169 170 59 90 10 97 -113 0 0 5 21 2508 4924 2067 -441 -1 4482 1327 23 1350 4504 5831

06TO 18 HRS. 49.97 2136 1943 340 120 58 10 -5 2467 2169 171 59 95 10 81 -118 0 0 5 21 2494 4961 2061 -433 -1 4527 1441 32 1473 4563 6004

18 TO 24 HRS. 49.83 2188 1991 546 572 251 11 -3 3369 2169 290 59 352 10 209 -23 92 0 3 21 3182 6551 3115 -67 -1 6483 755 134 889 6649 7405

REST. DEMA

ND

UNREST.

DEMAND

Own Generation Schedule from

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- March 2012

FIGURES IN MWLoad Shedding

Act.Drl UI

Other

Imp/ Exp

DEMAND

MET

TotAvl.Hrs. FREQ.

Annual Report 2011-12, SLDC, MPPTCL, JBP 66

Page 71: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Max Min Avg Max Min Avg Max Min Avg Max Min Avg Max Min Avg Max Min Avg

Apr 2584 1067 1694 2588 812 1461 2221 937 1530 2103 832 1309 2784 1749 2257 2648 1141 1681

May 2388 976 1596 2291 805 1402 2268 1024 1562 1898 910 1368 2973 1453 2093 2366 1171 1583

Jun 2149 603 1280 2003 526 1161 2053 783 1267 1772 698 1198 2642 775 1701 2319 782 1424

Jul 1915 832 1339 1864 767 1208 1834 861 1290 1652 831 1197 2347 855 1446 1967 855 1211

Aug 1989 814 1302 1956 794 1237 1878 954 1330 1806 875 1256 2014 718 1324 1878 954 1330

Sep 2114 787 1344 2009 788 1310 2081 904 1366 1841 904 1309 2448 999 1483 2308 1003 1429

Oct 2727 1147 1717 2736 945 1517 2671 1128 1874 2346 898 1482 3831 1392 2716 3146 1157 2104

Nov 2805 1394 2004 2758 1120 1731 2852 1386 2311 2439 1086 1887 4245 2748 3465 3297 1904 2627

Dec 3068 1528 2121 2611 1304 1765 3061 1596 2349 2480 1484 1912 4115 2289 3361 3153 1606 2521

Jan 2863 747 1694 2729 746 1494 2816 1270 2179 2593 1100 1820 3836 1693 2947 3053 1571 2292

Feb 2931 1322 1935 2683 1120 1670 2925 1716 2313 2529 1143 1766 3655 1760 2789 2863 1499 2142

Mar 2998 1120 1859 2786 1009 1622 2799 1046 1925 2676 877 1590 3461 1556 2515 3300 1174 1880

Max/Min/Avg 3068 603 1657 2786 526 1465 3061 783 1775 2676 698 1508 4245 718 2341 3300 782 1852

Year : 2011-12

Monthwise Maximum , Minimum and Average Unrestricted Demand and Demand Met in MW

Unrestricted Demand Demand Met

EAST DISCOMMONTH

Unrestricted Demand Demand Met

WEST DISCOMCENTRAL DISCOM

Year : 2011-12

Unrestricted Demand

Year : 2011-12

Demand Met

Annual Report 2011-12, SLDC, MPPTCL, JBP 67

Page 72: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 49.81 1492 1584 92 198 0 1593 1791 1538 1487 -51 172 0 1496 1667 1399 1475 76 473 0 1484 1957

2:00 49.84 1471 1508 37 205 0 1516 1720 1507 1430 -77 201 0 1437 1637 1338 1501 163 439 0 1508 1947

3:00 49.84 1478 1526 48 153 0 1533 1686 1512 1391 -121 230 0 1397 1628 1333 1594 261 416 0 1602 2018

4:00 49.88 1474 1446 -27 147 0 1451 1599 1503 1357 -146 198 0 1362 1561 1310 1635 325 380 0 1641 2020

5:00 49.76 1468 1367 -101 168 0 1376 1544 1496 1350 -146 160 0 1359 1520 1300 1642 343 380 2 1656 2037

6:00 49.86 1452 1282 -171 176 0 1287 1463 1480 1306 -174 224 0 1311 1535 1273 1600 327 557 20 1627 2184

7:00 49.88 1446 1257 -189 256 0 1262 1517 1470 1277 -194 266 0 1281 1547 1260 1576 316 581 0 1581 2163

8:00 50.01 1446 1246 -199 278 0 1246 1524 1468 1321 -147 179 0 1321 1500 1253 1542 289 566 0 1542 2108

9:00 49.90 1436 1220 -216 363 0 1224 1587 1452 1174 -278 272 0 1177 1448 1242 1683 440 593 3 1691 2284

10:00 49.95 1482 1360 -122 223 0 1362 1585 1432 1047 -385 212 0 1048 1261 1273 1779 506 557 12 1794 2351

11:00 49.91 1494 1371 -123 223 4 1379 1601 1435 949 -486 256 0 951 1207 1270 1874 603 465 2 1880 2345

12:00 49.88 1490 1361 -129 207 0 1366 1573 1430 1001 -428 246 0 1005 1251 1264 1752 488 430 2 1761 2190

13:00 50.00 1478 1245 -233 239 0 1245 1484 1413 1048 -365 188 0 1048 1237 1232 1766 534 593 0 1766 2359

14:00 49.90 1473 1100 -373 295 0 1104 1399 1406 1092 -314 127 0 1095 1223 1228 1705 477 527 0 1710 2237

15:00 49.83 1361 1224 -137 278 0 1230 1508 1343 1086 -257 200 0 1092 1292 1118 1505 387 823 0 1513 2336

16:00 49.86 1333 1298 -35 220 0 1304 1523 1333 1039 -295 212 0 1043 1255 1091 1427 336 848 0 1433 2282

17:00 49.93 1338 1199 -139 242 0 1202 1443 1337 1178 -159 92 0 1180 1272 1102 1469 367 834 0 1472 2305

18:00 50.03 1380 1167 -213 265 0 1166 1431 1390 1320 -70 91 0 1318 1410 1196 1559 364 793 0 1558 2351

19:00 49.82 1672 1562 -110 228 0 1570 1799 1648 1582 -66 161 0 1591 1751 1623 1854 231 684 0 1864 2548

20:00 49.83 1823 1995 172 182 0 2005 2187 1818 1577 -240 304 2 1587 1891 1886 1887 1 707 5 1902 2609

21:00 49.76 1878 2193 315 86 39 2248 2334 1882 1673 -209 290 3 1688 1978 1980 1948 -33 593 13 1974 2567

22:00 49.82 1944 2110 166 90 73 2193 2283 1884 1662 -222 266 7 1678 1944 1987 2088 101 461 13 2112 2573

23:00 49.69 1686 1830 143 272 9 1856 2128 1732 1549 -183 325 2 1566 1891 1722 1827 105 464 9 1854 2317

24:00 49.72 1560 1602 43 330 6 1622 1952 1615 1525 -90 273 0 1538 1810 1532 1667 135 478 16 1697 2175

Avg. 49.86 1523 1461 -63 222 5 1472 1694 1522 1309 -213 214 1 1315 1530 1384 1681 298 568 4 1693 2261

00 TO 06 HRS. 49.83 1473 1452 -20 174 0 1459 1634 1506 1387 -119 198 0 1394 1591 1325 1575 249 441 4 1586 2027

06 TO 12 HRS. 49.92 1466 1303 -163 258 1 1306 1565 1448 1128 -320 238 0 1131 1369 1260 1701 441 532 3 1708 2240

12 TO 18 HRS. 49.93 1394 1206 -188 257 0 1208 1465 1370 1127 -243 152 0 1130 1281 1161 1572 411 736 0 1575 2312

06TO 18 HRS. 49.92 1430 1254 -176 257 0 1257 1515 1409 1128 -281 195 0 1130 1325 1211 1636 426 634 2 1642 2276

18 TO 24 HRS. 49.77 1760 1882 121 198 21 1916 2114 1763 1595 -168 270 2 1608 1877 1788 1879 90 564 9 1901 2465

FIGURES IN MW

Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- April 2011

Hrs. FREQ.

CZONE WZONEEZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 68

Page 73: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 49.89 1515 1636 121 159 2 1643 1803 1554 1574 20 124 10 1590 1713 1502 1446 -56 453 0 1451 1903

2:00 50.00 1501 1612 111 165 0 1612 1777 1532 1508 -24 163 5 1514 1677 1464 1470 6 487 2 1472 1959

3:00 50.01 1490 1621 130 107 0 1621 1727 1513 1469 -45 177 0 1469 1646 1438 1525 87 393 0 1525 1917

4:00 50.07 1460 1514 55 119 0 1511 1630 1479 1454 -25 151 0 1451 1602 1383 1490 107 300 0 1487 1787

5:00 49.93 1449 1360 -89 135 0 1363 1498 1465 1413 -52 115 0 1417 1532 1355 1480 125 280 0 1483 1763

6:00 50.11 1417 1178 -239 158 0 1174 1332 1422 1307 -115 145 0 1303 1447 1269 1490 221 505 0 1485 1990

7:00 50.07 1354 1065 -289 274 0 1063 1337 1345 1171 -174 253 0 1169 1422 1142 1445 303 433 0 1442 1876

8:00 50.12 1349 1041 -308 269 0 1037 1306 1335 1174 -161 245 0 1170 1415 1119 1398 280 497 0 1393 1891

9:00 50.05 1347 1047 -300 258 0 1046 1303 1329 1124 -205 275 0 1122 1398 1117 1555 439 545 0 1553 2098

10:00 49.96 1462 1199 -263 157 0 1200 1357 1380 1066 -314 250 0 1067 1318 1224 1738 514 498 8 1748 2246

11:00 49.87 1478 1291 -187 183 0 1296 1479 1388 1094 -294 220 0 1099 1319 1254 1806 553 429 23 1837 2266

12:00 49.90 1497 1331 -166 163 0 1335 1498 1408 1170 -238 208 1 1175 1383 1285 1703 418 392 29 1737 2130

13:00 49.99 1499 1331 -169 185 3 1334 1519 1416 1291 -125 192 0 1292 1483 1310 1694 383 525 17 1712 2237

14:00 49.83 1495 1196 -299 255 2 1204 1459 1414 1321 -93 139 0 1327 1466 1307 1601 294 518 14 1624 2142

15:00 49.80 1402 1270 -132 267 0 1278 1545 1356 1315 -42 157 5 1327 1485 1212 1433 221 634 3 1445 2079

16:00 49.98 1370 1311 -59 206 4 1316 1521 1340 1226 -115 202 6 1232 1434 1175 1331 156 715 14 1345 2060

17:00 50.02 1343 1162 -180 248 0 1161 1409 1322 1174 -148 167 4 1177 1344 1136 1363 226 739 0 1362 2101

18:00 50.20 1351 1030 -322 249 0 1023 1273 1342 1229 -113 167 0 1222 1388 1145 1401 256 656 0 1393 2049

19:00 49.98 1571 1260 -311 214 0 1261 1475 1531 1486 -45 101 0 1487 1588 1412 1737 325 543 0 1738 2281

20:00 49.92 1759 1757 -2 163 0 1762 1925 1744 1584 -160 212 0 1587 1800 1785 1839 54 561 0 1843 2404

21:00 49.89 1813 2021 208 74 1 2029 2103 1819 1715 -104 214 2 1723 1937 1923 1867 -56 606 0 1873 2479

22:00 49.94 1807 2027 220 71 7 2037 2108 1812 1728 -83 205 16 1747 1952 1925 1938 13 521 0 1942 2463

23:00 49.79 1672 1774 101 217 0 1785 2002 1686 1631 -56 266 0 1641 1907 1727 1664 -63 448 0 1675 2123

24:00 49.85 1566 1622 57 272 5 1634 1906 1601 1597 -4 232 3 1606 1838 1577 1580 3 413 0 1587 2000

Avg. 49.96 1499 1402 -96 190 1 1405 1596 1481 1368 -113 191 2 1371 1562 1383 1583 200 504 5 1590 2093

00 TO 06 HRS. 50.00 1472 1487 15 140 0 1487 1628 1494 1454 -40 146 3 1457 1603 1402 1484 82 403 0 1484 1887

06 TO 12 HRS. 49.99 1414 1162 -252 217 0 1163 1380 1364 1133 -231 242 0 1134 1376 1190 1608 418 466 10 1618 2084

12 TO 18 HRS. 49.97 1410 1217 -193 235 1 1219 1454 1365 1259 -106 171 2 1263 1433 1214 1470 256 631 8 1480 2111

06TO 18 HRS. 49.98 1412 1189 -223 226 1 1191 1417 1365 1196 -168 206 1 1198 1405 1202 1539 337 549 9 1549 2098

18 TO 24 HRS. 49.89 1698 1743 45 169 2 1751 1920 1699 1623 -75 205 3 1632 1837 1725 1771 46 515 0 1776 2292

FIGURES IN MW

Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- May 2011

Hrs. FREQ.

CZONE WZONEEZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 69

Page 74: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 49.92 1334 1348 14 123 0 1351 1474 1416 1324 -92 52 0 1327 1380 1427 1345 -82 372 0 1349 1721

2:00 49.99 1321 1334 13 120 1 1336 1456 1403 1304 -98 67 0 1305 1372 1397 1340 -58 353 0 1340 1693

3:00 50.07 1314 1328 14 69 0 1325 1395 1394 1270 -124 70 0 1267 1338 1386 1354 -31 297 0 1352 1649

4:00 50.12 1291 1225 -65 77 0 1221 1297 1368 1244 -124 57 0 1240 1297 1335 1308 -28 271 0 1303 1574

5:00 49.95 1258 1099 -159 90 0 1101 1191 1330 1213 -117 37 0 1215 1252 1268 1266 -2 273 2 1269 1542

6:00 50.07 1230 984 -246 110 0 982 1092 1299 1117 -181 28 0 1115 1143 1195 1245 49 280 0 1242 1522

7:00 50.06 1196 876 -320 219 0 874 1093 1262 1046 -216 91 0 1044 1135 1135 1216 81 234 0 1213 1447

8:00 50.09 1183 838 -344 194 0 836 1030 1248 1057 -191 111 0 1054 1166 1108 1189 81 259 5 1191 1450

9:00 50.02 1184 846 -338 116 0 845 961 1249 992 -257 107 0 992 1098 1115 1281 166 244 0 1280 1524

10:00 50.01 1194 961 -233 68 0 961 1028 1269 971 -298 82 0 971 1053 1229 1504 275 243 4 1507 1750

11:00 49.95 1262 1056 -207 77 0 1057 1134 1305 1052 -253 22 0 1054 1075 1299 1593 294 167 8 1604 1770

12:00 49.94 1269 1138 -131 75 0 1140 1215 1315 1104 -211 20 0 1106 1127 1327 1555 228 175 6 1564 1739

13:00 50.03 1276 1165 -111 93 2 1166 1259 1323 1171 -152 38 0 1170 1208 1361 1561 200 163 12 1571 1735

14:00 49.80 1283 1079 -204 124 0 1085 1209 1328 1202 -126 34 0 1210 1244 1372 1516 144 191 6 1531 1722

15:00 49.80 1214 1089 -125 132 0 1096 1228 1279 1188 -91 40 0 1196 1237 1273 1368 95 313 0 1376 1689

16:00 50.00 1182 1107 -75 100 1 1108 1209 1255 1119 -136 98 6 1125 1223 1225 1263 37 388 0 1263 1651

17:00 49.99 1166 982 -185 144 1 983 1127 1242 1057 -185 101 0 1058 1158 1184 1254 70 355 0 1254 1609

18:00 50.12 1159 900 -259 150 0 897 1047 1233 1073 -160 88 0 1069 1157 1138 1301 163 252 0 1296 1548

19:00 49.95 1352 1054 -298 131 0 1055 1186 1410 1266 -144 33 0 1267 1301 1411 1603 191 159 0 1605 1764

20:00 49.77 1514 1441 -74 129 0 1450 1580 1585 1385 -201 76 0 1394 1470 1719 1756 37 231 0 1768 1999

21:00 49.84 1572 1623 51 62 0 1630 1693 1644 1442 -202 101 0 1449 1550 1829 1739 -90 316 0 1747 2064

22:00 49.91 1577 1632 55 47 8 1644 1691 1648 1438 -209 96 6 1448 1545 1836 1729 -107 311 0 1734 2044

23:00 49.83 1461 1442 -19 154 0 1450 1604 1536 1381 -154 88 0 1389 1476 1644 1463 -182 375 1 1471 1845

24:00 49.88 1383 1329 -54 196 0 1334 1530 1462 1335 -128 74 0 1340 1414 1520 1433 -87 339 0 1438 1777

Avg. 49.96 1299 1161 -137 117 1 1164 1280 1367 1198 -169 67 1 1200 1267 1364 1424 60 273 2 1428 1701

00 TO 06 HRS. 50.02 1291 1220 -72 98 0 1219 1317 1368 1245 -123 52 0 1245 1297 1335 1310 -25 308 0 1309 1617

06 TO 12 HRS. 50.01 1215 952 -262 125 0 952 1077 1275 1037 -238 72 0 1037 1109 1202 1390 187 220 4 1393 1613

12 TO 18 HRS. 49.96 1213 1054 -160 124 1 1056 1180 1277 1135 -142 67 1 1138 1205 1259 1377 118 277 3 1382 1659

06TO 18 HRS. 49.98 1214 1003 -211 124 0 1004 1128 1276 1086 -190 69 1 1087 1157 1231 1383 153 249 3 1388 1636

18 TO 24 HRS. 49.86 1477 1420 -56 120 1 1427 1547 1547 1375 -173 78 1 1381 1459 1660 1620 -40 288 0 1627 1916

FIGURES IN MW

Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- June 2011

Hrs. FREQ.

CZONE WZONEEZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 70

Page 75: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 49.92 1275 1422 147 135 0 1426 1561 1325 1318 -8 69 3 1324 1393 1381 1164 -217 272 0 1166 1438

2:00 49.90 1273 1410 137 124 1 1415 1539 1325 1297 -27 86 0 1301 1387 1359 1156 -204 257 0 1159 1416

3:00 49.96 1265 1417 152 67 2 1421 1487 1318 1277 -42 100 0 1278 1378 1337 1176 -160 197 0 1178 1375

4:00 50.01 1241 1303 62 83 1 1304 1387 1300 1270 -30 84 0 1269 1353 1290 1132 -158 137 0 1132 1269

5:00 49.86 1218 1118 -101 98 1 1123 1222 1270 1233 -37 62 0 1239 1301 1241 1126 -115 127 0 1131 1258

6:00 49.99 1195 982 -213 135 0 983 1117 1245 1096 -149 48 0 1097 1144 1179 1130 -49 167 0 1130 1297

7:00 49.98 1152 900 -252 183 0 900 1083 1204 1021 -183 98 0 1021 1120 1111 1096 -15 136 0 1097 1232

8:00 50.03 1131 884 -247 163 0 883 1046 1180 1032 -148 119 0 1031 1149 1080 1076 -4 191 0 1074 1265

9:00 49.94 1123 896 -227 140 0 897 1037 1173 984 -189 120 0 986 1106 1080 1173 93 168 0 1175 1343

10:00 49.97 1186 1019 -167 82 0 1020 1102 1203 999 -205 117 0 1000 1117 1206 1275 69 144 6 1283 1427

11:00 49.87 1209 1109 -100 118 0 1113 1231 1220 1044 -177 69 0 1048 1117 1263 1293 29 171 0 1298 1469

12:00 49.88 1205 1155 -50 112 0 1159 1272 1215 1081 -135 63 0 1085 1148 1269 1238 -32 185 6 1248 1433

13:00 50.01 1200 1152 -48 116 0 1152 1268 1211 1128 -83 91 0 1128 1219 1265 1259 -6 230 2 1262 1492

14:00 49.86 1225 1068 -158 151 0 1072 1223 1206 1139 -67 76 0 1144 1219 1253 1207 -46 226 1 1213 1439

15:00 49.85 1119 1095 -23 161 1 1101 1262 1155 1136 -19 68 10 1152 1219 1140 1101 -39 350 6 1112 1462

16:00 49.91 1094 1103 9 116 6 1111 1228 1142 1071 -72 112 10 1084 1195 1091 1047 -44 342 9 1059 1401

17:00 49.96 1105 1013 -91 163 1 1016 1179 1155 1036 -119 103 0 1037 1140 1102 1065 -37 327 2 1068 1395

18:00 50.06 1111 957 -154 151 0 956 1106 1164 1108 -56 67 0 1106 1172 1109 1147 39 193 2 1147 1341

19:00 49.87 1294 1132 -162 159 0 1137 1295 1328 1297 -30 30 2 1304 1334 1376 1360 -16 228 2 1368 1596

20:00 49.72 1444 1492 48 138 0 1504 1642 1466 1410 -57 108 0 1422 1530 1625 1462 -163 338 1 1476 1814

21:00 49.74 1532 1722 190 58 2 1738 1796 1560 1469 -92 125 4 1484 1609 1803 1484 -320 267 0 1495 1762

22:00 49.87 1532 1708 176 48 0 1715 1763 1559 1480 -79 118 0 1486 1604 1810 1435 -375 248 0 1440 1688

23:00 49.84 1375 1515 140 153 0 1522 1675 1419 1416 -3 114 0 1422 1537 1565 1274 -291 276 0 1280 1556

24:00 49.92 1310 1426 115 196 0 1429 1626 1360 1376 16 94 0 1380 1474 1439 1179 -260 366 0 1182 1548

Avg. 49.91 1242 1208 -34 127 1 1212 1339 1279 1197 -83 89 1 1201 1290 1307 1211 -97 231 2 1216 1446

00 TO 06 HRS. 49.94 1245 1275 31 107 1 1279 1386 1297 1249 -49 75 0 1251 1326 1298 1147 -151 193 0 1149 1342

06 TO 12 HRS. 49.95 1168 994 -174 133 0 995 1129 1199 1027 -173 98 0 1028 1126 1168 1192 24 166 2 1196 1361

12 TO 18 HRS. 49.94 1142 1065 -78 143 1 1068 1211 1172 1103 -69 86 3 1108 1194 1160 1138 -22 278 4 1144 1422

06TO 18 HRS. 49.94 1155 1029 -126 138 1 1032 1170 1186 1065 -121 92 2 1068 1160 1164 1165 1 222 3 1170 1392

18 TO 24 HRS. 49.83 1414 1499 85 125 0 1508 1633 1449 1408 -41 98 1 1416 1515 1603 1366 -237 287 1 1373 1661

FIGURES IN MW

Discomwise Hourly Average Schedule Drawal , Actual Drawal ,Demand&Over(+)/Under(-) DrawalMonth :- July 2011

Hrs. FREQ.

CZONE WZONEEZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 71

Page 76: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 49.93 1291 1429 138 92 0 1432 1524 1284 1382 99 70 0 1385 1455 1654 1216 -439 101 0 1218 1319

2:00 49.93 1304 1420 116 82 0 1423 1506 1301 1358 57 79 0 1361 1439 1660 1183 -478 101 0 1185 1286

3:00 49.92 1312 1415 103 39 0 1419 1458 1310 1349 39 80 0 1352 1432 1664 1190 -474 77 0 1193 1269

4:00 49.96 1281 1338 57 33 0 1339 1372 1280 1372 92 59 0 1374 1433 1628 1198 -430 50 0 1200 1250

5:00 49.90 1268 1164 -104 49 0 1167 1217 1268 1337 68 49 0 1341 1389 1600 1164 -436 45 0 1168 1213

6:00 49.99 1249 1009 -240 66 0 1009 1075 1252 1208 -43 28 5 1214 1242 1564 1174 -391 62 0 1174 1235

7:00 49.99 1270 1002 -267 45 0 1002 1048 1268 1115 -153 14 0 1115 1130 1570 1174 -396 32 0 1174 1206

8:00 50.07 1263 975 -288 32 0 973 1005 1266 1112 -155 17 0 1109 1126 1566 1154 -411 32 0 1152 1184

9:00 49.95 1199 938 -261 27 0 939 967 1190 1075 -114 5 0 1077 1082 1496 1219 -277 28 0 1221 1249

10:00 50.00 1219 1009 -209 24 0 1009 1033 1203 1071 -131 11 0 1071 1082 1549 1265 -284 39 0 1265 1304

11:00 49.90 1198 1116 -82 28 0 1120 1147 1178 1128 -50 22 0 1132 1153 1539 1260 -279 45 0 1264 1309

12:00 49.92 1191 1173 -18 36 0 1175 1212 1171 1136 -35 39 0 1139 1178 1537 1203 -334 68 0 1206 1274

13:00 50.05 1185 1180 -5 56 0 1179 1235 1167 1162 -5 60 0 1161 1221 1527 1144 -383 95 0 1143 1238

14:00 49.96 1186 1117 -68 56 0 1119 1174 1171 1165 -6 47 0 1167 1214 1514 1121 -393 92 0 1123 1215

15:00 49.84 1126 1118 -7 62 0 1124 1186 1119 1167 48 43 0 1173 1216 1432 1039 -393 146 0 1044 1189

16:00 49.92 1110 1101 -10 63 0 1103 1166 1112 1115 3 33 4 1122 1154 1417 1027 -390 159 0 1029 1189

17:00 50.03 1129 1008 -122 78 0 1007 1085 1131 1099 -31 36 0 1098 1135 1438 1109 -328 146 0 1108 1254

18:00 49.96 1141 970 -171 72 0 971 1043 1141 1167 26 40 0 1169 1209 1455 1203 -252 108 0 1205 1313

19:00 49.77 1313 1260 -54 92 0 1269 1361 1302 1387 85 40 0 1397 1437 1656 1391 -265 163 0 1401 1564

20:00 49.74 1422 1577 154 102 2 1590 1693 1424 1462 37 163 4 1477 1640 1824 1448 -376 227 0 1459 1686

21:00 49.80 1462 1740 279 28 12 1763 1791 1473 1484 11 178 6 1499 1677 1905 1423 -482 177 0 1432 1609

22:00 49.82 1467 1690 223 32 10 1710 1742 1477 1514 36 120 9 1531 1651 1912 1396 -516 158 0 1404 1561

23:00 49.86 1336 1502 166 127 7 1515 1642 1333 1391 58 227 3 1400 1626 1745 1274 -471 158 0 1280 1438

24:00 49.92 1354 1433 78 140 4 1440 1580 1353 1388 35 194 5 1396 1590 1741 1266 -474 158 0 1270 1427

Avg. 49.92 1261 1237 -25 61 1 1242 1302 1257 1256 -1 69 1 1261 1330 1608 1218 -390 103 0 1222 1324

00 TO 06 HRS. 49.94 1284 1296 12 60 0 1298 1359 1283 1334 52 61 1 1338 1398 1628 1187 -441 73 0 1190 1262

06 TO 12 HRS. 49.97 1223 1036 -188 32 0 1036 1068 1213 1106 -106 18 0 1107 1125 1543 1213 -330 41 0 1214 1254

12 TO 18 HRS. 49.96 1146 1082 -64 64 0 1084 1148 1140 1146 6 43 1 1148 1191 1464 1107 -356 124 0 1109 1233

06TO 18 HRS. 49.97 1185 1059 -126 48 0 1060 1108 1176 1126 -50 31 0 1128 1158 1503 1160 -343 82 0 1161 1244

18 TO 24 HRS. 49.82 1392 1533 141 87 6 1548 1635 1394 1438 44 154 4 1450 1604 1797 1366 -431 173 0 1374 1548

FIGURES IN MW

Discomwise Hourly Average Schedule Drawal , Actual Drawal, Demand &Over(+)/Under(-) DrawalMonth :- August 2011

Hrs. FREQ.

CZONE WZONEEZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 72

Page 77: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 49.93 1292 1498 206 5 6 1508 1513 1293 1487 194 0 31 1521 1521 1799 1427 -371 13 2 1433 1446

2:00 49.95 1298 1469 171 5 9 1480 1484 1299 1443 144 0 41 1486 1486 1802 1382 -420 13 4 1389 1401

3:00 49.98 1306 1458 152 3 7 1465 1468 1305 1427 122 0 49 1477 1477 1807 1358 -449 13 0 1360 1373

4:00 50.02 1315 1416 101 2 9 1424 1426 1316 1408 93 0 41 1448 1448 1819 1344 -475 9 3 1347 1356

5:00 49.93 1291 1345 54 5 8 1356 1361 1292 1405 113 0 30 1438 1438 1796 1366 -430 9 1 1371 1380

6:00 49.99 1279 1229 -51 8 9 1238 1247 1281 1288 7 0 27 1316 1316 1784 1425 -359 9 4 1430 1439

7:00 49.99 1240 1139 -102 14 0 1139 1153 1245 1168 -77 10 0 1169 1179 1750 1360 -390 27 0 1361 1388

8:00 50.04 1225 1080 -145 14 0 1079 1093 1229 1125 -104 11 0 1124 1135 1731 1377 -354 23 0 1376 1399

9:00 49.92 1198 1023 -174 21 0 1026 1046 1200 1075 -126 15 0 1077 1093 1703 1425 -279 25 0 1429 1453

10:00 49.91 1148 1083 -65 18 0 1086 1104 1146 1077 -69 18 5 1086 1103 1651 1437 -214 35 0 1442 1477

11:00 49.85 1137 1141 5 19 0 1147 1166 1132 1107 -24 32 4 1117 1148 1639 1412 -227 42 5 1424 1466

12:00 49.93 1220 1157 -63 23 1 1160 1184 1113 1097 -16 54 0 1099 1153 1624 1354 -270 55 5 1362 1417

13:00 50.01 1110 1134 24 34 2 1135 1169 1102 1141 40 53 3 1144 1198 1613 1309 -303 59 11 1321 1379

14:00 49.88 1118 1082 -36 36 5 1090 1127 1111 1149 38 56 3 1156 1212 1626 1300 -326 53 11 1317 1370

15:00 49.87 1115 1120 5 30 4 1128 1158 1109 1130 22 54 3 1138 1192 1611 1276 -335 51 2 1284 1334

16:00 49.88 1111 1108 -3 28 3 1115 1142 1105 1092 -13 43 3 1100 1143 1605 1265 -340 53 0 1271 1323

17:00 49.88 1128 1050 -79 34 0 1054 1088 1124 1071 -53 50 2 1076 1125 1626 1307 -318 49 0 1313 1362

18:00 49.97 1150 1094 -57 38 0 1094 1132 1150 1204 54 40 6 1211 1251 1647 1413 -234 55 0 1414 1469

19:00 49.54 1423 1520 97 2 41 1582 1584 1453 1577 125 34 34 1633 1667 1907 1724 -183 40 0 1749 1789

20:00 49.82 1465 1699 234 0 65 1773 1773 1488 1630 142 34 89 1728 1762 1966 1742 -224 14 108 1859 1873

21:00 49.78 1476 1743 266 0 58 1812 1812 1503 1630 127 27 78 1718 1745 1988 1683 -305 3 106 1800 1804

22:00 49.84 1460 1704 244 0 56 1768 1768 1481 1608 126 50 63 1679 1729 1973 1627 -346 7 83 1718 1725

23:00 49.84 1410 1609 199 0 59 1676 1676 1419 1550 131 50 58 1615 1665 1918 1528 -390 12 75 1611 1622

24:00 49.96 1392 1533 141 0 57 1593 1593 1399 1522 123 35 45 1569 1604 1898 1463 -435 16 61 1525 1541

Avg. 49.90 1263 1310 47 14 17 1330 1344 1262 1309 47 28 26 1339 1366 1762 1429 -332 29 20 1454 1483

00 TO 06 HRS. 49.97 1297 1402 105 5 8 1412 1416 1298 1410 112 0 36 1448 1448 1801 1384 -417 11 2 1388 1399

06 TO 12 HRS. 49.94 1195 1104 -91 18 0 1106 1124 1178 1108 -69 23 2 1112 1135 1683 1394 -289 34 2 1399 1433

12 TO 18 HRS. 49.92 1122 1098 -24 33 2 1103 1136 1117 1131 14 49 4 1137 1187 1621 1312 -309 53 4 1320 1373

06TO 18 HRS. 49.93 1158 1101 -57 26 1 1105 1130 1147 1120 -27 36 3 1125 1161 1652 1353 -299 44 3 1359 1403

18 TO 24 HRS. 49.80 1438 1634 197 0 56 1700 1701 1457 1586 129 38 61 1657 1695 1942 1628 -314 15 72 1710 1726

FIGURES IN MW

Discomwise Hourly Average Schedule Drawal , Actual Drawal, Demand &Over(+)/Under(-) DrawalMonth :- September 2011

Hrs. FREQ.

CZONE WZONEEZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 73

Page 78: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 49.63 1510 1658 148 125 91 1767 1892 1607 1677 70 262 34 1729 1991 2086 2104 18 503 32 2158 2661

2:00 49.67 1484 1600 115 124 119 1734 1858 1578 1601 23 262 96 1713 1975 2044 2056 13 509 58 2134 2643

3:00 49.73 1474 1594 120 64 124 1731 1795 1567 1547 -20 349 63 1621 1970 2026 2081 55 509 57 2154 2663

4:00 49.65 1436 1494 58 45 115 1624 1670 1527 1595 69 157 68 1679 1835 1968 2024 56 438 68 2112 2550

5:00 49.58 1434 1401 -33 54 59 1477 1531 1524 1568 44 157 116 1703 1859 1965 2040 75 438 67 2130 2568

6:00 49.73 1380 1356 -25 78 30 1396 1475 1467 1442 -26 154 173 1626 1780 1889 1986 98 444 138 2139 2583

7:00 49.72 1256 1273 17 173 17 1300 1474 1333 1213 -120 353 54 1277 1630 1710 1867 157 601 89 1971 2572

8:00 49.78 1239 1235 -4 182 11 1253 1435 1314 1095 -219 521 10 1112 1632 1683 1904 222 599 84 1999 2598

9:00 49.68 1240 1122 -119 189 5 1137 1326 1316 1149 -167 457 9 1168 1625 1687 1988 301 659 69 2074 2733

10:00 49.67 1313 1241 -73 151 4 1256 1407 1389 1137 -253 494 14 1162 1655 1793 2053 260 702 36 2108 2810

11:00 49.63 1343 1376 33 142 11 1401 1543 1423 1255 -168 466 0 1268 1734 1836 2110 273 626 86 2217 2843

12:00 49.68 1348 1380 32 151 28 1421 1571 1429 1304 -125 420 19 1335 1755 1846 1946 100 632 151 2115 2747

13:00 49.80 1352 1403 50 183 18 1429 1612 1433 1368 -65 370 42 1418 1788 1851 2084 233 534 117 2213 2746

14:00 49.67 1349 1295 -55 237 29 1335 1572 1432 1276 -156 443 43 1330 1773 1863 2083 220 539 119 2220 2760

15:00 49.71 1280 1359 79 218 39 1410 1628 1360 1191 -168 490 41 1242 1732 1756 1938 182 548 60 2013 2561

16:00 49.73 1234 1305 71 160 70 1385 1545 1310 1221 -88 354 83 1313 1667 1685 1893 208 573 127 2034 2608

17:00 49.74 1248 1243 -5 185 53 1305 1490 1323 1379 56 191 98 1487 1678 1707 1915 209 556 83 2011 2567

18:00 49.87 1375 1362 -13 197 38 1405 1602 1466 1540 73 177 117 1663 1840 1912 1910 -2 481 107 2023 2504

19:00 49.73 1681 1745 63 154 21 1780 1934 1800 1811 11 334 20 1844 2179 2360 2369 9 508 17 2404 2912

20:00 49.77 1825 1988 163 129 26 2027 2156 1955 1880 -75 310 6 1899 2209 2560 2473 -87 461 10 2499 2960

21:00 49.75 1834 2157 323 44 112 2284 2328 1963 1963 0 158 55 2032 2191 2573 2619 46 388 24 2662 3051

22:00 49.79 1809 2085 276 50 107 2203 2254 1936 1910 -26 267 14 1936 2203 2537 2560 23 421 34 2609 3030

23:00 49.72 1690 1927 237 140 25 1967 2107 1805 1746 -59 401 0 1760 2161 2372 2352 -20 456 4 2374 2831

24:00 49.73 1585 1816 230 155 27 1857 2012 1691 1692 2 401 0 1705 2106 2220 2138 -83 498 22 2176 2674

Avg. 49.72 1447 1517 70 139 49 1579 1717 1539 1482 -58 331 49 1543 1874 1997 2104 107 526 69 2190 2716

00 TO 06 HRS. 49.66 1453 1517 64 82 90 1622 1703 1545 1572 27 223 92 1678 1902 1996 2049 52 474 70 2138 2611

06 TO 12 HRS. 49.70 1290 1271 -19 164 13 1295 1459 1367 1192 -175 452 18 1220 1672 1759 1978 219 636 86 2081 2717

12 TO 18 HRS. 49.75 1307 1328 21 197 41 1378 1575 1387 1329 -58 337 71 1409 1746 1796 1971 175 539 102 2086 2624

06TO 18 HRS. 49.72 1298 1299 1 181 27 1336 1517 1377 1261 -117 395 44 1315 1709 1777 1974 197 587 94 2083 2671

18 TO 24 HRS. 49.75 1737 1953 215 112 53 2020 2132 1858 1834 -25 312 16 1863 2175 2437 2419 -19 456 19 2454 2910

FIGURES IN MW

Discomwise Hourly Average Schedule Drawal , Actual Drawal, Demand &Over(+)/Under(-) DrawalMonth :- October 2011

Hrs. FREQ.

CZONE WZONEEZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 74

Page 79: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 49.78 1730 1780 50 343 4 1796 2138 1866 1901 36 330 20 1934 2263 2500 2852 352 527 29 2899 3426

2:00 49.85 1715 1742 27 343 15 1765 2107 1850 1888 38 330 25 1921 2251 2479 2886 407 527 41 2939 3466

3:00 49.91 1712 1863 151 33 33 1901 1935 1846 1907 61 330 25 1937 2267 2473 2897 424 527 56 2961 3488

4:00 49.90 1708 1778 70 28 18 1802 1830 1843 1939 96 228 8 1952 2180 2469 2939 470 527 38 2986 3513

5:00 49.82 1710 1609 -101 55 5 1623 1678 1844 1956 111 228 17 1983 2211 2471 2981 509 527 46 3043 3570

6:00 49.74 1720 1577 -143 88 0 1590 1678 1855 1920 65 228 31 1967 2195 2486 2923 437 527 129 3076 3603

7:00 49.65 1571 1575 4 241 7 1599 1840 1695 1798 103 302 70 1886 2188 2271 2633 362 531 451 3111 3642

8:00 49.91 1561 1543 -18 243 9 1556 1799 1684 1744 60 395 39 1788 2183 2256 2402 146 653 528 2937 3590

9:00 49.70 1508 1522 15 235 5 1541 1776 1626 1610 -16 498 22 1647 2145 2195 2425 229 758 50 2496 3255

10:00 49.71 1562 1601 39 188 85 1699 1887 1685 1722 37 463 14 1751 2214 2257 2512 254 910 87 2621 3531

11:00 49.69 1585 1684 99 163 178 1877 2039 1710 1814 104 413 43 1874 2287 2291 2562 271 742 389 2974 3716

12:00 49.73 1592 1529 -63 289 122 1663 1952 1717 1845 128 376 81 1941 2317 2300 2768 468 676 347 3138 3814

13:00 49.86 1598 1602 5 268 121 1730 1998 1724 1837 113 255 154 1999 2254 2309 2728 419 676 280 3020 3696

14:00 49.78 1587 1545 -42 374 22 1577 1952 1712 1879 167 224 108 2000 2224 2293 2742 450 640 258 3019 3659

15:00 49.70 1571 1421 -150 374 90 1524 1898 1694 1856 162 352 57 1930 2282 2270 2715 445 637 192 2931 3567

16:00 49.77 1539 1419 -119 275 120 1549 1824 1660 1820 161 362 73 1906 2268 2224 2601 377 655 151 2770 3425

17:00 49.77 1519 1392 -127 300 11 1412 1712 1638 1907 269 289 124 2044 2333 2195 2433 237 734 109 2558 3292

18:00 49.88 1601 1508 -93 318 3 1516 1834 1727 1992 264 424 65 2063 2488 2314 2423 109 821 100 2532 3353

19:00 49.90 1743 1734 -9 336 0 1739 2075 1880 2000 119 393 55 2061 2454 2519 2580 61 751 7 2596 3347

20:00 49.83 1857 1967 110 294 5 1982 2276 2003 2087 84 391 15 2112 2504 2683 2577 -106 769 0 2591 3360

21:00 49.85 1920 2349 428 142 60 2419 2561 2071 2271 200 231 49 2330 2561 2775 2405 -370 769 0 2416 3185

22:00 49.90 1900 2472 572 18 86 2565 2582 2051 2038 -13 438 23 2067 2505 2748 2456 -292 855 0 2462 3318

23:00 49.91 1791 2267 477 135 36 2309 2444 1931 1779 -152 663 0 1784 2447 2588 2362 -226 855 0 2369 3224

24:00 49.93 1718 2074 356 164 49 2127 2291 2393 1777 -617 665 0 1781 2446 2483 2257 -226 855 0 2262 3117

Avg. 49.81 1667 1731 64 219 45 1786 2004 1821 1887 66 367 47 1944 2311 2410 2627 217 686 137 2779 3465

00 TO 06 HRS. 49.83 1716 1725 9 148 13 1746 1894 1851 1918 68 279 21 1949 2228 2480 2913 433 527 57 2984 3511

06 TO 12 HRS. 49.73 1563 1576 12 227 67 1656 1882 1686 1755 69 408 45 1814 2222 2262 2550 289 712 309 2880 3591

12 TO 18 HRS. 49.79 1569 1481 -88 318 61 1551 1870 1692 1882 190 318 97 1990 2308 2267 2607 340 694 182 2805 3499

06TO 18 HRS. 49.76 1566 1528 -38 272 64 1604 1876 1689 1819 129 363 71 1902 2265 2265 2579 314 703 245 2842 3545

18 TO 24 HRS. 49.89 1822 2144 322 181 39 2190 2372 2055 1992 -63 464 24 2023 2486 2633 2440 -193 809 1 2449 3258

FIGURES IN MW

Discomwsie Hourly Average Schedule Drawal , Actual Drawal, Demand &Over(+)/Under(-) DrawalMonth :- November 2011

Hrs. FREQ.

CZONE WZONEEZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 75

Page 80: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 49.88 1757 1799 42 335 0 1806 2141 1895 1940 45 285 0 1947 2232 2539 2588 49 540 0 2598 3138

2:00 49.89 1760 1790 30 341 0 1796 2137 1898 1951 53 285 5 1963 2247 2544 2596 53 540 0 2605 3145

3:00 49.93 1764 1851 87 31 0 1855 1886 1902 1996 93 137 0 2000 2137 2549 2574 25 540 4 2584 3124

4:00 50.00 1770 1702 -68 35 0 1702 1737 1909 2022 113 137 0 2022 2159 2558 2677 119 540 0 2677 3217

5:00 49.86 1769 1570 -199 72 0 1577 1649 1908 2056 148 139 0 2065 2204 2556 2719 162 540 0 2731 3271

6:00 49.77 1770 1585 -184 116 0 1596 1712 1900 1999 99 139 10 2023 2163 2558 2731 173 540 11 2761 3301

7:00 49.72 1609 1640 30 271 6 1660 1930 1729 1759 30 309 110 1883 2192 2316 2448 132 550 480 2949 3499

8:00 49.81 1602 1633 31 272 23 1666 1938 1727 1669 -58 508 12 1691 2199 2314 2333 19 665 543 2889 3554

9:00 49.67 1610 1639 29 270 64 1720 1989 1737 1724 -13 536 48 1790 2326 2327 2491 164 859 73 2588 3447

10:00 49.69 1625 1644 19 231 218 1877 2109 1753 1764 11 455 198 1979 2434 2349 2471 122 921 157 2651 3572

11:00 49.66 1664 1669 5 169 390 2076 2244 1794 1856 62 336 283 2158 2494 2404 2470 65 696 476 2971 3667

12:00 49.73 1717 1560 -158 309 281 1853 2162 1852 1894 42 303 298 2207 2510 2481 2687 205 676 364 3072 3749

13:00 49.86 1724 1731 7 284 221 1959 2243 1859 1973 114 214 327 2308 2522 2491 2644 153 674 269 2925 3599

14:00 49.78 1711 1710 -1 407 47 1768 2175 1845 1921 76 308 191 2125 2433 2472 2693 221 651 281 2992 3642

15:00 49.69 1706 1493 -213 436 177 1684 2120 1840 1871 31 349 171 2059 2408 2465 2761 297 651 170 2957 3607

16:00 49.76 1678 1476 -203 328 210 1696 2024 1810 1796 -15 402 159 1968 2370 2426 2732 306 672 131 2882 3554

17:00 49.81 1630 1542 -88 372 10 1560 1932 1758 1824 66 334 240 2074 2408 2366 2453 88 771 33 2500 3271

18:00 49.86 1660 1642 -18 383 0 1649 2032 1790 2028 237 259 334 2370 2629 2399 2379 -20 842 74 2463 3305

19:00 49.70 1761 1875 114 384 85 1977 2361 1899 1987 88 241 87 2091 2332 2512 2564 52 762 18 2605 3367

20:00 49.77 1827 1998 171 325 104 2116 2441 1971 2065 94 236 63 2142 2378 2641 2475 -166 780 9 2501 3281

21:00 49.83 1878 2159 281 160 296 2466 2627 2025 2159 134 117 153 2323 2440 2714 2321 -394 780 0 2333 3113

22:00 49.92 1878 2439 561 15 224 2668 2683 1990 2039 48 369 49 2093 2461 2667 2352 -315 849 0 2358 3206

23:00 49.84 1707 2221 514 130 66 2298 2428 1841 1788 -53 586 2 1799 2385 2467 2230 -237 844 0 2241 3085

24:00 49.90 1769 1992 223 149 60 2057 2207 1899 1819 -80 479 0 1824 2304 2557 2122 -435 821 0 2129 2949

Avg. 49.81 1723 1765 42 243 103 1878 2121 1856 1912 57 311 114 2038 2349 2486 2521 35 696 129 2665 3361

00 TO 06 HRS. 49.89 1765 1716 -49 155 0 1722 1877 1902 1994 92 187 3 2003 2190 2551 2648 97 540 2 2659 3199

06 TO 12 HRS. 49.71 1638 1631 -7 254 164 1809 2062 1765 1778 12 408 158 1951 2359 2365 2483 118 728 349 2853 3581

12 TO 18 HRS. 49.79 1685 1599 -86 368 111 1719 2088 1817 1902 85 311 237 2151 2462 2436 2610 174 710 160 2786 3496

06TO 18 HRS. 49.75 1661 1615 -47 311 137 1764 2075 1791 1840 49 359 198 2051 2410 2401 2547 146 719 254 2820 3539

18 TO 24 HRS. 49.83 1803 2114 311 194 139 2264 2458 1938 1976 39 338 59 2045 2383 2593 2344 -249 806 5 2361 3167

FIGURES IN MW

Discomwise Hourly Average Schedule Drawal , Actual Drawal, Demand &Over(+)/Under(-) DrawalMonth :- December 2011

Hrs. FREQ.

CZONE WZONEEZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 76

Page 81: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 50.04 1630 1450 -180 65 0 1448 1513 1732 1862 130 49 0 1860 1908 2077 2036 -41 519 0 2033 2553

2:00 50.09 1641 1397 -243 65 0 1394 1459 1742 1840 98 49 0 1835 1884 2091 2019 -72 519 0 2014 2533

3:00 50.14 1616 1345 -271 34 0 1340 1374 1716 1827 112 48 0 1820 1868 2057 2016 -41 519 0 2008 2527

4:00 50.16 1588 1290 -298 37 0 1284 1321 1687 1845 158 41 0 1836 1877 2022 2107 85 538 0 2097 2635

5:00 50.07 1601 1238 -362 89 0 1236 1325 1704 1885 181 31 0 1881 1912 2042 2175 133 538 0 2171 2709

6:00 49.96 1663 1296 -367 129 0 1297 1426 1762 1828 65 36 0 1829 1866 2115 2278 162 538 0 2281 2818

7:00 49.84 1555 1305 -250 246 0 1312 1557 1646 1500 -146 456 0 1507 1963 1972 2442 470 521 55 2509 3030

8:00 49.88 1564 1308 -255 289 0 1313 1602 1661 1456 -205 554 5 1466 2020 1991 2405 414 583 30 2444 3027

9:00 49.71 1569 1339 -230 277 0 1350 1628 1666 1511 -155 542 19 1543 2085 1997 2469 472 662 5 2496 3157

10:00 49.81 1662 1470 -192 244 0 1478 1722 1758 1694 -64 450 37 1740 2190 2115 2416 301 661 120 2549 3210

11:00 49.77 1748 1496 -252 240 0 1506 1746 1855 1783 -73 432 54 1849 2282 2225 2439 214 672 328 2783 3456

12:00 49.83 1763 1332 -431 309 0 1339 1648 1871 1763 -108 399 77 1849 2249 2245 2757 513 586 65 2837 3423

13:00 49.95 1736 1361 -375 262 0 1363 1625 1845 1761 -84 343 129 1892 2234 2229 2656 427 561 58 2718 3279

14:00 49.91 1733 1418 -315 261 0 1422 1682 1839 1815 -25 331 93 1913 2244 2207 2620 414 559 52 2679 3238

15:00 49.86 1672 1403 -270 270 0 1409 1679 1774 1740 -35 417 88 1835 2251 2128 2586 458 552 18 2615 3167

16:00 49.88 1649 1447 -203 217 0 1452 1669 1754 1612 -142 631 1 1619 2250 2097 2444 346 580 44 2497 3077

17:00 49.94 1625 1353 -272 251 0 1355 1606 1724 1709 -15 579 0 1712 2291 2062 2218 156 669 2 2224 2893

18:00 50.04 1674 1348 -326 305 0 1346 1652 1777 2055 279 366 35 2088 2454 2124 2253 129 784 5 2256 3040

19:00 49.89 1913 1923 9 189 0 1929 2118 2030 2095 65 419 24 2126 2545 2426 2416 -10 783 15 2439 3222

20:00 49.85 1963 2227 264 62 6 2243 2305 2082 2140 58 419 35 2185 2604 2489 2319 -170 789 0 2329 3118

21:00 49.95 1955 2108 153 240 2 2114 2354 2075 2270 196 236 55 2329 2565 2480 2126 -353 755 0 2130 2885

22:00 49.96 1788 1889 101 231 2 1894 2125 1897 2027 130 331 58 2087 2418 2204 2055 -148 764 0 2058 2822

23:00 50.05 1641 1578 -62 302 0 1576 1878 1741 1818 77 427 0 1816 2243 2082 1887 -196 661 0 1884 2545

24:00 50.05 1659 1545 -114 91 0 1543 1633 1761 1843 83 245 0 1841 2085 2106 1878 -228 498 0 1875 2373

Avg. 49.94 1692 1494 -198 196 0 1498 1694 1796 1820 24 326 30 1852 2179 2149 2292 143 617 33 2330 2947

00 TO 06 HRS. 50.08 1623 1336 -287 70 0 1333 1403 1724 1848 124 42 0 1844 1886 2067 2105 38 528 0 2101 2629

06 TO 12 HRS. 49.81 1643 1375 -268 267 0 1383 1650 1743 1618 -125 472 32 1659 2131 2091 2488 397 614 101 2603 3217

12 TO 18 HRS. 49.93 1682 1388 -293 261 0 1391 1652 1786 1782 -4 444 58 1843 2287 2141 2463 322 618 30 2498 3116

06TO 18 HRS. 49.87 1663 1382 -281 264 0 1387 1651 1764 1700 -64 458 45 1751 2209 2116 2475 360 616 65 2550 3166

18 TO 24 HRS. 49.96 1820 1878 59 186 2 1883 2069 1931 2032 101 346 29 2064 2410 2298 2114 -184 708 2 2119 2828

FIGURES IN MW

Discomwise Hourly Average Schedule Drawal , Actual Drawal, Demand &Over(+)/Under(-) DrawalMonth :- January 2012

Hrs. FREQ.

CZONE WZONEEZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 77

Page 82: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 49.92 1602 1680 77 107 0 1684 1791 1711 1945 234 196 0 1950 2145 2026 1986 -39 499 0 1991 2490

2:00 50.00 1608 1596 -12 107 3 1599 1706 1715 1910 195 196 11 1922 2117 2033 1974 -59 499 0 1974 2474

3:00 50.04 1604 1472 -132 52 0 1471 1523 1707 1819 112 250 0 1817 2067 2028 1953 -75 499 0 1951 2450

4:00 50.07 1604 1443 -160 46 0 1440 1486 1708 1847 139 238 0 1843 2081 2027 2046 19 522 0 2042 2564

5:00 49.99 1620 1367 -253 133 0 1367 1500 1722 1868 146 238 0 1868 2106 2048 2085 37 522 0 2086 2608

6:00 49.93 1662 1479 -183 125 0 1482 1607 1767 1831 64 235 0 1835 2070 2103 2041 -62 554 0 2046 2600

7:00 49.92 1492 1518 25 227 26 1547 1774 1595 1483 -112 555 18 1504 2059 1887 2154 267 524 111 2270 2793

8:00 49.94 1492 1475 -17 317 7 1484 1800 1578 1372 -206 775 5 1379 2154 1886 2130 244 516 33 2166 2683

9:00 49.79 1488 1512 24 374 0 1521 1895 1571 1389 -181 855 0 1398 2253 1881 2256 375 649 0 2271 2919

10:00 49.84 1586 1546 -40 372 22 1575 1948 1677 1546 -131 776 38 1592 2368 2005 2222 216 606 107 2339 2945

11:00 49.79 1608 1539 -69 329 54 1602 1930 1713 1626 -87 734 43 1679 2413 2037 2408 371 668 154 2577 3245

12:00 49.81 1613 1362 -251 475 13 1382 1857 1654 1586 -68 706 49 1643 2349 2038 2611 573 609 92 2718 3327

13:00 49.95 1622 1365 -257 437 0 1367 1803 1721 1737 15 532 78 1818 2349 2051 2505 454 578 67 2575 3154

14:00 49.92 1624 1673 48 327 0 1677 2003 1724 1807 83 497 55 1866 2363 2051 2356 305 578 69 2431 3009

15:00 49.85 1586 1655 69 324 0 1663 1986 1683 1683 0 571 70 1760 2332 2005 2165 160 566 0 2175 2740

16:00 49.92 1542 1683 141 227 0 1687 1915 1637 1482 -155 850 0 1486 2336 1950 2014 65 565 0 2020 2585

17:00 50.05 1513 1452 -61 234 0 1449 1683 1606 1544 -62 781 0 1542 2323 1913 1889 -24 570 0 1886 2456

18:00 50.05 1574 1298 -276 343 0 1296 1639 1670 1825 155 449 4 1827 2276 1990 2005 15 593 0 2002 2595

19:00 49.85 1855 2079 224 217 3 2092 2309 1980 2019 39 516 14 2042 2558 2344 2432 88 810 0 2443 3253

20:00 49.89 1961 2531 570 0 109 2649 2649 2081 2109 28 516 0 2116 2632 2479 2352 -126 810 0 2360 3170

21:00 49.90 1943 2417 473 10 290 2714 2724 2062 2299 237 287 79 2385 2672 2456 2166 -290 764 0 2172 2935

22:00 50.03 1759 2190 431 307 56 2244 2551 1867 2131 264 452 18 2147 2598 2223 2087 -137 767 0 2085 2852

23:00 49.94 1621 1856 235 408 7 1866 2274 1720 1823 103 663 0 1826 2490 2047 1864 -183 767 0 1867 2635

24:00 49.93 1615 1833 218 114 38 1875 1990 1714 1755 41 665 7 1766 2431 2034 1796 -238 740 0 1799 2539

Avg. 49.93 1633 1667 34 234 26 1697 1931 1733 1768 36 522 20 1792 2314 2064 2146 82 616 26 2177 2793

00 TO 06 HRS. 49.99 1617 1506 -111 95 0 1507 1602 1722 1870 148 225 2 1872 2098 2044 2014 -30 516 0 2015 2531

06 TO 12 HRS. 49.85 1546 1492 -55 349 20 1519 1867 1631 1500 -131 733 25 1533 2266 1956 2297 341 595 83 2390 2986

12 TO 18 HRS. 49.96 1577 1521 -56 315 0 1523 1838 1673 1680 6 613 35 1716 2330 1993 2156 162 575 23 2181 2756

06TO 18 HRS. 49.90 1562 1506 -55 332 10 1521 1853 1652 1590 -62 673 30 1625 2298 1974 2226 252 585 53 2286 2871

18 TO 24 HRS. 49.92 1793 2151 358 176 84 2240 2416 1904 2022 119 517 20 2047 2564 2264 2116 -148 776 0 2121 2897

FIGURES IN MW

Discomwise Hourly Average Schedule Drawal , Actual Drawal, Demand &Over(+)/Under(-) DrawalMonth :- February 2012

Hrs. FREQ.

CZONE WZONEEZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 78

Page 83: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

Demand

1:00 49.86 1492 1481 -12 356 0 1487 1842 1584 1704 120 343 0 1711 2053 1886 1655 -232 456 0 1662 2117

2:00 49.92 1473 1469 -3 344 0 1473 1817 1563 1650 88 313 0 1655 1968 1861 1652 -209 397 0 1656 2053

3:00 49.97 1473 1531 58 132 0 1532 1664 1563 1502 -61 457 0 1504 1960 1862 1691 -171 308 0 1693 2001

4:00 50.00 1472 1499 28 129 0 1500 1628 1562 1598 36 265 0 1598 1863 1860 1655 -205 440 0 1656 2096

5:00 49.86 1466 1550 83 111 0 1556 1668 1556 1624 68 265 0 1631 1896 1853 1655 -199 440 0 1662 2102

6:00 49.98 1498 1675 177 114 0 1676 1790 1589 1615 26 264 18 1634 1898 1893 1756 -137 529 0 1758 2287

7:00 49.96 1427 1510 82 226 6 1518 1744 1515 1706 191 168 26 1734 1902 1804 1415 -389 949 7 1424 2373

8:00 49.99 1399 1283 -116 400 0 1284 1684 1488 1644 155 243 17 1661 1904 1769 1485 -284 961 0 1486 2446

9:00 49.93 1387 1424 36 315 0 1427 1741 1472 1401 -71 472 0 1405 1877 1754 1551 -203 890 0 1554 2444

10:00 49.96 1425 1479 54 309 0 1481 1790 1513 1316 -197 572 14 1331 1903 1802 1637 -165 884 6 1646 2529

11:00 49.87 1469 1479 10 310 9 1494 1804 1559 1351 -207 498 0 1357 1855 1857 2098 241 569 106 2212 2781

12:00 49.90 1446 1357 -89 319 24 1385 1704 1534 1386 -148 400 3 1394 1794 1828 1908 81 846 28 1943 2789

13:00 49.99 1427 1351 -76 396 2 1354 1750 1515 1276 -239 445 0 1276 1722 1804 1845 41 816 22 1868 2683

14:00 49.96 1449 1520 71 321 1 1523 1844 1538 1195 -343 473 0 1196 1669 1832 2219 387 540 14 2236 2776

15:00 49.91 1420 1479 59 320 0 1483 1803 1507 1198 -308 443 0 1202 1645 1795 2087 292 482 48 2141 2623

16:00 49.96 1353 1413 60 267 8 1423 1691 1436 1127 -310 366 9 1137 1503 1711 1671 -39 910 0 1673 2584

17:00 50.08 1333 1198 -135 324 16 1211 1535 1415 1193 -222 272 14 1204 1476 1685 1629 -56 882 0 1625 2508

18:00 50.15 1414 1173 -242 142 0 1167 1310 1501 1559 59 179 5 1557 1736 1788 1756 -32 380 0 1748 2128

19:00 49.83 1822 1817 -5 89 0 1826 1915 1933 2027 94 192 0 2037 2229 2303 2326 23 559 0 2338 2897

20:00 49.85 1995 2319 323 66 42 2371 2437 2117 2130 13 229 9 2148 2377 2522 2340 -182 535 0 2351 2886

21:00 49.83 2080 2490 410 7 155 2658 2665 2207 2273 66 26 82 2366 2393 2629 2671 43 111 114 2800 2910

22:00 49.81 2049 2437 388 58 39 2490 2548 2174 2111 -63 47 124 2247 2295 2589 2473 -116 134 166 2653 2787

23:00 49.82 1792 2161 369 43 43 2216 2259 1902 1848 -54 338 13 1871 2209 2260 2040 -220 803 0 2051 2854

24:00 49.87 1598 1822 225 152 5 1835 1987 1695 1717 22 338 13 1736 2075 2011 1895 -116 803 0 1903 2706

Avg. 49.93 1548 1622 73 219 15 1640 1859 1643 1590 -54 317 14 1608 1925 1957 1880 -77 609 21 1906 2515

00 TO 06 HRS. 49.93 1479 1534 55 198 0 1537 1735 1569 1615 46 318 3 1622 1940 1869 1677 -192 428 0 1681 2109

06 TO 12 HRS. 49.94 1426 1422 -4 313 6 1431 1745 1513 1467 -46 392 10 1480 1872 1802 1682 -120 850 25 1711 2561

12 TO 18 HRS. 50.01 1400 1356 -44 295 5 1360 1655 1485 1258 -227 363 5 1262 1625 1769 1868 99 668 14 1882 2550

06TO 18 HRS. 49.97 1413 1389 -24 304 5 1396 1700 1499 1363 -137 378 7 1371 1749 1786 1775 -11 759 19 1796 2555

18 TO 24 HRS. 49.83 1889 2174 285 69 47 2233 2302 2005 2018 13 195 40 2068 2263 2385 2291 -95 491 47 2349 2840

FIGURES IN MW

Discomwise Hourly Average Schedule Drawal , Actual Drawal, Demand &Over(+)/Under(-) DrawalMonth :- March 2012

Hrs. FREQ.

CZONE WZONEEZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 79

Page 84: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

No.of Days--> 30 31 30 31 31 30 31 30 31 31 28 31 365 30 31 30 31 31 30 31 30 31 31 28 31 365

Commissinary HQ 22:18 22:59 23:32 22:53 23:37 24:00 22:50 22:21 22:17 23:24 22:42 22:50 22:58 22:54 22:48 22:57 23:17 23:43 24:00 23:16 23:00 23:01 23:11 23:06 23:01 23:11

District HQ 20:51 21:30 22:39 21:50 23:26 24:00 21:43 20:03 19:58 22:03 20:24 20:36 21:35 21:02 20:28 20:50 21:14 22:56 24:00 21:27 20:14 20:18 21:08 20:25 22:06 21:21

Tehsil HQ 16:01 16:34 18:38 17:37 19:53 21:58 15:00 14:06 13:20 18:29 15:42 16:15 16:58 17:43 16:36 17:33 17:47 20:10 22:22 16:40 14:51 14:02 16:57 15:59 19:37 17:32

Rural -3Phase 11:47 12:19 14:28 13:23 16:38 20:26 11:28 11:01 10:21 14:44 12:02 12:26 13:25 12:54 12:13 14:12 13:15 16:11 20:27 11:53 10:30 10:09 12:46 11:03 13:52 13:17

Rural -1Phase 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00

Total Rural 11:47 12:19 14:28 13:23 16:38 20:26 11:28 11:01 10:21 14:44 12:02 12:26 13:25 12:54 12:13 14:12 13:15 16:11 20:27 11:53 10:30 10:09 12:46 11:03 13:52 13:17

Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

30 31 30 31 31 30 31 30 31 31 28 31 365 30 31 30 31 31 30 31 30 31 31 28 31 365

Commissinary HQ 23:11 23:28 23:55 23:41 23:54 24:00 23:14 23:02 23:01 24:00 24:00 23:58 23:37 22:43 23:00 23:22 23:12 23:43 24:00 23:06 22:45 22:45 23:26 23:07 23:08 23:11

District HQ 20:58 21:57 23:00 22:46 23:45 24:00 20:48 19:54 20:46 21:49 22:05 22:50 22:03 20:57 21:19 22:13 21:56 23:23 24:00 21:23 20:04 20:18 21:42 20:55 21:43 21:39

Tehsil HQ 16:36 16:35 20:18 17:36 19:41 22:44 14:04 14:49 14:46 16:24 15:54 17:15 17:13 16:44 16:34 18:45 17:40 19:55 22:19 15:15 14:33 13:58 17:23 15:52 17:36 17:13

Rural -3Phase 12:30 12:27 15:56 13:35 15:38 21:38 9:36 10:03 10:00 11:24 10:50 12:17 12:59 12:20 12:20 14:48 13:24 16:13 20:47 11:05 10:35 10:11 13:10 11:23 12:51 13:15

Rural -1Phase 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00

Total Rural 12:30 12:27 15:56 13:35 15:38 21:38 9:36 10:03 10:00 11:24 10:50 12:17 12:59 12:20 12:20 14:48 13:24 16:13 20:47 11:05 10:35 10:11 13:10 11:23 12:51 13:15

West Zone

Discoms wise Average Supply Hours : 2011-12

PARTICULARS

PARTICULARS

East Zone Central Zone

MP

Annual Report 2011-12, SLDC, MPPTCL, JBP 80

Page 85: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SYSTEM DISTURBANCE

YEAR 2011-12

1. Occurrence at Satpura TPS :- On dtd. 05.07.2011 at about 18.15 hrs., due to failure of

220 KV Bus-I Y-Phase PT (SCT make), a bus fault occurred at 220 KV Bus-I at Satpura Thermal Power Station Sarni, resulting in tripping of all running units 2,3 & 6. Ttotal generation loss of 234 MW (Unit # 2- 45 MW, Unit # 3- 44 MW & Unit # 6- 145 MW) and feeders connected with 220 KV Bus I & II .

There was total interruption at about 20 minutes at Satpura 220 KV Bus.

Restoration was started by taking supply from 220KV Sarni – Itarsi feeder no II and unit syncronised as below :

Unit No.2 : 22.34 Hrs on dtd. 05.07.2011

Unit No.3 : 22.08 Hrs on dtd. 05.07.2011

Unit No.6 : 20.15 Hrs on dtd. 05.07.2011

2. Occurrence at 220KV S/s Narsinghpur :- On dated 24th July 2011 at about 04.06 hrs, a bus fault occurred on 220 KV Y Ph. Bus of 220 KV sub-station, Narsinghpur due to Y Ph. cross over jumper at Main Bus structure snapped from T-Clamp, causing tripping of all 220 KV feders from remote end, resulting in total supply failure at 220 KV s/s. The indications on only BB Panel panel reci\orded at 220 KV Narsinghpur s/s. The following indication was observed on BB panel, B phase, Bus zone protection operated.

Due to above tripping, total interruption occurred at following sub-stations for the period as detailed below :

Sr. No.

Name of S/s From To Period Loss of Load-In MW

1. 220 KV S/s, Narsinghpur 04.06 04.39 33 min. - 2. 132 KV S/s, Gadarwara 04.06 04.30 24 min. 10.0 3. 132 KV S/s, Narsinghpur 04.06 04.33 27 min. 4.8 4. 132 KV S/s, Shrinagar 04.06 04.34 28 min. 4.0 5. 132 KV S/s, Shahapura 04.06 04.37 31 min. 2.0 6. 132 KV S/s, Barman 04.06 04.32 26 min. 3.2

3. Occurrence at 220 KV Badnagar S/S :- On dtd. 03.09.2011 at about 21.45 hrs. C-Phase pole of Ckt Bkr of 220KV Indore feeder failed at 220KV S/S Badnagar, causing total intruption occurred on 220KV S/S Badnagar from 21.45 to 22.20 hrs (Total interruption at about 35 minutes). Support column of AREVA make 220KV Bkr of 160 MVA X’mer No.-2 also damaged due to shattring of insulator of 220KV Bkr of Indore feeder.

Restoration was started by taking supply from 132KV S/S Ingoriya at 22.20 hrs.

Annual Report 2011-12, SLDC, MPPTCL, JBP 81

Page 86: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

4. Occurrence at 220 KV Dew as S/S :- On dtd. 27.09.2011 at about 05.59 hrs. Total intruption occurred on 132KV Main Bus at 220KV S/S Dewas due to bursting of LA of 33 KV Shipra feeder at 132KV S/S MSP Dewas. The shattered LA conductor snaped and hit to overhead 132 KV MSP-220 KV Dewas, causing phase to phase fault and tripping of 160 MVA X-mer I & II at 220 KV S/s Dewas. Due to above tripping, interruption occurred at 220 KV S/s Dewas (11 minutes), 132 KV S/s MSP-Dewas (3 minutes), 132 KV S/s BNP Dewas (4 minutes), 132 KV S/s Chapda (11 minutes) and 132 KV S/s Sonkatchh (13 minutes).

Supply normalized at 10.10 Hrs. at 220KV S/S Dewas 5. Occurrence at Satpura TPS :- On dtd. 30.09.2011 at about 12.05 hrs. 220 KV Bus-I

dead due to bus bar differential protection caused by fault occurred in 220 KV Pandhurna feeder. All connected feeders and Generator of Bus-I tripped on Bus bar differential protection resulting in tripping of all running units 3,5 & 7. Total generation loss of 215 MW (Unit #3- 35 MW, Unit # 5- 35W, & Unit # 7- 145 MW) and feeders connected with 220 KV Bus I. 220 KV Bus-II was healthy. 220 KV Bus Coupler Bus-I B-Ph. Isolator arm also found damaged.

Restoration started and unit syncronised as below : Unit No.3 : 17.55 Hrs on dtd. 30.09.2011 Unit No.5 : 13.08 Hrs on dtd. 30.09.2011 Unit No.7 : 13.45 Hrs on dtd. 30.09.2011 (6). Mal operation of bus bar protection relay at 220 KV S/s, Badnagar : On dated

10.10.2011 at 19.30 hrs, mal operation of bus bar protection relay occurred at 220 KV S/s, Badnagar resulting tripping of all connected feeders with the bus i.e. 220 KV Ratlam-I, Ratlam-II, Indore, 160 MVA CGL X-mer, 160 MVA Areva, 100 MVA Areva X-mer from 220 KV side. No interruption has been occurred to any area as the supply was available from 132 KV side. The bus bar relay has been kept out of service for investigation and will be taken back in service after rectification of the problem. The 220 KV bus has been charged within 20 min. time.

(7). Mal operation of bus bar protection relay at 220 KV S/s, Barod : On dated

31.10.2011 at 06.17 hrs, mal operation of bus bar protection relay occurred at 220 KV S/s, Barod resulting tripping of all connected feeders with the bus i.e. 220 KV Ujjain I, 220 KV Ujjain-II, 220 KV Kota, 220 KV Modak and 220 / 132 KV 160 MVA X-mer from 220 KV side. No interruption has been occurred to any area as the supply was available from 132 KV side. The bus bar relay has been kept out of service for investigation and will be taken back in service after rectification of the problem. The 220 KV bus has been charged within 01.15 hrs time.

8. Occurrence at 400 KV Nagda S/S :- On dtd. 21.12.2011 at about 05.05 hrs. all 400KV breakers of 400KV Main bus-I got tripped through 400KV bus bar protection without any indication / event / disturbance in the relay. 315MVA X’mer No. I & II were connected with Main bus-I hance total load shifted on 315MVA X’mer No.-III, thus overload scheme operated at 400KV S/S Nagda, causing total intruption to the large area around Ujjain / Ratlam / Neemuch / Badnagar. Total load interrupted was 865 MW.

Annual Report 2011-12, SLDC, MPPTCL, JBP 82

Page 87: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Restoration was started by charging ICT-I at 400Kv S/s Nagda by 06.35 Hrs. and the system fully normalized by 07.00 Hrs.

9. Tripping around Nagda, Jetpura & Badnagar area on 04.01.2012 - The 400 KV Indore-Nagda lines tripped from both ends on 04.01.2014 at about 14.17 hrs (400 KV ISP-Ngada was already open). The total load on this line mainly shifted on 220 KV Indore-Badnagar link (already carrying about 140 MW) and associated 132 KV links emanating from 220 KV S/s, Jaitpura & Ujjain. The 220 KV Indore-Badnagar feeder got tripped on over current at 14.17 hrs due to increased loading. 160 MVA, 220 /132 KV X-mers I & II also got tripped at the same time at 220 KV Sub-station Jaitpura on overloading. The load of 220 KV s/s Badnagar (140 MW), 220 KV Ratlam links (50 MW), 220 KV S/s, Jaitpura (223 KW approx.) got shifted to 400 KV Nagda ICTs (510+140+50+223 = 923 MW approx.). Due to overloading of ICTs at 400 KV Nagda, the load dropping scheme Stage-I operated and following feeders and X-mers got tripped achieving a load relief of 106 MW :

(i) 132 KV Sailana feeder (from 220 KV S/s, Ratlam) (ii) 132 KV Mahitpur I & II (from 220 KV S/s, Nagda) (iii) 132 KV I (from 220 KV S/s, Nagda) (iv) 33 KV incoming I & II of 100 MVA X-mer (from 220 S/s, Nagda) (v) 132 KV Tarana I & II (from 220 KV S/s, Ujjain)

The total load interrupted was of the order of 106 MW approximately. The restoration process started by closing Indore-Badnagar Ckt. At 14.34 hrs and 400 KV ISP-Nagda Ckt. 14.53 hrs.

10. Tripping of 400 KV feeders at Indira Sagar Pow er Station on 25.01.2012 - On

25.01.2012 at about 22.27 hrs, due to prevailing high voltages at Nagda and Indira Sagar, SLDC had given instructions to open 400 KV ISP-Nagda line. However as per SCADA archieved data, at 22:27:30 hrs 400 KV ISP-Indore Line-II and at 22:28:22 hrs 400 KV ISP-Indore Line-I got tripped. At the same time 400 KV ISP-Nagda line was opened at ISP causing outage of all the lines as the remaining line i.e. 400 KV ISP-Sarni tripped 52 milliseconds after opening of 400 KV ISP-Nagda line on high voltage. As the generating units were not running at the time of tripping there was no generation loss, however the system reliability reduced on account of these trippings. The restoration process started immediately but got delayed as the breakers at ISP could not be hold. The supply to ISP has been restored at 23.28 hrs after charging of 400 KV ISP-Indore Ckt. II and subsequently other 400 KV Ckts. From ISP have been restored.

11. System occurrence at 400 KV S/s, Bhopal on 31.01.2012 at 18.08 Hrs – A shut down

was availed by MPPTCL on 220 KV Bus-II and 315 MVA , 400/220 KV ICT No.1 at 400 KV S/s, Bhopal on 31.1.2012. After completion of work, 220 KV bus-II was charged by closing bus coupler. While normalizing the bus arrangement when 315 MV A 400/220 KV ICT –II was shifted on 220 KV Bus-II at 18.18 hrs, all 220 KV feeders & transformers tripped due to operation of 220 KV Bus-bar protection, thereby causing tripping of all the 220 KV feeders and ICTs from 220 KV side at 400 KV S/s, Bhopal. The normalization started at 18.26 hrs by charging 220 KV side of 315 MVA ICT-I with 220 KV Bus-I. At 18.31 hrs 220 KV Bus-tie charged. The restoration of the feeders and transformers done sequentially and by 18.52 hrs the complete system was normalized. There was no interruption to any area due to this tripping.

Annual Report 2011-12, SLDC, MPPTCL, JBP 83

Page 88: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

12. System occurrence at 400KV S/s Indore on 22.02.2012 - At about 10.39 Hours 220KV South Zone ckt-II tripped on B-ph, Zone-1 indication, simultaneously 220KV Bus-II Busbar protection operated hance all connected feeder to 220KV Bus-II tripped at 4ooKV S/s Indore. Same was charged by availing supply through Barwaha Ckt-II at 11.15 hrs. and there after system normalized. Due to this occurrence 10 to 20 Min interruption occurred in 220KV s/s Indore SZ and 132KV s/s Chamble, Satya-Sai, Mangliya, Indore-West & Ghatabillod.

13 Tripping of 220 KV lines on 12.03.2012 at around 19.45 hrs: - On dated 12.03.2012 at 19.40 hrs, MP system was running normal at frequency 49.9 Hz. At around 19.45 hrs, it has been reported that 220 KV Birsinghpur-Jabalpur line II was tripped and auto-reclosed at Jabalpur end and tripped from Birsinghpur end on ABC phase, Zone I & II indications. Further to the tripping mentioned as above, 220 KV IC No. 1, 2 & 4 between Birsinghpur Power House and 220 KV sub-stations also tripped from Power House end. The line fault of 220 KV Birsinghpur-Jabalpur II was cleared from Birsinghpur 220 KV sub-station end, hence the tripping of 220 KV IC No. 1, 2 & 4 appears to be due to over reach of protection. It is therefore necessary that DPR settings provided on 220 KV Birsinghpur-Birsinghpur inter connectors may be checked and corrected at SGTPS Birsinghpur end so that the unwanted trippings of lines could be avoided. Results of the DPR testing may also be intimated by the SGTPS, Birsinghpur to this office at an earliest.

14 System disturbance on 19.03.2012 at 11.02 hrs at 220 KV Satna, S/s :- On dated 19.03.2012 at 11.00 hrs, M.P. system was running normal at frequency 49.90 Hz. At around 11.02 hrs, it has been reported that at 220 KV Satna sub-station R-phase over head conductor between gantry to gantry of 220 KV Satna-Chhatarpur line snapped and fall on 220 KV Main bus-I. There was a bus fault occurred due to snapping of conductor as detailed above. All 220 KV & 132 KV line emanating from 220 KV Satna sub-station tripped, hence total supply failed. 105 MW Tons machine No. 1 & 2 also tripped. There is provision of Bus-bar protection scheme which is under commissioning, hence total supply was failed on both the bus.

Annual Report 2011-12, SLDC, MPPTCL, JBP 84

Page 89: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

EXECUTIVE SUMMARY2011-2012 V/s 2010-2011

GENERATION / ENERGY SUPPLY S. YEAR YEAR %

No. 2011-2012 2010-2011 ChangeA

1 Thermal Generation (Incl. 100 % Satpura I ) MU 15810.58 15695.48 115.10 0.73

2 Plant Utilisation Factor % 61.38 61.10 0.28 0.46

3 Hydel Generation ( Stations controlled by MPSEB ) MU 3230.53 1731.14 1499.39 86.61

B

1 THERMAL MU 15148.31 14990.97 157.35 1.05

2 HYDEL MU 3197.11 1724.23 1472.88 85.42

3 TOTAL MU 18345.42 16715.19 1630.23 9.75

C

1 THERMAL AVAILABILITY MU 13669.31 13449.12 220.19 1.64

2 HYDEL AVAILABILITY MU 3163.28 1698.73 1464.55 86.21

3 Indira Sagar (NHDC) MU 3274.79 2195.43 1079.36 49.16

4 OmKareshwar MU 1365.79 993.26 372.52 37.50

5 MP Schedule from Central Sector of WR MU 16142.81 15980.00 162.80 1.02

6 MP Schedule from Central Sector ER MU 311.88 415.46 -103.58 -24.93

7 Total MP Schedule from Central Sector (WR+ER) MU 16454.69 16395.47 59.22 0.36

8 UI Energy MU -471.87 444.05 -915.92 -206.26

9 Schedule From DVC ER MU 1056.77 690.79 365.99 52.98

10 Schedule From Sugen MU 571.68 64.22 507.46 790.24

11 Schedule from Sardar Sarovar MU 2423.83 2001.85 421.98 21.08

12 Schedule for SEZ MU 87.62 98.04 -10.42 -10.63

13 Schedule from Rihand+Matatila MU 144.51 58.30 86.21 147.88

14 Additional Power Purchase MU 1281.87 102.49 1179.38 1150.73

15 Energy Exchange MU 0.00 18.05 -18.05 -100.00

16 Banking of Energy MU -147.39 23.18 -170.57 -735.90

17 Sale of Power MU -849.37 -416.38 -433.00 103.99

18 MP Schedule Drawal Including Power Purchase MU 21024.20 19035.99 1988.21 10.44

19 MP Drawal Including Power Purchase MU 20552.33 19480.04 1072.29 5.50

20 Import from bargi Left Bank Canal Power House MU 15.33 7.95 7.38 92.90

21 Chambal - Satpura System Excess / less Overshare by MP MU 366.32 480.16 -113.85 -23.71

22 Rajghat Hydel Power Station Excess / Less Overshare by MP MU 58.52 20.06 38.45 191.66

23 Energy Purchase from Wind Farm MU 104.56 79.64 24.92 31.30

24 Purchased from ASN Biomass Katni + RDM Care Industries Biogas Pariyat MU 5.54 0.00 5.54

25 Energy Purchase from ISP NVDA MU 11.34 8.49 2.85 33.62

26 Sale of Power to SEZ by MPPTC MU -43.22 -7.01 -36.21 516.67

27 Firm / Infirm Energy of HEG Mandideep purchase by MP MU 38.93 6.27 32.66 520.51

28 Energy Purchased From Tawa HEG MU 23.23 41.46 -18.23 -43.96

29 UI of MPPGCL Thermal MU 93.11 141.33 -48.22 -34.12

30 UI OF ISP+CPP MU 4.18 0.30 3.88 1290.12

31 Wheeled Energy of Tawa HEG+Wind Farm+Ascent Hydro MU 241.64 204.05 37.59 18.42

32 NET IMPORT MU 21471.81 20462.75 1009.06 4.93

33 M.P. SUPPLY EX BUS MU 42944.98 38799.30 4145.68 10.68

34 ENERGY REQUIREMENT MU 51337.87 48619.26 2718.61 5.59

35 Shrortage % 16.35 20.20 -3.85 -19.06

D AVERAGE DAILY MP SUPPLY MU 117.34 106.30 11.04 10.38

E MAXIMUM DAILY MP SUPPLY MU 154.10 137.36 16.74 12.19

F MINIMUM DAILY MP SUPPLY MU 74.76 71.06 3.69 5.20

DifferenceP A R T I C U L A R S

GENERATION (MPPGCL)

MPPGCL GENERATION AS PER SHARE

ENERGY SUPPLY (Ex-Bus)

Annual Report 2011-12, SLDC, MPPTCL, JBP 85

Page 90: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

EXECUTIVE SUMMARY DEMAND, FREQUENCY AND SUPPLY HOURS

2011-2012 V/s 2010-2011S. YEAR YEAR %

No. 2011-2012 2010-2011 Change

1 REGISTERED MAXIMUM DEMAND MET MW 8546 8331 215.0 2.58

2 MORNING PEAK DEMAND MET MW 7720 6829 891.0 13.05

3 EVENING PEAK DEMAND MET MW 8546 8331 215.0 2.58

4 COMPUTED DEMAND MW 8946 8518 427.8 5.02

5 UNRESTRICTED DEMAND MW 8946 8758 188.0 2.15

6 FREQUENCY

a Average Frequency Hz 49.85 49.85 0.0 0.00

b Maximum Instantaneous Hz 50.95 50.80 0.2 0.30

c Minimum Instantaneous Hz 48.57 48.56 0.0 0.02

d Maximum Integrated over an hour Hz 50.71 50.57 0.1 0.28

e Minimum Integrated over an hour Hz 48.70 48.74 0.0 -0.08

7 Percentage Time when frequency was

a 50.3 TO 51.0 Hz % 0.85 1.84 -1.0 -53.62

b 50.2 TO 50.3 Hz % 1.95 3.90 -1.9 -49.95

c 49.7 TO 50.2 HZ % 65.73 68.36 -2.6 -3.85

d 49.5 TO 49.7 Hz % 23.43 14.20 9.2 65.06

e 49.2 TO 49.5 Hz % 6.65 7.75 -1.1 -14.14

g 48.8 TO 49.2 Hz % 1.26 3.64 -2.4 -65.46

h BELOW 48.8 Hz % 0.12 0.31 -0.2 -61.00

8 AVERAGE SUPPLY HOURS/DAY TO DIFFERENT SECTORa Div. Head Quarters Hrs/day 23:11 22:49

b District Head Quarters Hrs/day 21:39 20:31

c Tahsil Head Quarters Hrs/day 17:12 15:00

d Rural Three Phase Hrs/day 13:26 11:15

e Rural Single Phase Hrs/day 0:00 0:00

f Total Rural Hrs/day 13:26 11:15

9 LOAD FACTOR % % 70.80 71.61 -0.8 -1.13

P A R T I C U L A R S Difference

Annual Report 2011-12, SLDC, MPPTCL, JBP 86

Page 91: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

S No. Source Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Total30.00 31.00 30.00 31.0 31.0 30.00 31.00 30 31 31 29 31.0 366.00

A.1 Thermal 1180.46 1101.36 1077.86 1026.52 875.21 749.63 1067.04 1189.55 1421.53 1370.90 1205.70 1403.55 13669.30842 Hydel 117.26 122.66 145.86 148.33 274.44 395.30 353.40 370.71 348.06 248.38 327.47 311.42 3163.284 Total 1297.72 1224.02 1223.73 1174.84 1149.65 1144.92 1420.44 1560.26 1769.59 1619.27 1533.17 1714.97 16832.59

B.1 Indira Sagar 131.91 152.52 215.31 235.52 591.02 720.61 326.11 198.08 189.31 197.42 161.61 155.38 3274.792 Omkareshwar 60.58 71.83 111.88 128.26 213.05 251.14 132.87 84.06 81.29 86.46 72.81 71.55 1365.793 MPSEB Schedule from Central Sector of WR 1368.29 1412.80 1214.31 1393.15 1216.79 938.42 1331.43 1458.61 1475.90 1432.68 1472.99 1427.43 16142.814 MPSEB Schedule from Central Sector ER 38.24 31.92 23.35 1.00 5.31 2.85 22.88 32.09 26.28 38.77 39.25 49.94 311.885 Total MPSEB Schedule from Central Sector (WR+ER) 1406.53 1444.72 1237.67 1394.15 1222.10 941.27 1354.31 1490.70 1502.19 1471.45 1512.24 1477.37 16454.696 UI Energy 15.60 -8.62 -166.13 -194.52 -337.54 -230.63 77.78 256.76 84.71 -44.10 97.45 -22.63 -471.877 Schedule From DVC ER 73.92 83.45 24.11 0.00 0.00 0.00 47.80 125.95 201.52 177.99 169.92 152.12 1056.778 Schedule From Sugen 72.00 73.82 23.33 27.31 17.18 64.99 71.27 48.24 39.81 46.91 41.17 45.67 571.689 Schedule from Sardar Sarovar 120.75 142.16 213.85 200.24 436.40 528.62 252.02 110.74 74.48 134.27 109.86 100.43 2423.83

10 Schedule from SEZ 7.90 7.90 7.70 8.05 7.07 5.03 6.50 7.77 7.57 7.03 7.44 7.64 87.6211 Schedule from Rihand+Matatila 2.52 3.45 1.65 7.8 14.5 21.83 19.42 14.07 12.96 12.08 17.79 16.47 144.5112 Additional Power Purchase 48.93 83.08 20.86 0.00 0.00 3.47 125.84 387.65 398.71 190.73 5.49 17.10 1281.8713 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0014 Banking of Energy -53.32 -49.43 -159.62 -290.76 -355.08 -298.21 -11.95 203.40 269.59 277.69 176.33 143.95 -147.3915 Sale of Power -2.10 0.00 -47.75 -62.61 -245.28 -353.61 -75.57 0.00 0.00 0.00 -0.25 -62.21 -849.3716 MP Schedule Incl. Power Purchase 1677.13 1789.17 1321.79 1284.16 1096.87 913.40 1789.65 2388.52 2506.83 2318.14 2039.98 1898.55 21024.2017 MP Drawal Including Power Purchase 1692.73 1780.55 1155.66 1089.64 759.33 682.77 1867.43 2645.28 2591.54 2274.04 2137.44 1875.92 20552.3318 Energy Purchase from Wind Farm 7.84 13.07 12.58 13.9 8.5 7.30 4.85 3.21 5.02 7.16 9.93 11.3 104.5619 Excess Energy of HEG Tawa purchased by MPPTC 0.00 0.00 0.00 0.0 1.6 8.90 3.90 8.85 0.00 0.00 0.00 0.0 23.2320 Sale of Power to SEZ by MPPTC 0.00 -2.94 -2.85 -2.984 -4.18 -3.74 -3.46 -3.60 -4.18 -5.21 -4.87 -5.21 -43.2221 Firm / Infirm Energy of HEG Mandideep purchase by MP 2.87 0.91 1.45 2.076 2.34 2.56 1.58 2.18 8.30 4.73 4.79 5.14 38.93

22 Purchased from ASN Biomass Katni + RDM Care Industries Biogas Pariyat 0.00 0.00 0.00 0.000 0.00 0.00 0.00 0.00 1.33 2.31 1.23 0.66 5.54

23 ISP NVDA 0.00 0.00 0.00 0.0 0.9 1.82 1.19 1.15 1.72 1.82 1.53 1.2 11.3424 Import from bargi Left Bank Canal Power House -0.01 0.00 -0.01 1.093 6.6 6.78 0.85 -0.01 -0.01 -0.01 -0.01 0.00 15.3325 Chambal - Satpura System Excess / less Overshare by MP 48.53 39.47 37.04 40.047 29.5 36.01 51.98 26.58 12.75 13.10 10.88 20.43 366.3226 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.02 -0.02 -0.04 7.683 11.2 9.33 3.79 6.79 7.09 3.27 8.32 1.16 58.5227 UI of MPPGCL Thermal 17.63 10.57 5.45 6.520 -3.9 0.33 15.54 8.11 11.54 5.32 4.58 11.43 93.1128 UI OF ISP 0.59 -0.10 0.16 0.225 0.21 2.06 0.85 0.21 0.13 -0.05 -0.12 0.01 4.1829 Infirm Energy of BLA Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.01 8.0130 Wheeled Energy of Wind Farm+Ascent Hydro 18.07 29.13 31.86 32.40 21.52 14.99 11.52 7.76 9.81 15.14 21.48 19.95 233.6331 MP Supply Ex. Auxiliary 3278.44 3319.01 2792.24 2729.19 2787.27 2885.80 3839.45 4548.91 4685.25 4224.76 3962.75 3891.91 42944.9832 AVERAGE DAILY 109.28 107.06 93.07 88.0 89.9 96.19 123.85 151.63 151.14 136.28 136.65 125.55 117.3433 MINIMUM DAILY 101.91 93.26 75.52 74.8 81.5 87.38 106.09 136.53 143.18 120.43 130.26 114.66 74.7634 MAXIMUM DAILY 121.65 107.93 105.56 92.0 102.0 107.80 151.93 154.10 153.69 152.31 136.42 138.33 154.1035 M.P.SUPPLY EX.AUX.- YEAR : 2010-11 3014.17 3010.25 2697.51 2490.57 2570.4 2731.64 3360.96 3416.50 4013.67 4244.70 3616.84 3632.08 38799.3036 (11-12)*100/(10-11) 8.77 10.26 3.51 9.58 8.4 5.64 14.24 33.15 16.73 -0.47 9.56 7.15 10.6837 Unshedule L/S : Year-2011-12 7.34 5.75 2.06 2.48 2.19 44.79 124.45 164.64 257.79 47.02 50.49 37.44 746.4538 Frequency Correction 13.79 4.17 3.76 7.61 7.17 9.47 30.30 25.19 26.70 7.60 8.43 9.52 153.7139 Restricted Requirement : Year-2011-12 3299.57 3328.93 2798.06 2739.27 2796.64 2940.06 3994.20 4738.74 4969.74 4279.38 4021.67 3938.87 43845.1340 Shedule L/S : Year-2011-12 720.51 654.77 329.23 322.27 172.98 50.60 740.89 915.21 929.73 847.76 956.71 852.06 7492.7341 Un-Restricted Requirement : Year-2011-12 4020.08 3983.70 3127.29 3061.54 2969.62 2990.66 4735.09 5653.95 5899.47 5127.14 4978.39 4790.93 51337.87

M.P. Availability

Exchange with other States / Systems

ENERGY BALANCE SHEETYear : 2011 - 12

All figures in Million Unit

Annual Report 2011-12, SLDC, MPPTCL, JBP 87

Page 92: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

S.NO. Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 TotalC.1 DEMAND MET 4567 4246 4482 3853 4188 4709 5975 6872 6130 7720 5456 5467 7720.002 LOAD RELIEF 794 506 476 307 0 138 1048 947 1369 665 1728 1279 665.003 LOAD SHEDDING 0 0 0 0 0 0 250 0 305 0 0 180 0.00D.1 DEMAND MET 7310 6155 6069 5170 5403 5979 7835 7548 7399 7376 7477 8546 85462 LOAD RELIEF 0 904 709 481 0 353 0 1121 1140 1447 953 0 03 LOAD SHEDDING 0 65 145 70 0 84 0 0 324 60 326 341 341F. REGISTERED MAXIMUM 7338 6155 6069 5170 5403 6025 7973 7548 7399 7720 7477 8546 8546G. COMPUTED MAXIMUM DEMAND 7488 6200 6234 5285 5471 6386 7883 7651 7734 7829 7835 8946 8946H. UNRESTRICTED MAXIMUM DEMAND 7488 7168 6944 5767 5680 6576 8766 8846 8874 8859 8808 8946 8946I.1. Div. Head Quarters 22:43 23:00 23:22 23:12 23:42 1.00 23:06 22:45 22:45 23:26 23:07 23:08 23:112. District Head Quarters 20:57 21:19 22:13 21:56 23:21 1.00 21:23 20:04 20:18 21:42 20:55 21:43 21:393. Tahsil Head Quarters 16:44 16:34 18:45 17:40 19:47 0.93 15:15 14:33 13:58 17:23 15:52 17:36 17:124. Rural Three Phase 12:20 12:20 14:48 14:08 16:44 0.88 11:51 10:35 10:11 13:06 11:23 12:51 13:265. Rural Single Phase 0:00 0:00 0:00 0:00 0:00 0.00 0:00 0:00 0:00 0:00 0:00 0:00 0:006. Total Rural 12:20 12:20 14:48 14:08 16:44 0.88 11:51 10:35 10:11 13:06 11:23 12:51 13:26J LOAD FACTOR % 62.05 72.48 63.90 70.95 69.34 66.52 64.73 83.70 85.11 73.55 76.15 61.08 70.80

S.N PARTICULARS Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 TotalA. INTGRATED FREQUENCY1. MAXIMUM 50.23 50.69 50.33 50.3 50.5 50.47 50.29 50.10 50.15 50.71 50.35 50.26 50.712. MINIMUM 49.34 49.38 49.07 49.4 49.1 49.06 48.70 49.34 49.23 49.45 49.54 49.58 48.70B. INSTANTANEOUS FREQUENCY1. MAXIMUM 50.65 50.95 50.69 50.5 50.7 50.66 50.63 50.58 50.42 50.84 50.48 50.61 50.952. MINIMUM 48.80 49.00 48.78 48.8 48.8 48.78 48.57 48.85 48.82 48.99 49.04 49.04 48.57C. AVG FREQUENCY 49.79 49.89 49.87 49.8 49.9 49.84 49.65 49.73 49.70 49.85 49.84 49.85 49.85D. % TIME WHEN FREQUENCY WAS1. ABOVE 50.5 Hz 0.35 1.86 0.89 0.2 1.7 1.47 0.30 0.00 0.07 2.28 0.46 0.62 0.852. 50.2 TO 50.5 Hz 1.07 2.80 3.62 1.7 2.8 3.66 0.50 0.55 0.69 2.83 1.35 1.90 1.953. 49.8 TO 50.2 HZ 68.35 78.60 78.12 76.8 75.9 68.61 31.63 34.87 51.81 69.30 75.71 79.35 65.734. 49.5 TO 49.8 hZ 22.74 13.64 12.81 16.6 15.5 15.52 44.02 53.83 30.91 20.36 19.62 15.83 23.435. 49.0 TO 49.5 Hz 6.85 2.90 4.02 4.4 3.7 8.45 13.56 10.36 15.24 5.09 2.83 2.23 6.656. 48.5 TO 49.0 Hz 0.64 0.20 0.54 0.4 0.5 2.28 8.57 0.39 1.28 0.14 0.03 0.07 1.267. BELOW 48.5 Hz 0.00 0.00 0.00 0.0 0.0 0.01 1.42 0.00 0.00 0.00 0.00 0.00 0.12

ENERGY BALANCE SHEET : Demand & Sypply Hours

FREQUENCY ANALYSIS YEAR 2011-12

Average Power Supply per day to

MORNING PEAK

EVENING PEAK

Year : 2011 - 12

Annual Report 2011-12, SLDC, MPPTCL, JBP 88

Page 93: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

S.NO. PARTICULARS 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

1 MP Thermal Availability 10574.84 12365.88 11866.34 12169.97 11568.63 12133.54 12465.68 13845.55 13840.40 13449.12 13669.31

2 MP Hydel Availability 2276.56 1733.09 2627.00 2249.67 2438.45 2985.88 2831.80 2585.62 1583.22 1698.73 3163.28

3 From Central Sector 12985.16 11430.00 11292.35 11904.22 11346.88 12072.75 13667.45 13465.77 15008.51 16395.47 16454.69

4 Unschedule Interchange from Grid 194.85 179.26 783.49 416.70 -246.16 368.34 261.27 -736.90 444.05 -471.87

5 DVC ER 28.75 513.34 399.40 690.79 1056.77

6 Torrant (Sugen) 64.22 571.68

7 Indira Sagar 192.92 1318.24 2555.75 2591.96 2715.56 1562.74 2111.85 2195.43 3274.79

8 Rihand + Matatila 101.67 88.52 58.30 144.51

9 Omkareshwar 686.94 781.32 938.13 993.26 1365.79

10 Sardar Sarovar 145.62 1092.23 2016.95 2484.11 1292.96 1395.23 2001.85 2423.83

11 Additional Power Purchase 522.17 1721.91 1428.62 2387.43 1326.98 420.04 501.39 0.00 102.49 1281.87

12 Sale of Power -18.90 -141.09 -135.45 -577.72 -657.04 -147.31 -416.38 -849.37

13 Energy Exchange 22.34 6.10 15.58 0.00 18.05 0.00

14 Banking of Power 253.19 339.62 87.54 23.18 -147.39

15 Overdrawal by MP from Chmabl-Satpura 501.63 767.39 592.23 585.03 281.16 344.70 415.04 451.75 504.69 480.16 366.32

16 Overdrawal by MP from Rajghat 36.82 16.86 35.37 22.12 68.89 64.86 25.12 64.32 52.81 20.06 58.52

17 Other Import / Export 62.59 63.84 91.52 36.36 216.52 256.30 282.44 376.77 436.82 580.52 582.27

18 Total Availability / MP Supply excl. Aux. Cons. 26437.61 27094.08 28598.90 30624.44 32231.55 33434.65 36072.84 35502.64 35562.91 38799.30 42944.98

19 % Growth wrt Last Year 2.48 5.55 7.08 5.25 3.73 7.89 -1.58 0.17 9.10 10.68

19 Load Shedding 4148.59 4516.91 4133.70 4556.20 4845.70 5268.70 5025.10 6610.20 7870.90 9622.38 8239.19

20 Frequency Correction 507.80 511.72 333.17 197.58 153.71

21 Unrestricted Requirement 30586.20 31610.99 32732.60 35180.64 37077.25 38703.35 41605.74 42624.56 43766.98 48619.26 51337.87

22 Shortage in MU 4148.59 4516.91 4133.70 4556.20 4845.70 5268.70 5532.90 7121.92 8204.07 9819.96 8392.89

23 % Shortage 13.56 14.29 12.63 12.95 13.07 13.61 13.30 16.71 18.74 20.20 16.35

24 Maximum Demand Met 4632 4652 4984 5241 5780 6109 6501 7019 6215 8331 8546

25 Maximum Unrestrcited Demand 5862 6063 6033 6148 6734 7114 7132 7593 7309 8758 8946

ENERGY SUPPLY : MU

Annual Report 2011-12, SLDC, MPPTCL, JBP 89

Page 94: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

S.No. Particulars Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total1 MPSEB Thermal Availability 977.22 899.32 819.60 810.54 935.61 794.96 1025.33 1045.86 1156.73 1147.59 1101.25 1152.34 11866.342 MPSEB Hydel Availability 35.14 40.59 35.25 159.52 289.22 322.77 374.51 464.21 351.06 255.86 179.74 119.14 2627.003 Schedule / Drawal From Central Sector 823.69 865.28 788.05 841.88 869.87 840.43 910.55 960.96 1053.79 1150.85 1070.52 1116.48 11292.354 Unschedule Interchange 81.95 55.74 33.96 -2.87 -118.04 -114.97 -11.52 71.22 41.23 -1.10 98.81 44.83 179.265 Indira Sagar 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 55.54 71.31 66.07 192.926 Sardar Sarovar 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.007 Additional Power Purchase 0.00 69.90 175.74 21.60 0.00 0.00 105.79 340.47 341.03 353.60 151.67 162.11 1721.918 Sale of Power 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.009 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10 Other Imp / Exp 57.16 41.52 50.39 56.40 75.00 70.43 78.57 55.54 39.19 43.37 73.69 77.85 719.1211 Total MP Supply excl. Aux. Cons. 1975.17 1972.36 1902.99 1887.07 2051.66 1913.62 2483.23 2938.28 2983.02 3005.70 2746.98 2738.82 28598.9112 Average Supply per Day 65.84 63.62 63.43 60.87 66.18 63.79 80.10 97.94 96.23 96.96 94.72 88.35 78.14

S.No. Particulars Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total1 MPSEB Thermal Availability 1112.27 1016.91 924.20 947.70 783.13 887.01 1004.18 1063.58 1140.00 1160.25 1029.04 1101.70 12169.972 MPSEB Hydel Availability 55.98 39.89 56.50 84.04 319.70 398.27 350.18 300.07 235.29 180.95 131.93 96.59 2249.373 Schedule / Drawal From Central Sector 1107.74 1076.89 934.41 1015.69 708.95 805.29 892.83 1055.74 1129.89 1127.71 962.86 1086.21 11904.224 Unschedule Interchange 3.95 77.34 0.17 -19.37 -88.19 39.63 27.82 165.22 175.64 182.02 125.17 94.09 783.495 Indira Sagar 28.51 20.74 78.72 89.75 318.90 278.45 90.57 113.67 89.70 88.90 73.68 46.65 1318.246 Sardar Sarovar 0.00 0.00 0.00 0.00 2.33 18.33 21.53 14.89 14.90 11.95 36.20 25.48 145.627 Additional Power Purchase 126.70 132.48 63.65 0.00 0.00 0.00 128.74 264.45 222.20 154.45 229.81 106.14 1428.628 Sale of Power 0.00 0.00 0.00 0.00 0.00 -18.90 0.00 0.00 0.00 0.00 0.00 0.00 -18.909 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10 Other Imp / Exp 65.75 65.59 56.84 61.97 49.54 46.58 54.19 50.77 49.57 46.38 40.48 55.86 643.5111 Total MP Supply excl. Aux. Cons. 2500.89 2429.84 2114.49 2179.78 2094.36 2454.66 2570.03 3028.40 3057.19 2952.61 2629.17 2612.72 30624.1312 Average Supply per Day 83.36 78.38 70.48 70.32 67.56 81.82 82.90 100.95 98.62 95.25 93.90 84.28 83.90

MPSEB SUPPLY Ex POWER STATION BUS (EXCLUDING AUXILIARY CONS. ) in Million UnitsYear : 2003-2004

Year : 2004-2005

Annual Report 2011-12, SLDC, MPPTCL, JBP 90

Page 95: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

MPSEB SUPPLY Ex POWER STATION BUS (EXCLUDING AUXILIARY CONS. ) in Million Units

S.No. Particulars Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total1 MPSEB Thermal Availability 1083.26 1029.45 824.49 721.10 749.14 724.72 1006.68 1147.67 1028.39 1062.88 1014.11 1176.75 11568.632 MPSEB Hydel Availability 21.50 22.75 17.11 235.37 371.16 334.69 330.66 338.43 278.25 238.60 168.29 81.63 2438.453 Schedule / Drawal From Central Sector 1012.76 970.79 1009.86 879.34 858.64 787.44 1058.34 989.02 988.70 957.10 834.21 1000.69 11346.884 Unschedule Interchange 42.83 33.03 11.69 -193.51 1.44 -32.73 84.22 211.14 152.26 141.96 -6.45 -29.17 416.705 Indira Sagar 25.33 23.17 112.31 485.96 480.53 376.75 265.86 198.14 189.75 166.82 132.62 98.51 2555.756 Sardar Sarovar 10.62 10.84 62.43 132.27 124.76 153.96 180.84 127.58 91.98 93.91 73.72 29.33 1092.237 Additional Power Purchase 31.51 156.81 102.56 0.00 0.00 17.07 198.45 349.80 491.83 449.38 461.03 128.99 2387.438 Sale of Power 0.00 0.00 0.00 -71.27 -67.52 -2.30 0.00 0.00 0.00 0.00 0.00 0.00 -141.099 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10 Other Imp / Exp 76.60 66.33 70.55 -18.52 -10.20 25.33 58.76 57.57 72.39 57.12 41.75 68.88 566.5811 Total MP Supply excl. Aux. Cons. 2304.40 2313.16 2210.99 2170.73 2507.97 2384.92 3183.81 3419.36 3293.55 3167.77 2719.29 2555.61 32231.5512 Average Supply per Day 76.81 74.62 73.70 70.02 80.90 79.50 102.70 113.98 106.24 102.19 97.12 82.44 88.31

S.No. Particulars Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total1 MPSEB Thermal Availability 1168.25 1135.78 967.70 879.51 678.68 709.39 1009.08 1011.36 1135.93 1177.13 1076.40 1184.33 12133.542 MPSEB Hydel Availability 75.87 44.71 24.82 119.33 247.02 377.45 399.35 380.70 391.38 385.35 282.86 257.04 2985.883 Schedule / Drawal From Central Sector 943.71 996.61 884.16 862.18 780.41 845.77 1013.75 1040.88 1151.43 1204.47 1099.91 1249.48 12072.754 Unschedule Interchange -5.36 18.85 13.29 -33.37 -149.79 -125.90 -27.86 11.54 38.78 -9.06 2.47 20.26 -246.165 Indira Sagar 114.68 102.85 137.12 126.99 464.80 226.27 259.57 391.44 323.76 260.27 93.75 90.46 2591.966 Sardar Sarovar 6.68 45.68 116.95 167.94 323.98 349.87 293.88 270.24 217.13 124.37 58.64 41.60 2016.957 Additional Power Purchase 58.97 17.17 36.71 0.00 0.00 1.11 123.48 343.32 319.23 309.04 81.41 36.53 1326.988 Sale of Power 0.00 0.00 0.00 -24.93 -82.97 -27.56 0.00 0.00 0.00 0.00 0.00 0.00 -135.459 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.60 7.36 7.31 3.54 0.54 22.34

10 Other Imp / Exp 76.90 77.55 68.98 36.03 0.23 7.90 47.70 61.47 73.92 75.73 72.71 66.74 665.8611 Total MP Supply excl. Aux. Cons. 2439.70 2439.22 2249.73 2133.68 2262.36 2364.29 3118.93 3514.55 3658.92 3534.62 2771.69 2946.97 33434.6512 Average Supply per Day 81.32 78.68 74.99 68.83 72.98 78.81 100.61 117.15 118.03 114.02 98.99 95.06 91.60

Year : 2006-2007

Year : 2005-2006

Annual Report 2011-12, SLDC, MPPTCL, JBP 91

Page 96: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

MPSEB SUPPLY Ex POWER STATION BUS (EXCLUDING AUXILIARY CONS. ) in Million Units

S.No. Particulars Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total1 MPSEB Thermal Availability 1050.44 1080.91 976.02 605.59 608.78 751.88 1089.68 1182.79 1329.95 1361.30 1234.48 1193.86 12465.682 MPSEB Hydel Availability 272.46 227.55 236.78 211.17 204.54 222.35 262.59 316.41 238.32 245.46 208.63 185.54 2831.803 Schedule / Drawal From Central Sector 1162.99 1242.42 1111.29 998.49 1012.95 983.90 1219.79 1159.46 1150.35 1185.98 1171.00 1268.82 13667.454 Unschedule Interchange -18.67 -25.44 -10.12 -243.07 -97.65 76.73 35.39 138.46 154.18 72.84 154.84 130.87 368.345 Indira Sagar 91.69 99.59 133.02 523.98 436.11 175.32 247.00 272.31 283.89 248.06 97.15 86.06 2694.176 Omkareshwar 0.00 0.00 0.00 0.57 49.30 83.19 97.92 116.51 127.56 117.48 50.05 44.35 686.947 Sardar Sarovar 84.77 47.72 125.14 466.32 471.50 337.93 195.68 211.72 213.35 209.45 46.62 73.91 2484.118 DVC ER 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.43 28.32 28.759 Additional Power Purchase 9.95 0.00 0.00 0.00 0.00 0.00 0.00 31.39 95.52 101.70 119.96 61.52 420.04

10 Sale of Power 0.00 -63.45 -159.17 -96.34 -74.91 -12.90 -162.31 -4.28 -3.77 -0.59 0.00 0.00 -577.7211 Energy Exchange 2.47 1.31 0.26 0.00 0.00 0.00 0.00 1.35 0.72 0.00 0.00 0.00 6.1012 Banking 10.30 53.40 0.00 -145.69 -203.04 -181.26 100.17 171.23 176.69 174.11 85.16 12.13 253.1913 Other Imp / Exp 75.52 68.50 50.87 26.55 73.34 55.48 76.13 81.96 82.32 61.25 43.87 48.20 743.9914 Total MP Supply excl. Aux. Cons. 2741.91 2732.51 2464.10 2347.57 2480.92 2492.61 3162.05 3679.31 3849.07 3777.04 3212.18 3133.57 36072.8515 Average Supply per Day 91.40 88.15 82.14 75.73 80.03 83.09 102.00 122.64 124.16 121.84 110.76 101.08 98.56

S.No. Particulars Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total1 MPSEB Thermal Availability 1153.38 1205.82 1064.27 979.09 1044.33 1008.61 1268.77 1243.95 1241.22 1277.36 1100.23 1258.51 13845.552 MPSEB Hydel Availability 110.80 85.40 156.42 341.02 298.62 171.72 264.00 355.16 279.27 226.68 159.77 136.75 2585.623 Schedule From Central Sector 1082.26 1194.35 991.94 1022.33 1007.15 1002.95 1067.88 1191.95 1216.72 1307.38 1115.15 1265.72 13465.774 Unschedule Interchange 63.32 -24.97 -105.57 -70.37 6.25 26.23 29.27 142.73 253.94 -8.99 24.29 -74.87 261.275 Indira Sagar 75.34 83.41 109.03 186.77 142.60 119.36 158.17 233.16 140.50 122.46 112.19 79.76 1562.746 Omkareshwar 40.69 44.22 60.88 107.82 76.02 57.08 70.70 103.74 64.77 59.12 55.83 40.44 781.327 Sardar Sarovar 70.30 104.76 140.82 143.74 120.38 179.24 89.70 146.66 90.67 65.50 79.21 61.98 1292.968 DVC ER 20.83 6.85 11.99 28.06 32.17 36.36 58.67 40.47 62.72 93.84 53.66 67.72 513.349 Additional Power Purchase 43.37 2.35 0.00 0.00 0.00 19.30 141.29 220.49 74.59 0.00 0.00 0.00 501.39

10 Sale of Power 0.00 0.00 -7.20 -399.70 -155.26 -46.88 -30.26 -12.77 -4.97 0.00 0.00 0.00 -657.0411 Energy Exchange 0.53 0.19 0.31 1.59 3.84 1.94 6.36 7.27 -1.75 -2.91 -1.79 0.00 15.5812 Banking -61.59 -34.77 -79.51 -86.67 -199.25 -104.73 121.33 215.12 263.44 157.94 109.38 38.93 339.6213 Other Imp / Exp 93.77 105.89 58.50 123.93 99.58 80.95 97.96 64.81 47.40 51.91 82.86 86.96 994.5114 Total MP Supply excl. Aux. Cons. 2693.01 2773.51 2401.87 2377.62 2476.43 2552.14 3343.83 3952.73 3728.51 3350.30 2890.79 2961.91 35502.6415 Average Supply per Day 89.77 89.47 80.06 76.70 79.88 85.07 107.87 131.76 120.27 108.07 103.24 95.55 97.27

Year : 2007-2008

Year : 2008-2009

Annual Report 2011-12, SLDC, MPPTCL, JBP 92

Page 97: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

MPSEB SUPPLY Ex POWER STATION BUS (EXCLUDING AUXILIARY CONS. ) in Million Units

S.No. Particulars Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total1 MPSEB Thermal Availability 1293.39 1098.18 904.49 893.61 963.59 947.58 1218.48 1340.28 1392.04 1350.01 1168.27 1270.47 13840.402 MPSEB Hydel Availability 177.87 153.60 120.53 168.50 137.24 141.01 172.45 101.60 125.51 134.95 66.55 83.40 1583.223 Schedule From Central Sector 1160.74 1251.43 1182.45 1281.90 1226.46 1188.81 1313.64 1208.49 1344.41 1283.09 1162.46 1404.62 15008.514 Unschedule Interchange -106.42 20.82 47.97 -45.13 5.89 -215.38 -113.73 -79.86 -95.81 -26.36 -16.54 -112.35 -736.905 Indira Sagar 99.99 81.71 85.43 69.33 170.08 357.48 169.07 147.47 245.63 312.00 180.91 192.76 2111.856 Omkareshwar 51.39 43.18 46.11 50.52 81.44 136.63 69.00 60.55 100.26 130.91 80.08 88.05 938.137 Sardar Sarovar 63.66 52.57 68.00 76.37 91.72 361.95 128.50 44.86 91.69 173.62 99.42 142.88 1395.238 DVC ER 56.65 26.35 13.02 35.02 29.18 26.32 31.97 30.07 28.04 26.80 51.12 44.87 399.409 Additional Power Purchase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10 Sale of Power -5.87 -6.52 0.00 -9.95 0.00 -19.76 0.00 0.00 0.00 0.00 -15.96 -89.26 -147.3111 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0012 Banking -59.97 -53.36 -21.00 -201.97 -244.91 -219.20 51.09 217.57 278.38 170.16 123.86 46.90 87.5413 Other Imp / Exp 94.75 101.82 85.22 79.28 101.07 99.31 92.88 62.13 84.99 93.09 99.78 108.44 1082.8414 Total MP Supply excl. Aux. Cons. 2826.18 2769.78 2532.22 2397.47 2561.76 2804.76 3133.33 3133.16 3595.13 3648.28 2999.96 3180.78 35562.9115 Average Supply per Day 94.21 89.35 84.41 77.34 82.64 93.49 101.08 104.44 115.97 117.69 107.14 102.61 97.43

S.No. Particulars Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total1 MPSEB Thermal Availability 1130.38 1202.57 980.59 861.98 947.91 699.15 996.63 1191.05 1396.10 1451.07 1264.46 1327.24 13449.122 MPSEB Hydel Availability 126.87 91.61 97.60 97.15 105.45 170.35 208.31 173.14 175.82 226.04 127.52 98.86 1698.733 Schedule From Central Sector 1304.88 1345.81 1347.22 1303.44 1432.33 1143.05 1379.60 1271.25 1397.91 1539.53 1391.76 1538.68 16395.474 Unschedule Interchange -74.01 114.61 156.58 65.83 -40.24 -89.89 182.35 23.67 62.04 34.60 32.99 -24.46 444.055 Indira Sagar 158.80 96.45 74.41 137.74 98.15 409.40 211.17 164.53 224.90 245.51 184.69 189.68 2195.436 Omkareshwar 75.18 49.17 40.98 80.28 63.90 170.99 85.12 66.84 91.38 103.36 80.64 85.42 993.267 Sardar Sarovar 169.25 95.69 90.25 136.82 209.01 463.34 152.09 129.62 146.53 178.62 105.25 125.37 2001.858 DVC ER 39.54 37.32 46.74 58.98 79.58 42.38 54.68 51.84 43.85 91.03 66.63 78.22 690.799 Sugen 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.22 64.229 Additional Power Purchase 0.00 14.06 9.04 0.00 0.00 0.00 17.18 8.27 0.26 0.00 16.41 37.27 102.49

10 Sale of Power -27.09 -89.28 -86.40 -64.37 -46.47 -29.07 -42.53 0.00 0.00 0.00 -4.80 -26.37 -416.3811 Energy Exchange 0.00 0.00 0.00 8.21 5.74 4.11 0.00 0.00 0.00 0.00 0.00 0.00 18.0512 Banking -5.02 -59.38 -169.93 -277.15 -375.73 -334.66 21.52 242.25 377.88 306.31 255.59 41.50 23.1813 Other Imp / Exp 115.38 111.62 110.41 81.67 90.77 82.51 94.86 94.03 97.01 68.62 95.69 96.46 1139.0414 Total MP Supply excl. Aux. Cons. 3014.17 3010.25 2697.51 2490.57 2570.41 2731.64 3360.96 3416.50 4013.67 4244.70 3616.84 3632.08 38799.3015 Average Supply per Day 100.47 97.10 89.92 80.34 82.92 91.05 108.42 113.88 129.47 136.93 129.17 117.16 106.30

Year : 2010-2011

Year : 2009-2010

Annual Report 2011-12, SLDC, MPPTCL, JBP 93

Page 98: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

MPSEB SUPPLY Ex POWER STATION BUS (EXCLUDING AUXILIARY CONS. ) in Million Units

S.No. Particulars Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Total

1 MPSEB Thermal Availability 1180.46 1101.36 1077.86 1026.52 875.21 749.63 1067.04 1189.55 1421.53 1370.90 1205.70 1403.55 13669.31

2 MPSEB Hydel Availability 117.26 122.66 145.86 148.33 274.44 395.30 353.40 370.71 348.06 248.38 327.47 311.42 3163.28

3 Schedule From Central Sector 1406.53 1444.72 1237.67 1394.15 1222.10 941.27 1354.31 1490.70 1502.19 1471.45 1512.24 1477.37 16454.69

4 Unschedule Interchange 15.60 -8.62 -166.13 -194.52 -337.54 -230.63 77.78 256.76 84.71 -44.10 97.45 -22.63 -471.87

5 Indira Sagar 131.91 152.52 215.31 235.52 591.02 720.61 326.11 198.08 189.31 197.42 161.61 155.38 3274.79

6 Omkareshwar 60.58 71.83 111.88 128.26 213.05 251.14 132.87 84.06 81.29 86.46 72.81 71.55 1365.79

7 Sardar Sarovar 120.75 142.16 213.85 200.24 436.40 528.62 252.02 110.74 74.48 134.27 109.86 100.43 2423.83

8 DVC ER 73.92 83.45 24.11 0.00 0.00 0.00 47.80 125.95 201.52 177.99 169.92 152.12 1056.77

9 Sugen 72.00 73.82 23.33 27.31 17.18 64.99 71.27 48.24 39.81 46.91 41.17 45.67 571.68

9 Additional Power Purchase 48.93 83.08 20.86 0.00 0.00 3.47 125.84 387.65 398.71 190.73 5.49 17.10 1281.87

10 Sale of Power -2.10 0.00 -47.75 -62.61 -245.28 -353.61 -75.57 0.00 0.00 0.00 -0.25 -62.21 -849.37

11 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

12 Banking -53.32 -49.43 -159.62 -290.76 -355.08 -298.21 -11.95 203.40 269.59 277.69 176.33 143.95 -147.39

13 Other Imp / Exp 105.91 101.45 95.01 116.76 95.79 113.21 118.53 83.06 74.05 66.68 82.96 98.20 1151.61

14 Total MP Supply excl. Aux. Cons. 3278.44 3319.01 2792.24 2729.19 2787.27 2885.80 3839.45 4548.91 4685.25 4224.76 3962.75 3891.91 42944.98

15 Average Supply per Day 109.28 107.06 93.07 88.04 89.91 96.19 123.85 151.63 151.14 136.28 136.65 125.55 117.34

Year : 2011-2012

Annual Report 2011-12, SLDC, MPPTCL, JBP 94

Page 99: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Drawal Schedule UI Energy UI Charges Adjusted UI Charges

Cap Amount

Additional UI

ChargesNet UI

MU MU MU Rs. Cr. Rs. Cr. Rs. Cr. Rs. Cr. Rs. Cr.

Apr-11 1632.61 1617.01 15.60 5.94 2.71 0.50 0.918 4.12

May-11 1719.45 1728.07 -8.62 -2.27 -4.02 0.16 0.412 -3.45

Jun-11 1147.22 1313.35 -166.13 -41.06 -42.38 2.22 0.161 -40.00

Jul-11 1085.37 1279.89 -194.52 -55.82 -55.56 2.71 0.139 -52.71

Aug-11 756.40 1093.94 -337.54 -91.37 -89.84 4.76 0.076 -85.01

Sep-11 782.10 1012.72 -230.63 -61.84 -59.19 7.88 1.780 -49.53

Oct-11 1849.31 1771.53 77.78 25.93 30.94 2.57 9.558 43.07

Nov-11 2611.98 2355.22 256.76 108.09 117.22 0.28 5.187 122.68

Dec-11 2544.11 2459.41 84.71 39.76 40.29 0.81 4.249 45.35

Jan-12 2230.58 2274.68 -44.10 -6.63 -7.02 0.69 0.347 -5.98

Feb-12 2102.96 2005.51 97.45 32.74 33.87 0.09 0.18 34.15

Mar-12 1838.88 1861.51 -22.63 2.66 0.26 0.24 0.34 0.83

Total 20300.97 20772.84 -471.87 -43.88 -32.75 22.91 23.35 13.51

Month

MONTH-WISE UI CHARGES YEAR : 2011 - 12

Annual Report 2011-12, SLDC, MPPTCL, JBP 95

Page 100: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Energy MU Cr. Rs. Ps/Kwh Energy

MU Cr. Rs. Ps/Kwh Energy MU Cr. Rs. Ps/Kwh

Apr 48.72 16.30 3.34 33.12 12.18 3.68 15.60 4.12 2.64

May 26.88 5.44 2.02 35.50 8.90 2.51 -8.62 -3.45 4.01

June 1.91 0.32 1.66 168.04 40.31 2.40 -166.13 -40.00 2.41

Jul 3.72 1.51 4.05 198.24 54.22 2.74 -194.52 -52.71 2.71

Aug 5.50 0.24 0.43 343.05 85.24 2.48 -337.54 -85.01 2.52

Sep 0.00 0.33 230.63 49.86 2.16 -230.63 -49.53 2.15

Oct 106.32 53.59 5.04 28.53 10.52 3.69 77.78 43.07 5.54

Nov 256.76 122.68 4.78 0.00 0.00 256.76 122.68 4.78

Dec 87.32 45.44 5.20 2.62 0.10 0.36 84.71 45.35 5.35

Jan 19.69 8.98 4.56 63.79 14.96 2.35 -44.10 -5.98 1.36

Feb 105.24 35.94 3.42 7.79 1.80 2.30 97.45 34.15 3.50

Mar 64.55 19.64 3.04 87.18 18.80 2.16 -22.63 0.83 -0.37

Total 726.60 310.39 4.27 1198.47 296.88 2.48 -471.87 13.51 -0.29

Year : 2011-2012

Monthwise UI Payable & Receivable by MP as per UI Bills

Month

UI ENERGY & UI CHARGE (Payable)

UI ENERGY & UI CHARGE (Recievable) NET ENERGY & CHARGE

Annual Report 2011-12, SLDC, MPPTCL, JBP 96

Page 101: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Month Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Total

KSTPS 293.31 288.55 304.49 328.83 335.96 118.46 238.99 292.55 247.34 188.29 265.43 268.01 3170.21

KSTPS-III 37.18 16.28 25.98 50.20 50.77 19.27 31.83 52.45 39.94 48.53 50.67 52.88 476.00

VSTPS-I 257.36 258.65 254.67 299.64 203.21 167.79 218.77 292.86 309.87 294.24 285.72 308.83 3151.63

VSTPS-II 210.12 231.76 210.56 177.01 106.97 132.58 193.09 211.17 224.86 216.30 202.23 172.17 2288.82

VSTPS-III 176.65 180.06 122.43 138.46 150.02 117.54 167.67 164.83 169.91 176.58 156.49 176.18 1896.81

Sipat-I 39.28 68.95 76.51 75.73 66.83 1.69 328.99

Sipat-II 85.39 138.65 131.65 133.35 123.93 132.05 134.60 129.98 138.87 137.79 130.38 137.57 1554.22

Kawas Gas 50.46 45.54 7.28 34.41 22.62 27.13 63.47 37.02 59.91 21.17 60.83 75.10 504.94

Kawas NAPM Gas 17.16 11.08 13.20 12.27 53.71

Kawas Liquid 0.80 0.28 0.00 0.00 0.00 1.03 11.58 0.00 0.00 0.00 0.00 0.00 13.69

Kawas_RLNG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Gandhar GPP 47.88 46.13 12.35 29.49 14.96 23.00 29.28 61.10 43.07 49.28 37.30 43.72 437.55

Gandhar NAPM 0.00 0.82 3.88 9.43 14.13

Gandhar_LNG 0.87 0.22 0.00 0.00 0.00 0.39 7.62 0.00 0.00 0.00 0.00 0.00 9.09

KAPP 72.62 70.53 71.89 75.06 69.73 70.14 72.82 65.45 72.33 76.17 71.74 76.05 864.55

TAPs 135.65 136.16 73.01 126.70 138.62 129.05 122.43 82.25 76.12 136.70 128.27 93.53 1378.47

Kahalgaon 38.24 31.92 23.35 1.00 5.31 2.85 22.88 32.09 26.28 38.77 39.25 49.94 311.88

Total 1406.53 1444.72 1237.67 1394.15 1222.10 941.27 1354.31 1490.70 1502.19 1471.45 1512.24 1477.37 16454.69

Monthise Schedule of MP from NTPC / NPC Stations of WR and ERYear : 2011-12

Annual Report 2011-12, SLDC, MPPTCL, JBP 97

Page 102: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

JABALPUR SAGAR REWA TOTAL BHOPAL GWALIO

R TOTAL INDORE UJJAIN TOTAL

Apr-11 428.00 211.12 323.86 962.98 558.93 372.54 931.48 742.83 459.59 1202.42 3096.88

May-11 463.70 203.86 303.68 971.24 594.09 375.46 969.55 756.17 439.72 1195.89 3136.68

Jun-11 336.10 168.90 257.19 762.19 481.39 329.76 811.15 704.88 370.54 1075.42 2648.76

Jul-11 317.29 184.41 312.24 813.94 495.83 355.69 851.53 591.20 346.30 937.50 2602.97

Aug-11 336.84 199.66 314.04 850.54 517.91 371.86 889.76 573.82 351.01 924.83 2665.13

Sep-11 354.24 203.62 312.91 870.77 529.32 372.34 901.67 656.77 387.32 1044.10 2816.53

Oct-11 432.24 243.99 346.58 1022.80 658.84 449.85 1108.69 931.36 599.69 1531.04 3662.53

Nov-11 480.62 297.18 355.33 1133.13 784.30 533.51 1317.81 1014.04 862.84 1876.88 4327.82

Dec-11 510.82 312.95 375.81 1199.59 819.14 568.91 1388.04 1007.92 855.55 1863.48 4451.11

Jan-12 398.35 270.43 335.50 1004.28 768.85 520.87 1289.72 943.19 775.23 1718.42 4012.41

Feb-12 434.96 272.03 359.81 1066.80 669.82 526.79 1196.62 844.49 659.36 1503.84 3767.26

Mar-12 502.90 257.98 351.57 1112.45 633.35 519.99 1153.34 827.62 580.40 1408.01 3673.80

TOTAL 4996.07 2826.12 3948.51 11770.70 7511.76 5297.58 12809.34 9594.30 6687.54 16281.84 40861.88

YEAR 2011-12

REGIONWISE ENERGY DRAWAL OF DISCOMs (at Discom Peripheri) Incl Direct Injection from MPPGCL

TOTAL DRAWAL at Discom Peripheri

MONTH

EAST ZONE(M.P.Pu.K.V. V.C.L.)

CENTRAL ZONE(M.P.M.K.V. V.C.L.)

WEST ZONE(M.P.Pa.K.V. V.C.L.)

Annual Report 2011-12, SLDC, MPPTCL, JBP 98

Page 103: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN

Apr-11 425 399 419 400 428 401 428 401 423 414

May-11 428 398 419 399 430 399 430 409 421 395

Jun-11 426 398 422 400 430 401 431 406 424 390

Jul-11 428 394 422 399 431 405 433 405 421 412

Aug-11 428 409 428 409 430 413 431 413 422 412

Sep-11 425 402 422 399 429 402 423 421 423 387

Oct-11 424 395 420 402 425 407 429 404 420 399

Nov-11 423 375 418 388 426 381 424 394 422 397

Dec-11 426 392 418 394 425 394 426 398 421 397

Jan-12 429 397 420 398 425 396 431 402 424 400

Feb-12 424 400 419 401 426 399 426 404 421 402

Mar-12 425 396 417 400 428 397 430 400 422 407

Yeraly 429 375 428 388 431 381 433 394 424 387

MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN

Apr-11 430 403 429 383 431 398 763 741 778 728

May-11 430 403 434 374 432 404 768 733 779 732

Jun-11 431 394 431 363 437 400 765 734 783 738

Jul-11 431 407 435 371 439 407 773 741 789 745

Aug-11 434 400 431 364 441 404 768 742 786 745

Sep-11 431 394 431 380 438 397 774 738 789 731

Oct-11 430 393 428 391 431 392 774 735 787 729

Nov-11 431 390 432 384 434 390 781 725 795 739

Dec-11 428 386 431 380 431 393 784 742 798 750

Jan-12 427 389 428 373 430 395 783 748 793 753

Feb-12 432 397 432 386 434 400 782 750 791 748

Mar-12 427 396 430 377 435 404 781 750 790 753

Yeraly 434 386 435 363 441 390 784 725 798 728

Sipat SeoniMONTH

Itarsi Gwalior Khandwa

MONTH

VOLTAGE PROFILE OF MAJOR 765/400 KV SUB STATION

INDORE Bhopal Nagda Satpura Bina

Annual Report 2011-12, SLDC, MPPTCL, JBP 99

Page 104: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN

Apr-11 235 213 232 219 230 216 235 216 231 226 230 217 230 219

May-11 239 221 234 218 232 216 236 211 230 216 232 215 229 220

Jun-11 238 218 237 219 234 218 239 217 232 214 235 216 231 219

Jul-11 237 231 236 220 235 220 236 208 235 212 232 216 234 218

Aug-11 237 217 237 223 236 223 236 230 229 225 233 216 236 224

Sep-11 237 214 239 224 236 216 237 211 230 210 234 216 231 218

Oct-11 236 215 235 218 233 216 233 214 229 215 233 220 230 218

Nov-11 235 215 235 216 230 213 237 207 230 216 233 220 229 212

Dec-11 233 216 235 217 221 214 236 220 234 218 232 222 229 215

Jan-12 238 213 237 217 226 220 237 214 236 230 233 219 230 217

Feb-12 234 213 233 219 231 216 237 211 229 220 233 220 229 221

Mar-12 234 212 235 219 231 215 238 218 230 220 233 219 230 220

Yeraly 239 212 239 216 236 213 239 207 236 210 235 215 236 212

MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN

Apr-11 234 214 230 211 226 211 230 215 228 210 229 213 234 218

May-11 233 216 230 216 227 215 229 215 226 211 227 213 234 219

Jun-11 234 216 230 215 230 210 229 226 227 210 229 214 234 219

Jul-11 236 216 230 216 227 210 230 218 231 213 227 213 236 217

Aug-11 234 223 230 220 227 221 229 216 230 221 229 224 236 224

Sep-11 234 218 230 216 228 205 229 214 230 213 228 212 234 220

Oct-11 237 210 230 213 226 206 229 215 231 210 229 202 234 215

Nov-11 230 200 230 212 229 195 229 201 231 194 228 195 232 201

Dec-11 231 203 230 214 230 207 229 216 232 212 230 208 234 214

Jan-12 231 214 230 219 230 214 230 214 232 210 228 206 235 218

Feb-12 231 206 230 217 229 215 229 218 232 218 228 210 233 219

Mar-12 234 213 230 217 228 210 230 217 233 218 230 215 234 217

Yeraly 237 200 230 211 230 195 230 201 233 194 230 195 236 201

VOLTAGE PROFILE OF MAJOR 220 KV SUB STATIONS

Rewa Jabalpur Narsinghpur Damoh Bina Gwalior

Ratlam Neemuch

BhopalMONTH

MONTHIndoreDewas Shujalpur Ujjain Nagda

Annual Report 2011-12, SLDC, MPPTCL, JBP 100

Page 105: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sr. No. Station Name Unit No. From To Remarks

1 Amarkantak 3 1-Apr-11 19-Feb-12 C.O.H.

2 Amarkantak 4 1-Jun-11 14-Nov-11 C.O.H.

3 Satpura -I 1

4 Satpura -I 2

5 Satpura -I 3

6 Satpura -I 4 1-May-11 31-May-11 A.O.H.

7 Satpura -I 5 23-Jul-11 17-Aug-11 A.O.H.

8 Satpura -II 6 30-May-11 22-Jun-11 A.O.H.

9 Satpura -II 7 29-Jul-11 29-Sep-11 C.O.H.

10 Satpura -III 8 1-Jul-11 30-Jul-11 A.O.H.

11 Satpura -III 9 9-Sep-11 8-Dec-11 C.O.H.

12 Satpura -III 9 20-Jan-12 12-Mar-12 C.O.H.

13 SGTPS-I 1 26-Sep-11 23-Oct-11 A.O.H.

14 SGTPS-I 2 6-Sep-11 31-Oct-11 C.O.H.

15 SGTPS-II 3 26-Jul-11 8-Sep-11 C.O.H.

16 SGTPS-II 4 6-May-11 30-May-11 A.O.H.

17 SGTPS-III 5 Deferred

Actual Maintenance of Thermal units of MPPGCLYear : 2011-2012

Deferred

Deferred

Deferred

Annual Report 2011-12, SLDC, MPPTCL, JBP 101

Page 106: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

E ACTUAL

R GEN.

MW K MKwh % MKwh % MKwh MW MT Kg/kWH KL ml/KWH

11-12 240.0 426.415 20.23 42.46 9.96 383.95 188 333590 0.78 2886 6.77

10-11 240.0 497.532 23.66 59.03 11.86 438.50 108 395353 0.79 2851 5.73

11-12 210.0 1734.331 94.02 167.27 9.64 1567.06 220 1180628 0.68 843 0.49

10-11 210.0 1420.757 77.23 141.63 9.97 1279.13 223 967397 0.68 1289 0.91

11-12 450.0 2160.746 67.91 209.73 9.71 1951.01 397 1514218 0.70 3729 1.73

10-11 450.0 1918.289 48.66 200.66 10.46 1717.63 327 1362750 0.71 4140 2.16

11-12 312.5 1655.669 60.32 186.55 11.27 1469.12 260 1799799 1.09 22511 13.60

10-11 312.5 1761.077 64.33 184.08 10.45 1577.00 270 1770123 1.01 18435 10.47

11-12 410.0 1980.641 55.00 210.47 10.63 1770.18 385 1960488 0.99 7462 3.77

10-11 410.0 2089.135 58.17 225.21 10.78 1863.92 385 2122987 1.02 12602 6.03

11-12 420.0 1750.363 47.44 208.06 11.89 1542.31 375 1778569 1.02 10751 6.14

10-11 420.0 2205.355 59.94 245.79 11.15 1959.57 400 2236992 1.01 13668 6.20

11-12 1142.5 5386.673 53.68 605.07 11.23 4781.60 1293 5538856 1.03 40724 7.56

10-11 1142.5 6055.567 60.51 655.08 10.82 5400.49 1021 6130102 1.01 44705 7.38

11-12 420.0 2037.692 55.23 207.67 10.19 1830.03 405 1543599 0.76 5095 2.50

10-11 420.0 1910.842 51.94 218.83 11.45 1692.01 356 1593839 0.83 5711 2.99

11-12 420.0 2499.001 67.74 251.66 10.07 2247.35 426 1856305 0.74 5048 2.02

10-11 420.0 2144.929 58.30 221.18 10.31 1923.75 427 1694537 0.79 3488 1.63

S.G.T.P.S. III 11-12 500.0 3726.47 84.85 196.35 5.27 3530.12 521 2449126 0.66 2608 0.70

10-11 500.0 3665.852 83.70 191.99 5.24 3473.86 520 2513377 0.69 1888 0.52

11-12 1340.0 8263.161 67.40 655.67 7.93 7607.49 1339 5849029 0.71 12751 1.54

10-11 1340.0 7721.623 65.78 632.01 8.18 7089.61 1280 5801753 0.75 11087 1.44

11-12 2932.5 15810.580 61.38 1470.48 9.30 14340.10 2621 12902104 0.82 57204 3.62

10-11 2932.5 15695.479 61.10 1487.74 9.48 14207.74 2488 13294605 0.85 59932 3.82

11-12 2807.5 15148.312 1395.85 9.21 13752.46

10-11 2807.5 14991.048 1414.11 9.43 13576.94

GENERATION PERFORMANCE REPORT Year : 2011-2012 Vs 2010-2011 (up to Mar)

T H E R M A L

MAX. DEMA

NDCOAL COSUMED OIL CONSUMEDSENT OUT

YEARSTATION NAME

AUX. CONS.P.L.F.CAPA-CITY

AMARKANTAK II

AMARKANTAK

SATPURA I

SATPURA II

AMARKANTAK III

MPPGCL THERMALShare

SATPURA III

SATPURA

S.G.T.P.S. I

S.G.T.P.S.II

S.G.T.P.S.

MPPGCL THERMAL

Annual Report 2011-12, SLDC, MPPTCL, JBP 102

Page 107: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

ACTUAL

GENE. INFLOW CONS.MW MKwh MKwh % MKwh MW MAFT MCM FT/M

11-12 115 293.739 0.86 0.29 292.88 118 0.00 2.38 1278.55

10-11 115 89.447 0.94 1.05 88.51 94 0.00 0.00 1249.39

11-12 172 363.560 0.43 0.12 363.13 172

10-11 172 174.400 0.43 0.25 173.97 172

11-12 99 277.500 0.56 0.20 276.94 99

10-11 99 146.276 0.33 0.23 145.95 99

11-12 386 934.799 1.85 0.20 932.95

10-11 386 410.123 1.71 0.42 408.42

11-12 193 467.400 0.93 0.20 466.47

10-11 193 205.061 0.85 0.42 204.21

11-12 160 440.191 0.77 0.18 439.42 161 0.00 477.66

10-11 160 305.699 0.74 0.24 304.96 160 0.00 483.90 482.38

11-12 107 293.461 0.51 0.18 292.95

10-11 107 203.799 0.49 0.24 203.31

11-12 90 534.139 0.81 0.15 533.33 90 414.15

10-11 90 401.725 0.66 0.16 401.07 94 0.00 6731.16 414.40

11-12 315 1370.496 3.74 0.27 1366.76 315 277.70

10-11 315 687.145 2.59 0.38 684.55 315 275.90

11-12 20 44.486 0.20 0.46 44.28 20 476.39

10-11 20 33.693 0.23 0.69 33.46 20 476.03

11-12 60 54.987 0.51 0.92 54.48 61 337.42

10-11 60 65.952 1.09 1.65 64.86 40 328.54

11-12 30 107.666 0.43 0.39 107.24 29 337.70

10-11 30 63.695 0 0.74 63.22 28 328.60

11-12 45 120.368 0.86 0.71 119.51 44 359.55

10-11 45 41.262 0.55 1.33 40.72 34 357.00

11-12 22.5 60.184 0.43 0.71 59.76

10-11 22.5 20.631 0.27 1.33 20.36

11-12 20 98.119 0.67 0.68 97.45 21 337.70

10-11 20 18.403 0.38 2.08 18.02 17 328.70

11-12 40 165.863 0.52 0.32 165.34 62 334.05

10-11 40 24.122 0.32 1.33 23.80 58 324.85

11-12 1166 3871.114 10.36 0.27 3860.76

10-11 1106 2051.819 8.74 0.43 2043.08

11-12 895 3230.055 9.36 0.29 3220.69 869

10-11 895 1731.143 7.97 0.46 1723.17 752

11-12 897.5 3196.800 8.74 0.27 3188.06

10-11 897.5 1724.227 7.37 0.43 1716.86

11-12 3705 18345.113 1404.60 7.66 16940.51

10-11 3705 16715.275 1421.48 8.50 15293.80

GENERATION PERFORMANCE REPORT Year : 2011-2012 Vs 2010-2011 (up to Mar)

H Y D E L

STATION NAME YEARCAPA-CITY AUX. CONS. SENT

OUT AT END LEVEL

MAX. DEMAN

D

RANAPRATAPSAGAR

JAWAHARSAGAR

MP HYDELShare

B.SGR(Jinha)

MADIKHEDA

B.SGR(SILPARA)

WATER

B.SGR(DEOLONDH)

CHAMBAL

M.P.CHAMBAL

PENCH

BIRSINGHPUR

M.P. PENCH

BARGI

TONS

GANDHISAGAR

MP TOTALShare

RAJGHAT

M.P.RAJGHAT

TOTAL HYDEL

MPPGCL ..HYDEL

Annual Report 2011-12, SLDC, MPPTCL, JBP 103

Page 108: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

UNIT No. APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TotalAMK #3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.8 40.8 41.548AMK # 4 48.1 67.5 0.6 0.0 0.0 0.0 0.0 26.6 58.2 64.5 66.2 53.1 384.867

AMK PH II 48.1 67.5 0.6 0.0 0.0 0.0 0.0 26.6 58.2 64.5 67.0 93.9 426.415AMK PH III 129.7 156.9 149.9 138.4 139.2 139.9 157.552 126.2 149.7 152.8 144.8 149.5 1734.331

AMK COMP. 177.7 224.4 150.5 138.4 139.2 139.9 157.6 152.8 207.9 217.3 211.8 243.3 2160.746STP # 1 29.9 31.9 31.6 27.9 30.0 26.9 32.5 30.8 30.9 27.8 27.6 30.3 358.245STP # 2 29.9 35.9 26.7 27.9 15.8 23.0 30.5 28.9 26.6 21.3 27.8 30.1 324.404STP # 3 31.0 0.1 25.5 31.0 27.0 24.1 29.6 31.9 33.8 31.7 25.5 28.3 319.518STP # 4 32.7 29.1 23.5 16.3 11.1 21.0 35.2 35.5 32.5 33.9 31.3 33.7 335.705STP # 5 26.3 29.8 7.5 24.7 26.7 29.1 29.5 31.0 27.4 31.9 25.4 28.5 317.797

STP PH I 149.8 126.8 114.8 127.7 110.7 124.1 157.4 158.1 151.2 146.7 137.5 150.9 1655.669STP # 6 74.4 71.7 68.5 89.8 0.0 2.7 105.6 112.2 115.7 118.9 116.3 110.3 985.733STP # 7 71.4 77.7 44.3 5.3 75.8 88.7 97.5 114.8 108.2 101.7 102.6 107.0 994.908

STP PH II 145.8 149.3 112.8 95.1 75.8 91.3 203.0 226.9 223.9 220.6 218.9 217.3 1980.641STP # 8 61.2 72.8 89.1 85.3 83.9 20.1 0.0 0.0 91.2 121.3 111.3 111.4 847.608STP # 9 90.4 92.8 73.3 90.4 86.6 75.7 107.7 90.3 87.4 59.1 0.0 49.0 902.755

STP PH III 151.6 165.6 162.4 175.7 170.5 95.8 107.7 90.3 178.5 180.5 111.3 160.4 1750.363STP COMP 447.1 441.7 390.0 398.6 357.0 311.2 468.1 475.3 553.6 547.7 467.6 528.7 5386.673SGTP # 1 90.4 98.1 94.6 72.8 63.5 70.7 25.3 115.5 123.4 92.1 88.0 111.9 1046.317SGTP # 2 97.4 93.9 80.1 74.4 59.4 16.5 0.2 76.0 125.7 128.0 119.5 120.3 991.374

SGTP PH I 187.8 192.0 174.7 147.2 122.9 87.2 25.4 191.5 249.1 220.2 207.5 232.3 2037.691SGTP # 3 101.2 104.2 86.3 84.8 0.0 56.1 119.8 103.4 124.3 124.7 108.3 131.7 1144.789SGTP # 4 122.6 20.3 111.0 111.8 116.6 109.3 135.0 136.2 124.3 121.7 119.1 126.3 1354.210

SGTP PH II 223.8 124.5 197.3 196.5 116.6 165.4 254.8 239.7 248.6 246.5 227.4 257.9 2498.999SGTP PH III 341.2 299.1 333.5 317.1 275.9 182.4 344.3 316.4 367.9 334.4 268.3 346.0 3726.468

SGTP COMP. 752.8 615.6 705.5 660.9 515.4 435.0 624.5 747.5 865.6 801.0 703.2 836.2 8263.158Total MPPGCL 1377.6 1281.6 1246.1 1197.8 1011.6 886.1 1250.2 1375.7 1627.2 1566.0 1382.6 1608.2 15810.577

A) THERMALUNIT No. APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTALAMK #3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.93 45.67 3.942AMK #4 55.62 75.59 0.73 0.00 0.00 0.00 0.00 30.84 65.24 72.23 79.31 59.45 36.512

AMK PH II 27.81 37.79 0.36 0.00 0.00 0.00 0.00 15.42 32.62 36.12 40.12 52.56 20.227AMK PH III 85.77 100.41 99.13 88.57 89.08 92.53 100.84 83.46 95.78 97.81 99.04 95.66 94.020

AMK COMP. 54.86 67.01 46.46 41.33 41.57 43.18 47.06 47.17 62.09 64.91 67.62 72.67 54.664STP # 1 66.37 68.63 70.31 60.01 64.60 59.78 69.96 68.43 66.40 59.79 63.52 65.25 65.254STP # 2 66.55 77.18 59.44 59.92 33.99 51.01 65.61 64.15 57.25 45.91 63.90 64.63 59.090STP # 3 68.78 0.11 56.57 66.71 58.04 53.64 63.72 70.95 72.72 68.22 58.58 60.93 58.200STP # 4 72.69 62.60 52.19 35.06 23.92 46.58 75.67 78.84 69.81 72.88 71.90 72.52 61.149STP # 5 58.40 64.09 16.67 53.02 57.47 64.76 63.45 68.93 58.99 68.61 58.28 61.26 57.887

STP PH I 66.56 54.52 51.04 54.94 47.60 55.15 67.68 70.26 65.03 63.08 63.24 64.92 60.316STP # 6 51.64 48.17 47.55 60.33 0.00 1.85 70.93 77.88 77.76 79.88 83.52 74.12 56.110STP # 7 47.22 49.70 29.28 3.41 48.51 58.65 62.40 75.92 69.24 65.09 70.20 68.50 53.935

STP PH II 49.37 48.95 38.19 31.17 24.84 30.94 66.56 76.88 73.40 72.30 76.70 71.24 54.996STP # 8 40.46 46.60 58.95 54.62 53.71 13.29 0.00 0.00 58.34 77.66 76.12 71.30 45.950STP # 9 59.79 59.38 48.48 57.86 55.44 50.06 68.94 59.74 55.93 37.85 0.00 31.38 48.939

STP PH III 50.12 52.99 53.71 56.24 54.57 31.67 34.47 29.87 57.14 57.76 38.06 51.34 47.445STP COMP 54.35 51.96 47.41 46.89 42.00 37.83 55.07 57.79 65.13 64.43 58.81 62.20 53.675SGTP # 1 59.79 62.81 62.55 46.61 40.64 46.75 16.17 76.38 78.99 58.97 60.19 71.64 56.722SGTP # 2 64.41 60.09 52.98 47.62 38.03 10.90 0.10 50.25 80.46 81.93 81.78 77.01 53.743

SGTP PH I 62.10 61.45 57.76 47.11 39.33 28.82 8.13 63.31 79.72 70.45 70.99 74.33 55.233SGTP # 3 66.91 66.69 57.11 54.24 0.00 37.10 76.69 68.41 79.58 79.82 74.09 84.26 62.060SGTP # 4 81.08 12.99 73.38 71.55 74.61 72.30 86.40 90.10 79.56 77.92 81.52 80.82 73.413

SGTP PH II 73.99 39.84 65.25 62.90 37.30 54.70 81.54 79.26 79.57 78.87 77.80 82.54 67.737SGTP PH III 94.79 80.40 92.65 85.24 74.17 50.67 92.55 87.89 98.89 89.89 77.08 93.00 84.847

SGTP COMP. 78.02 61.75 73.13 66.29 51.69 45.09 62.64 77.48 86.83 80.34 75.40 83.87 70.202TOTAL 65.25 58.74 59.02 54.90 46.36 41.97 57.30 65.16 74.58 71.78 67.74 73.71 61.379

MONTHWISE UNITWISE THERMAL GENERATION IN MU FOR THE YEAR 2011-2012

MONTHWISE P.L.F. IN % FOR THE YEAR 2010-2011

Annual Report 2011-12, SLDC, MPPTCL, JBP 104

Page 109: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

UNIT No. APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR ANNUAL

G. SAGAR #1 0.00 0.32 0.08 0.00 0.08 1.75 5.55 13.35 12.44 10.32 11.96 6.60 62.449

G. SAGAR #2 0.21 0.64 0.71 0.00 0.27 1.92 5.58 13.49 10.74 6.50 9.35 5.33 54.745

G. SAGAR #3 0.06 0.53 0.75 0.00 0.28 1.37 4.60 12.49 12.24 10.55 12.05 6.73 61.648

G. SAGAR #4 0.21 0.44 0.81 0.00 0.31 1.90 5.42 13.16 8.72 5.89 9.09 5.34 51.281

G. SAGAR #5 0.16 0.28 0.48 0.00 0.32 2.53 7.37 17.83 11.13 7.16 10.45 5.91 63.616

G. SAGAR 0.64 2.20 2.84 0.00 1.26 9.46 28.51 70.32 55.27 40.41 52.91 29.91 293.739

PENCH #1 12.32 4.74 17.80 5.37 13.28 36.49 22.93 23.03 24.76 18.70 22.00 17.34 218.777

PENCH #2 5.83 9.62 23.58 8.73 9.69 41.85 28.31 15.45 23.46 17.78 20.30 16.84 221.414

PENCH COMP 18.15 14.36 41.38 14.11 22.97 78.34 51.24 38.48 48.21 36.48 42.29 34.18 440.191

BARGI #1 15.67 8.15 13.84 23.72 33.34 32.43 33.55 31.89 9.72 4.79 13.67 22.69 243.466

BARGI #2 19.99 18.58 13.69 23.81 33.07 32.16 33.57 31.04 27.01 12.50 22.56 22.68 290.673

BARGI 35.66 26.74 27.53 47.53 66.40 64.59 67.13 62.93 36.73 17.30 36.23 45.37 534.139

TONS #1 14.03 1.57 15.51 12.55 27.32 46.28 54.35 42.23 41.43 42.87 67.46 72.31 437.882

TONS #2 23.32 30.47 37.97 7.92 32.09 54.06 59.59 55.44 54.12 55.71 70.30 74.03 555.006

TONS #3 26.93 46.76 19.54 20.91 44.92 62.65 65.45 43.31 45.89 0.00 0.00 1.25 377.608

TONS 64.27 78.79 73.02 41.38 104.32 162.99 179.38 140.98 141.44 98.58 137.75 147.59 1370.496

DEVLOND#1 0.00 0.00 0.00 0.00 2.49 12.21 3.42 0.00 0.00 0.00 0.00 0.00 18.120

DEVLOND#2 0.00 0.00 0.00 0.00 2.59 12.29 3.45 0.00 0.00 0.00 0.00 0.00 18.330

DEVLOND#3 0.00 0.00 0.00 0.00 2.99 12.16 3.38 0.00 0.00 0.00 0.00 0.00 18.537

DEVLONE 0.00 0.00 0.00 0.00 8.07 36.66 10.25 0.00 0.00 0.00 0.00 0.00 54.987

SILPARA 1 4.12 3.83 3.77 0.21 0.05 3.79 7.01 9.10 8.63 5.55 7.81 8.01 61.882

SILPARA 2 2.18 3.06 1.01 0.39 1.19 3.86 6.53 5.85 5.92 4.38 5.47 5.96 45.784

SILPARA 6.30 6.88 4.78 0.60 1.24 7.65 13.54 14.95 14.55 9.93 13.28 13.97 107.666

BANSAGAR IV -1 0.00 0.00 0.00 0.21 1.36 6.00 7.35 7.46 7.79 5.93 7.24 6.46 49.799

BANSAGAR IV -2 0.00 0.00 0.00 0.02 0.95 6.16 7.34 7.45 7.69 4.77 6.97 6.97 48.320

BANSAGAR IV 0.00 0.00 0.00 0.23 2.31 12.17 14.69 14.91 15.48 10.69 14.21 13.43 98.119

B'PUR 0.00 0.00 2.59 9.89 14.47 14.46 2.08 0.13 0.07 0.39 0.32 0.09 44.486

RAJGHAT #1 0.00 0.00 0.00 3.32 7.42 5.99 1.18 2.24 5.69 1.69 5.26 2.13 34.917

RAJGHAT #2 0.00 0.00 0.00 7.62 9.49 10.20 4.27 9.95 6.98 3.46 7.72 0.33 60.021

RAJGHAT #3 0.00 0.00 0.00 4.90 6.08 3.02 2.39 1.47 1.81 1.61 4.14 0.00 25.430

RAJGHAT 0.00 0.00 0.00 15.84 22.99 19.21 7.84 13.66 14.48 6.76 17.12 2.46 120.368

MADHIKHEDA-1 0.09 0.00 2.66 11.19 15.31 8.27 1.24 3.65 4.04 4.21 1.69 3.76 56.105

MADHIKHEDA-2 0.05 0.00 2.15 10.04 15.15 7.89 1.82 3.57 4.02 2.76 1.68 3.72 52.841

MADHIKHEDA-3 0.05 0.00 3.44 10.66 15.40 8.38 1.94 3.78 3.54 4.34 1.53 3.87 56.917

MADHIKHEDA 0.19 0.00 8.25 31.89 45.87 24.53 5.00 10.99 11.60 11.30 4.90 11.35 165.863

R.P.SAGAR 0.01 1.33 3.18 0.04 0.00 1.68 13.80 74.92 77.86 66.02 72.49 52.22 363.560

J.SAGAR 0.78 1.13 4.01 2.67 14.49 16.56 10.89 47.84 51.03 43.48 48.78 35.87 277.500

TOTAL HYDEL 125.22 128.97 160.38 161.46 289.91 430.06 379.67 367.34 337.84 231.85 318.99 298.36 3230.055

MONTHWISE UNITWISE HYDEL GENERATION IN MU FOR THE YEAR 2010-2011

Annual Report 2011-12, SLDC, MPPTCL, JBP 105

Page 110: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

MKWH PLF % MKWH PLF % MKWH PLF % MKWH PLF % MKWH PLF % MKWH PLF % MKWH PLF % MKWH PLF % MKWH PLF % MKWH PLF %

APR 1261.17 77.08 1156.90 70.71 1304.75 79.74 1264.35 77.27 1354.19 82.76 1224.94 74.86 1343.22 74.02 1497.14 73.24 1332.52 63.11 1377.59 65.25

MAY 1198.05 70.86 1059.56 62.67 1210.21 71.58 1195.56 70.71 1318.54 77.99 1255.79 74.27 1396.58 68.67 1291.98 60.15 1401.88 64.25 1281.63 58.74

TOTAL 2459.22 73.92 2216.46 66.62 2514.96 75.59 2459.92 73.94 2672.73 80.34 2480.73 74.56 2739.80 71.30 2789.12 66.59 2734.40 63.69 2659.22 61.94

JUN 1021.63 62.44 982.15 60.03 1095.99 66.98 981.48 59.99 1127.68 68.92 1140.09 69.68 1228.25 59.71 1051.71 50.54 1156.76 54.79 1246.06 59.02

TOTAL 3480.85 70.13 3198.61 64.45 3610.95 72.76 3441.39 69.34 3800.41 76.57 3620.82 72.95 3968.05 67.48 3840.83 61.30 3891.16 60.76 3905.28 60.98

JUL 1167.67 69.06 967.02 57.20 1125.40 66.56 863.49 51.07 1034.87 61.21 728.88 43.11 1169.74 56.53 1045.52 47.51 1022.77 46.88 1197.82 54.90

TOTAL 4648.52 69.86 4165.63 62.60 4736.35 71.18 4304.88 64.70 4835.28 72.67 4349.69 65.37 5137.79 64.70 4886.35 57.79 4913.93 57.23 5103.10 59.43

AUG 1060.60 62.73 1113.41 65.85 931.81 55.11 892.35 52.78 807.56 47.76 733.26 43.37 1219.62 63.59 1136.79 52.73 1121.49 51.40 1011.56 46.36

TOTAL 5709.12 68.42 5279.04 63.26 5668.16 67.93 5197.23 62.28 5642.84 67.62 5082.96 60.91 6357.41 64.47 6023.14 56.77 6035.43 56.05 6114.66 56.78

SEP 1114.61 68.12 951.06 58.13 1048.96 64.11 865.59 52.90 785.09 47.98 891.67 54.50 1173.88 58.81 1101.68 52.18 838.18 39.70 886.11 41.97

TOTAL 6823.73 68.37 6230.10 62.42 6717.12 67.30 6062.83 60.74 6427.93 64.40 5974.63 59.86 7531.29 63.38 7124.81 55.97 6873.61 53.37 7000.77 54.36

OCT 1275.57 75.44 1210.60 71.60 1187.36 70.23 1169.59 69.18 1155.09 68.32 1267.31 74.96 1467.05 71.12 1400.43 64.19 1169.35 53.60 1250.19 57.30

TOTAL 8099.30 69.39 7440.70 63.75 7904.49 67.72 7232.42 61.97 7583.02 64.97 7241.94 61.66 8998.34 64.67 8525.24 57.23 8042.95 53.40 8250.96 54.78

NOV 1271.78 77.73 1231.31 75.25 1251.67 76.50 1328.93 81.22 1175.17 71.82 1368.19 79.52 1438.36 72.06 1525.40 72.25 1388.30 65.75 1375.71 65.16

TOTAL 9371.08 70.42 8672.01 65.17 9156.16 68.80 8561.36 64.33 8758.19 65.81 8610.14 63.85 10436.70 65.69 10050.64 59.16 9431.26 54.92 9626.67 56.06

DEC 1312.52 77.63 1355.12 80.15 1333.77 78.89 1198.29 70.87 1310.88 77.53 1532.64 80.29 1438.80 69.75 1594.61 73.09 1613.66 73.96 1627.16 74.58

TOTAL 10683.60 71.23 10027.13 66.85 10489.93 69.94 9759.64 65.07 10069.07 67.13 10142.77 65.71 11875.50 66.20 11645.24 60.79 11044.91 57.07 11253.83 58.15

JAN 1408.35 83.30 1345.76 79.60 1354.89 80.14 1242.32 73.48 1359.35 80.40 1559.82 80.51 1464.56 71.00 1548.09 70.96 1669.09 76.50 1565.99 71.78

TOTAL 12091.95 72.45 11372.89 68.15 11844.82 70.97 11001.96 65.92 11428.42 68.48 11702.59 67.21 13340.06 66.73 13193.33 61.87 12714.00 59.04 12819.82 59.53

FEB 1156.49 75.73 1288.45 81.46 1204.73 78.89 1180.57 77.31 1217.11 79.70 1414.30 76.71 1278.97 68.65 1346.39 68.32 1454.44 73.81 1382.61 67.74

TOTAL 13248.44 72.73 12661.34 69.30 13049.54 71.64 12182.53 66.88 12645.53 69.42 13116.90 68.03 14619.03 66.91 14539.72 62.43 14168.44 60.27 14202.42 60.24

MAR 1310.65 77.52 1353.78 80.07 1301.31 76.97 1358.30 80.34 1371.04 81.09 1383.44 78.41 1460.86 70.19 1471.49 67.44 1527.04 69.99 1608.15 73.71

TOTAL 14559.09 73.14 14015.12 70.21 14350.85 72.09 13540.83 68.02 14016.57 70.41 14500.34 68.91 16079.89 67.21 16011.21 62.86 15695.48 61.10 15810.58 61.38

11-12

MONTHWISE/PROGRESSIVE THERMAL GENERATION & PLANT LOAD FACTOR 08-09 09-1007-08

MONTH

02-03 10-1103-04 04-05 06-0705-06

Annual Report 2011-12, SLDC, MPPTCL, JBP 106

Page 111: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

ATPS PH-II 209.0 395.0 29.0 0.0 0.0 0.0 0.0 569.0 242.0 130.0 660.0 652.0 2886.0

ATPS PH-III 200.4 1.5 59.4 74.0 42.7 0.0 0.0 417.8 47.0 0.0 0.0 0.0 842.8

AMARKANTAK COMP 409.4 396.5 88.4 74.0 42.7 0.0 0.0 986.8 289.0 130.0 660.0 652.0 3728.8

STPS PH-I 1642.5 1222.0 1655.6 2785.7 1787.0 1978.9 1871.1 1724.0 1944.7 1978.9 2289.0 1632.0 22511.4

STPS PH-II 901.1 780.5 1354.69 1212.6 542.0 819.1 409.3 386.8 500.4 187.0 86.2 282.2 7461.9

STPS PH-III 1557.6 890.1 1476.4 2553.6 1260.9 792.6 226.0 185.4 584.5 326.7 26.5 870.6 10751.1

SATPURA COMP. 4101.2 2892.6 4486.7 6551.9 3590.0 3590.6 2506.5 2296.2 3029.7 2492.6 2401.6 2784.8 40724.4

SGTPS PH-I 556.0 402.0 596.0 756.0 466.0 259.3 544.0 470.0 227.7 288.0 331.0 199.0 5095.0

SGTPS PH-II 453.0 537.0 752.5 500.0 323.8 1230.0 146.0 231.0 244.0 349.0 197.0 85.0 5048.3

SGTPS PH-III 51.0 74.0 50.0 701.0 382.0 242.0 0.0 146.0 101.0 288.0 341.0 232.0 2608.0

SGTPS COMP. 1060.0 1013.0 1398.5 1957.0 1171.8 1731.3 690.0 847.0 572.7 925.0 869.0 516.0 12751.2

TOTAL THERMAL 5570.6 4302.1 5973.6 8582.9 4804.5 5321.9 3196.5 4129.9 3891.4 3547.6 3930.6 3952.8 57204.4

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

ATPS PH-II 154.0 380.0 5.0 0.0 0.0 0.0 0.0 271.0 171.0 70.0 532.0 606.0 2189.0

ATPS PH-III 72.9 1.5 28.5 27.3 19.8 0.0 0.0 315.2 16.8 0.0 0.0 0.0 481.9

AMARKANTAK COMP 226.9 381.5 33.5 27.3 19.8 0.0 0.0 586.2 187.8 70.0 532.0 606.0 2670.9

STPS PH-I 1642.5 1222.0 1655.6 2785.7 1787.0 1978.9 1871.1 1724.0 1944.7 1978.9 2289.0 1632.0 22511.4

STPS PH-II 749.0 657.0 1203.6 1132.7 480.9 664.9 299.6 310.1 478.3 162.9 57.8 189.2 6386.0

STPS PH-III 1335.1 787.6 1400.4 2315.2 1160.3 676.0 226.0 141.3 436.2 319.6 24.7 642.8 9465.4

SATPURA COMP. 3726.6 2666.7 4259.7 6233.6 3428.2 3319.8 2396.8 2175.4 2859.2 2461.5 2371.5 2464.0 38362.9

SGTPS PH-I 419.0 402.0 458.1 497.0 270.0 144.3 58.0 308.0 137.9 101.0 184.0 104.0 3083.3

SGTPS PH-II 359.0 461.0 576.2 441.0 309.0 786.0 47.0 66.0 109.0 279.0 79.0 85.0 3597.2

SGTPS PH-III 40.0 45.0 36.0 586.0 219.0 140.0 0.0 78.0 76.0 259.0 258.0 150.0 1887.0

SGTPS COMP. 818.0 908.0 1070.3 1524.0 798.0 1070.3 105.0 452.0 322.9 639.0 521.0 339.0 8567.5

TOTAL THERMAL 4771.5 3956.2 5363.5 7784.8 4246.0 4390.1 2501.8 3213.5 3369.9 3170.5 3424.5 3409.0 49601.3

M.P. THERMAL 4114.5 3467.3 4701.2 6670.6 3531.2 3598.6 1753.3 2523.9 2592.0 2378.9 2508.9 2756.2 40596.7

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

ATPS PH-II 55.0 15.0 24.0 0.0 0.0 0.0 0.0 298.0 71.0 60.0 128.0 46.0 697.0

ATPS PH-III 127.5 0.0 30.9 46.8 22.9 0.0 0.0 102.6 30.3 0.0 0.0 0.0 360.9

AMARKANTAK COMP 182.5 15.0 54.9 46.8 22.9 0.0 0.0 400.6 101.3 60.0 128.0 46.0 1057.9

STPS PH-I 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

STPS PH-II 152.1 123.5 151.1 80.0 61.1 154.2 109.7 76.7 22.1 24.1 28.3 93.0 1075.9

STPS PH-III 222.5 102.4 75.9 238.4 100.7 116.6 0.0 44.2 148.3 7.1 1.8 227.8 1285.6

SATPURA COMP. 374.6 225.9 227.0 318.4 161.8 270.8 109.7 120.9 170.4 31.1 30.1 320.8 2361.5

SGTPS PH-I 137.0 0.0 137.9 259.0 196.0 115.0 486.0 162.0 89.8 187.0 147.0 95.0 2011.7

SGTPS PH-II 94.0 76.0 176.3 59.0 14.8 444.0 99.0 165.0 135.0 70.0 118.0 0.0 1451.1

SGTPS PH-III 11.0 29.0 14.0 115.0 163.0 102.0 0.0 68.0 25.0 29.0 83.0 82.0 721.0

SGTPS COMP. 242.0 105.0 328.2 433.0 373.8 661.0 585.0 395.0 249.8 286.0 348.0 177.0 4183.7

TOTAL THERMAL 799.1 345.9 610.1 798.1 558.5 931.8 694.7 916.4 521.5 377.1 506.1 543.8 7603.2

M.P. THERMAL 496.7 445.2 522.2 581.9 1152.2 645.9 789.6 1394.8 432.2 290.2 628.8 443.1 7822.8

MONTHWISE SEC. OIL CONSUMPTION IN K.L FOR THE YEAR 2011-12

MONTHWISE FURNACE OIL CONSUMPTION IN KL FOR THE YEAR 2011-12

MONTHWISE HSD / LDO IN KL FOR THE YEAR 2011-12

Annual Report 2011-12, SLDC, MPPTCL, JBP 107

Page 112: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

ATPS PH-II 4.35 5.85 46.25 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 21.35 4.16 2.02 9.85 6.95 6.77

ATPS PH-III 1.55 0.01 0.40 0.53 0.31 0.00 0.00 3.31 0.31 0.00 0.00 0.00 0.49

AMARKANTAK COMP 2.30 1.77 0.59 0.53 0.31 0.00 0.00 6.46 1.39 0.60 3.12 2.68 1.73

STPS PH-I 10.97 9.64 14.42 21.81 16.15 15.95 11.89 10.91 12.86 13.49 16.64 10.81 13.60

STPS PH-II 6.18 5.23 12.02 12.75 7.15 8.97 2.02 1.70 2.24 0.85 0.39 1.30 3.77

STPS PH-III 10.28 5.38 9.09 14.53 7.39 8.28 2.10 2.05 3.27 1.81 0.24 5.43 6.14

SATPURA COMP. 9.17 6.55 11.50 16.44 10.06 11.54 5.35 4.83 5.47 4.55 5.14 5.27 7.56

SGTPS PH-I 2.96 2.09 3.41 5.14 3.79 2.97 21.40 2.45 0.91 1.31 1.60 0.86 2.50

SGTPS PH-II 2.02 4.31 3.81 2.54 2.78 7.44 0.57 0.96 0.98 1.42 0.87 0.33 2.02

SGTPS PH-III 0.15 0.25 0.15 2.21 1.38 1.33 0.00 0.46 0.27 0.86 1.27 0.67 0.70

SGTPS COMP. 1.41 1.65 1.98 2.96 2.27 3.98 1.10 1.13 0.66 1.15 1.24 0.62 1.54

TOTAL THERMAL 4.04 3.36 4.79 7.17 4.75 6.01 2.56 3.00 2.39 2.27 2.84 2.46 3.62

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

ATPS PH-II 3.20 5.63 7.97 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 10.17 2.94 1.09 7.94 6.46 5.13

ATPS PH-III 0.56 0.01 0.19 0.20 0.14 0.00 0.00 2.50 0.11 0.00 0.00 0.00 0.28

AMARKANTAK COMP 1.28 1.70 0.22 0.20 0.14 0.00 0.00 3.84 0.90 0.32 2.51 2.49 1.24

STPS PH-I 10.97 9.64 14.42 21.81 16.15 15.95 11.89 10.91 12.86 13.49 16.64 10.81 13.60

STPS PH-II 5.14 4.40 10.68 11.91 6.35 7.28 1.48 1.37 2.14 0.74 0.26 0.87 3.22

STPS PH-III 8.81 4.76 8.62 13.17 6.80 7.06 2.10 1.56 2.44 1.77 0.22 4.01 5.41

SATPURA COMP. 8.34 6.04 10.92 15.64 9.60 10.67 5.12 4.58 5.16 4.49 5.07 4.66 7.12

SGTPS PH-I 2.23 2.09 2.62 3.38 2.20 1.66 2.28 1.61 0.55 0.46 0.89 0.45 1.51

SGTPS PH-II 1.60 3.70 2.92 2.24 2.65 4.75 0.18 0.28 0.44 1.13 0.35 0.33 1.44

SGTPS PH-III 0.12 0.15 0.11 1.85 0.79 0.77 0.00 0.25 0.21 0.77 0.96 0.43 0.51

SGTPS COMP. 1.09 1.47 1.52 2.31 1.55 2.46 0.17 0.60 0.37 0.80 0.74 0.41 1.04

TOTAL THERMAL 3.46 3.09 4.30 6.50 4.20 4.95 2.00 2.34 2.07 2.02 2.48 2.12 3.14

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

ATPS PH-II 1.14 0.22 38.28 0.00 0.00 0.00 0.00 11.18 1.22 0.93 1.91 0.49 1.63

ATPS PH-III 0.98 0.00 0.21 0.34 0.16 0.00 0.00 0.81 0.20 0.00 0.00 0.00 0.21

AMARKANTAK COMP 1.03 0.07 0.37 0.34 0.16 0.00 0.00 2.62 0.49 0.28 0.60 0.19 0.49

STPS PH-I 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

STPS PH-II 1.04 0.83 1.34 0.84 0.81 1.69 0.54 0.34 0.10 0.11 0.13 0.43 0.54

STPS PH-III 1.47 0.62 0.47 1.36 0.59 1.22 0.00 0.49 0.83 0.04 0.02 1.42 0.73

SATPURA COMP. 0.84 0.51 0.58 0.80 0.45 0.87 0.23 0.25 0.31 0.06 0.06 0.61 0.44

SGTPS PH-I 0.73 0.00 0.79 1.76 1.59 1.32 19.12 0.85 0.36 0.85 0.71 0.41 0.99

SGTPS PH-II 0.42 0.61 0.89 0.30 0.13 2.68 0.39 0.69 0.54 0.28 0.52 0.00 0.58

SGTPS PH-III 0.03 0.10 0.04 0.36 0.59 0.56 0.00 0.21 0.07 0.09 0.31 0.24 0.19

SGTPS COMP. 0.32 0.17 0.47 0.66 0.73 1.52 0.94 0.53 0.29 0.36 0.49 0.21 0.51

TOTAL THERMAL 0.58 0.27 0.49 0.67 0.55 1.05 0.56 0.67 0.32 0.24 0.37 0.34 0.48

MONTHWISE HSD /LDO CONSUMPTION IN ML/KWH FOR THE YEAR 2011-12

MONTHWISE SEC. OIL CONSUMPTION IN IN ML/KWH FOR THE YEAR 2011-12

MONTHWISE FURNACE OIL CONSUMPTION IN ML/KWH FOR THE YEAR 2011-12

Annual Report 2011-12, SLDC, MPPTCL, JBP 108

Page 113: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR ANNUAL

AMARKANTAK PH-II 37286 51037 377 0 0 0 0 20977 45994 50797 53117 74005 333590

AMARKANTAK PH-III 84903 100599 92530 92681 98161 100990 103720 87935 103804 106600 100683 108022 1180628

AMARKANTAK COMP. 122189 151636 92907 92681 98161 100990 103720 108912 149798 157397 153800 182027 1514218

SATPURA PH-I 161055 134377 124034 137905 127366 140200 183784 168240 156683 149185 142785 174185 1799799

SATPURA PH-II 165948 167211 117000 104161 81108 97089 205218 227518 200869 198514 192669 203183 1960488

SATPURA PH-III 172569 185401 172175 189646 182276 102585 108867 90557 160162 162443 101916 149972 1778569

SATPURA COMP. 499572 486989 413209 431712 390750 339874 497869 486315 517714 510142 437370 527340 5538856

SGTPS PH-I 144435 144811 132559 113615 99189 70653 20537 136756 184802 163841 157382 175019 1543599

SGTPS PH-II 165290 90125 143742 145678 88383 130591 204578 166055 180589 181087 169603 190584 1856305

SGTPS PH-III 226621 205058 225962 212941 193755 121358 227502 210183 248829 207546 161941 207430 2449126

SGTPS COMP. 536346 439994 502262 472234 381327 322602 452617 512994 614220 552474 488926 573033 5849029

TOTAL THERMAL 1158107 1078619 1008378 996627 870238 763466 1054206 1108221 1281732 1220013 1080096 1282400 12902104

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

AMARKANTAK PH-II 0.78 0.76 0.60 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0.79 0.79 0.79 0.79 0.79 0.78

AMARKANTAK PH-III 0.65 0.64 0.62 0.67 0.71 0.72 0.66 0.70 0.69 0.70 0.70 0.72 0.68

AMARKANTAK COMP. 0.69 0.68 0.62 0.67 0.71 0.72 0.66 0.71 0.72 0.72 0.73 0.75 0.70

SATPURA PH-I 1.08 1.06 1.08 1.08 1.15 1.13 1.17 1.06 1.04 1.02 1.04 1.15 1.09

SATPURA PH-II 1.14 1.12 1.04 1.10 1.07 1.06 1.01 1.00 0.90 0.90 0.88 0.93 0.99

SATPURA PH-III 1.14 1.12 1.06 1.08 1.07 1.07 1.01 1.00 0.90 0.90 0.92 0.93 1.02

SATPURA COMP. 1.12 1.10 1.06 1.08 1.09 1.09 1.06 1.02 0.94 0.93 0.94 1.00 1.03

SGTPS PH-I 0.77 0.75 0.76 0.77 0.81 0.81 0.81 0.71 0.74 0.74 0.76 0.75 0.76

SGTPS PH-II 0.74 0.72 0.73 0.74 0.76 0.79 0.80 0.69 0.73 0.73 0.75 0.74 0.74

SGTPS PH-III 0.66 0.69 0.68 0.67 0.70 0.67 0.66 0.66 0.68 0.62 0.60 0.60 0.66

SGTPS COMP. 0.71 0.71 0.71 0.71 0.74 0.74 0.72 0.69 0.71 0.69 0.70 0.69 0.71

TOTAL THERMAL 0.84 0.84 0.81 0.83 0.86 0.86 0.84 0.81 0.79 0.78 0.78 0.80 0.82

MONTHWISE COAL CONSUMPTION IN MT (YEAR 2011-2012)

MONTHWISE Sp. COAL CONSUMPTION IN kg/kwh (YEAR 2011-2012)

Annual Report 2011-12, SLDC, MPPTCL, JBP 109

Page 114: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

AMARKANTAK PH-II 4.5 6.6 0.8 0.7 0.0 0.0 0.0 3.2 5.5 6.2 6.9 8.1 42.5

AMARKANTAK PH-III 12.4 14.3 13.7 13.4 14.5 14.0 14.5 12.6 14.2 14.9 14.0 14.8 167.3

AMARKANTAK COMP. 16.9 21.0 14.4 14.1 14.5 14.0 14.5 15.8 19.7 21.1 20.9 22.9 209.7

SATPURA PH-I 16.8 15.9 14.1 15.5 12.7 13.8 16.4 16.3 16.4 16.3 15.5 16.9 186.6

SATPURA PH-II 16.7 17.5 14.4 11.3 9.4 11.1 20.7 22.0 22.5 22.2 21.5 21.1 210.5

SATPURA PH-III 18.7 20.6 21.0 21.3 20.3 13.0 12.6 11.4 20.1 19.6 11.9 17.6 208.1

SATPURA COMP. 52.1 54.1 49.5 48.2 42.4 37.8 49.7 49.7 59.0 58.1 48.9 55.5 605.1

SGTPS PH-I 20.0 21.4 20.7 17.6 15.8 12.1 5.1 19.9 23.1 17.6 16.6 17.7 207.7

SGTPS PH-II 22.6 14.1 20.1 20.3 11.9 17.0 24.1 22.0 22.2 25.7 23.9 27.6 251.7

SGTPS PH-III 16.1 16.3 19.5 20.7 16.6 11.7 17.1 15.7 17.9 16.4 12.2 16.3 196.3

SGTPS COMP. 58.7 51.7 60.3 58.6 44.2 40.9 46.3 57.7 63.2 59.8 52.7 61.6 655.7

TOTAL THERMAL 127.7 126.8 124.3 120.9 101.0 92.7 110.5 123.2 141.9 139.0 122.5 140.0 1470.5

M.P. THERMAL 121.0 120.4 118.7 114.7 96.0 87.2 103.9 116.7 135.4 132.4 116.3 133.2 1395.9

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

AMARKANTAK PH-II 9.41 9.84 125.02 0.00 0.00 0.00 0.00 12.07 9.51 9.55 10.25 8.59 9.96

AMARKANTAK PH-III 9.53 9.12 9.11 9.67 10.40 10.01 9.21 10.00 9.47 9.77 9.68 9.91 9.64

AMARKANTAK COMP. 9.50 9.34 9.59 10.16 10.40 10.01 9.21 10.36 9.48 9.71 9.86 9.40 9.71

SATPURA PH-I 11.20 12.57 12.28 12.16 11.47 11.13 10.42 10.30 10.83 11.09 11.28 11.17 11.27

SATPURA PH-II 11.43 11.73 12.80 11.93 12.34 12.10 10.19 9.71 10.06 10.09 9.83 9.70 10.63

SATPURA PH-III 12.31 12.47 12.92 12.14 11.93 13.54 11.68 12.61 11.26 10.85 10.69 10.95 11.89

SATPURA COMP. 11.65 12.25 12.70 12.10 11.87 12.16 10.61 10.46 10.66 10.61 10.46 10.50 11.23

SGTPS PH-I 10.66 11.12 11.85 11.98 12.82 13.93 20.02 10.39 9.27 8.01 8.02 7.63 10.19

SGTPS PH-II 10.11 11.32 10.21 10.34 10.17 10.28 9.47 9.20 8.94 10.43 10.51 10.70 10.07

SGTPS PH-III 4.71 5.44 5.84 6.52 6.00 6.43 4.96 4.97 4.86 4.91 4.53 4.70 5.27

SGTPS COMP. 7.80 8.40 8.55 8.87 8.57 9.39 7.42 7.72 7.30 7.46 7.50 7.37 7.93

TOTAL THERMAL 9.27 9.89 9.97 10.09 9.99 10.46 8.84 8.96 8.72 8.87 8.86 8.70 9.30

M.P. THERMAL 9.14 9.88 10.00 10.05 9.84 10.51 8.68 8.77 8.55 8.68 8.65 8.47 9.16

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

GANDHISAGAR 0.08 0.07 0.07 0.08 0.08 0.07 0.07 0.06 0.07 0.08 0.07 0.07 0.86

R.P.SAGAR 0.03 0.04 0.05 0.03 0.03 0.02 0.03 0.04 0.04 0.04 0.04 0.04 0.43

J.SAGAR 0.03 0.03 0.03 0.02 0.03 0.02 0.02 0.02 0.03 0.27 0.02 0.02 0.56

TOT.CHAMBAL 0.14 0.14 0.16 0.14 0.13 0.11 0.12 0.13 0.14 0.39 0.13 0.13 1.85

M.P.CHAMBAL 0.07 0.07 0.08 0.07 0.07 0.06 0.06 0.06 0.07 0.20 0.06 0.06 0.93

PENCH 0.06 0.07 0.06 0.05 0.05 0.08 0.07 0.05 0.07 0.06 0.07 0.07 0.77

M.P. PENCH 0.04 0.05 0.04 0.03 0.04 0.06 0.05 0.04 0.04 0.04 0.05 0.05 0.51

BARGI 0.06 0.08 0.08 0.06 0.03 0.06 0.06 0.06 0.15 0.05 0.06 0.06 0.81

TONS 0.23 0.29 0.29 0.23 0.38 0.44 0.46 0.34 0.33 0.22 0.25 0.30 3.74

BANSAGAR(DEVLONE) 0.09 0.07 0.07 0.08 0.03 0.02 0.03 0.02 0.02 0.03 0.03 0.03 0.51

BANSAGAR(SILPARA) 0.04 0.05 0.03 0.00 0.03 0.04 0.03 0.06 0.06 0.02 0.02 0.04 0.43

BANSAGAR IV 0.00 0.02 0.02 0.03 0.04 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.67

MADHIKHEDA 0.04 0.05 0.03 0.05 0.05 0.05 0.05 0.05 0.03 0.04 0.04 0.35 0.84

BIRSINGHPUR 0.01 0.01 0.01 0.03 0.04 0.03 0.02 0.02 0.02 0.01 0.01 0.01 0.20

RAJGHAT 0.00 0.04 0.08 0.10 0.13 0.07 0.06 0.06 0.07 0.07 0.08 0.09 0.86

M.P.RAJGHAT 0.00 0.02 0.04 0.05 0.06 0.04 0.03 0.03 0.03 0.03 0.04 0.05 0.43

TOTAL HYDEL 0.61 0.7 0.7 0.7 0.9 0.94 0.9 0.8 0.9 0.7 0.7 1.1 9.7

M.P. Share 0.58 0.7 0.7 0.6 0.8 0.86 0.9 0.8 0.8 0.7 0.6 1.0 9.1

MONTHWISE THERMAL POWER HOUSEWISE AUX. CONSUMPTION IN M.U FOR THE YEAR 2011-2012

MONTHWISE POWER HOUSEWISE AUX. CONSUMPTION IN % FOR THE YEAR 2011-2012

MONTHWISE HYDEL POWER HOUSEWISE AUX. CONSUMPTION IN M.U FOR THE YEAR 2011-2012

Annual Report 2011-12, SLDC, MPPTCL, JBP 110

Page 115: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

GANDHISAGAR 12.18 3.25 2.36 0.00 6.13 0.73 0.23 0.09 0.13 0.19 0.13 0.22 0.29

R.P.SAGAR 286.56 2.76 1.69 79.37 0.00 1.13 0.22 0.05 0.05 0.06 0.05 0.07 0.12

J.SAGAR 4.08 2.74 0.86 0.81 0.17 0.14 0.20 0.05 0.05 0.63 0.05 0.06 0.20

TOT.CHAMBAL 9.86 2.99 1.55 5.08 0.84 0.40 0.22 0.07 0.08 0.26 0.07 0.11 0.20

M.P.CHAMBAL 9.86 2.99 1.55 5.08 0.84 0.40 0.22 0.07 0.08 0.26 0.07 0.11 0.20

PENCH 0.34 0.50 0.15 0.36 0.23 0.11 0.13 0.14 0.14 0.17 0.16 0.20 0.18

M.P. PENCH 0.34 0.50 0.15 0.36 0.23 0.11 0.13 0.14 0.14 0.17 0.16 0.20 0.18

BARGI 0.16 0.32 0.27 0.13 0.05 0.10 0.09 0.10 0.40 0.29 0.15 0.13 0.15

TONS 0.36 0.36 0.40 0.54 0.36 0.27 0.26 0.24 0.23 0.22 0.18 0.20 0.27

BANSAGAR(DEVLONE) 0.00 0.00 0.00 0.00 0.32 0.05 0.28 0.00 0.00 0.00 0.00 0.00 0.92

BANSAGAR(SILPARA) 0.70 0.67 0.70 0.70 2.66 0.46 0.24 0.40 0.41 0.17 0.14 0.30 0.39

BANSAGAR IV 0.00 0.00 0.00 12.52 1.70 0.64 0.55 0.53 0.53 0.72 0.55 0.61 0.68

MADHIKHEDA 22.27 0.00 0.38 0.17 0.11 0.20 1.09 0.48 0.30 0.34 0.73 3.05 0.50

BIRSINGHPUR 0.00 0.00 0.54 0.27 0.25 0.23 0.89 12.33 23.65 3.14 3.89 6.50 0.46

RAJGHAT 0.00 0.00 0.00 0.63 0.56 0.39 0.81 0.45 0.46 0.02 0.49 3.67 0.71

M.P. RAJGHAT 0.00 0.00 0.00 0.63 0.56 0.39 0.81 0.45 0.46 1.03 0.49 3.67 0.71

TOTAL HYDEL 0.48 0.58 0.46 0.44 0.29 0.22 0.25 0.22 0.26 0.28 0.22 0.36 0.30

M.P. HYDEL 0.48 0.56 0.47 0.42 0.27 0.22 0.25 0.20 0.24 0.29 0.19 0.32 0.28

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

AMARKANTAK PH-II 43.5 60.8 -0.2 -0.7 0.0 0.0 0.0 23.4 52.7 58.3 60.1 85.8 384.0

AMARKANTAK PH-III 117.3 142.6 136.2 125.0 124.7 125.9 143.0 113.6 135.5 137.9 130.7 134.6 1567.1

AMARKANTAK COMP. 160.9 203.4 136.1 124.3 124.7 125.9 143.0 137.0 188.2 196.2 190.9 220.4 1951.0

SATPURA PH-I 133.0 110.8 100.7 112.2 98.0 110.3 141.0 141.8 134.8 130.4 122.0 134.1 1469.1

SATPURA PH-II 129.1 131.8 98.3 83.7 66.4 80.3 182.4 204.9 201.4 198.3 197.3 196.2 1770.2

SATPURA PH-III 132.9 144.9 141.4 154.4 150.2 82.8 95.1 78.9 158.4 160.9 99.4 142.9 1542.3

SATPURA COMP. 395.0 387.6 340.5 350.4 314.6 273.4 418.5 425.6 494.6 489.6 418.7 473.2 4781.6

SGTPS PH-I 167.8 170.7 154.0 129.6 107.2 75.0 20.3 171.6 226.0 202.5 190.9 214.5 1830.0

SGTPS PH-II 201.1 110.4 177.2 176.2 104.7 148.4 230.7 217.6 226.4 220.7 203.5 230.3 2247.3

SGTPS PH-III 325.2 282.8 314.1 296.4 259.3 170.7 327.2 300.7 350.0 318.0 256.1 329.7 3530.1

SGTPS COMP. 694.1 563.9 645.2 602.2 471.2 394.1 578.2 689.9 802.4 741.2 650.5 774.6 7607.5

TOTAL THERMAL 1249.9 1154.8 1121.8 1076.9 910.5 793.4 1139.7 1252.5 1485.2 1427.0 1260.1 1468.2 14340.1

M.P. THERMAL 1196.7 1110.5 1081.5 1032.0 871.3 749.3 1083.3 1195.8 1431.3 1374.9 1211.3 1414.5 13752.5

POWER STATION APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL

GANDHISAGAR 0.6 0.0 2.8 -0.1 1.2 9.4 28.4 70.3 55.2 40.3 52.8 29.8 292.9

R.P.SAGAR 0.0 1.3 3.1 0.0 0.0 1.7 13.8 74.9 77.8 66.0 72.4 52.2 363.1

J.SAGAR 0.7 1.1 4.0 2.6 14.5 16.5 10.9 47.8 51.0 43.2 48.8 35.8 276.9

TOT.CHAMBAL 1.3 4.5 9.9 2.6 15.6 27.6 53.1 193.0 184.0 149.5 174.0 117.9 932.9

M.P.CHAMBAL 0.6 2.3 4.9 1.3 7.8 13.8 26.5 96.5 92.0 74.8 87.0 58.9 466.5

PENCH 18.1 0.0 0.0 14.1 22.9 78.3 51.2 38.4 48.1 36.4 42.2 34.1 439.4

M.P. PENCH 12.1 9.5 27.5 9.4 15.3 52.2 34.1 25.6 32.1 24.3 28.1 22.7 292.9

BARGI 35.6 26.7 27.5 47.5 66.4 64.5 67.1 62.9 36.6 17.2 36.2 45.3 533.3

TONS 64.0 78.5 72.7 41.2 103.9 162.6 178.9 140.6 141.1 98.4 137.5 147.3 1366.8

BANSAGAR(DEVLONE) -0.1 -0.1 -0.1 -0.1 8.0 36.6 10.2 0.0 0.0 0.0 0.0 0.0 54.5

BANSAGAR(SILPARA) 6.3 6.8 4.7 0.6 1.2 7.6 13.5 14.9 14.5 9.9 13.3 13.9 107.2

BANSAGAR IV 0.0 0.0 0.0 0.2 2.3 12.1 14.6 14.8 15.4 10.6 14.1 13.4 97.5

MADHIKHEDA 0.1 0.0 8.2 31.8 45.8 24.5 4.9 10.9 11.6 11.3 4.9 11.0 165.0

BIRSINGHPUR 0.0 0.0 2.6 9.9 14.4 14.4 2.1 0.1 0.1 0.4 0.3 0.1 44.3

RAJGHAT 0.0 0.0 -0.1 15.7 22.9 19.1 7.8 13.6 14.4 6.7 17.0 2.4 119.5

M.P. RAJGHAT 0.0 0.0 0.0 7.9 11.4 9.6 3.9 6.8 7.2 3.3 8.5 1.2 59.8

TOTAL HYDEL 124.6 111.8 118.3 160.7 289.1 429.1 378.7 366.5 337.0 231.2 318.3 297.3 3220.4

M.P. HYDEL 118.7 123.6 148.1 149.6 276.6 397.9 355.9 373.2 350.5 250.1 329.9 313.8 3187.8

MONTHWISE HYDEL POWER HOUSEWISE SENT OUT IN M.U FOR THE YEAR 2011-2012

MONTHWISE HYDEL POWER HOUSEWISE AUX. CONSUMPTION IN % FOR THE YEAR 2011-2012

MONTHWISE THERMAL POWER HOUSEWISE SENT OUT IN M.U FOR THE YEAR 2011-2012

Annual Report 2011-12, SLDC, MPPTCL, JBP 111

Page 116: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

ON 1st MAX. MIN. ON 1st MAX. MIN. ON 1st MAX. MIN.FEET FEET FEET METER METER METER METER METER METER

Apr-11 1249.36 1249.36 1248.35 482.35 482.35 481.37 414.35 414.35 411.95May-11 1248.26 1248.26 1246.59 481.34 481.34 480.27 411.80 411.80 404.20Jun-11 1246.53 1246.53 1245.08 480.22 480.22 477.10 408.15 412.05 408.15Jul-11 1245.10 1256.50 1245.10 477.04 480.05 477.04 412.45 420.80 412.45Aug-11 1256.85 1288.62 1256.85 480.08 485.90 480.08 420.90 423.00 420.90Sep-11 1290.14 1301.92 1290.14 486.20 490.00 486.20 422.20 423.00 422.05Oct-11 1301.89 1301.89 1300.13 489.54 489.54 488.33 422.80 422.80 421.65Nov-11 1299.98 1299.98 1295.35 488.23 488.23 486.46 421.60 421.60 419.80Dec-11 1295.17 1295.17 1290.95 486.43 486.43 484.23 419.70 419.70 418.35Jan-12 1290.87 1290.87 1287.52 484.16 484.16 482.56 418.30 418.30 418.10Feb-12 1287.36 1287.36 1282.28 482.52 482.52 480.03 418.05 418.05 416.65Mar-12 1282.13 1282.13 1278.55 479.93 479.93 477.66 416.60 416.60 414.15

Max/Min 1301.92 1245.08 490.00 477.04 423.00 404.20

ON 1st MAX. MIN. ON 1st MAX. MIN. ON 1st MAX. MIN.METER METER METER METER METER METER METER METER METER

Apr-11 476.02 476.02 475.70 357.00 357.00 356.70 328.51 328.51 327.66May-11 475.70 475.70 475.37 356.70 356.70 356.15 327.64 327.64 326.50Jun-11 475.37 476.26 475.30 356.15 367.65 355.10 326.46 329.13 325.92Jul-11 476.31 476.31 475.38 361.45 368.50 361.45 329.44 333.63 329.44Aug-11 476.29 476.60 476.29 368.60 369.90 368.60 333.71 340.53 333.71Sep-11 476.51 476.91 476.51 369.95 371.00 369.95 340.55 341.78 340.55Oct-11 476.47 476.83 476.47 371.00 371.00 370.80 341.69 341.69 341.21Nov-11 476.54 476.62 476.54 370.75 370.75 369.10 341.19 341.19 340.52Dec-11 476.62 476.68 476.65 369.05 369.05 367.20 340.49 340.49 339.67Jan-12 476.66 476.76 476.66 367.10 367.10 366.15 339.64 339.64 339.28Feb-12 476.68 476.68 476.61 366.05 366.05 362.10 339.25 339.25 338.42Mar-12 476.60 476.60 476.39 362.00 362.00 359.55 338.39 338.39 337.42

Max/Min 476.60 476.91 475.30 362.00 371.00 355.10 338.39 341.78 325.92

ON 1st MAX. MIN. ON 1st MAX. MIN. ON 1st MAX. MIN.METER METER METER METER METER METER METER METER METER

Apr-11 251.31 251.31 249.88 188.68 188.93 188.59 118.64 119.09 117.19May-11 249.84 249.84 247.56 188.67 188.93 188.63 117.25 117.36 115.53Jun-11 247.47 247.47 244.70 188.85 188.90 188.53 115.39 116.05 112.86Jul-11 244.63 253.59 244.24 188.58 188.73 188.50 112.77 117.58 112.77Aug-11 253.82 259.94 253.82 188.60 189.00 188.50 117.55 127.11 116.62Sep-11 259.71 259.98 252.62 189.00 189.90 188.98 124.57 125.56 121.94Oct-11 259.52 259.52 258.22 188.96 189.00 188.63 121.95 121.95 120.80Nov-11 258.17 258.17 257.17 188.91 188.99 188.80 121.49 121.54 120.94Dec-11 257.15 257.15 255.92 188.90 189.00 188.79 120.86 120.96 120.76Jan-12 255.88 255.88 254.12 188.96 189.00 188.79 120.96 121.07 119.51Feb-12 254.07 254.07 252.67 188.98 188.99 188.86 119.39 119.39 117.53Mar-12 252.64 252.64 251.12 188.94 189.00 188.50 117.39 117.45 115.49

Max/Min 259.98 244.24 189.90 188.50 127.11 112.77

MONTH

BIRSINGHPUR RAJGHAT BANSAGAR

INDIRA SAGAR OMKARESHWAR SARDAR SAROVAR

RESERVOIR LEVEL OF HYDEL POWER STATION : 2011-12

MONTH

PENCH BARGIGANDHISAGARMONTH

Annual Report 2011-12, SLDC, MPPTCL, JBP 112

Page 117: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sr. No Station Name 2011-12 2010-11 2009-10 2008-09 2007-08 2006-07 2005-06 2004-05 2003-04 2002-03

1 Amarkantak-I --- --- --- 21.15 27.57 36.60 34.30 39.64 41.93 51.85

2 Amarkantak-II 20.23 23.66 29.38 48.23 45.95 63.03 45.31 48.78 46.78 57.83

3 Amarkantak-III 94.02 77.23 78.57 7.80 --- --- --- --- --- ---

4 Amarkantak Comple 54.66 60.50 45.95 43.56 42.78 58.47 43.41 47.20 45.94 56.80

5 Sanjay Gandhi -I 55.23 51.94 51.44 60.75 64.31 68.27 53.65 66.41 62.74 62.59

6 Sanjay Gandhi -II 67.74 58.30 67.24 75.99 73.92 78.65 78.36 82.28 76.19 79.50

7 Sanjay Gandhi -III 84.85 83.70 77.15 66.93 --- --- --- --- ---

8 SGTPS Complex 70.20 65.04 65.98 68.00 69.12 73.46 66.00 74.34 69.47 71.05

9 Satpura-I 60.32 64.33 65.69 71.38 74.52 68.78 72.47 77.49 77.11 80.28

10 Satpura-II 55.00 58.17 66.64 75.24 74.34 72.29 78.87 73.12 74.86 75.52

11 Satpura-III 47.44 59.94 61.72 70.47 77.03 78.26 75.14 79.75 78.78 80.97

12 Satpura Complex 53.68 60.50 64.57 72.43 75.38 61.05 75.75 76.75 76.92 78.83

13 MPPGCL Total 61.38 61.10 62.87 67.21 68.90 70.41 68.02 72.09 70.21 73.14

Yearwise / Stationwise %PLF of MPPGCL Thermal Power Stations

Annual Report 2011-12, SLDC, MPPTCL, JBP 113

Page 118: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

SN STATION East Zone

Central Zone

West Zone TOTAL

a AMARKANTAK - II 115,427,173 152,995,573 107,261,255 375,684,000

b AMARKANTAK III (210 MW) 480,762,828 636,682,053 441,747,370 1,559,192,250

c NET AMARKANTAK 596,190,000 789,677,625 549,008,625 1,934,876,250

d SATPURA -I ( MP SHARE) 393,086,011 500,970,648 331,398,802 1,225,455,461

e SATPURA -II & III 1,059,949,853 1,332,525,415 870,694,379 3,263,169,648

f NET SATPURA I + II +III 1,453,035,864 1,833,496,064 1,202,093,182 4,488,625,109

g SGTPS (4x210MW) 1,141,818,157 1,512,199,724 1,049,797,787 3,703,815,669

h SGTPS Extn (500MW) 1,092,025,679 1,446,224,818 1,003,740,888 3,541,991,385

i NET SGTPS 2,233,843,837 2,958,424,542 2,053,538,675 7,245,807,054

j Total MPPGCL THERMAL (Share Basis) 4,283,069,700 5,581,598,231 3,804,640,482 13,669,308,413

B. DETAILS OF MONTHLY ACTUAL ENERGY FROM MPPGCL HYDEL STATIONS

SN STATION East Zone

Central Zone

West Zone TOTAL

a Gandhi Sagar Hydel Power Station ( MP Share) 29,060,470 72,713,239 43,528,642 145,302,352

b Pench Hydel Power Station ( MP Share) 58,199,846 118,546,608 114,252,778 290,999,232

c Bargi Hydel Power Station 154,469,110 121,818,530 253,792,240 530,079,880

e Bansagar Hydel Power Station-I 392,137,938 392,137,938 569,789,544 1,354,065,420

f Bansagar Hydel Power Station-II 30,863,232 30,863,232 45,514,272 107,240,735

g Bansagar Hydel Power Station-III 16,414,056 16,414,056 21,832,848 54,660,960

h Bansagar Hydel Power Station-IV 28,624,018 28,624,018 38,155,781 95,403,816

i Rajghat Hydel Power Station ( MP Share) 11,703,330 23,403,295 23,410,023 58,516,648

j Birsingpur Hydel Power Station 13,321,500 8,881,000 22,202,500 44,405,000

k Madikheda Hydel Power Station 49,179,264 32,787,936 81,946,080 163,913,280

m Ranaprathap Sagar Hydel Power Station ( MP Share) 36,296,931 90,625,477 54,562,246 181,484,653

n Jawahar Sagar Hydel Power Station ( MP Share) 27,441,348 68,421,038 41,344,354 137,206,740

o Hydel 847,711,043 1,005,236,367 1,310,331,307 3,163,278,716

C. DETAILS OF MONTHLY SCHEDULED / ACTUAL ENERGY FROM NHDC / NVDA HYDEL STATIONS

SN STATION East Zone

Central Zone

West Zone TOTAL

1 Bargi Left Bank Canal Power House 4,598,875 3,063,333 7,665,293 15,327,500

2 ISP NVDA 3,393,739 3,622,303 4,326,358 11,342,400

3 INDIRA SAGAR (NHDC) (Scheduled Energy) 654,957,814 832,918,796 1,786,912,462 3,274,789,072

4 OSP (Actual Injection) 396,494,160 273,157,040 696,134,000 1,365,785,200

SN STATION East Zone

Central Zone

West Zone TOTAL

1 SALE OF POWER -266,960,215 -283,922,746 -298,491,208 -849,374,170

2 ADDL POWER PURCHASE 371,184,852 398,135,139 512,553,783 1,281,873,773

3 BANKING OF POWER -71,814,335 -73,760,473 -1,816,699 -147,391,507

4 ENERGY EXCHANGE 0 0 0 0

STATE LOAD DESPATCH CENTREMPPTCL, JABALPUR

STATE ENERGY ACCOUNT For the Year : 2011-12

D. DETAILS OF MONTHLY SCHEDULED ENERGY OF INTER STATE OPEN ACCESS

A. DETAILS OF MONTHLY SCHEDULED ENERGY FROM SSGS THERMAL STATIONS as per Implemented Schedule

All Figures in KWH unless specified otherwise Annual Report 2011-12, SLDC, MPPTCL, JBP 114

Page 119: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

STATE LOAD DESPATCH CENTREMPPTCL, JABALPUR

STATE ENERGY ACCOUNT For the Year : 2011-12E. DETAILS OF MONTHLY SCHEDULED ENERGY FROM ISGS as per Implemented Schedule

SN STATION East Zone

Central Zone

West Zone TOTAL

I ISGS a KSTPS 1,569,703,016 945,332,174 655,179,646 3,170,214,835b KSTPS-III 143,893,169 153,178,965 178,930,883 476,003,017c VSTPS-I 1,095,109,627 1,236,851,854 819,666,287 3,151,627,768d VSTPS-II 813,676,247 802,276,515 672,869,312 2,288,822,074e VSTPS-III 534,141,175 681,333,487 681,333,487 1,896,808,150f Sipat -I 143,404,737 128,468,800 57,111,866 328,985,403g Sipat -II 677,482,825 606,921,411 269,811,926 1,554,216,161h Kawas GPP 159,661,076 100,988,190 244,291,683 504,940,949i Kawas NAPM 17,188,019 10,742,512 25,782,028 53,712,558j Kawas RLNG 4,359,282 2,738,037 6,592,865 13,690,183k Kawas Liquid 0 0 0 0l Gandhar GPP 138,136,595 87,510,515 211,905,464 437,552,573

m Gandhar NAPM 4,520,261 2,825,163 6,780,391 14,125,815n Gandhar RLNG 2,887,969 1,818,524 4,386,126 9,092,619o KAPP 256,789,167 254,968,892 352,789,250 864,547,309p TAPs 411,826,282 403,945,999 562,696,300 1,378,468,581q SUGEN Torrent (Gujrat) 172,209,652 183,701,872 215,767,941 571,679,465r Sardare Sarovar 753,440,288 484,766,140 1,185,624,270 2,423,830,698s SCHEDULE OF RIHAND 28,351,153 30,238,937 35,532,696 94,122,786t SCHEDULE OF MATATILA 15,194,593 16,226,617 18,961,329 50,382,540u DVC 324,900,364 158,515,932 573,356,584 1,056,772,880v Kahalgaon-II 98,316,109 55,360,220 158,204,089 311,880,418w TOTAL ISGS SCHEDULE (WR+ER) 7,365,191,604 6,348,710,755 6,937,574,424 20,651,476,782

F. OTHERSSN STATION East

ZoneCentral Zone

West Zone TOTAL

1 ENERGY PURCHASE BY MPPTC FROM WIND GEN. 32,038,429 33,975,519 38,547,866 104,561,8152 EXCESS DRAWAL BY MP IN CHAMBAL-SATPURA 111,456,994 118,576,677 136,285,031 366,318,7023 EXCESS DRAWAL BY MP IN RAJGHAT 17,820,101 19,028,925 21,667,621 58,516,6484 ASN Industries BioMass Katni 1,432,106 1,524,438 1,876,619 4,833,1635 RDM Care Industries Biogas Pariyat 211,446 224,091 266,942 702,4806 Excess Energy of HEG Tawa purchased by MPPTC 6,564,618 7,305,628 9,363,382 23,233,6287 Sale of Power MPPTC to SEZ (Intra State OAC) -13,064,227 -13,893,623 -16,258,150 -43,216,000

8 Firm Energy of HEG Tawa purchase by MPPTC Normal Time (Intra-State) 825,635 886,677 1,162,026 2,874,338

9 Firm Energy of HEG Tawa purchase by MPPTC Off-Peak Hours (Intra-State) 1,338,111 1,431,136 1,822,721 4,591,968

10 Firm Energy of HEG Tawa purchase by MPPTC Peak Hours (Intra-State) 269,003 289,001 379,735 937,739

11 InFirm Energy of HEG Tawa purchase by MPPTC Normal Time (Intra-State) 631,110 671,021 819,018 2,121,149

12 InFirm Energy of HEG Tawa purchase by MPPTC Off-Peak Hours (Intra-State) 282,929 300,292 361,735 944,956

13 InFirm Energy of HEG Tawa purchase by MPPTC Peak Hours (Intra-State) 207,925 221,104 270,130 699,159

14 Total Firm / Infirm Energy of Tawa HEG 3,554,713 3,799,231 4,815,365 12,169,309

15 Firm Energy of HEG Manideep purchase by MPPTC Normal Time (Intra-State) 2,449,910 2,609,000 3,003,118 8,062,028

16 Firm Energy of HEG Manideep purchase by MPPTC Off-Peak Hours (Intra-State) 1,648,420 1,754,914 2,032,457 5,435,791

17 Firm Energy of HEG Manideep purchase by MPPTC Peak Hours (Intra-State) 817,211 869,172 1,011,324 2,697,708

18 InFirm Energy of HEG Manideep purchase by MPPTC Normal Time (Intra-State) 1,579,026 1,680,022 1,949,345 5,208,393

19 InFirm Energy of HEG Manideep purchase by MPPTC Off-Peak Hours (Intra-State) 1,141,280 1,213,712 1,408,019 3,763,012

20 InFirm Energy of HEG Manideep purchase by MPPTC Peak Hours (Intra-State) 484,591 514,277 602,412 1,601,279

21 Total Firm / Infirm Energy of HEG Mandideep 8,120,438 8,641,097 10,006,675 26,768,210

G APPORTIONMENT OF SURPLUS ENERGY (INTRA DISCOM TRADING) AT DISCOMs PERIPHERY : Sale(-) / Purchase(+) -873,687,492 -474,285,294 1,347,972,786 0

H Total Scheduled Energy 12,882,274,362 13,793,655,433 16,314,374,339 42,990,304,135

I Unschedule Energy (Discom) -187,042,521 -119,196,657 646,255,734

J Regional UI -471,870,914

K UI of MPPGCL Thermal+ISP 97,295,137

L Wheeeled Energy ( Wind+HEG Tawa) 241,636,320

M Schedule for SEZ 87,616,605

N Energy Supply 12,695,231,841 13,674,458,776 16,960,630,073 42,944,981,283

All Figures in KWH unless specified otherwise Annual Report 2011-12, SLDC, MPPTCL, JBP 115

Page 120: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

All Figures in `

PAYABLE RECEIVABLE

Gen: O.Inj or U.Inj and Ben : U Drl > 10 % or 250 MW than Sdl

Gen : O.Inj > 105% in a block or 101% in a day

MPMKVVCL 90,837,832 715,120,162 8,331,814 0 33,545,918 (582,404,598)

MPPaKVVCL 3,078,826,078 1,015,055,351 33,735,866 0 280,395,211 2,377,901,804

Special Economic Zone 15,214,504 27,308,722 0 0 3,991,402 (8,102,816)

MPPuKVVCL 166,982,346 769,741,777 25,199,368 0 50,426,296 (527,133,767)

Amarkantak Thermal Power Station -II 10,363,049 76,830,731 (2,075,724) 21,847,758 362,551 (46,333,097)

Amarkantak Thermal Power Station -III 53,845,292 3,137,736 7,750,414 334,621 (42,622,521)

Sanjay Gandhi Thermal Power Station I&II 241,338,896 12,785,204 79,757,339 1,370,341 (147,426,012)

Sanjay Gandhi Thermal Power Station -III 159,313,664 10,865,410 41,874,407 990,703 (105,583,144)

Satpura Thermal Power Station 15,053,287 105,337,610 (3,392,844) 40,662,431 3,059,773 (49,954,963)

Indira Sagar Project 0 61,098,128 0 0 468,579 (60,629,549)

M/S BLA POWER (P) LTD, GADARWARA - 20,417,852 0 0 (20,417,852)

CPP 18,036,585 11,527,593 (3,755,164) 0 470,442 3,224,270

Regional UI Amount 2,361,951,544 2,500,329,447 0 0 0 (138,377,903)

Differential Amount arised from capping (276,724,015)

Amount arised from Additional UI (375,415,837)

TOTAL 5,757,265,225 5,757,265,225 84,831,666 191,892,349 375,415,837 0

() RECEIVABLE 0

MADHYA PRADESH POWER TRANSMISSION COMPANYSTATE LOAD DESPATCH CENTRE - JABALPUR

UTILITY NET UI RECEIVABLE / PAYABLE

UI CHARGES

ADDITIONAL UI CHARGES

CAPPING AMOUNT

POOL SUMMARY OF UI CHARGES FOR THE YEAR : 2011-12

Annual Report 2011-12, SLDC, MPPTCL, JBP 116

Page 121: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sch Drl UI

UI After Adjustment of Intra Discom

Trading

Net UI Charges

Intra Discom Trading Unit

sale(-) /Purchase(+)

Intra Discom trading unit

Charges

Net Payable(+) / Receivable(-

)

Sch Drl UI

UI After Adjustment

of Intra Discom Trading

Net UI Charges

Intra Discom Trading Unit

sale(-) /Purchase(+)

Intra Discom trading

unit Charges

Net Payable(+)

/ Receivable(-

)MU MU MU MU Cr.Rs MU Cr.Rs Cr.Rs MU MU MU MU Cr.Rs MU Cr.Rs Cr.Rs

Apr-11 1031.70 962.70 -69.01 5.64 2.62 -74.65 -15.75 -13.13 Apr-11 1020.39 930.82 -89.57 -10.15 -9.20 -79.42 -16.76 -25.96

May-11 1051.99 973.24 -78.75 1.46 -1.82 -80.21 -17.00 -18.82 May-11 1029.14 972.31 -56.84 -1.32 -3.63 -55.51 -11.77 -15.40

Jun-11 883.14 758.85 -124.29 -70.92 -16.62 -53.37 -11.31 -27.93 Jun-11 933.20 809.76 -123.44 -59.54 -18.34 -63.89 -13.54 -31.89

Jul-11 870.63 810.77 -59.86 -51.47 -15.89 -8.39 -1.77 -17.66 Jul-11 902.71 848.88 -53.83 -40.11 -13.34 -13.71 -2.89 -16.23

Aug-11 885.68 847.41 -38.27 -68.08 -17.95 29.81 6.08 -11.87 Aug-11 879.94 888.51 8.57 -25.72 -11.67 34.29 6.99 -4.67

Sep-11 831.34 868.82 37.48 -2.94 -1.44 40.42 7.84 6.40 Sep-11 849.16 898.91 49.74 5.93 -1.45 43.81 8.50 7.05

Oct-11 1098.20 1022.78 -75.41 6.31 3.74 -81.72 -14.95 -11.21 Oct-11 1152.91 1106.51 -46.40 8.93 1.28 -55.33 -10.12 -8.85

Nov-11 1268.36 1131.46 -136.90 11.12 6.47 -148.02 -30.05 -23.58 Nov-11 1357.08 1316.53 -40.55 9.09 5.58 -49.65 -10.08 -4.50

Dec-11 1343.34 1196.33 -147.01 1.57 -4.96 -148.58 -30.76 -35.72 Dec-11 1449.22 1388.80 -60.42 -1.91 -2.12 -58.51 -12.11 -14.24

Jan-12 1249.46 1002.40 -247.07 -40.69 -13.29 -206.38 -42.93 -56.21 Jan-12 1353.57 1289.71 -63.86 -7.97 -3.10 -55.88 -11.62 -14.72

Feb-12 1135.89 1063.17 -72.72 24.05 4.96 -96.78 -20.23 -15.27 Feb-12 1213.39 1190.27 -23.12 23.70 3.79 -46.81 -9.78 -5.99

Mar-12 1161.36 1112.43 -48.93 -3.10 1.46 -45.83 -9.72 -8.25 Mar-12 1245.90 1152.12 -93.78 -20.12 -6.03 -73.66 -15.62 -21.65Total 11-12 12811.10 11750.37 -1060.73 -187.04 -52.71 -873.69 -180.54 -233.26 Total 11-12 13386.62 12793.14 -593.48 -119.20 -58.24 -474.29 -98.81 -157.05

Sch Drl UI

UI After Adjustment of Intra Discom

Trading

Net UI Charges

Intra Discom Trading Unit

sale(-) /Purchase(+)

Intra Discom trading unit

Charges

Net Payable(+) / Receivable(-

)

Sch Drl UI Net UI Charges

MU MU MU MU Cr.Rs MU Cr.Rs Cr.Rs MU MU MU Cr.RsApr-11 939.30 1177.15 237.85 83.78 19.53 154.07 32.51 52.04 Apr-11 7.24 9.75 -2.51 0.85

May-11 958.81 1157.45 198.64 62.92 8.01 135.72 28.77 36.78 May-11 10.04 10.18 -0.14 0.07

Jun-11 880.25 1016.60 136.35 19.09 -0.72 117.26 24.86 24.14 Jun-11 9.76 10.09 -0.34 0.42

Jul-11 876.17 875.64 -0.53 -22.63 -12.28 22.10 4.66 -7.61 Jul-11 10.19 10.35 -0.15 -0.46

Aug-11 1105.77 884.40 -221.37 -157.27 -47.63 -64.10 -13.08 -60.70 Aug-11 10.44 10.09 0.35 -0.17

Sep-11 1191.31 1013.99 -177.32 -93.09 -36.04 -84.23 -16.34 -52.38 Sep-11 8.20 10.23 -2.04 0.36

Oct-11 1255.52 1512.55 257.03 119.99 65.59 137.04 25.08 90.67 Oct-11 9.32 9.76 -0.44 0.07

Nov-11 1410.55 1867.52 456.97 259.31 119.84 197.66 40.13 159.97 Nov-11 10.59 9.56 1.03 -0.19

Dec-11 1495.18 1849.97 354.79 147.69 64.98 207.09 42.87 107.85 Dec-11 10.99 10.16 0.83 -0.11

Jan-12 1369.42 1689.95 320.53 58.27 14.10 262.26 54.55 68.65 Jan-12 11.40 10.12 1.28 -0.27

Feb-12 1207.81 1472.62 264.82 121.23 30.71 143.59 30.01 60.72 Feb-12 11.45 9.42 2.03 -1.08

Mar-12 1209.61 1376.08 166.47 46.98 11.69 119.49 25.33 37.03 Mar-12 12.01 10.59 1.42 -0.30

Total 11-12 13899.70 15893.93 1994.23 646.26 237.79 1347.97 279.35 517.14 Total 11-12 121.64 120.30 1.33 -0.81

(+) payable by Entity (-) Recievable by Entity

Monthwsie Details of UI Charges of DiscomsYear : 2011 - 2012

Month

WZONE

Month

EZONE

Month

SEZ

Month

CZONE

Annual Report 2011-12, SLDC, MPPTCL, JBP 117

Page 122: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sch Inj Act Inj UI Net UI Charges Sch Inj Act Inj UI Net UI Charges Sch Inj Act Inj UI Net UI Charges

MU MU MU Cr.Rs MU MU MU Cr.Rs MU MU MU Cr.RsApr-11 42.375 43.796 1.422 -0.374 117.162 117.322 0.160 -0.047 391.546 395.342 3.796 -1.032May-11 61.112 60.845 -0.268 0.083 141.515 142.568 1.053 -0.435 390.216 388.844 -1.372 0.287Jun-11 0.630 0.086 -0.544 0.766 135.007 136.231 1.224 -0.283 342.671 340.487 -2.184 1.003Jul-11 0.000 -0.498 -0.498 -0.979 124.159 124.990 0.831 -0.978 348.666 348.567 -0.100 -1.656Aug-11 0.000 -0.666 -0.666 -1.343 124.873 124.705 -0.168 -0.935 316.761 312.387 -4.374 -0.555Sep-11 0.000 -0.684 -0.684 0.012 125.528 125.892 0.364 -0.132 273.604 272.107 -1.497 -0.140Oct-11 0.000 -0.548 -0.548 0.115 142.136 143.036 0.900 -0.350 413.763 417.431 3.669 -1.173Nov-11 22.600 23.680 1.080 -0.084 112.965 113.570 0.605 -0.047 425.901 424.931 -0.970 0.613Dec-11 51.172 52.977 1.804 -0.424 134.122 135.471 1.349 -0.459 492.261 493.785 1.523 -0.510Jan-12 57.163 58.526 1.363 -0.255 137.984 137.887 -0.097 -0.022 486.186 488.942 2.756 -0.692Feb-12 58.721 60.521 1.800 -1.307 130.169 130.745 0.576 -0.324 416.853 417.231 0.379 -0.402Mar-12 81.912 85.533 3.621 -0.843 133.573 134.642 1.069 -0.251 470.085 472.781 2.696 -0.739

Total 11-12 375.684 383.568 7.884 -4.633 1559.192 1567.058 7.866 -4.262 4768.514 4772.835 4.321 -4.995

Sch Inj Act Inj UI Net UI Charges Sch Inj Act Inj UI Net UI Charges Sch Inj Act Inj UI Net UI Charges

MU MU MU Cr.Rs MU MU MU Cr.Rs MU MU MU Cr.RsApr-11 361.571 370.230 8.658 -2.428 321.029 324.622 3.593 -1.220 1233.683 1251.311 17.628 -5.102May-11 274.899 282.661 7.762 -2.253 278.136 281.534 3.398 -1.254 1145.879 1156.452 10.573 -3.572Jun-11 330.138 332.794 2.656 0.033 309.676 313.976 4.300 -1.003 1118.122 1123.574 5.453 0.515Jul-11 303.230 307.101 3.871 -1.659 295.180 297.595 2.415 -1.532 1071.235 1077.755 6.520 -6.803Aug-11 215.249 214.023 -1.226 -0.588 257.443 259.969 2.526 -0.734 914.326 910.418 -3.907 -4.155Sep-11 224.173 224.965 0.792 -0.918 170.336 171.695 1.359 -1.210 793.641 793.975 0.335 -2.388Oct-11 245.759 251.082 5.323 -1.756 321.635 327.834 6.199 -1.939 1123.292 1138.834 15.542 -5.104Nov-11 385.420 391.125 5.705 -1.255 299.400 301.087 1.687 -0.348 1246.286 1254.393 8.107 -1.120Dec-11 449.203 453.819 4.616 -1.532 348.687 350.934 2.247 -0.878 1475.445 1486.985 11.540 -3.802Jan-12 422.335 424.158 1.823 -0.600 319.376 318.849 -0.528 0.025 1423.045 1428.362 5.318 -1.545Feb-12 393.434 394.999 1.566 -1.036 255.436 255.692 0.256 -0.324 1254.612 1259.188 4.576 -3.393Mar-12 442.520 445.979 3.459 -0.750 329.217 329.800 0.583 -0.141 1457.307 1468.736 11.429 -2.723

Total 11-12 4047.929 4092.935 45.007 -14.743 3505.551 3533.587 28.036 -10.558 14256.870 14349.984 93.114 -39.192

Sch Inj Act Inj UI Net UI Charges

MU MU MU Cr.RsApr-11 131.911 132.500 0.588 -0.386May-11 151.617 151.515 -0.102 -0.172 (+) payable by Entity (-) Recievable by EntityJun-11 215.309 215.472 0.163 -0.394Jul-11 235.517 235.742 0.225 -1.325Aug-11 591.083 591.295 0.213 -1.247Sep-11 720.608 722.672 2.065 -0.789Oct-11 326.106 326.953 0.847 -0.747Nov-11 198.084 198.296 0.212 -0.220Dec-11 189.314 189.448 0.134 -0.384Jan-12 197.423 197.374 -0.050 -0.176Feb-12 161.606 161.483 -0.122 -0.108Mar-12 155.379 155.388 0.009 -0.114

Total 11-12 3273.956 3278.137 4.181 -6.063

SGTPS-III Total Genco

Monthwsie Details of UI Charges of MPPGCL Thermal Stations & Indira Sagar HEP : 2011-12

Month

Amarkantak-II Amarkantak-III Satpura

Month

ISP

Month

SGTPS-I&II

Annual Report 2011-12, SLDC, MPPTCL, JBP 118

Page 123: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sch Act Net UI Charges Sch Act Net UI

Charges Sch Act Net UI Charges

MU MU Cr.Rs MU MU Cr.Rs MU MU Cr.RsApr-11 2.615 5.267 0.073 0.012 0.012 0.000 1.378 1.748 0.021May-11 0.083 0.944 0.013 0.000 0.000 0.000 0.450 0.582 0.005Jun-11 0.541 1.885 0.036 0.000 0.000 0.000 0.000 0.000 0.000Jul-11 1.721 3.502 0.127 0.000 0.000 0.000 0.000 0.000 0.000Aug-11 1.676 3.786 0.049 0.000 0.000 0.000 0.000 0.000 0.000Sep-11 1.464 3.834 0.082 0.187 0.191 0.000 0.000 0.000 0.000Oct-11 6.900 7.842 0.236 1.003 1.029 -0.003 0.000 0.000 0.000Nov-11 4.279 5.573 0.220 0.188 0.196 -0.001 0.000 0.000 0.000Dec-11 3.504 5.111 0.244 0.161 0.165 -0.001 0.000 0.000 0.000Jan-12 1.821 3.097 0.028 0.000 0.000 0.000 0.000 0.000 0.000Feb-12 4.974 6.955 0.164 0.000 0.000 0.000 0.000 0.000 0.000Mar-12 0.657 5.329 0.081 0.000 0.000 0.000 0.000 0.000 0.000

Total 11-12 30.234 53.125 1.353 1.550 1.593 -0.005 1.829 2.330 0.026

Sch Act Net UI Charges Sch Act Net UI

Charges Sch Act Net UI Charges

MU MU Cr.Rs MU MU Cr.Rs MU MU Cr.RsApr-11 0.127 0.131 0.000 0.000 0.000 0.000 0.000 0.000 0.000May-11 0.112 0.114 0.000 0.000 0.000 0.000 0.000 0.000 0.000Jun-11 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000Jul-11 0.000 0.000 0.000 0.108 0.112 0.000 0.000 0.000 0.000Aug-11 0.000 0.000 0.000 0.358 0.278 0.017 0.000 0.000 0.000Sep-11 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000Oct-11 2.880 2.951 -0.008 0.060 0.040 0.006 0.000 0.000 0.000Nov-11 4.456 4.533 -0.015 0.100 0.076 0.010 0.000 0.000 0.000Dec-11 4.878 4.987 -0.018 0.000 0.000 0.000 0.000 0.000 0.000Jan-12 1.304 1.329 -0.004 0.000 0.000 0.000 0.000 0.000 0.000Feb-12 0.510 0.516 -0.002 0.000 0.000 0.000 0.000 0.000 0.000Mar-12 0.035 0.036 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Total 11-12 14.302 14.597 -0.048 0.625 0.505 0.033 0.000 0.000 0.000

Sch Act Net UI Charges Sch Act Net UI

Charges Sch Act Net UI Charges

MU MU Cr.Rs MU MU Cr.Rs MU MU Cr.RsApr-11 0.000 0.000 0.000 0.000 0.000 0.000 4.132 7.158 0.093May-11 0.000 0.000 0.000 0.000 0.000 0.001 0.646 1.640 0.018Jun-11 0.000 0.000 0.000 0.000 0.000 0.000 0.541 1.885 0.036Jul-11 0.000 0.000 0.000 0.000 0.000 0.000 1.830 3.614 0.127Aug-11 0.000 0.000 0.000 0.000 0.000 0.000 2.034 4.064 0.066Sep-11 0.000 0.000 0.000 0.000 0.000 0.000 1.651 4.025 0.081Oct-11 1.102 1.102 0.000 0.040 0.041 -0.001 11.985 13.004 0.231Nov-11 0.000 0.000 0.000 0.000 0.000 0.000 9.022 10.378 0.214Dec-11 0.000 0.000 0.000 0.000 0.000 0.000 8.542 10.263 0.226Jan-12 0.000 0.000 0.000 0.000 0.000 0.000 3.124 4.426 0.024Feb-12 0.000 0.000 0.000 0.000 0.000 0.000 5.484 7.471 0.162Mar-12 0.153 0.150 0.001 0.014 0.014 0.000 0.860 5.529 0.082

Total 11-12 1.255 1.252 0.001 0.055 0.056 0.000 49.851 73.457 1.360

Month

Vardhman Fabrics Vardhman Yarns Total CPP 132

Monthwsie Details of UI Charges of CPP Injecting at 132 KV Level

Month

HEG Mandideep Vikram Cement Jaypee Rewa

Month

Jaypee Sidhi ACC Kymore Grasim Ind

Annual Report 2011-12, SLDC, MPPTCL, JBP 119

Page 124: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sch Inj Act Inj Net UI Charges Sch Inj Act Inj Net UI

Charges Sch Inj Act Inj Net UI Charges

MU MU Cr.Rs MU MU Cr.Rs MU MU Cr.RsApr-11 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000May-11 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000Jun-11 0.000 0.000 0.000 0.000 0.000 0.000 0.706 0.880 0.000Jul-11 0.000 0.000 0.000 0.000 0.000 0.000 0.012 0.010 0.000Aug-11 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000Sep-11 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000Oct-11 0.000 0.000 0.000 0.119 0.101 0.029 0.182 0.174 0.005Nov-11 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000Dec-11 2.943 9.013 0.000 0.000 0.000 0.000 0.000 0.000 0.000Jan-12 3.258 6.610 0.002 0.000 0.000 0.000 0.000 0.000 0.000Feb-12 1.038 3.267 0.000 0.000 0.000 0.000 0.000 0.000 0.000Mar-12 0.127 0.344 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Total 11-12 7.367 19.234 0.002 0.119 0.101 0.029 0.900 1.063 0.006

Sch Act Net UI Charges Sch Act Net UI

Charges Sch Act Net UI Charges

MU MU Cr.Rs MU MU Cr.Rs MU MU Cr.RsApr-11 0.436 0.430 0.003 0.436 0.430 0.003May-11 0.192 0.191 0.000 0.192 0.191 0.000Jun-11 0.038 0.038 0.000 0.744 0.918 0.000Jul-11 0.501 0.501 0.000 0.513 0.510 0.001Aug-11 0.585 0.587 0.000 0.585 0.587 0.000Sep-11 0.781 0.778 0.001 0.781 0.778 0.001Oct-11 2.293 2.197 0.113 2.593 2.472 0.148Nov-11 0.180 0.179 0.000 0.180 0.179 0.000Dec-11 0.039 0.039 0.000 2.982 9.051 0.000Jan-12 0.000 0.000 0.000 3.258 6.610 0.002Feb-12 0.000 0.000 0.000 1.038 3.267 0.000Mar-12 0.000 0.000 0.000 0.127 0.344 0.000

Total 11-12 5.045 4.940 0.117 13.430 25.339 0.154

Month

MCPL Total CPP 33 KV (Discom Embeded)

Monthwsie Details of UI Charges of CPP injecting at 33 KV Level (Discom Embeded)

Month

Tawa HEG NSAIL Maral

Annual Report 2011-12, SLDC, MPPTCL, JBP 120

Page 125: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sch Act Net UI Charges Sch Act Net UI

Charges Sch Act Net UI Charges Sch Act Net UI

Charges MU MU Cr.Rs MU MU Cr.Rs MU MU Cr.Rs MU MU Cr.Rs

Apr-11 0.000 0.000 0.000 0.000 0.000 0.000 0.417 2.856 -0.011 0.000 0.000 0.000May-11 1.439 1.226 -0.052 0.216 0.455 -0.003 0.725 2.961 -0.050 0.000 0.000 0.000Jun-11 1.059 0.855 -0.068 0.000 0.000 0.000 0.224 2.858 -0.018 0.102 6.156 -0.001Jul-11 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.426 6.973 -0.001Aug-11 0.000 0.000 0.000 0.000 0.000 0.000 0.423 3.793 -0.039 0.440 5.679 0.000Sep-11 0.000 0.000 0.000 3.526 4.198 -0.005 1.091 3.091 -0.091 0.489 6.183 0.000Oct-11 0.000 0.000 0.000 0.758 1.060 0.000 0.189 2.460 -0.030 0.004 5.290 0.000Nov-11 0.000 0.000 0.000 1.153 1.625 -0.001 0.017 3.815 0.000 0.000 0.000 0.000Dec-11 0.000 0.000 0.000 0.000 0.000 0.000 0.349 3.531 -0.028 0.000 0.000 0.000Jan-12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.020 3.530 0.000Feb-12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000Mar-12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Total 11-12 2.499 2.080 -0.120 5.653 7.338 -0.010 3.435 25.365 -0.267 1.481 33.811 -0.002

Sch Act Net UI Charges Sch Act Net UI

Charges Sch Act Net UI Charges Sch Act Net UI

Charges MU MU Cr.Rs MU MU Cr.Rs MU MU Cr.Rs MU MU Cr.Rs

Apr-11 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000May-11 0.000 0.000 0.000 1.134 21.597 -0.004 0.000 0.000 0.000 0.000 0.000 0.000Jun-11 0.921 0.646 -0.075 13.884 31.692 -0.016 0.327 4.494 -0.005 0.192 0.583 -0.007Jul-11 0.000 0.000 0.000 14.038 30.556 -0.145 0.000 0.000 0.000 0.228 0.536 -0.014Aug-11 0.000 0.000 0.000 10.848 32.500 -0.002 0.000 0.000 0.000 0.485 0.708 -0.018Sep-11 0.000 0.000 0.000 9.643 28.679 -0.017 0.000 0.000 0.000 0.588 0.846 -0.025Oct-11 0.003 0.000 -0.001 0.859 31.054 -0.003 0.000 0.000 0.000 0.112 0.483 -0.007Nov-11 1.462 1.245 -0.060 0.000 0.000 0.000 0.000 0.000 0.000 0.005 0.491 0.000Dec-11 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.149 0.672 -0.005Jan-12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.369 0.792 -0.015Feb-12 4.545 4.291 -0.065 0.663 32.160 0.000 0.000 0.000 0.000 0.766 1.072 -0.026Mar-12 1.964 1.603 -0.055 1.125 33.002 0.000 0.000 0.000 0.000 0.772 0.992 -0.030

Total 11-12 8.895 7.785 -0.256 52.195 241.242 -0.186 0.327 4.494 -0.005

Sch Act Net UI Charges Sch Act Net UI

Charges Sch Act Net UI Charges Sch Act Net UI

Charges MU MU Cr.Rs MU MU Cr.Rs MU MU Cr.Rs MU MU Cr.Rs

Apr-11 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000May-11 0.000 0.000 0.000 0.435 2.574 0.000 0.000 0.000 0.000 0.000 0.000 0.000Jun-11 0.000 0.000 0.000 1.893 6.249 -0.001 0.000 0.000 0.000 0.000 0.000 0.000Jul-11 0.000 0.000 0.000 0.808 4.417 0.000 1.327 4.935 -0.006 0.000 0.000 0.000Aug-11 0.000 0.000 0.000 0.397 1.084 -0.001 1.330 4.998 0.000 1.297 1.908 -0.003Sep-11 0.000 0.000 0.000 0.000 0.000 0.000 1.719 5.055 0.000 1.492 2.064 -0.004Oct-11 0.089 0.044 -0.011 0.000 0.000 0.000 0.026 6.129 0.000 0.354 2.010 -0.004Nov-11 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.804 1.860 -0.011Dec-11 0.000 0.000 0.000 0.039 2.183 0.000 0.000 0.000 0.000 0.594 2.008 -0.001Jan-12 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.188 1.976 -0.011Feb-12 3.461 2.805 -0.173 ```` 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000Mar-12 0.001 0.000 0.000 0.337 4.445 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Total 11-12 3.551 2.849 -0.184 3.909 20.952 -0.003 4.401 21.116 -0.006 5.730 11.826 -0.035

Maral Drawal Mid India Drwal

Month

Vardhman Yarn Drawal Grasim Drawal HEG Mandideep Drawal

Birla Drawal

Nsail Drawal

Ritspin_Drawal

Monthwsie Details of UI Charges of CPP / OAC drawing power

Vardhman Fabrics Drawal Vik. Cment Drawal Abhishek Indust._Drawal

Month

JAyPee Rewa Drawal

Annual Report 2011-12, SLDC, MPPTCL, JBP 121

Page 126: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

S.No. Particulars Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12CUMM.

Upto :-Mar-12

1 MPPGCL Injection 1350.03 1256.08 1255.49 1212.79 1177.23 1196.30 1484.83 1579.80 1786.35 1623.15 1547.03 1729.48 17198.57

2 ISP 132.07 151.49 215.47 235.74 591.23 722.67 326.95 198.29 189.45 197.37 161.48 155.39 3277.61

3 OMKAESHWAR 60.58 71.83 111.88 128.26 213.05 251.14 132.87 84.06 81.29 86.46 72.81 71.55 1365.79

4 Import from Sawai Madhopur (Rajsthan) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5 MATATEELA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6 CENTRAL SECTOR 1609.83 1707.29 1109.69 1075.14 737.93 704.24 1795.42 2567.98 2492.15 2195.13 2051.81 1783.10 19829.70

7 BLA Injection 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.01 8.01

8 Import from HEG Tawa, Wind Farm,National Steel + Malanpur Captive Plant+MARAL+Kamal Sponge 21.70 40.09 42.25 37.72 31.60 33.09 19.67 19.77 23.89 28.87 31.80 30.52 360.95

9 Import from HEG Mandideep ,Jaypee Bela ,Japee Rewa, Vardhman farics, Vardhman Yarns, Acc Kymore & Jaypee Sidhi 10.32 8.65 8.40 8.77 8.52 9.01 16.07 13.20 13.75 9.94 13.81 13.48 133.92

10 Total Injection At MP Pheriphery 3184.54 3235.43 2743.18 2698.41 2759.55 2916.46 3775.80 4463.10 4586.88 4140.91 3878.74 3791.54 42174.55

11 Discom Drawal Excluding 33KV 3085.66 3125.98 2640.14 2585.58 2653.20 2803.06 3646.70 4312.36 4436.44 3996.16 3748.53 3658.65 40692.47

a M.P.Pu.K.V. V.C.L. 947.17 953.34 745.90 795.61 830.48 849.39 1001.42 1111.71 1177.86 983.51 1046.94 1091.93 11535.25

b M.P.M.K.V. V.C.L. 931.48 969.55 811.15 851.53 889.76 901.67 1108.69 1317.81 1388.04 1289.72 1196.62 1153.34 12809.34

c M.P.Pa.K.V. V.C.L. 1197.27 1192.88 1072.99 928.12 922.57 1041.79 1526.82 1873.53 1860.12 1712.83 1495.55 1402.78 16227.27

d SEZ 9.74 10.21 10.10 10.32 10.39 10.22 9.78 9.31 10.41 10.10 9.42 10.60 120.61

12 KOTA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

13 Losses 98.87 109.45 103.05 112.83 106.35 113.40 129.10 150.74 150.44 144.76 130.21 132.88 1482.08

14 % Loss 3.10 3.38 3.76 4.18 3.85 3.89 3.42 3.38 3.28 3.50 3.36 3.50 3.51

Monthwise Injection and MP Tranmission Losses (Excluding 33 KV) in MUYear 2011-2012

Annual Report 2011-12, SLDC, MPPTCL, JBP 122

Page 127: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Month 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

Apr 4.64 4.93 4.67 3.83 3.67 3.24 3.10

May 4.70 4.76 4.01 3.96 3.80 3.81 3.38

Jun 4.07 4.63 3.98 4.12 3.92 4.31 3.76

Jul 4.26 4.81 3.72 3.72 4.69 3.97 4.18

Aug 4.45 4.28 3.73 4.09 4.72 4.24 3.85

Sep 4.52 4.28 3.82 4.22 4.83 3.79 3.89

Oct 5.48 5.10 4.26 4.64 4.53 4.03 3.42

Nov 5.53 5.74 4.01 4.46 4.66 3.89 3.38

Dec 5.29 5.60 4.22 3.99 4.14 3.73 3.28

Jan 4.93 5.21 4.24 3.92 4.07 3.65 3.50

Feb 5.31 5.08 4.12 3.87 3.89 3.30 3.36

Mar 5.42 5.01 4.11 4.08 3.51 3.30 3.50

Yearly 4.94 5.02 4.09 4.09 4.19 3.74 3.51

Monthwise MP Transmission Losses in %

Annual Report 2011-12, SLDC, MPPTCL, JBP 123

Page 128: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

YEAR TRANSMISSION SYSTEM

AVAILABILITY TARGET % AS PER MPERC

TRANSMISSION SYSTEM

AVAILABILITY ACHIEVEMENT

%2005-2006 95 98.41

2006-2007 97 98.96

2007-2008 97 99.02

Quarter % AvailabilityApr-Jun 98.45

Jul-Sep 97.85

Oct-Dec 98.58

Jan-Mar 97.92Cummulative Transmission Availability % 98.16

Month 2009-10 2010-11 2011-12April 97.68 99.14 98.43

May 97.35 98.54 99.13

June 98.46 98.46 99.38

July 98.78 99.22 99.57

August 99.00 99.09 99.20

September 98.71 98.53 98.74

October 98.80 98.90 98.55

November 99.06 99.49 99.65

December 99.53 99.59 99.56

January 99.53 99.66 99.60

February 99.50 99.64 99.72

March 99.38 99.30 99.27Cummulative Transmission Availability % 98.82 99.13 99.23

MONTHWISE % TRANSMISSION SYSTEM AVAILABILITY

TRANSMISSION SYSTEM AVAILABILITY TARGET % AS PER MPERC - 98.00 %

TRANSMISSION SYSTEM AVAILABILITY

TRANSMISSION SYSTEM AVAILABILITY TARGET % AS PER MPERC - 97.50 %

TRANSMISSION SYSTEM AVAILABILITY -Year : 2008-2009

Quartery Availability Achievement

Annual Report 2011-12, SLDC, MPPTCL, JBP 124

Page 129: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

MONTHLYCummulat

ive YEARLY

MONTHLYCummulat

ive YEARLY

MONTHLYCummula

tive YEARLY

MONTHLY Cummulative YEARLY MONTHLY

Cummulative

YEARLY

% % % % % % % % % %Apr-11 60.00 27.25 27.25 85.00 85.15 85.15 80.00 52.70 52.70 80.00 67.98 67.98 85.00 97.77 97.77May-11 38.03 32.73 99.53 92.46 53.85 53.29 54.73 61.25 94.38 96.04Jun-11 0.41 22.07 98.89 94.58 47.28 51.31 61.26 61.25 95.89 95.99Jul-11 0.00 16.46 89.63 93.32 45.98 49.95 56.72 60.10 98.58 96.65Aug-11 0.00 13.13 91.44 92.94 47.52 49.46 52.92 58.65 86.59 94.61Sep-11 0.00 10.97 97.35 93.66 40.26 47.95 45.31 56.46 87.55 93.45Oct-11 0.00 9.39 99.97 94.58 54.53 48.90 46.33 54.99 98.76 94.22Nov-11 14.53 10.02 82.10 93.04 57.43 49.95 73.14 57.22 90.48 93.76Dec-11 31.84 12.48 94.33 93.19 64.47 51.59 83.85 60.23 102.01 94.69Jan-12 35.57 14.82 98.13 93.69 63.06 52.75 76.26 61.85 95.66 94.79Feb-12 39.06 16.92 97.87 94.05 57.75 53.18 73.90 62.89 78.89 93.42Mar-12 50.97 19.80 93.95 94.04 60.78 53.83 77.97 64.17 94.75 93.53

MONTHLYCummulat

ive YEARLY

MONTHLYCummulat

ive YEARLY

MONTHLYCummula

tive YEARLY

MONTHLY Cummulative YEARLY MONTHLY

Cummulative

YEARLY % % % % % % % % % %

Apr-11 60.00 27.25 27.25 85.00 85.15 85.15 80.00 51.89 51.89 80.00 64.98 64.98 85.00 94.87 94.87May-11 38.03 32.73 99.53 92.46 50.05 50.95 47.81 56.26 79.54 87.08Jun-11 0.41 22.07 98.12 94.33 45.41 49.13 59.33 57.27 91.51 88.54Jul-11 0.00 16.46 87.33 92.55 44.72 48.01 52.74 56.12 84.41 87.49Aug-11 0.00 13.13 87.83 91.59 40.62 46.51 37.44 52.33 73.62 84.68Sep-11 0.00 10.97 91.23 91.53 36.26 44.83 40.29 50.36 50.34 79.05Oct-11 0.00 9.39 99.97 92.75 53.07 46.02 42.74 49.26 91.98 80.92Nov-11 14.53 10.02 82.10 91.44 56.44 47.30 69.27 51.72 88.48 81.85Dec-11 31.84 12.48 94.33 91.77 63.13 49.09 78.13 54.69 99.72 83.87Jan-12 35.57 14.82 97.05 92.31 62.35 50.43 73.45 56.59 91.33 84.62Feb-12 39.06 16.92 97.87 92.79 57.15 51.01 73.15 58.03 78.09 84.06Mar-12 50.97 19.80 93.95 92.89 60.29 51.80 76.96 59.63 94.15 84.91

AMARKANTAK # 5

TARGET APPROVED BY MPERC

AMARKANTAK # 5

TARGET APPROVED BY MPERC

SGTPS # 5

TARGET APPROVED BY MPERC

SGTPS # 5

TARGET APPROVED BY MPERC

MONTHLY / CUMMULATIVE PLF % AS PER SCHEDULE GENERATION GIVEN BY SLDCFOR THE YEAR 2011-12

MONTHS

AMARKANTAK COMPLEX SATPURA COMPLEX SGTPS COMPLEX

TARGET APPROVED BY MPERC

MONTHLY / CUMMULATIVE AVAILABILITY % AS PER DECLARED CAPACITY GIVEN BY MPPGCLFOR THE YEAR 2011-12

TARGET APPROVED BY MPERC

TARGET APPROVED BY MPERC

MONTHS

AMARKANTAK COMPLEX

TARGET APPROVED BY MPERC

TARGET APPROVED BY MPERC

SATPURA COMPLEX SGTPS COMPLEX

TARGET APPROVED BY MPERC

Annual Report 2011-12, SLDC, MPPTCL, JBP 125

Page 130: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

MONTHLY CummulativeYEARLY MONTHLY Cummulative

YEARLY MONTHLY CummulativeYEARLY MONTHLY Cummulative

YEARLY MONTHLY CummulativeYEARLY

% % % % % % % % % %Apr-11 46.14 46.14 70.00 70.00 86.89 86.89 88.79 88.79 0.00 0.00May-11 23.52 34.65 51.61 60.66 61.68 74.08 69.69 79.08 0.00 0.00Jun-11 27.69 32.35 89.00 70.00 49.55 65.99 67.92 75.40 23.33 7.69Jul-11 24.10 30.25 61.77 67.91 91.58 72.49 64.38 72.60 93.55 29.51Aug-11 88.87 42.13 100.00 74.41 100.00 78.07 77.31 73.56 100.00 43.79Sep-11 93.82 50.60 98.33 78.33 100.00 81.66 98.47 77.64 100.00 53.01Oct-11 90.08 56.32 100.00 81.47 100.00 84.32 97.04 80.45 93.55 58.88Nov-11 91.31 60.62 100.00 83.75 100.00 86.25 97.79 82.58 6.67 52.46Dec-11 96.08 64.62 100.00 85.58 100.00 87.80 90.36 83.46 3.23 46.91Jan-12 95.76 67.78 100.00 87.04 93.55 88.38 53.25 80.40 100.00 52.29Feb-12 96.54 70.27 100.00 88.16 99.23 89.32 65.90 79.14 100.00 56.42Mar-12 95.30 72.39 95.00 88.74 94.86 89.79 67.87 78.19 100.00 60.11

MONTHLY CummulativeYEARLY MONTHLY Cummulative

YEARLY MONTHLY CummulativeYEARLY MONTHLY Cummulative

YEARLY MONTHLY CummulativeYEARLY

% % % % % % % % % %Apr-11 47.00 47.00 0.00 0.00 0.00 0.00 0.00 0.00 20.22 20.22May-11 54.19 50.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.95Jun-11 32.22 44.58 0.00 0.00 0.00 0.00 0.00 0.00 31.89 17.18Jul-11 5.27 34.59 0.00 0.00 59.00 14.99 1.94 0.49 100.00 38.22Aug-11 10.32 29.67 25.54 5.17 78.85 27.93 17.34 3.91 100.00 50.74Sep-11 50.00 33.01 86.67 18.53 67.11 34.35 96.67 19.11 90.00 57.18Oct-11 69.46 38.29 29.03 20.05 30.75 33.83 100.00 30.83 41.94 54.97Nov-11 85.56 44.10 0.00 17.59 46.37 35.37 105.00 39.95 100.00 60.51Dec-11 80.65 48.22 0.00 15.61 47.24 36.71 105.00 47.28 97.85 64.72Jan-12 57.85 49.19 0.00 14.03 25.73 35.60 91.29 51.74 93.55 67.64Feb-12 69.20 50.93 0.00 12.81 61.46 37.84 105.00 56.35 98.85 70.34Mar-12 70.11 52.55 0.00 11.73 7.96 35.31 100.00 60.05 99.35 72.80

JHINNA (BS IV)

MONTHS

DEVLOND (BS III)

BIRSINGHPUR

SILPARA (BS II) RAJGHAT MANIKHEDA

PLANT AVAILABILITY FACTOR OF MPPGCL HYDEL POWER STATIONSYEAR :2011-2012

TARGET APPROVED FOR PLANT AVAILABILITY FACTOR FOR ALL HYDEL POWER STATION : 85 %

TONSBARGI

MONTHS

GANDHI SAGAR PENCH

Annual Report 2011-12, SLDC, MPPTCL, JBP 126

Page 131: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sale Purchase Sale Purchase Sale Purchase

1 M/s. JAYPEE REWA PLANT, REWA 01.08.07 --- --- 22.00 --- 10.00 ---

2 M/s. HEG LTD., MANDIDEEP 01.04.09 --- --- 39.50 5.00 5.00 ---

3 M/s. MARAL OVERSEAS, NIMRANI 20.11.08 --- --- 8.00 8.00 --- ---

4 M/s. MCPL, MALANPUR 01.08.07 13.00 --- 13.00 --- --- ---

5 M/s. VARDHMAN FABRICS, BUDHNI 23.06.09 6.00 --- 8.00 20.00 --- ---

6 M/s. VARDHMAN YARNS, BHOPAL 27.04.09 2.10 --- 14.00 23.00 --- ---

7 M/s. NATIONAL STEEL & AGRO LTD,GHATABILLOD 04.04.09 5.00 --- 10.00 5.00 --- ---

8 M/S.ULTRATECH CEMENT LTD 18.09.09 --- --- 15.00 13.00 --- ---

9 M/s. ACC CEMENT, KYMORE, 01.01.09 5.00 --- 5.00 --- --- ---

10 M/s. GRASIM, NAGDA 10.03.10 --- --- 22.00 28.50 --- ---

11 M/s. BIRLA CORPN. LTD., SATNA 01.08.09 --- --- 12.00 12.00 --- ---

12 M/s. JAYPEE SIDHI CEMENT PLANT, 20.04.10 --- --- 10.00 --- 10.00 ---

13 M/s Mid INDIA POWER 03.06.10 --- --- --- 4.00 --- ---

14 M/S. KAMAL SPONGE STEEL & POWER LTD .SATNA 22.12.09 --- --- --- --- --- ---

15 M/s.MPKVANL (SEZ) 01.01.11 --- --- --- --- --- 7.00

16 M/s.ABHISHEK LTD. 01.07.11 --- --- --- 7.50 --- ---

17 M/S. RITSPIN SYNTHETICS LTD. 05.08.11 --- --- --- 3.20 --- ---

18 M/s. HEG LTD., TAWA HYDRO ELECTRIC PLANT 30.11.11 --- --- 10.30 --- 13.00 ---

19 M/s.BHILAI JAYPEE CEMENT LTD. SATNA 10.10.11 --- --- --- 10.00 --- ---

20 M/S.ASN INDUSTRIES PVT.LTD (Biomass) 10.12.11 --- --- --- --- 6.50 ---

TOTAL 31.10 0.00 188.80 139.20 44.50 7.00

CONSENT / STANDING CLEARENCE / NO OBJECTION CERTIFICATE / APPROVAL FOR SHORT TERM OPEN ACCESS GIVEN TO CPPs/IPPS/OACs BY SLDC

YEAR 2011-12 Fig.in MW CONSENT FOR STOA BY SLDC

(Maximum)SL. NO NAME OF CPP TRANSACTION

STARTED BILATERAL COLLECTIVE (Through IEX)

INTRA STATE Approval Given by SLDC

(Maximum)

Annual Report 2011-12, SLDC, MPPTCL, JBP 127

Page 132: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

S. No. Name of Transmission line/ Financed by Financed by Circuit Kms Date of Completion

(A) 400kV LinesNIL

Total 400kV Lines- Circuit Length NIL(B) 220 kV Lines

1LILO of one circuit of 220kV Bina-Shivpuri line for Interconnection with 315 MVA transformer at 765/400/220kV Sub-station of PGCIL at Bina

Other Works 2x0.830 18.04.2011

2 Shifting of 220kV Sarni-Pandhurna line between location No.4 to 9 due to Coal Handling Plant ADB-II 2x1.497 06.01.2012

3 220kV Maheshwar-Pithampur line ADB-II 2x57.44 25.01.20124 220kV Malwa(TPH)-Chhegaon line New PFC 2x47.854 23.02.2012

5 LILO of 220kV Katni-Satna line at 220kV Sub-station Maihar Other Works 2x0.663 28.03.2012

10 Diversion of 400kV Jabalpur-Sukha line due to guage conversion of Jabalpur-Gondia Railway line

Consumer Contribution 2x6.18 29.07.2011

(C) 132 kV Lines

1 Modification/shifting of 132kV Vindhyachal-Waidhan line due to Stage-IV extension project VSTPP, NTPC Ltd. Singrauli

Consumer Contribution 2x6.706

27.04.11 (Ist Circuit)03.05.11 (2nd

Circuit)

2 132kV line from 220kV Kotar Sub-station to M/s Bhilai Jaypee Cement at Babupur Satna

Consumer Contribution 1x17.485 26.05.2011

3 2nd circuit of 132kV Sabalgarh-Sheopurkalan line (Part line of 2nd circuit of 132kV Jora-Sabalgarh-Sheopurkalan) ADB-II 88.966 13.07.2011

4 132kV Shahdol-Dindori line Other Works 1x61.763 28.08.2011

5 132kV Sironj-Maksudangarh line ADB-II 1x59.329 29.08.2011

6 LILO of both circuit of 132kV Betul-Multai line as I/C 220kV Betul ADB-II 2x3.752+

2x3.548 21.09.2011

7 132kV tap line of 132kV Ashta sonkakthch Power supply to M/s SEL Mehetwara (part line)

Consumer Contribution 1x1.744 5.10.2011

8 132kV DCSS line to M/s Prism Cement Satna from 220kV Sub-station Kotar

Consumer Contribution 1x22.599 23.11.2011

9132kV DCSS line from 132kV Sub-station Gadarwara to proposed 132kV Sub-station of M/s BLA Power(P) Ltd. Gadarwara

Consumer Contribution 1x7.136 01.12.2011

10 LILO 132kV Gadarwara-Pipariya line for 132kV Sub-station Bankhedi PFC 2x3.081 14.12.2011

112nd circuiting of 132kV Maihar-Amarpatan line from 220kV Sub-station to locn. No.27 and 132kV DCSS tap line for temporary supply to M/s KJS Cement

Consumer Contribution

8.09 Kms. 2nd circuit +1x0.62

Kms24.12.2011

12 River crossing of 33kV Beohari(132kV S/s) to Pand (33kV S/s) Consumer Contribution 1x0.40 01.01.2012

13 132kV Satna-Nagod line PFC 1x4.122 06.02.2012

14 LILO of both circuit of 132kV Amarkantak-Morwa line for 132kV Sub-station Rajmilan

Equity /Loan from State Govt. 4x0.9+2x0.3 24.02.2012

15 132kV Sabalgarh-Vijaypur line ADB-II 1x31.430 03.03.2012

16

132kV 2 phase 4 wire line for Power Supply to RTS Bareth (Ganjbasoda) including 2nd circuit from 132kV S/s Sironj to 132kV S/s Ganjbasoda (132kV Bina-Sironj line from Sironj to locn.No.83 and 132kV Ganjbasoda tap line)

Consumer Contribution

2x12.5862nd circuiting-60.968 Kms.)

29.03.2012

17 132kV Sidhi- Mauganj Other Works 2nd circuiting-7.30 Kms 31.03.2012

DETAILS OF COMPLETED WORKS DURING 11-12 (BY EHT CONSTN WING)

Annual Report 2011-12, SLDC, MPPTCL, JBP 128

Page 133: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sr, No. Name of Sub Station Volatge Capacity

in MVA Make Serial No. Date of Commission Capacity Added

1 220KV ASTHA 36KV 2X12 SHREEM - 01.04.11 12MVAR Capacitor bank 0

2 132KV CHICHOLI 132/33 40 ABB 12020-011 21-Apr-11 NEW S/S (Test charged on 09.04.11 at. 20:30 hrs) 40

3 220KV BADNAGAR 36KV 2X12 SHREEM - 22.04.11&29.04.11 12MVAR Capacitor bank 0

4 132KV SHAMSHABAD 132/33 40 BBL 5197/2 30-May-11 NEW S/S (Test charged on 27.05.11 at. 17:36 hrs) 40

5 132 MACT BHOPAL 132/33 63 BBL 5198/1 06-Jun-11 Augmentation (63-20)MVA (Test charged on 05.06.11 at. --:-- hrs) 43

6 132 KV REWA 132/33 40 BBL 5197/1 12-Jun-11 Additional 40MVA (Test charged on 11.06.11 19.25 Hrs) 40

7 132KV CHHEGAON MAKHAN 132/33 20 NGEF ```` 13-Jun-11 REPLACEMENT OFFAILED 20 MVA 0

8 220 KV ASTHA 220/132/33 160 BHEL(RU) 6005209 09-Jul-11 Additional 160MVA (Test charged on 01.07.11 19.28 Hrs) 160

9 220KV BETUL 36KV 12 SHREEM - 07.07.11 12MVAR Capacitor bank 0

10 132KV CHICHOLI 36KV 12 SHREEM - 12.07.11 12MVAR Capacitor bank 0

11 132 VINOBA BHAWE 132/33 63 BBL 5198/2 09-Aug-11 Augmentation (63-40)MVA (Test charged on 08.08.11, 16.22 hrs) 23

12 132KV VIJAYPUR 132/33 40 EMCO HT-1864/13198 24-Aug-11 NEW S/S (Test charged on 22.08.11 at. 14:10 hrs) 40

13 132KV DINDORI 132/33 20 TELK 120255-1 29-Aug-11 NEW S/S (Test charged on 28.08.11 at. 16:46 hrs) 20

14 132KV PITHAMPUR 132/33 40 VIJAY ELECTRICAL 90033B 02 30-Aug-11 Addl.40MVA (Test charged on

29.08.11 at. 15:15 hrs) 40

15 132 MACT BHOPAL 132/33 40 BBL 5197/03, YR 2011

26/09/2011 12.25 HRS

REPLACEMENT OF FAILED 40 MVA (25.09.11,11.40 hrs), 0

16 220KV KATNI 132/33 40 BBL 5197/04 29-Sep-11 Addl.40MVA (Test charged on 28.08.11 at. hrs) 40

17 132KV KAYMORE 132/33 40 EMCO 1864/13199 02-Nov-11 Augmentation (20-40MVA) (Test charged on 01.11.11 19:50Hrs) 20

18 132KV MULTAI 132/33 40 GEC B-25821 06-Nov-11 Augmentation (20-40MVA) (Test charged on 05.11.11 23:50Hrs) 20

19 220KV SARNI 132/33 20 NGEF 280005/3081 10-Nov-11 REPLACEMENT OF FAILED 20 MVA (09.11,11), 0

DETAILS OF EHV XMERS COMMISSIONED

New S/S220KV--1 (upgrade)

160KV--1132KV--663MVA--140MVA--420MVA--1

Aug-20-63MVA--240-63--220-40--3

Addl-160MVA--540MVA--520MVA--3

Rep-20-20MVA--3Capacity Added-220KV - 983MVA'132KV - 672MVA, TOTAL - 1165MVA

YEAR 2011-2012 Remarks

Annual Report 2011-12, SLDC, MPPTCL, JBP 129

Page 134: STATE LOAD DESPATCH CENTRE, JABALPUR REPORT MADHYA PRADESH POWER TRANSMISSION COMPANY LTD. STATE LOAD DESPATCH CENTRE, JABALPUR okf"kZd fjiksVZ 2011-2012 Phone : (+91761) 2706800,

Sr, No. Name of Sub Station Volatge Capacity

in MVA Make Serial No. Date of Commission Capacity Added

DETAILS OF EHV XMERS COMMISSIONED YEAR 2011-2012

Remarks

20 220KV HOSHANGABAD 132/33 20 BBL 1991/4 13-Nov-11 REPLACEMENT OF FAILED 20 MVA (12.11,11, 21:05), 0

21 132KV MANSAKRA 132/33 63 BBL 5198/3 09-Dec-11 Augmentation (20-63MVA) (Test charged on 08.12.11 19:30Hrs) 43

22 132KV DAMOH 132/33 40 T&R PCO-100079 01-Jan-12 Augmentation (20-40MVA) 20

23 132KV MANGLIYA 132/33 40 CGL 24790 31-Jan-12 Addl.40MVA (Test charged on 30.01.12 at. hrs) 40

24 132KV KATRA 132/33 20 GEC B-26081 04-Feb-12 Addl.20MVA (Test charged on 31.01.12 at. hrs) 20

25 132KV NAGOD 132/33 40 EMCO 1864/13201 09-Feb-12 NEW S/S (Test charged on 07.02.12 at. **:** hrs) 40

26 132KV LAKHNADON 132/33 20 BHEL 6004548 28-Feb-12 Addl.20MVA (Test charged on 27.02.12 at. 13.20 hrs)

FROM KYMORE 28/2, 15;15, 1983 20

27 132KV ARON 132/33 40 EMCO 1864/13200 28-Feb-12 Addl.40MVA (Test charged on 27.02.12 at. hrs) New, 28/2,17:10 40

28 132KV NAGOD 36KV 12 SHREEM - 28-2-12 12MVAR Capacitor bank 0

29 220KV JABALPUR 2x36KV 12 SHREEM - 07.03.12 & 16.03.12 12MVAR Capacitor bank 0

30 132KV RAJMILAN 132/33 63 VIJAY ELECTRICAL 90033 A 02 16-3-12 NEW S/S (Test charged on

05.03.12 at. 17:58 hrs) 63

31 220KV CHHEGAON 220/132/33 160 BBL 5199/2 21-Mar-12 Addl.160MVA (Test charged on 14.03.12 at. hrs) 160

32 220KV DALODA 220/132/33 160 NEW S/S (Test charged on 16.03.12 at. hrs) 0

33 132KV DINDORI 132/33 20 EMCO 1239/11292 29-3-12 Addl.20MVA (From 132KV Damoh) 20

34 220KV MAIHAR 220/132/33 160 EMCO HT-1832/13110 29-3-12 Upgraded S/S 160MVA (Test charged on 31.07.10 17.12 Hrs) 160

35 220KV MEHGAON 220/132/33 160 BBL 5261/1 30-3-12 Addl. 160MVA (Test charged on 30.07.10) 160

36 220KV SEONI 220/132/33 160 BBL 5199/01 30-3-12 Addl.160MVA (Test charged on 27.03.12 at. 16:15 hrs) 160

Total---> 1472 MVA

Annual Report 2011-12, SLDC, MPPTCL, JBP 130