State & Federal
Energy Storage Technology Advancement
Partnership (ESTAP)
Todd Olinsky-Paul
Clean Energy States Alliance
East Penn and Ecoult Battery Installation
Case Study Webinar
March 26, 2013
www.cleanenergystates.org 2
Housekeeping
All participants will be in listen-only mode throughout the broadcast.
You can connect to the audio portion of the webinar using VOIP and your computer’s speakers or USB-type headset. You can also connect by telephone. If by phone, please expand the Audio section of the webinar console to select “Telephone” to see and enter the PIN number shown on there onto your telephone keypad.
You can enter questions for today’s event by typing them into the “Question Box” on the webinar console. We will pose your questions, as time allows, following the presentation.
This webinar is being recorded and will be made available after the event on the CESA website at www.cleanenergystates.org/events/
Thank You:
Dr. Imre Gyuk U.S. Department of Energy,
Office of Electricity Delivery and Energy Reliability
Dan Borneo
Sandia National Laboratories
ESTAP is a project of CESA
Clean Energy States Alliance (CESA) is a non-profit organization providing a forum for states to work together to implement effective clean energy policies & programs:
– Information Exchange
– Partnership Development
– Joint Projects (National RPS Collaborative, Interstate Turbine Advisory Council)
– Clean Energy Program Design & Evaluations
– Analysis and Reports
CESA is supported by a coalition of states and public utilities representing the leading U.S. public clean energy programs.
ESTAP* Overview
Purpose: Create new DOE-state
energy storage partnerships and advance energy storage, with technical assistance from Sandia National Laboratories
Focus: Distributed electrical energy storage technologies
Outcome: Near-term and ongoing project deployments across the U.S. with co-funding from states, project partners, and DOE
* (Energy Storage Technology Advancement Partnership)
States Vendors Other
partners
ESTAP Key Activities
• Disseminate information to stakeholders
• ESTAP listserv >500 members
• Webinars, conferences, information updates, surveys
• Facilitate public/private partnerships at state level to
support energy storage demonstration project
development
• Match bench-tested energy storage technologies with state hosts for
demonstration project deployment
• DOE/Sandia provide $ for generic engineering, monitoring and
assessment
• Cost share $ from states, utilities, foundations, other stakeholders
Contact Information
Project website:
www.cleanenergystates.org/projects/energy-storage-technology-advancement-partnership/
CESA Project Director:
Todd Olinsky-Paul ([email protected])
Sandia Project Director:
Dan Borneo ([email protected])
Today’s Speakers
Dan Borneo, Sandia National Laboratories
Imre Gyuk, U.S. Department of Energy,
Office of Electricity Delivery and Energy Reliability
John Wood, Ecoult
Steve Willard, PNM
Webinar recording will be available at
www.cleanenergystates.org/events/
John Wood
Powered by Deka UltraBattery®
Separator
Pb PbO2
Lead-Acid Cell
+ - Separator
PbO2 Carbon Electrode
Asymmetric Supercapacitor
- +
i i1
i2 + -
UltraBattery® Technology
Market Size: $3.5B
Motive Battery
Market Size: $6B
Standby Battery
New Lead-Acid Market
PSOC UltraBattery
Market Size: $15B
Starter Battery
State of Charge
1881
0%
100% 80%
20%
1960 1980 Today
The New Dimension in a Lead Acid World
State of Charge
The New Dimension in a Lead Acid World
High Efficiency in Partial State of Charge Use
UltraBattery®: highly efficient & high longevity
Lower Efficiency & higher rate of degradation
Lower Efficiency and higher rate of degradation.
20%
80%
93% – 95% DC to DC
100%
0%
Wind Solar Renewables Variability Management
Regulation Services Grid Ancillary Services
Regulation Services
East Penn Manufacturing
BESS Master Controller
4 x UltraBattery® strings 900 kW
Inverter 3.6 MW BES System for 3MW of Frequency Regulation
3 MW Frequency Regulation Installed at EPM
13.8 kV
PJM Frequency Regulation Project
PJM Request and BESS Response for Aug 30, 2012
Pow
er (M
W)
Neg
ativ
e fo
r Cha
rge
& P
ositi
ve fo
r Disc
harg
e
3:00:00 6:00:00 9:00:00 12:00:00 15:00:00
PJM Request (MV) BESS Response(MV) 4
3
2
1
0
-1
-2
-4
-3
Accuracy of Signal
String Voltages – Aug 30, 2012
Strin
g Vo
ltage
(V)
1200
1100
900
800
1000
String 1 (V) String 2 (V) String 3 (V) String 4 (V)
3:00:00 6:00:00 9:00:00 12:00:00 15:00:00
Voltage
String SOC – Aug 30, 2012
SOC
60
55
50
45
40
String 1 (%) String 2 (%) String 3 (%) String 4 (%)
3:00:00 6:00:00 9:00:00 12:00:00 15:00:00
State of Charge
PJM Energy Storage System – Power Rating
Energy (10 hr Rate - 100% Capacity) 5.0 MWh
Energy (Capacity at Rated Power - 100% Capacity) 2.2 MWh
Used Partial State of Charge Energy Band 0.5 MWh
Daily MWh Mileage (Charge + Discharge) per MW ≈ 6.5
Full Capacity Turnovers Per Day Normalized to 10 hr Rate ≈ 4
Total MWh Mileage (Charge + Discharge) to Date 1.3 GWh
Throughput for Last Week 100 MWh
Total Number of Hours of 1MW Regulation Service Supplied to PJM 4930
PJM Energy Storage System – Power Rating
Average Price Recently ≈ $35/hr
Average PJM Score ≈ 96.90%
DC-DC Efficiency (Rate Dependent) ≈ 92%
AC-AC Efficiency ≈ 84%
Parasitic Losses ≈ 3%
Current Average Operational Availability (2 Days in 60
Allocated for Maintenance Activities) ≈ 96%
Wind Solar Renewables Variability Management
Regulation Services Grid Ancillary Services
Solar Smoothing & Shifting/Firming
1MW Grid-Tied Inverter
Power Smoothing –Containerized VRLA UltraBattery Cells
Peak Shifting –Containerized Advanced Carbon Synergy Battery Cells
500kW DC Converter with Power Regulator
250kW DC Converter with Power Regulator
500kWp Solar PV Array
500kW Central Inverter
12.47 kV BESS Master
Controller
of PNM Prosperity Project Energy Storage System
-400
-200
0
200
400
600
2/16/2013 6:00:00 AM 2/16/2013 6:00:00 PM 2/17/2013 6:00:00 AM 2/17/2013 6:00:00 PM
PNM Prosperity Project – PV Firming & Simultaneous Smoothing Example (Feb 2013)
Primary Meter Battery Meter
PV Meter
-200
-100
0
100
200
300
400
500
2/17/2013 6:00:00 AM
PV Meter Primary Meter
Battery Meter
Closer Look at the Smoothing during PV Intermittency
PNM Energy Storage System – Power Rating Smoothing Shifting
Energy (10 hr Rate - 100% Capacity) 1 MWh
Used Partial State of Charge Energy Band 300 kWh
Daily MWh Mileage (Charge + Discharge) per MW ≈ 0.2
Total MWh Mileage (Charge + Discharge) to Date 50 MWh
Throughput for Last Week 1.25 MWh
3.0 MWh
1 MWh
≈ 0.5-1.0
250 MWh
11 MWh
PNM Prosperity Project Energy Storage System
Wind Solar Renewables Variability Management
Regulation Services Grid Ancillary Services
Wind Smoothing
Power Smoothing –Containerized VRLA UltraBattery Cells (2 x CUBS)
1MW DC Converter with Power Regulator
1MW Grid-Tied Inverter
BESS Master
Controller
BES SYSTEM SUPPLIED BY EPM/ECOULT
660 kW WIND TURBINE
11 kV
Of Hampton Wind Farm Energy Storage System
Of Wind Output and Ramp Rate Reduction
Hampton Energy Storage System – Power Rating
Energy (10 hr Rate - 100% Capacity) 1 MWh
Energy (Capacity at Rated Power - 100% Capacity) 500 kWh
Used Partial State of Charge Energy Band 400 kWh
Ecoult UltraBattery® Test: Dual Purpose Regulation Services and UPS Event
20
22
24
26
28
30
150
200
250
300
0 2000 4000 6000 8000 10000 12000 14000 16000
Time (seconds)
Ahr Volts
Set Up Regulation Services UPS
Test Results
Market Size: $3.5B
Motive Battery
Market Size: $6B
Standby Battery
New Lead-Acid Market
PSOC UltraBattery
Market Size: $15B
Starter Battery
State of Charge
1881
0%
100% 80%
20%
1960 1980 Today
The New Dimension in a Lead Acid World
John Wood, CEO Ecoult www.ecoult.com
John Wood
Powered by Deka UltraBattery®