10
1 1-1. Overview of the subdrain water treatment facilities. Water treatment facilities including subdrain consist of water collecting equipment, purification equipment, and transfer equipment. Subdrain water collecting equipment Equipment to pump up groundwater from subdrain pits installed around the turbine buildings of Units 1 to 4 and the water collecting equipment (groundwater subdrain) to be installed inside the impermeable wall on the seaside. Subdrain purification equipment Equipment to remove existing radioactive nuclides (except for tritium) contained in pumped up groundwater to the lowest concentration possible. Subdrain transfer equipment Equipment to transfer the treated water having undertaken sampling during storage in a tank. Water collecting tank P Subdrain and groundwater drain of Units 1 to 4 Water collecting tank/ transfer pump Sampling tank Adsorption tower Pre- treatment filter Adsorption tower Pre- treatment filter Purified water transfer pump Treatment equipment Supplying tank P *1 Subdrain purification equipment Subdrain water collecting equipment Subdrain purification equipment Subdrain transfer equipment Designed flow: 1,200m 3 / day/ system Start of the verification test for purifying performance of the subdrain water treatment facilities at Fukushima Daiichi Nuclear Power Station <Reference> August 11, 2014 Tokyo Electric Power Company *1 Where to be transferred will be reflected on once the specific design is determined.

Start of the verification test for purifying performance of the ......Subdrain water collecting equipment Major process 2014 Excavation for new pit installation Floating article removal

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • 1

    1-1. Overview of the subdrain water treatment facilities. Water treatment facilities including subdrain consist of water collecting equipment, purification equipment, and transfer equipment.

    Subdrain water collecting equipmentEquipment to pump up groundwater from subdrain pits installed around the turbine buildings of Units 1 to 4 and the water collecting equipment (groundwater subdrain) to be installed inside the impermeable wall on the seaside.

    Subdrain purification equipmentEquipment to remove existing radioactive nuclides (except for tritium) contained in pumped up groundwater to the lowest concentration possible.

    Subdrain transfer equipmentEquipment to transfer the treated water having undertaken sampling during storage in a tank.

    Water collecting tank

    PSubdrain and

    groundwater drain of Units 1 to 4

    Water collecting

    tank/ transfer pump Sampling tank

    Adsorption tower

    Pre-treatment

    filterAdsorption

    tower

    ・・・

    Pre-treatment

    filterPurified water transfer pumpTreatment

    equipment Supplying tank

    P

    *1

    Subdrain purification equipment

    Subdrain water collecting equipment

    Subdrain purification equipment

    Subdrain transfer equipment

    Designed flow: 1,200m3/ day/ system

    Start of the verification test for purifying performance of the subdrain water treatment facilities at Fukushima Daiichi Nuclear Power Station

    August 11, 2014Tokyo Electric Power Company

    *1 Where to be transferred will be reflected on once the specific design is determined.

  • 2

    Layout of components in the subdrain purification equipment building.

    1-2. Layout of subdrain water treatment facilities

    Subdrain purification equipment

    Main anti-earthquake bldg.

    Subdrain water collecting equipment

    At the location of O.P.+40m, subdrain purification equipment building (approx. 46 m x approx. 32 m) will be built.

    Subdrain transfer equipment

  • 3

    2-1. Verification test for purifying performance

    PurposeIn response to a partial completion of the subdrain water treatment facilities, a test* to verify the performance of removing radioactive nuclides (except for tritium) will be performed on the actual equipment. (* Verification test for purifying performance)

    Actions [1] Pump up groundwater from the 14 subdrain pits having been installed to be mixed in the

    water collecting tank. [2] Verify the removal competence by comparing two concentrations of radioactive nuclides

    sampled respectively at the inlet and the outlet of the subdrain purification equipment. [3] Treated water having passed through the purification equipment will be stored in the

    sampling tank located at the downstreem.

  • 4

    2-2. Verification test for purifying performance (subdrain water collecting equipment)

    Equipment to use for verification test for purifying performance (outlined in red) Subdrain pit 14 pits (14 out of 42) Relaying tank 2 tanks (2 out of 5) Water collecting tank 1 tank (1 out of 3)

    :既設ピット

    :新設ピット

    :中継タンク、中継タンク移送ポンプ

    :配管

    :配管(浄化性能確認試験にて使用)

    集水タンク

    中継タンク①

    中継タンク②

    中継タンク③中継タンク④

    中継タンク⑤

    #1 T/B

    #1R/B #2

    R/B

    #2 T/B

    #3R/B

    #3 T/B

    #4R/B

    #4 T/B

    Water collecting tank

    Relaying tank [2]

    Relaying tank [1]

    Relaying tank [5]

    Relaying tank [4]Relaying tank [3]

    Newly installed pit

    Existing pit

    Relaying tank/ transfer pump bet. relaying tanks

    Pipe line (used for the verification testPipe line

  • 5

    2-3. Verification test for purifying performance (scope of use)

    Equipment to use for verification test for purifying performance (Outlined in red) Subdrain purification equipment 1 system (B system, 1 out of two) Sampling tank 1 tank (1 out of 8)

    集水タンク

    前処理フィルタ

    サブドレン他浄化装置

    吸着塔

    前処理フィルタ

    吸着塔

    P

    処理装置

    供給タンク

    P

    処理装置

    供給ポンプ

    P1B 2B 3B 4B

    処理装置

    加圧ポンプ

    1B 2B 3B 4B 5B

    1A 2A 3A 4A P 1A 2A 3A 4A 5AP P

    サブドレン他移送設備サブドレン集水設備

    ・・・

    浄化水移送

    ポンプ

    P

    P

    P P

    浄化水攪拌

    ポンプ

    P

    P

    *1 Under designing for where to be transferred.

    Water collecting tank

    Pre-treatmentFilter

    Subdrain purification equipment

    Adsorption tower

    Pre-treatmentFilter Adsorption tower

    Water collecting tankTransfer pump

    P

    Treatment deviceSupplying pumo

    P P1B 2B 3B 4B 1B 2B 3B 4B 5B

    1A 2A 3A 4A P 1A 2A 3A 4A 5AP P

    Subdrain purification equipment Subdrain transfer equipmentSubdrain water collecting equipment

    Sampling tank

    ・・・

    Treated water transfer pump

    P

    P

    P P

    Treated watersteering pump

    P

    P

    *11~4号機サブドレンピット

    P

    P P P P P

    Relaying tank

    Units 1 to 4Subdrain pit

    P

    PP PP PP PP PP Relaying tankTransfer pump

    Treatment devicePressure pump

    Treatment deviceSupplying tank

  • 6

    3-1 Overall schedule

    Subdrain purification equipment

    Subdrain pipe line,Relaying/water collecting tanks

    SubdrainExisting pit

    SubdrainNewly installed pit

    62015

    109875432112111098

    Sub

    drai

    n w

    ater

    col

    lect

    ing

    equi

    pmen

    t

    Major process

    2014

    Excavation for new pit installation

    Floating article removal form existing pits

    Demolition of fixed facilities and installation of foundation, pipe line and tanks

    Start up construction▼

    Preparatory work

    Yard preparation (rubble removal, etc.)

    (Water investigation)

    Bldg.

    Note: The schedule is subject to change in the course of adjustment with construction works.

    Passing water examinationFacilities

    Site preparation Foundation Steel frame, exterior walls, roof Finish up

    Subdrain transfer equipment

    Purification equipment installation

    Transfer equipment installation/passing water examination

    Filed implementation plan 12/18▼

    Groundwater drain

    Excavation for new pit installation

    Pipe/tank installation

    Approved implementation plan(Subdrain water collecting equipment

    and purification equipment)8/6▼

    Start up pumping up groundwater8/12▽

  • 7

    3‐2. Schedule on Verification test for purifying performance (incl. analysis)

    June July August September October to 

    Beg. Mid. Late Beg. Mid. Late Beg. Mid. Late Beg. Mid. Late

    The whole

    Before‐use Inspection

    Water collecting/purification equipment

    Analysis *

    Installation works (System B)

    Passing water examination with filtered water

    ▽8/20 Verification test for purifying performance

    Analysis (Cs, gross β, and H‐3)

    Detailed analysis (in‐house)

    Detailed analysis (external, third parties)

    Installation works (System A)

    PPPWater 

    collecting tank

    Water collecting tank

    Transfer pump

    Supplying tank

    Treatment device

    Supplying pump

    Pre‐treatmentfilter

    Treatment device

    Pressure pump

    Adsorbent Sampling tank

    Water collecting equipment

    Purification equipment

    Water collecting equipmentexamination range for passing 

    water with filtered waterPurification equipment

    examination range for passing water with  filtered water

    Scope of verification test for purifying performance

    1200m3 1200m3

    P PRelayingtank

    Relaying tankTransfer pump

    12m3 30m3

    ▽8/12  Start up of groundwater pump up from subdrain pits

    ▼ Implementation plan approved on 8/6

    + analysis results will be reported in an timely manner.

  • 8

    [Reference] Subdrain purification equipment

    System composition outline

    Floa

    ting

    artic

    les

    rem

    oval

    Pre-treatment filter

    Subdrain/ groundwater drain of

    Units 1 to 4 Cs

    roug

    h re

    mov

    al

    Sr R

    ough

    rem

    oval

    Cs/

    Sr a

    dsor

    bent

    Cs/

    Sr a

    dsor

    bent

    Cs/

    Sr a

    dsor

    bent

    Sb

    abso

    rben

    t

    Hea

    vy m

    etal

    ads

    orbe

    nt

    Treatment device

    Supplying tank Floa

    ting

    artic

    les

    rem

    oval

    Pump

    Pump

    Adsorbent tower

    To s

    ampl

    ing

    tank

    s

    Subdrain purification equipmentSubdrain water collecting equipment

    Bird’ eye view (Image)

    The same with the system mentioned above.

    1 2 3 4 1 2 3 4 5

    *1 Filter which absorbs Cs or Sr, or both of Cs and Sr depending on water quality.Verification test for purifying performance is planned to follow the below composition of towers.

    1st tower: Sr adsorbent2nd tower: Sr adsorbent3rd tower: Cs&Sr adsorbent

    Water collecting tank

    *1*1*1

  • 9

    [Reference] Main conditions/ specifications for subdrain water treatment facilities

    *1 Index indicating a degree to which radioactive materials (contamination sources) are removed through decontamination treatment.*2 Estimated value for major nuclides

    Item Contents

    Design throughput (100% flow)

    1,200m3/day X 2 systems (purification facilities)

    Radioactive concentration

    at the exit of facilities

    Cs-137: 1Bq/L or less *2

    Sr-90 : 1Bq/L or less *2

    Decontamination coefficient *1

    Cs-137: 104 or more *2

    Sr-90 : 103 or more *2

    Seismic class Class B

  • 10

    [Reference] Installation construction of subdrain water treatment facilities

    Newly installed subdrain pit N1 (excavation completed) No 1 relaying tank installation

    Inside the building Sampling tank installation

    Water collecting tank installation

    Exterior of the building (Southeast side)