1-1. Overview of the subdrain water treatment facilities. Water treatment facilities including subdrain consist of water collecting equipment, purification equipment, and transfer equipment.
Subdrain water collecting equipmentEquipment to pump up groundwater from subdrain pits installed around the turbine buildings of Units 1 to 4 and the water collecting equipment (groundwater subdrain) to be installed inside the impermeable wall on the seaside.
Subdrain purification equipmentEquipment to remove existing radioactive nuclides (except for tritium) contained in pumped up groundwater to the lowest concentration possible.
Subdrain transfer equipmentEquipment to transfer the treated water having undertaken sampling during storage in a tank.
Water collecting tank
PSubdrain and
groundwater drain of Units 1 to 4
Water collecting
tank/ transfer pump Sampling tank
Adsorption tower
Pre-treatment
filterAdsorption
tower
・・・
Pre-treatment
filterPurified water transfer pumpTreatment
equipment Supplying tank
P
*1
Subdrain purification equipment
Subdrain water collecting equipment
Subdrain purification equipment
Subdrain transfer equipment
Designed flow: 1,200m3/ day/ system
Start of the verification test for purifying performance of the subdrain water treatment facilities at Fukushima Daiichi Nuclear Power Station
August 11, 2014Tokyo Electric Power Company
*1 Where to be transferred will be reflected on once the specific design is determined.
2
Layout of components in the subdrain purification equipment building.
1-2. Layout of subdrain water treatment facilities
Subdrain purification equipment
Main anti-earthquake bldg.
Subdrain water collecting equipment
At the location of O.P.+40m, subdrain purification equipment building (approx. 46 m x approx. 32 m) will be built.
Subdrain transfer equipment
3
2-1. Verification test for purifying performance
PurposeIn response to a partial completion of the subdrain water treatment facilities, a test* to verify the performance of removing radioactive nuclides (except for tritium) will be performed on the actual equipment. (* Verification test for purifying performance)
Actions [1] Pump up groundwater from the 14 subdrain pits having been installed to be mixed in the
water collecting tank. [2] Verify the removal competence by comparing two concentrations of radioactive nuclides
sampled respectively at the inlet and the outlet of the subdrain purification equipment. [3] Treated water having passed through the purification equipment will be stored in the
sampling tank located at the downstreem.
4
2-2. Verification test for purifying performance (subdrain water collecting equipment)
Equipment to use for verification test for purifying performance (outlined in red) Subdrain pit 14 pits (14 out of 42) Relaying tank 2 tanks (2 out of 5) Water collecting tank 1 tank (1 out of 3)
:既設ピット
:新設ピット
:中継タンク、中継タンク移送ポンプ
:配管
:配管(浄化性能確認試験にて使用)
集水タンク
中継タンク①
中継タンク②
中継タンク③中継タンク④
中継タンク⑤
#1 T/B
#1R/B #2
R/B
#2 T/B
#3R/B
#3 T/B
#4R/B
#4 T/B
Water collecting tank
Relaying tank [2]
Relaying tank [1]
Relaying tank [5]
Relaying tank [4]Relaying tank [3]
Newly installed pit
Existing pit
Relaying tank/ transfer pump bet. relaying tanks
Pipe line (used for the verification testPipe line
5
2-3. Verification test for purifying performance (scope of use)
Equipment to use for verification test for purifying performance (Outlined in red) Subdrain purification equipment 1 system (B system, 1 out of two) Sampling tank 1 tank (1 out of 8)
集水タンク
前処理フィルタ
サブドレン他浄化装置
吸着塔
前処理フィルタ
吸着塔
P
処理装置
供給タンク
P
処理装置
供給ポンプ
P1B 2B 3B 4B
処理装置
加圧ポンプ
1B 2B 3B 4B 5B
1A 2A 3A 4A P 1A 2A 3A 4A 5AP P
サブドレン他移送設備サブドレン集水設備
・・・
浄化水移送
ポンプ
P
P
P P
浄化水攪拌
ポンプ
P
P
*1 Under designing for where to be transferred.
Water collecting tank
Pre-treatmentFilter
Subdrain purification equipment
Adsorption tower
Pre-treatmentFilter Adsorption tower
Water collecting tankTransfer pump
P
Treatment deviceSupplying pumo
P P1B 2B 3B 4B 1B 2B 3B 4B 5B
1A 2A 3A 4A P 1A 2A 3A 4A 5AP P
Subdrain purification equipment Subdrain transfer equipmentSubdrain water collecting equipment
Sampling tank
・・・
Treated water transfer pump
P
P
P P
Treated watersteering pump
P
P
*11~4号機サブドレンピット
P
P P P P P
Relaying tank
Units 1 to 4Subdrain pit
P
PP PP PP PP PP Relaying tankTransfer pump
Treatment devicePressure pump
Treatment deviceSupplying tank
6
3-1 Overall schedule
Subdrain purification equipment
Subdrain pipe line,Relaying/water collecting tanks
SubdrainExisting pit
SubdrainNewly installed pit
62015
109875432112111098
Sub
drai
n w
ater
col
lect
ing
equi
pmen
t
Major process
2014
Excavation for new pit installation
Floating article removal form existing pits
Demolition of fixed facilities and installation of foundation, pipe line and tanks
Start up construction▼
Preparatory work
Yard preparation (rubble removal, etc.)
(Water investigation)
Bldg.
Note: The schedule is subject to change in the course of adjustment with construction works.
Passing water examinationFacilities
Site preparation Foundation Steel frame, exterior walls, roof Finish up
Subdrain transfer equipment
Purification equipment installation
Transfer equipment installation/passing water examination
Filed implementation plan 12/18▼
Groundwater drain
Excavation for new pit installation
Pipe/tank installation
Approved implementation plan(Subdrain water collecting equipment
and purification equipment)8/6▼
Start up pumping up groundwater8/12▽
7
3‐2. Schedule on Verification test for purifying performance (incl. analysis)
June July August September October to
Beg. Mid. Late Beg. Mid. Late Beg. Mid. Late Beg. Mid. Late
The whole
Before‐use Inspection
Water collecting/purification equipment
Analysis *
Installation works (System B)
Passing water examination with filtered water
▽8/20 Verification test for purifying performance
Analysis (Cs, gross β, and H‐3)
Detailed analysis (in‐house)
Detailed analysis (external, third parties)
Installation works (System A)
PPPWater
collecting tank
Water collecting tank
Transfer pump
Supplying tank
Treatment device
Supplying pump
Pre‐treatmentfilter
Treatment device
Pressure pump
Adsorbent Sampling tank
Water collecting equipment
Purification equipment
Water collecting equipmentexamination range for passing
water with filtered waterPurification equipment
examination range for passing water with filtered water
Scope of verification test for purifying performance
1200m3 1200m3
P PRelayingtank
Relaying tankTransfer pump
12m3 30m3
▽8/12 Start up of groundwater pump up from subdrain pits
▼ Implementation plan approved on 8/6
+ analysis results will be reported in an timely manner.
8
[Reference] Subdrain purification equipment
System composition outline
Floa
ting
artic
les
rem
oval
Pre-treatment filter
Subdrain/ groundwater drain of
Units 1 to 4 Cs
roug
h re
mov
al
Sr R
ough
rem
oval
Cs/
Sr a
dsor
bent
Cs/
Sr a
dsor
bent
Cs/
Sr a
dsor
bent
Sb
abso
rben
t
Hea
vy m
etal
ads
orbe
nt
Treatment device
Supplying tank Floa
ting
artic
les
rem
oval
Pump
Pump
Adsorbent tower
To s
ampl
ing
tank
s
Subdrain purification equipmentSubdrain water collecting equipment
Bird’ eye view (Image)
The same with the system mentioned above.
1 2 3 4 1 2 3 4 5
*1 Filter which absorbs Cs or Sr, or both of Cs and Sr depending on water quality.Verification test for purifying performance is planned to follow the below composition of towers.
1st tower: Sr adsorbent2nd tower: Sr adsorbent3rd tower: Cs&Sr adsorbent
Water collecting tank
*1*1*1
9
[Reference] Main conditions/ specifications for subdrain water treatment facilities
*1 Index indicating a degree to which radioactive materials (contamination sources) are removed through decontamination treatment.*2 Estimated value for major nuclides
Item Contents
Design throughput (100% flow)
1,200m3/day X 2 systems (purification facilities)
Radioactive concentration
at the exit of facilities
Cs-137: 1Bq/L or less *2
Sr-90 : 1Bq/L or less *2
Decontamination coefficient *1
Cs-137: 104 or more *2
Sr-90 : 103 or more *2
Seismic class Class B
10
[Reference] Installation construction of subdrain water treatment facilities
Newly installed subdrain pit N1 (excavation completed) No 1 relaying tank installation
Inside the building Sampling tank installation
Water collecting tank installation
Exterior of the building (Southeast side)